    Project

    Contractor

    Sub Contractor

    Contract No.

    Title Of Work

    UNIT VOLUME TERPASANG BLM TERPAS

    1.1 FIRE DETECTION

    Boiler Area

    1. ID Fan and Oil Console

    Type of detector Flame Detector PCS 4 - Input module for detector PCS 4

    - Input module for pressure switch or waterflow switch PCS 4

    - Output module for Solenoid valve of Deluge system PCS 4

    Cabling & acc, in steel galvanized conduit LOT 1

    Power House

    1. Turbine Oil Tank

    Type of detector Flame Detector PCS 2 - Input module for detector PCS 2 - Input module for pressure switch or waterflow switch PCS 2

    - Output module for Solenoid valve of Deluge system PCS 2

    Cabling & acc, in steel galvanized conduit LOT 1

    2. Generator Transformer

    Type of detector Line termister ( LHD ) MTR 150 LHD Test Switch PCS 2

    - Input module for detector PCS 2

    - Input module for pressure switch or waterflow switch PCS 2

    - Output module for Solenoid valve of Deluge system PCS 2

    Cabling & acc, in steel galvanized conduit LOT 1

    3. Unit Auxiliary Transformer

    Type of detector Line termister ( LHD ) MTR 100

    LHD Test Switch PCS 2- Input module for detector PCS 2

    - Input module for pressure switch or waterflow switch PCS 2

    - Output module for Solenoid valve of Deluge system PCS 2

    Cabling & acc, in steel galvanized conduit LOT 1

    4. BFP/BFW Oil Console Area

    Type of detector Flame Detector PCS 4 - Input module for detector PCS 4

    - Input module for pressure switch or waterflow switch PCS 4

    - Output module for Solenoid valve of Deluge system PCS 4

    Cabling & acc, in steel galvanized conduit LOT 1

    7. MPB el 0.00

    Complete with :

    - Sounder & Strobe lamp ( combination ) PCS 6 - Manual call point/Manual push button PCS 6

    - Terminal Box , for 45 I/O modules PCS 1

    - Isolator Module PCS 1

    - Input module for manual call point PCS 1

    - Output module for Sounder & Strobe lamp PCS 1

    Cabling & acc, in steel galvanized conduit LOT 1

    7.1 # 1 MV Room

    Type of detector Smoke Detector PCS 2 - Input module for detector PCS 1

    Cabling & acc, in steel galvanized conduit LOT 1

    7.2 # 1 LV Room

    Type of detector Smoke Detector PCS 2

    Period: SATURDAY, 9 JULY 2011 UNTIL 15 JULY 2011

    CONTRACT STATUSNo DESCRIPTION

    : PLTU LAMPUNG ( SEBALANG ) 2 X 100 MW

    : ADHI - JEPOE JO

    : PT HANORA DAYA MANDIRI

    : PLG-SC-303-MR-MC-0001

    : Pengadaan Alat Deluge System, Sprinkler System, Outdoor Hydrant, Foam System, CO2

    System dan Fire Detection

  • 7/30/2019 Check List Material Fire Alarm edit_Pak ADIT(1).xlsx

    2/23

    UNIT VOLUME TERPASANG BLM TERPASA

    CONTRACT STATUSNo DESCRIPTION

    7.5 Channel

    Type of detector Smoke Detector PCS 1 - Input module for detector PCS 1

    Cabling & acc, in steel galvanized conduit LOT 1

    7.6 DC Battery Room

    Type of detector Smoke Detector PCS 1 - Input module for detector PCS 1

    Cabling & acc, in steel galvanized conduit LOT 1

    7.7 Essential Room

    Type of detector Smoke Detector PCS 1

    - Input module for detector PCS 1Cabling & acc, in steel galvanized conduit LOT 1

    7.8 Chemistry Dosing Room

    Type of detector Smoke Detector PCS 1 - Input module for detector PCS 1

    Cabling & acc, in steel galvanized conduit LOT 1

    7.9 #2 MV Room

    Type of detector Smoke Detector PCS 2

    - Input module for detector PCS 1

    Cabling & acc, in steel galvanized conduit LOT 1

    7.10 #2 LV Room

    Type of detector Smoke Detector PCS 2 - Input module for detector PCS 1 Cabling & acc, in steel galvanized conduit LOT 1

    7.11 #2 Outlet Room

    Type of detector Smoke Detector PCS 1 - Input module for detector PCS 1 Cabling & acc, in steel galvanized conduit LOT 1

    7.12 #2 Excitation Room

    Type of detector Smoke Detector PCS 1 - Input module for detector PCS 1 Cabling & acc, in steel galvanized conduit LOT 1

    8 MPB el +4.50 ~ +5.00

    Complete with :

    - Sounder & Strobe lamp ( combination ) PCS 4 - Manual call point/Manual push button PCS 4

    - Terminal Box , for 11 I/O modules PCS 1

    - Isolator Module PCS 1

    - Input module for manual call point PCS 1

    - Output module for Sounder & Strobe lamp PCS 1

    Cabling & acc, in steel galvanized conduit LOT 1

    8.1 Storage - 1

    Type of detector Smoke Detector PCS 1 - Input module for detector PCS 1

    Cabling & acc, in steel galvanized conduit LOT 1

    8.2 Channel - 1

    Type of detector Smoke Detector PCS 3 Input module for detector PCS 1

  • 7/30/2019 Check List Material Fire Alarm edit_Pak ADIT(1).xlsx

    3/23

    UNIT VOLUME TERPASANG BLM TERPASA

    CONTRACT STATUSNo DESCRIPTION

    8.5 #1 Outlet Room

    Type of detector Smoke Detector PCS 1 - Input module for detector PCS 1

    Cabling & acc, in steel galvanized conduit LOT 1

    8.6 #2 Outlet Room

    Type of detector Smoke Detector PCS 1 - Input module for detector PCS 1

    Cabling & acc, in steel galvanized conduit LOT 1

    8.7 Storage - 2

    Type of detector Smoke Detector PCS 1

    - Input module for detector PCS 1

    Cabling & acc, in steel galvanized conduit LOT 1

    8.8 Channel - 2

    Type of detector Smoke Detector PCS 3

    - Input module for detector PCS 1 Cabling & acc, in steel galvanized conduit LOT 1

    9 MPB el +9.00

    Complete with :

    - Sounder & Strobe lamp ( combination ) PCS 4 - Manual call point/Manual push button PCS 4 - Terminal Box , for 8 I/O modules PCS 1 - Isolator Module PCS 1 - Input module for manual call point PCS 1 - Output module for Sounder & Strobe lamp PCS 1 Cabling & acc, in steel galvanized conduit LOT 1

    9.1 Electronic Equipment Room

    Type of detector Smoke Detector PCS 12 Complete with :

