Upload
mihai-zaharia
View
342
Download
1
Embed Size (px)
Citation preview
8/17/2019 Normativ Tunel
1/67
Underground Activities
Imagine the result
Living structures for a sustainable society
8/17/2019 Normativ Tunel
2/67
Technics
Conventional excavation
Mechanized excavation
Trenchless technology
Cut &
Cover
structures
Immersed tubes
IMMERSED TUNNELS – 2nd Coentunnel (The Netherlands)
IMMERSED TUNNELS – Busan‐Geoje Fixed Link (South Korea)
TRENCHLESS TECHNOLOGY – Mantes‐la‐Ville (France)
CUT & COVER – Merval Metro (Chile)
MECHANIZED EXCAVATION – Lötschberg (Switzerland)
CONVENTIONAL EXCAVATION – Mrazovska tunnel(Czech Republic
8/17/2019 Normativ Tunel
3/67
Tunnel use
Road tunnels
Railway tunnels
Metros
Underground Space
Shafts
Mining
Technical &
Hydraulic
Galleries
Investigation Galleries
HYDRAULIC GALLERIES – TIMA‐Storm storage galleries‐Paris (France
INVESTIGATION GALLERIES – Lyon‐Turin Ferroviaire (Italy & France
SHAFTS – Channel Tunnel
Sangatte (France)
MINING – Andina (Chile)
UNDERGROUND SPACE – City of Prague (Czech Republic)
RAILWAY TUNNELS –Tram Train – La Réunion
ROAD TUNNELS –A2 Maastricht (The Netherlands)
METROS – East Side Access – New York (USA)
ROAD TUNNELS – Roertunnel (The Netherlands)
RAILWAY TUNNELS –
Paris Eole Project (France)
8/17/2019 Normativ Tunel
4/67
Skills
Geology, Hydrogeology & Geotechnics
Ground improvement
techniques
Seismic Engineering
Civil Engineering
Monitoring Engineering
Environmental Services
Safety Studies
Systems Engineering
GEOLOGY, HYDROGEOLOGY & GEOTECHNICS
CIVIL ENGINEERING
SEISMIC ENGINEERINGMONITORING ENGINEERING – City of Prague (Czech Republic)
ENVIRONMENTAL SERVICES – Lyon ‐Turin Ferroviaire (Italy‐France)
SYSTEMS ENGINEERING – Piet Hein Tunnel (The Netherlands)
SYSTEMS ENGINEERING –BeneluxTunnel (The Netherlands)
SAFETY STUDIES –A2 Maastricht (The Netherlands)
8/17/2019 Normativ Tunel
5/67
Our Services
Realization
Engineering
Design
Consultancy
services
Maintain
Project DevelopmentFeasibility Studies
Program Consultancy
Master Planning
8/17/2019 Normativ Tunel
6/67
United States
Brazil Peru
Chile
China
Netherlands
France
Italy Romania
Czech Republic
United
Arab
Emirates
Global Knowledge Network
Tunnels
Activities
Belgium Germany
United KingdomPoland
ARCADIS BELGIUMARCADIS CHILE
ARCADIS CZECH REPUBLIC
ARCADIS FRANCE
ARCADIS NETHERLANDSARCADIS ROMANIA
ARCADIS US
8/17/2019 Normativ Tunel
7/67
7
Toulouse Metro – TBM section
(France) Toulon Highway – Cut & Cover section
International Membership
• AITES‐ITA
(International
Tunnelling
Association)
• AFTES (French tunnelling association)
• COSUF (Committee on Operational Safety of Underground Facilities)
• COB (Dutch Center for Underground Construction)
• CzTA (Czech Tunnelling Association)
• SME (Society
of
Mining
Engineers)
• ASCE (American Society of Civil Engineers)
• Pipeline Crossings Committee & Pipeline Infrastructure Committee
• Trenchless Technology Magazine, Member of Editorial Advisory Board
• ...and Training
D8 Motorway - Panenská and Libouchec Tunnels
(Czech Republic)
Schiphol Tunnel
(The Netherlands)
8/17/2019 Normativ Tunel
8/67
8
Projects
8/17/2019 Normativ Tunel
9/67
9
Great Crossings
8/17/2019 Normativ Tunel
10/67
CHANNEL TUNNEL ARCADIS Services: Geotechnics – Preliminary design of all tunnels on French part – Basic and detailed design of 6 underground caverns for the assembly of the 5 french TBMs – On‐site engineering (geological & geotechnical follow‐up)
