·. LOS ANG£L£S DISTRICT U.S. ARMYCORPS OF ENGINEERS DEPARTMENT OF THE ARMY PERMIT Permittee Port of Loo Ange:1et, Enginemng DivWon (AntQnio 0Uri Pmnit Nwnbn: 'Auin8 N«e: The term "you" and its derivitive&. U used In this permit,.ln9nsthe or any fulun! transferee. The term "this office" refers to the appropriate district IN dlviaion o ffice of the Colps of Engineers having iuri$dirnon the p"rmimod activity or the appropriate official acting Wtder !he authority of the OJrJt:NndJns olfiC1!'r. You art: aulhcrized to perform won. in accordllr\a: with the terms and conditions specified Nlow. Project DH<ription: To di8ch.a'l" fill into approrimately 2.9 • .;ret of wateT$ of the U.s. and create approJ<imately 4.5 acra of open water, and to tempourily intI*" .pproxlmately 41 acres of walerl of the U.s.. in aAOCUitioro with the of the exiltInt!; marina in Watmom Satin Cobrillo Way F'rojKt), .. .oownon dnwings. Sp«ific.ally. you m! to: I. Dredge approximately 8 of Wltel'\l of the Us. 10-15 Mean Lower low Wit..,. (MLLW) with depth to -3S MLLW In the vicinity of the Confined Disposal Facility (COF) rock dike perimeter (dredging lotal 01102,000 cubic ra"h. including 2 foot over· dredge depth) 2. upland material (I , e. land cut) to c", .t e approximately 4.5 am.'I of w.te", of the U.5. 3. fill into approximately 2.t.ere!! of wlters 01 the U.s. to c",ate I COF in the northeast comer of Watchom Basin 4. Di$r<- 01 the dredged material.t Anchorage Road Upland other appmvlNl upland site. the COF material may be.ton>d temporarily in an 3.1 acre nN eouih of W .. "house 6). or ....use it _ile as buriINI flU Landward of the slOp<! or shonl!llne protectionJstabil.ization .5. the land-<:ut malc!riaI OnIlte ( ...g..10 help stabilize the slop<! or shonl!Me protJedion/slllbiliution) or dispote of it in the COF, Anchorage Ro.d Upland SlOrage

LOS ANG£L£S DISTRICT - United States Army · 3/9/2008  · LOS ANG£L£S DISTRICT U.S. ARMYCORPS OF ENGINEERS DEPARTMENT OF THE ARMY PERMIT Permittee Port of Loo Ange:1et, Enginemng

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: LOS ANG£L£S DISTRICT - United States Army · 3/9/2008  · LOS ANG£L£S DISTRICT U.S. ARMYCORPS OF ENGINEERS DEPARTMENT OF THE ARMY PERMIT Permittee Port of Loo Ange:1et, Enginemng

· .

LOS ANG£L£S DISTRICT U.S. ARMYCORPS OF ENGINEERS

DEPARTMENT OF THE ARMY PERMIT

Permittee Port of Loo Ange:1et, Enginemng DivWon (AntQnio Gioi~1lo, 0Uri Ifubor~)

Pmnit Nwnbn: SPt-2OO7~14I7-SDM

'A uin8 Offi~:

N«e: The term "you" and its derivitive&. U used In this permit,.ln9nsthe penni~ or any fulun! transferee. The term "this office" refers to the appropriate district IN dlviaion office of the Colps of Engineers having iuri$dirnon ov~r the p"rmimod activity or the appropriate official acting Wtder !he authority of the OJrJt:NndJns olfiC1!'r.

You art: aulhcrized to perform won. in accordllr\a: with the terms and conditions specified Nlow.

Project DH<ription: To p"rma~tly di8ch.a'l" fill into approrimately 2.9 • .;ret of wateT$ of the U.s. and create approJ<imately 4.5 acra of open water, and to tempourily intI*" .pproxlmately 41 acres of walerl of the U.s.. in aAOCUitioro with the red~elopmmt of the exiltInt!; marina in Watmom Satin {I.~ Cobrillo Way ~larina F'rojKt), .. .oownon i;he.~ dnwings.

