96
CHAPTER 3 APPENDIX Appendix 3.1 List of Work Specialisation for Contractors Registration in CIDB Malaysia 160 Appendix 3.2 Numbers of Local Contractors Registered by State and Grade in 2013 and 2014 162 Appendix 3.3 Sijil Perolehan Kerja Kerajaan (SPKK) Awarded to Contractor by Grade in 2013 and 2014 163 Appendix 3.4 Monthly Average Price of Construction Materials in Malaysia in 2013 and 2014 164 Appendix 3.5 Monthly Average Price for Diesel in Malaysia in 2013 and 2014 165 Appendix 3.6 Monthly Average Price for Cement in Malaysia (RM/bag) in 2013 and 2014 166 Appendix 3.7 Monthly Average Price for Aggregate in Malaysia (RM/tonne) in 2013 and 2014 167 Appendix 3.8 Monthly Average Price for Sand in Malaysia (RM/tonne) in 2013 and 2014 168 Appendix 3.9 Monthly Average Price for Steel Bar in Malaysia (RM/tonne) in 2013 and 2014 169 Lampiran 3.10 Monthly Average Price for Ready Mixed Concrete in Malaysia (RM/per m³) in 2013 and 2014 170 Appendix 3.11 Monthly Average Price for Reinforcement Iron Mesh A10 (BRCA A10) in Malaysia (RM/per m²) in 2013 and 2014 171 Appendix 3.12 PMonthly Average Price for Bricks in Malaysia (RM/per unit) in 2013 and 2014 172 Appendix 3.13 Average Daily Wage Rates for Skilled Local Machine Operators in Peninsular Malaysia in 2013 and 2014 (RM/day) 173 Appendix 3.14 Average Daily Wage Rates for Semi-Skilled Local Machine Operators in Peninsular Malaysia in 2013 and 2014 (RM/day) 175 Appendix 3.15 Average Daily Wage Rates for Skilled Local Machine Operators in Sabah in 2013 and 2014 (RM/day) 177

CHAPTER 3 APPENDIX - Goverment Documents · CHAPTER 3 APPENDIX Appendix 3.16 ... E17 Kabel bawah tanah voltan rendah E35 Grid berkapasiti melebihi 72KW E18 Kabel bawah tanah …

Embed Size (px)

Citation preview

Page 1: CHAPTER 3 APPENDIX - Goverment Documents · CHAPTER 3 APPENDIX Appendix 3.16 ... E17 Kabel bawah tanah voltan rendah E35 Grid berkapasiti melebihi 72KW E18 Kabel bawah tanah …

CHAPTER 3 APPENDIX

Appendix 3.1 List of Work Specialisation for Contractors Registration in CIDB Malaysia 160

Appendix 3.2 Numbers of Local Contractors Registered by State and Grade in 2013 and 2014 162

Appendix 3.3 Sijil Perolehan Kerja Kerajaan (SPKK) Awarded to Contractor by Grade in 2013 and 2014 163

Appendix 3.4 Monthly Average Price of Construction Materials in Malaysia in 2013 and 2014 164

Appendix 3.5 Monthly Average Price for Diesel in Malaysia in 2013 and 2014 165

Appendix 3.6 Monthly Average Price for Cement in Malaysia (RM/bag) in 2013 and 2014 166

Appendix 3.7 Monthly Average Price for Aggregate in Malaysia (RM/tonne) in 2013 and 2014 167

Appendix 3.8 Monthly Average Price for Sand in Malaysia (RM/tonne) in 2013 and 2014 168

Appendix 3.9 Monthly Average Price for Steel Bar in Malaysia (RM/tonne) in 2013 and 2014 169

Lampiran 3.10 Monthly Average Price for Ready Mixed Concrete in Malaysia (RM/per m³) in 2013 and 2014 170

Appendix 3.11 Monthly Average Price for Reinforcement Iron Mesh A10 (BRCA A10) in Malaysia (RM/per m²) in 2013 and 2014 171

Appendix 3.12 PMonthly Average Price for Bricks in Malaysia (RM/per unit) in 2013 and 2014 172

Appendix 3.13 Average Daily Wage Rates for Skilled Local Machine Operators in Peninsular Malaysia in 2013 and 2014 (RM/day) 173

Appendix 3.14 Average Daily Wage Rates for Semi-Skilled Local Machine Operators in Peninsular Malaysia in 2013 and 2014 (RM/day) 175

Appendix 3.15 Average Daily Wage Rates for Skilled Local Machine Operators in Sabah in 2013 and 2014 (RM/day) 177

Page 2: CHAPTER 3 APPENDIX - Goverment Documents · CHAPTER 3 APPENDIX Appendix 3.16 ... E17 Kabel bawah tanah voltan rendah E35 Grid berkapasiti melebihi 72KW E18 Kabel bawah tanah …

CHAPTER 3 APPENDIX

Appendix 3.16 Average Daily Wage Rates for Semi-Skilled Local Machine Operators in Sabah in 2013 and 2014 (RM/day) 179

Appendix 3.17 Average Daily Wage Rates for Local Machine Operators in Sarawak in 2013 and 2014 (RM/day) 181

Appendix 3.18 Average Daily Wage Rates for Semi-Skilled Local Machine Operators in Sarawak in 2013 and 2014 (RM/day) 183

Appendix 3.19 Average Daily Wage Rates for Skilled Local Construction Workers in Peninsular Malaysia in 2013 and 2014 (RM/day) 185

Appendix 3.20 Average Daily Wage Rates for Semi-Skilled Local Construction Workers in Peninsular Malaysia in 2013 and 2014 (RM/day) 188

Appendix 3.21 Average Daily Wage Rates for Skilled Local Construction Workers in 2013 and 2014 (RM/day) 191

Appendix 3.22 Average Daily Wage Rates for Semi-Skilled Local Construction Workers in Sabah in 2013 and 2014 (RM/day) 194

Appendix 3.23 Average Daily Wage Rates for Skilled Local Construction Workers in Sarawak in 2013 and 2014 (RM/day) 197

Appendix 3.24 PAverage Daily Wage Rates for Semi-Skilled Local Construction Workers in Sarawak in 2013 and 2014 (RM/day) 200

Appendix 3.25 Average Daily Wage Rates for IBS Component Installers in Peninsular Malaysia in 2013 and 2014 (RM/day) 203

Appendix 3.26 Average Daily Wage Rates for Skilled Foreign Machine Operators in Peninsular Malaysia in 2013 and 2014 (RM/day) 204

Appendix 3.27 Average Daily Wage Rates for Semi-Skilled Foreign Machine Operators in Peninsular Malaysia in 2013 and 2014 (RM/day) 206

Page 3: CHAPTER 3 APPENDIX - Goverment Documents · CHAPTER 3 APPENDIX Appendix 3.16 ... E17 Kabel bawah tanah voltan rendah E35 Grid berkapasiti melebihi 72KW E18 Kabel bawah tanah …

CHAPTER 3 APPENDIX

Appendix 3.28 Average Daily Wage Rates for Skilled Foreign Machine Operators in Sabah in 2013 and 2014 (RM/day) 208

Appendix 3.29 Average Daily Wage Rates for Semi-Skilled Foreign Machine Operator in Sabah in 2013 and 2014 (RM/day) 210

Appendix 3.30 Average Daily Wage Rates for Skilled Foreign Machine Operator in Sarawak in 2013 and 2014 (RM/day) 212

Appendix 3.31 Average Daily Wage Rates for Semi-Skilled Foreign Machine Operator in Sarawak in 2013 and 2014 (RM/day) 214

Appendix 3.32 Average Daily Wage Rates for Skilled Foreign Construction Workers in Peninsular Malaysia in 2013 and 2014 (RM/day) 216

Appendix 3.33 Average Daily Wage Rates for Semi-Skilled Foreign Construction Workers in Peninsular Malaysia in 2013 and 2014 (RM/day) 219

Appendix 3.34 Average Daily Wage Rates for Skilled Foreign Construction Workers in Sabah in 2013 and 2014 (RM/day) 222

Appendix 3.35 Average Daily Wage Rates for Semi-Skilled Foreign Construction Workers in Sabah in 2013 and 2014 (RM/day) 225

Appendix 3.36 Average Daily Wage for Skilled Foreign Construction Workers in Sarawak in 2013 and 2014 (RM/day) 228

Appendix 3.37 Average Daily Wage for Semi-Skilled Foreign Construction Workers in Sarawak in 2013 and 2014 (RM/day) 231

Appendix 3.38 Average Daily Rental Rates for Major Machineries in Peninsular Malaysia in 2013 and 2014 (RM/unit) 234

Appendix 3.39 Average Monthly Rental Rates for Major Machineries in Peninsular Malaysia in 2013 and 2014 (RM/unit) 236

Page 4: CHAPTER 3 APPENDIX - Goverment Documents · CHAPTER 3 APPENDIX Appendix 3.16 ... E17 Kabel bawah tanah voltan rendah E35 Grid berkapasiti melebihi 72KW E18 Kabel bawah tanah …

CHAPTER 3 APPENDIX

Appendix 3.40 Average Daily Rental Rates for Major Machineries in Sabah and Sarawak in 2013 and 2014 (RM/unit) 238

Appendix 3.41 Average Cost for Building Material Index by Building Category and Region in Peninsular Malaysia in 2013 and 2014 (July 2012 = 100) 240

Appendix 3.42 Average Cost for Building Material Index by Building Category and Region in Sabah in 2013 and 2014 (July 2012 = 100) 241

Appendix 3.43 Average Cost for Building Material Index by Building Category and Region in Sarawak in 2013 and 2014 (July 2012 = 100) 241

Appendix 3.44 Average Cost Index for a Unit of Construction Materials by Region in Peninsular Malaysia in 2013 and 2014 (July 2012 = 100) 242

Appendix 3.45 Average Cost Index for a Unit of Construction Materials by Major City in Sabah in 2013 and 2014 (July 2012 = 100) 243

Appendix 3.46 Average Cost Index for a Unit of Construction Materials by Major City in Sarawak in 2013 and 2014 (July 2012 = 100) 243

Appendix 3.47 Average Cost Index for Construction Materials by Building Category and Region in Peninsular Malaysia in 2013 and 2014 (July 2012 = 100) 244

Appendix 3.48 Average Cost Index for Construction Materials by Building Category and Major City in Sabah in 2013 and 2014 (July 2012 = 100) 244

Appendix 3.49 Average Average Cost Index for Construction Materials by Building Category and Region in Sarawak in 2013 and 2014 (July 2012 = 100) 245

Appendix 3.50 Average Cost Index for a Construction Workers by Region in Peninsular Malaysia in 2013 and 2014 (July 2012 = 100) 245

Page 5: CHAPTER 3 APPENDIX - Goverment Documents · CHAPTER 3 APPENDIX Appendix 3.16 ... E17 Kabel bawah tanah voltan rendah E35 Grid berkapasiti melebihi 72KW E18 Kabel bawah tanah …

CHAPTER 3 APPENDIX

Appendix 3.51 Average Cost Index for a Construction Workers by Major City in Sabah in 2013 and 2014 (July 2012 = 100) 246

Appendix 3.52 Average Cost Index for a Construction Workers by Major City in Sarawak in 2013 and 2014 (July 2012 = 100) 246

Appendix 3.53 Average Cost Index for a Construction Workers by Building Category and Region in Peninsular Malaysia in 2013 and 2014 (July 2012 = 100) 247

Appendix 3.54 Average Cost Index for a Construction Workers by Building Category and Major City in Sabah in 2013 and 2014 (July 2012 = 100) 247

Appendix 3.55 Average Cost Index for a Construction Workers by Building Category and Major City in Sarawak in 2013 and 2014 (July 2012 = 100) 248

Appendix 3.56 Average Cost Index for a Unit of Machinery by Region in Peninsular Malaysia in 2013 and 2014 (July 2012 = 100) 248

Appendix 3.57 PAverage Cost Index for a Unit of Machinery by Major City in Sabah in 2013 and 2014 (July 2012 = 100) 249

Appendix 3.58 Average Cost Index for a Unit of Machinery by Major City in Sarawak in 2013 and 2014 (July 2012 = 100) 249

Appendix 3.59 Average Cost Index for a Unit of Machinery by Building Category and Region in Peninsular Malaysia in 2013 and 2014 (July 2012 = 100) 250

Appendix 3.60 Average Cost Index for a Unit of Machinery by Building Category and Major City in Sabah in 2013 and 2014 (July 2012 = 100) 250

Appendix 3.61 Average Cost Index for a Unit of Machinery by Building Category and Major City in Sarawak in 2013 and 2014 (July 2012 = 100) 250

Page 6: CHAPTER 3 APPENDIX - Goverment Documents · CHAPTER 3 APPENDIX Appendix 3.16 ... E17 Kabel bawah tanah voltan rendah E35 Grid berkapasiti melebihi 72KW E18 Kabel bawah tanah …

STATISTICS AND CONSTRUCTION DEMAND 2015-2016

CHAPTER 3 APPENDIX

160

Appendix 3.1 List of Work Specialisation for Contractors Registration in CIDB Malaysia

Specialisation Category Building (B)

B01 IBS: Prefabricated buildings and industrial plant B15 Roof installation and metal cladding works

B02 IBS: Steel framed buildings and industrial plant B16 Swimming pool construction and system

B03 Restoration and conservation B17 Pressurising & post-tensioning works

B04 General building works & maintenance B18 Metal works

B05 Piling works B19 IBS: System formwork

B06 Concrete repairs B20 Installation of gas pipe in building

B07 Interior design/decoration B21 Scaffolding installation

B08 Water proofing installation B22 IBS: System block

B09 Landscaping B23 IBS: Sistem kerangka kayu

B10 Plumbing B24 Building maintenance

B11 Sign craft installation B25 Connection of private pipeline to the sewerage system

B12 Aluminium/metal & glazing works B26 Demolition works

B13 Tiling and plastering works B27 Maintenance services of water supply systems or sewerage

B14 Painting B28 Various work

Specialisation Category Civil Engineering (CE)

CE01 Road and pavement construction CE20 Water supply system

CE02 Bridge construction CE21 General civil engineering works

CE03 Marine structures CE22 Synthetic track and playing fields

CE04 Dam CE23 Pressurising and post-tensioning works

CE05 Tunnelling and underpinning CE24 Civil engineering structures

CE06 Irrigation and flood control systems CE25 Rock blasting works

CE07 Railway tracks CE26 Sculptured structures

CE08 Slope protection systems CE27 Thermal insulation/refectory works

CE09 Oil or gas pipe lines CE28 Specialised formwork systems

CE10 Piling works CE29 Scaffolding installation

CE11 Concrete repairs CE30 Soil stabilisation works, underground drainage

CE12 Soil investigation works CE31 Civil engineering works telecommunications

CE13 Sign craft installation CE32 Maintenance of civil engineering work

CE14 Landscaping CE33 Drilling for underground water

CE15 Offshore construction works CE34 Installation of pre-cast concrete work

CE16 Underwater construction works & maintenance CE35 Concrete test

CE17 Airports CE36 Earthworks

CE18 Reclamation works CE37 Works chimney power station

CE19 Sewerage system

Page 7: CHAPTER 3 APPENDIX - Goverment Documents · CHAPTER 3 APPENDIX Appendix 3.16 ... E17 Kabel bawah tanah voltan rendah E35 Grid berkapasiti melebihi 72KW E18 Kabel bawah tanah …

STATISTICS AND CONSTRUCTION DEMAND 2015-2016

CHAPTER 3 APPENDIX

161

Specialisation Category Mechanical (ME)

M01 Air conditioning and ventilation system M13 Drilling rig

M02 Fire protection system M14 Pollution control system

M03 Lifts and escalators M15 Miscellaneous mechanical equipment

M04 Building automation systems M16 Tower crane

M05 Works, mill, quarry and etc. M17 Laundry equipment

M06 Medical equipment M18 Hot water system

M07 Kitchen equipment M19 Installation of plant equipment

M08 Heat recovery system M20 General maintenance of mechanical

M09 Compressor and mechanical based generator M21 Kerja-kerja kimpalan

M10 Chiller for power generation M22 Sistem pam

M11 Specialized fabrication and treatment M23 Sistem SCADA dan telemetri

M12 Specialised plant

Specialisation Category Electrical (ME)

E01 Sound systems E19 Kabel bawah tanah voltan tinggi melebihi 11KV sehingga 33KV

E02 Surveillance and security systems E20 Kabel bawah tanah voltan tinggi melebihi 33KV

E03 Building automation system and energy generation systems E21 Talian atas voltan rendah Kabel talian atas voltan tinggi

Sehingga 33KV

E04 Low voltage installation E22 Kabel talian atas voltan tinggi Melebihi 33kv

E05 High voltage installation E23 Pemasangan voltan tinggi melebihi 11 KV sehingga 33 KV

E06 Specialized lighting systems E24 Pemasangan voltan tinggi Melebihi 33 KV

E07 Internal telecommunications system E25 Kerja-kerja mencantum kabel voltan rendah 1KV

E08 External telecommunication systems E26 Kerja-kerja mencantum kabel Sehingga 11 KV

