31
No 03/1203 Edition: AIRAC 1203 Monitoring Report: AIRAC 1306 30 May 2013 - 26 June 2013

Monitoring Report: AIRAC 1306 No 03/1203 30 May 2013 - 26 ... · - Implementation of Free Route Airspace Maastricht/ FRAM Phase 5a (cross-border direct routes) within Maastricht UAC

  • Upload
    others

  • View
    3

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Monitoring Report: AIRAC 1306 No 03/1203 30 May 2013 - 26 ... · - Implementation of Free Route Airspace Maastricht/ FRAM Phase 5a (cross-border direct routes) within Maastricht UAC

No 03/1203

Edition: AIRAC 1203

Monitoring Report: AIRAC 1306

30 May 2013 - 26 June 2013

Page 2: Monitoring Report: AIRAC 1306 No 03/1203 30 May 2013 - 26 ... · - Implementation of Free Route Airspace Maastricht/ FRAM Phase 5a (cross-border direct routes) within Maastricht UAC
Page 3: Monitoring Report: AIRAC 1306 No 03/1203 30 May 2013 - 26 ... · - Implementation of Free Route Airspace Maastricht/ FRAM Phase 5a (cross-border direct routes) within Maastricht UAC

EUROPEAN ORGANISATION FOR SAFETY OF AIR NAVIGATION

European Route Network Improvement Plan

(ERNIP) Implementation Monitoring

Monitoring Report: AIRAC 1306

30 May 2013 – 26 June 2013

DIRECTORATE NETWORK MANAGEMENT

E UROCONTROL

Page 4: Monitoring Report: AIRAC 1306 No 03/1203 30 May 2013 - 26 ... · - Implementation of Free Route Airspace Maastricht/ FRAM Phase 5a (cross-border direct routes) within Maastricht UAC

Left blank intentionally

Page 5: Monitoring Report: AIRAC 1306 No 03/1203 30 May 2013 - 26 ... · - Implementation of Free Route Airspace Maastricht/ FRAM Phase 5a (cross-border direct routes) within Maastricht UAC

European Route Network Improvement Plan (ERNIP) – Implementation Monitoring

Monitoring Report AIRAC 1306 (30 May 2013 - 26 June 2013)

- 1 -

TABLE OF CONTENT TABLE OF CONTENT...................................................................................................................... 1 1. INTRODUCTION................................................................................................................. 3

1.1 SUMMARY...........................................................................................................................3 1.2 EVOLUTIONS TOWARDS THE ACHIEVEMENT OF THE EUROPEAN TARGET ............3 1.3 AIRSPACE DESIGN DEVELOPMENT AND IMPLEMENTATION MONITORING ..............4 1.4 EXTERNAL DOCUMENT RELEASE...................................................................................4

2. LIST OF PROPOSALS IMPLEMENTED AIRAC 1306 (30 MAY 2013)............................. 5 2.1 SUMMARY OF MAJOR PROJECTS IMPLEMENTED ON 30 MAY 2013...........................5

3. EVOLUTION OF PERFORMANCE INDICATORS............................................................. 6 3.1 AIRSPACE DESIGN INDICATOR EVOLUTION..................................................................6 3.2 FLIGHT PLANNING INDICATOR EVOLUTION ..................................................................6 3.3 ROUTE AVAILABILITY INDICATOR EVOLUTION .............................................................6 3.4 FLIGHT EFFICIENCY EVOLUTION PER AIRAC CYCLE...................................................7

3.4.1 SPECIAL EVENTS........................................................................................................ 8 3.4.2 LAST FILED FLIGHT PLAN - BENEFITS AND ASSESSMENT ................................... 8 3.4.3 RAD EVOLUTIONS - BENEFITS AND ASSESSMENT................................................ 9

3.5 AIRSPACE CHANGES EVOLUTION ................................................................................12 3.6 FREE ROUTE AIRSPACE EVOLUTION...........................................................................12 3.7 ASM PERFORMANCE EVOLUTION.................................................................................13 3.8 VERTICAL FLIGHT EFFICIENCY EVOLUTION................................................................13

ANNEX A: DETAILED LIST OF PROJECTS IMPLEMENTED 30 MAY 2013 .............................. 15 ANNEX B: ACRONYMS AND TERMINOLOGY ............................................................................ 24

Page 6: Monitoring Report: AIRAC 1306 No 03/1203 30 May 2013 - 26 ... · - Implementation of Free Route Airspace Maastricht/ FRAM Phase 5a (cross-border direct routes) within Maastricht UAC

European Route Network Improvement Plan (ERNIP) – Implementation Monitoring

Monitoring Report AIRAC 1306 (30 May 2013 - 26 June 2013)

- 2 -

Left blank intentionally

Page 7: Monitoring Report: AIRAC 1306 No 03/1203 30 May 2013 - 26 ... · - Implementation of Free Route Airspace Maastricht/ FRAM Phase 5a (cross-border direct routes) within Maastricht UAC

European Route Network Improvement Plan (ERNIP) – Implementation Monitoring

Monitoring Report AIRAC 1306 (30 May 2013 - 26 June 2013)

- 3 -

1. INTRODUCTION

1.1 SUMMARY

This Report updates on the evolution of the environment indicators1 listed in the Network Manager Performance Plan and informs on the progress achieved to further improve airspace design and utilisation flight efficiency based on the improvement proposals implemented during the relevant AIRAC cycle.

This edition focuses on AIRAC 1306 (30 MAY 2013). The methodology used for assessing flight efficiency is included in WP9 of RNDSG/64. This document can be consulted on: https://extranet.eurocontrol.int/http://beid.eurocontrol.be:8980/Members/irc/eurocontrol/rndsg/home

1.2 EVOLUTIONS TOWARDS THE ACHIEVEMENT OF THE EUROPEAN TARGET

The Performance Scheme for air navigation services and network functions includes an environment/ flight efficiency Key Performance area: Average horizontal en-route flight efficiency:

the average horizontal en-route flight efficiency indicator is the difference between the length of the “en-route” part of the trajectory and the optimum trajectory which, in average, is the great circle.

“en-route” is defined as the distance flown outside a circle of 40 NM around the airport. the flights considered for the purpose of this indicator are:

o all commercial IFR flights within European airspace; o where a flight departs or arrives outside the European airspace, only that part inside the

European airspace is considered; o circular flights and flights with a great circle distance shorter than 80NM between

terminal areas are excluded. Environment target 2012 - 2014: For the performance reference period starting on 1st January 2012 and ending on 31st December 2014, the European Union-wide and EUROCONTROL performance target will be as follows: Reduction of 0,75 percentage points of the average horizontal en-route flight efficiency indicator in 2014 as compared to the situation in 2009. Objectives:

Develop and support the deployment of 500 airspace changes in 2012 – 2014. Support the implementation of Free Route Airspace in 25 ACCs by 2014. Increase annually the number of CDRs by 5%. Increase annually the CDR1/2 availability and usage by an average of 5%. Reduce the route unavailability (in time and quantity) by 10% in 2013 and 2014. Reduction of vertical flight inefficiency by 5% in 2014.

