Page 1: Denitrification Improvement Alternative Evaluation for Hilton ......Denitrification Improvement Alternative Evaluation for Hilton Head Public Service District using Extensive BNR Modeling

Denitrification Improvement Alternative Evaluation for Hilton Head Public Service District using Extensive BNR Modeling and Process Optimization

Don Lee, Ph.D., P.E.Senior Wastewater Process EngineerProject ManagerAECOMGreenville SC

Page 2: Denitrification Improvement Alternative Evaluation for Hilton ......Denitrification Improvement Alternative Evaluation for Hilton Head Public Service District using Extensive BNR Modeling

OutlineIntroduction Wastewater Characterization and Capacity Assessment

Flows and loads characterizationsUnit process treatment capacity assessment

Denitrification Improvement Alternative Evaluation Alternative Development Evaluation with Extensive Modeling and OptimizationOpinions of Probable Construction Costs

Summary, Conclusions, and Q&A

Page 3: Denitrification Improvement Alternative Evaluation for Hilton ......Denitrification Improvement Alternative Evaluation for Hilton Head Public Service District using Extensive BNR Modeling

OutlineIntroduction Wastewater Characterization and Capacity Assessment

Flows and loads characterizationsUnit process treatment capacity assessment

Denitrification Improvement Alternative Evaluation Alternative Development Evaluation with Extensive Modeling and OptimizationOpinions of Probable Construction Costs

Summary, Conclusions, and Q&A

Page 4: Denitrification Improvement Alternative Evaluation for Hilton ......Denitrification Improvement Alternative Evaluation for Hilton Head Public Service District using Extensive BNR Modeling

Denitrification Improvement Alternative Evaluation for Hilton Head PSD

INTRODUCTIONHilton Head PSD Reclaimed Water Plant

6.4 MGD activated sludge plant

Golf course irrigation + surface water discharge

Currently treating 2.5 MGD average

EQ Basins

Influent PS

Aeration Basins

Clarifier

Clarifier

Clarifier

Page 5: Denitrification Improvement Alternative Evaluation for Hilton ......Denitrification Improvement Alternative Evaluation for Hilton Head Public Service District using Extensive BNR Modeling

Denitrification Improvement Alternative Evaluation for Hilton Head PSD

INTRODUCTION

Needs for denitrification No nitrate regulations under NPDES permit

Golf course irrigation – potential nitrate elevation in groundwater

Historical effluent nitrate with semi-Ludzack Ettinger and Post Anoxic

process mod: 15 - 25 mg/L

Other BNR benefits

– aeration energy savings, alkalinity recovery, bulking control

Project Goals Evaluate feasibility of denitrification (nitrate below 10 mg/L ) with

process optimizations (no capital improvement).

If not, propose minor capital improvements with process optimizations.

Page 6: Denitrification Improvement Alternative Evaluation for Hilton ......Denitrification Improvement Alternative Evaluation for Hilton Head Public Service District using Extensive BNR Modeling

OutlineIntroductionWastewater Characterization and Capacity Assessment

Flows and loads characterizationsUnit process treatment capacity assessment

Denitrification Improvement Alternative Evaluation Alternative Development Evaluation with Extensive Modeling and OptimizationOpinions of Probable Construction Costs

Summary, Conclusions, and Q&A

Page 7: Denitrification Improvement Alternative Evaluation for Hilton ......Denitrification Improvement Alternative Evaluation for Hilton Head Public Service District using Extensive BNR Modeling

Denitrification Improvement Alternative Evaluation for Hilton Head PSD

WASTEWATER CHARACTERIZATIONS AND CAPACITY ASSESSMENT

Seasonal flows and loads variations General flows and loads trend: Summer high, Winter low

Seasonal loadings normalized by unit capacity

BOD and TSS: 200 mg/L avg, 250-300 mg/L max month

Mixed liquor temp: 27ºC Summer max, Winter low: 16ºC

Low BOD/N ratio 4:1 based on Jan – Feb 2016 sampling

May reflect out-of-town commuters and visitors

Target Capacity: 3 MGD (6.4 MGD permitted) • Eff nitrate goal: 8 mg/L

• Eff ammonia goal: 3 mg/L (5 mg/L limit)