E09 Miscellaneous specialized equipment E27 Kerja-kerja mencantum kabel melebihi 11KV sehingga 33KV

E10 Specialized control panels E28 Kerja-kerja mencantum kabel 33KV sehingga 66KV

E11 General electrical works E29 Kerja-kerja mencantum kabel sehingga 132KV

E12 Electrical signboard E30 Kerja-kerja mencantum kabel Tiada sekatan melebihi 132KV

E13 Railway telecommunications system E31 Janakuasa voltan rendah

E14 Computer cable network E32 Janakuasa voltan tinggi Sehingga 33KV

E15 Lampu landasan lapangan terbang E33 Sistem solar fotovolta (photovoltic) tersambung grid yang

berkapasiti sehingga 72KW

E16 Lampu jalan dan lampu isyarat E34 Sistem solar fotovolta (photovoltaic)tersambung

E17 Kabel bawah tanah voltan rendah E35 Grid berkapasiti melebihi 72KW

E18 Kabel bawah tanah voltan tinggi sehingga 11KV

Page 8: CHAPTER 3 APPENDIX - Goverment Documents · CHAPTER 3 APPENDIX Appendix 3.16 ... E17 Kabel bawah tanah voltan rendah E35 Grid berkapasiti melebihi 72KW E18 Kabel bawah tanah …

STATISTICS AND CONSTRUCTION DEMAND 2015-2016

CHAPTER 3 APPENDIX

162

Appe

ndix

3.2

Num

bers

of L

ocal

Con

trac

tors

Reg

iste

red

by S

tate

and

Gra

de in

201

3 an

d 20

14

Stat

eTo

tal

Gra

de

G1

G2

G3

G4

G5

G6

G7

2013

2014

2013

2014

2013

2014

2013

2014

2013

2014

2013

2014

2013

2014

2013

2014

Joho

r6,

540

6,54

03,

111

2,99

11,

173

1,26

81,

079

1,08

333

233

433

834

313

112

537

639

6

Keda

h3,

528

3,56

92,

208

2,16

151

761

530

230

197

9714

913

861

5619

420

1

Kela

ntan

3,26

83,

271

2,18

92,

147

391

505

252

224

8785

141

118

7461

134

131

Mel

aka

2,21

32,

222

1,10

31,

073

358

398

338

332

131

133

110

114

4343

130

129

Neg

eri S

embi

lan

3,33

23,

289

2,02

61,

944

552

606

326

341

122

113

149

133

5250

105

102

Paha

ng3,

843

3,83

12,

270

2,22

958

164

443

141

019

319

616

016

362

5714

613

2

Pera

k4,

437

4,54

22,

622

2,58

568

176

549

150

719

920

520

824

094

8814

215

2

Perli

s1,

183

1,15

393

389

711

713

254

4818

1728

269

624

27

Pula

u Pi

nang

3,38

93,

334

1,39

41,

349

485

497

673

634

177

166

236

232

9010

433

435

2

Saba

h9,

674

10,0

446,

724

6,88

51,

272

1,47

878

376

014

515

021

121

179

7846

048

2

Sara

wak

3,48

53,

797

1,64

71,

768

638

728

355

412

151

164

168

179

102

8742

445

9

Sela

ngor

10,7

7311

,039

4,31

24,

091

1,36

91,

514

1,93

51,

999

705

709

942

1,03

232

835

51,

182

1,33

9

Tere

ngga

nu3,

744

3,83

22,

328

2,30

445

557

529

829

815

615

222

022

010

497

183

186

W.P

Kua

la L

umpu

r7,

263

7,37

01,

618

1,56

767

971

61,

508

1,52

652

557

21,

070

1,13

836

532

11,

498

1,53

0

Tota

l66

,672

67,8

3334

,485

33,9

919,

268

10,4

418,

825

8,87

53,

038

3,09

34,

130

4,28

71,

594

1,52

85,

332

5,61

8

Page 9: CHAPTER 3 APPENDIX - Goverment Documents · CHAPTER 3 APPENDIX Appendix 3.16 ... E17 Kabel bawah tanah voltan rendah E35 Grid berkapasiti melebihi 72KW E18 Kabel bawah tanah …

STATISTICS AND CONSTRUCTION DEMAND 2015-2016

CHAPTER 3 APPENDIX

163

Appe

ndix

3.3

Si

jil P

erol

ehan

Ker

ja K

eraj

aan

(SPK

K) A

war

ded

to C

ontr

acto

r by

Gra

de in

201

3 an

d 20

14

Stat

eTo

tal

G1

G2

G3

G4

G5

G6

G7

2013

2014

2013

2014

2013

2014

2013

2014

2013

2014

2013

2014

2013

2014

2013

2014

Joho

r4,

286

4,13

92,

566

2,44

770

271

230

429

622

721

517

917

072

6823

623

1

Keda

h2,

991

2,85

32,

034

1,92

038

339

815

713

777

7210

797

5954

174

175

Kela

ntan

3,11

82,

987

2,12

31,

985

342

397

199

176

8981

137

127

6965

159

156

Mel

aka

1,68

91,

624

1,03

498

223

623

813

213

010

493

6661

2628

9192

Neg

eri S

embi

lan

2,87

52,

758

1,89

51,

799

481

487

178

170

9080

102

9836

3593

89

Paha

ng3,

103

3,07

82,

060

2,02

038

742

521

320

714

213

712

311

553

5112

512

3

Pera

k3,

491

3,36

42,

464

2,36

942

642

720

018

112

611

812

012

059

5496

95

Perli

s1,

185

1,12

492

086

912

312

047

4418

1832

319

736

35

Pula

u Pi

nang

1,96

41,

880

1,18

41,

117

236

240

146

140

8077

7772

5654

185

180

Saba

h3,

423

3,01

22,

011

1,65

245

444

733

931

185

8710

810

154

4837

236

6

Sara

wak

2,00

21,

977

874

790

429

492

121

124

8583

8681

6161

346

346

Sela

ngor

8,36

68,

006

4,05

63,

734

971

1,01

781

279

845

547

357

253

326

725

81,

233

1,19

3

Tere

ngga

nu3,

532

3,55

02,

248

2,21

037

446

121

921

815

014

623

221

810

510

220

419

5

W.P

Kua

la L

umpu

r4,

101

3,92

41,

553

1,422

330

341

382

378

252

261

398

371

176

163

1,01

098

8

Tota

l46

,126

44,2

7627

,022

25,3

165,

874

6,20

23,

449

3,31

01,

980

1,94

12,

339

2,19

51,

102

1,04

84,

360

4,26

4

Page 10: CHAPTER 3 APPENDIX - Goverment Documents · CHAPTER 3 APPENDIX Appendix 3.16 ... E17 Kabel bawah tanah voltan rendah E35 Grid berkapasiti melebihi 72KW E18 Kabel bawah tanah …

STATISTICS AND CONSTRUCTION DEMAND 2015-2016

CHAPTER 3 APPENDIX

164

Appendix 3.4 Monthly Average Price of Construction Materials in Malaysia in 2013 and 2014

Month

Major Construction Materials (RM)

Cement/bag

Aggregate/tonne

Sand/tonne

Steel Bars/100kg

Ready-Mixed Concrete/m3

BRC A10/m²

Bricks/100 unit

Jan. 2013 17.03 29.61 19.00 242.02 221.30 17.08 39.00

Feb. 17.03 29.79 19.00 245.29 221.30 16.70 38.75

Mar. 17.03 29.79 19.00 246.05 221.30 16.86 38.75

Apr. 17.04 29.79 19.00 247.70 221.30 16.86 38.75

May 17.04 29.92 19.00 247.76 221.30 16.88 38.75

Jun. 17.10 29.92 19.00 245.63 221.30 16.88 38.75

Jul. 17.11 29.92 19.00 246.80 221.30 16.83 38.63

Aug. 17.13 29.92 19.00 245.92 221.30 16.83 38.75

Sep. 17.16 29.92 19.00 243.82 221.30 16.83 38.75

Oct. 17.18 29.92 19.00 244.30 221.30 16.79 39.13

Nov. 17.18 29.92 19.00 242.25 221.30 16.79 39.13

Dec. 17.18 29.92 19.00 241.03 221.30 16.65 38.88

Jan. 2014 17.69 36.46 30.25 237.25 210.67 17.02 40.38

Feb. 17.69 36.71 30.50 236.67 210.63 17.07 40.25

Mar. 18.84 37.42 31.04 235.45 210.75 17.07 40.25

Apr. 18.84 38.00 31.29 234.13 211.00 17.06 40.25

May 18.84 38.69 31.75 232.46 211.00 17.07 40.25

Jun. 18.84 38.73 32.09 219.54 211.21 17.04 40.50

Jul. 18.84 39.08 32.43 220.28 211.46 17.11 40.50

Aug. 18.38 39.67 32.96 219.10 210.63 17.16 40.50

Sep. 18.25 38.50 33.08 218.10 210.83 17.14 40.50

Oct. 18.17 38.63 33.87 216.74 212.17 17.14 40.63

Nov. 18.10 38.25 33.71 215.37 212.42 17.14 40.88

Dec. 18.19 38.62 34.13 215.46 212.42 17.18 40.88

Page 11: CHAPTER 3 APPENDIX - Goverment Documents · CHAPTER 3 APPENDIX Appendix 3.16 ... E17 Kabel bawah tanah voltan rendah E35 Grid berkapasiti melebihi 72KW E18 Kabel bawah tanah …

STATISTICS AND CONSTRUCTION DEMAND 2015-2016

CHAPTER 3 APPENDIX

165

Appendix 3.5 Monthly Average Price for Diesel in Malaysia in 2013 and 2014

MonthPrice (RM / liter)

Peninsular Sabah Sarawak Average

Jan. 2013 2.68 2.67 2.66 2.67

Feb. 2.85 2.84 2.83 2.84

Mar. 2.67 2.66 2.65 2.66

Apr. 2.49 2.48 2.45 2.47

May 2.46 2.46 2.45 2.46

Jun. 2.46 2.46 2.45 2.46

Jul. 2.61 2.60 2.60 2.60

Aug. 2.73 2.72 2.71 2.72

Sep. 2.81 2.80 2.80 2.80

Oct. 2.81 2.80 2.80 2.80

Nov. 2.73 2.72 2.71 2.72

Dec. 2.73 2.72 2.71 2.72

Jan. 2014 2.73 2.72 2.71 2.72

Feb. 2.73 2.72 2.71 2.72

Mar. 2.77 2.76 2.75 2.76

Apr. 2.77 2.76 2.75 2.76

May 2.74 2.73 2.72 2.73

Jun. 2.71 2.71 2.70 2.71

Jul. 2.71 2.71 2.70 2.71

Aug. 2.59 2.58 2.58 2.58

Sep. 2.59 2.58 2.58 2.58

Oct. 2.32 2.31 2.31 2.31

Nov. 2.32 2.31 2.31 2.31

Dec. 2.23 2.23 2.23 2.23

Source: Special Release 1, Peninsular Malaysia (For Civil Engineering Works), Mac 2015, Department of Statistic Malaysia. Special Release 1, Sabah and Sarawak (For Civil Engineering Works), Mac 2015, Department of Statistic Malaysia.

Page 12: CHAPTER 3 APPENDIX - Goverment Documents · CHAPTER 3 APPENDIX Appendix 3.16 ... E17 Kabel bawah tanah voltan rendah E35 Grid berkapasiti melebihi 72KW E18 Kabel bawah tanah …

STATISTICS AND CONSTRUCTION DEMAND 2015-2016

CHAPTER 3 APPENDIX

166

Appendix 3.6 Monthly Average Price for Cement in Malaysia (RM/bag) in 2013 and 2014

Month

Peninsular Sabah Sarawak

Average Northern Region

Central Region

Eastern Region

Southern Region

AverageKota

KinabaluKuching

Jan. 2013 16.42 16.75 17.44 17.35 16.99 17.50 16.95 17.03

Feb. 16.42 16.75 17.44 17.35 16.99 17.50 16.95 17.03

Mar. 16.42 16.75 17.44 17.35 16.99 17.50 16.95 17.03

Apr. 16.42 16.85 17.44 17.35 17.01 17.50 16.95 17.04

May 16.42 16.85 17.44 17.35 17.01 17.50 16.95 17.04

Jun. 16.42 16.85 17.44 17.76 17.12 17.50 16.95 17.10

Jul. 16.42 16.85 17.44 17.91 17.15 17.50 16.95 17.11

Aug. 16.42 17.00 17.44 17.91 17.19 17.50 16.95 17.13

Sep. 16.42 17.25 17.44 17.91 17.25 17.50 16.95 17.16

Oct. 16.42 17.25 17.44 18.00 17.16 17.50 16.95 17.18

Nov. 16.42 17.25 17.44 18.05 17.17 17.50 16.95 17.18

Dec. 16.42 17.25 17.44 17.95 17.15 17.59 16.95 17.18

Jan. 2014 18.00 17.75 17.65 18.00 17.84 17.50 17.00 17.69

Feb. 18.00 17.75 17.65 18.00 17.84 17.50 17.00 17.69

Mar. 19.00 19.25 18.25 19.50 18.88 19.00 18.50 18.84

Apr. 19.00 19.25 18.25 19.50 18.88 19.00 18.50 18.84

May 19.00 19.25 18.25 19.50 18.88 19.00 18.50 18.84

Jun. 19.00 19.25 18.25 19.50 18.88 19.00 18.50 18.84

Jul. 19.00 19.25 18.25 19.50 18.88 19.00 18.50 18.84

Aug. 18.25 19.00 18.00 19.50 18.50 18.00 18.00 18.38

Sep. 18.25 18.00 18.00 19.50 18.33 18.00 18.00 18.25

Oct. 18.25 17.00 18.25 19.83 18.31 18.00 17.50 18.17

Nov. 18.00 17.00 18.25 19.83 18.22 18.00 17.50 18.10

Dec. 17.50 17.00 18.50 20.00 18.17 19.00 17.50 18.19

Note: Data Covers Major States Only: Northern Region: Perak and Pulau Pinang; Central Region: Selangor; Eastern Region: Kelantan and Pahang; Southern Region: Johor.

Page 13: CHAPTER 3 APPENDIX - Goverment Documents · CHAPTER 3 APPENDIX Appendix 3.16 ... E17 Kabel bawah tanah voltan rendah E35 Grid berkapasiti melebihi 72KW E18 Kabel bawah tanah …

STATISTICS AND CONSTRUCTION DEMAND 2015-2016

CHAPTER 3 APPENDIX

167

Appendix 3.7 Monthly Average Price for Aggregate in Malaysia (RM/tonne) in 2013 and 2014

Month

Peninsular Sabah Sarawak

Average Northern Region

Central Region

Eastern Region

Southern Region

AverageKota

KinabaluKuching

Jan. 2013 23.34 24.50 24.84 23.00 23.97 57.00 36.00 29.61

Feb. 23.34 26.00 24.84 23.00 24.22 57.00 36.00 29.79

Mar. 23.34 26.00 24.84 23.00 24.22 57.00 36.00 29.79

Apr. 23.34 26.00 24.84 23.00 24.22 57.00 36.00 29.79

May 23.34 27.00 24.84 23.00 24.39 57.00 36.00 29.92

Jun. 23.34 27.00 24.84 23.00 24.39 57.00 36.00 29.92

Jul. 23.34 27.00 24.84 23.00 24.39 57.00 36.00 29.92

Aug. 23.34 27.00 24.84 23.00 24.39 57.00 36.00 29.92

Sep. 23.34 27.00 24.84 23.00 24.39 57.00 36.00 29.92

Oct. 23.34 27.00 24.84 23.00 24.39 57.00 36.00 29.92

Nov. 23.34 27.00 24.84 23.00 24.39 57.00 36.00 29.92

Dec. 23.34 27.00 24.84 23.00 24.39 57.00 36.00 29.92

Jan. 2014 31.84 43.33 27.33 33.00 32.44 58.00 39.00 36.46

Feb. 32.17 43.33 27.67 33.67 32.78 58.00 39.00 36.71

Mar. 33.50 45.33 28.00 34.00 33.72 58.00 39.00 37.42

Apr. 33.67 48.00 28.34 34.67 34.45 58.33 39.00 38.00

May 34.50 50.00 29.33 34.67 35.39 58.17 39.00 38.69

Jun. 35.17 50.00 29.50 35.33 35.78 58.50 36.67 38.73

Jul. 35.67 50.33 30.00 35.67 36.22 58.67 36.67 39.08

Aug. 36.67 51.00 30.67 36.33 37.00 58.67 36.67 39.67

Sep. 36.67 41.67 30.67 36.33 35.44 58.67 36.67 38.50

Oct. 37.33 40.00 31.34 36.33 35.61 58.67 36.67 38.63

Nov. 37.33 40.00 31.34 36.33 35.61 55.67 36.67 38.25

Dec. 37.67 40.33 31.67 37.00 36.00 55.67 37.33 38.62

Note: Data Covers Major States Only: Northern Region: Perak and Pulau Pinang; Central Region: Selangor; Eastern Region: Kelantan and Pahang; Southern Region: Johor.