Note: The FUA indicators (bullet 3-5) are reported quarterly. Flight efficiency (bullet 6) is reported only twice per yea.

1 FPL: Flight Plan data provided by NM systems; SAAM analysis performed by NM. DES/RAD: Traffic demand provided by NM systems; airspace environment data, profile calculations and SAAM analysis provided by NM.

Page 8: Monitoring Report: AIRAC 1306 No 03/1203 30 May 2013 - 26 ... · - Implementation of Free Route Airspace Maastricht/ FRAM Phase 5a (cross-border direct routes) within Maastricht UAC

European Route Network Improvement Plan (ERNIP) – Implementation Monitoring

Monitoring Report AIRAC 1306 (30 May 2013 - 26 June 2013)

- 4 -

1.3 AIRSPACE DESIGN DEVELOPMENT AND IMPLEMENTATION MONITORING

The Network Manager coordinates the following activities to achieve the required improvement in flight efficiency: Enhancing European enroute airspace design through annual improvements of European ATS

route network, high priority being given to: Implementation of a coherent package of annual improvements and shorter routes; Improving efficiency for the most penalised city pairs; Implementation of additional Conditional Routes for main traffic flows; Supporting initial implementation of free route airspace.

Improving airspace utilisation and route network availability through: Actively supporting and involving aircraft operators and the computer flight plan service

providers in flight plan quality improvements; Gradually applying route availability restrictions only where and when required; Improving the use and availability of civil/military airspace structures.

Efficient Terminal Manoeuvring Area (TMA) design and utilisation through: Implementing advanced navigation capabilities; Implementing Continuous Descent Operations (CDO), improved arrival/departure routes,

optimised departure profiles, etc. Improving awareness of performance.

1.4 EXTERNAL DOCUMENT RELEASE The latest AIRAC report is available on the EUROCONTROL Airspace design website under the sub section ERNIP, ERNIP Implementation Monitoring:

http://www.eurocontrol.int/articles/airspace-design as well as on the EUROCONTROL Network Operations Monitoring and Reporting website under European Route Network Improvement Plan - Monitoring Report:

http://www.eurocontrol.int/articles/network-operations-monitoring-and-reporting The full list of monitoring reports is available on the EUROCONTROL Media & Info Centre website:

http://www.eurocontrol.int/lists/publications/all-publications?type=3656 A copy of the AIRAC Report of the European Route Network Improvement Plan is also available via the restricted EUROCONTROL OneSky Online websites for access by other interested members of the RNDSG, ASMSG and NETOPS (see ref sub-sections under main section "LIBRARY"):

http://extranet.eurocontrol.int/http://beid.eurocontrol.be:8980/Members/irc/eurocontrol/ant/home http://extranet.eurocontrol.int/http://beid.eurocontrol.be:8980/Members/irc/eurocontrol/rndsg/home http://extranet.eurocontrol.int/http://beid.eurocontrol.be:8980/Members/irc/eurocontrol/asm-sg/home

Page 9: Monitoring Report: AIRAC 1306 No 03/1203 30 May 2013 - 26 ... · - Implementation of Free Route Airspace Maastricht/ FRAM Phase 5a (cross-border direct routes) within Maastricht UAC

European Route Network Improvement Plan (ERNIP) – Implementation Monitoring

Monitoring Report AIRAC 1306 (30 May 2013 - 26 June 2013)

- 5 -

2. LIST OF PROPOSALS IMPLEMENTED AIRAC 1306 (30 MAY 2013)

2.1 SUMMARY OF MAJOR PROJECTS IMPLEMENTED ON 30 MAY 2013

During the AIRAC cycle 29 packages of airspace improvements co-ordinated at network level have been implemented. Beside of several ATS route network improvement measures the list below provides an overview of the major improvement projects implemented on 30 MAY 2013:

Armenia: - Adaptation of lower/upper vertical limits, expressed in FL, of ATS routes within

Yerevan FIR (change of IFR FL to VFR FL).

Austria/ Hungary/ Slovakia: - Implementation of ABLOM dualisation.

Estonia:

- Implementation of P-RNAV (GNSS only) SIDs and STARs at Tallinn airport.

Germany: - Implementation of SENEKA, Phase 1 (shorter route options and increase of

capacity).

Germany/ Maastricht UAC: - Implementation of Free Route Airspace Maastricht and Karlsruhe/ FRAMaK (cross-

border cop-less DCTs) within Maastricht UAC and Karlsruhe UAC.

Italy: - Implementation of several new ATS route segments (Q/UQ549, UQ333, UT484,

UQ217 and UY765).

Italy/ Malta: - Implementation of Night ATS routes UN163 and UY19.

Malta:

- Swap of RAD Appendix 4 DCTs (L20 and L21) into bidirectional ATS routes.

Maastricht UAC: - Implementation of Free Route Airspace Maastricht/ FRAM Phase 5a (cross-border

direct routes) within Maastricht UAC.

Norway: - Expansion of Farris TMA to the west.

UK:

- Revision of RAD restriction EG2207 (P/UP16).

A detailed list of all improvement measures implemented on 30 May 2013 is attached in Annex A. The list is an extract of the European Route Network Improvement Plan database accessible via: https://extranet.eurocontrol.int/http://prisme-web.hq.corp.eurocontrol.int/ernip_database/Index.action A description of the airspace improvements together with orientation maps due for implementation on the relevant AIRAC cycle is provided in the RNDSG Airspace Improvements Synopsis (RAIS).

Page 10: Monitoring Report: AIRAC 1306 No 03/1203 30 May 2013 - 26 ... · - Implementation of Free Route Airspace Maastricht/ FRAM Phase 5a (cross-border direct routes) within Maastricht UAC

European Route Network Improvement Plan (ERNIP) – Implementation Monitoring

Monitoring Report AIRAC 1306 (30 May 2013 - 26 June 2013)

- 6 -

3. EVOLUTION OF PERFORMANCE INDICATORS

3.1 AIRSPACE DESIGN INDICATOR EVOLUTION

The graph below shows the yearly evolution of the airspace design flight efficiency (RTE-DES2) over the period 2007 - 2012 and the evolution until 26 June 2013.

RTE-DES

3,53% 3,54% 3,45% 3,22% 3,04% 2,96% 2,86%

2%

3%

4%

5%

6%

2007 2008 2009 2010 2011 2012 2013

Figure 1 : Airspace Design indicator evolution

3.2 FLIGHT PLANNING INDICATOR EVOLUTION

The graph below shows the yearly evolution of the last filed flight plan indicator (RTE-FPL3) over the period 2007 - 2012 and the evolution until 26 June 2013. This indicator is presented with and without the 2 days of ATC strike that took place on 11-12 June 2013.

