APPENDIKS CSPESIFIKASI ALAT

1. OPEN YARD PASIR BESI (F-111)Fungsi : Menyimpan pasir besi yang digunakan sebagai bahan baku proses.Kondisi operasi: Suhu = 30oC Poperasi = 1 atmYang akan dihitung : Volume dan jumlah open yard yang dibutuhkanLangkah Perhitungan:mpasir besi= 72.832,34 kg/jampasir besi = 1.450 kg/m3(sumber:http://etd.eprints.ums.ac.id/1709/) Vpasir besi= = = 50,229 m3/jam

Kapasitas penyimpanan ditetapkan 30 hari (sumber : Ulrich, Tabel 4-27,p.249)Sehingga Vpasir besi = 50,229 m3/jam x 30 hari x 24 jam = 36.165,024 m3

Vmaks = 200.000 m3/open yard (sumber : Ulrich, Tabel 4-27, p.248)

V = 0,25 x x D2 x 0,4 x D36.165,024 = 0,1 x x D3D = = 48,654 m

Dmax = 120 m (sumber : Ulrich, tabel. 4-27,p . 248)

Tinggi open yard (L) = 0,4 x D = 0,4 x 48,654 = 19,462 m

Spesifikasia. Volume = 36.165,024 m3b. Diameter = 48,654 mc. Tinggi= 19,462 md. Jumlah alat= 1 unit

2. OPEN YARD LIMESTONE (F-121)Fungsi : Menyimpan limestone yang digunakan sebagai bahan baku proses.Kondisi operasi : Suhu = 30oC Poperasi = 1 atmYang akan dihitung : Volume dan jumlah open yard yang dibutuhkanLangkah Perhitungan :mlimestone= 30.384,21 kg/jamlimestone= 2.670 kg/m3 (sumber:http://groups.yahoo.com/group/infokom_pangkep/message/1) Vlimestone= = = 11,38 m3/jam

Kapasitas penyimpanan ditetapkan 30 hari (sumber : Ulrich, Tabel 4-27,p.249)Sehingga Vlimestone = 11,38 m3/jam x 30 hari x 24 jam= 8.193,495 m3

Vmaks = 200.000 m3/open yard (sumber : Ulrich, Tabel 4-27, p. 248)

V = 0,25 x x D2 x 0,4 x D8.193,495= 0,1 x x D3D= = 29,661 m

Dmax = 120 m (sumber : Ulrich, tabel. 4-27, p.248)

Tinggi open yard (L) = 0,4 x D = 0,4 x 29,661 = 11,864 m

Spesifikasia. Volume = 8.193,495 m3b. Diameter = 29,661 mc. Tinggi= 11,864 md. Jumlah alat= 1 unit

3. CLOSED STORAGE KOKAS (F-125)Fungsi: Menyimpan kokas yang digunakan sebagai bahan baku proses.Kondisi operasi : Suhu = 30oC Poperasi = 1 atmYang akan dihitung : Volume dan jumlah bin yang dibutuhkanLangkah Perhitungan :mkokas= 24.611,21 kg/jamkokas= 2.600 kg/m3 (sumber:http://groups.yahoo.com/group/infokom_pangkep/message/1) Vkokas= = = 9,466 m3/jam

Kapasitas penyimpanan ditetapkan 8 jam (sumber : Ulrich, Tabel 4-27,p.249)Sehingga Vkokas = 9,466 m3/hari x 8 jam= 75,727 m3

Vmaks = 4.000 m3/bin (sumber : Ulrich, Tabel 4-27, p.248)

Tan ( ) = dan P = LTan ( x 120 ) = Tan 60= Tlimas = 0,41 P

Vbin = Vkubus + Vlimas = P x L x Tkubus + P x L x 1/3 Tlimas

Tkubus = 3 P dan P = L

Vbin = P x P x 3 P + P x P x 1/3 x 0,41 P75,727 = 3 P3 + 0,137 P3 = 3,137 P3 P = P = 2,89 m

L = P = 2,89 mTlimas = 0,41 P = 0,41 x 2,89 = 1,185 mTkubus = 3 P = 3 x 2,89 = 8,67 mT = Tlimas + Tkubus = 1,185 + 8,67 = 9,855 m

Bahan konstruksi = SA 240 GR M type 316 (sumber : Brownell&Young, p.342)f = 18.750 psi

t = t = 1,984 m

Spesifikasia. Volume = 75,727 m3b. Panjang = 2,89 mc. Lebar= 2,89 md. Tinggi= 9,855 me. Tebal= 1,984 mf. Jumlah alat= 1 unit

4. BIN KOKAS (F-126-A)Fungsi: Menyimpan kokas yang digunakan sebagai bahan baku proses.Kondisi operasi : Suhu = 30oC Poperasi = 1 atmYang akan dihitung : Volume dan jumlah bin yang dibutuhkanLangkah Perhitungan :mkokas= 24.611,21 kg/jamkokas= 2.600 kg/m3 (sumber:http://groups.yahoo.com/group/infokom_pangkep/message/1) Vkokas= = = 9,466 m3/jam

Kapasitas penyimpanan ditetapkan 8 jam (sumber : Ulrich, Tabel 4-27,p.249)Sehingga Vkokas = 9,466 m3/hari x 8 jam= 75,727 m3

Vmaks = 4.000 m3/bin (sumber : Ulrich, Tabel 4-27, p.248)

Tan ( ) = dan P = LTan ( x 120 ) = Tan 60= Tlimas = 0,41 P

Vbin = Vkubus + Vlimas = P x L x Tkubus + P x L x 1/3 Tlimas

Tkubus = 3 P dan P = L

Vbin = P x P x 3 P + P x P x 1/3 x 0,41 P75,727 = 3 P3 + 0,137 P3 = 3,137 P3 P = P = 2,89 m

L = P = 2,89 mTlimas = 0,41 P = 0,41 x 2,89 = 1,185 mTkubus = 3 P = 3 x 2,89 = 8,67 mT = Tlimas + Tkubus = 1,185 + 8,67 = 9,855 m

Bahan konstruksi = SA 240 GR M type 316 (sumber : Brownell&Young, p.342)f = 18.750 psi

t = t = 1,984 m

Spesifikasig. Volume = 75,727 m3h. Panjang = 2,89 mi. Lebar= 2,89 mj. Tinggi= 9,855 mk. Tebal= 1,984 ml. Jumlah alat= 1 unit

5. BIN LIMESTONE (F-126-B)Fungsi : Menyimpan limstone sementara sebelum diproses di blast furnace.Kondisi operasi : Suhu = 30oC Poperasi = 1 atmYang akan dihitung : Volume dan jumlah bin yang dibutuhkanLangkah Perhitungan :mlimestone= 27.345,788 kg/jamlimestone= 2.670 kg/m3 (sumber:http://groups.yahoo.com/group/infokom_pangkep/message/1) Vlimestone= = = 10,24 m3/hari