    - Sounder & Strobe lamp ( combination ) PCS 8

    - Manual Release CO2 PCS 4

    - Abort switch PCS 4

    - Terminal Box PCS 1

    - Isolator Module PCS 1

    - Input module for detector PCS 2

    Cabling & acc, in steel galvanized conduit LOT 1

    9.2 Central Control Room

    Type of detector Smoke Detector PCS 6

    Complete with :

    - Sounder & Strobe lamp ( combination ) 2 pintu , diluar & didalam PCS 4

    - Manual Release CO2 2 pintu , diluar PCS 2

    - Abort switch 2 pintu, diluar PCS 2

    - Terminal Box PCS 1- Isolator Mofdule PCS 1

    - Input module for detector For CO2 remote indication PCS 2

    Cabling & acc, in steel galvanized conduit LOT 1

    9.3 Engineer Room

    Type of detector Smoke Detector PCS 1 Complete with :

    - Sounder & Strobe lamp ( combination ) PCS 1

    - Input module for detector PCS 1

    Cabling & acc, in steel galvanized conduit LOT 1

  • 7/30/2019 Check List Material Fire Alarm edit_Pak ADIT(1).xlsx

    4/23

    UNIT VOLUME TERPASANG BLM TERPASA

    CONTRACT STATUSNo DESCRIPTION

    9.6 Front Room - 2

    Type of detector Smoke Detector PCS 1 Cabling & acc, in steel galvanized conduit LOT 1

    9.7 Pantry

    Type of detector Smoke Detector PCS 1 - Input module for detector PCS 1 Cabling & acc, in steel galvanized conduit LOT 1

    9.8 Locker Room

    Type of detector Smoke Detector PCS 1 Cabling & acc, in steel galvanized conduit LOT 1

    9.9 Pray Room

    Type of detector Smoke Detector PCS 1 - Input module for detector PCS 1 Cabling & acc, in steel galvanized conduit LOT 1

    10 MPB el +18.50

    Complete with :

    - Sounder & Strobe lamp ( combination ) PCS 1 - Manual call point/Manual push button PCS 1

    - Terminal Box PCS 1

    - Isolator Module PCS 1

    - Input module for manual call point PCS 1

    - Output module for Sounder & Strobe lamp PCS 1

    Cabling & acc, in steel galvanized conduit LOT 1

    10.1 High Temperature Room

    Type of detector Smoke Detector PCS 1

    - Input module for detector PCS 1

    Cabling & acc, in steel galvanized conduit LOT 1

    10.2 Instrument Panel Room

    Type of detector Smoke Detector PCS 2 - Input module for detector PCS 1

    Cabling & acc, in steel galvanized conduit LOT 1

    Coal/Limestone and Ash Handling Area1. Coal Bunker bay 1 set wet sprinkler

    - Terminal Box PCS 1 - Isolator Module PCS 1

    - Input module for pressure switch or waterflow switch PCS 1

    Cabling & acc, in steel galvanized conduit LOT 1

    2. Head Bed Layer 1 Deluge system

    Type of detector Line termister ( LHD ) MTR 15

    LHD Test Switch PCS 1 - Terminal Box PCS 1

    - Isolator Module PCS 1

    - Input module for detector PCS 1

    - Input module for pressure switch or waterflow switch PCS 1

    - Output module for Solenoid valve of Deluge system PCS 1

    Cabling & acc, in steel galvanized conduit LOT 1

    4. Crusher House

    2 sets deluge system ( 1 valve

    only ) , 1set wet alarm valve (

    Valve only )

    Type of detector Line termister ( LHD ) - mtr MTR 130

  • 7/30/2019 Check List Material Fire Alarm edit_Pak ADIT(1).xlsx

    5/23

    UNIT VOLUME TERPASANG BLM TERPASA

    CONTRACT STATUSNo DESCRIPTION

    5. #3 Transfer Station 2 sets deluge system

    Type of detector Line termister ( LHD ) MTR 110

    LHD Test Switch PCS 3- Terminal Box PCS 1

    - Isolator Module PCS 1

    - Input module for detector PCS 3

    - Input module for pressure switch or waterflow switch PCS 2

    - Output module for Solenoid valve of Deluge system PCS 2

    Cabling & acc, in steel galvanized conduit LOT 1

    6. #2 Transfer Station & #3 Tunnel3 sets deluge system , 2 set wet

    sprinkler

    Type of detector Line termister ( LHD ) MTR 55

    LHD Test Switch PCS 3

    - Terminal Box PCS 1

    - Isolator Module PCS 1 - Input module for detector PCS 3

    - Input module for pressure switch or waterflow switch PCS 5

    - Output module for Solenoid valve of Deluge system PCS 3

    Cabling & acc, in steel galvanized conduit LOT 1

    8. #1 Transfer Station 3 sets deluge system , 1 set wetsprinkler

    Type of detector Line termister ( LHD ) MTR 90

    LHD Test Switch PCS 4

    - Terminal Box , for 9 I/O Module PCS 1

    - Isolator Module PCS 1 - Input module for detector PCS 4

    - Input module for pressure switch or waterflow switch PCS 4

    - Output module for Solenoid valve of Deluge system PCS 3

    Cabling & acc, in steel galvanized conduit LOT 1

    9. Coal Storage Silo

    Type of detector Line termister ( LHD ) MTR 60 LHD Test Switch PCS 2

    - Input module for detector PCS 2

    Cabling & acc, in steel galvanized conduit LOT 1

    10. Coal Handling Control Building / Electrical Room

    Type of detector Smoke Detector PCS 11

    - Sounder & Strobe lamp ( combination ) PCS 1 - Manual call point/Manual push button PCS 1

    - Terminal Box , for 22 I/O Module PCS 1

    - Isolator Module PCS 1

    - Input module for detector PCS 1

    - Output module for Sounder & Strobe lamp PCS 1

    Cabling & acc, in steel galvanized conduit LOT 1

    11. Coal Conveyor ( From Jetty to #1 Transfer Station )

    Type of detector Line termister ( LHD ) MTR 750

    LHD Test Switch PCS 1- Input module for detector PCS 1

    Cabling & acc, in steel galvanized conduit LOT 1

    12. Coal Dust Collector 2 sets deluge system

    Type of detector Line termister ( LHD ) MTR 55

    LHD Test Switch PCS 2

    - Input module for detector PCS 2

    - Input module for pressure switch or waterflow switch PCS 2

    - Output module for Solenoid valve of Deluge system PCS 2

    Cabling & acc, in steel galvanized conduit LOT 1

  • 7/30/2019 Check List Material Fire Alarm edit_Pak ADIT(1).xlsx

    6/23

    UNIT VOLUME TERPASANG BLM TERPASA

    CONTRACT STATUSNo DESCRIPTION

    2. Chlorination Building

    Type of detector Smoke Detector PCS 3 - Sounder & Strobe lamp ( combination ) PCS 1