Page 8: Denitrification Improvement Alternative Evaluation for Hilton ......Denitrification Improvement Alternative Evaluation for Hilton Head Public Service District using Extensive BNR Modeling

Denitrification Improvement Alternative Evaluation for Hilton Head PSD

WASTEWATER CHARACTERIZATIONS AND CAPACITY ASSESSMENT

UNIT PROCESS CAPACITY ASSESSMENT TO MEET TREATMENT GOALS

Unit Process/Structure

/EquipmentNo Descriptions

Each Size/Capacity

Total Size/Capacity

Total Size/Capacity Requirements Evaluation Criteria/Size and

Capacity RequirementSize

/CapacityUnit

Size /Capacity

UnitSize

/CapacityUnit

Aeration Basins 6 RectangularBasins

0.4 MG 2.4 MG 1.2 MG Provide 8-day SRT for completenitrification at 4,500 mg/L MLSSwith Maximum Month BOD andTSS loadings (BioWin prediction).

0.6 MG Provide 4-day SRT fordenitrification at 4,500 mg/L MLSSwith Maximum Month BOD andTSS loadings (BioWin prediction).

1.8 MG Provide total SRT of 12 days at4,500 mg/L MLSS with MaximumMonth BOD and TSS loadings(BioWin prediction).

EQ Basins 2 Rectangular Basins

0.561 MG 1.122 MG 0.6 MG Provide 4-day SRT fordenitrification at 4,500 mg/L MLSSwith Maximum Month BOD andTSS loadings (BioWin prediction).

Page 9: Denitrification Improvement Alternative Evaluation for Hilton ......Denitrification Improvement Alternative Evaluation for Hilton Head Public Service District using Extensive BNR Modeling

OutlineIntroductionWastewater Characterization and Capacity Assessment

Flows and loads characterizationsUnit process treatment capacity assessment

Denitrification Improvement Alternative Evaluation Alternative Development Evaluation with Extensive Modeling and OptimizationOpinions of Probable Construction Costs

Summary, Conclusions, and Q&A

Page 10: Denitrification Improvement Alternative Evaluation for Hilton ......Denitrification Improvement Alternative Evaluation for Hilton Head Public Service District using Extensive BNR Modeling

Denitrification Improvement Alternative Evaluation for Hilton Head PSD

DENITRIFICATION IMPROVEMENT ALTERNATIVE EVALUATION

Alternative Development

• Non-capital Improvement Alternatives (process optimization only)o Semi Ludzack Ettinger (LE) Process o Semi Post Anoxic Process

• Minor Capital Improvement Alternatives with Process Optimization o Aeration On-Off Cyclingo Modified Ludzack Ettinger (MLE) Process

Page 11: Denitrification Improvement Alternative Evaluation for Hilton ......Denitrification Improvement Alternative Evaluation for Hilton Head Public Service District using Extensive BNR Modeling

Denitrification Improvement Alternative Evaluation for Hilton Head PSD

NON-CAPITAL IMPROVEMENT ALTERNATIVE 1

Semi Ludzack-Ettinger (LE) Process

BOD Influent ANX Secondary Effluent

Sludge Holding Tank

Dewatered Cake

AER

Page 12: Denitrification Improvement Alternative Evaluation for Hilton ......Denitrification Improvement Alternative Evaluation for Hilton Head Public Service District using Extensive BNR Modeling

Denitrification Improvement Alternative Evaluation for Hilton Head PSD

NON-CAPITAL IMPROVEMENT ALTERNATIVE 1

Aeration on

EQ Basins

Influent PS

Clarifier

Clarifier

Clarifier

Aeration off

Semi Ludzack-Ettinger (LE) Process

Page 13: Denitrification Improvement Alternative Evaluation for Hilton ......Denitrification Improvement Alternative Evaluation for Hilton Head Public Service District using Extensive BNR Modeling