Sp«ific.ally. you m! .u~z,ed to:

I. Dredge approximately 8 ~ of Wltel'\l of the Us. 10-15 Mean Lower low Wit..,. (MLLW) with depth to -3S MLLW In the vicinity of the Confined Disposal Facility (COF) rock dike perimeter (dredging lotal 01102,000 cubic ra"h. including 2 foot over· dredge depth)

2. Exc.v~te upland material (I ,e. land cut) to c",.te approximately 4.5 am.'I of w.te", of the U.5.

3. Oixharg~ fill into approximately 2.t.ere!! of wlters 01 the U.s. to c",ate I COF in the northeast comer of Watchom Basin

4. Di$r<- 01 the dredged material.t Anchorage Road Upland Stor.~S'te, other appmvlNl upland site. the COF (d~glNl material may be.ton>d temporarily in an appmxima~ly 3.1 acre nN eouih of W .. "house 6). or ....use it _ile as buriINI flU Landward of the slOp<! or shonl!llne protectionJstabil.ization

.5. ~ the land-<:ut malc!riaI OnIlte ( ... g..10 help stabilize the slop<! or shonl!Me protJedion/slllbiliution) or dispote of it in the COF, Anchorage Ro.d Upland SlOrage

Page 2: LOS ANG£L£S DISTRICT - United States Army · 3/9/2008  · LOS ANG£L£S DISTRICT U.S. ARMYCORPS OF ENGINEERS DEPARTMENT OF THE ARMY PERMIT Permittee Port of Loo Ange:1et, Enginemng

Site, or oth~r approved upland site 6. Construct rock and sr""lshed pile slop<l protection/stlbilization along the uplandlwatcr

interface 7. Insr~U IS ~te piles to supporl the WiICr-lilde/over-water promenade_lion 8. Install approximately 1,000 wn<T1!te or sleel piles for !he pr~1 ronc;To:tC bo;ot docb 9. Construct approximately 700 boat docJ<. and 400 dry-5tacldna ~es In tho> project area.

Project I.oation: This p"*,",, 0<XUn in and along Walchom !Win on the .. _ aide of the West ~ in LoI Anseles Harbor, in the Oty of LoI Angeles,. Los Angcok-s County, Califomia.

Permit Conditions:

I. Tho: limo: limit for completing the a1Jthorized activity ends on September 3, 2011. If you find that you neN ~ time to comp~te !he authoriz.ed activity, submit your request for a time ,.,.tension to ItiliI office fOl" cormd ..... rion atlft$l_ month ~ the abow date is reacl"led.

2. Y<O.t must rmlnWn the activity ;m\hori.zed by this permit in good mnd,ri<:In and in conformanoe with thetent\5and conditions of ItiliI pennit You m::not rel~ of this requirement if you abandon the permitb'd. K"livity, although you may make a good faith transfer 10. third. P1U"t)' In c:ompliJTICI! with GenerJJ Condltlott (below. Should you wish 10 """"" 10 nUllntain the authorlud activity or should you desire to ~bandon it without a good faith transfer, yOll must obtain a modification from this permit &om this office.. which may requi' f restOTation of the area.

3. If you discover my prevlouAly unknown historic or ~I remaiN while ~lishins the activity authorized by this pmnit. you must intmedi;otely notify this oIfio!, 01 whal you have fow"Id . We will Initiate the FedcrJJ and state coordination required tod~ if the remaiN warrant a _cry effort or If the site is eligible for ~sting In tho> NatioNl Register 01 Historic~

4. If you ~Il the property ~ted with this pennl~ yoo must obtoln tho signature ol the new owner in the apace provided and forward I copy of the permit m this office to validate tho> transfer of this authorUanon.

5. If a conditioned w.~ quality ...mtlcation has been i$5ued for your p~ you must comply with the conditioN spedfied in the Cfttifia,tion .. tpedal cnnditionl 10 this permit For your coo~ • copy of the cmification is attached if It mntains:such conditions..

6. You must lUoW rq>relentativ<!s from this offiee to inspect the IUthorizeod ldi.vity.t any limo: d""med ~ry 10 ~Il' that il is ~ o. has been ll("o,lInpli$hed with the terms and conditions of your perml\.

,

Page 3: LOS ANG£L£S DISTRICT - United States Army · 3/9/2008  · LOS ANG£L£S DISTRICT U.S. ARMYCORPS OF ENGINEERS DEPARTMENT OF THE ARMY PERMIT Permittee Port of Loo Ange:1et, Enginemng

S~ Conditioru:

1. The permitted ~ctivity shall nol interfere with the right 01 me public to f""" navigation on att navigable waten of the United States.s defined by 33 C.F.R Part 329.

2 A pre<onstruction survey lor GUlInpoI IWfoIu. (C.~I~rpa) of the project area .hall be conducted in accord~ with the CauIo.rpa Control Protocol (see btW·/4wr nmb DNa ggytbcdlcalll.makq1 pdP not earlier than 90calendar da)'!i prior to planned rorutruction and not later than 30 calendar days prior to cnMtruction. The """,Its of that ,urvey .hall be furnished to the Corps, National Marine Fisheries Servke, Md the CaUfomi. Deparb:nent of Fish and Game (CDFG) allea.1 15 calendar day. prior to initiation of work in navigable wale .... In the "ve,,1 that c.. .. /ttpd is de~ within the project area, the permitt .... shall not oommence work until such time as the infestation has been isolated, treated, and the ril;k of spread is eliminaled as cnnfIrrned in writing by the Corps. in cnnsultation with National Marine Fisheries Service and CDFG.