Kapasitas penyimpanan ditetapkan 8 jam (sumber : Ulrich, Tabel 4-27,p.249)Sehingga Vlimestone = 10,24 m3/hari x 8 jam= 81,935 m3

Vmaks = 4.000 m3/bin (sumber : Ulrich, Tabel 4-27, p.248)

Tan ( ) = dan P = LTan ( x 120 ) = Tan 60= Tlimas = 0,41 P

Vbin = Vkubus + Vlimas = P x L x Tkubus + P x L x 1/3 Tlimas

Tkubus = 3 P dan P = L

Vbin = P x P x 3 P + P x P x 1/3 x 0,41 P81,935 = 3 P3 + 0,137 P3 = 3,137 P3 P = P = 2,967 m

L = P = 2,967 mTlimas = 0,41 P = 0,41 x 2,967 = 1,217 mTkubus = 3 P = 3 x 2,967 = 8,901 mT = Tlimas + Tkubus = 1,217 + 8,901 = 10,118 m

Bahan konstruksi = SA 240 GR M type 316 (sumber : Brownell&Young, p.342)f = 18.750 psi

t = t = 2,092 m

Spesifikasia. Volume = 81,935 m3b. Panjang = 2,967 mc. Lebar= 2,967 md. Tinggi= 10,118 me. Tebal= 2,092 mf. Jumlah alat= 1 unit

6. BIN PASIR BESI (F-126-C)Fungsi : Menyimpan pasir besi sementara sebelum diproses di blast furnace.Kondisi operasi: Suhu = 30oC Poperasi = 1 atmYang akan dihitung : Volume dan jumlah bin yang dibutuhkanLangkah Perhitungan:mpasir besi= 60.930,842 kg/jampasir besi = 1.450 kg/m3(sumber:http://etd.eprints.ums.ac.id/1709/) Vpasir besi= = = 42,021 m3/jam

Kapasitas penyimpanan ditetapkan 8 jam (sumber : Ulrich, Tabel 4-27,p.249)Sehingga Vpasir besi = 42,021 m3/jam x 8 jam= 366,17 m3

Vmaks = 4.000 m3/bin (sumber : Ulrich, Tabel 4-27, p.248)

Tan ( ) = dan P = LTan ( x 120 ) = Tan 60= Tlimas = 0,41 P

Vbin = Vkubus + Vlimas = P x L x Tkubus + P x L x 1/3 Tlimas

Tkubus = 3 P dan P = L

Vbin = P x P x 3 P + P x P x 1/3 x 0,41 P336,17 = 3 P3 + 0,137 P3 = 3,137 P3 P = P = 4,75 m

L = P = 4,75 mTlimas = 0,41 P = 0,41 x 4,75 = 1,947 mTkubus = 3 P = 3 x 4,75 = 14,25 mT = Tlimas + Tkubus = 1,947 + 14,25 = 16,197 m

Bahan konstruksi = SA 240 GR M type 316 (sumber : Brownell&Young, p.342)f = 18.750 psi

t = t = 3,122 m

Spesifikasia. Volume = 336,17 m3b. Panjang = 4,75 mc. Lebar= 4,75 md. Tinggi= 16,197 me. Tebal= 3,122 mf. Jumlah alat= 1 unit

7. JAW CRUSHER (C-122)Fungsi : Untuk mengubah ukuran limestone yang masuk dan limestone yang oversize pada screener.Kondisi operasi: Suhu = 30oC Poperasi = 1 atmKapasitas: 30.384,21 kg/jam 30,384 ton/jam

Spesifikasi (sumber: Perry's 7th ed, tabel 20-8. p.20-24)a. Tipe= jaw crusher b. Ukuran= standard 22 inc. Rpm= 400 rpmd. Power= 10 hpe. Jumlah alat= 1 unit

8. ROLL CRUSHER (C-124)Fungsi : Untuk mengubah ukuran limestone menjadi lebih kecil.Kondisi operasi: Suhu = 30oC Poperasi = 1 atmKapasitas: 3.038 kg/jam 3,038 ton/jam

Spesifikasi (sumber: Perry's 7th ed, tabel 20-12. p.20-27)a. Tipe= open circuit HP200 b. Ukuran= 0,25 inc. Rpm= 1200 rpmd. Power= 150 hpe. Jumlah alat= 1 unit

9. SCREENER LIMESTONE (H-123)Fungsi: Untuk memisahkan limestone yang sudah berukuran kecil/undersize untuk dibawa menuju bin dan yang masih berukuran besar/oversize nantinya akan direcycle menuju crusher.Kondisi operasi: Suhu = 30oC Poperasi = 1 atmYang akan dihitung : luas area screenLangkah perhitungan:Massa feed = 30.384,21 kg/jamMassa oversize (y) = 3.038,42 kg/jamMassa undersize (x) = 27.345,789 kg/jamUkuran = 0,01 cmDigunakan High-speed vibrating screens dengan screen Tyler ukuran 20 mesh.Diameter kawat (d) = 0,51 mm(sumber : Perry, p.19-20) = 0,051 cm

Bukaan sieve (a) = 0,841 mm= 0,0841 cm

Kode sieve = 841 micron

Penentuan luas area screenA = (sumber : Perry's 7th ed, eq 19-7, p 19-23)

Dimana A = luas screen Ct = rate aliran Cu = kapasitas unit Foa = faktor luas bukaan Fs = faktor luas slotCt = 27.345,789 kg/jam = 27,345 ton/jam

Cu = 0,3 ton/jam ft2 (sumber : Perry's 7th ed, fig 19-21, p 19-24) Foa = 100 x = 100 x = 38,75%

Fs = 1 (sumber : Perry's 7th ed, tabel 19-7, p 19-23)

A = = 94,091 ft2

Efisiensi ( E ) = Dimana c = fraksi partikel oversize di atas screen f= fraksi partikel oversize di atas feed

rasio = = = 0,17 = 0,2Berdasarkan Wills 6th ed Table 8.1, untuk rasio 0.2 dipoleh fraksi partikel lolos sebesar 0,64.Jumlah partikel undersize lolos screenz = 0,64 x 27.375,789 = 17.501,3 kgJumlah partikel undersize yang tidak lolos screenw = 27.375,789 - 17.501,3 = 9.844,489 kg

c = = 0,236

f = = 0,1

E = = 64%

Dari Perry 3rd ed Hal 956 didapat Power Screen = 0.05-0.1 HP/ft2. Diambil Power screen 0,1 hp/ft2 dengan efisiensi 80%, maka kebutuhan power untuk vibrating adalahPower vibrating = = 11,76 hp = 12 hp

Spesifikasia. Tipe= screen Tylerb. Ukuran= 20 meshc. Diameter= 0,051 cmd. Bukaan sieve= 0,0841 cme. Kode sieve= 841 micronf. Luas screen= 94,091 ft2g. Power vibrating = 12 hph. Jumlah alat= 1 unit