RTE-FPL

4,91% 5,03% 4,90% 4,91% 4,73% 4,64% 4,65%

2%

3%

4%

5%

6%

2007 2008 2009 2010 2011 2012 2013

RTE-FPL (11-12 JUN excluded)

4,91% 5,03% 4,90% 4,91% 4,73% 4,64% 4,62%

2%

3%

4%

5%

6%

2007 2008 2009 2010 2011 2012 2013

Figure 2 : Flight Planning indicator evolution

3.3 ROUTE AVAILABILITY INDICATOR EVOLUTION

The impact of the civil route restrictions included in the Route Availability Document (RAD) is measured through a specific RAD indicator. The graph below shows the yearly evolution of the RTE-RAD4 indicator between January 2012 and 26 June 2013.

RTE-RAD

3,75% 3,70%

2%

3%

4%

5%

6%

2007 2008

Figure 3 : Route Availability indicator evolution

2 RTE-DES (Flight Extension due to Route Network Design) This KPI will be calculated by measuring the difference between the shortest route length (from TMA exit and entry points) and the great circle distance. For this KPI the RAD will not be taken into account and all the CDR routes will be considered as being open. 3 RTE-FPL (Flight Extension due to Route Network Utilisation – last filled FPL) This KPI will be calculated by measuring the difference between the route from the last filed flight plan for each flight (from TMA exit and entry points) and the great circle distance. 4 RTE-RAD: (Flight Extension due to Route Network Utilisation – RAD active) This KPI will be calculated by measuring the difference between the shortest plannable route length (from TMA exit and entry points) and the great circle distance. For this KPI the RAD will be taken into account and all the CDR routes will be considered as being open.

Page 11: Monitoring Report: AIRAC 1306 No 03/1203 30 May 2013 - 26 ... · - Implementation of Free Route Airspace Maastricht/ FRAM Phase 5a (cross-border direct routes) within Maastricht UAC

European Route Network Improvement Plan (ERNIP) – Implementation Monitoring

Monitoring Report AIRAC 1306 (30 May 2013 - 26 June 2013)

- 7 -

3.4 FLIGHT EFFICIENCY EVOLUTION PER AIRAC CYCLE The graph below shows the evolution per AIRAC cycle of the two main flight efficiency indicators RTE-DES and RTE-FPL over the period 2007 - 2012 and the evolution until 26 June 2013, Figure 4 including the French strike, Figure 5 excluding the industrial action in France 11-12 June 2013.

Route Efficiency KPI per AIRAC cycle

20

12

20

10

20

09

20

11

20

13

2,5%

3,0%

3,5%

4,0%

4,5%

5,0%

5,5%

908

909

910

911

912

913

1001

1002

1003

1004

1005

1006

1007

1008

1009

1010

1011

1012

1013

1101

1102

1103

1104

1105

1106

1107

1108

1109

1110

1111

1112

1113

1201

1202

1203

1204

1205

1206

1207

1208

1209

1210

1211

1212

1213

1301

1302

1303

1304

1305

1306

AIRAC

Ro

ute

Ext

ensi

on

0

0,1

0,2

0,3

0,4

0,5

0,6

0,7

0,8

0,9

1

RTE-DES

RTE-FPL

Figure 4 : Flight efficiency (DES, RAD) evolution per AIRAC cycle (French strike included)

Route Efficiency KPI per AIRAC cycleFrench strike 11 - 12 June 2013 excluded

20

12

20

10

20

09

20

11

20

13

2,5%

3,0%

3,5%

4,0%

4,5%

5,0%

5,5%

908

909

910

911

912

913

1001

1002

1003

1004

1005

1006

1007

1008

1009

1010

1011

1012

1013

1101

1102

1103

1104

1105

1106

1107

1108

1109

1110

1111

1112

1113

1201

1202

1203

1204

1205

1206

1207

1208

1209

1210

1211

1212

1213

1301

1302

1303

1304

1305

1306

AIRAC

Ro

ute

Ext

ensi

on

0

0,1

0,2

0,3

0,4

0,5

0,6

0,7

0,8

0,9

1

RTE-DES

RTE-FPL

Figure 5 : Flight efficiency (DES, RAD) evolution per AIRAC cycle (French strike excluded)

Page 12: Monitoring Report: AIRAC 1306 No 03/1203 30 May 2013 - 26 ... · - Implementation of Free Route Airspace Maastricht/ FRAM Phase 5a (cross-border direct routes) within Maastricht UAC

European Route Network Improvement Plan (ERNIP) – Implementation Monitoring

Monitoring Report AIRAC 1306 (30 May 2013 - 26 June 2013)

- 8 -

The graph below shows the evolution per AIRAC cycle of the two main efficiency indicators RTE-DES and RTE-FPL in relation to the RTE-RAD indicator between January 2012 and 26 June 2013, including the French strike 11/12 June 2013.

Route Efficiency KPI per AIRAC cycle

2,50%

3,00%

3,50%

4,00%

4,50%

5,00%

5,50%

12

01

12

02

12

03

12

04

12

05

12

06

12

07

12

08

12

09

12

10

12

11

12

12

12

13

13

01

13

02

13

03

13

04

13

05

13

06

AIRAC

Ro

ute

Ex

ten

sio

n

RTE-DES

RTE-RAD

RTE-FPL

Figure 6 : Flight efficiency (DES, RAD, FPL) evolution per AIRAC cycle

The current data indicates that, the average yearly route extension due to airspace design reduced between 2009 and 26 June 2013 by 0.59 percentage points. The evolution of the airspace design indicator is on the right trend and the contributions of the airspace design projects are key for improving flight efficiency. The current data indicates that, the average yearly route extension based on the last filed flight plan reduced between 2009 and 26 June 2013 by 0.25 percentage points (0.27 percentage points in AIRAC 1305).

The difference between the airspace design indicator and the last filed flight plan indicator was 1.45 percentage points in 2009 and is 1.79 percentage points in June 2013, recording a slight increase compared to the previous AIRAC cycles (1.76 in April/1.77 in May).

The current data indicates that the route extension due to airspace design decreased to a historically low level of 2.84% in June 2013. The current data indicates that, the route extension based on the last filed flight plan went significantly up from 4.61% end of May 2013 to 4.73% in June 2013 as a result of the French strike.

3.4.1 SPECIAL EVENTS

The French industrial action which took place 11 - 13 June 2013 resulted in extreme re-routing options in order to avoid French airspace reflected in the flight planning indicator for this AIRAC cycle. Additionally between 4000 - 4500 flights were cancelled. Military activities were kept on very low level to free up capacity.

3.4.2 LAST FILED FLIGHT PLAN - BENEFITS AND ASSESSMENT

Due to the airspace design improvements, the potential savings achieved during the AIRAC cycle 1306 amount to 183 630 NMs flown less compared to the equivalent AIRAC cycle in 2012. This translates into 1 100 tons of fuel, or 3 670 tons of CO2, or 918 150 Euros.

Based on the last filed flight plan indicator, the losses calculated during the AIRAC cycle 1306 amount to -823 254 NMs flown more compared to the equivalent AIRAC cycle in 2012. This translates into -4 940 tons of fuel, or -16 465 tons of CO2, or -4 116 270 Euros.

