Normativ Tunel

Embed Size (px)

Citation preview

  • 8/17/2019 Normativ Tunel

    1/67

    Underground Activities

    Imagine the result

    Living structures for a sustainable society

  • 8/17/2019 Normativ Tunel

    2/67

    Technics

    Conventional excavation

    Mechanized excavation

    Trenchless technology

    Cut &

     Cover

     structures

    Immersed tubes

    IMMERSED TUNNELS  – 2nd Coentunnel (The Netherlands)

    IMMERSED TUNNELS  – Busan‐Geoje Fixed Link (South Korea)

    TRENCHLESS TECHNOLOGY  – Mantes‐la‐Ville (France)

    CUT & COVER  – Merval Metro (Chile)

    MECHANIZED EXCAVATION  – Lötschberg (Switzerland)

    CONVENTIONAL EXCAVATION  – Mrazovska tunnel(Czech Republic

  • 8/17/2019 Normativ Tunel

    3/67

    Tunnel use

    Road tunnels

    Railway tunnels

    Metros

    Underground Space

    Shafts

    Mining

    Technical &

     Hydraulic

     Galleries

    Investigation Galleries

    HYDRAULIC GALLERIES  – TIMA‐Storm storage galleries‐Paris (France

    INVESTIGATION GALLERIES  – Lyon‐Turin Ferroviaire (Italy & France

    SHAFTS  – Channel Tunnel 

    Sangatte (France)

    MINING  – Andina (Chile)

    UNDERGROUND SPACE  – City of  Prague (Czech Republic)

    RAILWAY TUNNELS  –Tram Train  – La Réunion

    ROAD TUNNELS  –A2 Maastricht (The Netherlands)

    METROS  – East Side Access  – New York (USA)

    ROAD TUNNELS  – Roertunnel (The Netherlands)

    RAILWAY TUNNELS  –

    Paris Eole Project (France) 

  • 8/17/2019 Normativ Tunel

    4/67

    Skills

    Geology, Hydrogeology & Geotechnics

    Ground improvement

     

    techniques

    Seismic Engineering

    Civil Engineering

    Monitoring Engineering

    Environmental Services

    Safety Studies

    Systems Engineering

    GEOLOGY, HYDROGEOLOGY & GEOTECHNICS

    CIVIL ENGINEERING

    SEISMIC ENGINEERINGMONITORING ENGINEERING  – City of  Prague (Czech Republic)

    ENVIRONMENTAL SERVICES  – Lyon ‐Turin Ferroviaire (Italy‐France)

    SYSTEMS ENGINEERING  – Piet Hein Tunnel (The Netherlands)

    SYSTEMS ENGINEERING  –BeneluxTunnel (The Netherlands)

    SAFETY STUDIES  –A2 Maastricht (The Netherlands)

  • 8/17/2019 Normativ Tunel

    5/67

    Our Services

    Realization

    Engineering

    Design

    Consultancy

    services

    Maintain

    Project DevelopmentFeasibility Studies

    Program Consultancy

    Master Planning

  • 8/17/2019 Normativ Tunel

    6/67

    United States

    Brazil Peru

    Chile

    China

    Netherlands

    France

    Italy Romania

    Czech Republic 

    United

     Arab

    Emirates

    Global Knowledge Network 

    Tunnels 

    Activities

    Belgium   Germany 

    United KingdomPoland 

    ARCADIS BELGIUMARCADIS CHILE

    ARCADIS CZECH REPUBLIC

    ARCADIS FRANCE

    ARCADIS NETHERLANDSARCADIS ROMANIA

    ARCADIS US

  • 8/17/2019 Normativ Tunel

    7/67

    7

    Toulouse Metro – TBM section

    (France) Toulon Highway – Cut & Cover section

    International Membership

    •   AITES‐ITA

     (International

     Tunnelling

     Association)

    •   AFTES (French tunnelling association)

    •   COSUF (Committee on Operational Safety of  Underground Facilities)

    •   COB (Dutch Center for Underground Construction)

    •   CzTA (Czech Tunnelling Association)

    •   SME (Society

     of 

     Mining

     Engineers)

    •   ASCE (American Society of  Civil Engineers)

    •   Pipeline Crossings Committee & Pipeline Infrastructure Committee

    •   Trenchless Technology Magazine, Member of  Editorial Advisory Board

    •   ...and Training

    D8 Motorway - Panenská and Libouchec Tunnels

    (Czech Republic)

    Schiphol Tunnel

    (The Netherlands)

