DIVISION 26 – ELECTRICAL SYSTEMS Section Title Number Technical Standards Revised 10/01/2015 1 of 34 26 00 00 ELECTRICAL SERVICES 26 05 00 Common Work Results for Electrical 26 05 13 Medium Voltage Cables 26 05 19 Low Voltage Electrical Power Conductors and Cables 26 05 26 Grounding and Bonding for Electrical Systems 26 05 29 Hangers and Supports for Electrical Systems 26 05 33 Raceway and Boxes for Electrical Systems 26 05 36 Cable Trays for Electrical Systems 26 05 43 Underground Ducts and Raceways for Electrical Systems 26 05 53 Identification for Electrical Systems 26 09 00 Instrumentation and Control for Electrical Systems 26 09 13 Electrical Power Monitoring and Control 26 09 43 Network Lighting Controls 26 10 00 MEDIUM VOLTAGE ELECTRICAL DISTRIBUTION 26 20 00 LOW VOLTAGE ELECTRICAL TRANSMISSION 26 22 00 Low Voltage Transformers 26 24 00 Switchboards and Panels 26 24 13 Switchboards 26 24 16 Panelboards 26 25 00 Enclosed Bus Assemblies 26 27 00 Low Voltage Distribution Equipment 26 27 26 Wiring Devices 26 29 00 Low Voltage Controllers 26 29 13 Enclosed Controllers 26 29 23 Variable Frequency Motor Controllers 26 30 00 FACILITY ELECTRICAL POWER GENERATING AND STORING EQUIPMENT 26 32 00 Packaged Generator Assemblies 26 32 13 Engine Generators 26 36 00 Transfer Switches 26 40 00 ELECTRICAL AND CATHODIC PROTECTION 26 41 00 Facility Lightning Protection 26 41 13 Lightning Protection for Structures 26 43 00 Transient Voltage Suppression 26 43 13 Transient Voltage Suppression for LowVoltage Electrical Power Circuits 26 50 00 LIGHTING 26 51 00 Interior Lighting 26 56 00 Exterior Lighting

DIVISION 26 – ELECTRICAL SYSTEMS Section Title Number ... · PDF fileDIVISION 26 – ELECTRICAL SYSTEMS Section Title Number Technical Standards Revised 10/01/2015 1 of 34 26 00

  • View
    213

  • Download
    0

Embed Size (px)

Text of DIVISION 26 – ELECTRICAL SYSTEMS Section Title Number ... · PDF fileDIVISION 26 –...

  • DIVISION 26 ELECTRICAL SYSTEMS Section Title Number

    Technical Standards Revised 10/01/2015

    1 of 34

    260000 ELECTRICALSERVICES260500 CommonWorkResultsforElectrical260513 MediumVoltageCables260519 LowVoltageElectricalPowerConductorsandCables260526 GroundingandBondingforElectricalSystems260529 HangersandSupportsforElectricalSystems260533 RacewayandBoxesforElectricalSystems260536 CableTraysforElectricalSystems260543 UndergroundDuctsandRacewaysforElectricalSystems260553 IdentificationforElectricalSystems260900 InstrumentationandControlforElectricalSystems260913 ElectricalPowerMonitoringandControl260943 NetworkLightingControls261000 MEDIUMVOLTAGEELECTRICALDISTRIBUTION262000 LOWVOLTAGEELECTRICALTRANSMISSION262200 LowVoltageTransformers262400 SwitchboardsandPanels262413 Switchboards262416 Panelboards262500 EnclosedBusAssemblies262700 LowVoltageDistributionEquipment262726 WiringDevices262900 LowVoltageControllers262913 EnclosedControllers262923 VariableFrequencyMotorControllers263000 FACILITYELECTRICALPOWERGENERATINGANDSTORINGEQUIPMENT263200 PackagedGeneratorAssemblies263213 EngineGenerators263600 TransferSwitches264000 ELECTRICALANDCATHODICPROTECTION264100 FacilityLightningProtection264113 LightningProtectionforStructures264300 TransientVoltageSuppression264313 TransientVoltageSuppressionforLowVoltageElectricalPowerCircuits265000 LIGHTING265100 InteriorLighting265600 ExteriorLighting