3. The permittee .hatt notify the Notional Marine Fisheries Setvice (NMFS) at least n hours in advance of dredging or fill operations, to provide NMFS the opportunity to dire<:tly observ~ theopentioru and evaluate impacts to Essential Fish Habitat

4. All pilings inst.J.IIed for this pro;ect shall bt constructed of concrete Or steel. No creosot ..... m.ated pilings shatt be used fo, Ihil; project.

5. 'The permitt .... sha1l discharge only dean rorutruction materials suitabl~ for \lSI' in me ()C('anic environment. 1he permittee shatt ensure no debril;, scil, silt, sand, sawdust, rubbish.. cemwt Or concrete washings theTeOI, oil Or petroleum producto, lrom cnnstruction shall be allowed to enter into Or placed where it may be washed by rainfaU Or runoff into waters 01 the United States. Upon cnmplction of the project authorized herein, ""y and all excess ma~tial or debris shall be completely removed from the work ar~a and disposed of in an appropriate upland si~.

6. During ~ge or fill operations, the permitt .... shall Implement an intcg",ted multi­parameter water quality monitoring program in cnnjunction with meeting att Corps and Loo Angeles Regional Water Quality Control Board (LARWQCB) Waste Discharge Requirements (WORs). wherein ~giI1g perlormanre is meilSUred in situ . The objective or the monitoring program shall be adaptive management of the dredging operation •. whereby potential exceedances of water ~uality obi",tiv<'S, such as turbidity, can be measured or predicted and dredging operations ... bsequently modified. If e~~ are obso:rved, the permitt .... shall immedi.~y meet with the oonstruction man.ger to di.s<:uss modifications of dredging operations to reduce turbidity and/or other problematic panmetcr to acreptabk: levels. This could include alteration of dredging method. andlor implementation of additional Besl "fanagement Practices, such as .ilt curtains. The permittee shall.1so immediately notify the Corps and the LARWQCB if e~anc:es arc observed.

7. 1he permittee shall notify the Corps of the dateol commencement 01 operations not less !han 14 calendar da~ prior to cnmrnencing work. and shall notify the Corps of the d~te of cnmpl~tion of operations at least 5 calendar d.~ prior to such cnmplction.

3

Page 4: LOS ANG£L£S DISTRICT - United States Army · 3/9/2008  · LOS ANG£L£S DISTRICT U.S. ARMYCORPS OF ENGINEERS DEPARTMENT OF THE ARMY PERMIT Permittee Port of Loo Ange:1et, Enginemng

B. The permittee shall notify the Commander, Eleventh Coast Guard District, aJ1d theCaasl Gu8td Marine Sa/ety Office/ Group LA-LB, not less than 14 calendar days prior to C<lmmendng work and a, project infonnation changes. The nC>tification, either by letter, fax, or e-mail, shaU include as. minimum the following information:

A) Projectdescription induding the type of operations. B) Location of operations, induding l.i1titude I Longitude (NAD 83). q Work start and completion dates and the expected dUf.tiol"l of operntions. D) Vessels involved in the operations (name, size, and type). E} VHF·FM radio frequendes monitored by vesselsol"l scene. F} Point of contact and 24-hour phoncmunber. G} Potential hazards to navigation. H) Chart number for the .rea oloperations.

Addresses and Phone N1JIIlbers:

Commander, 11th Coast Guard District (oan) Coast Guard Island, Building 50-3 Alameda, CA 94S01-5100 A TIN: Local Notice to Mariners TEl..: (510) 437-2986 FAX: (511l) 437-3423 FAX: (310) 732-1029

U.S. Coast Gund MarineSafctyOffice IGroup LA_LB 1001 South Seaside Ave., Bldg 10 San Pedro. CA 90731 Attn: Waterways Man.gement TEL: (310) 521-3860 FAX: (310) 521-3869

9. The permittee and its C<lntrador(s) shall not remove, relocate, obstruct. willfully damage, make fast to, or Interfere with any aids to navigation defined.t 33 C.F.R. chapter I, subchapter C, part 66. The pennittee shall eT\Sl!re il$ contractor notifies the Eleventh Coast Guard District in writing. with a copy to the Corps, not less than 30 calendardays in advanceol operating any equipment adjacent to any aids to navigation that requires relocation or removal. Should any lederal ald5to navigation be affected by this projec~ the pcrrn.ittce shall submit a request. In writing. to the Corps as weU as the U.s. Coast Guard (USCG), Aids to Navigation office. The permittee and il$ contractor(s) are prohibited from relocating Or removing any aids to navigation Imtil authorized to do "" by the Corps and the USCG.