  • 8/17/2019 Normativ Tunel

    8/67

    8

    Projects

  • 8/17/2019 Normativ Tunel

    9/67

    9

    Great Crossings

  • 8/17/2019 Normativ Tunel

    10/67

    CHANNEL TUNNEL ARCADIS Services:  Geotechnics  – Preliminary design of  all tunnels on French part  – Basic and detailed design of  6 underground caverns for the assembly of  the 5 french TBMs  – On‐site engineering (geological & geotechnical follow‐up)

    CHANNEL TUNNEL (France‐UK)  ‐   Client: TransManche Link (TML)Key data: Construction period: 1986‐1991 ‐ 2 railway running tunnels, 50.4 km long each, bored by 8.64 m to8.78 diameter EPBM (inner diameter: 7.60 m) ‐ 1 service tunnel, 50.4 km long bored by 5.61 m to 5.77 m diameter EPBM (inner diameter: 4.80 m)

    Great Crossings

  • 8/17/2019 Normativ Tunel

    11/67

    ALPTRANSIT PROJECT  – LÖTSCHBERG BASE TUNNELARCADIS Services: Partnering with Swiss engineering companies ‐ Definition of  the necessary arrangements for crossing faults and rock burst events ‐ Evaluation of  the stress‐field in rock mass ‐ Definition of  excavation stages & temporary support for branches ‐ Evaluation of  thermal effects on the final lining

    ALPTRANSIT PROJECT  – LÖTSCHBERG BASE TUNNEL (Switzerland)  ‐Client: BLS Alptransit AGKey data: Construction period: 1996‐2006 ‐ 2 railway running tunnels, 21.1 km excavated by drill and blast technique (65 m2), 18.7 km bored by TBM (excavated diameter: 9.40 m, 70 m2)

    Great Crossings

  • 8/17/2019 Normativ Tunel

    12/67

    Great Crossings

    LYON TURIN FERROVIAIRE  – BASE TUNNELARCADIS Services: Geotechnics  – Preliminary design up to tender documents of  the 3 inclined galleries  –Preliminary design of  the Base Tunnel

    LYON TURIN FERROVIAIRE  – BASE TUNNEL (France‐Italy) ‐   Client: LTF Key data: Construction period: 2002‐on going 

    2 railway running tunnels, 57 km long, 43 m2 section ‐ 1 large underground technical station ‐ 4 inclined galleries ‐ cross passages

  • 8/17/2019 Normativ Tunel

    13/67

    13

    Railway Tunnels

  • 8/17/2019 Normativ Tunel

    14/67

    HSL ATLANTICARCADIS Services: Geotechnics  – Preliminary Design ‐   Basic Design of  the bored tunnels, the portals, the open‐air sections ‐ On‐site engineering (geological, geotechnical and monitoring follow‐up of  the tunnels)

    HSL ATLANTIC (France)  ‐   Client: SNCF (French National Railway Authority)Key data: Construction period: 1983 to 1989  – 2 railway running tunnels, 4 800 m long each, bored by a 9.25m diameter slurry shield TBM

    High Speed Line Tunnels

  • 8/17/2019 Normativ Tunel

    15/67

    HSL PERPIGNAN‐FIGUERASARCADIS Services: Geotechnics  – Preliminary Design ‐   Basic & Detailed Design of  the bored tunnels, the French Portal, the French open‐air section ‐ On‐site engineering (geological, geotechnical and structural 

    follow‐up of  the tunnels)

    HSL PERPIGNAN‐FIGUERAS (France‐Spain) ‐   Client: EIFFAGE  – ACS ‐ DRAGADOSKey data: Concession ‐ Construction period: 2004 to 2010  –2 railway running tunnels , 8 000m long  –1 conventional treatment gallery ‐ Cross‐passages ‐ French & Spanish portals ‐ French & Spanish open‐air 

    sections

    High Speed Line Tunnels

  • 8/17/2019 Normativ Tunel

    16/67

    High Speed Line Tunnels

    HSL MEDITERRANEEARCADIS Services: Geotechnics  – Preliminary & final design, tender documents of  the tunnels ‐ Supervision of  civil works 

    HSL MEDITERRANEE (France)  ‐   Client: SNCF (French National Railway Authority)Key data: Construction period: 1995 to 1999 ‐ “Pennes‐Mirabeau” tunnel: 1 530 m long ‐ “Marseille”tunnel: 5 414 m long

  • 8/17/2019 Normativ Tunel

    17/67

    HNĚVKOVSKÝ I, HNĚVKOVSKÝ II AND MALÁ HUBA TUNNELS ARCADIS Services: Geotechnical monitoring and Construction Management