CHANNEL TUNNEL (France‐UK) ‐ Client: TransManche Link (TML)Key data: Construction period: 1986‐1991 ‐ 2 railway running tunnels, 50.4 km long each, bored by 8.64 m to8.78 diameter EPBM (inner diameter: 7.60 m) ‐ 1 service tunnel, 50.4 km long bored by 5.61 m to 5.77 m diameter EPBM (inner diameter: 4.80 m)
Great Crossings
8/17/2019 Normativ Tunel
11/67
ALPTRANSIT PROJECT – LÖTSCHBERG BASE TUNNELARCADIS Services: Partnering with Swiss engineering companies ‐ Definition of the necessary arrangements for crossing faults and rock burst events ‐ Evaluation of the stress‐field in rock mass ‐ Definition of excavation stages & temporary support for branches ‐ Evaluation of thermal effects on the final lining
ALPTRANSIT PROJECT – LÖTSCHBERG BASE TUNNEL (Switzerland) ‐Client: BLS Alptransit AGKey data: Construction period: 1996‐2006 ‐ 2 railway running tunnels, 21.1 km excavated by drill and blast technique (65 m2), 18.7 km bored by TBM (excavated diameter: 9.40 m, 70 m2)
Great Crossings
8/17/2019 Normativ Tunel
12/67
Great Crossings
LYON TURIN FERROVIAIRE – BASE TUNNELARCADIS Services: Geotechnics – Preliminary design up to tender documents of the 3 inclined galleries –Preliminary design of the Base Tunnel
LYON TURIN FERROVIAIRE – BASE TUNNEL (France‐Italy) ‐ Client: LTF Key data: Construction period: 2002‐on going
2 railway running tunnels, 57 km long, 43 m2 section ‐ 1 large underground technical station ‐ 4 inclined galleries ‐ cross passages
8/17/2019 Normativ Tunel
13/67
13
Railway Tunnels
8/17/2019 Normativ Tunel
14/67
HSL ATLANTICARCADIS Services: Geotechnics – Preliminary Design ‐ Basic Design of the bored tunnels, the portals, the open‐air sections ‐ On‐site engineering (geological, geotechnical and monitoring follow‐up of the tunnels)
HSL ATLANTIC (France) ‐ Client: SNCF (French National Railway Authority)Key data: Construction period: 1983 to 1989 – 2 railway running tunnels, 4 800 m long each, bored by a 9.25m diameter slurry shield TBM
High Speed Line Tunnels
8/17/2019 Normativ Tunel
15/67
HSL PERPIGNAN‐FIGUERASARCADIS Services: Geotechnics – Preliminary Design ‐ Basic & Detailed Design of the bored tunnels, the French Portal, the French open‐air section ‐ On‐site engineering (geological, geotechnical and structural
follow‐up of the tunnels)
HSL PERPIGNAN‐FIGUERAS (France‐Spain) ‐ Client: EIFFAGE – ACS ‐ DRAGADOSKey data: Concession ‐ Construction period: 2004 to 2010 –2 railway running tunnels , 8 000m long –1 conventional treatment gallery ‐ Cross‐passages ‐ French & Spanish portals ‐ French & Spanish open‐air
sections
High Speed Line Tunnels
8/17/2019 Normativ Tunel
16/67
High Speed Line Tunnels
HSL MEDITERRANEEARCADIS Services: Geotechnics – Preliminary & final design, tender documents of the tunnels ‐ Supervision of civil works
HSL MEDITERRANEE (France) ‐ Client: SNCF (French National Railway Authority)Key data: Construction period: 1995 to 1999 ‐ “Pennes‐Mirabeau” tunnel: 1 530 m long ‐ “Marseille”tunnel: 5 414 m long
8/17/2019 Normativ Tunel
17/67
HNĚVKOVSKÝ I, HNĚVKOVSKÝ II AND MALÁ HUBA TUNNELS ARCADIS Services: Geotechnical monitoring and Construction Management
HNĚVKOVSKÝ I, HNĚVKOVSKÝ II AND MALÁ HUBA TUNNELS (Czech Republic)Client: SZDC s.o., Administration of Railway TransportKey data: Construction period: May 2004‐February 2006
Railway Tunnels