10. ShOllld the permittee determine the work requIres the placement and useof private aids to navigation in navigable waters of the U.s .. the permittee >hall submit a reqU<!8t in writing to the Corps as well as the U.S. Coast Guard, Aido to Navigation office. The permittee is prohibited from establishing private aids to navigation in novigable waters of the U.s. until au:hori:ted to

do SO by the Corps and the USCG.

11. Upon notification to the USCG as specified in Special Condition 10, the permittee shall forward a C<lpy of the notification to theCoast Guard Captain of the Port (Corp)' The Corp may modify the deployment 01 marine ronstructionequipm .... t or mooringsystems to safeguard navigation during project construction. The permittee shall direct questions ronceming lighting, equipm .... t plaC'ement, and mooring to the appropriate Can>.

12 Within 30 calendar days of completion of the project .uthorized by this permit. the pennittee >han conduct a post-project survey indicating changes to structures and other features in navigable waters. The permittt!<! shall forward a copy of the survey to the Corps

Page 5: LOS ANG£L£S DISTRICT - United States Army · 3/9/2008  · LOS ANG£L£S DISTRICT U.S. ARMYCORPS OF ENGINEERS DEPARTMENT OF THE ARMY PERMIT Permittee Port of Loo Ange:1et, Enginemng

and to the National OceaniC and AtmosphericService for chart updating: Gerald E Wheaton, NOAA, Regional Manag~r, West Coast and Padlic~an,. OOD C~nter Mon"'rey Hay, Room 5082, Seaside, CA 93955~7Il.

13. The permitie<.' understands and agrees th.t, if futu~ operations by the United Sbtes , rC<juire the structu~ Or work he~in authorized, or if, in the opinion of the Secretary of the Army or his authorized "'Presentative, said structure or work shall cause unreasonable obstruction to the free navigation of the IUIvigable waters, the permittee will be ""lulled. upon due notice from the Co'1'" of Engmecrs, to remove, Moc.te, or alter the stru<:tu.ral work Or obstruCtiOIlS caused thereby, without exp<'TIse to the United States. No claim shall be made against the United States on ac<:ount of any such removal or alteration.

14. For this permi~ the lenn dredging operations shaD mean: navigation of the dredging vessel at the dredging .ite. e~c.'Wation of dredged material withfn the project boundarico, and placement of dredged material mto a hop!",r dredge or disposaVtransfer bars<' or srow.

15. Dredging authorized fn this permit shall be limiled to the areoS defined in I'ort of Los Angeles Drawings 1-2778 D-OO to 1-2778 D-17. No more than 102,OOOcubk yards ofdr«lged mat<:rial is authorized for dredging withm appro~imately 8 acres 01 Watchorn Basm byihe permittee (this number includes allowance for a maximum 012 feet of over-dredge depth). Dredging docs not include the excavation of upland material or land cuts 10 create approximately 4.5 acres of additional waters of the US in the project area. No dredging is authorized m any other location under this permit.

16. For dredging under this permit, the ma~imum dredging design depth <also known as the project d~pth or grade) shall be - 15 fe<>1 MLLW, with a m",imum allowable over-<lredg~depth of - 2 feel below the design grade. The only exception to this limit i.th~ dredging to -35 MLLW in the vicinity 01 the Confined Dil;JXlSal F<>eility rock dike perimeter needed to address geotechnical.lability at thi. particular location. No dredging shall OCl"Ur deeper than _2 leet below the design grade or ()IJtsid~ the project boundaries.

17. The permitie<.' Is prohibited from disposing 01 any of the dredged rna"'rial in waters of the U.S., except within the Confined Disposal hcility to becreated in the approximately 2.1-.ae northeast triangu1ar portion of the Watchorn Basin. Disposal of dredged material in this ca.., would include side<:asting or otherwise redistributing dredgedJeJ<Cavated material in waters of the US.

18. At lust 15 c.ale!1dar days before initiation of any dredging operations authorized by this pennit, the permitte<: shall send a dredging and disposal operations plan to the Corps and LARWQCB, with the following inlormotion:

A) A list 01 the names, addresses. and telephone numbers of the permittee's project mano.ger, the contractor's project manager, the dredging operations inspector, the disposal operations inspedOl". and the captain of each tug boat, hopper/clam-shell dredge, Or other form of vehicle used to transport dredged material 10 the designated dlsposalsile . B) A lis! 01 all vess.ds, major dr«lging equipment and electronic positioning systems or IUIvigation equipment that will N used lor dredging and disposal operations. in(:luding the c8padty, load level and a<xepl3ble operating sea conditions for each hopper/dam-

