12
Amr Abdul Fattah Salah El-Din PERSONAL DATA : Egyptian. Home Address: Married. Ain shams, Cairo Egypt. Birth date: 7th may, 1979. Engineers Syndicate, Cairo, Egypt, Military Service: exempt. Member No: 20/04881. Driving license: Valid (Egypt, KSA). [email protected]m +966547776408. [email protected] CAREER OBJECTIVE. 10 years of experience in the execution of Architecture finishing field and concrete works for sports buildings, hotels, mosques, administrative buildings, industrial buildings and security headquarters centres, as a consultant , Site engineer and senior Arch. QA/QC engineer. Moreover design and preparing arch. Shop drawing. And preparing quality plan such as (method statement, checklist, forms, and inspection test plan) . EDUCATION & TRAINING. -Education : Faculty of engineering Al-Azhar University, architecture section, 2005. Health, safety and remediation training Course. - P.C skills : Auto cad – Office. - Language : Arabic (mother tongue), English (good). -Training : Cassia &associates for, interior design & engineering consults. I have been gained an important experience in Architectural Finishes field During training in the Multi-National Consultant Office (Cassia &associates) And mega project such as (city stars, Cairo) at Intercontinental Hotel and City Stars mall.

QA-QC Eng

Embed Size (px)

Citation preview

Page 1: QA-QC Eng

Amr Abdul Fattah Salah El-Din PERSONAL DATA:

Egyptian. Home Address: Married. Ain shams, Cairo Egypt. Birth date: 7th may, 1979. Engineers Syndicate, Cairo, Egypt, Military Service: exempt. Member No: 20/04881. Driving license: Valid (Egypt, KSA). [email protected]

+966547776408. [email protected]

CAREER OBJECTIVE.10 years of experience in the execution of Architecture finishing field and concrete works for sports buildings,

hotels, mosques, administrative buildings, industrial buildings and security headquarters centres, as a consultant , Site engineer and senior Arch. QA/QC engineer. Moreover design and preparing arch. Shop drawing. And

preparing quality plan such as (method statement, checklist, forms, and inspection test plan) .EDUCATION & TRAINING.-Education : Faculty of engineering Al-Azhar University, architecture section, 2005. Health, safety and remediation training Course.- P.C skills: Auto cad – Office.- Language: Arabic (mother tongue), English (good). -Training :

Cassia &associates for, interior design & engineering consults. I have been gained an important experience in Architectural Finishes field

During training in the Multi-National Consultant Office (Cassia &associates) And mega project such as (city stars, Cairo) at Intercontinental Hotel and City Stars mall.CAREER HISTORY& EXPERIENCE.

SAUDI OGER LTD. (Saudi Arabia). (Jan-2013 to present). http://www.saudioger.com

Project: King Abdullah Project For The development of Security Centres (Kap-1). - Client: Ministry of Interior.

- Consultant: Khatib & Alami. (http://www.khatibalami.com)

- Budget of the project: SR. 7 billion.

- The Project:

305 Sites (19 Prototypes). Such as Police stations, traffic division,

Civil defence squads, drugs enforcement division,

Forensic laboratories, highway security force command division.

- Scope of work: - Senior Arc. QA/QC Engineer responsible for 11 sites in northern region (Arar, Turaif and Rafha), - Follow-up and Implement of the quality plan like (MS-ITP- checklist-forms). -Achieve the quality of the documentary cycle such as (IR-MIR-NAC-JS-NNC-NCR).- The quality of civil, arch. And electromechanical woks.- Submitting material and batch plant for approval.- Coordinate with consultant’s representatives for any site instructions and inspection of works.- Support the Project Manager in accomplishing all the goals and targets for the arch. Groups at site.- Perform other related duties as may be required by the project manager.

Page 2: QA-QC Eng

Hassan Allam sons Construction Company. (Jan-2011 to Dec-2012). http://www.allamsons.com

Project: UPTOWN CAIRO (Al-Mokattam-Cairo).- Client: Emaar Misr. (http://www.emaarmisr.com)

- Project Management: Turner. (http://www.turnerconstruction.com)

- Consultant: Katib & Alami. (http://www.khatibalami.com)

- The Project:

Zone K (8 Residential Building), zone G (230 Villas) and zone I (120villas).

- Budget of the project: L.E 450 Million.

-Scope of work: QA/QC Engineer responsible for finishing (turnkey) for 28 apartments at zone (k).

such as (block, plaster, ceramic tiles, painting, false ceiling, marble, G.R.C, G.R.G, aluminium work,

Wood and carpentry such as (parquet, walls cladding, kitchens, doors and furniture).