Denitrification Improvement Alternative Evaluation for Hilton Head PSD

NON-CAPITAL IMPROVEMENT ALTERNATIVE 1

Semi Ludzack Ettinger (LE) Process

0

5

10

15

20

25

4 5 6 7 8 9 10 11 12 13

Nitrate N at AAD Loadings

Nitrate N at MMAD Loadings

Ammonia N at AAD Loadings

Ammonia N at MMAD Loadings

Aerobic Solids Retention Time (days)

Nitr

ogen

(mg/

L )

Nitr

ogen

(mg/

L )

Nitrification Goal (Effluent Ammonia below 3 mg/L)

Denitrification Goal (Effluent Nitrate below 8 mg/L)

Process Optimization with BioWin default kinetic parameters (SND = 0.05 mg/L)

0

5

10

15

20

25

4 5 6 7 8 9 10 11 12 13

Nitrate N at AAD Loadings

Nitrate N at MMAD Loadings

Ammonia N at AAD Loadings

Ammonia N at MMAD Loadings

Aerobic Solids Retention Time (days)

Nitr

ogen

(mg/

L )

Nitr

ogen

(mg/

L )

Nitrification Goal (Effluent Ammonia below 3 mg/L)

Denitrification Goal (Effluent Nitrate below 8 mg/L)

Process Optimization with adjusted SNDcoefficient (0.2 mg/L)

Page 14: Denitrification Improvement Alternative Evaluation for Hilton ......Denitrification Improvement Alternative Evaluation for Hilton Head Public Service District using Extensive BNR Modeling

Denitrification Improvement Alternative Evaluation for Hilton Head PSD

NON-CAPITAL IMPROVEMENT ALTERNATIVE 2

Semi Post-Anoxic Process

BOD Influent AER Secondary Effluent

Sludge Holding Tank

Dewatered Cake

ANX

Page 15: Denitrification Improvement Alternative Evaluation for Hilton ......Denitrification Improvement Alternative Evaluation for Hilton Head Public Service District using Extensive BNR Modeling

Denitrification Improvement Alternative Evaluation for Hilton Head PSD

NON-CAPITAL IMPROVEMENT ALTERNATIVE 2

Aeration on

Aeration off

Semi Post-Anoxic Process

EQ Basins

Influent PS

Clarifier

Clarifier

Clarifier

Page 16: Denitrification Improvement Alternative Evaluation for Hilton ......Denitrification Improvement Alternative Evaluation for Hilton Head Public Service District using Extensive BNR Modeling

Denitrification Improvement Alternative Evaluation for Hilton Head PSD

NON-CAPITAL IMPROVEMENT ALTERNATIVE 2

Semi Post-Anoxic Process (SND = 0.2 mg/L)

0

5

10

15

20

25

4 5 6 7 8 9 10 11 12 13

Nitrate N at AAD Loadings

Nitrate N at MMAD Loadings

Ammonia N at AAD Loadings

Ammonia N at MMAD Loadings

Aerobic Solids Retention Time (days)

Nitr

ogen

(mg/

L )

Nitr

ogen

(mg/

L )

Nitrification Goal (Effluent Ammonia below 3 mg/L)

Denitrification Goal (Effluent Nitrate below 8 mg/L)

Page 17: Denitrification Improvement Alternative Evaluation for Hilton ......Denitrification Improvement Alternative Evaluation for Hilton Head Public Service District using Extensive BNR Modeling

Denitrification Improvement Alternative Evaluation for Hilton Head PSD

MINOR CAPITAL IMPROVEMENT ALTERNATIVE 1

Aeration On-Off Cycling

BOD Influent AER/ANX (AERATION ON-OFF CYCLING) Secondary Effluent

Sludge Holding Tank

Dewatered Cake

Aeration On

SRT allocation between oxic and anoxic conditions

Aeration Off

12:00 AM 01:00 AM 03:00 AM 04:00 AM 06:00 AM 07:00 AM

Aeration On

Aeration Off

Aeration On

Aeration Off

Additional BNR efficiency improvement using SND

Page 18: Denitrification Improvement Alternative Evaluation for Hilton ......Denitrification Improvement Alternative Evaluation for Hilton Head Public Service District using Extensive BNR Modeling