5

Page 6: LOS ANG£L£S DISTRICT - United States Army · 3/9/2008  · LOS ANG£L£S DISTRICT U.S. ARMYCORPS OF ENGINEERS DEPARTMENT OF THE ARMY PERMIT Permittee Port of Loo Ange:1et, Enginemng

shell dredge or lransport/d~ barge or ""'W to osslm! compliance with s~ """ditiom on dredging and disposal operaliom. C) A detailed description of the dredging and dbposal O!"'ralions authorized by i;hJs permit. Descriplion of the dredging and. disposal operations should include, at a minimum, the following:

i) Dredging, transport. and disposal p~ures for up to 102.000 cubi< yards (includes over-d.redge depth <>f 2 feel) to be dredged from the W.r.:horn Basin. ii) A $dtedule showing when the dred&'ng project is planned to begin and end.

D) A pre-dr<!dging bathymetric condition survey (presented as • large formal plan view drawing), taken within thirty (30) daY" belo", the dnodging begins, accurate to O.5-loot with the exact location of all soundin~ dearly defIned on the survey chart. The pre­dredge survey ch.rtshal1 be prepared showing the following infom'l3lion:

i) The entire dredging area, the toe and lop of all sid ..... lopes and typical cross sections of the dredging are .... To ensure that the entire area i. surveyed, the p....-..dredge amdilion survey should cover an area at leasl 50 feet outside the top of the side-slope or the boundary of the dredging area, un!<'SS obstructi""" In'

encountered. ii) The dredging d""ign depth, ovcr-dredge depth and the side-slope rali". iii) The total quantity of dredged materia.! to be removed from the dredging areas and the side-slope .reas. iv) Areas shallower than the dredging design depth shall be shaded green. areas betw""" the dredging design depth and overdredgc depth shall be shaded yellow, and areas below o"er-dredge depth that will not be dredged shan be 5h.a.ded blue. If these arcas are not durly sho"",,, the Corps may request additional information. v) The pre-dredging survey chari sh.U be signed by the permittee to certify that the data are accurate and that the survey w .. completed within thirty (30) days befoN! the proposed dredging start dat...

E) A debris mana8"ment plan to prevCI"It disposal olla'ge debris at all disposal Io<;atioou. The debris management plan shaU include: KIIlrces ""d expected types of debris. debris separation and retrieval methOOs, ""d debris disposal methocLo including disposallocalioru..

19. . I

20. The permittee shall maintain ~ copy of i;hJs permil on all wssels used to dredge, transport, Or disposeof dredged material authorized under this permit.

21. The permittee shall ensure that the captain of any dredge, til&- Or other v-.:I used in the dredging.. tr1InSier, o. dJspos.aI operlilions, is a II~ operator under USCG regul.o.tions and lollows the Inland and Ocean Rules of Navigation or the USCG Vessel Traffic Control Servi<e. All such v_Is, dredS .... or disposal barges or scows, shall have the proper day shapes, operating marine band radio, and other appropriate navig.tional.ids.

22. The permittee·, conlractor(') and the coptain of &Ilydredge<:ovcred by this permit shall monitor VHF-FM channeI.s 13 and 16 while conducting dredging operatic .....

6

Page 7: LOS ANG£L£S DISTRICT - United States Army · 3/9/2008  · LOS ANG£L£S DISTRICT U.S. ARMYCORPS OF ENGINEERS DEPARTMENT OF THE ARMY PERMIT Permittee Port of Loo Ange:1et, Enginemng

23. Upon noques~ the permittee and itsmntractor(s) shall allow inspectors from the Corps, US. Environmental Prot...:tion Agency (USEPA), LARWQCB, and/or the USCG to inspect 0.11 phases of the dredging.. transfer, and disposal operations.

24. Upon reques~ the permittee and its contractor(s) retained taperform work authorized by the permit or to manitor <:ompliance with this permit shall make available to inspectors from tile Corps, USEPA, LARWQCB, and/or the USCG tile following: dredging and disposal operations inspectors' logs, the vessel track plots and all disposal v_I logs or records. any analyses af the characteristics of drroged material, or my other documents related to dredging and disposal operations.

25. If a violation of any pcrmitcondition occurs, the violation shall ~ rf'ported by th .. permittee to the Corps within twenty_four (24) hours. If the permittee retains any conlractors to perform any activity autllorized by this permit. Ihe permittee shall instruct all such contractors that notice of any violations muSI be reported to the permiltee immediately.

