i UNIVERSITAS DIPONEGORO PROYEK PEMBANGUNAN GEDUNG MAHKAMAH AGUNG REPUBLIK INDONESIA, JALAN MEDAN MERDEKA UTARA NO. 9 13 JAKARTA The Construction Project of The Main Building of The Supreme Court of The Republic of Indonesia on 9 13 Medan Merdeka Utara Jakarta KERJA PRAKTEK Diajukan untuk memenuhi syarat menyelesaikan Pendidikan Sarjana Teknik FAHMI AKMAL HASANI 21010111130116 JURUSAN TEKNIK SIPIL FAKULTAS TEKNIK SEMARANG APRIL, 2015

COVER, KATA PENGANTAR, DAFTAR ISI dll.pdf

Embed Size (px)

Citation preview

  • i

    UNIVERSITAS DIPONEGORO

    PROYEK PEMBANGUNAN GEDUNG MAHKAMAH AGUNG

    REPUBLIK INDONESIA, JALAN MEDAN MERDEKA UTARA NO. 9

    13 JAKARTA

    The Construction Project of The Main Building of The Supreme Court of The

    Republic of Indonesia on 9 13 Medan Merdeka Utara Jakarta

    KERJA PRAKTEK

    Diajukan untuk memenuhi syarat menyelesaikan Pendidikan Sarjana Teknik

    FAHMI AKMAL HASANI

    21010111130116

    JURUSAN TEKNIK SIPIL

    FAKULTAS TEKNIK

    SEMARANG

    APRIL, 2015

  • ii

    UNIVERSITAS DIPONEGORO

    PROYEK PEMBANGUNAN GEDUNG MAHKAMAH AGUNG

    REPUBLIK INDONESIA, JALAN MEDAN MERDEKA UTARA NO. 9

    13 JAKARTA

    The Construction Project of The Main Building of The Supreme Court of The

    Republic of Indonesia on 9 13 Medan Merdeka Utara Jakarta

    FAHMI AKMAL HASANI

    21010111130116

    Semarang, April 2015

    Mengetahui,

    Ketua Jurusan/Program Studi Teknik Sipil

    Fakultas Teknik Universitas Diponegoro,

    Ir. Sumbogo Pranoto, MT.

    NIP. 19580604.198602.1.001

    Disetujui

    Dosen Pembimbing Kerja Praktek

    Parang Sabdono, Ir., M. Eng.

    NIP. 196205161990011001

  • iii

    KATA PENGANTAR

    Puji syukur penulis panjatkan ke hadirat Allah SWT yang telah melimpahkan rahmat

    dan hidayah-Nya sehingga penulis dapat menyelesaikan dan menyusun laporan kerja praktek

    Pembangunan Gedung Mahkamah Agung RI.

    Laporan kerja praktek ini disusun untuk memenuhi salah satu persyaratan akademis

    dalam menyelesaikan pendidikan program studi strata satu (S1) bagi mahasiswa jurusan

    Teknik Sipil Fakultas Teknik Universitas Diponegoro, Semarang. Kerja praktek ini menjadi

    tambahan pengetahuan lapangan sebagai pelengkap pengetahuan teoritis para calon sarjana

    teknik sipil. Waktu yang diberikan selama 60 hari kerja praktek semoga menjadi bekal yang

    cukup bagi penulis mengambil berbagai pengetahuan dari proyek ini.

    Pada kesempatan ini penulis menyampaikan terima kasih, atas segala bantuan dan

    bimbingan yang telah diberikan selama kerja praktek sampai tersusunnya laporan ini. Penulis

    mengucapkan terima kasih kepada :

    1. Ir. Sumbogo Pranoto, MT., sebagai Ketua Jurusan Teknik Sipil Universitas Diponegoro,

    Semarang sekaligus sebagai dosen wali penulis yang memberikan banyak pengarahan

    bagi penulis.

    2. Ir. Moga Narayudha, SP1., selaku koordinator Kerja Praktek Jurusan Teknik Sipil Faultas

    Teknik Universitas Diponegoro

    3. Ir. Hari Budieny, M.T., selaku koordinator bidang akademik Jurusan Teknik Sipil

    Fakultas Teknik Universitas Diponegoro

    4. Bapak Parang Sabdono, Ir., M. Eng, selaku dosen pembimbing Kerja Praktek yang telah

    memberikan bimbingan hingga selesainya Laporan Kerja Praktek ini.