8/17/2019 Normativ Tunel
18/67
TUNNEL UNDER MOTORWAY INTERSECTION FRANKFURT/MAIN ARCADIS Services: Geotechnical check of the detailed design and Construction Management
TUNNEL UNDER MOTORWAY INTERSECTION FRANKFURT/MAIN (Germany) ‐Client: EBA – German Railway Control and Certifying AuthorityKey data: Construction period: 1996‐1998
Railway Tunnels
8/17/2019 Normativ Tunel
19/67
DIABOLO TUNNELARCADIS Services: Geotechnical analysis and tunnel excavation design during tender phase
DIABOLO TUNNEL (Belgium) ‐ Client: THV BESIX – Eiffage TP ‐ AB Construction JVKey data: Double tube railway tunnel underneath Brussels airport – Slurry TBM excavated tunnel, each tube approx. 1,400 m long ‐ Cross‐passages between the tubes
Railway Tunnels
8/17/2019 Normativ Tunel
20/67
LIEFKENSHOEK TUNNEL (Belgium) ARCADIS Services: Geotechnical analysis and tunnel excavation design during tender phase
LIEFKENSHOEK TUNNEL (Belgium) ‐ Client: THV BESIX – Eiffage TP ‐ AB Construction JVKey data: Double tube railway tunnel crossing Antwerp harbour basins and Scheldt river – Slurry TBM excavated tunnel, 8.40 m diameter, each tube approx. 6,000 m long ‐ 12 cross‐passages between the tubes
‐
Railway Tunnels
8/17/2019 Normativ Tunel
21/67
21
Metros and Tramways
8/17/2019 Normativ Tunel
22/67
Paris – Lille – Rouen – Rennes – Toulouse – Marseille – Lyon (France)
Metros and Tramways
8/17/2019 Normativ Tunel
23/67
LRT of TOULOUSE DISTRICT – LINE BARCADIS Services: Detailed design of 11 stations ‐ Detailed design of break‐in & break‐out in the stations ‐Control of detailed design for tunnels ‐ Consultant for boring machine & geotechnical problems ‐
Monitoring for stations & tunnels
LRT of TOULOUSE DISTRICT – LINE B (France) ‐ Client: ContractorsKey data: Construction period: 2001 (on going) – 11.6 km of double tracks & single track tunnels, bored by 2 earth pressure balance machines,1 slurry shield machine & 1 compressed air machine ‐ 20 stations ‐
Ventilation & access shafts & galleries
Metros and Tramways
8/17/2019 Normativ Tunel
24/67
LRT of RENNES DISTRICT – LINE 1ARCADIS Services: Definition & supervision of geotechnical field investigations ‐ Geological, hydrogeological & geotechnical synthesis – Preliminary & Basic Design ‐ Construction Management
LRT of RENNES DISTRICT – LINE 1 (France) ‐ Client: RENNES DISTRICTKey data: Construction period: 1997 – 2001 – 9.4 km of double tracks line ‐ bored tunnels: 3 560 m by 1 earth pressure balance machine ‐ 15 stations ‐ 1 garage workshop
Metros and Tramways
8/17/2019 Normativ Tunel
25/67
AMSTERDAM CENTRAL STATION ‐ NORTH‐SOUTH METRO LINE JUNCTION ARCADIS Services: preliminary and detailed design – construction managementAMSTERDAM CENTRAL STATION ‐ NORTH‐SOUTH METRO LINE JUNCTION (The Netherlands) – Client: ProRailKey data: under construction ‐ Amsterdam Central station in full operation
Metros and Tramways
8/17/2019 Normativ Tunel
26/67
SIJTWENDE TUNNELARCADIS Services: Preliminary and detailed design (civil + systems)
SIJTWENDE TUNNEL (The Netherlands) – Client: Royal Volker Wessels construction companyKey data: In operation (2003) ‐ 2.2 km cut & cover combined road and tramway tunnel including one underground station
Metros and Tramways
8/17/2019 Normativ Tunel
27/67
NEW YORK CITY – EAST SIDE ACCESS (USA) ARCADIS Services: Construction Management
NEW YORK CITY – EAST SIDE ACCESS (USA) ‐ Client: NYC Metropolitan Transit Authority (MTA)