Page 14: CHAPTER 3 APPENDIX - Goverment Documents · CHAPTER 3 APPENDIX Appendix 3.16 ... E17 Kabel bawah tanah voltan rendah E35 Grid berkapasiti melebihi 72KW E18 Kabel bawah tanah …

STATISTICS AND CONSTRUCTION DEMAND 2015-2016

CHAPTER 3 APPENDIX

168

Appendix 3.8 Monthly Average Price for Sand in Malaysia (RM/tonne) in 2013 and 2014

Month

Peninsular Sabah Sarawak

Average Northern Region

Central Region

Eastern Region

Southern Region

AverageKota

KinabaluKuching

Jan. 2013 12.00 21.00 9.84 15.50 13.36 38.80 33.00 19.00

Feb. 12.00 21.00 9.84 15.50 13.36 38.80 33.00 19.00

Mar. 12.00 21.00 9.84 15.50 13.36 38.80 33.00 19.00

Apr. 12.00 21.00 9.84 15.50 13.36 38.80 33.00 19.00

May 12.00 21.00 9.84 15.50 13.36 38.80 33.00 19.00

Jun. 12.00 21.00 9.84 15.50 13.36 38.80 33.00 19.00

Jul. 12.00 21.00 9.84 15.50 13.36 38.80 33.00 19.00

Aug. 12.00 21.00 9.84 15.50 13.36 38.80 33.00 19.00

Sep. 12.00 21.00 9.84 15.50 13.36 38.80 33.00 19.00

Oct. 12.00 21.00 9.84 15.50 13.36 38.80 33.00 19.00

Nov. 12.00 21.00 9.84 15.50 13.36 38.80 33.00 19.00

Dec. 12.00 21.00 9.84 15.50 13.36 38.80 33.00 19.00

Jan. 2014 26.50 35.00 22.67 35.00 28.06 38.00 35.67 30.25

Feb. 26.67 35.67 22.84 35.67 28.39 38.00 35.67 30.50

Mar. 28.00 36.00 23.00 36.00 29.00 38.33 36.00 31.04

Apr. 28.17 36.67 23.17 36.67 29.33 38.33 36.00 31.29

May 28.84 36.67 24.33 36.67 29.95 38.33 36.00 31.75

Jun. 29.34 37.73 24.50 37.33 30.46 39.33 34.67 32.09

Jul. 29.50 37.73 25.17 37.67 30.79 40.00 34.67 32.43

Aug. 30.34 38.33 25.84 38.33 31.50 40.00 34.67 32.96

Sep. 30.34 38.33 26.17 38.33 31.61 43.33 31.67 33.08

Oct. 31.50 38.33 27.67 38.33 32.50 46.33 29.67 33.87

Nov. 32.17 38.33 27.67 38.33 32.72 43.67 29.67 33.71

Dec. 32.67 39.00 28.00 39.00 33.22 43.67 30.00 34.13

Note: Data Covers Major States Only: Northern Region: Perak and Pulau Pinang; Central Region: Selangor; Eastern Region: Kelantan and Pahang; Southern Region: Johor.

Page 15: CHAPTER 3 APPENDIX - Goverment Documents · CHAPTER 3 APPENDIX Appendix 3.16 ... E17 Kabel bawah tanah voltan rendah E35 Grid berkapasiti melebihi 72KW E18 Kabel bawah tanah …

STATISTICS AND CONSTRUCTION DEMAND 2015-2016

CHAPTER 3 APPENDIX

169

Appendix 3.9 Monthly Average Price for Steel Bar in Malaysia (RM/tonne) in 2013 and 2014

Month

Peninsular Sabah Sarawak

Average Northern Region

Central Region

Eastern Region

Southern Region

AverageKota

KinabaluKuching

Jan. 2013 2,380.51 2,216.67 2,398.15 2,340.42 2,352.40 2,624.69 2,622.22 2,420.17

Feb. 2,507.69 2,222.22 2,398.15 2,326.27 2,393.36 2,624.69 2,638.33 2,452.90

Mar. 2,488.47 2,296.67 2,398.15 2,333.12 2,400.50 2,640.13 2,641.11 2,460.53

Apr. 2,518.85 2,296.67 2,398.15 2,375.51 2,417.70 2,665.75 2,643.89 2,476.98

May 2,520.77 2,296.67 2,398.15 2,376.73 2,418.54 2,665.75 2,643.89 2,477.61

Jun. 2,451.80 2,296.67 2,398.15 2,363.38 2,393.32 2,653.00 2,637.41 2,456.29

Jul. 2,525.26 2,296.67 2,398.15 2,309.70 2,408.86 2,653.00 2,637.78 2,468.00

Aug. 2,458.59 2,296.67 2,398.15 2,309.70 2,386.64 2,623.81 2,729.72 2,459.17

Sep. 2,392.44 2,296.67 2,398.15 2,288.01 2,360.98 2,623.81 2,716.02 2,438.21

Oct. 2,425.26 2,132.22 2,441.26 2,288.01 2,358.88 2,621.88 2,769.17 2,443.04

Nov. 2,343.15 2,132.22 2,441.26 2,288.01 2,331.51 2,621.88 2,769.17 2,422.51

Dec. 2,290.98 2,132.22 2,441.26 2,306.16 2,317.14 2,610.50 2,769.17 2,410.32

Jan. 2014 2,241.67 2,311.11 2,363.89 2,350.00 2,312.04 2,585.93 2,522.22 2,372.55

Feb. 2,242.17 2,311.11 2,355.56 2,350.00 2,309.43 2,571.11 2,505.56 2,366.65

Mar. 2,233.33 2,338.89 2,355.56 2,250.00 2,294.44 2,563.70 2,505.56 2,354.49

Apr. 2,233.34 2,305.56 2,313.89 2,250.00 2,275.00 2,574.81 2,505.56 2,341.30

May 2,241.67 2,288.89 2,247.23 2,250.00 2,252.78 2,574.81 2,505.56 2,324.63

Jun. 2,110.00 2,162.96 2,141.67 2,094.44 2,126.79 2,447.04 2,355.56 2,195.42

Jul. 2,133.33 2,185.19 2,186.11 2,094.44 2,153.09 2,394.44 2,309.26 2,202.78

Aug. 2,149.17 2,201.85 2,186.11 2,094.44 2,161.14 2,294.44 2,266.67 2,190.99

Sep. 2,133.33 2,153.70 2,194.45 2,111.11 2,153.39 2,261.11 2,266.67 2,181.02

Oct. 2,133.33 2,127.78 2,186.11 2,127.78 2,149.07 2,211.11 2,233.33 2,167.36

Nov. 2,130.56 2,124.07 2,161.11 2,111.11 2,136.42 2,194.44 2,216.67 2,153.70

Dec. 2,103.71 2,118.52 2,169.44 2,144.44 2,134.88 2,194.44 2,233.33 2,154.63

Note: Data Covers Major States Only: Northern Region: Perak and Pulau Pinang; Central Region: Selangor; Eastern Region: Kelantan and Pahang; Southern Region: Johor.

Page 16: CHAPTER 3 APPENDIX - Goverment Documents · CHAPTER 3 APPENDIX Appendix 3.16 ... E17 Kabel bawah tanah voltan rendah E35 Grid berkapasiti melebihi 72KW E18 Kabel bawah tanah …

STATISTICS AND CONSTRUCTION DEMAND 2015-2016

CHAPTER 3 APPENDIX

170

Appendix 3.10 Monthly Average Price for Ready Mixed Concrete in Malaysia (RM/per m³) in 2013 and 2014

Month

Peninsular Sabah Sarawak

Average Northern Region

Central Region

Eastern Region

Southern Region

AverageKota

KinabaluKuching

Jan. 2013 201.39 204.63 204.85 199.00 202.68 288.33 266.00 221.30

Feb. 201.39 204.63 204.85 199.00 202.68 288.33 266.00 221.30

Mar. 201.39 204.63 204.85 199.00 202.68 288.33 266.00 221.30

Apr. 201.39 204.63 204.85 199.00 202.68 288.33 266.00 221.30

May 201.39 204.63 204.85 199.00 202.68 288.33 266.00 221.30

Jun. 201.39 204.63 204.85 199.00 202.68 288.33 266.00 221.30

Jul. 201.39 204.63 204.85 199.00 202.68 288.33 266.00 221.30

Aug. 201.39 204.63 204.85 199.00 202.68 288.33 266.00 221.30

Sep. 201.39 204.63 204.85 199.00 202.68 288.33 266.00 221.30

Oct. 201.39 204.63 204.85 199.00 202.68 288.33 266.00 221.30

Nov. 201.39 204.63 204.85 199.00 202.68 288.33 266.00 221.30

Dec. 201.39 204.63 204.85 199.00 202.68 288.33 266.00 221.30

Jan. 2014 190.00 193.00 187.67 193.33 190.28 300.00 243.67 210.67

Feb. 190.34 193.00 188.00 193.33 190.50 298.33 243.67 210.63

Mar. 190.50 193.00 189.17 193.33 190.94 296.67 243.67 210.75

Apr. 190.67 193.00 189.17 193.33 191.00 298.33 243.67 211.00

May 190.67 193.00 189.17 193.33 191.00 298.33 243.67 211.00

Jun. 190.67 193.00 189.17 195.00 191.28 298.33 243.67 211.21

Jul. 191.67 193.00 189.17 195.00 191.61 298.33 243.67 211.46

Aug. 190.00 193.00 189.17 195.00 191.06 295.00 243.67 210.63

Sep. 190.00 193.00 190.00 195.00 191.33 295.00 243.67 210.83

Oct. 190.34 193.00 192.50 195.00 192.28 300.00 243.67 212.17

Nov. 190.34 193.00 194.17 195.00 192.83 300.00 242.33 212.42

Dec. 190.34 193.00 194.17 195.00 192.83 300.00 242.33 212.42

Note: Data Covers Major States Only: Northern Region: Perak and Pulau Pinang; Central Region: Selangor; Eastern Region: Kelantan and Pahang; Southern Region: Johor.

Page 17: CHAPTER 3 APPENDIX - Goverment Documents · CHAPTER 3 APPENDIX Appendix 3.16 ... E17 Kabel bawah tanah voltan rendah E35 Grid berkapasiti melebihi 72KW E18 Kabel bawah tanah …

STATISTICS AND CONSTRUCTION DEMAND 2015-2016

CHAPTER 3 APPENDIX

171

Appendix 3.11 Monthly Average Price for Reinforcement Iron Mesh A10 (BRCA A10) in Malaysia (RM/per m²) in 2013 and 2014

Month

Peninsular Sabah Sarawak

Average Northern Region

Central Region

Eastern Region

Southern Region

AverageKota

KinabaluKuching

Jan. 2013 15.97 16.00 17.77 16.64 16.69 17.51 19.00 17.08

Feb. 15.97 13.00 17.77 16.64 16.19 17.51 19.00 16.70

Mar. 16.21 13.75 17.77 16.64 16.39 17.51 19.00 16.86

Apr. 16.21 13.75 17.77 16.64 16.39 17.51 19.00 16.86

May 16.21 13.75 17.77 16.64 16.39 17.72 19.00 16.88

Jun. 16.21 13.75 17.77 16.64 16.39 17.72 19.00 16.88

Jul. 16.01 13.75 17.77 16.64 16.32 17.72 19.00 16.83

Aug. 16.01 13.75 17.77 16.64 16.32 17.72 19.00 16.83

Sep. 16.01 13.75 17.77 16.64 16.32 17.72 19.00 16.83

Oct. 15.84 13.75 17.77 16.64 16.27 17.72 19.00 16.79

Nov. 15.84 13.75 17.77 16.64 16.27 17.72 19.00 16.79

Dec. 15.84 13.75 17.77 15.49 16.08 17.72 19.00 16.65

Jan. 2014 16.13 13.43 17.77 16.00 16.21 17.83 21.10 17.02

Feb. 16.30 13.43 17.80 16.00 16.27 17.83 21.10 17.07

Mar. 16.33 13.43 17.77 16.00 16.27 17.83 21.10 17.07

Apr. 16.33 13.43 17.72 16.00 16.25 17.83 21.10 17.06

May 16.33 13.43 17.75 16.00 16.27 17.83 21.10 17.07

Jun. 16.33 13.43 17.75 15.83 16.24 17.83 21.10 17.04

Jul. 16.59 13.43 17.75 15.83 16.32 17.83 21.10 17.11

Aug. 16.59 13.83 17.75 15.83 16.39 17.83 21.10 17.16

Sep. 16.59 13.83 17.75 15.83 16.39 17.67 21.10 17.14

Oct. 16.59 13.83 17.75 15.83 16.39 17.67 21.10 17.14

Nov. 16.59 13.83 17.75 15.83 16.39 17.67 21.10 17.14

Dec. 16.59 14.00 17.84 15.83 16.45 17.67 21.10 17.18

Note: Data Covers Major States Only: Northern Region: Perak and Pulau Pinang; Central Region: Selangor; Eastern Region: Kelantan and Pahang; Southern Region: Johor.

Page 18: CHAPTER 3 APPENDIX - Goverment Documents · CHAPTER 3 APPENDIX Appendix 3.16 ... E17 Kabel bawah tanah voltan rendah E35 Grid berkapasiti melebihi 72KW E18 Kabel bawah tanah …

STATISTICS AND CONSTRUCTION DEMAND 2015-2016

CHAPTER 3 APPENDIX

172

Appendix 3.12 Monthly Average Price for Bricks in Malaysia (RM/per unit) in 2013 and 2014

Month

Peninsular Sabah Sarawak

Average Northern Region

Central Region

Eastern Region

Southern Region

AverageKota

KinabaluKuching

Jan. 2013 0.38 0.37 0.44 0.40 0.40 0.35 0.37 0.39

Feb. 0.38 0.35 0.44 0.40 0.40 0.35 0.37 0.39

Mar. 0.38 0.35 0.44 0.40 0.40 0.35 0.37 0.39

Apr. 0.38 0.35 0.44 0.40 0.40 0.35 0.37 0.39

May 0.38 0.35 0.44 0.40 0.40 0.35 0.37 0.39

Jun. 0.38 0.35 0.44 0.40 0.40 0.35 0.37 0.39

Jul. 0.38 0.35 0.44 0.40 0.40 0.35 0.37 0.39

Aug. 0.38 0.35 0.44 0.40 0.40 0.35 0.37 0.39

Sep. 0.38 0.35 0.44 0.40 0.40 0.35 0.37 0.39

Oct. 0.40 0.35 0.44 0.40 0.40 0.35 0.37 0.39

Nov. 0.40 0.35 0.44 0.40 0.40 0.35 0.37 0.39

Dec. 0.39 0.35 0.44 0.39 0.40 0.35 0.37 0.39

Jan. 2014 0.40 0.40 0.44 0.41 0.41 0.35 0.40 0.40

Feb. 0.40 0.40 0.44 0.41 0.41 0.35 0.40 0.40

Mar. 0.40 0.40 0.44 0.41 0.41 0.35 0.40 0.40

Apr. 0.40 0.40 0.44 0.41 0.41 0.35 0.40 0.40

May 0.40 0.40 0.44 0.41 0.41 0.35 0.40 0.40

Jun. 0.40 0.40 0.45 0.41 0.42 0.35 0.40 0.41

Jul. 0.40 0.40 0.45 0.41 0.42 0.35 0.40 0.41

Aug. 0.40 0.40 0.45 0.41 0.42 0.35 0.40 0.41

Sep. 0.40 0.40 0.45 0.41 0.42 0.35 0.40 0.41

Oct. 0.40 0.40 0.45 0.41 0.42 0.35 0.40 0.41

Nov. 0.40 0.40 0.45 0.41 0.42 0.37 0.40 0.41

Dec. 0.40 0.40 0.45 0.41 0.42 0.37 0.40 0.41

Note: Data Covers Major States Only: Northern Region: Perak and Pulau Pinang; Central Region: Selangor; Eastern Region: Kelantan and Pahang; Southern Region: Johor.

Page 19: CHAPTER 3 APPENDIX - Goverment Documents · CHAPTER 3 APPENDIX Appendix 3.16 ... E17 Kabel bawah tanah voltan rendah E35 Grid berkapasiti melebihi 72KW E18 Kabel bawah tanah …

STATISTICS AND CONSTRUCTION DEMAND 2015-2016

CHAPTER 3 APPENDIX

173

Appe

ndix

3.1

3 A

vera

ge D

aily

Wag

e R

ates

for S

kille

d Lo

cal M

achi

ne O

pera

tors

in P

enin

sula

r Mal

aysi

a in

201

3 an

d 20

14 (R

M/d

ay) (

1)

Wor

ker C

ateg

ory

Min

imum

/ M

axim

um

Wag

es

Year

Cha

nge

(%)

2013

2014

Cent

ral

Regi

onNo

rther

n Re

gion

Easte

rn

Regi

onSo

uthe

rn

Regi

onAv

erag

eCe

ntra

l Re

gion

North

ern

Regi

onEa

stern

Re

gion

Sout

hern

Re

gion

Aver

age

Cent

ral

Regi

onNo

rther

n Re

gion

Easte

rn

Regi

onSo

uthe

rn

Regi

onAv

erag

e

Exca

vato

r Ope

rato

rs

Min

imum

60.0

080

.00

70.0

070

.00

70.0

057

.00

50.0

057

.69

57.0

055

.42

-5.0

-37.