    5. Ir. M. Nugerahanto, selaku Kepala Proyek Pembangunan Gedung Mahkamah Agung RI

    6. Mahardhika Agit ST., selaku Kepala Teknik pembangunan Gedung Mahkamah Agung RI

    sekaligus sebagai pembimbing penulis selama kerja praktek

    7. Mas Defri, selaku Quality Control pembangunan Gedung Mahkamah Agung RI yang

    membagi pengalamannya seputar proyek.

  • iv

    8. Mas Rahmat sebagai senior yang selalu memberikan semangat dan motivasi bagi penulis.

    9. Ibu dan Bapak tercinta yang telah mendukung penulis dalam selama kerja praktek ini

    melalui doanya.

    10. Hifdzi Ulil Azmi sebagai kakak yang selalu memberi semangat bagi penulis

    11. Keluarga besar wisma Al-Fath yang selalu memberikan semangat baru.

    12. Keluarga Teknik Sipil angkatan 2011 yang memberikan bantuannya baik moril maupun

    materil kepada penulis dalam penyelesaian laporan ini.

    13. Semua pihak yang tidak mampu ditulis satu persatu yang telah membantu penulis

    menyelesaikan laporan kerja prektek ini.

    Penulis mengharapkan kritik dan saran yang membangun. Semoga laporan ini dapat

    bermanfaat dan memberikan amal bagi penulis.

    Semarang, April 2015

    Penulis

  • v

    DAFTAR ISI

    HALAMAN JUDUL .................................................................................................................. i

    LEMBAR PENGESAHAN ....................................................................................................... ii

    KATA PENGANTAR .............................................................................................................. iii

    DAFTAR ISI ............................................................................................................................. v

    DAFTAR GAMBAR .............................................................................................................. viii

    DAFTAR TABEL ................................................................................................................... xii

