PCAPP Update
29 January 2014
Safety
As of Dec. 31, 2013
PCAPP staff has accomplished:
614 Safe Work Days
3,319,552 Safe Work Hours
Element Ownership Teams formed for VPP Application for Operations
2
Staffing – 1,023 employees
Bechtel Pueblo Team non-manual: 845
Pueblo – 843
–193 Pueblo County hires
–41 Colorado hires
–Off-project locations—2
Construction Workers: 178
–Bechtel direct-hire – 93
–Subcontractor personnel – 85
3
Pueblo County residents filled 20% of Positions in December
Hires v. Vacancies Pueblo County Applicants v. Hires
PCAPP Staffing Actuals
0
5
10
15
20
25
30
35
40
9/20/2013- 10/19/2013 12/15/2013 1/1/2014
Filled Positions
Filled Positionscontaining PuebloCounty Applicants
Pueblo County NewHires
05
10152025303540 New Hires Pueblo
County
New Hires fromColorado
New Hires fromOther (IncludesTransfers)
Positions Filled
758781
814
862868
911
0
200
400
600
800
1000
1200
Jul-1
3
Aug
-13
Sep
-13
Oct
-13
Nov
-13
Dec
-13
Jan-
14
Feb
-14
Mar
-14
Apr
-14
May
-14
Jun-
14
Jul-1
4
Aug
-14
Sep
-14
Oct
-14
Nov
-14
Dec
-14
Jan-
15
Feb
-15
Mar
-15
Apr
-15
May
-15
Jun-
15
Jul-1
5
Aug
-15
Sep
-15
Start…
Medical
Maintenance
Ops Support
Operations
Laboratory
Other
Actuals
4
Recruiting Efforts
5
Monthly ads will run in the “Help Wanted” section of the Pueblo Chieftain in 2014. They will highlight the following:
Workshops
Job Fairs
Local hiring success stories
Staffing Needs
First-in-a-Series. This ad, running Jan. 27-Feb. 2, features a Resume
Writing Workshop in conjunction with the Pueblo Workforce Center.
ORR Major Milestones – The Road to Initial Agent Operations
*Major Milestones per the
PCAPP Integrated Master
Schedule (IMS)
1
7
9
8
5
4
3
6
14
15
Lab Dilute Agent Operations Mini-Operational Readiness Review (ORR)
Boiler Ignition Readiness Assessment
Start Operational Readiness Demo (IOD) – JUN 2015
Agent Entry Readiness and Agent Containment and Confinement Controls – JUL 2014
Start ERB Provisional Operations/Operations Certifications – SEP 2014
Start APB Provisional Operations/Operations Certifications – NOV 2014
Contingency Training Readiness/Crew Certification – JAN 2015
Begin Plant “Soft” Lockdown (Familiarization) – FEB 2015
Start BTA Provisional Operations/Operations Certifications – NOV 2014 (Optional
– Not required per ACWA Policy #26)
Yard Provisional Operations – JUL 2014
Systemization Complete/Declare
Readiness – JUL 2015
Complete PCAPP Systemization
(for Pilot Testing) – SEP 2015
Training Facility Available for Practical Factors – Readiness Check
Pre-Systemization Complete
Training Facility Available for Toxic Area Training – Readiness Check
10
11
12
13Environmental Readiness – MAR 2015
16Key Readiness Milestones
COMPLETE
IN PROGRESS
NOT STARTED
* Incremental Readiness
Assessments will overlap –
they are not strictly sequential
2
6
Control Room
7
Inside the Control Room, workers are remotely operating the robots in one of the Explosion Containment Rooms in the Enhanced Reconfiguration Building.
Enhanced Reconfiguration Building
8
The robots are being controlled remotely from the Control Room.
Agent Filtration Area (AFA)
9
Eight Exhaust Air Filter Units in the AFA now contain filters, consisting of:
128 pre-filters
256 HEPA filters
2,304 charcoal adsorber cells
1440 stainless steel cells, weighing 85 lbs. each
864 plastic cells, weighing 73 lbs. each
Total weight of all carbon cells is 185,472 lbs. or 92.736 tons
ALL ACCOMPLISHED SAFELY!
Biotreatment Area (BTA)
In the BTA, painters with G.C. Zarnas take a break from prepping the brine containment area in preparation for polyurea coatings. The coatings will make cleanup easier in the event of an accidental spill.
10
Toxic Training Underway
Entry Support Area (ESA) tenders prepare for training wearing Demilitarization Protective Ensemble (DPE) suits. The ESA tenders will make entries into the main processing buildings during operations and need to have full body protection in the event of a chemical incident.
11
PCAPP Explosive Destruction System
SAVE
THIS
SPACE!
Starting next month stay current on the progress of the PCAPP Explosive Destruction System (EDS). New information will be part of our PCAPP monthly updates!
12
Questions?
13