    - Manual call point/Manual push button PCS 1

    - Terminal Box PCS 1

    - Isolator Module PCS 1

    - Input module for detector PCS 1

    - Output module for Sounder & Strobe lamp PCS 1

    Cabling & acc, in steel galvanized conduit LOT 1

    3. Water Treatment Building

    Type of detector Smoke detector PCS 6 - Sounder & Strobe lamp ( combination ) PCS 1

    - Manual call point/Manual push button PCS 1

    - Terminal Box PCS 1

    - Isolator Module PCS 1

    - Input module for detector PCS 1

    - Output module for Sounder & Strobe lamp PCS 1

    Cabling & acc, in steel galvanized conduit LOT 1

    4. Waste Water Treatment Building

    Type of detector Smoke detector PCS 4

    - Sounder & Strobe lamp ( combination ) PCS 1- Manual call point/Manual push button PCS 1

    - Terminal Box PCS 1

    - Isolator Module PCS 1

    - Input module for detector PCS 1

    - Output module for Sounder & Strobe lamp PCS 1

    - Output module for Solenoid valve of Deluge system PCS 0

    Cabling & acc, in steel galvanized conduit LOT 1

    5 HSD Oil Tanks 2 sets foam , 2 set deluge

    Type of detector Explosion Proof Flame Detector PCS 4

    - Input module for detector PCS 4

    - Input module for pressure switch or waterflow switch PCS 4

    - Output module for Solenoid valve of Deluge system PCS 2

    open control PCS 2

    close conrol PCS 2

    Cabling & acc, in steel galvanized conduit LOT 1

    6. HSD Oil Pump House

    Type of detector Smoke detector PCS 2

    - Input module for detector PCS 1

    - Input module for pressure switch or waterflow switch PCS 1

    - Output module for Solenoid valve of Deluge system PCS 1

    Cabling & acc, in steel galvanized conduit LOT 1

    7. Emergency Diesel Generator Building

    Type of detector Smoke Detector PCS 5

    - Terminal Box , for 14 I/O Module PCS 1 - Isolator Module PCS 1

    - Input module for detector PCS 1

    Cabling & acc, in steel galvanized conduit LOT 1

    8. Foam Maker

    - Input module for pressure switch or waterflow switch PCS 1 open control PCS 1

    closed control PCS 1

    - Output module for Motorized Valve

    - Output module for Motorized valve

  • 7/30/2019 Check List Material Fire Alarm edit_Pak ADIT(1).xlsx

    7/23

    UNIT VOLUME TERPASANG BLM TERPA

    CONTRACT STATUSNo DESCRIPTION

    2.3 Miscellaneous Requirements

    Consist of

    LCD Annunciator PCS 1

    Main Fire Alarm Control Panel PCS 1

    Evacuate Sign Lamp PCS 7

    Gas Discharge Sign Lamp PCS 6

    CO2 Main Control Panel PCS 2

    Loop Relay Module PCS 2

    Loop Splitter PCS 2

    Addr. Network Power supply unit c/w batt. PCS 2

    Isolator Module PCS 10

    LOT 1

    Sub Total Fire Detection

    2.1 FIRE PROTECTION

    A Boiler Area

    1. ID Fan and Oil Console

    Deluge Valve

    Size 4" sets 4

    Water Spray Nozzle/Open SprinklerWater Spray Nozzle, 1/2",

    angle150 pcs 10

    2. BFW Pump

    Deluge valve

    Size 4" sets 4

    Water Spray Nozzle/Open SprinklerWater Spray Nozzle, 1/2",

    angle150pcs 22

    B Power House

    1. Turbine Oil Tank

    Deluge Valve

    Size 4" sets 2

    Water Spray Nozzle/Open SprinklerWater Spray Nozzle, 1/2",

    angle150pcs 10

    2. Generator Transformer

    Deluge Valve

    Size 6" sets 2

    Water Spray Nozzle/Open SprinklerWater Spray Nozzle, 1/2",

    angle150pcs 210

    3. Unit Auxiliary Transformer

    Deluge Valve

    Size 4" sets 2

    Water Spray Nozzle/Open SprinklerWater Spray Nozzle, 1/2",

    angle150pcs 74

    4. Central Control Room (CCR)

    Complete with :68 ltr cylinder c/w valve , filled

    45kg CO2pcs 11

    - Flexible discharge hose Flexible discharge hose pcs 11

    - Pilot actuation hose Pilot actuation hose pcs 10

    - Electric solenoid actuatorElectric solenoid actuator +

    Manual Leverpc 1

    - Discharge Nozzle Discharge Nozzle , dia 3/4" pcs 10

    - Manifold system & cylinder bracket

    Manifold & cylinder bracket for

    11 cyl pc 1

    Cabling & acc, in steel galvanized conduit2 loops and repeater, data &

    power cable, loop connection

  • 7/30/2019 Check List Material Fire Alarm edit_Pak ADIT(1).xlsx

    8/23

    UNIT VOLUME TERPASANG BLM TERPA

    CONTRACT STATUSNo DESCRIPTION

    Coal/Limestone and Ash Handling Area

    1. Coal Bunker/Coal Storage Silo

    2. Head Bed Layer

    3. #5 Trestle

    4. Crusher House

    5. #3 Transfer Station

    6. #3 Transfer Station & #3 Tunnel

    7. #2 Tunnel

    8. #1 Transfer Station

    a). Deluge Valve

    Size 4" sets 11

    Water Spray Nozzle/Open SprinklerWater Spray Nozzle, 1/2",

    angle150pcs 79

    b). Wet Alarm Valve

    Quantity

    Size 6" sets 3

    4" sets 2

    Water Spray Nozzle/Sprinkler HeadSealed , pendent ,1/2",79C ,

    glass bulbpcs 350

    6. Coal Dust Collector

    Deluge Valve

    Size 4" sets 2

    Water Spray Nozzle/Open SprinklerWater Spray Nozzle, 1/2",

    angle150pcs 32

    7. Drainage Tank #1 (Turbine Elv 9.0)

