Slope Protection
TUNEL KLOTAR, HR
Slope Protection | Tunel Klotar, HR 2/6
TUNEL KLOTARSlope Protection
Project Tunel KlotarProject number 130527-HRPlace VrbovskoCountry/Region Croatia
Year of installation 2015
Customer Hrvatske eljezniceEngineering Geotehniki studio ZagrebContractor Octopus Rijeka
Situation Rockfalls on a speed up railway line near tunnel Klotar.
Description Active slope protection and tunnel portal with nailed DELTAX mesh and TECCO
SYSTEM3.
Protected object RailwaySystems TECCO G65/3, DELTAX G80/2
Corrosion protection GEOBRUGG SUPERCOATING , GEOBRUGG ULTRACOATING
Geology Limestone.
Stabilized area 3 m
Maximum slope height 10 mSlope inclination 60 - 75
Protection measure Active slope stabilization
Exposition South-East
Slope Protection | Tunel Klotar, HR 3/6
Tunnel Klostar portal and slopes around in the final stateafter stabilization.
Drilling works on the slope directly next to the tunnelportal.
Drilling works and installation of nails on the tunnelportal.
Slope Protection | Tunel Klotar, HR 4/6
Tunnel portal protected with TECCO SYSTEM3.
TECCO SYSTEM3 on the slope.
Slope Protection | Tunel Klotar, HR 5/6
Slope Protection | Tunel Klotar, HR 6/6
Tunnel portal after completion of all installation works.
For questions please contact our Geobrugg specialist at your side
Head office and production
Phone +1 505 771 4080
Geobrugg North America, LLC22 Centro Algodones | Algodones NM 87001 | USA| www.geobrugg.comA company of the BRUGG Group | Certified to ISO 9001