Key data: Construction period: 2007 – 2015
Metros and Tramways
8/17/2019 Normativ Tunel
28/67
VALPARAISO – MERVAL PROJECT ‐ Client: MERVAL S.AARCADIS Services: Complete design (from preliminary design to detailed design) – Architectural design –Tender documents
VALPARAISO – MERVAL PROJECT (Chile) ‐ Client: MERVAL S.AKey data: Construction period: 1998‐2005
Metros and Tramways
8/17/2019 Normativ Tunel
29/67
PRAGUE UNDERGROUND ARCADIS Services: Detailed Engineering for sections IV C1 and IV C2
PRAGUE UNDERGROUND (Czech Republic) ‐ Client: Public Transport Company of the Capital City of Prague
Key data: Construction period: 2001 ‐ 2008
Metros and Tramways
8/17/2019 Normativ Tunel
30/67
Metros and Tramways
CAIRO METRO – LINE 2ARCADIS Services: Definition & supervision of geotechnical field investigation ‐ Geological, hydrogeological & geotechnical synthesis ‐ Definition of soil improvement for break‐in & break‐out of the stations & for special
structures (cross‐passages,…) ‐ Evaluation of building underpinning
CAIRO METRO – LINE 2 (Egypt) ‐ Client: CAMPENON BERNARD SGE – SPIE BATIGNOLLES –FOUGEROLLE – BOUYGUES – SOLETANCHE BACHY – ARAB CONTRACTORS JV
Key data: Construction period: 1993 to 1997 ‐ 19 stations ‐ a double tracks tunnel bored by a slurry shield machine
8/17/2019 Normativ Tunel
31/67
31
Highway and Road Tunnels
8/17/2019 Normativ Tunel
32/67
MARSEILLE – NORTH‐SOUTH COAST AXISARCADIS Services: Design and Construction Management (EGIS Rail‐ARCADIS‐MASCARELLI Architects JV) including geotechnical aspects
MARSEILLE – NORTH‐SOUTH COAST AXIS (France) ‐ Client: CUMPMKey Data: Construction period: 2004‐2010 – Demolition of the existing viaduct: 19 000 t – Cut & cover construction (2 and 3 lanes): 1100 m – 30 000 m2 slurry walls
Highway and Road Tunnels
8/17/2019 Normativ Tunel
33/67
A86 HIGHWAY – WESTERN SECTIONARCADIS Services: Definition & supervision of geotechnical field investigations ‐ Geological, hydrogeological & geotechnical synthesis ‐ Assessments on impacts on the underground water‐table ‐ Technical assistance
during detailed design phase ‐ Detailed design & shop drawings of the tunnel internal structures
A86 HIGHWAY – WESTERN SECTION (France) ‐ Client: SOCATOPKey data: Construction period: 1991 (on going) – 1 tunnel 10.3 m finished diameter, 10.2 km long ‐ 1 tunnel 10.5 m finished diameter, 7.6 km long
Both tunnels bored by TBM
Highway and Road Tunnels
8/17/2019 Normativ Tunel
34/67
BAILLET TUNNELARCADIS Services: Definition & supervision of geotechnical field investigations Geological, hydrogeological & geotechnical synthesis – Design ‐ Construction Management
BAILLET TUNNEL (France) ‐ Client: BPB PLACO (Plaster manufacturer)Key data: Construction period: 1997 to 2001 – 1 two‐lane road tunnel: 84 m2 cross‐section excavated by NATM method, 300 m long ‐ 1 connecting cavern excavated by NATM method ‐ a 150 m long open‐trench
at the main tunnel portal
Highway and Road Tunnels
8/17/2019 Normativ Tunel
35/67
200m cut and cover “West” 1818 m mined tunnel
200m cut and cover “East”
A
A
Section A-A
50 meter
TOULON A50‐A57 – 2nd TUBEARCADIS Services: Detailed Design of temporary supports – External control of Detailed Design of final linings and cut & cover sections