Denitrification Improvement Alternative Evaluation for Hilton Head PSD

MINOR CAPITAL IMPROVEMENT ALTERNATIVE 1Aeration On-Off Cycling

No structural improvement

New mechanical mixers in the aeration basins

New DO control system

Aeration On/OFF

EQ Basins

Influent PS

Clarifier

Clarifier

Clarifier

Page 19: Denitrification Improvement Alternative Evaluation for Hilton ......Denitrification Improvement Alternative Evaluation for Hilton Head Public Service District using Extensive BNR Modeling

Denitrification Improvement Alternative Evaluation for Hilton Head PSD

MINOR CAPITAL IMPROVEMENT ALTERNATIVE 1Aeration On-Off Cycling

= Unareaed Phase Length / Cycle Length

0

12

34

5

67

89

1011

1213

1415

16

0.25 0.3 0.35 0.4 0.45 0.5

Nitrate N (3 hr)

Ammonia N (3 hr)

Unaerated Phase Fraction = Unaerated Phase Length/Cycle Length

Optimum Range of Unaerated Phase Fraction

at 3 hr Cycle Length

Nitr

ogen

(mg/

L )

Aeration On

Aeration Off

Unaerated phase length ( 1 hour)

Cycle length ( 3 hour)12:00 AM 01:00 AM 03:00 AM 04:00 AM 06:00 AM 07:00 AM

Aeration On

Aeration Off

Aeration On

Aeration Off

Page 20: Denitrification Improvement Alternative Evaluation for Hilton ......Denitrification Improvement Alternative Evaluation for Hilton Head Public Service District using Extensive BNR Modeling

Denitrification Improvement Alternative Evaluation for Hilton Head PSD

MINOR CAPITAL IMPROVEMENT ALTERNATIVE 1Aeration On-Off Cycling (SND = 0.05 mg/L)

Efflu

ent N

itrat

e an

d Am

mon

ia

2-Dimension Optimization

Page 21: Denitrification Improvement Alternative Evaluation for Hilton ......Denitrification Improvement Alternative Evaluation for Hilton Head Public Service District using Extensive BNR Modeling

Denitrification Improvement Alternative Evaluation for Hilton Head PSD

MINOR CAPITAL IMPROVEMENT ALTERNATIVE 1Aeration On-Off Cycling (SND = 0.05 mg/L)

0

1

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

0.25 0.3 0.35 0.4 0.45 0.5

Nitrate N (1 hrcycle length)Nitrate N (2 hr)

Nitrate N (3 hr)

Ammonia N (1 hr)

Ammonia N (2 hr)

Ammonia N (3 hr)

Unaerated Phase Fraction (%)

Nitr

ogen

(mg/

L )

Optimum Range of Unaerated Phase Fraction (%)

at 3 hr Cycle Length

Nitr

ogen

(mg/

L )

Optimum Range of Unaerated Phase Fraction (%)

at 1 hr Cycle Length

Maximum Month Loadings11 d SRTAverage Temp (20ºC)

= Unareaed Phase Length / Cycle Length

0

1

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

0.25 0.3 0.35 0.4 0.45 0.5

Nitrate N (1 hrcycle length)Nitrate N (2 hr)

Nitrate N (3 hr)

Ammonia N (1 hr)

Ammonia N (2 hr)

Ammonia N (3 hr)

Unaerated Phase Fraction (%)

Nitr

ogen

(mg/

L )

Optimum Range of Unaerated Phase Fraction (%)

at 3 hr Cycle Lengh

Unaerated Phase Fraction (%)

Nitr

ogen

(mg/

L ) Optimum Range of

Unaerated Phase Fraction (%) at 1 hr Cycle Lengh

Maximum Month Loadings16 d SRTAverage Temp (20ºC)

0

1

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

0.25 0.3 0.35 0.4 0.45 0.5

Nitrate N (1 hrcycle length)Nitrate N (2 hr)

Nitrate N (3 hr)

Ammonia N (1 hr)

Ammonia N (2 hr)

Ammonia N (3 hr)

Unaerated Phase Fraction (%)

Nitr

ogen

(mg/

L )

Optimum Range of Unaerated Phase Fraction (%)

at 3 hr Cycle Length

Nitr

ogen

(mg/

L )