Page 13: Monitoring Report: AIRAC 1306 No 03/1203 30 May 2013 - 26 ... · - Implementation of Free Route Airspace Maastricht/ FRAM Phase 5a (cross-border direct routes) within Maastricht UAC

European Route Network Improvement Plan (ERNIP) – Implementation Monitoring

Monitoring Report AIRAC 1306 (30 May 2013 - 26 June 2013)

- 9 -

Approximately 70 % of the losses recorded for the last filed flight plan data during AIRAC cycle 1306 compared to the same AIRAC cycle in 2012 were caused by the French industrial action (11-13 June 2013). This event resulted in significant re-routings and consequently had an impact on flight efficiency.

The staffing issues and capacity problems in Cyprus and Warsaw ACC, regulations applied due to staff shortages in Langen ACC as well as severe weather conditions due to thunderstorms throughout Belgium, Germany, France, Netherlands, Switzerland and southern UK.might have caused re-routings with impact on network efficiency.

3.4.3 RAD EVOLUTIONS - BENEFITS AND ASSESSMENT

As shown above the impact of the RAD is slightly decreasing by 0,05 percentage points in 2013 compared to 2012. More actions will be required to further diminish this impact and to ensure that the target set in the Network Manager Performance Plan is reached. Most of the decrease of this indicator is due to improvements in airspace design and to a lesser degree due to the removal of RAD restrictions.

The difference between the three indicators (DES, FPL, RAD) clearly indicate that additional efforts must be made to further improve the efficiency of the airspace utilisation and to ensure that the indicator based on the latest filed flight plan and the RAD indicator follow similar trends like the airspace design indicator.

Page 14: Monitoring Report: AIRAC 1306 No 03/1203 30 May 2013 - 26 ... · - Implementation of Free Route Airspace Maastricht/ FRAM Phase 5a (cross-border direct routes) within Maastricht UAC

European Route Network Improvement Plan (ERNIP) – Implementation Monitoring

Monitoring Report AIRAC 1306 (30 May 2013 - 26 June 2013)

- 10 -

FLIGHT EFFICIENCY SAVINGS COMPARED TO EQUIVALENT AIRAC CYCLE IN THE PREVIOUS YEAR(In Thousands of Nautical Miles)

-1000

-500

0

500

1000

AIRAC CYCLE

NM

/10

00

NM DES

NM FPL

NM DES 236 169 121 134 146 137 130 113 88 205 28 200 -2 184

NM FPL 331 151 241 271 506 -272 -70 -57 -176 -19 -206 -140 -416 -823

1206 1207 1208 1209 1210 1211 1212 1213 1301 1302 1303 1304 1305 1306

Figure 7 : Flight Efficiency savings in Nautical Miles

FLIGHT EFFICIENCY SAVINGS COMPARED TO EQUIVALENT AIRAC CYCLE IN THE PREVIOUS YEAR

(In Tons of Fuel)

-6000

-4000

-2000

0

2000

4000

AIRAC CYCLE

TO

NS

OF

FU

EL

TONS FUEL DES

TONS FUEL FPL

TONS FUEL DES 1416 1014 727 804 876 822 780 678 527 1233 169 1201 -12 1102

TONS FUEL FPL 1986 905 1447 1626 3036 -1632 -420 -342 -1057 -114 -1237 -841 -2497 -4940

1206 1207 1208 1209 1210 1211 1212 1213 1301 1302 1303 1304 1305 1306

Figure 8 : Flight Efficiency savings in Tons of Fuel

Page 15: Monitoring Report: AIRAC 1306 No 03/1203 30 May 2013 - 26 ... · - Implementation of Free Route Airspace Maastricht/ FRAM Phase 5a (cross-border direct routes) within Maastricht UAC

European Route Network Improvement Plan (ERNIP) – Implementation Monitoring

Monitoring Report AIRAC 1306 (30 May 2013 - 26 June 2013)

- 11 -

FLIGHT EFFICIENCY SAVINGS COMPARED TO EQUIVALENT AIRAC CYCLE IN THE PREVIOUS YEAR

(In CO2)

-20000

-15000

-10000

-5000

0

5000

10000

15000

AIRAC CYCLE

TO

NS

OF

CO

2

TONS CO2 DES

TONS CO2 FPL

TONS CO2 DES 4720 3380 2422 2680 2920 2740 2600 2260 1756 4108 562,5 4002 -39,6 3673

TONS CO2 FPL 6620 3017 4823 5420 10120-5440 -1400 -1140 -3522 -379 -4122 -2804 -8324 -1646

1206 1207 1208 1209 1210 1211 1212 1213 1301 1302 1303 1304 1305 1306

Figure 9 : Flight Efficiency savings in CO2

FLIGHT EFFICIENCY SAVINGS COMPARED TO EQUIVALENT AIRAC CYCLE IN THE PREVIOUS YEAR

(In Thousands of EURO)

-5000

-4000

-3000

-2000

-1000

0

1000

2000

3000

AIRAC CYCLE

EU

RO

/10

00

EURO DES

EURO FPL

EURO DES 1180 845 606 670 730 685 650 565 439 1027 141 1001 -10 918

EURO FPL 1655 754 1206 1355 2530 -1360 -350 -285 -881 -95 -1031 -701 -2081 -4116

1206 1207 1208 1209 1210 1211 1212 1213 1301 1302 1303 1304 1305 1306

Figure 10 : Flight Efficiency savings in Thousands of EURO

Note: For additional information on ATFM delay that could impact on network efficiency check out the DNM Monthly Network Operations Reports, accessible via: http://www.eurocontrol.int/lists/publications/all-publications?type=2939&date_filter[value][year]=&keyword=

Page 16: Monitoring Report: AIRAC 1306 No 03/1203 30 May 2013 - 26 ... · - Implementation of Free Route Airspace Maastricht/ FRAM Phase 5a (cross-border direct routes) within Maastricht UAC

European Route Network Improvement Plan (ERNIP) – Implementation Monitoring

Monitoring Report AIRAC 1306 (30 May 2013 - 26 June 2013)

- 12 -

3.5 AIRSPACE CHANGES EVOLUTION

The NM Performance Plan target for the period 2012-2014 is to implement 500 airspace improvement packages over this period. Since January 2012 until 26 June 2013, 366 (three hundred and sixty six) airspace improvement packages coordinated at network level have been implemented. For the reference period 2012 - 2014 in total 660 airspace packages are currently planned to be implemented.

0

100

200

300

400

500

600

Packages Implemented

2012/ 2013 Target 2014

366

Figure 11 : Airspace Improvement Packages Implementation

3.6 FREE ROUTE AIRSPACE EVOLUTION

The NM Performance Plan target for 2014 is to fully or partially implement Free Route Airspace within 25 ACCs within the ECAC area. Until 26 June 2013 Free Route Airspace has been partially and/or fully implemented in the following 14 ACCs: Beograd ACC, Karlsruhe UAC, Kobenhavn ACC, Lisboa ACC, Maastricht UAC, Malmo ACC, Praha ACC, Shannon ACC, Skopje ACC, Stockholm ACC, Tampere ACC, Warsaw ACC, Wien ACC and Zagreb ACC.

