Recent Accomplishments

Successful completion of Laboratory Operational Readiness Review

Development of a VSL MINCAMS Method

• Precision and Accuracy Study and Initial Alternate Baseline Study complete

Development of a DAAMS VSL method

Receipt of hydrolysate

Receipt of Stock A standards

Staffing targets met to support Laboratory operations

2

Page 3: PCAPP Laboratory February 26, 2014

Operational Readiness

Why assess readiness for the Lab?

• Laboratory operations using dilute agent must begin before the balance of plant operations to support systemization of the agent monitoring system

• The Laboratory and supporting systems introduce new hazards at PCAPP The Laboratory Operational Readiness Review (LORR) fulfilled

multiple purposes:

• Provided a documented basis for management to accept that the Laboratory, supporting documentation, and personnel are ready for Stock A dilute agent operations

• Provided experience to PCAPP personnel in the execution of the readiness assessment process

To declare readiness

• Meet 52 LORR criteria

• Successfully complete seven Laboratory Demonstrations

3

Page 4: PCAPP Laboratory February 26, 2014

What is an Operational Readiness Review?

People

PlantPaper

Achieve Readiness – by Responsible Managers

Validate Readiness – by ORR Board

Declare Readiness – by Project Manager

Accept Readiness – by ACWA

• The ORR process is used to validate that PCAPP “plant, paper, and people” collectively meet the required criteria to allow a new operation to begin

• PCAPP ORR process is led by the systems-contractor (SC) to support a declaration of readiness

• ACWA provides ORR oversight; independent validation is used to support the SC’s declaration of readiness

• Stakeholders may observe the ORR process

4

Page 5: PCAPP Laboratory February 26, 2014

Laboratory ORR Demonstrations

Seven Demonstrations completed 14-17 October:

1. Receipt, inventory, and storage of RDT&E Stock A standards

2. Simulation of working standard (water) preparation

3. Waste handling

4. RDT&E Stock A monthly accountability

5. Industrial chemical (simulated) spill, including injury

6. RDT&E (simulated) spill, including injury

7. Partial or total impairment of LAB HVAC system

Each Demonstration was assessed as passing.

The Laboratory declared readiness and concurrence was received by ACWA

The Laboratory transferred the Stock A solutions from the PCD Laboratory to the PCAPP Laboratory (where it was stored until ACWA concurrence of readiness was received)

5

Page 6: PCAPP Laboratory February 26, 2014

Staffing

Jan-13

Mar-13

May-13

Jul-13

Sep-13

Nov-13

Jan-14

Mar-14

May-14

Jul-14

Sep-14

Nov-14

Jan-15

Mar-15

May-15

Jul-15

Sep-15

0

20

40

60

80

100

120

140

160

Actual

6

Page 7: PCAPP Laboratory February 26, 2014

Ongoing Activities

Method development of MINICAMS and DAAMS in order to initiate interference testing

203 Products have been tested to date by Battelle’s corporate Laboratory

Continued interference testing has been transitioned to the PCAPP Laboratory

Systemizing MINICAMS at the plant monitoring locations - function tested 19 MINICAMS

Received hydrolysate from corporate Laboratory in January 2014

• 2 liters of HD and 2 liters of HT resulted in 53 liters of hydrolysate using bench scale reactor

• Method development of hydrolysate analytical method initiated

7

Page 8: PCAPP Laboratory February 26, 2014

Partnered with CSU-Pueblo student to provide 30 hours of course credit for class

Employed four interns in Summer of 2013 from CSU-Pueblo

Focused on Staff Training and Certification• Technical training• Human performance error recognition• Front Line Supervisory Leadership training

Continued with Laboratory Information Management System programming

• MINICAMS, Agent Standards and Inventory Modules fully implemented and tested. DAAMS to be completed in next two weeks.

Continued development and validation of analytical methods

Continued documentation development• MOPs are complete and LOPs at 92% (4 LIMS outstanding)• Analytical Methods at 78% complete

Ongoing Activities

8

Page 9: PCAPP Laboratory February 26, 2014

Ongoing Activities

Improvements

• Six Sigma project (process improvement methodology used to eliminate process defects and inefficiency

• delivering high performance, value-added work and process reliability

• recent Six Sigma review projects that have been completed include:

– DAAMS Tube Confirmation Process

– Laboratory Procurement Process

– Sample Requests and Results with Data Dissemination.