TOULON – A50‐A57 – 2nd TUBE (France) ‐ Client: BOUYGUES TP ‐ SBF – COLAS ‐ SCREGKey data: Construction period: 2007 to 2011 – 2 cut and cover sections of 200m each (East and West) ‐mined tunnel of 1818 m including safety equipments (fire niches, safety niches,…) – 7 cross‐passages for
pedestrian access – 2 cross‐passages for rescue vehicle access
Highway and Road Tunnels
8/17/2019 Normativ Tunel
36/67
ROUTE DES TAMARINS – SECTION 1ARCADIS Services: Independent checker for viaduct, cut & cover section and bored tunnels section
ROUTE DES TAMARINS – SECTION 1 (Isle of La Réunion) ‐ Client: DDE RéunionKey Data: Construction period: 2004‐2009 – Viaduct of Saint‐Paul, 750 m long – Cut & cover, 150 m long –Cap de la Houssaye Tunnel, 300 m long – 3 other viaducts
Highway and Road Tunnels
8/17/2019 Normativ Tunel
37/67
2nd COENTUNNEL PPPARCADIS Services: overall design management ‐ Preliminary and Detailed design of the tunnel – highway
design ‐ Management of tunnel safety aspects‐ monitoring of the existing tunnel during construction –functional design traffic management systems – interface management tunnelsystems
2nd COENTUNNEL PPP (The Netherlands) – Client: Coentunnel Company BV (concessionaire)Key data: Construction period: 2009 (on going) – includes a 1.2 km immersed tube tunnel and the refurbishment of the existing Coentunnel
Highway and Road Tunnels
8/17/2019 Normativ Tunel
38/67
A2 LEIDSCHE RIJNARCADIS Services: Preliminary and Detailed design of tunnel – service buildings – interface management tunnel systems
A2 LEIDSCHE RIJN (The Netherlands) – Client: Besix – Dura Vermeer joint ventureKey data: Construction period: 2007 ‐ 2010 – 1650 m cut & cover tunnel 10 –lane tunnel part of the Trans European Road Network
Highway and Road Tunnels
8/17/2019 Normativ Tunel
39/67
BUSAN‐GEOJE FIXED LINK (South Korea) ARCADIS Services: Independent checker – Construction supervision
BUSAN‐GEOJE FIXED LINK (South Korea) ‐ Client: GK Fixed LinkKey Data: Construction period: 2003‐2009
Highway and Road Tunnels
8/17/2019 Normativ Tunel
40/67
D5 MOTORWAY – VALIK TUNNEL ARCADIS Services: Complex geotechnical monitoring of two tunnels
D5 MOTORWAY – VALIK TUNNEL (Czech Republic) ‐ Client: Road and Motorway Directorate
Key Data: Construction period: March 2003 – May 2006
Highway and Road Tunnels
8/17/2019 Normativ Tunel
41/67
MRAZOVKA TUNNEL ARCADIS Services: Construction supervision ‐ Monitoring
MRAZOVKA TUNNEL (Czech Republic) ‐ Client: Road and Motorway DirectorateKey Data: Construction period: 1998 – 2002
Highway and Road Tunnels
h d d l
8/17/2019 Normativ Tunel
42/67
D8 MOTORWAY – PANENSKÁ AND LIBOUCHEC TUNNEL ARCADIS Services: Complex geotechnical services
D8 MOTORWAY – PANENSKÁ AND LIBOUCHEC TUNNEL (Czech Republic) ‐Client: Road and Motorway DirectorateKey Data: Construction period: March 2003 – November 2006
Highway and Road Tunnels
Hi h d R d T l
8/17/2019 Normativ Tunel
43/67
MOSCOW – LEFORTOVO TUNNEL ARCADIS Services: Geotechnical Assistance – Technical Assistance for surface settlements appraisal
MOSCOW – LEFORTOVO TUNNEL (Russia) ‐ Client: VINCI Construction JVKey Data: Construction period: 2000 – 2001
Highway and Road Tunnels
Hi h d R d T l
8/17/2019 Normativ Tunel
44/67
EL AZHAR ROAD TUNNELS (Egypt)ARCADIS Services: Definition & supervision of geotechnical field investigation ‐ Geological, hydrogeological & geotechnical synthesis ‐ Definition of the lay‐out ‐ Audit of the project (civil engineering & equipments)
E L H U S S E I N
V E N T .
