Upload
others
View
2
Download
0
Embed Size (px)
Citation preview
October 5th 2018IROS, Madrid
Recent advances in underwater manipulation within the DexROV project
Recent advances in underwater manipulation within the DexROV project
Gianluca AntonelliISME & University of Cassino
http://pages.unicas.it/gianluca-antonelliwww.isme.unige.it
October 5th 2018IROS, Madrid
2
European project funded by the Horizon2020 scheme
October 5th 2018IROS, Madrid
3
• Nodes:● Ancona● Bologna● Cassino● Cosenza● Firenze● Genova● Lecce● Pisa● Roma Sapienza
October 5th 2018IROS, Madrid
DexROV concept
4
October 5th 2018IROS, Madrid
5
DexROV concept, a closer view
October 5th 2018IROS, Madrid
The exoscheleton and virtual reality
6
developed by SpaceApps
October 5th 2018IROS, Madrid
The exoscheleton and virtual reality
7
October 5th 2018IROS, Madrid
8
developed by Idiap(http://calinon.ch)
Cognitive engine
October 5th 2018IROS, Madrid
9
Cognitive engine
October 5th 2018IROS, Madrid
Vehicle-arm control
10
developed by ISME (Cassino, Genova & Lecce nodes)
October 5th 2018IROS, Madrid
Set-based-task-priority Inverse Kinematics
11
October 5th 2018IROS, Madrid
Tasks classification
12
Mechanical joint limitsObstacle avoidance
Virtual wallsSelf-hits
Set-based, safety-related tasks
e.e. positione.e. orientation
Mission-oriented tasks
ManipulabilityField of view
Directional sensorsOptimization tasks
PRIORITY
(inerithed by similar work done at POLIMI or DLR)
October 5th 2018IROS, Madrid
Admittance within set-based-task-priority
13
Off-the-shelf dynamic controller (vehicle, arm & hand)
Whole-body kinematic controlInteraction control loop
low levelcontroller
+set-basedtask-priorityimpedance
October 5th 2018IROS, Madrid
The Hardware
14
Comex+GT+Jacobs
October 5th 2018IROS, Madrid
The Hardware
15
October 5th 2018IROS, Madrid
16
The Hardware
October 5th 2018IROS, Madrid
17
The valve
• configuration-dependent spring
October 5th 2018IROS, Madrid
18
The valve
October 5th 2018IROS, Madrid
Dry tests
19
Autonomous compensation of the tracking errors
October 5th 2018IROS, Madrid
Dry tests
20
Admittance loop tuning
October 5th 2018IROS, Madrid
21
October 5th 2018IROS, Madrid
The turn valve operation
22
june 2018
• 30m depth• 1 arm + grabber configuration• dummy hand :( • Tested pipeline
● exoscheleton● learning node● satellite comm● vision● reconstruction node● inverse kinematics
● full implementation: admittance, safety, e.e position-orientation
• operation repeated• crash tests with intentional impact tested
Marseille
Zaventem
October 5th 2018IROS, Madrid
Onboard-view video of the results
23
October 5th 2018IROS, Madrid
Integration
24
• few weeks of full HW at disposal• hard work of partial preliminary integration
October 5th 2018IROS, Madrid
25
THANKS