1. Contract for MaterialMaterial provided under separate
Contract and delivered to Bihac Water Utility.WU has received
material in total value of 741.000EUR:- Service Line Pipe material
(PE80, PN10, OD25-50) 14.100m;- City Network Pipe material (PE100,
PN16, OD63-250) -13.212m;-Transmission Main DI DN300, PN16 Pipe
material 1.222m- In addition all Pipe fittings, 830nr Service
valves, 330nr Gate valves, 30 Hydrants, 3.000nr Water Meters, 100nr
Bulk Water Meters were provided by the Project
2. STEEL FLANGED TEESWATER METERS 3.000NR
3. VARIOUS MATERIALDI DN300 PAM UNIVERSAL PIPES (PN16)
1.222M
4. SERVICE LINES PE80, PN10 PIPE MATERIAL (OD25-50,
L=14.100M)PIPE MAIN PE100, PN16 PIPE MATERIAL (OD63-250, L=
13.212M)
5. Projects Sign Board
6. Project Scope of Works:o Project Zone 1: Replacement of
existing pipes by construction of new PE-HD pipes, OD 63 with total
length 1151m, OD 90 with a total length 195m, OD 180 with a total
length 721m, OD 250 with total length 97m. Construction of approx.
470 new house connections along and to the already new installed
line PE DN200/PE DN100/PE DN50 (=OD250/OD 125/OD63); including
disconnection of old lines and house connections.o Project Zone 4:
Replacement of existing pipes by construction of new PE-HD pipes,
OD 63 with total length 707m, OD 90 with total length 476m, OD 125
with total length 364m, OD 180 with total length 1814m.
Construction of approx. 270 new house connections along and to the
already new installed line PE DN200/PE DN100/PE DN50 (=OD250/OD
125/OD63); including disconnection of old lines and house
connections.o Project Zone 5: Replacement of existing pipes by
construction of new PE-HD pipes, OD 63 with total length 532m, OD
125 with total length 970m, OD 250 with total length 3.774m.
Construction of approx. 231 new house connections along and to the
already new installed line PE DN200/PE DN100/PE DN50 (=OD250/OD
125/OD63); including disconnection of old lines and house
connections.o Project Zone 10: Replacement of existing pipes by
construction of new PE-HD pipes, OD 63 with total length 140m, OD
125 with a total length 931m, Construction of approx. 150 new house
connections along and to the already new installed line PE DN200/PE
DN100/PE DN50 (=OD250/OD 125/OD63); including disconnection of old
lines and house connections.
7. Zones 1, 4, 5 & 10 City NetworkIn Total installed:City
Network Pipelines (PE100, PN16):OD63 2.371m;OD90 1.229m;OD125
1.069m;OD180 2.331m;OD225 437m;OD250 1.241mTotally installed 8.678m
of main pipelines with 670 associated House Connections
8. PIPE WELDING
9. HOUSE CONNECTIONS DIAMETERS OD25-50, 670NR IN ~10.000M
LENGTH
10. PIPE SADDLE HOUSE CONNECTIONSBRANCH GATE VALVE
11. PRESSURE TESTING (EN805)HYDRANT INSTALLATION (IN TOTAL 20
UNDERGROUND HYDRANTS INSTALLED)
12. HOUSE CONNECTION (SERVICE LINE) WITH PIPE SADDLE AND
VALVEABOVE-GROUND HYDRANTS (3NR INSTALLED)
13. UNDERGROUND HYDRANTSUNDERGROUND HYDRANTS
14. PIPE TRENCH BACKFILLING COMPACTION (PLATE LOAD TEST PER
DIN18134)PIPE MARKING TAPE
15. HOUSE CONNECTIONS TO WATER METER LOCATION (3.000NR WATER
METERS AND ASSOCIATED FITTINGS PROVIDED FOR WATER UTILITY)HOUSE
CONNECTIONS TO WATER METER LOCATION
16. TRENCH COMPACTIONPLATE LOAD TEST ON TRENCH AREAS(AS PER DIN
18134 / NORM B4417)
17. Zone 8 New WS RC Tank Debeljaca (700m3)The new RC water
reservoir constructed app. 100 m north of the old reservoir. The
maximum operating water level is at a height of 293,00masl, the
minimum water level is at a height of 288,50masl.In the first stage
only one chamber of the reservoir with a volume of 700m will be
constructed. The walls and the piping built in a manner that an
extension in the future with further 700m is possible without any
changing.
18. ELECTRO MAGNETIC FLOW METER PROMAG 50W
19. ELECTRIC ACTUATOR
20. SCADA CONTROL CABINETAUTOMATIC AIR VALVE
21. Zone 8 Feeder Line DI DN300, L=332mGravity feed Feeder Line
DI DN300 from new RC Tank Debeljaca to Flow Control Chamber
22. CONNECTION TO RC TANK DEBELJACACONNECTION TO FLOW METER
CHAMBER
23. Zone 8 Flow Control ShaftThe flow control shaft constructed
250m north of the New Debeljaca Reservoir at the feeder line to the
distribution network.
24. BASE SLAB REINFORCING WORKSDI PIPE PENETRATION THROUGH THE
WALL
25. WALL REINFORCEMENT WORKSROOF SLAB REINFORCEMENT WORKS
26. HYDRO-INSULATIONFLOW EL.CONTROL VALVE BERMARD MODEL
718-03
27. Zone 9 Transmission Main Ductile Iron PipelineThe Project
Zone 9 is presenting the transmission main from Privlica Pumping
Station to the New Debeljaca Reservoir.The connection realized with
a pressure DI pipe with a diameter of DN300mm. In parallel a data
cable connection from Privlica Pumping Station to Debeljaca
Reservoir shall be laid.DI DN300; PN16, L=826m
28. PIPE MATERIAL:PAM UNIVERSAL DI DN300, PN16TITANIUM SIT -
JOINTS
29. CONNECTION OF DI PIPESTITANIUM SIT - JOINTS
30. PRESSURE TESTING ANCHORING THE PIPE-ENDSANALOG &
DIGITAL PRESSURE GAUGES, TESTING AS PER EN805 STANDARD
31. Zone 9 Transmission Main Drain Valve
32. SUPPLY AND INSTALL AN OIL-IMMERSED TRANSFORMER10 KV/ 0.4
KV, RATED 1,000 KVA, INCLUDING ALL AUXILIARIES AND PROTECTION
EQUIPMENT.TYPE: KBTS-1-VP 10(20)/0,4KV, 1X1000KVA (EN61330)
33. EL. MAG. FLOW METER ENDRESS+HAUSER PROMAG 50 WDN350,
PN16
34. ELECTRO MAGNETIC FLOW METER ENDRESS+HAUSER PROMAG 50 W,
DN250, PN16
35. Remaining BudgetOut of the remaining Budget the following
items have been provided for WU:- Vehicle VW Van 2,5 TDI;- Leak
Detection Equipment:Woltex Water Meters (3nr DN100, 200, 300)Geofon
Guterman (2nr)Measuring Wheel M10 (2nr)SEWAD 30-s digital pressure
logger (2nr)Kit for SEWAD 30-s (1nr)GPS/GIS Magellan Mobile Mapper
6 (1nr)FUJI Metal Locator F-90M (2nr)In total:Contract for Material
741.085,28Contract for Works 1,258,872.74Total Value:
1,999,958.02Total Project Budget: 2,000,000.00