CAN

LIS

SEV

MAD

BAR

BOR

BREREI

MAALONWAR

BRA

BUD

PRA

VIE

MAR

ROM

BRI

ATH

SOFZAG

PAD

ANK

NIC

MAK

MALT

SHA

PRE

STA

RIG

TAL

VIL

OSL

MALCOP

STO

BEO

TIR

BOD

SKO

LVI

KIEDNI

SIM

ODE

YERBAKGEN

ZUR

TAM

KAR

CASCAS

SHA

LJUBUC

Full Implementation

Partial Implementation

Free Route Implementation 2013

Figure 12 : Free Route Airspace Implementation

Page 17: Monitoring Report: AIRAC 1306 No 03/1203 30 May 2013 - 26 ... · - Implementation of Free Route Airspace Maastricht/ FRAM Phase 5a (cross-border direct routes) within Maastricht UAC

European Route Network Improvement Plan (ERNIP) – Implementation Monitoring

Monitoring Report AIRAC 1306 (30 May 2013 - 26 June 2013)

- 13 -

3.7 ASM PERFORMANCE EVOLUTION

Not reported for this AIRAC cycle (reporting interval 4 times per year).

3.8 VERTICAL FLIGHT EFFICIENCY EVOLUTION

Not reported for this AIRAC cycle (reporting interval twice per year).

Page 18: Monitoring Report: AIRAC 1306 No 03/1203 30 May 2013 - 26 ... · - Implementation of Free Route Airspace Maastricht/ FRAM Phase 5a (cross-border direct routes) within Maastricht UAC

European Route Network Improvement Plan (ERNIP) – Implementation Monitoring

Monitoring Report AIRAC 1306 (30 May 2013 - 26 June 2013)

- 14 -

Left blank intentionally

Page 19: Monitoring Report: AIRAC 1306 No 03/1203 30 May 2013 - 26 ... · - Implementation of Free Route Airspace Maastricht/ FRAM Phase 5a (cross-border direct routes) within Maastricht UAC

European Route Network Improvement Plan (ERNIP) – Implementation Monitoring

Monitoring Report AIRAC 1306 (30 May 2013 - 26 June 2013)

- 15 -

ANNEX A: DETAILED LIST OF PROJECTS IMPLEMENTED 30 MAY 2013 The following table presents detailed information about each of the improvement proposals developed within the RNDSG and implemented 30 May 2013. The description of the proposals is based on the information available from different sources (e.g. AOs, ANSPs and EUROCONTROL). For the correctness and verification of the relevant aeronautical information consult official State AIP publication. The data from this document should not be used for operational purposes. The table includes:

Proposal ID number: A reference number to identify each proposal allowing to trace at which RNDSG it was initiated.

Project Name: Dedicated Name and Phase/ Step of the improvement project.

Description: A detailed description of the planned improvement proposal.

Objective: A brief description of the purpose of the enhancement measure.

Implementation Status: The implementation status defined as Proposed, Planned, Confirmed or Implemented.

Project Group: The Functional Airspace Block Group (FAB), Regional Focus Group (RFG), Sub-Group (SG) or any other Project Group(s) involved directly or indirectly by the proposed enhancement measure.

Project Category: The nature of the proposed enhancement measure defined through Project Categories referring to:

o Airspace Structure; o ATC Sectors; o ATS Routes; o CDRs: o Civil/Military Airspace; o DCTs; o Free Route Airspace; o Night Routes; o PBN; o RAD; o Route Redesignation; o TMA.

States and Organisations: The States and/or Organisations involved directly or indirectly by the proposed enhancement measure.

Originator(s): The States, Organisations who have originated the proposal.

Comments: The conditions and/or pre-requisites which have to be met in order to implement the proposal or any other relevant comment(s).

Note: The list of implemented changes for this AIRAC cycle does not claim to be complete

Page 20: Monitoring Report: AIRAC 1306 No 03/1203 30 May 2013 - 26 ... · - Implementation of Free Route Airspace Maastricht/ FRAM Phase 5a (cross-border direct routes) within Maastricht UAC

European Route Network Improvement Plan (ERNIP) – Implementation Monitoring

Monitoring Report AIRAC 1306 (30 May 2013 - 26 June 2013)

- 16 -

Proposal ID : 65.050 / BM0079 Impl. Status: State(s) & Org. Comments:

1.

Description: To replace the existing DCT PAN - ABRAM with an ATS route.

Objective: To further improve the ATS route network between Roma UIR, Malta UIR and Tripoli FIR.

Implemented 30 MAY 2013

Project Group: FAB BLUE MED

Project Category: ATS Routes

MLT ITA LBY

Originator(s): MLT

ICAO Task Force Group. Subject to approval by Libya. Note: extension of UM740 RONAB -

MEGAN implemented 4 June 2009. Libya did not accept DEKIL. Route PAN -

ABRAM southbound only is now proposed. Original proposal: to implement ATS route

PAN - DEKIL. Replaced by new ATS route UN163.

Related proposals: 65.014 76.009

Proposal ID : 78.001 Impl. Status: State(s) & Org. Comments:

2.

Project Name: Reclassification of UJ32 segment MOREG-MOLUS

Description: To change UJ32 segment MOREG - MOLUS from route category "permanent" to conditional route category 3 (CDR3).

Objective: To prevent flight planning on a route and in a level band which is tactically never available. To simplify RAD restrictions.

Implemented 30 MAY 2013

Project Category: ATS Routes RAD

CHE FRA

Originator(s): CHE

Segment MOREG - MOLUS is available only in lower airspace.

RAD restriction LSLF1040 will be revised accordingly.

Proposal ID : 70.059f Impl. Status: State(s) & Org. Comments:

3.

Project Name: Free Route Airspace Maastricht - FRAM Phase 5a

Description: To implement Free Route Airspace Maastricht/ FRAM Phase 5a: 1. Cross border direct routes - initial implementation. 2. Implementation of DCTs cross ANSPs.

Objective: To implement FRA Concept and further improve flight efficiency within MUAC AoR and adjacent centres airspace.

Implemented 30 MAY 2013

Project Category: Free Route Airspace DCTs

MUAC BEL DEU LUX NLD EUROCONTROL FAB EC

Originator(s): MUAC

Related proposals: 70.059a 70.059b 70.059c 70.059g 70.059h 71.083c 77.053 78.039

Proposal ID : 72.009 / BM0181 Impl. Status: State(s) & Org. Comments:

4.

Description: To implement eastbound ATS route Q/UQ549 TIBER - KATAR.

Objective: To further improve ATS route options for DEP LIRF.