10. TANGKI SLURRY (M-113)Fungsi: Untuk membuat slurry pasir besi dengan air proses 30oC hingga terbentuk slurry 20% padatan.Kondisi operasi : Suhu = 30oC Poperasi = 1 atmYang akan dihitung : volume tangki dan dimensi tangkiLangkah perhitungan :mslurry = mpasir besi + mair = 72.832,34 + 291.329,36 = 364.161,7 kg/jam = 802.838,167 lb/jam

Menentukan volume tangkiPasir besiAir

Massa72.832,34 kg291.329,36 kg

Densitas1450 kg/m31000 kg/m3

Volume50,229 m3291,329 m3

slurry = = = 1.066,18 kg/m3= 66,428 lb/ft3

Waktu tinggal = 1/3 jam

m total = 802.838,167 lb/jam x 1/3 jam = 267.612,722 lb

Vslurry = = = 4.028,587 ft3Ditetapkan ruang kosong 10% dari volume slurry, sehinggaVtangki (Vt) = = 4.431,445 ft3

Menentukan desain dimensi tangkiTangki berupa silinder tegak dengan tutup atas dan bawah berbentuk standar dish headDan digunakan = 1,5

Volume silinder (Vs) = =

Volume tutup (Vdish) = 0,0847 x Ds3

Vt = Vs + Vdish4.431,445 = + 0,0847 x Ds34.431,445 = 1,378 x Ds3 Ds3 = 3.287,4919 Ds= 14,869 ft = 178,431 inStandarisasi OD = 180 in (sumber : Brownel&Young, tabel 5.7, p.91)= 15 ft

Ls = 1,5 x DsLs = 1,5 x 15 = 22,5 ft = 270 inTinggi tutup atas (ha) = 0,169 x D = 0,169 x 180 = 30,42 in = 2,54 ft

Tinggi tutup bawah (hb) = ha = 30,42 in = 2,54 ft

Vdish = 0,0847 x Ds3 = 0,0847 x 153 = 285,863 ft3

V larutan silinder (Vl) = V larutan Vdish = 4.028,587 285,863 = 3.742,724 ft3

Tinggi larutan silinder (hl) = = = 21,19 ft

Tinggi larutan tangki (Hl) = hl + hb = 21,19 + 2,54 = 23,73 ft

Tinggi tangki (ht) = Ls + ha + hb = 22,5 + 2, 54 + 2,54 = 27,58 ft

Pdesain = 1,05 x ( Phidrostatik + Pdalam tangki ) = 1,05 x ( + 14,696 ) = 1,05 x ( + 14,696) = 11,49 + 15,43 = 26,923 psi = 12,227 psig

Bahan konstruksi = Carbon steel, SA 283 tipe C (sumber : Brownel&Young, tabel 13.1, p.251)f = 12.650 lb/in2sambungan las, dipilih tipe double welded butt joint E = 0,8Faktor korosi, c = 0,125 in

Tebal silinder (ts) = = = 0,234 inStandarisasi ts = 4/16 in = 0,021 ft

ID = OD (2 x ts)= 180 (2 x 4/16)= 179,5 in

Tebal tutup atas (tha) = dimana r = OD = = 0,318 inStandarisasi tha = 7/16 in = 0,037 ft

tha = thb = 7/16 inicr = 7/8 in(sumber : Brownel&Young, tabel 5.5, p.88)sf = 6 in

tinggi total tangki + ketebalan (Ht) = ha + tha + hb + thb + Ls + ts + sf = 30,42 + 7/8 + 30,42 + 7/8 + 270 + 4/16 +6 = 338,59 in = 28,216 ft

Menentukan dimensi pengadukair = 0,8007 cp = 0,000538 lbm/ft.s(sumber: Geankoplis, p.855)slurry = 66,428 lbm/ft3

Dipakai impeller jenis turbin dengan 6 buah flat blade dengan 4 baffle diameter impeller (Di) = 0,333 x OD (sumber : G.G Brown p.507) = 0,333 x 15 = 5 ftLebar daun impeler = 0,2 x Di = 0,2 x 5 = 1 ftPanjang blade = 0,25 x Di = 0,25 x 5 = 1,25 ftTebal blade = 0,1 x Ds = 0,1 x 15 = 1,5 ft

Jumlah pengaduk = = = 0,47Ditetapkan jumlah pengaduk = 1Letak pengaduk = Di = 5 ft

Kecepatan putar impeller ditetapkan :N = 100 rpm = 1,67 rps

= 1,57 lbm/ft.s

Nre = = = 1763

Dari kurva A fig.9-13 (Mc.Cabe), untuk Nre = 1763 didapatkan bilangan daya (Np) = 0,85Daya pengaduk (P) = = = 46,16 hp

Kobocoran tenaga akibat poros dan bearing (Gland losses) = 10% x power input = 0,1PiKebocoran tenaga akibat motor seperti pada belt dan gear = 20% x power input = 0,2Pi

Total power yang diperlukan (Pi) = P + 0,1Pi + 0,2Pi Pi =46,16 + 0,3Pi 0,7Pi = 46,16 Pi = 65,95 hp Pi = 49,18 kWEfisiensi motor ditetapkan 80%Power motor = = 61,47 kW

Spesifikasia. Volume tangki= 4.431,445 ft3b. Material= Carbon steel, SA 283 tipe Cc. Bentuk tutup= standard dish headd. Sambungan las= double welded butt jointe. Faktor korosi= 0,125 inf. Pdesain= 26,923 psig. Diameter luar(OD)= 180 inh. Tinggi silinder (Hs)= 270 ini. Tinggi tutup (ha=hb)= 30,42 inj. Tinggi tangki (ht)= 27,57 ftk. Tebal silinder (ts)= 4/16 inl. Diameter dalam (ID)= 179,5 inm. Tebal tutup (tha=thb)= 7/16 inn. Tinggi total tangki (Ht) = 338,59 ino. Jenis impeler= turbine dengan 6 buah flat blade dengan 4 bafflep. Diameter impeler (Di) = 60 inq. Lebar daun impeler= 10,2 inr. Panjang blade= 15 ins. Tebal blade= 18 int. Jumlah pengaduk= 1u. Jarak pengaduk= 5 ft dari dasar shellv. Kecepatan putar impeler = 100 rpmw. Bilangan Reynold (Nre) = 1.763x. Bilangan daya (Np) = 0,85y. Power motor= 61,47 kWz. Jumlahalat= 1 unit

11. POMPA AIR (L-112)Fungsi : Untuk mengalirkan air ke dalam tangki slurry dan magnetic separator.Kondisi operasi : Suhu = 30oC Tekanan = 1 atmLangkah perhitungan :Rate air = 291.329,36 + 173.180,465 = 464.509,825 kg/jam = 1.024.068,798 lb/jamViskositas () = 0,8007 cpDensitas () = 995,68 kg/m3 = 62,019 lb/ft3Rate volumetrik (Q) = = 4,587 ft3/s = 2.058,676 gpm = 1,042 m3/jamAliran dianggap turbulent,sehinggaDi, opt = 3,9 x Q0,45 x 0,13(sumber : Timmerhaus, p.496)Di = 3,9 x 4,5870,45 x 62,0190,13 = 13,236 in

Karena diameter yang ada di pasaran hanya sampai 8 in maka dipakai 3 buah pompa untuk memudahkan mengalirkan air ke dalam tangki slurry dan magnetic separator.