5-1

7.6-1

8.6

-20.

8

Max

imum

150.

0015

0.00

110.

0013

0.00

135.

0018

0.00

140.

0011

0.00

150.

0014

5.00

20.0

-6.7

0.0

15.4

7.4

Com

mon

106.

4810

1.97

93.5

096

.13

99.5

211

2.68

101.4

294

.14

95.3

110

0.89

5.8

-0.5

0.7

-0.9

1.4

Pile

Rig

ger

Min

imum

60.0

075

.00

71.0

075

.00

70.2

560

.00

60.0

073

.00

75.0

067

.00

0.0

-20.

02.

80.

0-4

.6

Max

imum

140.

0014

5.00

120.

0011

5.00

130.

0015

0.00

145.

0012

0.00

160.

0014

3.75

7.1

0.0

0.0

39.1

10.6

Com

mon

103.

4097

.53

88.7

890

.31

95.0

111

1.08

102.

1789

.86

93.3

399

.11

7.44.

81.

23.

34.

3

Off-

Road

Tru

ck O

pera

tors

Min

imum

60.0

065

.00

60.0

070

.00

63.7

560

.00

60.0

040

.00

80.0

060

.00

0.0

-7.7

-33.

314

.3-5

.9

Max

imum

150.

0014

0.00

93.0

010

5.00

122.

0015

0.00

140.

0096

.00

120.

0012

6.50

0.0

0.0

3.2

14.3

3.7

Com

mon

96.3

392

.11

80.3

188

.13

89.2

210

5.00

93.7

280

.33

92.1

192

.79

9.0

1.7

0.0

4.5

4.0

Back

hoe

Load

er

Ope

rato

rs

Min

imum

50.0

075

.00

70.0

065

.00

65.0

050

.00

80.0

064

.54

71.0

066

.39

0.0

6.7

-7.8

9.2

2.1

Max

imum

145.

0015

0.00

100.

0012

5.00

130.

0015

0.00

150.

0011

5.00

125.

0013

5.00

3.4

0.0

15.0

0.0

3.8

Com

mon

100.

7897

.22

88.2

291

.72

94.4

910

3.05

100.

8989

.15

92.1

796

.32

2.3

3.8

1.1

0.5

1.9

Rolle

r Ope

rato

rs

Min

imum

50.0

065

.00

55.0

065

.00

58.7

555

.00

70.0

055

.00

65.0

061

.25

10.0

7.70.

00.

04.

3

Max

imum

135.

0013

5.00

91.0

013

5.00

124.

0015

0.00

135.

0097

.50

135.

0012

9.38

11.1

0.0

7.1

0.0

4.3

Com

mon

101.

1390

.50

81.6

189

.44

90.6

710

8.43

93.6

383

.03

91.0

194

.03

7.2

3.5

1.7

1.8

3.7

Rolle

r/C

ompa

ctor

O

pera

tors

Min

imum

50.0

070

.00

50.0

070

.00

60.0

038

.00

70.0

031

.00

38.0

044

.25

-24.

00.

0-3

8.0

-45.

7-2

6.3

Max

imum

130.

0013

5.00

100.

0010

0.00

116.

2515

0.00

135.

0010

6.50

100.

0012

2.88

15.4

0.0

6.5

0.0

5.7

Com

mon

100.

3595

.28

84.5

386

.19

91.5

910

0.80

97.6

084

.72

85.6

792

.20

0.4

2.4

0.2

-0.6

0.7

Scap

per O

pera

tors

Min

imum

50.0

060

.00

60.0

070

.00

60.0

040

.00

65.0

060

.00

70.0

058

.75

-20.

08.

30.

00.

0-2

.1

Max

imum

120.

0011

5.00

115.

0013

0.00

120.

0015

0.00

120.

0011

5.00

130.

0012

8.75

25.0

4.3

0.0

0.0

7.3

Com

mon

100.

2091

.33

90.2

898

.26

95.0

210

4.28

95.6

993

.56

94.4

797

.00

4.1

4.8

3.6

-3.9

2.1

Mot

or G

rade

r Ope

rato

rs

Min

imum

60.0

060

.00

80.0

075

.00

68.7

560

.00

70.0

063

.46

70.0

065

.87

0.0

16.7

-20.

7-6

.7-4

.2

Max

imum

150.

0012

0.00

110.

0012

5.00

126.

2515

0.00

125.

0011

0.00

125.

0012

7.50

0.0

4.2

0.0

0.0

1.0

Com

mon

101.

8591

.61

90.6

796

.39

95.1

310

5.16

98.8

192

.43

94.2

697

.67

3.2

7.9

1.9

-2.2

2.7

Page 20: CHAPTER 3 APPENDIX - Goverment Documents · CHAPTER 3 APPENDIX Appendix 3.16 ... E17 Kabel bawah tanah voltan rendah E35 Grid berkapasiti melebihi 72KW E18 Kabel bawah tanah …

STATISTICS AND CONSTRUCTION DEMAND 2015-2016

CHAPTER 3 APPENDIX

174

Wor

ker C

ateg

ory

Min

imum

/ M

axim

um

Wag

es

Year

Cha

nge

(%)

2013

2014

Cent

ral

Regi

onNo

rther

n Re

gion

Easte

rn

Regi

onSo

uthe

rn

Regi

onAv

erag

eCe

ntra

l Re

gion

North

ern

Regi

onEa

stern

Re

gion

Sout

hern

Re

gion

Aver

age

Cent

ral

Regi

onNo

rther

n Re

gion

Easte

rn

Regi

onSo

uthe

rn

Regi

onAv

erag

e

Whe

el L

oade

r Ope

rato

rs

Min

imum

55.0

075

.00

60.0

060

.00

62.5

055

.00

75.0

065

.00

60.0

063

.75

0.0

0.0

8.3

0.0

2.0

Max

imum

150.

0016

5.00

100.

0011

5.00

132.

5015

0.00

165.

0010

2.50

115.

0013

3.13

0.0

0.0

2.5

0.0

0.5

Com

mon

102.

0310

1.60

86.3

687

.19

94.3

011

0.20

103.

1889

.55

88.6

197

.89

8.0

1.6

3.7

1.6

3.8

Pave

r Ope

rato

rs

Min

imum

60.0

080

.00

75.0

065

.00

70.0

070

.00

80.0

078

.00

65.0

073

.25

16.7

0.0

4.0

0.0

4.6

Max

imum

150.

0014

0.00

120.

0010

8.00

129.

5015

0.00

140.

0011

5.00

113.

5012

9.63

0.0

0.0

-4.2

5.1

0.1

Com

mon

103.

7397

.39

96.1

193

.53

97.6

910

9.55

100.

9499

.20

93.5

810

0.82

5.6

3.6

3.2

0.1

3.2

Mob

ile C

rane

Ope

rato

rs

Min

imum

80.0

080

.00

85.0

090

.00

83.7

590

.00

80.0

076

.92

89.0

083

.98

12.5

0.0

-9.5

-1.1

0.3

Max

imum

150.

0018

0.00

122.

0013

2.00

146.

0031

0.00

170.

0012

5.00

150.

0018

8.75

106.

7-5

.62.

513

.629

.3

Com

mon

116.

0511

3.44

101.

5011

0.44

110.

3614

3.23

121.

5010

2.58

116.

3612

0.92

23.4

7.1

1.1

5.4

9.6

Cra

wle

r Cra

ne O

pera

tors

Min

imum

85.0

080

.00

90.0

090

.00

86.2

585

.00

80.0

092

.00

89.0

086

.50

0.0

0.0

2.2

-1.1

0.3

Max

imum

140.

0015

0.00

160.

0013

1.00

145.

2518

0.00

161.

0016

0.00

138.

5015

9.88

28.6

7.3

0.0

5.7

10.1

Com

mon

113.

8310

8.00

108.

9211

0.17

110.

2312

9.08

115.

2811

1.03

110.

3911

6.45

13.4

6.7

1.9

0.2

5.6

Tow

er C

rane

Ope

rato

rs

Min

imum

80.0

080

.00

100.

0010

3.00

90.7

569

.00

80.0

096

.15

84.0

082

.29

-13.

80.

0-3

.8-1

8.4

-9.3

Max

imum

180.

0016

5.00

145.

0020

0.00

172.

5021

0.00

165.

0014

5.00

200.

0018

0.00

16.7

0.0

0.0

0.0

4.3

Com

mon

120.

4012

3.31

116.

1712

9.47

122.

3413

0.63

126.

7811

6.48

122.

0612

3.99

8.5

2.8

0.3

-5.7

1.3

Fork

lift O

pera

tors

Min

imum

60.0

065

.00

80.0

055

.00

65.0

058

.00

70.0

070

.00

55.0

063

.25

-3.3

7.7-1

2.5

0.0

-2.7

Max

imum

115.

0012

0.00

120.

0010

0.00

113.

7515

0.00

120.

0012

0.00

115.

0012

6.25

30.4

0.0

0.0

15.0

11.0

Com

mon

85.9

590

.06

92.5

083

.71

88.0

691

.60

92.3

192

.86

84.7

590

.38

6.6

2.5

0.4

1.2

2.6

Slin

ger /

Dog

ger

Min

imum

60.0

070

.00

80.0

055

.00

66.2

555

.00

70.0

070

.00

55.0

062

.50

-8.3

0.0

-12.

50.

0-5

.7

Max

imum

115.

0012

5.00

125.

0011

0.00

118.

7515

0.00

125.

0012

5.00

120.

0013

0.00

30.4

0.0

0.0

9.1

9.5

Com

mon

86.2

392

.83

92.9

285

.50

89.3

79.

0395

.25

93.5

885

.17

70.7

6-8

9.5

2.6

0.7

-0.4

-20.

8

Not

e:

Dat

a C

over

s:

Cen

tral

Reg

ion:

Per

ak, S

elan

gor a

nd K

uala

Lum

pur

N

orth

ern

Regi

on: K

edah

and

Pul

au P

inan

g

East

ern

Regi

on: P

ahan

g, K

elan

tan

and

Tere

ngga

nu

Sout

hern

Reg

ion:

Neg

eri S

embi

lan,

Mel

aka

and

Joho

r

Appe

ndix

3.1

3 A

vera

ge D

aily

Wag

e R

ates

for S

kille

d Lo

cal M

achi

ne O

pera

tors

in P

enin

sula

r Mal

aysi

a in

201

3 an

d 20

14 (R

M/d

ay) (

2)

Page 21: CHAPTER 3 APPENDIX - Goverment Documents · CHAPTER 3 APPENDIX Appendix 3.16 ... E17 Kabel bawah tanah voltan rendah E35 Grid berkapasiti melebihi 72KW E18 Kabel bawah tanah …

STATISTICS AND CONSTRUCTION DEMAND 2015-2016

CHAPTER 3 APPENDIX

175

Appe

ndix

3.1

4 A

vera

ge D

aily

Wag

e R

ates

for S

emi-

Skill

ed L

ocal

Mac

hine

Ope

rato

rs in

Pen

insu

lar M

alay

sia

in 2

013

and

2014

(RM

/day

) (1)

Wor

ker C

ateg

ory

Min

imum

/ M

axim

um

Wag

es

Year

Cha

nge

(%)

2013

2014

Cent

ral

Regi

onNo

rther

n Re

gion

Easte

rn

Regi

onSo

uthe

rn

Regi

onAv

erag

eCe

ntra

l Re

gion

North

ern

Regi

onEa

stern

Re

gion

Sout

hern

Re

gion

Aver

age

Cent

ral

Regi

onNo

rther

n Re

gion

Easte

rn

Regi

onSo

uthe

rn

Regi

onAv

erag

e

Exca

vato

r Ope

rato

rs

Min

imum

--

--

--

--

--

--

--

-

Max

imum

--

--

--

--

--

--

--

-

Com

mon

--

--

--

--

--

--

--

-

Pile

Rig

ger

Min

imum

50.0

050

.00

55.0

055

.00

52.5

050

.00

50.0

060

.00

55.0

053

.75

0.0

0.0

9.1

0.0

2.4

Max

imum

100.

0013

0.00

90.0

095

.00

103.

7513

0.00

130.

0090

.00

100.

0011

2.50

30.0

0.0

0.0

5.3

8.4

Com

mon

71.2

378

.36

73.6

171

.20

73.6

085

.00

85.2

876

.08

74.3

980

.19

19.3

8.8

3.4

4.5

9.0

Off-

Road

Tru

ck O

pera

tors

Min

imum

40.0

050

.00

45.0

050

.00

46.2

545

.00

50.0

032

.00

55.0

045

.50

12.5

0.0

-28.

910

.0-1

.6

Max

imum

140.

0010

0.00

80.0

080

.00

100.

0014

0.00

110.

0079

.00

100.

0010

7.25

0.0

10.0

-1.3

25.0

7.3

Com

mon

71.4

072

.53

66.3

364

.88

68.7

977

.95

78.5

666

.89

72.6

674

.02

9.2

8.3

0.8

12.0

7.6

Back

hoe

Load

er

Ope

rato

rs

Min

imum

--

--

--

--

--

--

--

-

Max

imum

--

--

--

--

--

--

--

-

Com

mon

--

--

--

--

--

--

--

-

Rolle

r Ope

rato

rs

Min

imum

45.0

055

.00

45.0

050

.00

48.7

548

.00

60.0

050

.00

50.0

052

.00

6.7

9.1

11.1

0.0

6.7

Max

imum

95.0

010

0.00

84.0

080

.00

89.7

510

0.00

95.0

088

.50

85.0

092

.13

5.3

-5.0

5.4

6.3

2.6

Com

mon

70.1

571

.22

68.8

965

.76

69.0

177

.20

73.9

971

.17

68.7

372

.77

10.0

3.9

3.3

4.5

5.5

Rolle

r/C

ompa

ctor

O

pera

tors

Min

imum

45.0

050

.00

50.0

045

.00

47.5

030

.00

55.0

025

.00

30.0

035

.00

-33.

310

.0-5

0.0

-33.

3-2

6.3

Max

imum

100.

0010

0.00

89.0

075

.00

91.0

010

0.00

100.

0093

.50

80.0

093

.38

0.0

0.0

5.1

6.7

2.6

Com

mon

70.9

074

.53

72.6

763

.69

70.4

573

.80

76.8

873

.22

64.4

772

.09

4.1

3.2

0.8

1.2

2.3

Scap

per O

pera

tors

Min

imum

45.0

055

.00

45.0

050

.00

48.7

534

.00

55.0

045

.00

50.0

046

.00

-24.

40.

00.

00.

0-5

.6

Max

imum

90.0

096

.00

91.0

087

.00

91.0

010

0.00

100.

0094

.50

92.5

096

.75

11.1

4.2

3.8

6.3

6.3

Com

mon

69.0

076

.67

74.8

172

.94

73.3

673

.93

78.3

277

.72

73.3

675

.83

7.1

2.2

3.9

0.6

3.4

Mot

or G

rade

r Ope

rato

rs

Min

imum

--

--

--

--

--

--

--

-

Max

imum

--

--

--

--

--

--

--

-

Com

mon

--

--

--

--

--

--

--

-

Whe

el L

oade

r Ope

rato

rs

Min

imum

50.0

050

.00

50.0

050

.00

50.0

050

.00

50.0

055

.00

50.0

051

.25

0.0

0.0

10.0

0.0

2.5

Max

imum

95.0

011

0.00

84.0

090

.00

94.7

510

0.00

110.

0088

.50

90.0

097

.13

5.3

0.0

5.4

0.0

2.5

Com

mon

71.1

777

.91

71.8

670

.50

72.8

677

.86

80.1

774

.22

71.3

175

.89

9.4

2.9

3.3

1.1

4.2

Page 22: CHAPTER 3 APPENDIX - Goverment Documents · CHAPTER 3 APPENDIX Appendix 3.16 ... E17 Kabel bawah tanah voltan rendah E35 Grid berkapasiti melebihi 72KW E18 Kabel bawah tanah …

STATISTICS AND CONSTRUCTION DEMAND 2015-2016

CHAPTER 3 APPENDIX

176

Wor

ker C

ateg

ory

Min

imum

/ M

axim

um

Wag

es

Year

Cha

nge

(%)

2013

2014

Cent

ral

Regi

onNo

rther

n Re

gion

Easte

rn

Regi

onSo

uthe

rn

Regi

onAv

erag

eCe

ntra

l Re

gion

North

ern

Regi

onEa

stern

Re

gion

Sout

hern

Re

gion

Aver

age

Cent

ral

Regi

onNo

rther

n Re

gion

Easte

rn

Regi

onSo

uthe

rn

Regi

onAv

erag

e

Pave

r Ope

rato

rs

Min

imum

45.0

050

.00

60.0

045

.00

50.0

045

.00

50.0

065

.00

45.0

051

.25

0.0

0.0

8.3

0.0

2.5

Max

imum

115.