    HNĚVKOVSKÝ I, HNĚVKOVSKÝ II AND MALÁ HUBA TUNNELS (Czech Republic)Client: SZDC s.o., Administration of  Railway TransportKey data: Construction period: May 2004‐February 2006

    Railway Tunnels

  • 8/17/2019 Normativ Tunel

    18/67

    TUNNEL UNDER MOTORWAY INTERSECTION FRANKFURT/MAIN ARCADIS Services: Geotechnical check of  the detailed design and Construction Management

    TUNNEL UNDER MOTORWAY INTERSECTION FRANKFURT/MAIN (Germany)   ‐Client: EBA  – German Railway Control and Certifying AuthorityKey data: Construction period: 1996‐1998

    Railway Tunnels

  • 8/17/2019 Normativ Tunel

    19/67

    DIABOLO TUNNELARCADIS Services: Geotechnical analysis and tunnel excavation design during tender phase

    DIABOLO TUNNEL (Belgium)  ‐   Client: THV BESIX  – Eiffage TP ‐ AB Construction JVKey data: Double tube railway tunnel underneath Brussels airport  – Slurry TBM excavated tunnel, each tube approx. 1,400 m long  ‐ Cross‐passages between the tubes

    Railway Tunnels

  • 8/17/2019 Normativ Tunel

    20/67

    LIEFKENSHOEK TUNNEL (Belgium) ARCADIS Services: Geotechnical analysis and tunnel excavation design during tender phase

    LIEFKENSHOEK TUNNEL (Belgium)  ‐   Client: THV BESIX  – Eiffage TP ‐ AB Construction JVKey data: Double tube railway tunnel crossing Antwerp harbour basins and Scheldt river  – Slurry TBM excavated tunnel, 8.40 m diameter, each tube approx. 6,000 m long  ‐ 12 cross‐passages between the tubes 

    Railway Tunnels

  • 8/17/2019 Normativ Tunel

    21/67

    21

    Metros and Tramways

  • 8/17/2019 Normativ Tunel

    22/67

    Paris  – Lille  – Rouen  – Rennes  – Toulouse  – Marseille  – Lyon (France) 

    Metros and Tramways

  • 8/17/2019 Normativ Tunel

    23/67

    LRT of  TOULOUSE DISTRICT  – LINE BARCADIS Services: Detailed design of  11 stations ‐ Detailed design of  break‐in & break‐out in the stations ‐Control of  detailed design for tunnels ‐ Consultant for boring machine & geotechnical problems ‐

    Monitoring for stations & tunnels

    LRT of  TOULOUSE DISTRICT  – LINE B (France) ‐   Client: ContractorsKey data: Construction period: 2001 (on going)  – 11.6 km of  double tracks & single track tunnels, bored by 2 earth pressure balance machines,1 slurry shield machine & 1 compressed air machine ‐ 20 stations ‐

    Ventilation & access shafts & galleries

    Metros and Tramways

  • 8/17/2019 Normativ Tunel

    24/67

    LRT of  RENNES DISTRICT  – LINE 1ARCADIS Services: Definition & supervision of  geotechnical field investigations ‐ Geological, hydrogeological & geotechnical synthesis  – Preliminary & Basic Design ‐ Construction Management

    LRT of  RENNES DISTRICT  – LINE 1 (France)  ‐   Client: RENNES DISTRICTKey data: Construction period: 1997  – 2001  – 9.4 km of  double tracks line ‐ bored tunnels: 3 560 m by 1 earth pressure balance machine ‐ 15 stations ‐ 1 garage workshop

    Metros and Tramways

  • 8/17/2019 Normativ Tunel

    25/67

    AMSTERDAM CENTRAL STATION ‐ NORTH‐SOUTH METRO  LINE JUNCTION ARCADIS Services: preliminary and detailed design  – construction managementAMSTERDAM CENTRAL STATION ‐ NORTH‐SOUTH METRO  LINE JUNCTION (The Netherlands)  – Client: ProRailKey data: under construction ‐   Amsterdam Central station in full operation

    Metros and Tramways

  • 8/17/2019 Normativ Tunel

    26/67

    SIJTWENDE TUNNELARCADIS Services: Preliminary and detailed design (civil + systems)

    SIJTWENDE TUNNEL (The Netherlands) – Client: Royal Volker Wessels construction companyKey data: In operation (2003) ‐ 2.2 km cut & cover combined road and tramway tunnel  including one underground station