    BAB I PENDAHULUAN

    1.1 LATAR BELAKANG PROYEK ........................................................................... I-1

    1.2 MAKSUD DAN TUJUAN PROYEK ................................................................... I-2

    1.3 LOKASI PROYEK ................................................................................................ I-2

    1.4 DATA PROYEK .................................................................................................... I-3

    1.5 RUANG LINGKUP PEKERJAAN ....................................................................... I-3

    1.6 RUANG LINGKUP KERJA PRAKTEK .............................................................. I-4

    1.7 METODE PENGUMPULAN DATA .................................................................... I-5

    1.8 SISTEMATIKA PENULISAN LAPORAN ........................................................... I-6

    BAB II MANAJEMEN PROYEK

    2.1. TINJAUAN UMUM ............................................................................................ II-1

    2.2. UNSUR UNSUR PENGELOLA PROYEK ..................................................... II-2

    2.3. STRUKTUR ORGANISASI PROYEK .............................................................. II-3

    2.4. HUBUNGAN KERJA ANTAR UNSUR ORGANISASI ................................... II-4

    2.5. STRUKTUR ORGANISASI PELAKSANA PROYEK ..................................... II-5

    2.6. STRUKTUR ORGANISASI PELAKSANA PROYEK ................................... II-11

    BAB III PERENCANAAN PROYEK

    3.1 TINJAUAN UMUM ......................................................................................... III-1

    3.2 TAHAP PERENCANAAN ................................................................................ III-1

  • vi

    3.3 TINJAUAN PERENCANAAN ARSITEKTUR ................................................ III-4

    3.4 TINJAUAN PERENCANAAN STRUKTUR ................................................... III-5

    3.5 PERATURAN PEMBEBANAN STRUKTUR ................................................. III-6

    3.6 TINJAUAN PERENCANAAN STRUKTUR ATAS ........................................ III-10

    3.7 PERENCANAAN MEKANIKAL DAN ELEKTRIKAL.................................. III-17

    3.8 PERENCANAAN SANITASI DAN PENGOLAHAN LIMBAH .................... III-19

    BAB IV ALAT DAN BAHAN

    4.1 TINJAUAN UMUM ......................................................................................... IV-1

    4.2 PERALATAN YANG DIGUNAKAN .............................................................. IV-1

    4.3 BAHAN YANG DIGUNAKAN ........................................................................ IV-14

    BAB V PELAKSANAAN PEKERJAAN

    5.1 TINJAUAN UMUM ......................................................................................... V-1

    5.2 PEKERJAAN KOLOM...................................................................................... V-2

    5.3 PEKERJAAN BALOK DAN PLAT LANTAI .................................................. V-10

    5.4 PEKERJAAN SHEARWALL .............................................................................. V-31

    5.5 PEKERJAAN TANGGA ................................................................................... V-38

    BAB VI PENGENDALIAN PROYEK

    6.1 TINJAUAN UMUM ......................................................................................... VI-1

    6.2 MEKANISME PENGAWASAN DAN PENGENDALIAN ............................. VI-2

    6.3 PENGAWASAN DAN PENGENDALIAN MUTU .......................................... VI-2

    6.4 PENGAWASAN DAN PENGENDALIAN WAKTU ...................................... VI-11

    6.5 PENGENDALIAN TEKNIS .............................................................................. VI-14

    6.6 PENGENDALIAN BIAYA ............................................................................... VI-15

    6.7 PENGENDALIAN K3LMP (KESEHATAN, KESELAMATAN KERJA

    LINGKUNGAN, MUTU DAN PENGAMANAN) ........................................... VI-16

    6.8 PENGENDALIAN TENAGA KERJA .............................................................. VI-20

  • vii

    BAB VII PERMASALAHAN PROYEK

    7.1 TINJAUAN UMUM ......................................................................................... VII-1

    7.2 PERMASALAHAN PROYEK ......................................................................... VII-1

    7.3 SOLUSI TERHADAP PERMASALAHAN PROYEK .....................................VII-3

    BAB VIII PENUTUP

    7.1 KESIMPULAN .................................................................................................. VII-1

    7.2 SARAN............................................................................................................... VII-1

    DAFTAR PUSTAKA

    LAMPIRAN A GAMBAR PROYEK

    LAMPIRAN B DATA-DATA PROYEK

    LAMPIRAN C SURAT-SURAT KERJA PRAKTEK

  • viii

    DAFTAR GAMBAR

    Gambar 1.1. Batas-batas Lokasi Proyek .................................................................................. I-2

    Gambar 2.1. Skema Hubungan Kerja Pengelola Proyek ........................................................ II-4

    Gambar 2.2. Struktur Organisasi Kontraktor Pelaksana ..................................................... II-5

    Gambar 2.2. Struktur Organisasi Konsultan Manajemen Konstruksi .............................. II-10

    Gambar 3.1. Detail Plat Tipe s5 .......................................................................................... III-11

    Gambar 3.2. Detail Kolom K1 dan K2 ................................................................................ III-14

    Gambar 3.3. Detail Shearwall SW1 ................................................................................... III-15

    Gambar 3.4. Detail Balok G1 .............................................................................................. III-16

    Gambar 3.5. Detail Tangga.................................................................................................. III-17

    Gambar 4.1. Tower Crane .....................................................................................................IV-2

    Gambar 4.2. Truck Mixer .....................................................................................................IV-3

    Gambar 4.3. Concrete Pump ................................................................................................IV-4

    Gambar 4.4. Air Compressor ................................................................................................IV-5

    Gambar 4.5. Concrete Vibrator ............................................................................................IV-6

    Gambar 4.6. Bar Bender .......................................................................................................IV-7

    Gambar 4.7. Bar Cutter .........................................................................................................IV-8

    Gambar 4.8. Cutting Wheel Machine ...................................................................................IV-8

    Gambar 4.9. Las gas (a), Las Listrik (b) ...............................................................................IV-9

    Gambar 4.10. Gerinda ..........................................................................................................IV-9

    Gambar 4.11. Waterpass dan Bak Ukur ..............................................................................IV-10

    Gambar 4.12. Pemasangan PCH ........................................................................................IV-10

    Gambar 4.13. Standart ........................................................................................................IV-11

    Gambar 4.14. Ledger ..........................................................................................................IV-11

    Gambar 4.15. Jack Base ....................................................................................................IV-11

    Gambar 4.16. U-Head ........................................................................................................IV-12

    Gambar 4.17. Props ............................................................................................................IV-12

    Gambar 4.18. Couplers / Swivle .........................................................................................IV-12

  • ix

    Gambar 4.19. Quickshore Beam Bracket ...........................................................................IV-12