Rate air = = 154.836,608 kg/jam = 341.356,266 lb/jamViskositas () = 0,8007 cpDensitas () = 995,68 kg/m3 = 62,019 lb/ft3Rate volumetrik (Q) = = 1,529 ft3/s = 686,225 gpm = 0,347 m3/jamAliran dianggap turbulent,sehinggaDi, opt = 3,9 x Q0,45 x 0,13(sumber : Timmerhaus, p.496)Di = 3,9 x 1,5290,45 x 62,0190,13 = 8,074 inDiameter standar 8 in sch 80 (sumber : Geankoplis, App AQ.5-1, p.892)ID = 7,625 in = 0,635 ft = 0,195 mOD = 8,625 in = 0,719 ft = 0,219 mA = 0,3171 ft2 = 0,029 m2v = = = 4,822 ft/s

NRE = = = 399.454,466( karena lebih besar dari 2100, maka asumsi benar )

B

A

Menghitung friksiA. Friksi di bagian suction1. Friksi yang terjadi karena adanya kontraksi ( air masuk dari expander ke pipa 8 in )Fc = Dimana Kc = dengan A1 >>>Sehingga Kc = 0,55

Fc = = 6,393 ft lbf/lbm

2. Friksi karena pipa lurusPanjang pipa lurus bagian suction diperkirakan 20 ftBahan konstruksi pipa adalah commercial steel , e = 4,6 x 10-5 sehinggae/D = = 0,000238NRE = 399.454,466Dari Geankoplis fig. 2.10-3 p.88 didapat f = 0,0037Fps = = = 0,168 ft lbf/lbm

Friksi bagian suction Fs = Fc + Fps = 6,393 + 0,168 = 6,561 ft lbf/lbm

B. Friksi di bagian discharge1. Friksi karena pipa lurusPanjang pipa lurus diperkirakan 40 ftFpd = = = 0,337 ft lbf/lbm2. Friksi karena fitting and valveJenis fitting and valveKfJumlah

Elbow 90o standar0,752

Globe valve (wide open)61

hf (elbow) = = = 0,271 ft lbf/lbmhf (valve) = = = 2,168 ft lbf/lbmFriksi bagian discharge Fd = Fpd + [ 2 x hf (elbow) ] + hf (valve) = 0,337 + ( 2 x 0,271 ) + 2,168 = 3,046 ft lbf/lbm

Friksi total pompa ( F ) = Fs + Fd = 6,561 + 3,046 = 9,607 ft lbf/lbm

Menghitung power pompaZa = bidang datum = 0 fta = b = 62,019 lb/ft3vb = va = 4,822 ft/s = = Ws = 39,608 ft lbf/lbmEfisensi pompa (h) ditentukan 90% sehinggaBhp = (sumber : Geankoplis, hal 134) = = 7,587 hp = 5,658 kW

Efisiensi motor ditentukan 80% sehinggaPower motor = = = 9,48 hpDipilih power motor = 10 hp

Spesifikasia. Tipe = centrifugal pumpb. Diameter pipa = 8 inc. Kecepatan alir = 4,82 ft/sd. Kerja pompa = 39,608 ft lbf/lbme. Daya pompa = 8 hpf. Power motor = 10 hpg. Jumlah alat = 3 unit

12. POMPA SLURRY (L-114)Fungsi : Untuk mengalirkan slurry dari tangki slurry ke magnetic separator.Kondisi operasi : Suhu = 30oC Tekanan = 1 atmLangkah perhitungan :Rate slurry =364.161,7 kg/jam = 802.839,067 lb/jamDensitas () = 1.066,177 kg/m3 = 66,428 lb/ft3Rate volumetrik (Q) = = 3,357 ft3/s = 1.506,798 gpm = 0,762 m3/jamAliran dianggap turbulent,sehinggaDi, opt = 3,9 x Q0,45 x 0,13(sumber : Timmerhaus, p.496)Di = 3,9 x 3,3570,45 x 66,4280,13 = 8,545 in = 9 in

Karena diameter yang ada di pasaran hanya sampai 8 in maka dipakai pompa 2 buah untuk memudahkan mengalirkan slurry dari tangki slurry ke magnetic separator.

Rate slurry = = 182.080,85 kg/jam = 401.419,53 lb/jamDensitas () = 1.066,177 kg/m3 = 66,428 lb/ft3 (sumber : Perry 5th ed, p.247)s = = = 0,25Viskositas liquid (l) = 0,8007 cpViskositas slurry (m) = = 1,957 cpRate volumetrik (Q) = = 1,679 ft3/s = 753,399 gpm = 0,381 m3/jamAliran dianggap turbulent,sehinggaDi, opt = 3,9 x Q0,45 x 0,13(sumber : Timmerhaus, p.496)Di = 3,9 x 1,6790,45 x 66,4280,13 = 6,255 inDiameter standar 8 in sch 80 (sumber : Geankoplis, App AQ.5-1, p.892)ID = 7,625 in = 0,635 ft = 0,195 mOD = 8,625 in = 0,719 ft = 0,219 mA = 0,3171 ft2 = 0,029 m2v = = = 5,294 ft/s

NRE = = = 192.166,523( karena lebih besar dari 2100, maka asumsi benar )

A

B

z = 20ft

Menghitung friksiA. Friksi di bagian suction1. Friksi yang terjadi karena adanya kontraksi ( slurry masuk dari expander ke pipa 8 in )Fc = Dimana Kc = dengan A1 >>>Sehingga Kc = 0,55

Fc = = 7,706 ft lbf/lbm

2. Friksi karena pipa lurusPanjang pipa lurus bagian suction diperkirakan 8 ftBahan konstruksi pipa adalah commercial steel , e = 4,6 x 10-5 sehinggae/D = = 0,000238NRE = 192.166,523Dari Geankoplis fig. 2.10-3 p.88 didapat f = 0,003Fps = = = 0,066 ft lbf/lbm