Implemented 30 MAY 2013

Project Group: FAB BLUE MED

Project Category: ATS Routes

ITA

Originator(s): IACA EUROCONTROL

Airspace improvement proposal reducing AOs SID extension imposed by RAD restriction LI2142.

Page 21: Monitoring Report: AIRAC 1306 No 03/1203 30 May 2013 - 26 ... · - Implementation of Free Route Airspace Maastricht/ FRAM Phase 5a (cross-border direct routes) within Maastricht UAC

European Route Network Improvement Plan (ERNIP) – Implementation Monitoring

Monitoring Report AIRAC 1306 (30 May 2013 - 26 June 2013)

- 17 -

Proposal ID : 74.044a / 15.019a Impl. Status: State(s) & Org. Comments:

5.

Description: To introduce P-RNAV (GNSS only) SIDs / STARs for Tallinn (EETN) airport.

Objective: To further improve airspace organisation within Tallinn FIR.

Implemented 30 MAY 2013

Project Group: SG BALTIC

Project Category: PBN Airspace Structure

EST

Originator(s): EST

Proposal ID : 75.048a Impl. Status: State(s) & Org. Comments:

6.

Description: To implement northbound ATS route Y/UY301 TAGOD - NIDOK for DEP LHBP via LITKU.

Objective: To further improve ATS route network within Bratislava FIR for DEP LHBP.

Implemented 30 MAY 2013

Project Group: FAB CE

Project Category: ATS Routes

SVK

Originator(s): EUROCONTROL

Current organisation between Hungary and Slovakia for DEP LHBP is via BADOV UP41 MAVOR or LITKU UL853 MEBAN / BILNA where option via LITKU allows a dog-leg connection via ULPUK UL624 KOPAT UL617 BILNA.

Option via AMRAX are not possible due to existence of permanently used TSA in that area.

Related proposals: 75.048b

Proposal ID : 75.087 Impl. Status: State(s) & Org. Comments:

7.

Description: To implement the following option for EDDF (Frankfurt) arrivals during Night period UQ863 ERKIR - TEKSI - GUPIN - ETASA.

Objective: To further improve Night Network and optimize operations for arrivals EDDF (Frankfurt).

Implemented 30 MAY 2013

Project Group: FAB EC

Project Category: Night Routes

DEU FAB EC

Originator(s): DEU

Proposal ID : 76.009 / BM0179 Impl. Status: State(s) & Org. Comments:

8.

Description: To allow the following NIGHT ATS routes: 1. UN163 CORSI - OSDET (northbound) OSDET - PAN (bidirectional)

PAN - NUPMA - ABRAM (southbound); 2. UY19 PELOS - OSDET southbound.

Objective: To further improve FPL options within Malta and Italy.

Implemented 30 MAY 2013

Project Group: FAB BLUE MED

Project Category: Night Routes

ITA MLT

Originator(s): MLT

BM179 - BM180; OSDET new waypoint to keep the

allignments at least 11NM away from Tunis FIR (37°45’53”N 011°38’58”E).

NUPMA new waypoint on FIR bdry (36°30’00”N 012°03’12”E)

Related proposals: 65.050

Page 22: Monitoring Report: AIRAC 1306 No 03/1203 30 May 2013 - 26 ... · - Implementation of Free Route Airspace Maastricht/ FRAM Phase 5a (cross-border direct routes) within Maastricht UAC

European Route Network Improvement Plan (ERNIP) – Implementation Monitoring

Monitoring Report AIRAC 1306 (30 May 2013 - 26 June 2013)

- 18 -

Proposal ID : 77.064 Impl. Status: State(s) & Org. Comments:

9.

Description: To implement southbound ATS route Y/UY500 SARAX - DISOR for DEP LYPR / BKPR.

Objective: To further improve ATS route network within Skopje FIR.

Implemented 30 MAY 2013

Project Group: RFG SE

Project Category: ATS Routes

MKD

Originator(s): EUROCONTROL

Will mainly serve flights to LTBA and LTFJ averagely 3 per day.

Current option is via TALAS UB1 TSL UM603 PEREN GOLDO.

Proposed option via DISOR is shorter by around 18NM if via TETOV and 12 NM if via GOSTI.

SAAM M3 data is supporting this proposal as flights are on direct radar tracks.

Proposal ID : 77.040 Impl. Status: State(s) & Org. Comments:

10.

Project Name: Farris TMA

Description: To further expand the existing Farris TMA to the west (up to FL155).

Objective: To improve the airspace structure of Farris TMA and ensure that traffic remains in controlled airspace within normal flight parameters.

Implemented 30 MAY 2013

Project Category: TMA

NOR

Originator(s): NOR

Related proposals: 67.043b

Proposal ID : 77.043 Impl. Status: State(s) & Org. Comments:

11.

Description: a) To implement bi-directional ATS route Z540 NEKLA - ALOLA (FL095

- FL660). b) To extend the following ATS routes:

i. M92 NEBSI - ALOLA bi-directional (FL095 - FL660); ii. M851 ALOLA - APTUG uni-directional (FL095 - FL660).

Objective: To further improve the ATS route network by creating connections via ALOLA for traffic to/from ESSB.

Implemented 30 MAY 2013

Project Category: ATS Routes

SWE EST

Originator(s): SWE

Replaces AIP RMK L870 & N616 how to flightplan to ESSB via ALOLA.

Proposal ID : 62.094a Impl. Status: State(s) & Org. Comments:

12.

Project Name: SENEKA, Phase 1

Description: 1. To implement the following ATS route segments:

a. MATUG - RASPU b. LIRSU - RIDAR (CDR1 FL350+) c. PITES - MAH (CDR 1 FL350+)

2. To implement new DCT PITES - UTABA, as discribed in RAD Appendix 4.

3. Alsace Release Line. 4. Harmonisation of Karlsruhe UAC sector boundaries ISA / CHI /

DON / ALP.

Implemented 30 MAY 2013

Project Category: DCTs ATC Sectors ATS Routes Airspace Structure

DEU

Originator(s): DEU

Phased implementation.

Related proposals: 62.077b 62.094b 62.094c

Page 23: Monitoring Report: AIRAC 1306 No 03/1203 30 May 2013 - 26 ... · - Implementation of Free Route Airspace Maastricht/ FRAM Phase 5a (cross-border direct routes) within Maastricht UAC

European Route Network Improvement Plan (ERNIP) – Implementation Monitoring

Monitoring Report AIRAC 1306 (30 May 2013 - 26 June 2013)

- 19 -

5. Adaptation of Karlsruhe UAC sector boundaries TGO/ ALP/ ISA sectors.

Objective: To further improve the airspace structure within Karlsruhe UAC while providing shorter route options and increasing the capacity to meet traffic demand (SENEKA, Phase 1).

Proposal ID : 78.008 Impl. Status: State(s) & Org. Comments:

13.

Project Name: ABLOM dualisation

Description: 1. To implement the following westbound ATS routes:

a. Z648 ADAMA - VEDER; b. Z649 KOXER - XENAK.