    Gambar 4.20. Base Plate ....................................................................................................IV-13

    Gambar 4.21. Trigger Brace ..............................................................................................IV-13

    Gambar 4.22. Kantilever ....................................................................................................IV-13

    Gambar 4.23. Concrete Bucket ............................................................................................IV-14

    Gambar 4.24. Semen Tipe 1 ...............................................................................................IV-16

    Gambar 4.25. Baja Tulangan ..............................................................................................IV-19

    Gambar 4.26. Kawat Bendrat .............................................................................................IV-19

    Gambar 4.27. Beton Decking .............................................................................................IV-20

    Gambar 4.28. Kayu .............................................................................................................IV-20

    Gambar 4.29. Multipleks .....................................................................................................IV-21

    Gambar 4.30. Bata Ringan .................................................................................................IV-22

    Gambar 4.31. Concrete Bonding Agent ..............................................................................IV-22

    Gambar 4.32. Mortar Siap Pakai (a) Thinbed (b) Skimcoat ...............................................IV-23

    Gambar 4.33. Tulangan Kolom Praktis ..............................................................................IV-23

    Gambar 4.34. Baja IWF ......................................................................................................IV-24

    Gambar 5.1. Bagan Alir Pekerjaan Kolom ............................................................................. V-2

    Gambar 5.2. Skema Pengukuran As Kolom ........................................................................... V-3

    Gambar 5.3. Pengukuran Sumbu As Kolom .......................................................................... V-3

    Gambar 5.3. Site Perangkaian Tulangan (a), Site Pemotongan dan Pembengkokan

    Tulangan (b) .......................................................................................................................... V-6

    Gambar 5.4. Pemasangan Sepatu Kolom .............................................................................. V-6

    Gambar 5.5. Bekisting yang Siap Pakai ................................................................................ V-6

    Gambar 5.6. Bekisting yang Sudah Terpasang ...................................................................... V-8

    Gambar 5.7. Penuangan Beton pada Bekisting Kolom (a), Pemadatan Kolom dengan

    Concrete Vibrator (b) ............................................................................................................ V-9

    Gambar 5.8. Penambalan Kolom ......................................................................................... V-10

    Gambar 5.9. Bagan Alir Pekerjaan Balok dan Plat ............................................................. V-11

    Gambar 5.10. Pemasangan Balok Pikul dan Suri-suri.......................................................... V-12

  • x

    Gambar 5.11. Pemasangan Bekisting Balok ....................................................................... V-13

    Gambar 5.12. Perkuatan Bekisting Balok dengan Dowel dan Tie Rod ............................... V-13

    Gambar 5.13. Pemasangan Bekisting Plat ........................................................................... V-14

    Gambar 5.14. Bekisting Balok dan Plat Tampak dari Bawah ............................................. V-14

    Gambar 5.15. Tulangan Utama Diganjal ............................................................................. V-15

    Gambar 5.16. Panjang Penjangkaran ................................................................................... V-15

    Gambar 5.17. Penulangan Balok ......................................................................................... V-16

    Gambar 5.18. Penulangan Plat Lantai ................................................................................. V-17

    Gambar 5.19. Ujung Pipa Concrete Pump .......................................................................... V-19

    Gambar 5.20. Pengecoran Plat dan Balok ........................................................................... V-20

    Gambar 5.21. Dimensi Plat yang Ditinjau ........................................................................... V-22

    Gambar 5.22. Pemodelan Beban Trapesium Plat terhadap Balok B1 ................................. V-24

    Gambar 5.23. Pemodelan Pembebanan pada Balok ............................................................ V-25

    Gambar 5.24. Diagram Tegangan dan Regangan Balok pada Tumpuan ............................ V-26

    Gambar 5.25. Diagram Tegangan dan Regangan Balok pada Lapangan ............................ V-28

    Gambar 5.26. Pembongkaran Bekisting Balok dan Plat Lantai .......................................... V-31

    Gambar 5.27. Bagan Alir Pekerjaan Shearwall ................................................................... V-32

    Gambar 5.28. Pembongkaran Bekisting Sherwall ............................................................... V-37

    Gambar 5.29. Bagan Alir Pekerjaan Tangga ....................................................................... V-38

    Gambar 5.30. Bekisting Tangga .......................................................................................... V-39