26. When u&ing a transferor disposal barge at scow, no water shall be allowed to flow over Ihe sides. The lIN .. 1 that a disposal barge or scow can be filled shall not exoeed tile load line to prevenl any dredged material or water from spilling Over the sides 31 the dredging site. No transfer or disposal barg" Or SCOw shall be filled above this predetemlined level. Before each disposal barge at scow is transported 10 the transferldisposal sHe, the dredging site irupector shall certify that it is filled <:orrectly

27. The permittee shall use an dectronic positioning system to navigate al the dredging sile. The electroniC positioning system shIll have a minimum m:uracy and preci5ion oj +1- 10 feet (3 melers). If the electronic positioning .ystem fail. or navigation problems are detected, all dredging operations shall cease until the failure or navigation problem. are corrected. Any n avigation proble"," and corrective measures shail be describ<!d in the posl-dredging completion rf'potl per Special Condition 30.

28. The permiltee shall impl<'lllentadequate measures 10 ensure water does not runoff and return to the Watchorn Basin/Los Angeles Harbor from the approximately 3.7 acre temporary stnckpile/stQrag<;: area for dredged material that will be established in the Cabrillo Way Marina project area.

29. The permittee shall nOI disposo:: of excess land-CUl and dredged. material (rurrenUy estimated at181.000cubk yard.) generated by theproje'" at an upl<md location other tIl.n Anchorage Road Upland SlorogeSile, unless approved by the Carps in writing (E-mail Qr l~tler).

30_ The pellIlittee shall submit a post-dredging <:ompletion report 10 the Co'P' within 30 ca lendar d ays after <:ompletion of the prOied to document compliance- with all general and special conditions defined in thi. permit. The report shall include all infarmation collected by the permittee. the dredging operations inspector, and the disposal operations inspector Or the transfer/disposal vessel captain a. required by the special conditions of this permit The rf'port shall indicote whether all general and special pennil conditions were met. Any violation, of the permit shall be explained in d..tail . The report .h.1I further include the following Information,

,

Page 8: LOS ANG£L£S DISTRICT - United States Army · 3/9/2008  · LOS ANG£L£S DISTRICT U.S. ARMYCORPS OF ENGINEERS DEPARTMENT OF THE ARMY PERMIT Permittee Port of Loo Ange:1et, Enginemng

A) PC'ID'liI and project number. s) Start dau> and rompldiQn. dall! 0/ dn!d~ and dispowl opcntiom. q A breakdown of the total Cllbic ylrdl dispo5ed al Anchorage Ro.ad Upland Soil Storage Sill! Or other sullable upland dbponlsite. dis~ of in Ow, projeci'J Confined Disposal Facility, and mued ONlle (landward of th" shorelinf! prolection/subilization). D) Mode of dn!dging. E) Mode of transportation. F) Fann of dn!dged material. G) I'ercenl sand, silt IUtd day In dredged IJ1lIteri~!. H) A =lified report from the dn!dging iile Inspector Indicating all gMl':ral and special pennit conditio ... we ... mf!I. Any violations of the po-mtil wll be explained in detaU. I) A detaUed posl-dredgin3 hydrognphic aliNey of !hedredging a ..... Thf! aurvey!N1I show areas above the dredging design depth s/u.ded green. are;u bctw-, the dredging desigl depth and ov.,,, .. -drmS'" depth shaded ycllow, areM below over-dred&ed depth. thai Wfie not dNdged Dr a ... a. that w"",, d~ !han the ~-dredS'" depth befOft the project Mgan ;u indicatM on the pn!-d.tedging survey shaded blue, and an!U dredged below the over-dredge depth Dr ""tslde the project bounda.v. $haded red. The method. used to pre"" ... the pDll-dredginj!: survey shall be the soome methods usoed in the pre-dTedging corodltion survey. The survey shill be ligned by ,1'Ml permln", certifying thai the data Ire a.:rur.le. n"The post-dredging repon llhall be signed. by I duly authorized representative of the permittee. The pennlttee's representative shan make the following certHlcation:

I attif'l "nd~r Pf./wty fJ/1tJ.w lhat this docum.nt «nd all atl.odlmtnl$ WV. ptqMtTtd w ..... my dirtCtion Or .upervi5ion. ~ info"""l;"" I~bmintd is. ta I~ ~t fJ/ my IwrwIcdg. «tid 1M1ief, Inu", """,,,,to, and rompl~fl. t.m.WI<U wt tJwn.", ,ipifi",mt pnwltu" for sJ<bmilting folM info"""l;"n, ,ltdwling /Ju ".-i/nl,/y ufJiItt: Uil imprUo>!ltIn!l Jot beoa1ing DioW.....,.

31. In the unlikely evenl tb<= is a collilliQn between a vessoei HSOC1;oied with protect conJIructlon and. 0tMine marnnW (~.g., seal,. !lea lion), the permittee shall Immediately notify the NMfS' Strmding Coordinator, Io..!ph Cordaro, at (562) 980-4017 lIS wdl as the Rqulatory Oivl5iQn of the eo.p. (POC: Sp.na:r ~eil (805) 58$-2152).