    Metros and Tramways

  • 8/17/2019 Normativ Tunel

    27/67

    NEW YORK CITY  – EAST SIDE ACCESS (USA) ARCADIS Services: Construction Management

    NEW YORK CITY  – EAST SIDE ACCESS (USA) ‐   Client: NYC Metropolitan Transit Authority (MTA)

    Key data: Construction period: 2007  – 2015 

    Metros and Tramways

  • 8/17/2019 Normativ Tunel

    28/67

    VALPARAISO  – MERVAL PROJECT ‐   Client: MERVAL S.AARCADIS Services: Complete design (from preliminary design to detailed design)  – Architectural design  –Tender documents

    VALPARAISO  – MERVAL PROJECT (Chile) ‐   Client: MERVAL S.AKey data: Construction period: 1998‐2005 

    Metros and Tramways

  • 8/17/2019 Normativ Tunel

    29/67

    PRAGUE UNDERGROUND ARCADIS Services: Detailed Engineering for sections IV C1 and IV C2

    PRAGUE UNDERGROUND (Czech Republic) ‐   Client: Public Transport Company of  the Capital City of  Prague

    Key data: Construction period: 2001 ‐ 2008

    Metros and Tramways

  • 8/17/2019 Normativ Tunel

    30/67

    Metros and Tramways

    CAIRO METRO  – LINE 2ARCADIS Services: Definition & supervision of  geotechnical field investigation ‐ Geological, hydrogeological & geotechnical synthesis ‐ Definition of  soil improvement for break‐in & break‐out of  the stations & for special 

    structures (cross‐passages,…) ‐ Evaluation of  building underpinning

    CAIRO METRO  – LINE 2 (Egypt)  ‐   Client: CAMPENON BERNARD SGE  – SPIE BATIGNOLLES  –FOUGEROLLE  – BOUYGUES  – SOLETANCHE BACHY  – ARAB CONTRACTORS JV

    Key data: Construction period: 1993 to 1997 ‐ 19 stations ‐ a double tracks tunnel bored by a slurry shield machine

  • 8/17/2019 Normativ Tunel

    31/67

    31

    Highway and Road Tunnels

  • 8/17/2019 Normativ Tunel

    32/67

    MARSEILLE  – NORTH‐SOUTH COAST AXISARCADIS Services: Design and Construction Management (EGIS Rail‐ARCADIS‐MASCARELLI Architects JV) including geotechnical aspects 

    MARSEILLE  – NORTH‐SOUTH COAST AXIS (France)  ‐   Client: CUMPMKey Data: Construction period: 2004‐2010  – Demolition of  the existing viaduct: 19 000 t  – Cut & cover construction (2 and 3 lanes): 1100 m  – 30 000 m2 slurry walls

    Highway and Road Tunnels

  • 8/17/2019 Normativ Tunel

    33/67

    A86 HIGHWAY  – WESTERN SECTIONARCADIS Services: Definition & supervision of  geotechnical field investigations ‐ Geological, hydrogeological & geotechnical synthesis ‐ Assessments on impacts on the underground water‐table ‐ Technical assistance 

    during detailed design phase ‐ Detailed design & shop drawings of  the tunnel internal structures

    A86 HIGHWAY  – WESTERN SECTION (France)  ‐   Client: SOCATOPKey data: Construction period: 1991 (on going)  – 1 tunnel 10.3 m finished diameter, 10.2 km long ‐ 1 tunnel 10.5 m finished diameter, 7.6 km long

    Both tunnels bored by TBM

    Highway and Road Tunnels

  • 8/17/2019 Normativ Tunel

    34/67

    BAILLET TUNNELARCADIS Services: Definition & supervision of  geotechnical field investigations Geological, hydrogeological & geotechnical synthesis  – Design ‐ Construction Management

    BAILLET TUNNEL (France)  ‐   Client: BPB PLACO (Plaster manufacturer)Key data: Construction period: 1997 to 2001  – 1 two‐lane road tunnel: 84 m2 cross‐section excavated by NATM method, 300 m long ‐ 1 connecting cavern excavated by NATM method ‐ a 150 m long open‐trench 

    at the main tunnel portal

    Highway and Road Tunnels

  • 8/17/2019 Normativ Tunel

    35/67

    200m cut and cover “West” 1818 m mined tunnel

    200m cut and cover “East”

    A

    A

    Section A-A

    50 meter 

    TOULON A50‐A57  – 2nd TUBEARCADIS Services: Detailed Design of  temporary supports  – External control of  Detailed Design of  final linings and cut & cover sections