  • DIVISION 26 ELECTRICAL SYSTEMS Section Title Number

    Technical Standards Revised 10/01/2015

    2 of 34

    260000 PreDesignRequirementsElectrical LoadMonitoring: Investigate the existing electrical service/distributionsystem and determine if sufficient capacity is available to accommodate the newloads.MeterreadingsarerequiredperNEC.ExistingElectrical Installation: Investigateallexistingelectrical installationssuchasexistingconcealedconduit runs,conduit types/sizes,cable types/sizes,panelboardtypes/sizes,electricalequipment locations,etc.,whichpotentially impact thenewinstallation.Compliance with NAU Technical Standards: the Design Professional shall submitthese Technical Standards to the NAU Electrical Shop prior to design anddevelopmentofprojectspecifications,withcomplyornoncomplymarkednexttoeachapplicableprovision.Providejustificationforallnoncomplyprovisions.CalculationsTheDesign Professional shall prepare and submit calculations as required by thetypeofdesignworkperformed.Calculationsshalljustifyorsupportthefollowing:

    Lightingdesigns Sizeofeachconductor Sizeofeachovercurrentprotectivedevice Sizeofeachequipmentbus Sizeofeachtransformer Sizeofeachgeneratorandtransferswitch Settingofeachovercurrentprotectivedevicewithadjustablecharacteristics RequiredPPEtomeetarcflashincidentenergylevels

    ItistheresponsibilityoftheDesignProfessionaltodeterminewhichcalculationsareperformedbytheDESIGNPROFESSIONAL,andwhichcalculationsaretobespecifiedby theDesign Professional and performed by the Contractor. Not all calculationtypeswillberequiredforallprojects. NAUreservestherighttorequestadditionalcalculationstosuittheproject.TheDesignProfessional shall submit the following calculations toNAUduring thedesignprocess:

    Lightingcalculations Faultcurrentcalculations Protectivedevicecoordinationstudy Arcflashcalculations(whennotrequiredtobeperformedbytheContractor) Loadcalculations

  • DIVISION 26 ELECTRICAL SYSTEMS Section Title Number

    Technical Standards Revised 10/01/2015

    3 of 34

    Generatorand/orUPSsizingcalculations Voltagedropcalculations Harmonicdistortioncalculations Lightningprotectionsystemriskanalysis

    FaultCurrentCalculations:Prepareandsubmitcalculationsforallnewprojectsandrenovations toexistingelectricaldistributionsystems. Theavailable faultcurrentsshallbe includedon the riserdiagrams,and shall show theavailable faultcurrent(expressedinamperes,RMSsymmetrical)ateachovercurrentprotectivedeviceandtransformer inthesystem. Supportingcalculations(suchasthoseresultingfromaSKMPowerToolsanalysis)thatjustifythesummaryavailablefaultcurrentsontheriserdiagramsmaybesubmittedseparatelyin8.5x11format.CoordinationStudy:Preparecoordinationcurvestodeterminetherequiredsettingsof overcurrent protective deviceswith adjustable trip characteristics. TheDesignProfessionalshallverifyfieldsettingsattimeofprojectcompletion.ArcFlashCalculations:Perform,orspecify,anarcflashanalysis inaccordancewithIEEE Std 1584a. For each bus analyzed, determine the following: Flash HazardProtection Boundary, Incident Energy Level, Required Personal ProtectiveEquipment Category, Type of Fire Rated Clothing, Limited Approach Boundary,Restricted Approach Boundary, and Prohibited Approach Boundary. Present, orspecifytobesubmitted,thedatadeterminedbytheanalysisinatabularformat,andsubmit,orspecify tobesubmitted, thepreparationofarc flashwarning labels foreachpieceofelectricalequipment, showing the items listedaboveaswellas thedateofissue.LoadCalculations:Prepareandsubmitloadcalculationsthatjustifythesizeofeachbranch circuit and feeder, overcurrent protective device, transformer, andequipment bus (panelboard, switchboard, switchgear, automatic transfer switch,etc.). Calculations shall be performed at all voltage levels. The method ofcalculation, including all applicableNECdiversity factors andnoncoincident loadsandtheiremploymentatvarious levelsoftheelectricalsystem,aswellascapacityreserved for future load, shallbe clearlypresented in thedrawings. Calculationsmaybeinpanelscheduleandswitchboardscheduleformat.ItshallbepossiblefortheNAUreviewertofollowtheloadflowfromthelowestleveltothehighestleveloftheriserdiagrams.GeneratorSizingCalculations: Prepareandsubmitcalculationsthat justifythesizeofeachgenerator, includingall loadsdownstreamof thegenerator set(s)and thesizingimpactsofproposedloadsteps,significantmotorloads,nonlinearloads,andcapacityreservedforfutureloads.