Friksi bagian suction Fs = Fc + Fps = 7,706 + 0,066 = 7,772 ft lbf/lbm

B. Friksi di bagian discharge1. Friksi karena pipa lurusPanjang pipa lurus diperkirakan 20 ftFpd = = = 0,165 ft lbf/lbm

2. Friksi karena fitting and valveJenis fitting and valveKfJumlah

Elbow 90o standar0,752

Globe valve (wide open)61

hf (elbow) = = = 0,327 ft lbf/lbmhf (valve) = = = 2,613 ft lbf/lbmFriksi bagian discharge Fd = Fpd + [ 2 x hf (elbow) ] + hf (valve) = 0,165 + ( 2 x 0,327 ) + 2,613 = 3,431 ft lbf/lbm

Friksi total pompa ( F ) = Fs + Fd = 7,772 + 3,431 = 11,203 ft lbf/lbm

Menghitung power pompaZa = bidang datum = 0 fta = b = 62,019 lb/ft3vb = va = 5,294 ft/s = = Ws = 31,202 ft lbf/lbm

Efisensi pompa (h) ditentukan 90% sehinggaBhp = (sumber : Geankoplis, hal 134) = = 7,029 hp = 5,241 kW

Efisiensi motor ditentukan 80% sehinggaPower motor = = = 8,79 hpDipilih power motor = 9 hp

Spesifikasia. Tipe = centrifugal pumpb. Diameter pipa = 8 inc. Kecepatan alir = 5,294 ft/sd. Kerja pompa = 31,202 ft lbf/lbme. Daya pompa = 8 hpf. Power motor = 9 hpg. Jumlah alat = 2 unit

13. MAGNETIC SEPARATOR (H-110)Fungsi : untuk memisahkan komponen non-magnetic dalam slurry pasir besi 20%.Kondisi operasi : suhu = 30oCTekanan = 1 atm

Kapasitas drum I = 364.161,7 kg/jam = 364,162 ton/jamKapasitas drum II = 346.360,9 kg/jam = 346,361 ton/jam

Spesifikasi (Sumber : Perry's 7th Ed, Tabel 19-6, p.19-20)a. Ukuran partikel = 0,0001 2 mmb. Tipe alat = Marston Sala High-Gradient Magnetic Separatorc. Jenis bahan konstruksi = electromagneticd. Medan magnet maksimum = 20.000 Oee. Jenis matriks yang digunakan = Steel Ballsf. Maksimum medan gradien yang didapat = 25.000.000 G/cmg. Kerentanan magnetik yang diperlukan untuk partikulat = kuat sangat lemahh. Jumlah alat= 14 unit

14. CENTRIFUGE SCREEN (H-115)Fungsi : Untuk menghilangkan air yang dibawa oleh pasir besi keluar magnetic separator.Kondisi operasi: Suhu = 30oC Poperasi = 1 atmYang akan dihitung : luas area screenLangkah perhitungan:Mpasir besi = 169.269,265 kg/jam = 169,269 ton/jamDigunakan High-speed vibrating screens dengan screen Tyler ukuran 200 mesh.Diameter kawat (d) = 0,053 mm(sumber : Perry's 7th ed, tabel 19-6, p 19-20) = 0,002087 in = 0,000053 m

Bukaan sieve (a) = 0,074 mm= 0,0029134 in= 0,000074 m

Kode sieve = 74 micron = 0,0029134 in

Penentuan luas area screenA = (sumber : Perry's 7th ed, eq 19-7, p 19-23)

Dimana A = luas screen Ct = rate aliran Cu = kapasitas unit Foa = faktor luas bukaan Fs = faktor luas slotCt = 169.269,265 kg/jam= 169,269 ton/jam

Cu = 0,02 ton/jam ft2 (sumber : Perry's 7th ed, fig 19-21, p 19-24)

Foa = 100 x a2 x m2

m = = = 200 in= 5,08 m

Foa = 100 x (0,0029134)2 x (5,08)2 = 0,00001413 m = 33,95 in = 2,83 ft

Fs = 1 (sumber : Perry's 7th ed, tabel 19-7, p 19-23)

A = = 1.196,56 ft2

Spesifikasia. Tipe= screen tylerb. Ukuran= 200 meshc. Diameter= 0,053 mmd. Bukaan sieve= 0,074 mme. Kode sieve= 74 micronf. Luas screen= 1.196,56 ft2g. Jumlah alat= 1 unit15. ROTARY DRYER (B-116)Fungsi: Untuk mengeringkan slurry pasir besi dengan menggunakan udara panas.Yang akan dihitung : ukuran rotary dryer, luas total perpindahan panas, kemiringan, kecepatan putar, dayaLangkah perhitungan :pasir besi = 1450 kg/m3mpasir besi = 62.155,674 kg/jam = 137.029,642 lb/jamVpasir besi = 42,866 m3/jammudara = 68.824,902 kg/jam = 151.732,755 lb/jamQt = 20.184541,58 kJ/jam = 5.606,817 kW = 19.130.908,51 Btu/jamt1 = 31oC = 87,8oF = 304 Kt2 = 50oC = 122oF = 323 KT1 = 250oC = 482oF = 523 KT2 = 130oC = 266oF = 403 K

Qt = 0,4 x L x D x G0,67 x TLMTD (sumber : Perry 7ed.persamaan 12-53, hal.12-54)Dimana L/D = 4 10(sumber : Perry 7ed.persamaan 12-53, hal.12-54)Trial : L/D = 9 D = 15 ftSehingga L = 9 x 15 = 135 ft

Luas penampang (A) = = = 176,715 ft2 = 16,417 m2

G = = = 858,632 lb = 4.192,3 kg

TLMTD = = = 258,533oF

Qt = 0,4 x 135 x 15 x (858,632)0,67 x 258,533= 19.348.719 Btu/jam (memenuhi)

Sehingga D = 15 ft = 4,572 m L = 135 ft = 41,149 m

Q = U x a x V x T (sumber : Perry, p.12-53)Dimana Q = Rate perpindahan panas (W)U = Heat transfer coefficient (W/m2K)V = Volume dryer (m3)a = Luas kontak partikel dan gas per satuan volume dari dryer (m2/m3) T = Beda suhu rata-rata antara partikel dan gas (K)

5.606,817 x 1000 = U x a x (3,14 x (4,572)2 x 41,149) x (523-303)U x a = 69,197 W/m3KU = 60 x G0,67(sumber : Ulrich, tabel4-10)= 60 x (4.192,3)0,67= 16.039,756 W/m3K

a = = = 0,004 m2/m3

Total luas perpindahan (a x V) = 0,004 x (3,14 x (4,572)2 x 41,149) = 2,913 m2 = 31,355 ft2Tebal dinding = 3 inBahan konstruksi = carbon steelcarbon steel = 489 lb/ft3

Vdryer = = = 24.658,31 ft3

mdryer = Vdryer x carbon steel = 24.658,31 x 489 = 12.057.914,4 lb = 5,469 ton

Kecepatan peripheral = 30-150 ft/min (sumber : Perry 7ed., p.12-54)Dipilih 110 ft/min

Kecepatan putar (N) = = = 2,334 rpm Cek nilai N x D = 2,334 x 15 = 35 (memenuhi nilai N x D antara 25-35)