S H A F T
P O R T S A I D
V E N T .
S H
A F T
A T T A B A
V E N T .
S H A F T
S A L A H
S A L E M
V E N T . S
H A F T
T B M E
N T R Y S H A F T
EL AZHAR ROAD TUNNELS (Egypt) ‐ Client: CAMPENON BERNARD SGE – SPIE BATIGNOLLES –FOUGEROLLE – BOUYGUES – ARAB CONTRACTORS JV
Key data: Construction period: 1998 to 2001 ‐ twin tunnels, 1 700 m long, 8.35 m finished diameter bored by a slurry shield machine ‐ 2 cut & covers, 200 m & 400 m long
Highway and Road Tunnels
8/17/2019 Normativ Tunel
45/67
45
Underground Space
Underground Space
8/17/2019 Normativ Tunel
46/67
LEP – TUNNEL FOR PARTICLE ACCELERATORARCADIS Services: Analysis & synthesis of geotechnical data ‐ Determination of geotechnical parameters for the whole project ‐ Detailed design & shop drawings of all the civil engineering structures (over 900
drawings produced)
Underground Space
LEP – TUNNEL FOR PARTICLE ACCELERATOR (Switzerland) ‐ Client: EUROLEPKey data: Construction period: 1984 to 1988 ‐ 6 underground caverns 22 m diameter ‐ 15 underground rooms ‐ 50 km of galleries, 4.50 m to 12 m diameter (19.4 km of galleries bored by 3 WIRTH TBM, 4.50 m diameter)
The LEP (Large Electron Positron Collider) tunnel accommodates the largest particle accelerator in the world
Underground Space
8/17/2019 Normativ Tunel
47/67
CHANNEL TUNNEL – FRENCH CROSS‐OVERARCADIS Services: Determination of the minimum chalk pillar thickness between the 2 railway running tunneEvaluation of the authorized deformation criteria during excavation ‐ Phasing determination for the primary
galleries mining ‐ 2D & 3D finite elements models ‐ Geological & geotechnical follow‐up for the work duration
CHANNEL TUNNEL – FRENCH CROSS‐OVER (France) ‐ Client: TransManche LinkKey data: Construction period: 1986 to 1991 ‐ The cavern is 170 m long, 19 m wide and 18 m high ‐ The thickness of chalk pillar separating the 2 railway running tunnels is just 1.5 m
Underground Space
Underground Space
8/17/2019 Normativ Tunel
48/67
HAUSSMANN St-LAZARE Station
MAGENTA StationGARE
SAINT-LAZARE
GARE DUNORD
EOLE PROJECT – PHASE IARCADIS Services: Geotechnics ‐ Basic & final design of bored tunnels, conventionally excavated tunnel, connecting structures, cross‐passages, shafts – Basic & final design of ground treatments ‐ Elaboration of construction methods & phasing ‐ Elaboration of the instrumentation program ‐ Preparation of the tender documents, including contractual technical specifications ‐ Geotechnical & technical advisor to the Client – Control of detailed design & acceptance of shop drawings
EOLE PROJECT – PHASE I (France) ‐ Client: SNCF (French National Railway Authority)Key data: Construction period: 1990 to 1995 – 2 underground stations 53 m wide, 225 m long ‐ 1 tunnel 12 m wide, 800 m long ‐ 2 parallel tunnels, 1 700 m long each, bored by 7.40m diameter slurry shield TBM ‐ 4 connecting caverns between main tunnels & stations
Underground Space
Underground Space
8/17/2019 Normativ Tunel
49/67