  • DIVISION 26 ELECTRICAL SYSTEMS Section Title Number

    Technical Standards Revised 10/01/2015

    4 of 34

    Voltage Drop Calculations: Prepare and submit calculations demonstratingcompliancewiththefollowingvoltagedroplimits:2%forfeeders,and3%forbranchcircuits,takenatdesignload.Harmonic Analysis: Prepare and submit calculations estimating the voltage andcurrenttotalharmonicdistortion(THD)forbusesrichinnonlinearloads.Usethesecalculationstojustifyactiveorpassivecomponentstomitigateharmonicdistortion.Lighting Calculations: Lighting calculations shall include the room name, roomnumber,fixturetypechosenfortheroom,numberandtypeoflampstobeusedintheroom,requiredilluminationlevel,calculatedilluminationlevel,andlightlossandreflectance assumptions used. Calculations for most interior spaces may beperformed using the zonal cavity method. Perform and submit pointbypointfootcandlelevel calculations for areas of greater architectural or luminoussophistication, and outdoor areas. The Design Professional shall submit exterioroutdoor pointbypoint footcandlelevel calculations and accompanying luminairecutsheets to the Dark Sky Committee for review. Calculations shall includedemonstratedcompliancewithenergyconservationmeasuresandcodes.DesignRequirementsRefertotheCodesandStandardsadoptedbyNAU.

    Sustainability: Provide metering and submetering as required to accomplishmeasurementandverificationgoals. Provideconduitpath(s) from the roof to theelectrical service entrance equipment to facilitate connection of roofmountedphotovoltaicsystems.Performlifecycleanalyseswhererequiredtosupportprojectgoals.Allmaterialsshallbenew,listedbyUnderwritersLaboratories.Electrical equipment spaces shall not be located beneath toilets, showers,laboratories,kitchens,sinks,opencourtyards,planters,roofdrain leaders,orotherareas where water service is provided. Electrical equipment spaces shall bedesigned to allow maintenance equipment access, and to facilitate equipmentreplacementwithoutdemolitionand reconstructionother than removalofadoorcenterpost.The Design Professional shall show electrical equipment footprints andaccompanyingNECworkingclearancesonthedrawings.Providethesameworkingclearancefornonfusedswitchesasisrequiredforfusedswitches.

  • DIVISION 26 ELECTRICAL SYSTEMS Section Title Number

    Technical Standards Revised 10/01/2015

    5 of 34

    Anypipeorductsystemforeigntotheelectrical installationshallnotenterorpassthroughanelectricalequipment space. TheDesignProfessional shallensure thatforeignpipingsuchaswaterpipes,steampipes,medicalgaspipes,sanitarywastepipes,roofdrains,A/Cductsandotherunrelatedpipingsystemscontaining liquidsor gases arenot installedorpass through electrical equipment spaces. Sprinklerpipingshallnotberouted throughelectricalrooms,unless itserves toprotect theelectricalinstallation.Electrical equipment spaces shall have the necessary mechanical ventilation orcooling system to maintain the indoor temperature range required for properoperationoftheequipmentwithinitsULlisting.Electricalequipmentspacesthatcontainfreestandingelectricalequipmentshallbesizedsuchthatsufficientspaceisprovidedtoaddoneadditionalsectiontoeachunitoffreestandingequipment.Provideextendedpadspaceandspareconduitsthatwillfacilitate future installation of equipment and conductors. Spare space shall beindicatedondrawings.Electrical closets shallhave20% sparewall space for future installationof similarelectricalequipment.The Design Professional shall coordinate electrical metering and submeteringrequirements with NAU during design. NAU may wish to submeter separateoccupanciesorareaswithinabuilding.Sustainability: Building electrical service equipment shall have breaker space toacceptconnectionofgridtiedphotovoltaicsystems.InstallationRequirementsAll electrical equipment, disconnects, starters, panels, devices and plates shall beinstalledplumbandtrue.AllelectricalworkshallbeinspectedandapprovedbytheNAUElectricalShoporitsdesigneebeforebeingcovered. AlltestsaretobeobservedbytheNAUElectricalShoporitsdesignee.Any ele