    Deluge Valve

    Size 4" sets 1

    Water Spray Nozzle/Open SprinklerWater Spray Nozzle, 1/2",

    angle150pcs 4

    8. Drainage Tank #2 (Turbine Elv 9.0)

    Deluge Valve

    Size 4" sets 1 Water Spray Nozzle/Open Sprinkler

    Water Spray Nozzle, 1/2",

    angle150pcs 4

    9. Burner #2

    Wet Alarm Valve

    Quantity

    Size 4" sets 1

    Water Spray Nozzle/Sprinkler HeadSealed , pendent ,1/2",79C ,

    glass bulbpcs 18

    10. Burner #1

    Wet Alarm Valve

    Quantity

    Size 4" sets 1

    Water Spray Nozzle/Sprinkler HeadSealed , pendent ,1/2",79C ,

    glass bulb pcs 18

  • 7/30/2019 Check List Material Fire Alarm edit_Pak ADIT(1).xlsx

    9/23

    UNIT VOLUME TERPASANG BLM TERPASA

    CONTRACT STATUSNo DESCRIPTION

    11. Oil Purifier #1 (Turbine Elv 0.0)

    Deluge Valve

    Size 4" sets 1

    Water Spray Nozzle/Open SprinklerWater Spray Nozzle, 1/2",

    angle150 pcs 20

    12. Oil Purifier #2 (Turbine Elv 0.0)

    Deluge Valve

    Size 4" sets 1 Water Spray Nozzle/Open Sprinkler

    Water Spray Nozzle, 1/2",

    angle150pcs 20

    12. EDG Building

    Deluge Valve

    Size 4" sets 1

    Water Spray Nozzle/Open SprinklerWater Spray Nozzle, 1/2",

    angle150pcs 12

    D HSD Oil System

    1. HSD Oil Tanks

    Deluge Valve

    Size 4" sets 2

    Water Spray Nozzle/Open SprinklerWater Spray Nozzle, 1/2",

    angle150pcs 40

    Foam System

    Foam Chamber Foam Chamber dia. 4" pcs 2

    Motorized Valve4", Butterfly , Motorized 13.9

    kg/cm2pcs 2

    Waterflow Indicator 4" pcs 2

    2. HSD Oil Pump House

    Deluge Valve

    Size 4" sets 1

    Water Spray Nozzle/Open Sprinkler

    Water Spray Nozzle, 1/2",

    angle150 pcs 21

    3. Emergency Diesel Generator Building

    Deluge Valve

    Size 4" sets 1

    Water Spray Nozzle/Open SprinklerWater Spray Nozzle, 1/2",

    angle150pcs 16

    E TYPE OF FIRE PROTECTION EQUIPMENT (OUTDOOR AREA)

    1. Administration Building

    Yard Hydrant 2 ways

    Quantity 4" x 2,5" x 2,5" pcs 2

    Outdoor Hydrant Box size 95x66x20cm rolls 2

    - Fire hose 2 roll 2,5" x 20m rolls 4

    - Jet Nozzle 2,5" pc 2

    2. BOILER #2

    Yard Hydrant 2 ways

    Quantity 4" x 2,5" x 2,5" pcs 2

    Outdoor Hydrant Box size 95x66x20cm rolls 2

    - Fire hose 2 roll 2,5" x 20m rolls 4

    - Jet Nozzle 2,5" pc 2

    3. Oil Station

    Yard Hydrant 2 ways

    Quantity 4" x 2,5" x 2,5" pcs 2

    Outdoor Hydrant Box size 95x66x20cm rolls 2

    - Fire hose 2 roll 2,5" x 20m rolls 4

  • 7/30/2019 Check List Material Fire Alarm edit_Pak ADIT(1).xlsx

    10/23

    UNIT VOLUME TERPASANG BLM TERPAS

    CONTRACT STATUSNo DESCRIPTION

    - Jet Nozzle 2,5" pc 1

  • 7/30/2019 Check List Material Fire Alarm edit_Pak ADIT(1).xlsx

    11/23

    UNIT VOLUME TERPASANG BLM TERPASA

    CONTRACT STATUSNo DESCRIPTION

    6. Coal Crusher Building

    Yard Hydrant 2 ways

    Quantity 4" x 2,5" x 2,5" pcs 1

    Outdoor Hydrant Box size 95x66x20cm rolls 1

    - Fire hose 2 roll 2,5" x 20m rolls 2 - Jet Nozzle 2,5" pc 1

    7. Waste Water Treatment Building

    Yard Hydrant 2 ways

    Quantity 4" x 2,5" x 2,5" pcs 1

    Outdoor Hydrant Box size 95x66x20cm rolls 1

    - Fire hose 2 roll 2,5" x 20m rolls 2 - Jet Nozzle 2,5" pc 1

    8. BOILER #1

    Yard Hydrant 2 ways

    Quantity 4" x 2,5" x 2,5" pcs 1

    Outdoor Hydrant Box size 95x66x20cm rolls 1

    - Fire hose 2 roll 2,5" x 20m rolls 2 - Jet Nozzle 2,5" pc 1

    9. TURBINE #1

    Yard Hydrant 2 ways

    Quantity 4" x 2,5" x 2,5" pcs 2

    Outdoor Hydrant Box size 95x66x20cm rolls 2

    - Fire hose 2 roll 2,5" x 20m rolls 4

    - Jet Nozzle 2,5" pc 2

    10. Ash Diposal

    Yard Hydrant 2 ways

    Quantity 4" x 2,5" x 2,5" pcs 5

    Outdoor Hydrant Box size 95x66x20cm rolls 5

    - Fire hose 2 roll 2,5" x 20m rolls 10

    - Jet Nozzle 2,5" pc 5

    11. Chlorination Building

    Yard Hydrant 2 ways

    Quantity 4" x 2,5" x 2,5" pcs 1

    Outdoor Hydrant Box size 95x66x20cm rolls 1

    - Fire hose 2 roll 2,5" x 20m rolls 2 - Jet Nozzle 2,5" pc 1

    12. WAREHOUSE

    Yard Hydrant 2 ways

    Quantity 4" x 2,5" x 2,5" pcs 1

    Outdoor Hydrant Box size 95x66x20cm rolls 1

    - Fire hose 2 roll 2,5" x 20m rolls 2 - Jet Nozzle 2,5" pc 1

    13. COAL YARD

    Yard Hydrant 2 ways

    Quantity 4" x 2,5" x 2,5" pcs 3

    Outdoor Hydrant Box size 95x66x20cm rolls 3

    - Fire hose 2 roll 2,5" x 20m rolls 6 - Jet Nozzle 2,5" pc 3

    14. Buldozer Building (Fire Station)

    Yard Hydrant 2 ways

    Quantity 4" x 2,5" x 2,5" pcs 1

    Outdoor Hydrant Box size 95x66x20cm rolls 1

  • 7/30/2019 Check List Material Fire Alarm edit_Pak ADIT(1).xlsx

    12/23

    UNIT VOLUME TERPASANG BLM TERPASANGPUNC

    CONTRACT STATUSNo DESCRIPTION

    16. JETTY

    Yard Hydrant 2 ways

    Quantity 4" x 2,5" x 2,5" pcs 2 Outdoor Hydrant Box size 95x66x20cm rolls 2 - Fire hose 2 roll 2,5" x 20m rolls 4 - Jet Nozzle 2,5" pc 2