0010

0.00

97.0

090

.00

100.

5011

5.00

100.

0010

0.00

94.0

010

2.25

0.0

0.0

3.1

4.4

1.7

Com

mon

72.1

375

.69

78.7

569

.22

73.9

578

.25

79.0

081

.67

70.8

377

.44

8.5

4.4

3.7

2.3

4.7

Mob

ile C

rane

Ope

rato

rs

Min

imum

50.0

055

.00

71.0

060

.00

59.0

050

.00

55.0

073

.00

60.0

059

.50

0.0

0.0

2.8

0.0

0.8

Max

imum

105.

0016

5.00

108.

0010

1.00

119.

7525

5.00

140.

0011

2.50

105.

0015

3.13

142.

9-1

5.2

4.2

4.0

27.9

Com

mon

71.9

487

.41

84.6

180

.53

81.1

299

.20

94.4

489

.92

84.3

891

.99

37.9

8.0

6.3

4.8

13.4

Cra

wle

r Cra

ne O

pera

tors

Min

imum

54.0

060

.00

60.0

060

.00

58.5

054

.00

60.0

065

.00

60.0

059

.75

0.0

0.0

8.3

0.0

2.1

Max

imum

125.

0011

0.00

100.

0010

4.00

109.

7514

7.00

121.

0010

5.40

108.

0012

0.35

17.6

10.0

5.4

3.8

9.7

Com

mon

77.1

583

.16

81.1

482

.58

81.0

192

.13

91.3

184

.33

86.1

188

.47

19.4

9.8

3.9

4.3

9.2

Tow

er C

rane

Ope

rato

rs

Min

imum

50.0

060

.00

89.0

075

.00

68.5

050

.00

65.0

075

.00

60.0

062

.50

0.0

8.3

-15.

7-2

0.0

-8.8

Max

imum

135.

0013

0.00

115.

0014

0.00

130.

0015

0.00

130.

0011

5.00

140.

0013

3.75

11.1

0.0

0.0

0.0

2.9

Com

mon

75.0

590

.41

97.5

095

.42

89.6

092

.38

97.2

798

.14

91.8

194

.90

23.1

7.60.

7-3

.85.

9

Fork

lift O

pera

tors

Min

imum

45.0

050

.00

70.0

045

.00

52.5

045

.00

55.0

072

.00

45.0

054

.25

0.0

10.0

2.9

0.0

3.3

Max

imum

80.0

095

.00

94.0

080

.00

87.2

510

0.00

105.

0097

.00

81.5

095

.88

25.0

10.5

3.2

1.9

9.9

Com

mon

60.6

371

.86

80.2

863

.19

68.9

968

.58

76.6

982

.31

63.7

672

.84

13.1

6.7

2.5

0.9

5.6

Slin

ger /

Dog

ger

Min

imum

40.0

050

.00

55.0

045

.00

47.5

050

.00

50.0

060

.00

45.0

051

.25

25.0

0.0

9.1

0.0

7.9

Max

imum

80.0

010

0.00

90.0

085

.00

88.7

510

0.00

100.

0093

.00

87.5

095

.13

25.0

0.0

3.3

2.9

7.2

Com

mon

61.3

074

.81

76.3

368

.92

70.3

468

.78

78.4

278

.06

69.3

173

.64

12.2

4.8

2.3

0.6

4.7

Not

e:

Dat

a C

over

s:

Cen

tral

Reg

ion:

Per

ak, S

elan

gor a

nd K

uala

Lum

pur

N

orth

ern

Regi

on: K

edah

and

Pul

au P

inan

g

East

ern

Regi

on: P

ahan

g, K

elan

tan

and

Tere

ngga

nu

Sout

hern

Reg

ion:

Neg

eri S

embi

lan,

Mel

aka

and

Joho

r

Appe

ndix

3.1

4 A

vera

ge D

aily

Wag

e R

ates

for S

emi-

Skill

ed L

ocal

Mac

hine

Ope

rato

rs in

Pen

insu

lar M

alay

sia

in 2

013

and

2014

(RM

/day

) (2)

Page 23: CHAPTER 3 APPENDIX - Goverment Documents · CHAPTER 3 APPENDIX Appendix 3.16 ... E17 Kabel bawah tanah voltan rendah E35 Grid berkapasiti melebihi 72KW E18 Kabel bawah tanah …

STATISTICS AND CONSTRUCTION DEMAND 2015-2016

CHAPTER 3 APPENDIX

177

Appe

ndix

3.1

5 A

vera

ge D

aily

Wag

e R

ates

for S

kille

d Lo

cal M

achi

ne O

pera

tors

in S

abah

in 2

013

and

2014

(RM

/day

) (1)

Wor

ker C

ateg

ory

Min

imum

/ M

axim

um

Wag

es

Year

Cha

nge

(%)

2013

2014

K. K

inab

alu

Sand

akan

Taw

auAv

erag

eK.

Kin

abal

uSa

ndak

anTa

wau

Aver

age

K. K

inab

alu

Sand

akan

Taw

auAv

erag

e

Exca

vato

r Ope

rato

rs

Min

imum

71.0

062

.00

69.0

067

.33

73.0

064

.00

71.0

069

.33

2.8

3.2

2.9

3.0

Max

imum

93.9

182

.00

88.0

087

.97

96.9

185

.00

91.0

090

.97

3.2

3.7

3.4

3.4

Com

mon

81.8

981

.69

72.5

078

.69

84.6

073

.58

79.5

879

.25

3.3

-9.9

9.8

0.7

Pile

Rig

ger

Min

imum

67.6

661

.00

65.0

064

.55

69.6

663

.00

67.0

066

.55

3.0

3.3

3.1

3.1

Max

imum

88.0

080

.00

88.0

085

.33

91.0

083

.00

91.0

088

.33

3.4

3.8

3.4

3.5

Com

mon

78.6

079

.05

71.0

076

.22

81.2

972

.92

78.1

677

.46

3.4

-7.8

10.1

1.6

Off-

Road

Tru

ck O

pera

tors

Min

imum

60.5

961

.00

62.0

061

.20

62.5

963

.00

64.0

063

.20

3.3

3.3

3.2

3.3

Max

imum

80.0

072

.00

72.0

074

.67

83.0

078

.00

78.0

079

.67

3.8

8.3

8.3

6.7

Com

mon

71.2

771

.38

67.0

069

.88

74.0

468

.83

70.8

571

.24

3.9

-3.6

5.7

1.9

Back

hoe

Load

er

Ope

rato

rs

Min

imum

73.0

064

.00

66.0

067

.67

75.0

066

.00

68.0

069

.67

2.7

3.1

3.0

3.0

Max

imum

97.9

577

.00

85.0

086

.65

100.

9580

.00

88.0

089

.65

3.1

3.9

3.5

3.5

Com

mon

83.5

380

.01

71.0

078

.18

86.2

372

.83

77.8

378

.96

3.2

-9.0

9.6

1.0

Rolle

r Ope

rato

rs

Min

imum

64.6

355

.00

54.0

057

.88

66.6

357

.00

56.0

059

.88

3.1

3.6

3.7

3.5

Max

imum

96.0

081

.00

87.2

688

.09

100.

0084

.00

90.2

691

.42

4.2

3.7

3.4

3.8

Com

mon

78.7

079

.60

68.5

875

.63

81.5

670

.58

76.1

876

.11

3.6

-11.

311

.10.

6

Rolle

r/C

ompa

ctor

O

pera

tors

Min

imum

60.7

161

.00

63.2

261

.64

62.7

163

.00

65.2

263

.64

3.3

3.3

3.2

3.2

Max

imum

94.0

080

.00

83.0

085

.67

97.0

083

.00

86.0

088

.67

3.2

3.8

3.6

3.5

Com

mon

78.6

079

.05

71.0

076

.22

81.4

672

.75

78.0

777

.43

3.6

-8.0

10.0

1.6

Scap

per O

pera

tors

Min

imum

66.0

062

.20

56.0

061

.40

68.0

064

.20

58.0

063

.40

3.0

3.2

3.6

3.3

Max

imum

81.0

072

.00

80.0

077

.67

84.0

075

.00

83.0

080

.67

3.7

4.2

3.8

3.9

Com

mon

73.0

072

.25

67.6

070

.95

75.8

069

.10

71.3

372

.08

3.8

-4.4

5.5

1.6

Page 24: CHAPTER 3 APPENDIX - Goverment Documents · CHAPTER 3 APPENDIX Appendix 3.16 ... E17 Kabel bawah tanah voltan rendah E35 Grid berkapasiti melebihi 72KW E18 Kabel bawah tanah …

STATISTICS AND CONSTRUCTION DEMAND 2015-2016

CHAPTER 3 APPENDIX

178

Wor

ker C

ateg

ory

Min

imum

/ M

axim

um

Wag

es

Year

Cha

nge

(%)

2013

2014

K. K

inab

alu

Sand

akan

Taw

auAv

erag

eK.

Kin

abal

uSa

ndak

anTa

wau

Aver

age

K. K

inab

alu

Sand

akan

Taw

auAv

erag

e

Mot

or L

oade

r Ope

rato

rs

Min

imum

59.0

056

.00

46.0

053

.67

61.0

058

.00

48.0

055

.67

3.4

3.6

4.3

3.7

Max

imum

91.7

172

.00

85.0

082

.90

94.7

178

.00

88.0

086

.90

3.3

8.3

3.5

4.8

Com

mon

62.2

861

.89

57.0

060

.39

75.5

766

.67

68.9

270

.39

21.3

7.7

20.9

16.6

Load

er O

pera

tors

Min

imum

56.0

056

.00

46.0

052

.67

58.0

058

.00

48.0

054

.67

3.6

3.6

4.3

3.8

Max

imum

87.0

070

.00

85.0

080

.67

90.0

073

.00

88.0

083

.67

3.4

4.3

3.5

3.7

Com

mon

74.5

072

.00

63.5

070

.00

77.2

064

.92

68.8

370

.32

3.6

-9.8

8.4

0.5

Pave

r Ope

rato

rs

Min

imum

61.0

041

.00

64.0

055

.33

63.0

043

.00

66.0

057

.33

3.3

4.9

3.1

3.6

Max

imum

81.0

082

.00

77.0

080

.00

84.0

085

.00

80.0

083

.00

3.7

3.7

3.9

3.8

Com

mon

72.8

977

.20

62.0

070

.70

75.5

965

.08

72.8

371

.17

3.7

-15.

717

.50.

7

Mob

ile C

rane

Ope

rato

rs

Min

imum

91.9

086

.00

84.6

487

.51

93.9

088

.00

86.6

489

.51

2.2

2.3

2.4

2.3

Max

imum

137.

0010

6.00

104.

0011

5.67

145.

0010

9.00

107.

0012

0.33

5.8

2.8

2.9

4.0

Com

mon

108.

1810

6.84

96.5

010

3.84

111.

0399

.50

97.9

510

2.83

2.6

-6.9

1.5

-1.0

Cra

wle

r Cra

ne O

pera

tors

Min

imum

91.0

091

.00

89.0

090

.33

93.0

093

.00

91.0

092

.33

2.2

2.2

2.2

2.2

Max

imum

137.

0010

0.00

101.

7611

2.92

140.

0010

3.00

105.

0011

6.00

2.2

3.0

3.2

2.7

Com

mon

108.

1810

3.84

96.0

010

2.67

110.

9399

.58

97.9

410

2.82

2.5

-4.1

2.0

0.1

Tow

er C

rane

Ope

rato

rs

Min

imum

96.0

086

.00

84.0

088

.67

98.0

088

.00

85.0

090

.33

2.1

2.3

1.2

1.9

Max

imum

126.

0011

0.00

109.

9111

5.30

129.

0011

3.00

112.

9111

8.30

2.4

2.7

2.7

2.6

Com

mon

108.

2910

8.90

98.5

010

5.23

111.

0499

.64

98.0

610

2.91

2.5

-8.5

-0.4

-2.2

Fork

lift O

pera

tors

Min

imum

74.0

068

.00

61.0

067

.67

76.0

070

.00

62.0

069

.33

2.7

2.9

1.6

2.5

Max

imum

91.8

977

.00

88.0

085

.63

94.8

980

.00

91.0

088

.63

3.3

3.9

3.4

3.5

Com

mon

83.5

480

.02

73.0

078

.85

86.2

574

.58

77.3

379

.39

3.2

-6.8

5.9

0.7

Slin

ger /

Dog

ger

Min

imum

61.0

056

.00

54.0

057

.00

63.0

058

.00

55.0

058

.67

3.3

3.6

1.9

2.9

Max

imum

94.0

080

.00

84.4

686

.15

97.0

083

.00

87.4

689

.15

3.2

3.8

3.6

3.5

Com

mon

72.9

976

.25

68.5

072

.58

75.7

070

.50

74.0

173

.40

3.7

-7.5

8.0

1.1

Appe

ndix

3.1

5 A

vera

ge D

aily

Wag

e R

ates

for S

kille

d Lo

cal M

achi

ne O

pera

tors

in S

abah

in 2

013

and

2014

(RM

/day

) (2)

Page 25: CHAPTER 3 APPENDIX - Goverment Documents · CHAPTER 3 APPENDIX Appendix 3.16 ... E17 Kabel bawah tanah voltan rendah E35 Grid berkapasiti melebihi 72KW E18 Kabel bawah tanah …

STATISTICS AND CONSTRUCTION DEMAND 2015-2016

CHAPTER 3 APPENDIX

179

Wor

ker C

ateg

ory

Min

imum

/ M

axim

um

Wag

es

Year

Cha

nge

(%)

2013

2014

K. K

inab

alu

Sand

akan

Taw

auAv

erag

eK.

Kin

abal

uSa

ndak

anTa

wau

Aver

age

K. K

inab

alu

Sand

akan

Taw

auAv

erag

e

Mot

or L

oade

r Ope

rato

rs

Min

imum

59.0

056

.00

46.0

053

.67

61.0

058

.00

48.0

055

.67

3.4

3.6

4.3

3.7

Max

imum

91.7

172

.00

85.0

082

.90

94.7

178

.00

88.0

086

.90

3.3

8.3

3.5

4.8

Com

mon

62.2

861

.89

57.0

060

.39

75.5

766

.67

68.9

270

.39

21.3

7.7

20.9

16.6

Load

er O

pera

tors

Min

imum

56.0

056

.00

46.0

052

.67

58.0

058

.00

48.0

054

.67

3.6

3.6

4.3

3.8

Max

imum

87.0

070

.00

85.0

080

.67

90.0

073

.00

88.0

083

.67

3.4

4.3

3.5

3.7

Com

mon

74.5

072

.00

63.5

070

.00

77.2

064

.92

68.8

370

.32

3.6

-9.8

8.4

0.5

Pave

r Ope

rato

rs

Min

imum

61.0

041

.00

64.0

055

.33

63.0

043

.00

66.0

057

.33

3.3

4.9

3.1

3.6

Max

imum

81.0

082

.00

77.0

080

.00

84.0

085

.00

80.0

083

.00

3.7

3.7

3.9

3.8

Com

mon

72.8

977

.20

62.0

070

.70

75.5

965

.08

72.8

371

.17

3.7

-15.

717

.50.

7

Mob

ile C

rane

Ope

rato

rs

Min

imum

91.9

086

.00

84.6

487

.51

93.9

088

.00

86.6

489

.51

2.2

2.3

2.4

2.3

Max

imum

137.

0010

6.00

104.

0011

5.67

145.

0010

9.00

107.

0012

0.33

5.8

2.8

2.9

4.0

Com

mon

108.

1810

6.84

96.5

010

3.84

111.

0399

.50

97.9

510

2.83

2.6

-6.9

1.5

-1.0

Cra

wle

r Cra

ne O

pera

tors

Min

imum

91.0

091

.00

89.0

090

.33

93.0

093

.00

91.0

092

.33

2.2

2.2

2.2

2.2

Max

imum

137.

0010

0.00

101.

7611

2.92

140.

0010

3.00

105.

0011

6.00

2.2

3.0

3.2

2.7

Com

mon

108.

1810

3.84

96.0

010

2.67

110.

9399

.58

97.9

410

2.82

2.5

-4.1

2.0

0.1

Tow

er C

rane

Ope

rato

rs

Min

imum

96.0

086

.00

84.0

088

.67

98.0

088

.00

85.0

090

.33

2.1

2.3

1.2

1.9

Max

imum

126.

0011

0.00

109.

9111

5.30

129.

0011

3.00

112.

9111

8.30

2.4

2.7

2.7

2.6

Com

mon

108.

2910

8.90

98.5

010

5.23

111.