3RD UNDERGROUND ELECTRIC POWER SUBSTATION ARCADIS Services: Complete design and construction management services for underground and surface structures
3RD UNDERGROUND ELECTRIC POWER SUBSTATION (Monaco) ‐ Client: Authority of Public Works, Principality of MonacoKey data: Construction period: 2008 to 2014
Underground Space
Underground Space
8/17/2019 Normativ Tunel
50/67
ANDINA PROJECT ARCADIS Services: Detailed engineering ‐ Geomechanical interaction of a large cavern with nearby cavities
ANDINA PROJECT (Chile) ‐ Client: CODELCOKey data: Construction period: 1998 to 2002
Underground Space
H dra lic & Technical Galleries
8/17/2019 Normativ Tunel
51/67
51
Hydraulic & Technical Galleries
Hydraulic & Technical Galleries
8/17/2019 Normativ Tunel
52/67
EL TENIENTE MINE ACCESS TUNNELARCADIS Services: Engineering services for the Consortium during the tendering process (Geotechnics –Preliminary Design of the underground structures)
EL TENIENTE MINE ACCESS TUNNEL (Chile) ‐ Client: VINCI – Solétanche Construction JVKey data: Design & Build project ‐ Double tube copper mine access tunnel in the Chilean Andes ‐ 9,000 m long, approx. 110 m² section (each tube), 20 cross passages – max. 1100 m rock cover ‐ locally squeezing
rock conditions
Hydraulic & Technical Galleries
Hydraulic & Technical Galleries
8/17/2019 Normativ Tunel
53/67
COLLECTOR MARGEN IZQUIERDAARCADIS Services: Technical & contractual assistance to the Client from preliminary design to tender documents
COLLECTOR MARGEN IZQUIERDA (Argentina) ‐ Client: AGUAS ARGENTINASKey data: Design period: 1998 to 2001 – Main sewer, 13 km long, 3.50 m finished diameter, bored by TBM ‐Drop shafts ‐ Junction chambers ‐ 2 connexions with existing major sewers ‐ Pumping station ‐ Diffuser tower ‐ 1 crossing below an existing major drinking water tunnel
Hydraulic & Technical Galleries
Hydraulic & Technical Galleries
8/17/2019 Normativ Tunel
54/67
PIQUETTES – BUCHELAY COMBINED SEWER SYSTEM ARCADIS Services: Complete design and Construction Management
PIQUETTES – BUCHELAY COMBINED SEWER SYSTEM (France) ‐ Client: Community of Mantes AgglomerationKey data: Construction period: 2004 ‐ 2007
Hydraulic & Technical Galleries
Hydraulic & Technical Galleries
8/17/2019 Normativ Tunel
55/67
SEINE RIVER
SST2 S S T 3
SST1 SST4
OV2
OV1 OV4
SS basin
IVRYMASSENA AUSTERLITZ
OV3PERIPHERIQUE
TIMA – STORM STORAGE TUNNELS & OVERFLOWSARCADIS Services: Preparation of Detailed Design ‐ Preparation of Tender Documents
TIMA – STORM STORAGE TUNNELS & OVERFLOWS (France) ‐ Client: SIAAPKey data: “Massena‐Austerlitz” tunnel, 2 300 m long ‐ 4.00 m finished diameter, bored by pressured front shield TBM ‐ “Peripherique‐Massena” tunnel, 650 m long, 4.00 m finished diameter, bored by pressured front shield TBM ‐ 3 storm overflows including 3 drop shafts, 30 to 40 m deep
Hydraulic & Technical Galleries
Hydraulic & Technical Galleries
8/17/2019 Normativ Tunel
56/67
Tunnel was abandoned after
2,400-ft at a cost of $100M.