    14. Foam system

    Foam HydrantYard Hydrant ,2 ways , 4 x 2,5"x

    2,5 "pcs 4

    Quantity Outdoor Hydrant Box, berisi : pcs 4

    Fire hose 4 roll, 2,5" x 20 meter rolls 16

    Foam Nozzle dia. 2,5" = 2buah pcs 8

    15. Foam Maker

    Foam Bladder Tank , c/w accessories Steel Tank , Color : red set 1 Capacity 1400 liter

    Water/foam Flow indicator 4" diameter pc 1 Isolating / Control Valve , Motorized valve

    4", Butterfly , Motorized 10

    kg/cm2pc 1

    Foam concentrate liquid Foam Concentrate Liquid Liter 1400 Type AFFF

    Concentrate 3%

    JMandatory Spare parts

    Water Spray Nozzle, 1/2",

    angle150pcs 25

    glass bullb , 79C pcs 20 Note :

    - Spare in storagehouse Adhi Karya :

    fire hose 2.5" = 37 rolls

    Wet sprinkler = 12 pcs

    Deluge Sprinkler = 3 pcs

    Noozle 2.5" = 8 pcs (to foam system)

    - Other places which sprinklers have been instaled are:

    Deluge Sprinkler installed at High Level Tank unit #1 = 4

    Deluge Sprinkler installed at High Level Tank unit #2 = 4

    Wet Sprinkler installed at burner unit #1 = 18 pcs

    Wet Sprinkler installed at burner unit #2 = 18 pcs (bought by Adhikarya from other Vendor)

    Wet Sprinkler which has been used for test = 6 pcs

    Prepared

    PT. Hanora Daya Mandiri

    Signature

    Name

    Date

    Acknowledge

    Not Installed yet

    Not Installed yet

    Not Installed yet

    Verifikasi

    2 pcs Coupling hose m

    1 pcs installed, 1 pcs

  • 7/30/2019 Check List Material Fire Alarm edit_Pak ADIT(1).xlsx

    13/23

    Project

    Contractor

    Sub Contractor

    Contract No.

    Title Of Work

    UNIT VOLUME RPASAN T

    1.1 FIRE DETECTION

    Boiler Area

    1. ID Fan and Oil Console

    Type of detector Flame Detector PCS 4

    - Input module for detector PCS 4 - Input module for pressure switch or waterflow switch PCS 4

    - Output module for Solenoid valve of Deluge system PCS 4 Cabling & acc, in steel galvanized conduit LOT 1

    Power House

    1. Turbine Oil Tank

    Type of detector Flame Detector PCS 2

    - Input module for detector PCS 2 - Input module for pressure switch or waterflow switch PCS 2 - Output module for Solenoid valve of Deluge system PCS 2 Cabling & acc, in steel galvanized conduit LOT 1

    2. Generator Transformer

    Type of detector Line termister ( LHD ) MTR 150

    LHD Test Switch PCS 2

    - Input module for detector PCS 2 - Input module for pressure switch or waterflow switch PCS 2 - Output module for Solenoid valve of Deluge system PCS 2 Cabling & acc, in steel galvanized conduit LOT 1

    3. Unit Auxiliary Transformer

    Type of detector Line termister ( LHD ) MTR 100

    LHD Test Switch PCS 2

    - Input module for detector PCS 2 - Input module for pressure switch or waterflow switch PCS 2

    - Output module for Solenoid valve of Deluge system PCS 2

    Cabling & acc, in steel galvanized conduit LOT 1

    4. BFP/BFW Oil Console Area

    Type of detector Flame Detector PCS 4 - Input module for detector PCS 4 - Input module for pressure switch or waterflow switch PCS 4 - Output module for Solenoid valve of Deluge system PCS 4 Cabling & acc, in steel galvanized conduit LOT 1

    7. MPB el 0.00

    Complete with :

    - Sounder & Strobe lamp ( combination ) PCS 6 - Manual call point/Manual push button PCS 6 - Terminal Box , for 45 I/O modules PCS 1 - Isolator Module PCS 1 - Input module for manual call point PCS 1 - Output module for Sounder & Strobe lamp PCS 1

    Period: SATURDAY, 9 JULY 2011 UNTIL 15 JULY 2011

    CONTRACT STATUSNo DESCRIPTION

    : PLTU LAMPUNG ( SEBALANG ) 2 X 100 MW

    : ADHI - JEPOE JO

    : PT HANORA DAYA MANDIRI

    : PLG-SC-303-MR-MC-0001: enga aan a e uge ys em, pr n er ys em, u oor y ran , oam ys em,

    S stem dan Fire Detection

  • 7/30/2019 Check List Material Fire Alarm edit_Pak ADIT(1).xlsx

    14/23

    7.3 #1 Outlet Room

    Type of detector Smoke Detector PCS 1

    - Input module for detector PCS 1

    Cabling & acc, in steel galvanized conduit LOT 1

    7.4 #1 Excitation Room

    Type of detector Smoke Detector PCS 1

    - Input module for detector PCS 1 Cabling & acc, in steel galvanized conduit LOT 1

    7.5 Channel

    Type of detector Smoke Detector PCS 1 - Input module for detector PCS 1 Cabling & acc, in steel galvanized conduit LOT 1

    7.6 DC Battery Room

    Type of detector Smoke Detector PCS 1

    - Input module for detector PCS 1 Cabling & acc, in steel galvanized conduit LOT 1

    7.7 Essential Room

    Type of detector Smoke Detector PCS 1 - Input module for detector PCS 1 Cabling & acc, in steel galvanized conduit LOT 1

    7.8 Chemistry Dosing Room

    Type of detector Smoke Detector PCS 1

    - Input module for detector PCS 1 Cabling & acc, in steel galvanized conduit LOT 1

    7.9 #2 MV Room

    Type of detector Smoke Detector PCS 2

    - Input module for detector PCS 1 Cabling & acc, in steel galvanized conduit LOT 1

    7.10 #2 LV Room

    Type of detector Smoke Detector PCS 2 - Input module for detector PCS 1 Cabling & acc, in steel galvanized conduit LOT 1

    7.11 #2 Outlet Room

    Type of detector Smoke Detector PCS 1

    - Input module for detector PCS 1 Cabling & acc, in steel galvanized conduit LOT 1

    7.12 #2 Excitation Room

    Type of detector Smoke Detector PCS 1 - Input module for detector PCS 1 Cabling & acc, in steel galvanized conduit LOT 1

    8 MPB el +4.50 ~ +5.00

    Complete with :

    - Sounder & Strobe lamp ( combination ) PCS 4 - Manual call point/Manual push button PCS 4

    - Terminal Box , for 11 I/O modules PCS 1

  • 7/30/2019 Check List Material Fire Alarm edit_Pak ADIT(1).xlsx

    15/23

    Type of detector Smoke Detector PCS 3

    - Input module for detector PCS 1 Cabling & acc, in steel galvanized conduit LOT 1