    Gambar 5.31. Penulangan pada Ujung Tangga ................................................................... V-40

    Gambar 5.32. Penulangan Tangga ....................................................................................... V-41

    Gambar 5.33. Pengecoran Tangga ....................................................................................... V-42

    Gambar 6.1. Kerucut Abrams dengan Ukurannya ...............................................................VI-4

    Gambar 6.2. Pengujian Kuat Tekan Beton ...........................................................................VI-6

    Gambar 6.3. Pengujian Kuat Tarik Baja ...............................................................................VI-8

    Gambar 6.4. Grafik Hubungan Regangan dan Tegangan Baja Tulangan ............................VI-9

    Gambar 6.5. Kurva S Proyek ...............................................................................................VI-13

    Gambar 6.6. Rambu-rambu K3LMP ..................................................................................VI-19

  • xi

    Gambar 6.7. Pekerja yang Tidak Menggunakan APD Lengkap ........................................VI-19

    Gambar 7.1. Kolom Keropos (a), Balok Keropos (b) ........................................................ VII-4

    Gambar 7.2. Bekisting Shearwall yang Jebol ..................................................................... VII-5

    Gambar 7.3. Proses Grouting pada Beton ........................................................................... VII-7

  • xii

    DAFTAR TABEL

    Tabel 3.1. Berat Sendiri Bahan Bangunan dan Komponen Gedung .................................... III-6

    Tabel 3.2. Beban Hidup pada Lantai Gedung ....................................................................... III-7

    Tabel 3.3. Faktor Keutamaan Ie (SNI 03-1726-2012)........................................................... III-9

    Tabel 3.4. Tulangan Plat Lantai .......................................................................................... III-11

    Tabel 3.5. Panjang Penyambungan Tulangan (L) mm ....................................................... III-12

    Tabel 3.6. Tipe dan Ukuran Kolom .................................................................................... III-13

    Tabel 5.1. Perhitungan Persentase Kuat Tekan Beton Umur 7 Hari terhadap 28 Hari ....... V-21

    Tabel 5.2. Perhitungan Standar Deviasi Kuat Tekan Beton ................................................ V-21

    Tabel 4.1. Bagian-bagian PCH ...........................................................................................IV-11

    Tabel 6.1. Hasil Uji Kuat Tekan Beton ................................................................................VI-7

    Tabel 6.2. Konversi Beton ....................................................................................................VI-7

    Tabel 6.3. Hasil Uji Kuat Tarik Baja Tulangan ....................................................................VI-9

  • xiii

    DAFTAR PUSTAKA

    Amrigunasti. 2011. Perencanaan Proyek .

    https://amrigunasti.wordpress.com/tag/perencanaan-proyek/ . (diakses tanggal 25

    Desember 2014)

    Departemen Pekerjaan Umum. 1983. Peraturan Pembebanan Indonesia Untuk

    Bangunan Gedung 1983. Bandung : Yayasan Lembaga Penyelidikan Masalah

    Bangunan.

    Dimyati, Hamdan & Kadar Nurjaman . 2014 . Manajemen Proyek. Pustaka Setia :

    Bandung

    Drymix. 2011 . Mortar Siap Pakai . http://drymix.co.id/mortar/ . (diakses tanggal 21

    Februari 2015)

    Ilmu Sipil. 2013. RAP Rencana Anggaran Biaya Proyek Pembangunan.

    http://www.ilmusipil.com/rap-rencana-anggaran-biaya-proyek-pembangunan

    (diakses tanggal 27 Januari 2015)

    Muhammad Abdat, Jamal . Struktur Beton II . Universitas Mercu Buana : Jakarta

    Panitia Teknik Standardisasi Bidang Konstruksi dan Bangunan . 2002 . SNI 03-2847-

    2002 Tata Cara Perhitungan Struktur Beton Untuk Bangunan Gedung . Badan

    Standardisasi Nasional : Bandung.

    Panitia Teknik Konstruksi dan Bangunan. 2002. SNI-03-1726-2012 Tata Cara

    Perencanaan Ketahanan Gempa untuk Bangunan Gedung dan Non Gedung.

    Badan Standardisasi Nasional.

    Winter, George & Arthur H. Nilson. 1993 . Perencanaan Struktur Beton Bertulang .

    Pradnya Paramita : Jakarta.