Fo.uth ... Information:

1. Congressional Authorities. You have been authorized 10 W>dertal<e the activity d.,..;ribe<! above pwsuant to:

(X) Section 10 of the River and Hubor Ad 011899 (33 USc. 400).

(X) Section 4()4 of !he ~an Water Act (33 US.c. 1344).

() 5«tiQn l030ftheMirine I'rotectiorI. ~.rcn ondSanctuarie!l Act of 1972 (3J US.c. 1413~

2. I.imitI of IhlI authorization.

Page 9: LOS ANG£L£S DISTRICT - United States Army · 3/9/2008  · LOS ANG£L£S DISTRICT U.S. ARMYCORPS OF ENGINEERS DEPARTMENT OF THE ARMY PERMIT Permittee Port of Loo Ange:1et, Enginemng

.. 1hiI ~t dOl'S not obviate the need to obuln other Federal, Sgll!, OJ Ioal authorizations required by l.w_

b. Thi5 permit docs not grant any property righll or c:<dusivc privilegft..

c. Thill permit dOl'S not authorize any Injury to th~ property or righlll of othc!ll.

d, Thi5 permit doe< nut authorize Inter/erena! with any .. xil;ting or proposed Feder.1 proj«t.

3. Umits of Feder.d liability. In issuin3 this permit, the Fed .... al Government d<>e$ not IISSUItle

any liability ~ the following:

a . D.vn.Iga 10 the permitted projc<:r or U5CS ther«>f as a result of other permitted Or unpmnin..-d Ktlvitil'S or from natur.J.l13U51l!S..

b. 0amag1l'S to the permitted prqed or useII thereof as a result of CI.IJTaIt or futu~ Ktlville undetta.ka1 by or on behalf of the Unlted Stalelln the ""blic interest.

Co I>anutp to J"'D""S, property, Or to other ~rmitted or unpermitted ..:tivitil'S or 1\roCttl_ caused by the activity authorized by this permit.

d, Deslgn or construction dclici~ assodated with the permitted work.

~. Dam..a~ dlims asoodated with any future modification. suspension, or revQ<;ati<)n of thb permit.

4. Reliance on Applicant's Data. The detl!rminallm of this office that i~ of thil -pennlt i! not oonlrM)' to the public in_t wu mad .. In reJiann. on the information you provided.

5. Reevaluation of Pnmit Decision. lhI$ officii! may ~te its dC!Cision on !hill prrmit at any time the circumsIanres warnnL ~ that COIlkI require. """,aIwotion include. but are not limited to. the k>llowing:

• . You fail to comply with thelerml and c:onditiont of this permit.

b. The in!ormation provided by you In rupporl of your perm;t application proves \(J have been false. incomplete, Or ina=."·,,te (See 4 .boVll!~

c. Signlflcant new information rurfa.ca whld> thls offiol:! did not consider in ""chin& the original publk interest decision.

Sud> a reo:ov.luation may result in • detcrmlmotlon that it is apprClp..u.te \(J use the suspension, modification. and revoootion prooeduns oontainood In 3J CFR 325.7 or ~t prooedu~ such as a-e wntained in 33 CPR 326.4 and 326.5. The referenoNI .ru0i""'"" ,t prooedurel providoo for the issuance 01. .... admInistRtlve ordn requlring)"JU \(J rompJy with the _ and mnditions of your permit and for the initiation of Io:gaJ action whee .woop. lite. You will be rc:quired 10 pay for anyooooKlive measu~ord...ro by thisoffice.. and if you faillOromply with

,

Page 10: LOS ANG£L£S DISTRICT - United States Army · 3/9/2008  · LOS ANG£L£S DISTRICT U.S. ARMYCORPS OF ENGINEERS DEPARTMENT OF THE ARMY PERMIT Permittee Port of Loo Ange:1et, Enginemng

such directive. tItia offi<:e tnayln omaln sltu~!iOlll (",<:fl. ~ opecified in 33 CfR 209.110) aa:omplish tJy cona1lw measu~ by ront:ract or otherwise ;md bill you for Ihe c;a$l

6. Elctmsions. Gcr>enl condition 1 emblishcl. time limit for the completion 0( the activity authorized by tItia permit Unless there .re drcumstano:s ""luiring either a prompt completion of the .uthorized ICtivity or a «"'Valu~tion of \he public Interest decision, the Corps will normaUy give you favorable ronslderaliott to a request for an e>:b!nsion of tlrls time limit

"

Page 11: LOS ANG£L£S DISTRICT - United States Army · 3/9/2008  · LOS ANG£L£S DISTRICT U.S. ARMYCORPS OF ENGINEERS DEPARTMENT OF THE ARMY PERMIT Permittee Port of Loo Ange:1et, Enginemng

Your sjgna~ below, as permittee, indicates that you accept and agn.>e to rumply ,,~th tho! term. and conditions of t!U:; permit.