    8.3 Cable Mezzanine - 1

    Type of detector Smoke Detector PCS 4 - Input module for detector PCS 1 Cabling & acc, in steel galvanized conduit LOT 1

    8.4Cable Mezzanine - 2

    Type of detector Smoke Detector PCS 2

    - Input module for detector PCS 1

    Cabling & acc, in steel galvanized conduit LOT 1

    8.5 #1 Outlet Room

    Type of detector Smoke Detector PCS 1

    - Input module for detector PCS 1 Cabling & acc, in steel galvanized conduit LOT 1

    8.6 #2 Outlet Room

    Type of detector Smoke Detector PCS 1

    - Input module for detector PCS 1 Cabling & acc, in steel galvanized conduit LOT 1

    8.7 Storage - 2

    Type of detector Smoke Detector PCS 1 - Input module for detector PCS 1 Cabling & acc, in steel galvanized conduit LOT 1

    8.8 Channel - 2

    Type of detector Smoke Detector PCS 3

    - Input module for detector PCS 1 Cabling & acc, in steel galvanized conduit LOT 1

    9 MPB el +9.00

    Complete with :

    - Sounder & Strobe lamp ( combination ) PCS 4 - Manual call point/Manual push button PCS 4

    - Terminal Box , for 8 I/O modules PCS 1 - Isolator Module PCS 1 - Input module for manual call point PCS 1 - Output module for Sounder & Strobe lamp PCS 1 Cabling & acc, in steel galvanized conduit LOT 1

    9.1 Electronic Equipment Room

    Type of detector Smoke Detector PCS 12 Complete with :

    - Sounder & Strobe lamp ( combination ) PCS 8 - Manual Release CO2 PCS 4 - Abort switch PCS 4 - Terminal Box PCS 1 - Isolator Module PCS 1 - Input module for detector PCS 2 Cabling & acc, in steel galvanized conduit LOT 1

  • 7/30/2019 Check List Material Fire Alarm edit_Pak ADIT(1).xlsx

    16/23

    Cabling & acc, in steel galvanized conduit LOT 1

    9.3 Engineer Room

    Type of detector Smoke Detector PCS 1

    Complete with :

    - Sounder & Strobe lamp ( combination ) PCS 1 - Input module for detector PCS 1 Cabling & acc, in steel galvanized conduit LOT 1

    9.4 Communication Room

    Type of detector Smoke Detector PCS 1

    - Input module for detector PCS 1 Cabling & acc, in steel galvanized conduit LOT 1

    9.5 Front Room - 1

    Type of detector Smoke Detector PCS 1

    - Input module for detector PCS 1 Cabling & acc, in steel galvanized conduit LOT 1

    9.6 Front Room - 2

    Type of detector Smoke Detector PCS 1 Cabling & acc, in steel galvanized conduit LOT 1

    9.7 Pantry

    Type of detector Smoke Detector PCS 1

    - Input module for detector PCS 1 Cabling & acc, in steel galvanized conduit LOT 1

    9.8 Locker Room

    Type of detector Smoke Detector PCS 1

    Cabling & acc, in steel galvanized conduit LOT 1

    9.9 Pray Room

    Type of detector Smoke Detector PCS 1 - Input module for detector PCS 1 Cabling & acc, in steel galvanized conduit LOT 1

    10 MPB el +18.50

    Complete with :

    - Sounder & Strobe lamp ( combination ) PCS 1 - Manual call point/Manual push button PCS 1 - Terminal Box PCS 1 - Isolator Module PCS 1 - Input module for manual call point PCS 1 - Output module for Sounder & Strobe lamp PCS 1 Cabling & acc, in steel galvanized conduit LOT 1

    10.1 High Temperature Room

    Type of detector Smoke Detector PCS 1

    - Input module for detector PCS 1 Cabling & acc, in steel galvanized conduit LOT 1

    10.2 Instrument Panel Room

    Type of detector Smoke Detector PCS 2 - Input module for detector PCS 1 Cabling & acc, in steel galvanized conduit LOT 1

  • 7/30/2019 Check List Material Fire Alarm edit_Pak ADIT(1).xlsx

    17/23

    - Isolator Module PCS 1 - Input module for detector PCS 1 - Input module for pressure switch or waterflow switch PCS 1 - Output module for Solenoid valve of Deluge system PCS 1 Cabling & acc, in steel galvanized conduit LOT 1

    4. Crusher House2 sets deluge system ( 1 valve only ) , 1set wet alarm valve ( Valve

    only )

    Type of detector Line termister ( LHD ) - mtr MTR 130

    LHD Test Switch PCS 3 - Terminal Box for 10 I/O Module PCS 1 - Isolator Module PCS 1

    - Input module for detector PCS 3 - Input module for pressure switch or waterflow switch PCS 3 - Output module for Solenoid valve of Deluge system PCS 2 Cabling & acc, in steel galvanized conduit LOT 1

    5. #3 Transfer Station 2 sets deluge system

    Type of detector Line termister ( LHD ) MTR 110 LHD Test Switch PCS 3

    - Terminal Box PCS 1 - Isolator Module PCS 1 - Input module for detector PCS 3 - Input module for pressure switch or waterflow switch PCS 2 - Output module for Solenoid valve of Deluge system PCS 2 Cabling & acc, in steel galvanized conduit LOT 1

    6. #2 Transfer Station & #3 Tunnel 3 sets deluge system , 2 set wet sprinkler

    Type of detector Line termister ( LHD ) MTR 55

    LHD Test Switch PCS 3 - Terminal Box PCS 1 - Isolator Module PCS 1 - Input module for detector PCS 3 - Input module for pressure switch or waterflow switch PCS 5 - Output module for Solenoid valve of Deluge system PCS 3 Cabling & acc, in steel galvanized conduit LOT 1

    8. #1 Transfer Station 3 sets deluge system , 1 set wet sprinkler

    Type of detector Line termister ( LHD ) MTR 90 LHD Test Switch PCS 4

    - Terminal Box , for 9 I/O Module PCS 1 - Isolator Module PCS 1 - Input module for detector PCS 4 - Input module for pressure switch or waterflow switch PCS 4 - Output module for Solenoid valve of Deluge system PCS 3 Cabling & acc, in steel galvanized conduit LOT 1

    9. Coal Storage Silo

    Type of detector Line termister ( LHD ) MTR 60 LHD Test Switch PCS 2

    - Input module for detector PCS 2 Cabling & acc, in steel galvanized conduit LOT 1

  • 7/30/2019 Check List Material Fire Alarm edit_Pak ADIT(1).xlsx

    18/23

    LHD Test Switch PCS 1

    - Input module for detector PCS 1 Cabling & acc, in steel galvanized conduit LOT 1