Tunnel Abandoned at STA 24+46
Proposed Shallow Rock Tunnel (SRT)
Outfall Riser Shafts
Completed in Detroit River
Existing Shaft Will Be
Used
1 23 4 5 6
7 8
Proposed Supplemental
Borings (6 vertical 2 inclined)
DETROIT RIVER OUTFALL n°2 – TUNNEL RESCUEARCADIS Services: Expertise of the flood reasons – Preliminary design of the potential rescue alternatives
DETROIT RIVER OUTFALL n°2 – TUNNEL RESCUE (USA) ‐ Client: DWSD Key Data: total length: 1890 m ‐ inner diameter: 7,92m, outer diameter: 8,72 m ‐ 2 access shafts (diam. 3m) and 6 riser shafts in the Detroit River (diam. 3m) ‐ tunnel depth: ca. 85 m to reach presumably less permeable rock ‐
geology: fractured limestone and marlstone ‐ water pressure of up to 6 bar ‐ high H2S content in ground water
y
Hydraulic & Technical Galleries
8/17/2019 Normativ Tunel
57/67
DETROIT ‐ UPPER ROUGE TUNNELARCADIS Services: Preliminary and Basic design of the main TBM entry shaft – Checking of the detailed design of the shaft
DETROIT ‐ UPPER ROUGE TUNNEL (CSO) (USA) ‐ Client: DWSDKey data: Construction period: 2008‐2014 – Total length: 11 260 m – Inner diameter: 9.14 m ‐ 9 drop shaft connections along the alignment ‐ tunnel depth: ca. 50 to 60m
geology: heterogeneous layers of limestone, shale, marlstone ‐ H2S and CH4 present in ground water
y
Tunnel Safety
8/17/2019 Normativ Tunel
58/67
58
Tunnel Safety
Tunnel safety – Rail
8/17/2019 Normativ Tunel
59/67
LYON TURIN FERROVIAIRE BASE TUNNEL ARCADIS Services: Analysis of transport of dangerous goods ‐ functional safety analysis – development of tunnel safety requirements
LYON TURIN FERROVIAIRE BASE TUNNEL (France‐Italy) – Client: LTFKey data: Under development ‐ 53 km tunnel between Lyon (France) and Torino (Italia)
Tunnel safety – Highway
8/17/2019 Normativ Tunel
60/67
A2 MAASTRICHT TUNNEL CORRIDOR ARCADIS Services: preliminary (civil) design ‐ Functional safety analysis – Quantitative risk analysis –Scenario analysis ‐ development of tunnel safety requirements – management of interface with emergency
services ‐ development of tunnel system specifications – development of operational procedures
A2 MAASTRICHT TUNNEL CORRIDOR (The Netherlands) – Client: Avenue2 JVKey data: Under design ‐ 2.3 km bi‐level tunnel in Maastricht – including real‐estate development and smaller tunnels and bridges
Tunnel Systems
8/17/2019 Normativ Tunel
61/67
61
Tunnel Systems
Tunnel systems – Rail
8/17/2019 Normativ Tunel
62/67
PANNERDENSCH KANAAL TUNNEL ARCADIS Services: Functional analysis – preliminary design (civil + systems) ‐ development of tunnel and tunnel system specifications – construction management
PANNERDENSCH KANAAL TUNNEL (The Netherlands) – Client: Betuweroute ManagementgroepKey data: twin tube TBM driven rail freight tunnel ‐ 2.68 km
Tunnel systems – Rail
8/17/2019 Normativ Tunel
63/67
BEST RAILWAY TUNNEL ARCADIS Services: Preliminary and detailed design (civil + systems) – construction management
BEST RAILWAY TUNNEL (The Netherlands) – Client: ProRailKey data: cut & cover rail tunnel including one underground station ‐ 1.9 km
Tunnel systems – Highway
8/17/2019 Normativ Tunel
64/67
2nd BENELUXTUNNELARCADIS Services: preliminary design and detailed design (civil + systems) ‐ development of tunnel and tunnel system specifications – construction management
2nd BENELUXTUNNEL (The Netherlands) – Client: RijkswaterstaatKey data: immersed tube tunnel ‐ 1.0 km – in operation (2002)
Tunnel systems – Highway
8/17/2019 Normativ Tunel
65/67
ROERTUNNELARCADIS Services: preliminary design (civil + systems) ‐ development of tunnel and tunnel system specifications – construction management
ROERTUNNEL (The Netherlands) – Client: RijkswaterstaatKey data: cut & cover / immersed tube tunnel ‐ 2.45 km – in operation (2009)
Highways & Roads
8/17/2019 Normativ Tunel
66/67
A2 Leidsche RijnANL Services: Preliminary and Detailed design of tunnel – service buildings – interface management tunnel systems
A2 Leidsche Rijn – Client: Besix – Dura Vermeer joint ventureKey data: Construction period: 2007 ‐ 2010 – 1650 m cut & cover tunnel 10 –lane tunnel part of the Trans European Road Network
8/17/2019 Normativ Tunel
67/67