0499

.64

98.0

610

2.91

2.5

-8.5

-0.4

-2.2

Fork

lift O

pera

tors

Min

imum

74.0

068

.00

61.0

067

.67

76.0

070

.00

62.0

069

.33

2.7

2.9

1.6

2.5

Max

imum

91.8

977

.00

88.0

085

.63

94.8

980

.00

91.0

088

.63

3.3

3.9

3.4

3.5

Com

mon

83.5

480

.02

73.0

078

.85

86.2

574

.58

77.3

379

.39

3.2

-6.8

5.9

0.7

Slin

ger /

Dog

ger

Min

imum

61.0

056

.00

54.0

057

.00

63.0

058

.00

55.0

058

.67

3.3

3.6

1.9

2.9

Max

imum

94.0

080

.00

84.4

686

.15

97.0

083

.00

87.4

689

.15

3.2

3.8

3.6

3.5

Com

mon

72.9

976

.25

68.5

072

.58

75.7

070

.50

74.0

173

.40

3.7

-7.5

8.0

1.1

Appe

ndix

3.1

6 A

vera

ge D

aily

Wag

e R

ates

for S

emi-

Skill

ed L

ocal

Mac

hine

Ope

rato

rs in

Sab

ah in

201

3 an

d 20

14 (R

M/d

ay) (

1)

Wor

ker C

ateg

ory

Min

imum

/ M

axim

um

Wag

es

Year

Cha

nge

(%)

2013

2014

K. K

inab

alu

Sand

akan

Taw

auAv

erag

eK.

Kin

abal

uSa

ndak

anTa

wau

Aver

age

K. K

inab

alu

Sand

akan

Taw

auAv

erag

e

Exca

vato

r Ope

rato

rs

Min

imum

--

--

--

--

--

--

Max

imum

--

--

--

--

--

--

Com

mon

--

--

--

--

--

--

Pile

Rig

ger

Min

imum

44.0

041

.00

44.0

043

.00

46.0

043

.00

46.0

045

.00

4.5

4.9

4.5

4.7

Max

imum

67.0

062

.00

57.0

062

.00

70.0

065

.00

60.0

065

.00

4.5

4.8

5.3

4.8

Com

mon

56.2

058

.85

52.0

055

.68

58.9

552

.17

54.9

255

.35

4.9

-11.4

5.6

-0.6

Off-

Road

Tru

ck O

pera

tors

Min

imum

41.0

039

.00

41.0

040

.33

43.0

041

.00

43.0

042

.33

4.9

5.1

4.9

5.0

Max

imum

63.0

057

.00

52.0

057

.33

66.0

060

.00

58.0

061

.33

4.8

5.3

11.5

7.0

Com

mon

52.6

554

.58

48.5

051

.91

55.3

550

.25

49.5

051

.70

5.1

-7.9

2.1

-0.4

Back

hoe

Load

er O

pera

tors

Min

imum

--

--

--

--

--

--

Max

imum

--

--

--

--

--

--

Com

mon

--

--

--

--

--

--

Rolle

r Ope

rato

rs

Min

imum

41.0

044

.00

41.0

042

.00

43.0

046

.00

43.0

044

.00

4.9

4.5

4.9

4.8

Max

imum

62.0

057

.00

59.0

059

.33

65.0

060

.00

63.0

062

.67

4.8

5.3

6.8

5.6

Com

mon

52.5

054

.50

51.0

052

.67

55.2

052

.17

54.1

753

.85

5.1

-4.3

6.2

2.2

Rolle

r/C

ompa

ctor

O

pera

tors

Min

imum

42.0

042

.62

43.0

042

.54

44.0

044

.62

45.0

044

.54

4.8

4.7

4.7

4.7

Max

imum

62.0

062

.00

60.0

061

.33

65.0

065

.00

63.0

064

.33

4.8

4.8

5.0

4.9

Com

mon

52.5

057

.00

52.8

154

.10

55.2

052

.67

54.2

554

.04

5.1

-7.6

2.7

-0.1

Scap

per O

pera

tors

Min

imum

44.0

042

.00

39.0

041

.67

46.0

044

.00

41.0

043

.67

4.5

4.8

5.1

4.8

Max

imum

62.0

057

.00

60.0

059

.67

65.0

060

.00

63.0

062

.67

4.8

5.3

5.0

5.0

Com

mon

52.5

054

.50

50.0

052

.33

55.2

052

.83

52.3

353

.45

5.1

-3.1

4.7

2.1

Page 26: CHAPTER 3 APPENDIX - Goverment Documents · CHAPTER 3 APPENDIX Appendix 3.16 ... E17 Kabel bawah tanah voltan rendah E35 Grid berkapasiti melebihi 72KW E18 Kabel bawah tanah …

STATISTICS AND CONSTRUCTION DEMAND 2015-2016

CHAPTER 3 APPENDIX

180

Wor

ker C

ateg

ory

Min

imum

/ M

axim

um

Wag

es

Year

Cha

nge

(%)

2013

2014

K. K

inab

alu

Sand

akan

Taw

auAv

erag

eK.

Kin

abal

uSa

ndak

anTa

wau

Aver

age

K. K

inab

alu

Sand

akan

Taw

auAv

erag

e

Mot

or L

oade

r Ope

rato

rs

Min

imum

--

--

--

--

--

--

Max

imum

--

--

--

--

--

--

Com

mon

--

--

--

--

--

--

Whe

el L

oade

r Ope

rato

rs

Min

imum

41.0

043

.00

36.0

040

.00

43.0

045

.00

38.0

042

.00

4.9

4.7

5.6

5.0

Max

imum

66.0

060

.00

57.0

061

.00

69.0

063

.00

60.0

064

.00

4.5

5.0

5.3

4.9

Com

mon

49.9

057

.70

55.5

054

.37

52.7

052

.18

50.4

251

.77

5.6

-9.6

-9.2

-4.8

Pave

r Ope

rato

rs

Min

imum

36.0

045

.15

41.0

040

.72

38.0

047

.15

43.0

042

.72

5.6

4.4

4.9

4.9

Max

imum

66.0

057

.00

55.0

059

.33

69.0

060

.00

58.0

062

.33

4.5

5.3

5.5

5.1

Com

mon

50.9

053

.70

51.5

852

.06

53.7

052

.63

50.9

252

.42

5.5

-2.0

-1.3

0.7

Mob

ile C

rane

Ope

rato

rs

Min

imum

66.6

561

.00

56.0

061

.22

68.6

563

.00

58.0

063

.22

3.0

3.3

3.6

3.3

Max

imum

87.0

075

.00

69.0

077

.00

90.0

078

.00

72.0

080

.00

3.4

4.0

4.3

3.9

Com

mon

75.2

974

.90

68.5

072

.90

78.0

468

.92

65.0

870

.68

3.7

-8.0

-5.0

-3.0

Cra

wle

r Cra

ne O

pera

tors

Min

imum

66.6

555

.00

56.0

059

.22

68.6

557

.00

57.0

060

.88

3.0

3.6

1.8

2.8

Max

imum

87.0

072

.00

75.0

078

.00

90.0

075

.00

78.0

081

.00

3.4

4.2

4.0

3.8

Com

mon

75.3

073

.40

64.0

070

.90

78.0

169

.08

64.3

370

.47

3.6

-5.9

0.5

-0.6

Tow

er C

rane

Ope

rato

rs

Min

imum

66.6

561

.00

56.0

061

.22

68.6

563

.00

57.0

062

.88

3.0

3.3

1.8

2.7

Max

imum

87.0

078

.00

73.0

079

.33

90.0

081

.00

76.0

082

.33

3.4

3.8

4.1

3.8

Com

mon

75.2

676

.38

70.0

073

.88

77.9

768

.92

64.3

370

.41

3.6

-9.8

-8.1

-4.7

Fork

lift O

pera

tors

Min

imum

36.0

041

.00

41.0

039

.33

38.0

043

.00

42.0

041

.00

5.6

4.9

2.4

4.2

Max

imum

67.0

054

.00

65.0

062

.00

70.0

057

.00

68.0

065

.00

4.5

5.6

4.6

4.8

Com

mon

50.9

052

.20

48.0

050

.37

53.7

550

.17

54.6

752

.86

5.6

-3.9

13.9

5.0

Slin

ger /

Dog

ger

Min

imum

46.0

041

.00

38.0

041

.67

48.0

043

.00

39.0

043

.33

4.3

4.9

2.6

4.0

Max

imum

67.0

062

.00

57.0

062

.00

70.0

065

.00

60.0

065

.00

4.5

4.8

5.3

4.8

Com

mon

52.5

057

.00

52.0

053

.83

55.2

552

.58

52.0

853

.30

5.2

-7.8

0.2

-1.0

Appe

ndix

3.1

6 A

vera

ge D

aily

Wag

e R

ates

for S

emi-

Skill

ed L

ocal

Mac

hine

Ope

rato

rs in

Sab

ah in

201

3 an

d 20

14 (R

M/d

ay) (

2)

Page 27: CHAPTER 3 APPENDIX - Goverment Documents · CHAPTER 3 APPENDIX Appendix 3.16 ... E17 Kabel bawah tanah voltan rendah E35 Grid berkapasiti melebihi 72KW E18 Kabel bawah tanah …

STATISTICS AND CONSTRUCTION DEMAND 2015-2016

CHAPTER 3 APPENDIX

181

Appe

ndix

3.1

7 A

vera

ge D

aily

Wag

e R

ates

for L

ocal

Mac

hine

Ope

rato

rs in

Sar

awak

in 2

013

and

2014

(RM

/day

) (1)

Wor

ker C

ateg

ory

Min

imum

/ M

axim

um

Wag

es

Year

Cha

nge

(%)

2013

2014

Kuch

ing

Mir

iSi

buAv

erag

eKu

chin

gM

iri

Sibu

Aver

age

Kuch

ing

Mir

iSi

buAv

erag

e

Exca

vato

r Ope

rato

rs

Min

imum

63.0

081

.00

98.0

080

.67

65.0

086

.60

106.

0085

.87

3.2

6.9

8.2

6.4

Max

imum

97.0

090

.31

136.

0010

7.77

100.

0013

7.00

139.

0012

5.33

3.1

51.7

2.2

16.3

Com

mon

84.2

887

.04

86.1

585

.82

86.9

888

.16

124.

0099

.71

3.2

1.3

43.9

16.2

Pile

Rig

ger

Min

imum

74.0

089

.00

70.0

077

.67

76.0

072

.00

74.0

074

.00

2.7

-19.

15.

7-4

.7

Max

imum

100.

0010

1.00

90.0

097

.00

105.

0010

5.00

93.0

010

1.00

5.0

4.0

3.3

4.1

Com

mon

89.2

094

.85

95.5

093

.18

91.8

598

.00

83.2

591

.03

3.0

3.3

-12.

8-2

.3

Off-

Road

Tru

ck O

pera

tors

Min

imum

70.3

681

.00

90.0

080

.45

72.3

685

.00

96.0

084

.45

2.8

4.9

6.7

5.0

Max

imum

92.0

010

0.00

100.

0097

.33

96.0

010

3.00

103.

0010

0.67

4.3

3.0

3.0

3.4

Com

mon

82.5

291

.01

91.0

088

.18

85.2

091

.42

98.5

091

.71

3.2

0.5

8.2

4.0

Back

hoe

Load

er O

pera

tors

Min

imum

61.0

061

.00

92.0

071

.33

63.0

066

.50

96.0

075

.17

3.3

9.0

4.3

5.4

Max

imum

89.0

087

.00

105.

0093

.67

93.0

010

6.00

108.

0010

2.33

4.5

21.8

2.9

9.3

Com

mon

72.5

079

.50

74.5

075

.50

75.2

079

.42

100.

2484

.95

3.7

-0.1

34.6

12.5

Rolle

r Ope

rato

rs

Min

imum

56.0

061

.00

88.0

068

.33

58.0

066

.50

92.0

072

.17

3.6

9.0

4.5

5.6

Max

imum

90.0

096

.00

126.

0010

4.00

94.0

012

7.00

129.

0011

6.67

4.4

32.3

2.4

12.2

Com

mon

70.9

083

.20

79.0

077

.70

73.6

079

.42

109.

7587

.59

3.8

-4.5

38.9

12.7

Rolle

r/C

ompa

ctor

Ope

rato

rs

Min

imum

70.0

071

.00

84.0

075

.00

72.0

076

.50

88.0

078

.83

2.9

7.7

4.8

5.1

Max

imum

100.

9410

0.00

116.

0010

5.65

104.

9411

7.00

119.

0011

3.65

4.0

17.0

2.6

7.6

Com

mon

84.2

391

.87

86.0

087

.37

86.9

488

.83

102.

5092

.76

3.2

-3.3

19.2

6.2

Scap

per O

pera

tors

Min

imum

81.0

081

.00

98.0

086

.67

83.0

086

.50

102.

0090

.50

2.5

6.8

4.1

4.4

Max

imum

100.

0010

7.00

116.

0010

7.67

104.

0011

7.00

119.

0011

3.33

4.0

9.3

2.6

5.3

Com

mon

92.6

199

.55

94.5

095

.55

95.3

198

.20

109.

8310

1.11

2.9

-1.4

16.2

5.8

Mot

or G

rade

r Ope

rato

rs

Min

imum

74.8

081

.00

90.0

081

.93

76.8

086

.50

96.0

086

.43

2.7

6.8

6.7

5.5

Max

imum

112.

0010

6.04

126.

0011

4.68

116.

0012

7.00

129.

0012

4.00

3.6

19.8

2.4

8.1

Com

mon

90.9

398

.23

94.0

294

.39

93.6

398

.08

109.

8310

0.51

3.0

-0.2

16.8

6.5

Whe

el L

oade

r Ope

rato

rs

Min

imum

71.0

071

.00

95.0

079

.00

73.0

075

.00

99.0

082

.33

2.8

5.6

4.2

4.2

Max

imum

110.

0097

.00

119.

0010

8.67

114.

0012

0.00

122.

0011

8.67

3.6

23.7

2.5

9.2

Com

mon

84.2

090

.35

84.5

086

.35

86.9

588

.00

110.

0995

.01

3.3

-2.6

30.3

10.0

Page 28: CHAPTER 3 APPENDIX - Goverment Documents · CHAPTER 3 APPENDIX Appendix 3.16 ... E17 Kabel bawah tanah voltan rendah E35 Grid berkapasiti melebihi 72KW E18 Kabel bawah tanah …

STATISTICS AND CONSTRUCTION DEMAND 2015-2016

CHAPTER 3 APPENDIX

182

Wor

ker C

ateg

ory

Min

imum

/ M

axim

um

Wag

es

Year

Cha

nge

(%)

2013

2014

Kuch

ing

Mir

iSi

buAv

erag

eKu

chin

gM

iri

Sibu

Aver

age

Kuch

ing

Mir

iSi

buAv

erag

e

Pave

r Ope

rato

rs

Min

imum

76.8

591

.00

95.0

087

.62

78.8

595

.00

99.0

090

.95

2.6

4.4

4.2

3.8

Max

imum

108.

0010

0.00

121.

0010

9.67

112.

0012

2.00

124.

0011

9.33

3.7

22.0

2.5

8.8

Com

mon

92.5

496

.02

96.0

094

.85

95.3

498

.25

105.

7599

.78

3.0

2.3

10.2

5.2

Mob

ile C

rane

Ope

rato

rs

Min

imum

81.0

081

.00

106.

0089

.33

83.0

086

.00

112.

0093

.67

2.5

6.2

5.7

4.9

Max

imum

117.

0011

8.15

125.

0012

0.05

120.

2412

6.00

128.

0012

4.75

2.8

6.6

2.4

3.9

Com

mon

105.

1711

1.41

100.

0810

5.55

107.

9298

.19

117.

5810

7.90

2.6

-11.

917

.52.

2

Cra

wle

r Cra

ne O

pera

tors

Min

imum

93.0

081

.00

100.

0091

.33

95.0

086

.50

110.

0097

.17

2.2

6.8

10.0

6.4

Max

imum

125.

0011

2.00

127.

0012

1.33

129.

0012

8.00

130.

0012

9.00

3.2

14.3

2.4

6.3

Com

mon

105.

3210

8.41

97.0

010

3.58

107.

8998

.08

121.

0010

8.99

2.4

-9.5

24.7

5.2

Tow

er C

rane

Ope

rato

rs

Min

imum

96.0

088

.00

100.

0094

.67

98.0

091

.50

104.

0097

.83

2.1

4.0

4.0

3.3

Max

imum

147.

0012

8.00

131.

0013

5.33

151.

0013

2.00

134.

0013

9.00

2.7

3.1

2.3

2.7

Com

mon

111.

2911

9.40

108.

5011

3.06

114.

1811

1.46

117.4

211

4.35

2.6

-6.6

8.2

1.1

Fork

lift O

pera

tors

Min

imum

61.0

065

.00

90.0

072

.00

63.0

070

.50

94.0

075

.83

3.3

8.5

4.4

5.3

Max

imum

83.0

087

.00

103.

0091

.00

87.0

010

4.00

106.

0099

.00

4.8

19.5

2.9

8.8

Com

mon

70.9

078

.70

76.5

075

.37

73.5

579

.42

96.7

583

.24

3.7

0.9

26.5

10.4

Slin

ger /

Dog

ger

Min

imum

61.0

061

.00

85.0

069

.00

63.0

066

.50

89.0

072

.83

3.3

9.0

4.7

5.6

Max

imum

82.0

094

.00

106.

0094

.00

85.0

010

7.00

109.