3. To re-align existing ATS route L/UL140 as LEDRI - VEDER - ALAMU.

Objective: To further improve ATS route network between Wien FIR and Bratislava FIR for DEP LOWW.

Implemented 30 MAY 2013

Project Category: ATS Routes

AUT HUN SVK

Originator(s): SVK AUT

Connected to the Three TMAs and regional TMAs SIDs/STARs/ATS route network adjustment.

Also connected to ABLOM RAD restriction and proposal for the problem completion/solution.

DEP LOWW via KOXER will be routed to SUPAK or MALBE.

DEP LOWW via ADAMA will be routed to ALAMU.

Proposal ID : 77.045 Impl. Status: State(s) & Org. Comments:

14.

Description: To re-align Z226 PELUP - NILUG as uni-directional (FL095 - FL660).

Objective: To further improve the ATS route network.

Implemented 30 MAY 2013

Project Category: ATS Routes

SWE

Originator(s): SWE

Z226 is a CDR1 MIKNA - NILUG with tactical re-route PELUP - NILUG when military play area M2 is active.

Proposal ID : 77.080 Impl. Status: State(s) & Org. Comments:

15.

Project Name: Rationalisation of non-regional RDs

Description: To re-designate ATS route Z18 BOR - ROVPA as Z418.

Objective: To rationalise the existing ATS route designators in Sweden FIR in order to further facilitate flight planning and release RDs.

Implemented 30 MAY 2013

Project Category: Route Redesignation

SWE

Originator(s): EUROCONTROL

Proposal ID : 79.050 / 18.018 Impl. Status: State(s) & Org. Comments:

16.

Project Name: Adaptation in AIP of ATS routes vertical limits

Description: To adapt the lower/upper vertical limits, expressed in FL, of ATS routes within Yerevan FIR - change of IFR FL to VFR FL.

Objective: To adapt in State AIP ATS routes vertical limits.

Implemented 30 MAY 2013

Project Group: SG BLACK

Project Category: ATS Routes

ARM

Originator(s): EUROCONTROL

Currently lower/upper limits varies as FL140 or FL150 or FL160 or FL180 etc.

Page 24: Monitoring Report: AIRAC 1306 No 03/1203 30 May 2013 - 26 ... · - Implementation of Free Route Airspace Maastricht/ FRAM Phase 5a (cross-border direct routes) within Maastricht UAC

European Route Network Improvement Plan (ERNIP) – Implementation Monitoring

Monitoring Report AIRAC 1306 (30 May 2013 - 26 June 2013)

- 20 -

Proposal ID : 79.051 Impl. Status: State(s) & Org. Comments:

17.

Project Name: Adaptation in AIP of ATS routes vertical limits

Description: To adapt the lower vertical limits, expressed in FL, of ATS routes within Bratislava FIR - change of IFR FL to VFR FL.

Objective: To adapt in State AIP ATS routes vertical limits.

Implemented 30 MAY 2013

Project Category: ATS Routes

SVK

Originator(s): EUROCONTROL

Currently some lower limits are set either as FL120 or FL150 or FL180.

Proposal ID : 78.044 Impl. Status: State(s) & Org. Comments:

18.

Description: To implement bidirectional ATS route segment UQ333 RESIA - UNTAD - DIKEM - ROKIB - BABAG.

Objective: To further improve the ATS route network while offering a new direct option for planning between NW and SE Europe across Italian airspace.

Implemented 30 MAY 2013

Project Group: FAB BLUE MED

Project Category: ATS Routes

ITA

Originator(s): ITA

In the process of inclusion in BM catalogue.

Proposal ID : 78.045 Impl. Status: State(s) & Org. Comments:

19.

Description: To implement bidirectional ATS route segment UT484 VAKON - BAMEK - LISKO.

Objective: To further improve the ATS route network while offering a more direct routing for traffic to/from East Europe from/to Milano area.

Implemented 30 MAY 2013

Project Group: FAB BLUE MED

Project Category: ATS Routes

ITA

Originator(s): ITA

In the process of inclusion in BM catalogue.

Proposal ID : 79.022 Impl. Status: State(s) & Org. Comments:

20.

Description: To swap existing RAD Appendix 4 DCTs into bi-directional ATS routes: a. L20 BASMO - LORED; b. L21 OMENI - LORED.

Objective: To establish ATS route segments and subsequently remove the corresponding DCT from RAD Appendix 4.

Implemented 30 MAY 2013

Project Category: RAD ATS Routes

MLT

Originator(s): MLT

Proposal ID : 78.039 Impl. Status: State(s) & Org. Comments:

21.

Project Name: Free Route Airspace Maastricht and Karlsruhe, FRAMAK

Description: To implement COP-less, cross-border DCTs making use of near-by COP option.

Objective:

Implemented 30 MAY 2013

Project Category: Free Route Airspace

DEU MUAC

Originator(s): DEU MUAC

Related proposals: 70.059f 71.083c 78.031 78.041

Page 25: Monitoring Report: AIRAC 1306 No 03/1203 30 May 2013 - 26 ... · - Implementation of Free Route Airspace Maastricht/ FRAM Phase 5a (cross-border direct routes) within Maastricht UAC

European Route Network Improvement Plan (ERNIP) – Implementation Monitoring

Monitoring Report AIRAC 1306 (30 May 2013 - 26 June 2013)

- 21 -

To further expand and harmonise the implementation of Free Route Airspace Karlsruhe UAC (FRAK) and Maastricht UAC (FRAM).

Proposal ID : 79.049 Impl. Status: State(s) & Org. Comments:

22.

Description: To change the status and routeing for the west part of UL15 and to extend UG42 untill new waypoint LESDO: 1. UL15 ING - LESDO - RANUX eastbound 2. UG42 LESDO - BUBLI eastbound

Objective: To temporarily improve the ATS route network through effective flight planning options and route shortening in order to connect UL15 with the permanent ATS route network avoiding TSA200 southeastbound.

Implemented 30 MAY 2013

Project Category: ATS Routes

FRA

Originator(s): FRA

Temporary validity from May 30 0000 to October 16 2359, 2013.

Proposal ID : 79.011 Impl. Status: State(s) & Org. Comments:

23.

Description: To allow H24 availability of the following DCTs for ARR/DEP LDDU: 1. PARAK - VEBAR (ARR LDDU/LDSP); 2. GENLU - PARAK (DEP LDDU).

Objective: To further improve the airspace utilisation at the interface between Beograd FIR/UIR, Sarajevo FIR and Zagreb FIR.

Implemented 30 MAY 2013

Project Category: DCTs RAD

SRB MNE BIH

Originator(s): IATA

ARR LDDU/LDSP will FL280- over VEBAR due to LoA requirements.

Proposal ID : 77.044 Impl. Status: State(s) & Org. Comments:

24.

Description: To extend ATS route P605 PERRY - new point ETPIG on N33 bi-directional (FL095-660) CDR2 FL095 - FL285.

Objective: To further improve the ATS route network.