Kemiringan rotary dryerX = (sumber : Coulson, p298)Dimana X = Holdup (% volume drum) = 0,1 D = Diameter drum (m) F = Feed rate (m3/s m2) S = Slope (kemiringan) dryer (m/m length)N = laju putar dyer (Hz)

0,1 = S = 0,757 m/m length

Sudut kemiringan = tan-1 S= tan-1 (0,757)= 37,14o = 37o

Perhitungan dayaBhp = (sumber : Perry 7ed., p.12-60)dimana bhp = brake horsepower (1 bhp = 0.75 kW)N = kecepatan putar (rpm)d = diameter luar RD (ft)w = berat bahan (lb)D = diameter dinding ring (d+2), ftW = berat total (lb) = w + mdryer

Bhp = = 1.253,403 bhp

Spesifikasia. Material = Carbon steel SA 283 Grade Cb. Diameter= 15 ftc. Panjang= 135 ftd. Tebal shell= 3 ine. Kecepatan putar = 2,334 rpmf. Daya = 1.254 bhpg. Kemiringan = 37oh. Jumlah alat = 1 unit

16. HEAT EXCHANGER (E-119)Fungsi: Sebagai media pertukaran panas antara udara kering dengan panas dari incinerator.Yang akan dihitung : jenis heat exchanger yang digunakan, ukuran tube and shellLangkah perhitungan :

M = 137.049,934 kg/jam = 302.140,285 lb/jamm = 68.824,902 kg/jam = 151.731,379 lb/jam

Udara panasT1 = 600 K = 377oC = 710,6oF

Udarat1 = 30oC = 86oF

t2 = 250oC = 482oF

T2 = 573,4 K = 300,4oC = 572,675oF

Spek alatOD = 3/4 in = 0,0625 ftPT = 15/16 in , triangular pitch16 BWGl = 16 ftP maksimal aliran di shell = 10 psiP maksimal aliran di tube = 2 psiRd gabungan minimal = 0,004 jam ft2 oF/Btu

Didapat at = 0,1963 ft3 (sumber : Kern, tabel 10, p.843)at = 0,302 in3 = 0,0021 ft3 ID = 0,62 in = 0,0517 ft

Menghitung Q udara panasQ udara panas = Q keluar Q masuk = 19.901.533,78 2.781.420,41 = 17.120.113,37 kJ/jam = 67.938.036,199 Btu/jam

Menghitung ttLM = = = = 341,54 oF

R = = = 0,348S = = = 01,732FT = 1 (sumber : Kern, fig 18, p.828)

t = tLM x FT = 341,54 x 1 = 341,54 oF

Menghitung Caloric TemperatureHot air Tc = = = 641,64 oFCold air tc = = = 284 oF

Menghitung jumlah tubeHeater UD kisaran = 5 50 Btu/jam ft2 oF (sumber : Kern, tabel 8, p.840)Diambil UD = 40 Btu/jam ft2 oF

A = = = 1.253,158 ft2

Nt = = = 398,99Diperoleh Nt standar = 420 (sumber : Kern, tabel 9, p.842)IDs = 23 inPasses = 2-P

Koreksi nilai UDA = Nt x L x at = 420 x 16 x 0,1963 = 1.319,136 ft2

UD = = = 37,999 Btu/jam ft2 oF ( karena nilai UD koreksi masih antara 5-50 sehingga memenuhi )Type HE = 2 4 Heat Exchanger C = PT OD = 0,94 0,75 = 0,1875 inB = 1 x IDs = 23 in (N+1) = = = 16,516 = 17de = 0,55 in = 0,045 ftn = 2 , n = 4Evaluasi Perpindahan Panas (sumber : Kern)Bagian Shell ( udara panas )

Bagian Tube ( udara )

as = = = 0,375 ft2

Gs = = = 804.869,02 lb/jam ft2

NRes = = = 516.736,659

jH =500 ( fig.28)pada Tc = 641,638 oFho = s = = =184,994 Btu/jam ft2 oF

at = = = 0,22 ft2

Gt = = = 689.035,59 lb/jam ft2

NRet = = = 653.814

jH = 1.120 ( fig.24)pada tc = 284 oFhi = t = =1.120 = 282,336 Btu/jam ft2 oF

= x = 282,336 x = 233,398 Btu/jam ft2 oF

tw = tc + ( Tc tc ) = 284 + (641,638 284) = 284,001 oFPada tw = 284,001 oF didapat w = 0,023 cp (fig.15)s = = 1,039

ho = 184,994 x 1,039 = 197,34 Btu/jam ft2 oF t = = 1

hi = 282,336 x 1 = 282,336 Btu/jam ft2 oF

hio = 233,398 x 1 = 233,398 Btu/jam ft2 oF

Uc = = = 106,929 Btu/jam ft2 oF

Rd = = = 0,017 jam ft2 oF/Btu

Karena Rd perhitungan lebih besar daripada Rd tetapan maka desain bisa dipakai.

Evaluasi pressure drop ( P )Bagian Shell ( udara panas )

Bagian Tube ( udara )

NRes = = = 516.736,659

f = 0,001 ( fig.29 )P = = = 5,105 psi

NRet = = = 653.814

f = 0,0003 ( fig.26 )Pl = = = 0,862 psi

Pn = = = 0,286 psi

Pt = Pl + Pn = 0,862 + 0,286 = 1,148 psi

Karena harga Rd dan P memenuhi syarat maka desain heat exchanger ini dapat digunakan.

Spesifikasia. Tipe = 2-4 Heat exchangerb. Material = Carbon Steel SA 212 Grade Ac. OD = ind. L = 16 fte. Ukuran tube = 15/16 in, segitiga pitchf. at = 0,1963 ft3g. at = 0,302 in3h. ID = 0,62 ini. Jumlah alat = 1 unit

17. CYCLONE (H-1111)Fungsi: Untuk memisahkan padatan yang keluar bersama udara panas pada Rotary Dryer.Yang akan dihitung : volume udara masuk, diameter partikel keluar cyclone, dan dimensi cyclone. Langkah perhitungan :mfeed = 1.224,832 kg/jam mimpurites = 627,65 kg/jammproduk = 597,18 kg/jam = 0,597 ton/jampartikel = 1450 kg/m3 = 90,521 lb/ft3udara = 33,078 kg/m3 = 2,065 lb/ft3udara = 345,94 cp = 0,233 lb/ft.sukuran partikel = 0,02 cm

Dpc = Ne = 2 (sumber : Perry 6th, p.20-86)fs = = = 0,951

ln = = = -5,568 = 0,0038m = 0,0038 x 345,94 = 1,321 cp = 4,754 kg/m jam

Vc = = = = =

0,0002 = Dc = 0,056 m

C-1

Dimensi cyclone

Bc = Bc = Dc x 0,25= 0,056 x 0,25= 0,014 m

(sumber : Perry, p.17-27)