    12. Coal Dust Collector 2 sets deluge system

    Type of detector Line termister ( LHD ) MTR 55 LHD Test Switch PCS 2

    - Input module for detector PCS 2 - Input module for pressure switch or waterflow switch PCS 2 - Output module for Solenoid valve of Deluge system PCS 2 Cabling & acc, in steel galvanized conduit LOT 1

    2.2 Miscellaneous Outdoor Building/Structures

    1. Administration Building

    Type of detector Smoke Detector PCS 50 ROR Heat Detector PCS 4

    Fixed Temp Detector PCS 2

    - Sounder & Strobe lamp ( combination ) PCS 2 - Manual call point/Manual push button PCS 2 - Terminal Box PCS 2 - Isolator Module PCS 1 - Input module for detector PCS 2 - Output module for Sounder & Strobe lamp PCS 2 Cabling & acc, in steel galvanized conduit LOT 1

    2. Chlorination Building

    Type of detector Smoke Detector PCS 3 - Sounder & Strobe lamp ( combination ) PCS 1 - Manual call point/Manual push button PCS 1 - Terminal Box PCS 1 - Isolator Module PCS 1 - Input module for detector PCS 1 - Output module for Sounder & Strobe lamp PCS 1 Cabling & acc, in steel galvanized conduit LOT 1

    3. Water Treatment Building

    Type of detector Smoke detector PCS 6

    - Sounder & Strobe lamp ( combination ) PCS 1 - Manual call point/Manual push button PCS 1 - Terminal Box PCS 1 - Isolator Module PCS 1 - Input module for detector PCS 1 - Output module for Sounder & Strobe lamp PCS 1 Cabling & acc, in steel galvanized conduit LOT 1

    4. Waste Water Treatment Building

    Type of detector Smoke detector PCS 4

    - Sounder & Strobe lamp ( combination ) PCS 1 - Manual call point/Manual push button PCS 1 - Terminal Box PCS 1 - Isolator Module PCS 1 - Input module for detector PCS 1

    - Output module for Sounder & Strobe lamp PCS 1

  • 7/30/2019 Check List Material Fire Alarm edit_Pak ADIT(1).xlsx

    19/23

    Cabling & acc, in steel galvanized conduit LOT 1

    6. HSD Oil Pump House

    Type of detector Smoke detector PCS 2

    - Input module for detector PCS 1 - Input module for pressure switch or waterflow switch PCS 1 - Output module for Solenoid valve of Deluge system PCS 1 Cabling & acc, in steel galvanized conduit LOT 1 7. Emergency Diesel Generator Building

    Type of detector Smoke Detector PCS 5

    - Terminal Box , for 14 I/O Module PCS 1 - Isolator Module PCS 1

    - Input module for detector PCS 1 Cabling & acc, in steel galvanized conduit LOT 1

    8. Foam Maker

    - Input module for pressure switch or waterflow switch PCS 1 open control PCS 1

    closed control PCS 1

    - Start-stop / Manual - Auto control panel for 3 unit PCS 1

    motorized valve

    Cabling & acc, in steel galvanized conduit LOT 1

    2.3 Miscellaneous Requirements

    Consist of

    LCD Annunciator PCS 1 Main Fire Alarm Control Panel PCS 1

    Evacuate Sign Lamp PCS 7

    Gas Discharge Sign Lamp PCS 6 CO2 Main Control Panel PCS 2

    Loop Relay Module PCS 2 Loop Splitter PCS 2 Addr. Network Power supply unit c/w batt. PCS 2 Isolator Module PCS 10

    LOT 1

    Sub Total Fire Detection

    2.1 FIRE PROTECTION

    A Boiler Area

    1. ID Fan and Oil Console

    Deluge Valve

    Size 4" sets 4 Water Spray Nozzle/Open Sprinkler Water Spray Nozzle, 1/2", angle150 pcs 10

    2. BFW Pump

    Deluge valve

    Size 4" sets 4

    Water Spray Nozzle/Open Sprinkler Water Spray Nozzle, 1/2", angle150 pcs 22

    B Power House

    1. Turbine Oil Tank

    Deluge Valve

    Si 4" 2

    - Output module for Motorized Valve

    Cabling & acc, in steel galvanized conduit 2 loops and repeater, data & power cable, loop connection

  • 7/30/2019 Check List Material Fire Alarm edit_Pak ADIT(1).xlsx

    20/23

    4. Central Control Room (CCR)

    Complete with : 68 ltr cylinder c/w valve , filled 45kg CO2 pcs 11

    - Flexible discharge hose Flexible discharge hose pcs 11 - Pilot actuation hose Pilot actuation hose pcs 10 - Electric solenoid actuator Electric solenoid actuator + Manual Lever pc 1 - Discharge Nozzle Discharge Nozzle , dia 3/4" pcs 10 - Manifold system & cylinder bracket Manifold & cylinder bracket for 11 cyl pc 1 Piping , ASTM A-53 A , sch. 40 , seamless Wire brush cleaning , Jotun epoxy paint lot 1

    5. Electronic Equipment Room

    Complete with : 68 ltr cylinder c/w valve , filled 45kg CO2 pcs 30 - Flexible discharge hose Flexible discharge hose pcs 30 - Pilot actuation hose Pilot actuation hose pcs 29

    - Electric solenoid actuator Electric solenoid actuator + Manual Lever pc 1

    - Discharge Nozzle Discharge Nozzle , dia 3/4" pcs 30

    - Manifold system & cylinder bracket Manifold & cylinder bracket ,for 15 cyl pc 2

    Piping , ASTM A-53 A , sch. 40 , seamless Wire brush cleaning , Jotun epoxy paint lot 1

    Coal/Limestone and Ash Handling Area

    1. Coal Bunker/Coal Storage Silo

    2. Head Bed Layer

    3. #5 Trestle

    4. Crusher House

    5. #3 Transfer Station

    6. #3 Transfer Station & #3 Tunnel

    7. #2 Tunnel

    8. #1 Transfer Station

    a). Deluge Valve

    Size 4" sets 11

    Water Spray Nozzle/Open Sprinkler Water Spray Nozzle, 1/2", angle150 pcs 79

    b). Wet Alarm Valve

    Quantity

    Size 6" sets 3 4" sets 2

    Water Spray Nozzle/Sprinkler Head Sealed , pendent ,1/2",79C , glass bulb pcs 350

    6. Coal Dust Collector

    Deluge Valve

    Size 4" sets 2

    Water Spray Nozzle/Open Sprinkler Water Spray Nozzle, 1/2", angle150 pcs 32

    D HSD Oil System

    1. HSD Oil Tanks

    Deluge Valve

    Size 4" sets 2

  • 7/30/2019 Check List Material Fire Alarm edit_Pak ADIT(1).xlsx

    21/23

    3. Emergency Diesel Generator Building

    Deluge Valve

    Size 4" sets 1

    Water Spray Nozzle/Open Sprinkler Water Spray Nozzle, 1/2", angle150 pcs 16

    E TYPE OF FIRE PROTECTION EQUIPMENT (OUTDOOR AREA)