Implemented 30 MAY 2013

Project Category: ATS Routes

SWE

Originator(s): SWE

Creates a new connection towards NE for dep ESMS.

ETPIG will also be a FRA transition point for dep ESMS.

Proposal ID : 78.007a Impl. Status: State(s) & Org. Comments:

25.

Description: To change to bi-directional existing westbound ATS route UZ500 PODAN - DEMOP.

Objective: To further improve ATS route network within Bratislava FIR in view of axis improvement with Budapest FIR and Warszawa FIR.

Implemented 30 MAY 2013

Project Category: ATS Routes

SVK

Originator(s): SVK

Related proposals: 78.007b 78.007c

Page 26: Monitoring Report: AIRAC 1306 No 03/1203 30 May 2013 - 26 ... · - Implementation of Free Route Airspace Maastricht/ FRAM Phase 5a (cross-border direct routes) within Maastricht UAC

European Route Network Improvement Plan (ERNIP) – Implementation Monitoring

Monitoring Report AIRAC 1306 (30 May 2013 - 26 June 2013)

- 22 -

Proposal ID : 77.038 Impl. Status: State(s) & Org. Comments:

26.

Project Name: Rationalisation of non-regional RDs

Description: To re-designate the following ATS routes: 1. Z12 TONDI - BELGU as Z312; 2. Z13 TUVIG - BELGU as Z313; 3. Z16 ZOL - UMSIS as Z132; 4. Z16 UMSIS - RIPAM as Z132; 5. Z20 LUNIP - MIRVU as Z320; 6. Z20 MIRVU - RBU as Z125.

Objective: To rationalise the existing ATS route designators in Norway FIR in order to further facilitate flight planning and release RDs.

Implemented 30 MAY 2013

Project Category: Route Redesignation

NOR

Originator(s): EUROCONTROL

Proposal ID : 78.046 Impl. Status: State(s) & Org. Comments:

27.

Description: To implement bidirectional ATS route segment UQ217 RESIA - SUMIR - RIFEN.

Objective: To further improve the ATS route network while offering a new option for planning between NW and SE Europe across Italian airspace.

Implemented 30 MAY 2013

Project Group: FAB BLUE MED

Project Category: ATS Routes

ITA

Originator(s): ITA

In the process of inclusion in BM catalogue.

Proposal ID : 78.047 Impl. Status: State(s) & Org. Comments:

28.

Description: To implement bidirectional ATS route segment UY765 PAR - OGPOT - ANC.

Objective: To further improve the ATS route network while offering a more direct routing to traffic to/from Milano area and Bologna airport proceeding via ANC.

Implemented 30 MAY 2013

Project Group: FAB BLUE MED

Project Category: ATS Routes

ITA

Originator(s): ITA

In the process of inclusion in BM catalogue.

Proposal ID : 78.018 Impl. Status: State(s) & Org. Comments:

29.

Description: To revise RAD restrcition EG2207 and allow ATS route segment P/UP16 NOKIN - RIBEL for traffic above FL195.

Objective: To further improve airspace utilisation in UK.

Implemented 30 MAY 2013

Project Category: RAD

GBR

Originator(s): GBR

Currently the segment is not available for traffic below FL285 and this traffic shall file via dog-leg NOKIN P/UP17 POL N/UN601 RIBEL.

Page 27: Monitoring Report: AIRAC 1306 No 03/1203 30 May 2013 - 26 ... · - Implementation of Free Route Airspace Maastricht/ FRAM Phase 5a (cross-border direct routes) within Maastricht UAC

European Route Network Improvement Plan (ERNIP) – Implementation Monitoring

Monitoring Report AIRAC 1306 (30 May 2013 - 26 June 2013)

- 23 -

Page 28: Monitoring Report: AIRAC 1306 No 03/1203 30 May 2013 - 26 ... · - Implementation of Free Route Airspace Maastricht/ FRAM Phase 5a (cross-border direct routes) within Maastricht UAC

European Route Network Improvement Plan (ERNIP) – Implementation Monitoring

Monitoring Report AIRAC 1306 (30 May 2013 - 26 June 2013)

- 24 -

ANNEX B: ACRONYMS AND TERMINOLOGY

1. The following ISO-3 coding of States is used in the column States and Organisation: ALB Albania IRQ Iraq ARM Armenia ITA Italy AUT Austria LBY Libyan Arab Jamahiriya AZE Azerbaijan LTU Lithuania BEL Belgium LUX Luxembourg BGR Bulgaria LVA Latvia BIH Bosnia and Herzegovina MAR Morocco BLR Belarus MDA Moldova, Republic of CHE Switzerland MKD The former Yugoslav Republic of Macedonia CYP Cyprus MLT Malta CZE Czech Republic MNE Montenegro DEU Germany NLD Netherlands DNK Denmark NOR Norway DZA Algeria POL Poland EGY Egypt PRT Portugal ESP Spain ROU Romania EST Estonia RUS Russian Federation FIN Finland SRB Serbia FRA France SVK Slovakia GBR United Kingdom SVN Slovenia GEO Georgia SWE Sweden GRC Greece SYR Syrian Arab Republic HRV Croatia TUN Tunisia HUN Hungary TUR Turkey IRL Ireland UKR Ukraine IRN Iran, Islamic Republic of

MUAC Maastricht UAC

Page 29: Monitoring Report: AIRAC 1306 No 03/1203 30 May 2013 - 26 ... · - Implementation of Free Route Airspace Maastricht/ FRAM Phase 5a (cross-border direct routes) within Maastricht UAC

European Route Network Improvement Plan (ERNIP) – Implementation Monitoring

Monitoring Report AIRAC 1306 (30 May 2013 - 26 June 2013)

- 25 -

2. BLUMED FAB, DANUBE FAB and FAB CE proposals referenced in proposal number box are coded with a unique identification number abbreviated as BM or DN or CE, respectively, following by four digits (XXXX) (example BM0001 or DN0001 or CE0001).

3. The content of each proposal is an indication of State’s intention to implement the relevant airspace improvement but don't represent a copy of any official publication. For the correctness and verification of the relevant aeronautical information consult official State AIP publication. The data from this document should not be used for operational purposes.

Page 30: Monitoring Report: AIRAC 1306 No 03/1203 30 May 2013 - 26 ... · - Implementation of Free Route Airspace Maastricht/ FRAM Phase 5a (cross-border direct routes) within Maastricht UAC

European Route Network Improvement Plan (ERNIP) – Implementation Monitoring

Monitoring Report AIRAC 1306 (30 May 2013 - 26 June 2013)

- 26 -

Left blank intentionally

Page 31: Monitoring Report: AIRAC 1306 No 03/1203 30 May 2013 - 26 ... · - Implementation of Free Route Airspace Maastricht/ FRAM Phase 5a (cross-border direct routes) within Maastricht UAC

European Route Network Improvement Plan (ERNIP) – Implementation Monitoring

Monitoring Report AIRAC 1306 (30 May 2013 - 26 June 2013)

- 27 -