    TOULON  – A50‐A57  – 2nd TUBE (France)  ‐ Client: BOUYGUES TP  ‐ SBF  – COLAS ‐ SCREGKey data: Construction period: 2007 to 2011  – 2 cut and cover sections of  200m each (East and West) ‐mined tunnel of  1818 m including safety equipments (fire niches, safety niches,…)  – 7 cross‐passages for 

    pedestrian access  – 2 cross‐passages for rescue vehicle access

    Highway and Road Tunnels

  • 8/17/2019 Normativ Tunel

    36/67

    ROUTE DES TAMARINS  – SECTION 1ARCADIS Services: Independent checker for viaduct, cut & cover section and bored tunnels section

    ROUTE DES TAMARINS  – SECTION 1 (Isle of  La Réunion)  ‐   Client: DDE RéunionKey Data: Construction period: 2004‐2009  – Viaduct of  Saint‐Paul, 750 m long  – Cut & cover, 150 m long  –Cap de la Houssaye Tunnel, 300 m long  – 3 other viaducts 

    Highway and Road Tunnels

  • 8/17/2019 Normativ Tunel

    37/67

    2nd COENTUNNEL PPPARCADIS Services: overall design management ‐ Preliminary and Detailed design of  the tunnel  – highway 

    design ‐ Management of  tunnel safety  aspects‐ monitoring of  the existing tunnel during construction  –functional design traffic management systems  – interface management tunnelsystems

    2nd COENTUNNEL PPP (The Netherlands)  – Client: Coentunnel Company BV (concessionaire)Key data: Construction period: 2009 (on going)  – includes a 1.2 km immersed tube tunnel and the refurbishment of  the existing Coentunnel

    Highway and Road Tunnels

  • 8/17/2019 Normativ Tunel

    38/67

    A2 LEIDSCHE RIJNARCADIS Services: Preliminary and Detailed design of  tunnel  – service buildings  – interface management tunnel systems

    A2 LEIDSCHE RIJN (The Netherlands)  – Client: Besix  – Dura Vermeer  joint ventureKey data: Construction period: 2007 ‐ 2010  – 1650 m cut & cover tunnel 10  –lane tunnel part of  the Trans European Road Network

    Highway and Road Tunnels

  • 8/17/2019 Normativ Tunel

    39/67

    BUSAN‐GEOJE FIXED LINK (South Korea) ARCADIS Services: Independent checker  – Construction supervision

    BUSAN‐GEOJE FIXED LINK (South Korea)  ‐   Client: GK Fixed LinkKey Data: Construction period: 2003‐2009 

    Highway and Road Tunnels

  • 8/17/2019 Normativ Tunel

    40/67

    D5 MOTORWAY  – VALIK TUNNEL ARCADIS Services: Complex geotechnical monitoring of  two tunnels

    D5 MOTORWAY  – VALIK TUNNEL (Czech Republic)  ‐   Client: Road and Motorway Directorate

    Key Data: Construction period: March 2003  – May 2006 

    Highway and Road Tunnels

  • 8/17/2019 Normativ Tunel

    41/67

    MRAZOVKA TUNNEL ARCADIS Services: Construction supervision ‐ Monitoring

    MRAZOVKA TUNNEL (Czech Republic)  ‐   Client: Road and Motorway DirectorateKey Data: Construction period: 1998  – 2002 

    Highway and Road Tunnels

    h d d l

  • 8/17/2019 Normativ Tunel

    42/67

    D8 MOTORWAY  – PANENSKÁ AND LIBOUCHEC TUNNEL ARCADIS Services: Complex geotechnical services

    D8 MOTORWAY  – PANENSKÁ AND LIBOUCHEC TUNNEL (Czech Republic)  ‐Client: Road and Motorway DirectorateKey Data: Construction period: March 2003  – November 2006 

    Highway and Road Tunnels

    Hi h d R d T l

  • 8/17/2019 Normativ Tunel

    43/67

    MOSCOW  – LEFORTOVO TUNNEL ARCADIS Services: Geotechnical Assistance  – Technical Assistance for surface settlements appraisal

    MOSCOW  – LEFORTOVO TUNNEL (Russia)  ‐   Client: VINCI Construction JVKey Data: Construction period: 2000  – 2001

    Highway and Road Tunnels

    Hi h d R d T l

  • 8/17/2019 Normativ Tunel

    44/67

    EL AZHAR ROAD TUNNELS (Egypt)ARCADIS Services:  Definition & supervision of  geotechnical field investigation ‐ Geological, hydrogeological & geotechnical synthesis ‐ Definition of  the lay‐out ‐ Audit of  the project (civil engineering & equipments)

        E    L    H    U    S    S    E    I    N

        V    E    N    T .