    1. Administration Building

    Yard Hydrant 2 ways

    Quantity 4" x 2,5" x 2,5" pcs 2 Outdoor Hydrant Box size 95x66x20cm rolls 2 - Fire hose 2 roll 2,5" x 20m rolls 4 - Jet Nozzle 2,5" pc 2

    2. BOILER #2

    Yard Hydrant 2 ways

    Quantity 4" x 2,5" x 2,5" pcs 2 Outdoor Hydrant Box size 95x66x20cm rolls 2

    - Fire hose 2 roll 2,5" x 20m rolls 4 - Jet Nozzle 2,5" pc 2

    3. Oil Station

    Yard Hydrant 2 ways

    Quantity 4" x 2,5" x 2,5" pcs 2 Outdoor Hydrant Box size 95x66x20cm rolls 2

    - Fire hose 2 roll 2,5" x 20m rolls 4

    - Jet Nozzle 2,5" pc 2

    4. HSD Oil Storage Area

    Siamese Connection

    Type 2ways

    Size 4" x 2.5" x 2.5" pc 1

    4", Check valve, 10 kg/cm pc 1

    5. Coal Handling Electrical Room

    Yard Hydrant 2 ways

    Quantity 4" x 2,5" x 2,5" pcs 1

    Outdoor Hydrant Box size 95x66x20cm rolls 1

    - Fire hose 2 roll 2,5" x 20m rolls 2

    - Jet Nozzle 2,5" pc 1

    6. Coal Crusher Building

    Yard Hydrant 2 ways

    Quantity 4" x 2,5" x 2,5" pcs 1

    Outdoor Hydrant Box size 95x66x20cm rolls 1

    - Fire hose 2 roll 2,5" x 20m rolls 2 - Jet Nozzle 2,5" pc 1

    7. Waste Water Treatment Building

    Yard Hydrant 2 ways

    Quantity 4" x 2,5" x 2,5" pcs 1 Outdoor Hydrant Box size 95x66x20cm rolls 1 - Fire hose 2 roll 2,5" x 20m rolls 2 - Jet Nozzle 2,5" pc 1

    8. BOILER #1

    Yard Hydrant 2 ways

    Quantity 4" x 2,5" x 2,5" pcs 1

  • 7/30/2019 Check List Material Fire Alarm edit_Pak ADIT(1).xlsx

    22/23

    10. Ash Diposal

    Yard Hydrant 2 ways

    Quantity 4" x 2,5" x 2,5" pcs 5 Outdoor Hydrant Box size 95x66x20cm rolls 5

    - Fire hose 2 roll 2,5" x 20m rolls 10

    - Jet Nozzle 2,5" pc 5

    11. Chlorination Building

    Yard Hydrant 2 ways

    Quantity 4" x 2,5" x 2,5" pcs 1 Outdoor Hydrant Box size 95x66x20cm rolls 1 - Fire hose 2 roll 2,5" x 20m rolls 2 - Jet Nozzle 2,5" pc 1

    12. WAREHOUSE

    Yard Hydrant 2 ways

    Quantity 4" x 2,5" x 2,5" pcs 1

    Outdoor Hydrant Box size 95x66x20cm rolls 1

    - Fire hose 2 roll 2,5" x 20m rolls 2 - Jet Nozzle 2,5" pc 1

    13. COAL YARD

    Yard Hydrant 2 ways

    Quantity 4" x 2,5" x 2,5" pcs 3

    Outdoor Hydrant Box size 95x66x20cm rolls 3 - Fire hose 2 roll 2,5" x 20m rolls 6 - Jet Nozzle 2,5" pc 3

    14. Buldozer Building (Fire Station)

    Yard Hydrant 2 ways

    Quantity 4" x 2,5" x 2,5" pcs 1

    Outdoor Hydrant Box size 95x66x20cm rolls 1

    - Fire hose 2 roll 2,5" x 20m rolls 2 - Jet Nozzle 2,5" pc 1

    15. TT#2 Area

    Yard Hydrant 2 ways

    Quantity 4" x 2,5" x 2,5" pcs 1

    Outdoor Hydrant Box size 95x66x20cm rolls 1 - Fire hose 2 roll 2,5" x 20m rolls 2 - Jet Nozzle 2,5" pc 1

    16. JETTY

    Yard Hydrant 2 ways

    Quantity 4" x 2,5" x 2,5" pcs 2 Outdoor Hydrant Box size 95x66x20cm rolls 2

    - Fire hose 2 roll 2,5" x 20m rolls 4

    - Jet Nozzle 2,5" pc 2

    14. Foam system

    Foam Hydrant Yard Hydrant ,2 ways , 4 x 2,5"x 2,5 " pcs 4 Quantity Outdoor Hydrant Box, berisi : pcs 4

    Fire hose 4 roll, 2,5" x 20 meter rolls 16

    Foam Nozzle dia. 2,5" = 2buah pcs 8

    15. Foam Maker

  • 7/30/2019 Check List Material Fire Alarm edit_Pak ADIT(1).xlsx

    23/23

    Note :

    Others material placed:

    No Description Area Position Quantity Unit

    1 Water spray nozzle 1/2", angle 150 Warehouse Stored 3 pcs

    2 Water spray nozzle 1/2", angle 150 Drainage Tank #1 (Turbine Elv. 9.00) Installed 4 pcs

    3 Water spray nozzle 1/2", angle 150 Drainage Tank #2 (Turbine Elv 9.00) Installed 4 pcs

    4 Water spray nozzle 1/2", angle 150Oil Purifier #1 Installed 20 pcs

    5 Water spray nozzle 1/2", angle 150Oil Purifier #2 Installed 20 pcs

    6 Sprinkler Head, 1/2", 79C , glass bulb Warehouse Stored 12 pcs

    7 Sprinkler Head, 1/2", 79C , glass bulbBurner #1 Installed 18 pcs

    8

    Sprinkler Head, 1/2", 79C , glass bulb Burner #2 Installed 18 pcs

    9 Fire Hose 2,5" Warehouse Stored 37 roll

    10 Nozzle foam system 2,5" Warehouse Stored 8 pcs

    46 37Prepared Acknowledge

    PT. Hanora Daya Mandiri

    Name

    Date

    Signature

    Remark

    19 pcs deluge sprinkler head installed, 1

    pcs not yet

    18 pcs deluge sprinkler head installed + 2

    pcs wet sprinkler head

    #2 Burner Elv 9.0= 6 pcs

    #2 Burner Elv 4.5 = 12 pcs wet sprinkler

    #2 Burner Elv 9.0= 6 pcs wet sprinkler

    #2 Burner Elv 4.5 = 11 pcs wet sprinkler +

    1 pcs deluge sprinkler