Optimum Range of Unaerated Phase Fraction (%)

at 1 hr Cycle Length

Annual Average Loadings16 d SRTWinter Minimum Temp (16ºC)

0123456789

101112131415161718

0.25 0.3 0.35 0.4 0.45 0.5

Nitrate N (1 hrcycle length)Nitrate N (2 hr)

Nitrate N (3 hr)

Ammonia N (1 hr)

Ammonia N (2 hr)

Ammonia N (3 hr)

Unaerated Phase Fraction (%)

Nitr

ogen

(mg/

L )

Optimum Range of Unaerated Phase Fraction (%)

at 3 hr Cycle Length

Nitr

ogen

(mg/

L ) Optimum Range of

Unaerated Phase Fraction (%)at 1 hr Cycle Length

Maximum Month Loadings16 d SRTSummer Max Temp (28ºC)

Page 22: Denitrification Improvement Alternative Evaluation for Hilton ......Denitrification Improvement Alternative Evaluation for Hilton Head Public Service District using Extensive BNR Modeling

Denitrification Improvement Alternative Evaluation for Hilton Head PSD

MINOR CAPITAL IMPROVEMENT ALTERNATIVE 2Modified Ludzack-Ettinger (MLE) Modification

BOD Influent ANX Secondary Effluent

Sludge Holding Tank

Dewatered Cake

AER

Page 23: Denitrification Improvement Alternative Evaluation for Hilton ......Denitrification Improvement Alternative Evaluation for Hilton Head Public Service District using Extensive BNR Modeling

Denitrification Improvement Alternative Evaluation for Hilton Head PSD

MINOR CAPITAL IMPROVEMENT ALTERNATIVE 2-1MLE Modification (within oxic basins)

Minor structural improvement – Baffle walls within aeration basins New Internal Recirculation Pumping StationNew DO control system New mechanical mixing in anoxic basins

Aeration Basins

Anoxic Basins EQ Basins

Influent PS

Clarifier

Clarifier

Clarifier

IR Pumping

Page 24: Denitrification Improvement Alternative Evaluation for Hilton ......Denitrification Improvement Alternative Evaluation for Hilton Head Public Service District using Extensive BNR Modeling

Denitrification Improvement Alternative Evaluation for Hilton Head PSD

MINOR CAPITAL IMPROVEMENT ALTERNATIVE 2-2MLE Modification (with EQ basins)

New Internal Recirculation Pumping StationNew DO control system New mechanical mixing in anoxic basins

Aeration Basins Anoxic Basins

Influent PS

Clarifier

Clarifier

Clarifier

IR Pumping

Page 25: Denitrification Improvement Alternative Evaluation for Hilton ......Denitrification Improvement Alternative Evaluation for Hilton Head Public Service District using Extensive BNR Modeling

Denitrification Improvement Alternative Evaluation for Hilton Head PSD

MINOR CAPITAL IMPROVEMENT ALTERNATIVE ALT 2-2MLE Modification (SND = 0.05 mg/L)

0

5

10

15

20

25

4 5 6 7 8 9 10 11

Nitrate N at AAD Loadings

Nitrate N at MMAAD Loadings

Ammonia N at AAD Loadings

Ammonia N at MMAD Loadings

Aerobic Solids Retention Time (days)

Nitr

ogen

(mg/

L )

Nitr

ogen

(mg/

L )

Nitrification Goal (Effluent Ammonia below 3 mg/L)

Denitrification Goal (Effluent Nitrate below 8 mg/L)

Various loadings6 – 10 day aerobic SRT400% internal recirculationAverage Temp (20ºC)

0

5

10

15

20

25

4 5 6 7 8 9 10 11

Nitrate N at AAD Loadings

Nitrate N at MMAAD Loadings

Ammonia N at AAD Loadings

Ammonia N at MMAD Loadings

Aerobic Solids Retention Time (days)

Nitr

ogen

(mg/

L )

Nitr

ogen

(mg/

L )

Nitrification Goal (Effluent Ammonia below 3 mg/L)

Denitrification Goal (Effluent Nitrate below 8 mg/L)

Various loadings6 – 10 day aerobic SRT400% internal recirculationWinter min temp (16ºC)