Project: Village gate (Residential Compound) New Cairo.- Client: PALM HILLS (http://www.palmhillsdevelopments.com)

- Consultant: EHAF. (http://www.ehaf.com)

- The Project: 44 residential buildings, on an area 31 Acres.

- Budget of the project: LE.250 Million. - Scope of work: QC Site engineer responsible for finishing works for 14 buildings.

Dorra Group - (CRC). (Mar-2007 to Dec-2010). http://www.dorra.com Project: Administration Building in Smart Village. - Client: Dorra Group.

-Consultant: Dorra Group.

- The Project:

Administration building (2B, G and 3 Floors) retaining walls, solid slabs, Flat slabs and high level Finishing, On an Area 4000 m2.

- Budget of the project: LE.30 Million. -Scope of work: Site engineer responsible for civil and finishing works such as (isolation, block, plaster, painting,

False ceiling, aluminium cladding, marble and structural glazing) and Follow up electro-mechanical works.

Page 3: QA-QC Eng

Project: Hotel & Administration Building in6th October City.- Client : Ministry of Interior.

- Consultant : Omar El Ghoneimi ( http://www.elghoneimi.com).

- The Project:

2 Floors Administrative and 12 floors hotel at the highest level of finishes,

On an area of 6000 m2,

- Budget of the project: LE. 130 Million.

-Scope of work: Site engineer responsible for finishing works (turnkey) in 3 Floors such as, (Isolation, block, plaster, ceramic tiles, steel cladding, painting, false ceiling, marble, structural glazing, Aluminium cladding and windows and wood and carpentry such as (cladding, doors and furniture).

Project: Egyptian Central Bank Sport Club - New Cairo.- Client: Central Bank of Egypt.- Consultant : Nader A Goubran.( http://www.ng-designoffice.com)

- The Project:

Sport club consists of sports buildings, social, and hotel. Gymnasium,

Football, tennis and other courts. Swimming pools complex, mosque and

Administration building on an area of 24 acre

- Budget of the project: LE. 150 Million.

-Scope of work: Site engineer responsible for 3 buildings,

- Hotel Building: Arch. finishing works for 36 rooms, (B+ 2 floors). Such as (isolation, block, plaster, ceramic tiles, Painting , Wood doors, false ceiling, aluminium, granite and marble) and Follow up electromechanical works.

- Administration Building : Arch. finishing works and Follow up electromechanical work for 2 floors. - Mosque Building: Arch. Finishing and Follow up electromechanical works.

Madina for Engineering &Construction. (Feb-2006 to Feb-2007). http://www.madina-ec.com/

Project: Sewage Treatment Plant and Foundations of Furnace melting iron at (Al EZZ Flat Steel Factory).- Client: Ezz Steel (http://www.ezzsteel.com) - The Project: Sewage treatment plant and foundations of furnace melting iron.- Scope of work: Site engineer responsible for civil and arch finishing works such as , retaining water structure, Sand filter, tanks foundations, operating room , landscape and site levelling.

Page 4: QA-QC Eng

Project: Lead Pollution Clean-Up in Qalyoubia .- Client: the ministry of environment cooperation with United States Agency for International Development (USAID) Egypt.- Consultant: (USAID) Egypt. (http://www.usaid.gov/egypt).-The Project: Remove of lead pollution from lead factories in Shubra Al Khaimah And rehabilitate the factories to use it for other purposes.-Scope of work: Site engineer responsible for remove of lead pollution from specific locations using chemicals and special equipment and rehabilitation of the sites using fibre reinforced concrete and different types of finishing.

Project: Helium Filling Station / Air Liquide Company in 6th October City.- Client: Air Liquide Company. (http://www.airliquide.com.eg)- Consultant: Air Liquide Company.-The Project: Helium filling station.- Scope of work: Site engineer responsible for finishing works such as (plaster, metal doors, granite , epoxy mortar, epoxy paint and aluminium work) and steel work such as truss.

Mr Mohamed Helal Ryad’s office for engineering & consults. (Oct.-2005 to Feb-2006).

-Scope of work: Design and preparing shop drawing in the residential and industrial building.

Personal Skills.- Effective communication.

- Problem-solving/Creativity.

- Planning and organizing.

- Teamwork skills.

- Leadership and management.

- Adaptability and flexibility.

- Professionalism and work ethic.

Page 5: QA-QC Eng
Page 6: QA-QC Eng
Page 7: QA-QC Eng
Page 8: QA-QC Eng
Page 9: QA-QC Eng