De = = = 0,0281 m

Hc = = = 0,0281 m

Lc = 2 x Dc= 2 x 0,056= 0,112 m

Sc = = = 0,007 m

Zc = 2 x Dc= 2 x 0,056= 0,112 m

Jc = = = 0,014 m

Spesifikasia. Material = Carbon Steel SA 283 Grade Cb. Dpth = 0,02 cmc. Bc= 0,014 md. Dc= 0,056 me. De= 0,028 mf. Hc= 0,028 mg. Lc= 0,112 mh. Sc= 0,007 mi. Zc= 0,112 mj. Jc= 0,014 mk. Jumlah alat = 1 unit

18. CYCLONE (H-128)Fungsi: Untuk memisahkan padatan dalam hal ini adalah ash yang terbawa oleh gas buang blast furnace.Yang akan dihitung : volume udara masuk, diameter partikel keluar cyclone, dan dimensi cyclone. Langkah perhitungan :mfeed = 99.654,83 kg/jam mimpurites = 984,448 kg/jammproduk = 98.670,38 kg/jam = 98,67 ton/jampartikel = 2.600 kg/m3 udara = 33,078 kg/m3 = 2,065 lb/ft3udara = 345,94 cp = 0,233 lb/ft.sukuran partikel = 2 cm

Dpc = Ne = 2 (sumber : Perry 6th, p.20-86)fs = = = 0,0099

ln = = = 0,025 = 1,026m = 1,026 x 345,94 = 354,812 cp = 1.277,323 kg/m jam

Vc = = = = =

0,02 = Dc = 0,883 m

C-61

Dimensi cyclone

Bc = Bc = Dc x 0,25= 0,883 x 0,25= 0,221 m

(sumber : Perry, p.17-27)

De = = = 0,441 m

Hc = = = 0,441 m

Lc = 2 x Dc= 2 x 0,883= 1,766 m

Sc = = = 0,11 m

Zc = 2 x Dc= 2 x 0,883= 1,766 m

Jc = = = 0,221 m

Spesifikasia. Material = Carbon Steel SA 283 Grade Cb. Dpth = 2 cmc. Bc= 0,221 md. Dc= 0,883 me. De= 0,441 mf. Hc= 0,441 mg. Lc= 1,766 mh. Sc= 0,11 mi. Zc= 1,766 mj. Jc= 0,221 mk. Jumlah alat = 1 unit19. FILTER UDARA (H-117)Fungsi : Untuk menyaring udara dari pengotor sebelum dialirkan oleh blower.Kondisi operasi: Suhu = 30oC Poperasi = 1 atmYang akan dihitung : luas area filterLangkah perhitungan:mudara = 168.732,479 kg/jam = 168,732 ton/jamDigunakan High-speed vibrating filter dengan ukuran 200 mesh.Diameter kawat (d) = 0,053 mm(sumber : Perry's 7th ed, tabel 19-6, p 19-20) = 0,002087 in = 0,000053 m

Bukaan sieve (a) = 0,074 mm= 0,0029134 in= 0,000074 m

Kode sieve = 74 micron = 0,0029134 in

Penentuan luas area filter A = (sumber : Perry's 7th ed, eq 19-7, p 19-23)

Dimana A = luas filter Ct = rate aliran Cu = kapasitas unit Foa = faktor luas bukaan Fs = faktor luas slotCt = 168.732,479 kg/jam= 168,732 ton/jamCu = 0,02 ton/jam ft2 (sumber : Perry's 7th ed, fig 19-21, p 19-24) Foa = 100 x a2 x m2

m = = = 200 in= 5,08 m

Foa = 100 x (0,0029134)2 x (5,08)2 = 0,00001413 m = 33,95 in = 2,83 ft

Fs = 1 (sumber : Perry's 7th ed, tabel 19-7, p 19-23)

A = = 1.192,76 ft2

Spesifikasia. Ukuran= 200 meshb. Diameter= 0,053 mmc. Bukaan sieve= 0,074 mmd. Kode sieve= 74 microne. Luas= 1.192,76 ft2f. Jumlah alat= 1 unit

20. BLOWER UDARA (G-115) Fungsi: Untuk menghembuskan udara ke dalam Heat Exchanger untuk kemudian menjadi media pengering dalam Rotary Dryer.Yang akan dihitung : rate volume udara dan daya blowerLangkah perhitungan :mudara = 168.732,479 kg/jam = 2.812,208 kg/min = 6.199,85 lb/minTudara = 30oC = 86oF Pin = 14,7 psiudara = 0,073 lb/ft3 (pada suhu 86oF)

asumsi P = 0,5 psisehingga Pout = 15,2 psi

Vudara = = = 84.929,452 ft3/min

Karena di pasaran blower centrifugal flowrate maksimal adalah 33.000 ft3/min maka blower yang dipakai adalah 3 unit.mudara = = 56.244,16 kg/jam = 937,403 kg/min = 2.066,617 lb/minTudara = 30oC = 86oF Pin = 14,7 psiudara = 0,073 lb/ft3 (pada suhu 86oF)

asumsi P = 0,5 psisehingga Pout = 15,2 psi

Vudara = = = 28.309,817 ft3/min

Daya = 1,57 x 10-4 x Q x P = 1,57 x 10-4 x 28.309,817 x 15,2 = 67,559 hp = 68 hp

Spesifikasia. Material = Carbon Steel SA 283 Grade Cb. Tipe= Centrifugalc. Volume udara= 63.748,659 ft3/mind. Daya= 68 hpe. Jumlah alat= 3 unit

21. BLOWER UDARA (G-127)Fungsi: Untuk menghembuskan udara ke dalam Stove untuk kemudian menjadi media pemanas dalam Blast Furnace.Yang akan dihitung : rate volume udara dan daya blowerLangkah perhitungan :mudara = 61.528,024 kg/jam = 1.025,467 kg/min = 2.260,765 lb/minTudara = 30oC = 86oF Pin = 14,7 psiudara = 0,073 lb/ft3 (pada suhu 86oF)

asumsi P = 0,5 psisehingga Pout = 15,2 psi

Vudara = = = 31.010,167 ft3/min

Daya = 1,57 x 10-4 x Q x P = 1,57 x 10-4 x 31.010,167 x 15,2 = 74 hp

Spesifikasif. Material = Carbon Steel SA 283 Grade Cg. Tipe= Centrifugalh. Volume udara= 31.010,167 ft3/mini. Daya= 74 hpj. Jumlah alat= 1 unit

22. BLAST FURNACE (Q-120)Fungsi: Sebagai tempat proses pembuatan pig ironKondisi operasi : suhu = 2400KYang akan dihitung : volume furnace, ukuran furnace, insulator, lubang masuk udara ke blast furnace.Langkah perhitungan :M= 120.321,469 kg/jam = 1.667,723 kg/m3 = 103,908 lb/ft3residence time (t) = 8 jamKapasitas furnace = m x t= 120.321,469 x 8= 962.571,752 kg= 962,571752 ton x 24 jam= 23.101,722 ton/hari