0010

0.33

3.7

13.8

2.8

6.7

Com

mon

70.9

082

.20

78.0

077

.03

73.5

579

.52

97.1

783

.41

3.7

-3.3

24.6

8.3

Appe

ndix

3.1

7 A

vera

ge D

aily

Wag

e R

ates

for L

ocal

Mac

hine

Ope

rato

rs in

Sar

awak

in 2

013

and

2014

(RM

/day

) (2)

Page 29: CHAPTER 3 APPENDIX - Goverment Documents · CHAPTER 3 APPENDIX Appendix 3.16 ... E17 Kabel bawah tanah voltan rendah E35 Grid berkapasiti melebihi 72KW E18 Kabel bawah tanah …

STATISTICS AND CONSTRUCTION DEMAND 2015-2016

CHAPTER 3 APPENDIX

183

Appe

ndix

3.1

8 A

vera

ge D

aily

Wag

e R

ates

for S

emi-

Skill

ed L

ocal

Mac

hine

Ope

rato

rs in

Sar

awak

in 2

013

and

2014

(RM

/day

) (1)

Wor

ker C

ateg

ory

Min

imum

/ M

axim

um

Wag

es

Year

Cha

nge

(%)

2013

2014

Kuch

ing

Mir

iSi

buAv

erag

eKu

chin

gM

iri

Sibu

Aver

age

Kuch

ing

Mir

iSi

buAv

erag

e

Exca

vato

r Ope

rato

rs

Min

imum

--

--

--

--

--

--

Max

imum

--

--

--

--

--

--

Com

mon

--

--

--

--

--

--

Pile

Rig

ger

Min

imum

56.0

071

.00

55.0

060

.67

58.0

057

.00

62.0

059

.00

3.6

-19.

712

.7-2

.7

Max

imum

81.0

089

.00

79.0

083

.00

84.0

092

.00

82.0

086

.00

3.7

3.4

3.8

3.6

Com

mon

70.1

079

.30

80.5

076

.63

72.3

580

.83

69.9

274

.37

3.2

1.9

-13.

1-3

.0

Off-

Road

Tru

ck O

pera

tors

Min

imum

60.0

065

.00

73.0

066

.00

62.0

069

.00

79.0

070

.00

3.3

6.2

8.2

6.1

Max

imum

85.0

088

.00

93.0

088

.67

89.0

094

.00

96.0

093

.00

4.7

6.8

3.2

4.9

Com

mon

70.2

078

.85

77.0

075

.35

72.8

580

.17

88.5

080

.51

3.8

1.7

14.9

6.8

Back

hoe

Load

er O

pera

tors

Min

imum

--

--

--

--

--

--

Max

imum

--

--

--

--

--

--

Com

mon

--

--

--

--

--

--

Rolle

r Ope

rato

rs

Min

imum

48.0

049

.00

82.0

059

.67

50.0

054

.50

87.0

063

.83

4.2

11.2

6.1

7.0

Max

imum

78.0

080

.00

96.0

084

.67

82.0

097

.00

99.0

092

.67

5.1

21.3

3.1

9.4

Com

mon

59.4

069

.45

65.0

064

.62

62.0

069

.13

89.5

873

.57

4.4

-0.5

37.8

13.9

Rolle

r/C

ompa

ctor

Ope

rato

rs

Min

imum

56.0

060

.70

76.0

064

.23

58.0

066

.20

83.0

069

.07

3.6

9.1

9.2

7.5

Max

imum

87.0

094

.00

95.0

092

.00

91.0

097

.00

98.0

095

.33

4.6

3.2

3.2

3.6

Com

mon

70.8

082

.15

77.8

576

.93

73.4

577

.69

86.5

879

.24

3.7

-5.4

11.2

3.0

Scap

per O

pera

tors

Min

imum

72.0

078

.00

81.0

077

.00

74.0

083

.00

84.0

080

.33

2.8

6.4

3.7

4.3

Max

imum

89.0

092

.00

99.0

093

.33

92.0

010

0.00

102.

0098

.00

3.4

8.7

3.0

5.0

Com

mon

81.6

086

.60

85.5

084

.57

83.8

087

.50

93.2

588

.18

2.7

1.0

9.1

4.3

Mot

or L

oade

r Ope

rato

rs

Min

imum

--

--

--

--

--

--

Max

imum

--

--

--

--

--

--

Com

mon

--

--

--

--

--

--

Page 30: CHAPTER 3 APPENDIX - Goverment Documents · CHAPTER 3 APPENDIX Appendix 3.16 ... E17 Kabel bawah tanah voltan rendah E35 Grid berkapasiti melebihi 72KW E18 Kabel bawah tanah …

STATISTICS AND CONSTRUCTION DEMAND 2015-2016

CHAPTER 3 APPENDIX

184

Wor

ker C

ateg

ory

Min

imum

/ M

axim

um

Wag

es

Year

Cha

nge

(%)

2013

2014

Kuch

ing

Mir

iSi

buAv

erag

eKu

chin

gM

iri

Sibu

Aver

age

Kuch

ing

Mir

iSi

buAv

erag

e

Whe

el L

oade

r Ope

rato

rs

Min

imum

49.0

061

.00

79.0

063

.00

51.0

066

.00

85.0

067

.33

4.1

8.2

7.6

6.9

Max

imum

94.0

086

.00

101.

0093

.67

98.0

010

2.00

104.

0010

1.33

4.3

18.6

3.0

8.2

Com

mon

70.9

278

.21

74.0

074

.38

73.7

977

.67

95.1

782

.21

4.0

-0.7

28.6

10.5

Pave

r Ope

rato

rs

Min

imum

71.0

075

.00

78.0

074

.67

73.0

080

.00

83.0

078

.67

2.8

6.7

6.4

5.4

Max

imum

92.0

094

.00

99.0

095

.00

97.0

010

0.00

102.

0099

.67

5.4

6.4

3.0

4.9

Com

mon

81.5

087

.50

87.0

085

.33

84.1

587

.25

91.5

887

.66

3.3

-0.3

5.3

2.7

Mob

ile C

rane

Ope

rato

rs

Min

imum

71.3

869

.00

86.0

075

.46

73.3

874

.50

90.0

079

.29

2.8

8.0

4.7

5.1

Max

imum

95.0

099

.00

98.0

097

.33

98.0

010

2.00

101.

0010

0.33

3.2

3.0

3.1

3.1

Com

mon

84.2

991

.40

84.5

086

.73

87.0

187

.50

104.

2092

.90

3.2

-4.3

23.3

7.1

Cra

wle

r Cra

ne O

pera

tors

Min

imum

71.0

071

.00

86.0

076

.00

73.3

876

.50

91.0

080

.29

3.4

7.7

5.8

5.6

Max

imum

94.0

099

.00

98.0

097

.00

98.0

010

1.00

101.

0010

0.00

4.3

2.0

3.1

3.1

Com

mon

84.2

990

.90

85.0

086

.73

86.7

987

.67

93.7

589

.40

3.0

-3.6

10.3

3.1

Tow

er C

rane

Ope

rato

rs

Min

imum

73.4

273

.00

85.0

077

.14

75.0

078

.50

89.0

080

.83

2.2

7.5

4.7

4.8

Max

imum

100.

0097

.00

99.0

098

.67

104.

0010

0.00

102.

0010

2.00

4.0

3.1

3.0

3.4

Com

mon

83.7

289

.86

85.5

086

.36

86.7

088

.10

93.7

389

.51

3.6

-2.0

9.6

3.6

Fork

lift O

pera

tors

Min

imum

51.0

054

.00

71.4

058

.80

53.0

059

.50

75.4

062

.63

3.9

10.2

5.6

6.5

Max

imum

72.0

076

.00

88.0

078

.67

76.0

089

.00

91.0

085

.33

5.6

17.1

3.4

8.5

Com

mon

59.6

067

.55

65.5

064

.22

62.3

068

.75

82.1

071

.05

4.5

1.8

25.3

10.6

Slin

ger /

Dog

ger

Min

imum

51.0

051

.00

68.0

056

.67

53.0

056

.50

72.0

060

.50

3.9

10.8

5.9

6.8

Max

imum

72.0

082

.00

90.0

081

.33

75.0

091

.00

93.0

086

.33

4.2

11.0

3.3

6.1

Com

mon

59.8

070

.65

67.0

065

.82

62.3

068

.83

82.3

371

.15

4.2

-2.6

22.9

8.1

Appe

ndix

3.1

8 A

vera

ge D

aily

Wag

e R

ates

for S

emi-

Skill

ed L

ocal

Mac

hine

Ope

rato

rs in

Sar

awak

in 2

013

and

2014

(RM

/day

) (2)

Page 31: CHAPTER 3 APPENDIX - Goverment Documents · CHAPTER 3 APPENDIX Appendix 3.16 ... E17 Kabel bawah tanah voltan rendah E35 Grid berkapasiti melebihi 72KW E18 Kabel bawah tanah …

STATISTICS AND CONSTRUCTION DEMAND 2015-2016

CHAPTER 3 APPENDIX

185

Appe

ndix

3.1

9 A

vera

ge D

aily

Wag

e R

ates

for S

kille

d Lo

cal C

onst

ruct

ion

Wor

kers

in P

enin

sula

r Mal

aysi

a in

201

3 an

d 20

14 (R

M/d

ay) (

1)

Wor

ker C

ateg

ory

Min

imum

/ M

axim

um

Wag

es

Year

Chan

ge (%

)20

1320

14

Cent

ral

Regi

onNo

rther

n Re

gion

East

ern

Regi

onSo

uthe

rn

Regi

onAv

erag

eCe

ntra

l Re

gion

North

ern

Regi

onEa

ster

n Re

gion

Sout

hern

Re

gion

Aver

age

Cent

ral

Regi

onNo

rther

n Re

gion

East

ern

Regi

onSo

uthe

rn

Regi

onAv

erag

e

Gen

eral

C

onst

ruct

ion

Wor

kers

- B

uild

ing

Min

imum

40.0

045

.00

50.0

045

.00

45.0

040

.00

40.0

040

.00

40.0

040

.00

0.0

-11.

1-2

0.0

-11.

1-1

1.1

Max

imum

90.0

090

.00

72.0

085

.00

84.2

511

0.00

93.0

078

.50

120.

0010

0.38

22.2

3.3

9.0

41.2

19.1

Com

mon

63.2

567

.69

62.1

963

.36

64.1

265

.30

68.4

763

.94

66.5

866

.07

3.2

1.2

2.8

5.1

3.0

Con

cret

ers

Min

imum

60.0

070

.00

50.0

060

.00

60.0

053

.33

70.0

050

.00

45.0

054

.58

-11.

10.

00.

0-2

5.0

-9.0

Max

imum

130.

0015

5.00

91.0

010

0.00

119.

0017

0.83

155.

0095

.00

150.

0014

2.71

31.4

0.0

4.4

50.0

19.9

Com

mon

90.6

310

2.75

76.5

381

.97

87.9

797

.03

101.

6979

.50

85.3

990

.90

7.1

-1.0

3.9

4.2

3.3

Bar B

ende

rs

Min

imum

70.0

080

.00

60.0

065

.00

68.7

570

.00

77.0

060

.00

60.0

066

.75

0.0

-3.8

8.3

-7.7

-2.9

Max

imum

130.

0013

0.00

89.0

012

0.00

117.

2524

0.00

130.

0011

5.00

130.

0015

3.75

84.6

0.0

3.4

8.3

31.1

Com

mon

99.0

593

.46

76.3

985

.47

88.5

910

5.03

97.0

780

.22

90.3

993

.18

6.0

3.9

5.6

5.8

5.2

Car

pent

ers

-Fo

rmw

ork

Min

imum

70.0

075

.00

60.0

075

.00

70.0

075

.00

75.0

055

.00

70.0

068

.75

7.1

0.0

-8.3

-6.7

-1.8

Max

imum

150.

0014

5.00

91.0

011

0.00

124.

0021

0.00

160.

0011

5.00

120.

0015

1.25

40.0

10.3

26.4

9.1

22.0

Com

mon

99.7

010

3.30

81.6

191

.72

94.0

811

0.15

106.

8586

.11

94.3

699

.37

10.5

3.4

5.5

2.9

5.6

Bric

klay

ers

Min

imum

60.0

065

.00

60.0

065

.00

62.5

060

.00

70.0

065

.00

45.0

060

.00

0.0

7.78.

3-3

0.8

-4.0

Max

imum

130.

0012

5.00

95.0

012

0.00

117.

5015

0.00

125.

0092

.00

160.

0013

1.75

15.4

0.0

21.1

33.3

12.1

Com

mon

94.5

091

.28

79.0

685

.94

87.7

010

2.63

97.6

980

.67

90.2

592

.81

8.6

7.014

.95.

05.

8

Roof

ers

Min

imum

70.0

070

.00

70.0

060

.00

67.5

070

.00

65.0

065

.00

65.0

066

.25

0.0

-7.1

0.0

8.3

-1.9

Max

imum

140.

0013

5.00

98.0

012

0.00

123.

2521

0.00

140.

0011

5.00

130.

0014

8.75

50.0

3.7

17.3

8.3

20.7

Com

mon

101.

3898

.19

87.7

892

.26

94.9

011

3.73

101.

0090

.83

96.0

010

0.39

12.2

2.9

4.4

4.1

5.8

Car

pent

ers

-Jo

iner

y

Min

imum

70.0

075

.00

70.0

070

.00

71.2

575

.00

75.0

070

.00

75.0

073

.75

7.1

0.0

0.0

7.1

3.5

Max

imum

150.

0014

5.00

95.0

012

0.00

127.

5021

0.00

190.

0011

5.00

180.

0017

3.75

40.0

31.0

21.1

50.0

36.3

Com

mon

111.

6310

9.50

88.0

610

0.03

102.

3112

6.05

116.

1991

.61

104.

8110

9.67

12.9

6.1

4.0

4.8

7.2

Stee

l Stru

ctur

eFa

bric

ator

s

Min

imum

75.0

080

.00

65.0

080

.00

75.0

075

.00

80.0

070

.00

60.0

071

.25

0.0

0.0

7.7-2

5.0

-5.0

Max

imum

160.

0014

0.00

101.

0012

0.00

130.

2521

0.00

140.

0011

5.00

180.

0016

1.25

31.3

0.0

13.9

50.0

23.8

Com

mon

113.

5010

3.08

91.2

297

.64

101.

3613

1.10

107.

3695

.28

100.

6110

8.59

15.5

4.2

4.5

3.0

7.1

Page 32: CHAPTER 3 APPENDIX - Goverment Documents · CHAPTER 3 APPENDIX Appendix 3.16 ... E17 Kabel bawah tanah voltan rendah E35 Grid berkapasiti melebihi 72KW E18 Kabel bawah tanah …

STATISTICS AND CONSTRUCTION DEMAND 2015-2016

CHAPTER 3 APPENDIX

186

Wor

ker C

ateg

ory

Min

imum

/ M

axim

um

Wag

es

Year

Chan

ge (%

)20

1320

14

Cent

ral

Regi

onNo

rther

n Re

gion

East

ern

Regi

onSo

uthe

rn

Regi

onAv

erag

eCe

ntra

l Re

gion

North

ern

Regi

onEa

ster

n Re

gion

Sout

hern

Re

gion

Aver

age

Cent

ral

Regi

onNo

rther

n Re

gion

East

ern

Regi

onSo

uthe

rn

Regi

onAv

erag

e

Gen

eral

Wel

ders

Min

imum

90.0

065

.00

75.0

065

.00

73.7

545

.00

65.0

070

.00

65.0

061

.25

-50.

00.

0-6

.70.

0-1

6.9

Max

imum

170.

0012

0.00

105.

0012

5.00

130.

0020

5.00

120.

0011

5.00

180.

0015

5.00

20.6

0.0

9.5

44.0

19.2

Com

mon

118.

7589

.31

91.0

093

.1498

.05

128.

5892

.56

92.5

398

.72

103.

108.

33.

61.7

6.0

5.1

Plum

bers

-Bui

ldin

g an

d Sa

nita

ry

Min

imum

80.0

075

.00

60.0

065

.00

70.0

080

.00

75.0

070

.00

60.0

071

.25

0.0

0.0

16.7

-7.7

1.8

Max

imum

170.

0014

0.00

100.

0011

5.00

131.2

522

5.00

150.

0011

5.00

150.

0016

0.00

32.4

7.115

.030

.421

.9

Com

mon

107.3

894

.83

81.2

887

.61

92.7

812

6.83

97.4

785

.67

93.0

310

0.75

18.1

2.8

5.4

6.2

8.6

Plum

bers

-Re

ticul

atio

n

Min

imum

70.0

070

.00

60.0

070

.00

67.5

075

.00

75.0

065

.00

75.0

072

.50

7.17.1

8.3

7.17.4

Max

imum

150.

0013

5.00

105.

0015

0.00

135.

0022

5.00

180.

0010

9.50

150.

0016

6.13

50.0

33.3

4.3

0.0

23.1

Com

mon

103.

7598

.36

92.7

896

.06

97.7

412

3.58

103.

5097

.1710

1.25

106.

3819

.15.

24.

75.

48.

