Visual Inspection Pipe Report
Name [Block capitals]_STEVE HUGHES SignatureSE Hughes__Pipe ident__E17_
Code/Specification used(YOUR CODE) Welding p rocessMMA__Joint typeSingle V
Welding position_____2G__Outside and th ickness_219 x 7 mmDate__12 march 03
Pipe Ident__E17___
Weld face
P.T.O. [FOR ROOT]
BA
C
PTO for root
Cap height 3maxCap width 12-15Toe blend smoothHi/lo 0.5mm
Cap height 3Cap width 12-15Toe blend sharpHi/lo 1mm
Cap height 1-4Cap width 12-15Toe blend sharpHi/lo 0.5mm
Cap height 3mmCap width 12-14Toe blend sharpHi/lo 0.5mm
5
25
15
5 35 To5
5 50
Undercut1mm sharp
Undercut1mm sharp
UndercutIntermittent2mm sharp
Undercutintermittent1mm sharp
Pores (x3) UndercutIntermittent1mm sharp
Arcstrike
Grinding marks< 0.5 smooth
Stop/startSmooth0.5 high
67
103
0
1656015138
75 100
5
3 7 5
4
5
3
7 5 575 90
15465
60 70 020 30
Arc strikeArc strike
Arc strike
Arc strikes
D
Undercut0.5 sharp
Undercut1mmsharp
Undercut
8/13/2019 Appendix 3Example Report E17
2/3
WELD INSPECTION REPORT/SENTENCE SHEET
Sheet 3 of 3
Pipe root face
A
C
B
D
Penetration height 0.5 - 4Penetration widthToe blend poorHi/lo 1mm
Penetration height 0 -1Penetration widthToe blend smoothHi/lo 0.5mm
Penetration height 0 - 2Penetration widthToe blend smoothHi/lo 0.5mm
Penetration height 0 - 4Penetration widthToe blend poorHi/lo 1mm
20
10
To C
52
To A13
3
Burnthrough (cont)
Burnthrough
Slag inclusion
Concavity0 5mm
Concavity