        S    H    A    F    T

        P    O    R    T    S    A    I    D

        V    E    N    T .

        S    H

        A    F    T

        A    T    T    A    B    A

        V    E    N    T .

        S    H    A    F    T

        S    A    L    A    H

        S    A    L    E    M 

        V    E    N    T .    S

        H    A    F    T

        T    B    M     E

        N    T    R    Y    S    H    A    F    T

    EL AZHAR ROAD TUNNELS (Egypt)  ‐   Client: CAMPENON BERNARD SGE  – SPIE BATIGNOLLES  –FOUGEROLLE  – BOUYGUES  – ARAB CONTRACTORS JV

    Key data: Construction period: 1998 to 2001 ‐ twin tunnels, 1 700 m long, 8.35 m finished diameter bored by a slurry shield machine ‐ 2 cut & covers, 200 m & 400 m long

    Highway and Road Tunnels

  • 8/17/2019 Normativ Tunel

    45/67

    45

    Underground Space

    Underground Space

  • 8/17/2019 Normativ Tunel

    46/67

    LEP  – TUNNEL FOR PARTICLE ACCELERATORARCADIS Services: Analysis & synthesis of  geotechnical data ‐ Determination of  geotechnical parameters for the whole project ‐ Detailed design & shop drawings of  all the civil engineering structures (over 900 

    drawings produced)

    Underground Space

    LEP  – TUNNEL FOR PARTICLE ACCELERATOR (Switzerland)  ‐   Client: EUROLEPKey data: Construction period: 1984 to 1988 ‐ 6 underground caverns 22 m diameter ‐ 15 underground rooms ‐ 50 km of  galleries, 4.50 m to 12 m diameter (19.4 km of  galleries bored by 3 WIRTH TBM, 4.50 m diameter)

    The  LEP  (Large  Electron  Positron Collider)  tunnel  accommodates  the largest particle accelerator in the world

    Underground Space

  • 8/17/2019 Normativ Tunel

    47/67

    CHANNEL TUNNEL  – FRENCH CROSS‐OVERARCADIS Services:  Determination of  the minimum chalk pillar thickness between the 2 railway running tunneEvaluation of  the authorized deformation criteria during excavation ‐ Phasing determination  for the primary 

    galleries mining ‐ 2D & 3D finite elements models ‐ Geological & geotechnical follow‐up for the work duration

    CHANNEL TUNNEL  – FRENCH CROSS‐OVER (France)  ‐   Client: TransManche LinkKey data: Construction period: 1986 to 1991 ‐ The cavern is 170 m long, 19 m wide and 18 m high ‐ The thickness of  chalk pillar separating the 2 railway running tunnels is  just 1.5 m 

    Underground Space

    Underground Space

  • 8/17/2019 Normativ Tunel

    48/67

    HAUSSMANN St-LAZARE Station

    MAGENTA StationGARE

    SAINT-LAZARE

    GARE DUNORD

    EOLE PROJECT  – PHASE IARCADIS Services: Geotechnics ‐ Basic & final design of  bored tunnels, conventionally excavated tunnel, connecting structures, cross‐passages, shafts  – Basic & final design of  ground treatments ‐ Elaboration of  construction methods & phasing ‐ Elaboration of  the instrumentation program ‐ Preparation of  the tender documents, including contractual technical specifications ‐ Geotechnical & technical advisor to the Client  – Control of  detailed design & acceptance of  shop drawings 

    EOLE PROJECT  – PHASE I  (France) ‐   Client: SNCF (French National Railway Authority)Key data: Construction period: 1990 to 1995  – 2 underground stations 53 m wide,  225 m long ‐ 1 tunnel 12 m wide, 800 m long ‐ 2 parallel tunnels, 1 700 m long each, bored by 7.40m diameter slurry shield TBM ‐ 4 connecting caverns between main tunnels & stations

    Underground Space

    Underground Space

  • 8/17/2019 Normativ Tunel

    49/67

    3RD UNDERGROUND ELECTRIC POWER SUBSTATION ARCADIS Services: Complete design and construction management services for underground and surface structures

    3RD UNDERGROUND ELECTRIC POWER SUBSTATION (Monaco) ‐   Client: Authority of  Public Works, Principality of  MonacoKey data: Construction period: 2008 to 2014 