Page 26: Denitrification Improvement Alternative Evaluation for Hilton ......Denitrification Improvement Alternative Evaluation for Hilton Head Public Service District using Extensive BNR Modeling

OutlineIntroductionWastewater Characterization and Capacity Assessment

Flows and loads characterizationsUnit process treatment capacity assessment

Denitrification Improvement Alternative Evaluation Alternative Development Evaluation with Extensive Modeling and OptimizationOpinions of Probable Construction Costs

Summary, Conclusions, and Q&A

Page 27: Denitrification Improvement Alternative Evaluation for Hilton ......Denitrification Improvement Alternative Evaluation for Hilton Head Public Service District using Extensive BNR Modeling

Denitrification Improvement Alternative Evaluation for Hilton Head PSD

Proposed ImprovementsALT 1 ALT 2-1 ALT 2-2

Aeration On-Off Cycling

MLE ModificationMLE Modification (using EQ basins)

Submersible Mixers $ 189,000 $ 168,000 $ 120,000

Online Monitoring of ORP, Ammonia, and Nitrate $ 196,000 - - - -

Aeration Basins Structural Modification - - $ 72,000 - -

IR Pumping Station - - $ 789,000 $ 789,000

Yard Piping Upgrade - - $ 124,000 $ 154,000

Construction Subtotal $ 385,000 $ 1,153,000 $ 1,063,000 OPINIONS OF PROBABLE PROJECT COST (with makrups and contingencies)

$ 513,000 $ 1,534,000 $ 1,414,000

OPINIONS OF PROBABLE CONSTRUCTION COSTS

Proposed ImprovementsALT 1 ALT 2-1

Aeration On-Off Cycling

MLE Modification (within oxic basins)

Submersible Mixers $ 189,000 $ 168,000

Online Monitoring of ORP, Ammonia, and Nitrate $ 196,000 - -

Aeration Basins Structural Modification - - $ 72,000

IR Pumping Station - - $ 789,000

Yard Piping Upgrade - - $ 124,000

Construction Subtotal $ 385,000 $ 1,153,000 OPINIONS OF PROBABLE PROJECT COST (with makrups and contingencies)

$ 513,000 $ 1,534,000

Proposed ImprovementsALT 1

Aeration On-Off Cycling

Submersible Mixers $ 189,000

Online Monitoring of ORP, Ammonia, and Nitrate $ 196,000

Aeration Basins Structural Modification - -

IR Pumping Station - -

Yard Piping Upgrade - -

Construction Subtotal $ 385,000 OPINIONS OF PROBABLE PROJECT COST (with markups and contingencies)

$ 513,000

Page 28: Denitrification Improvement Alternative Evaluation for Hilton ......Denitrification Improvement Alternative Evaluation for Hilton Head Public Service District using Extensive BNR Modeling

OutlineIntroductionWastewater Characterization and Capacity Assessment

Flows and loads characterizationsUnit process treatment capacity assessment

Denitrification Improvement Alternative Evaluation Alternative Development Evaluation with Extensive Modeling and OptimizationOpinions of Probable Construction Costs

Summary, Conclusions, and Q&A

Page 29: Denitrification Improvement Alternative Evaluation for Hilton ......Denitrification Improvement Alternative Evaluation for Hilton Head Public Service District using Extensive BNR Modeling

Denitrification Improvement Alternative Evaluation for Hilton Head PSD

Summary

Denitrification improvements did not appear to be feasible with process optimization only – consistent with plant data.

Wastewater characteristics played key role in denitrification efficiency.

Denitrification improvements appeared to be feasible with minor capital improvements.

- Aeration on/off cycling: feasible with process optimization, less costs, more sensitive to operations

- MLE Modification: more costs, less sensitive to operations

Page 30: Denitrification Improvement Alternative Evaluation for Hilton ......Denitrification Improvement Alternative Evaluation for Hilton Head Public Service District using Extensive BNR Modeling

Don Lee, Ph.D., P.E.Senior Wastewater Process Engineer/Project ManagerAECOM, Greenville SC

10 Patewood Dr Building 6 Suite 500Greenville SC [email protected]