M = 23.101.722,048 kg/hari= 7.700.574,016 kg/8jam

Vfurnace = = = 3.927,56 m3/8 jam

Asumsi furnace berbentuk kubus sehinggaV =s3s = = 15,778 m

Perhitungan lubang udara masuk ke Furnacemudara = 61.528,024 kg/jam = 492,224 ton/8jamudara = 1,18 kg/m3

asumsi jumlah lubang = 60 buahmaka untuk tiap lubangm = = 8,204 ton/8jam = 1,025 ton/jam = 1.025,467 kg/jam

Vudara = = = 869,04 m3/jam = 0,241 m3/sAsumsiDiameter pipa udara = 0,2 m = 7,874 inMaka ukuran pipa 8 sch 40

Lpipa = = = 0,031 m2

Kecepatan aliran = = = 7,688 m/s

Spesifikasia. Bentuk = kubusb. Panjang sisi = 15,778 mc. Ukuran pipa = 8 ind. Sch number= 40e. Jumlah pipa udara = 60 buahf. Jumlah alat= 1 unit

23. BELT CONVEYOR Fungsi: Mengangkut pasir besi dari open yard ke tangki slurryKapasitas: 72.832,34 kg/jam = 72,832 ton /jam

Kapasitas max= 88 ton(sumber : Perry 7ed.tabel 21-11)

SpesifikasiTipe= Troughet Belt on 10o idlerLebar belt= 16 inPanjang belt= 40 ftKecepatan belt= 200 ft/minPower motor= 0,9 hp/10ft x 40 ft= 3,6 hpKemiringan= 10o

24. BELT CONVEYORFungsi: Mengangkut pasir besi dari screener ke Rotary DryerKapasitas: 62.155,674 kg/jam = 62,155 ton /jam

Kapasitas max= 64 ton(sumber : Perry 7ed.tabel 21-11)Tipe= Troughet Belt on 10o idlerLebar belt= 14 inPanjang belt= 50 ftKecepatan belt= 200 ft/minPower motor= 0,68 hp/10ft x 50 ft= 3,4 hpKemiringan= 10o

25. BELT CONVEYORFungsi: Mengangkut pasir besi dari Rotary Dyer ke Stock HouseKapasitas: 60.997,872 kg/jam = 60,997 ton /jam

Kapasitas max= 64 ton(sumber : Perry 7ed.tabel 21-11)Tipe= Troughet Belt on 10o idlerLebar belt= 14 inPanjang belt= 45 ftKecepatan belt= 200 ft/minPower motor= 0,68 hp/10ft x 45 ft= 3,06 hpKemiringan= 10o

26. BELT CONVEYORFungsi: Mengangkut pasir besi dari Stock House ke Blast FurnaceKapasitas: 68.364,471 kg/jam = 68,364 ton /jam

Kapasitas max= 88 ton(sumber : Perry 7ed.tabel 21-11)Tipe= Troughet Belt on 20o idlerLebar belt= 16 inPanjang belt= 150 ftKecepatan belt= 200 ft/minPower motor= 0,9 hp/10ft x 150 ft= 13,5 hpKemiringan= 20o

27. BELT CONVEYORFungsi: Mengangkut limestone dari open yard ke crusher Kapasitas: 30.384,21 kg/jam = 30,384 ton /jam

Kapasitas max= 32 ton(sumber : Perry 7ed.tabel 21-11)Tipe= Troughet Belt on 10o idlerLebar belt= 14 inPanjang belt= 40 ftKecepatan belt= 100 ft/minPower motor= 0,34 hp/10ft x 40 ft= 1,36 hpKemiringan= 10o

28. BELT CONVEYORFungsi: Mengangkut limestone dari screener ke crusher Kapasitas: 30.384,21kg/jam = 30,384 ton/jam

Kapasitas max= 32 ton(sumber : Perry 7ed.tabel 21-11)Tipe= Troughet Belt on 10o idlerLebar belt= 14 inPanjang belt= 10 ftKecepatan belt= 100 ft/minPower motor= 0,34 hp/10ftx 10 ft= 0,34 hpKemiringan= 10o

29. BELT CONVEYORFungsi: Mengangkut limestone dari screener ke stock houseKapasitas: 27.345,788 kg/jam = 27,346 ton /jam

Kapasitas max= 32 ton(sumber : Perry 7ed.tabel 21-11)Tipe= Troughet Belt on 20o idlerLebar belt= 14 inPanjang belt= 50 ftKecepatan belt= 100 ft/minPower motor= 0,34 hp/10ftx 50 ft= 1,7 hpKemiringan= 20o

30. BELT CONVEYORFungsi: Mengangkut limestone dari stock house ke Blast FunaceKapasitas: 27.345,788 kg/jam = 27,345 ton /jam

Kapasitas max= 32 ton(sumber : Perry 7ed.tabel 21-11)Tipe= Troughet Belt on 20o idlerLebar belt= 14 inPanjang belt= 150 ftKecepatan belt= 100 ft/minPower motor= 0,34 hp/10ftx 150 ft= 5,1 hpKemiringan= 20o

31. BELT CONVEYORFungsi: Mengangkut kokas dari stock house ke Blast Funace Kapasitas: 24.611,21 kg/jam = 24,611 ton /jam

Kapasitas max= 32 ton(sumber : Perry 7ed.tabel 21-11)Tipe= Troughet Belt on 20o idlerLebar belt= 14 inPanjang belt= 150 ftKecepatan belt= 200 ft/minPower motor= 0,34 hp/10ft x150 ft= 5,1 hpKemiringan= 20o

32. HOT BLAST STOVE (E-127)Fungsi : Sebagai alat pemindah panas dari udara panas keluar incinerator ke udara kering yang masuk ke stove.Kondisi: suhu = 500 K

Kapasitas = 61.528,024 kg/jamFuel = sumatran crude oilKapasitas fuel= 4.592,166 kg/jam

33. INCINERATOR (E-128)Fungsi: Untuk membakar karbon monoksida yang keluar bersama dari Hot Blast Stove Kondisi operasi : suhu = 2400K mtail gas : 137.049,934 kg/jamtail gas : 0,6936 kg/m3 Rate volumetrik = = 83.826,508 m3/jam

mudara: 58.142,066 kg/jamudara: 1,628 kg/m3 Rate volumetrik = = 35.713,8 m3/jam

Spesifikasia. Tipe= direct fired with reciprocating gratesb. Tipe bahan bakar= tail gas (gas sisa)c. Bahan material= carbon steeld. Operasi = sistem kontinyue. Jumlah alat= 1 unit

C

r

ID

OA

B

A

sf

a

t

OD

b

icr

Gambar 2. Dimensi dari dished head