    Underground Space

    Underground Space

  • 8/17/2019 Normativ Tunel

    50/67

    ANDINA PROJECT ARCADIS Services: Detailed engineering ‐ Geomechanical interaction of  a large cavern with nearby cavities

    ANDINA PROJECT (Chile) ‐   Client: CODELCOKey data: Construction period: 1998 to 2002 

    Underground Space

    H dra lic & Technical Galleries

  • 8/17/2019 Normativ Tunel

    51/67

    51

    Hydraulic & Technical Galleries

    Hydraulic & Technical Galleries

  • 8/17/2019 Normativ Tunel

    52/67

    EL TENIENTE MINE ACCESS TUNNELARCADIS Services: Engineering services for the Consortium during the tendering process (Geotechnics  –Preliminary Design of  the underground structures)

    EL TENIENTE MINE ACCESS TUNNEL (Chile) ‐   Client: VINCI  – Solétanche Construction JVKey data: Design & Build project ‐ Double tube copper mine access tunnel in the Chilean Andes ‐ 9,000 m long, approx. 110 m² section (each tube), 20 cross passages  – max. 1100 m rock cover ‐ locally squeezing 

    rock conditions 

    Hydraulic & Technical Galleries

    Hydraulic & Technical Galleries

  • 8/17/2019 Normativ Tunel

    53/67

    COLLECTOR MARGEN IZQUIERDAARCADIS Services: Technical & contractual assistance to the Client from preliminary design to tender documents

    COLLECTOR MARGEN IZQUIERDA (Argentina)  ‐   Client: AGUAS ARGENTINASKey data: Design period: 1998 to 2001  – Main sewer, 13 km long, 3.50 m finished diameter, bored by TBM ‐Drop shafts ‐ Junction chambers ‐ 2 connexions with existing major sewers ‐ Pumping station ‐ Diffuser tower ‐ 1 crossing below an existing major drinking water tunnel

    Hydraulic & Technical Galleries

    Hydraulic & Technical Galleries

  • 8/17/2019 Normativ Tunel

    54/67

    PIQUETTES  – BUCHELAY COMBINED SEWER SYSTEM ARCADIS Services: Complete design and Construction Management

    PIQUETTES  – BUCHELAY COMBINED SEWER SYSTEM (France)  ‐   Client: Community of  Mantes AgglomerationKey data: Construction period: 2004 ‐ 2007

    Hydraulic & Technical Galleries

    Hydraulic & Technical Galleries

  • 8/17/2019 Normativ Tunel

    55/67

    SEINE RIVER

    SST2   S        S        T       3 

    SST1 SST4

    OV2

    OV1 OV4

    SS basin

    IVRYMASSENA AUSTERLITZ

    OV3PERIPHERIQUE

    TIMA  – STORM STORAGE TUNNELS & OVERFLOWSARCADIS Services: Preparation of  Detailed Design ‐ Preparation of  Tender Documents

    TIMA  – STORM STORAGE TUNNELS & OVERFLOWS (France)  ‐   Client: SIAAPKey data: “Massena‐Austerlitz” tunnel, 2 300 m long ‐ 4.00 m finished diameter, bored by pressured front shield TBM ‐ “Peripherique‐Massena” tunnel, 650 m long, 4.00 m finished diameter, bored by pressured front shield TBM ‐ 3 storm overflows including 3 drop shafts, 30 to 40 m deep

    Hydraulic & Technical Galleries

    Hydraulic & Technical Galleries

  • 8/17/2019 Normativ Tunel

    56/67

    Tunnel was abandoned after

    2,400-ft at a cost of $100M.

    Tunnel Abandoned at STA 24+46

    Proposed Shallow Rock Tunnel (SRT)

    Outfall Riser Shafts

    Completed in Detroit River 

    Existing Shaft Will Be

    Used

    1 23 4 5 6

    7 8

    Proposed Supplemental

    Borings (6 vertical 2 inclined)

    DETROIT RIVER OUTFALL n°2  – TUNNEL RESCUEARCADIS Services: Expertise of  the flood reasons  – Preliminary design of  the potential rescue alternatives