DAT I

A"ft:>l1 ic Gioi<.\k, C"',(: H.."\,,,..- ~i'Q'

This permit berome5 effective when the Federal official designated to act for the Secretary of the Anny, \\assigned below_

Aaron O. Allen. PhD Chief, North Coa.t Branch Regulatory Division

When Ihe structures or work authoriud by this permit arc still in existen<:e at the tim<:: the pIoperty is transferred, the terms and oondilions of t:Iili< permit will continue to be binding on the new owner(s) of the property. To validate the transfer of this permitand the assodat.,d Ii.bilities associated with rumpliance with its terms and rondition!l, have the transferee sign and date below.

rnANSFEREE

n

Page 12: LOS ANG£L£S DISTRICT - United States Army · 3/9/2008  · LOS ANG£L£S DISTRICT U.S. ARMYCORPS OF ENGINEERS DEPARTMENT OF THE ARMY PERMIT Permittee Port of Loo Ange:1et, Enginemng

LOS ANGELES DISTRICT U.S. AR,,\-iYCORPS OF ENGINEERS

NOTIFICATION OF COMMENCEME~'T OF WORK FOR

bEPARTMENT OF THE ARMY PERMIT

Permi t Number. SPL -2007-{)1417-SDM Name of Permittee: Port of Los Angtlts, Enginttrmg Dilli5'On

(Anton io Gioiello, Chk/Harber EnSinur) Date of Issuilnee: Stp!tmba 3, 2008

Date work in waters of the U.S. will comme~re~, =============== Estimated construction p"riod (in wffks): Nune« phone of contractor (if any):

Please note that your permitted activity is subject to a compliance inspection by an Army Corps of Engineers repre;entiltive. IT you fail to comply ,,~th thi5 permit you may be subject to permit suspension. modification, or revocation.

I hereby certify that!, and the contractor (if applicable), have read and ag~ to comply with the terms and conditions of the above referenred permit.

Signature of Permittee

At least ten (10) days prior to the commencement 0/ the activity authorized by this permit, sign this =-tlfication and return it using any ONE at the following ~ (3) methods:

OR

OR

(1) E-~lAJL a statement including all the above inforTl\.ltion to: Spencer.D.~tacNeil~ce.army.mil

(2) FAX this certification, after sigl'dng. to: (805) 585-2152

(3) MAIL to the following address:

US. Army Corps of Engineers, Los Angeles District Regulatory DiviSion Ventura Field Office, A TIN: CESPL· RG-SPL·2007 -01 417·SD~1 2151 Alessandro Drive, Suite ! 10 Ventura, California 93001

12

Page 13: LOS ANG£L£S DISTRICT - United States Army · 3/9/2008  · LOS ANG£L£S DISTRICT U.S. ARMYCORPS OF ENGINEERS DEPARTMENT OF THE ARMY PERMIT Permittee Port of Loo Ange:1et, Enginemng

LOS ANGELES DISTRICT US ARMYCORPS OF ENGINEERS

NOTIFICATION OF COMPLETION OF WORK AND CERTIFlCA TION OF COMPLIANCE WITH

DEPARTMENT OF THE ARMY PERMIT

Permit Number: SPL·2007-01417·SDM Name of Permi ttee: Port afLo! Angelt!', Enginl'('ring Division

(AntOllw Gwitlw, Chi4HarOOr Engilll'~) Date of Issu;mce: Sqnnnbn 3, 2008

Date work in wAters of the U.S. rompleted: ================= Construction period (in week~):

Name & ph.me of contractor (if any):

Please note that your permitted activity is subject to a compliance inspection by an Army Corps of Engineers representa tive. If you fail to comply wi th this permit you may be subjKt to permit suspet.5ion, modification, or revOC<Ition.

I hereby certify that the work authorized by the above referenced permit has been completed in accordance with the terms and conditions of said permit.

Signature of Permittee

Upon completion of the activity authorized by this permit, sign this certification and return it using any ONE of the following three (3) methods:

(1) E-MAIL a statement including all the above information to: Spencer.D.Macneil.gusace.army.mil OR

OR (2) FAX this certification, after signing, to: (805) 555-2152

(3) MAIL to the following address:

u.s. Army Corps of Engineers. Los Angeles District Regulatory Divi>ion Ventura Field Office, ATI"N: CESPl-RG-SPl-2007-OJ41i-Sm.i 2151 Alessandro Drive, Suite 110 Ventura, California 93001