    DETROIT RIVER OUTFALL n°2  – TUNNEL RESCUE (USA)  ‐ Client:  DWSD Key Data:  total length: 1890 m ‐ inner diameter: 7,92m, outer diameter: 8,72 m ‐ 2 access shafts (diam. 3m) and 6 riser shafts in the Detroit River (diam. 3m) ‐ tunnel depth: ca. 85 m to reach presumably less permeable rock ‐

    geology: fractured limestone and marlstone ‐ water pressure of  up to 6 bar ‐ high H2S content in ground water

    y

    Hydraulic & Technical Galleries

  • 8/17/2019 Normativ Tunel

    57/67

    DETROIT ‐ UPPER ROUGE TUNNELARCADIS Services: Preliminary and Basic design of  the main TBM entry shaft  – Checking of  the detailed design of  the shaft

    DETROIT ‐ UPPER ROUGE TUNNEL (CSO) (USA)  ‐   Client: DWSDKey data: Construction period: 2008‐2014  – Total length: 11 260 m  – Inner diameter: 9.14 m ‐ 9 drop shaft connections along the alignment ‐ tunnel depth: ca. 50 to 60m

    geology: heterogeneous layers of  limestone, shale, marlstone ‐ H2S and CH4 present in ground water 

    y

    Tunnel Safety

  • 8/17/2019 Normativ Tunel

    58/67

    58

    Tunnel Safety

    Tunnel safety  – Rail

  • 8/17/2019 Normativ Tunel

    59/67

    LYON TURIN FERROVIAIRE BASE TUNNEL ARCADIS Services: Analysis of  transport of  dangerous goods ‐ functional safety analysis  – development of  tunnel safety requirements

    LYON TURIN FERROVIAIRE BASE TUNNEL (France‐Italy) – Client: LTFKey data: Under development  ‐ 53 km tunnel between Lyon (France) and Torino (Italia)

    Tunnel safety  – Highway

  • 8/17/2019 Normativ Tunel

    60/67

    A2 MAASTRICHT TUNNEL CORRIDOR ARCADIS Services: preliminary (civil) design ‐ Functional safety analysis  – Quantitative risk analysis  –Scenario analysis ‐ development of  tunnel safety requirements  – management of  interface with emergency 

    services ‐   development of  tunnel system specifications  – development of  operational procedures

    A2 MAASTRICHT TUNNEL CORRIDOR (The Netherlands) – Client: Avenue2 JVKey data: Under design  ‐ 2.3 km bi‐level tunnel in Maastricht  – including real‐estate development and smaller tunnels and bridges

    Tunnel Systems

  • 8/17/2019 Normativ Tunel

    61/67

    61

    Tunnel Systems

    Tunnel systems  – Rail

  • 8/17/2019 Normativ Tunel

    62/67

    PANNERDENSCH KANAAL TUNNEL ARCADIS Services: Functional analysis  – preliminary design (civil + systems) ‐ development of  tunnel and tunnel system specifications  – construction management

    PANNERDENSCH KANAAL TUNNEL (The Netherlands) – Client: Betuweroute ManagementgroepKey data: twin tube TBM driven rail freight tunnel  ‐ 2.68 km 

    Tunnel systems  – Rail

  • 8/17/2019 Normativ Tunel

    63/67

    BEST RAILWAY TUNNEL ARCADIS Services: Preliminary and detailed design (civil + systems)  – construction management

    BEST RAILWAY TUNNEL (The Netherlands)  – Client: ProRailKey data: cut & cover rail tunnel  including one underground station ‐ 1.9 km

    Tunnel systems  – Highway

  • 8/17/2019 Normativ Tunel

    64/67

    2nd BENELUXTUNNELARCADIS Services: preliminary design and detailed design (civil + systems) ‐ development of  tunnel and tunnel system specifications  – construction management

    2nd BENELUXTUNNEL (The Netherlands) – Client: RijkswaterstaatKey data: immersed tube tunnel  ‐ 1.0 km  – in operation (2002)

    Tunnel systems  – Highway

  • 8/17/2019 Normativ Tunel

    65/67

    ROERTUNNELARCADIS Services: preliminary design (civil + systems) ‐ development of  tunnel and tunnel system specifications  – construction management

    ROERTUNNEL (The Netherlands)  – Client: RijkswaterstaatKey data: cut & cover / immersed tube tunnel  ‐ 2.45 km  – in operation (2009) 

    Highways & Roads 

  • 8/17/2019 Normativ Tunel

    66/67

    A2 Leidsche RijnANL Services: Preliminary and Detailed design of  tunnel  – service buildings  – interface management tunnel systems

    A2 Leidsche Rijn  – Client: Besix  – Dura Vermeer  joint ventureKey data: Construction period: 2007 ‐ 2010  – 1650 m cut & cover tunnel 10  –lane tunnel part of  the Trans European Road Network

  • 8/17/2019 Normativ Tunel

    67/67