8

Build

ing

Wiri

ngIn

stal

lers

Min

imum

--

--

--

--

--

--

--

-

Max

imum

--

--

--

--

--

--

--

-

Com

mon

--

--

--

--

--

--

--

-

Elec

tric

al W

irem

en

PW2

(Mon

thly

RM

)

Min

imum

1,750

.00

1,200

.00

1,550

.00

1,400

.00

1,475

.00

1,800

.00

1,050

.00

1,050

.00

1,400

.00

1,325

.00

2.9

-12.

5-3

2.3

0.0

-10.

2

Max

imum

4,20

0.00

3,00

0.00

2,50

2.00

4,53

0.00

3,55

8.00

5,00

0.00

3,00

0.00

2,60

0.00

4,53

0.00

3,78

2.50

19.0

0.0

3.9

0.0

6.3

Com

mon

3,07

1.75

2,12

7.61

2,09

3.00

2,32

5.94

2,40

4.58

3,14

3.13

2,19

5.92

2,03

2.53

2,41

3.94

2,44

6.38

2.3

3.2

-2.9

3.8

1.7

Elec

tric

al W

irem

enPW

4 (M

onth

ly R

M)

Min

imum

2,21

0.00

1,800

.00

1,850

.00

1,550

.00

1,852

.50

2,25

0.00

1,800

.00

1,950

.00

1,500

.00

1,875

.00

1.80.

05.

4-3

.21.2

Max

imum

4,50

0.00

3,36

0.00

2,96

9.00

5,25

0.00

4,01

9.75

6,00

0.00

3,40

6.00

2,97

2.00

5,25

0.00

4,40

7.00

33.3

1.40.

10.

09.

6

Com

mon

3,40

0.10

2,81

1.89

2,61

7.28

2,98

5.33

2,95

3.65

3,82

2.93

2,87

4.17

2,59

7.56

3,09

1.33

3,09

6.50

12.4

2.2

-0.8

3.6

4.8

Scaff

olde

rs -

Pref

abric

ated

Min

imum

80.0

060

.00

65.0

075

.00

70.0

080

.00

60.0

070

.00

60.0

067

.50

0.0

0.0

7.7-2

0.0

-3.6

Max

imum

140.

0015

5.00

99.0

012

0.00

128.

5016

0.00

155.

0010

2.00

180.

0014

9.25

14.3

0.0

3.0

50.0

16.1

Com

mon

103.

8810

4.42

80.5

692

.00

95.2

211

1.63

103.

6783

.81

93.5

898

.177.5

-0.7

4.0

1.73.

1

Scaff

olde

rs -

Tubu

lar

Min

imum

75.0

070

.00

65.0

065

.00

68.7

575

.00

70.0

070

.00

75.0

072

.50

0.0

0.0

7.715

.45.

5

Max

imum

120.

0012

5.00

100.

0011

5.00

115.

0016

0.00

131.0

010

0.00

130.

0013

0.25

33.3

4.8

0.0

13.0

13.3

Com

mon

97.0

090

.75

84.2

293

.89

91.4

710

7.63

97.2

586

.1498

.1797

.30

11.0

7.22.

34.

66.

4

Appe

ndix

3.1

9 A

vera

ge D

aily

Wag

e R

ates

for S

kille

d Lo

cal C

onst

ruct

ion

Wor

kers

in P

enin

sula

r Mal

aysi

a in

201

3 an

d 20

14 (R

M/d

ay) (

2)

Page 33: CHAPTER 3 APPENDIX - Goverment Documents · CHAPTER 3 APPENDIX Appendix 3.16 ... E17 Kabel bawah tanah voltan rendah E35 Grid berkapasiti melebihi 72KW E18 Kabel bawah tanah …

STATISTICS AND CONSTRUCTION DEMAND 2015-2016

CHAPTER 3 APPENDIX

187

Wor

ker C

ateg

ory

Min

imum

/ M

axim

um

Wag

es

Year

Chan

ge (%

)20

1320

14

Cent

ral

Regi

onNo

rther

n Re

gion

East

ern

Regi

onSo

uthe

rn

Regi

onAv

erag

eCe

ntra

l Re

gion

North

ern

Regi

onEa

ster

n Re

gion

Sout

hern

Re

gion

Aver

age

Cent

ral

Regi

onNo

rther

n Re

gion

East

ern

Regi

onSo

uthe

rn

Regi

onAv

erag

e

Plas

tere

rs

Min

imum

70.0

080

.00

65.0

070

.00

71.2

575

.00

85.0

068

.00

45.0

068

.25

7.16.

34.

6-3

5.7

-4.2

Max

imum

150.

0012

0.00

90.0

011

0.00

117.5

017

0.00

160.

0011

5.00

170.

0015

3.75

13.3

33.3

27.8

54.5

30.9

Com

mon

106.

2596

.78

79.4

488

.47

92.7

410

9.40

106.

9782

.86

89.8

397

.27

3.0

10.5

4.3

1.54.

9

Tile

rs

Min

imum

80.0

080

.00

80.0

070

.00

77.5

080

.00

90.0

085

.00

70.0

081

.25

0.0

12.5

6.3

28.3

4.8

Max

imum

145.

0013

5.00

115.

0012

5.00

130.

0018

0.00

135.

0011

5.00

150.

0014

5.00

24.1

0.0

0.0

20.0

11.5

Com

mon

110.

4810

1.31

92.7

896

.56

100.

2811

6.43

106.

8195

.92

97.19

104.

095.

45.

43.

40.

73.

8

Pain

ters

- B

uild

ing

Min

imum

80.0

070

.00

55.0

060

.00

66.2

575

.00

70.0

068

.00

45.0

064

.50

-6.3

0.0

23.6

-25.

0-2

.6

Max

imum

130.

0012

5.00

90.0

012

0.00

116.

2515

0.00

125.

0010

0.00

130.

0012

6.25

15.4

0.0

11.1

8.3

8.6

Com

mon

96.1

389

.67

75.1

184

.17

86.2

710

5.78

92.5

379

.42

87.2

891

.25

10.0

3.2

5.7

3.7

5.8

Gen

eral

C

onst

ruct

ion

Wor

kers

-Civ

il

Min

imum

45.0

045

.00

45.0

045

.00

45.0

040

.00

35.0

045

.00

40.0

040

.00

-11.

1-2

2.2

0.0

-11.

1-1

1.1

Max

imum

100.

0080

.00

79.0

085

.00

86.0

013

0.00

101.

0082

.00

120.

0010

8.25

30.0

26.3

3.8

41.2

25.9

Com

mon

65.6

067

.06

62.3

964

.88

64.9

873

.18

72.4

265

.00

69.1

769

.94

11.6

8.0

4.2

6.6

7.6

Not

e:

Dat

a C

over

s:

Cen

tral

Reg

ion:

Per

ak, S

elan

gor a

nd K

uala

Lum

pur

N

orth

ern

Regi

on: K

edah

and

Pul

au P

inan

g

East

ern

Regi

on: P

ahan

g, K

elan

tan

and

Tere

ngga

nu

Sout

hern

Reg

ion:

Neg

eri S

embi

lan,

Mel

aka

and

Joho

r

Appe

ndix

3.1

9 A

vera

ge D

aily

Wag

e R

ates

for S

kille

d Lo

cal C

onst

ruct

ion

Wor

kers

in P

enin

sula

r Mal

aysi

a in

201

3 an

d 20

14 (R

M/d

ay) (

3)

Page 34: CHAPTER 3 APPENDIX - Goverment Documents · CHAPTER 3 APPENDIX Appendix 3.16 ... E17 Kabel bawah tanah voltan rendah E35 Grid berkapasiti melebihi 72KW E18 Kabel bawah tanah …

STATISTICS AND CONSTRUCTION DEMAND 2015-2016

CHAPTER 3 APPENDIX

188

Appe

ndix

3.2

0 A

vera

ge D

aily

Wag

e R

ates

for S

emi-

Skill

ed L

ocal

Con

stru

ctio

n W

orke

rs in

Pen

insu

lar M

alay

sia

in 2

013

and

2014

(RM

/day

) (1)

Wor

ker C

ateg

ory

Min

imum

/ M

axim

um

Wag

es

Year

Chan

ge (%

)20

1320

14

Cent

ral

Regi

onNo

rther

n Re

gion

East

ern

Regi

onSo

uthe

rn

Regi

onAv

erag

eCe

ntra

l Re

gion

North

ern

Regi

onEa

ster

n Re

gion

Sout

hern

Re

gion

Aver

age

Cent

ral

Regi

onNo

rther

n Re

gion

East

ern

Regi

onSo

uthe

rn

Regi

onAv

erag

e

Gen

eral

Con

stru

ctio

n W

orke

rs -

Bui

ldin

g

Min

imum

--

--

--

--

--

--

--

-

Max

imum

--

--

--

--

--

--

--

-

Com

mon

--

--

--

--

--

--

--

-

Con

cret

ers

Min

imum

45.0

055

.00

40.0

040

.00

45.0

045

.00

54.0

045

.00

45.0

047

.25

0.0

-1.8

12.5

12.5

5.0

Max

imum

85.0

010

5.00

77.0

082

.00

87.2

510

0.00

105.

0080

.50

120.

0010

1.38

17.6

0.0

4.5

46.3

16.2

Com

mon

63.3

876

.11

63.6

465

.58

67.1

869

.48

75.0

066

.50

71.7

270

.68

9.6

-1.5

4.5

9.4

5.2

Bar B

ende

rs

Min

imum

50.0

050

.00

45.0

050

.00

48.7

550

.00

50.0

050

.00

45.0

048

.75

0.0

0.0

11.1

-10.

00.

0

Max

imum

100.

0090

.00

76.0

080

.00

86.5

020

0.00

100.

0080

.00

105.

0012

1.25

100.

011

.15.

331

.340

.2

Com

mon

71.4

371

.67

63.6

766

.34

68.2

878

.58

72.1

966

.42

70.7

871

.99

10.0

0.7

4.3

6.7

5.4

Car

pent

ers

-Fo

rmw

ork

Min

imum

45.0

045

.00

45.0

045

.00

45.0

050

.00

45.0

048

.00

50.0

048

.25

11.1

0.0

6.7

11.1

7.2

Max

imum

100.

0095

.00

82.0

089

.00

91.5

015

5.00

95.0

085

.00

100.

0010

8.75

55.0

0.0

3.7

12.4

18.9

Com

mon

70.3

876

.83

69.7

866

.47

70.8

779

.70

75.6

972

.08

70.8

774

.59

13.2

-1.5

3.3

6.6

5.2

Bric

klay

ers

Min

imum

45.0

045

.00

55.0

045

.00

47.5

045

.00

45.0

050

.00

45.0

046

.25

0.0

0.0

-9.1

0.0

-2.6

Max

imum

115.

0095

.00

76.0

095

.00

95.2

511

5.00

100.

0080

.50

120.

0010

3.88

0.0

5.3

5.9

26.3

9.1

Com

mon

68.0

071

.87

66.3

966

.51

68.1

973

.88

75.6

167

.53

72.6

672

.42

8.6

5.2

1.7

9.2

6.2

Roof

ers

Min

imum

50.0

050

.00

55.0

045

.00

50.0

055

.00

50.0

055

.00

48.0

052

.00

10.0

0.0

0.0

6.7

4.0

Max

imum

95.0

010

0.00

82.0

090

.00

91.7

512

5.00

100.

0087

.50

100.

0010

3.13

31.6

0.0

6.7

11.1

12.4

Com

mon

72.6

875

.75

71.1

769

.99

72.4

080

.00

78.7

273

.50

74.1

176

.58

10.1

3.9

3.3

5.9

5.8

Car

pent

ers

-Jo

iner

y

Min

imum

50.0

055

.00

55.0

045

.00

51.2

550

.00

60.0

055

.00

50.0

053

.75

0.0

9.1

0.0

11.1

4.9

Max

imum

120.

0011

0.00

87.0

095

.00

103.

0014

0.00

110.

0091

.50

140.

0012

0.38

16.7

0.0

5.2

47.4

16.9

Com

mon

75.0

088

.06

74.5

672

.39

77.5

086

.25

87.6

176

.58

79.4

482

.47

15.0

-0.5

2.7

9.7

6.4

Stee

l Stru

ctur

eFa

bric

ator

s

Min

imum

50.0

055

.00

50.0

055

.00

52.5

050

.00

55.0

058

.00

40.0

050

.75

0.0

0.0

16.0

-27.

3-3

.3

Max

imum

120.

0010

5.00

91.0

010

0.00

104.

0015

0.00

105.

0096

.50

140.

0012

2.88

25.0

0.0

6.0

40.0

18.1

Com

mon

78.6

382

.06

76.6

177

.50

78.7

091

.98

84.1

178

.83

80.9

783

.97

17.0

2.5

2.9

4.5

6.7

Page 35: CHAPTER 3 APPENDIX - Goverment Documents · CHAPTER 3 APPENDIX Appendix 3.16 ... E17 Kabel bawah tanah voltan rendah E35 Grid berkapasiti melebihi 72KW E18 Kabel bawah tanah …

STATISTICS AND CONSTRUCTION DEMAND 2015-2016

CHAPTER 3 APPENDIX

189

Wor

ker C

ateg

ory

Min

imum

/ M

axim

um

Wag

es

Year

Chan

ge (%

)20

1320

14

Cent

ral

Regi

onNo

rther

n Re

gion

East

ern

Regi

onSo

uthe

rn

Regi

onAv

erag

eCe

ntra

l Re

gion

North

ern

Regi

onEa

ster

n Re

gion

Sout

hern

Re

gion

Aver

age

Cent

ral

Regi

onNo

rther

n Re

gion

East

ern

Regi

onSo

uthe

rn

Regi

onAv

erag

e

Gen

eral

Wel

ders

Min

imum

50.0

050

.00

55.0

045

.00

50.0

050

.00

50.0

050

.00

46.0

049

.00

0.0

0.0

-9.1

2.2

-2.0

Max

imum

130.

0091

.00

83.0

091

.00

98.7

515

0.00

96.0

088

.50

140.

0011

8.63

15.4

5.5

6.6

53.8

20.1

Com

mon

77.2

572

.50

74.0

671

.94

73.9

486

.40

75.6

776

.00

76.7

878

.71

11.8

4.4

2.6

6.7

6.5

Plum

bers

-Bui

ldin

g an

d Sa

nita

ry

Min

imum

53.0

055

.00

55.0

045

.00

52.0

055

.00

55.0

050

.00

40.0

050

.00

3.8

0.0

-9.1

-11.

1-3

.8

Max

imum

120.

0012

0.00

74.0

082

.00

99.0

013

5.00

130.

0079

.50

110.

0011

3.63

12.5

8.3

7.434

.114

.8

Com

mon

73.2

375

.50

66.9

464

.47

70.0

485

.20

76.5

668

.17

70.9

675

.22

16.3

1.41.

810

.17.4

Plum

bers

-Re

ticul

atio

n

Min

imum

50.0

055

.00

50.0

048

.00

50.7

550

.00

55.0

050

.00

50.0

051

.25

0.0

0.0

0.0

4.2

1.0

Max

imum

105.

0011

0.00

95.0

099

.00

102.

2515

0.00

150.

0097

.00

110.

0012

6.75

42.9

36.4

2.1

11.1

24.0

Com

mon

72.3

581

.25

80.3

373

.25

76.8

088

.55

85.8

982

.14

78.3

183

.72

22.4

5.7

2.3

6.9

9.0

Build

ing

Wiri

ngIn

stal

lers

Min

imum

70.0

060

.00

60.0

050

.00

60.0

070

.00

47.0

070

.00

50.0

059

.25

0.0

-21.

716

.70.

0-1

.3

Max

imum

130.

0012

0.00

100.

0010

6.00

114.

0015

0.00

140.

0010

1.50

130.

0013

0.38

15.4

16.7

1.5

22.6

14.4

Com

mon

92.5

090

.06

89.2

882

.28

88.5

399

.15

92.0

692

.97

90.1

493

.58

7.2

2.2

4.1

9.6

5.7

Elec

tric

al W

irem

en

PW2

(Mon

thly

RM

)

Min

imum

--

--

--

--

--

--

--

-

Max

imum

--

--

--

--

--

--

--

-

Com

mon

--

--

--

--

--

--

--

-

Elec

tric

al W

irem

enPW

4 (M

onth

ly R

M)

Min

imum

--

--

--

--

--

--

--

-

Max

imum

--

--

--

--

--

--

--

-

Com

mon

--

--

--

--

--

--

--

-

Scaff

olde

rs -

Pref

abric

ated

Min

imum

60.0

040

.00

50.0

055

.00

51.2

560

.00

45.0

050

.00

40.0

048

.75

0.0

12.5

0.0

-27.

3-4

.9

Max

imum

110.

0012

0.00

74.0

010

5.00

102.

2512

0.00

120.

0077

.00

120.

0010

9.25

9.1

0.0

4.1

14.3

6.8

Com

mon

78.0

875

.03

65.9

474

.76

73.4

581

.83

77.8

167

.97

77.4

076

.25

4.8

3.7

3.1

3.5

3.8

Scaff

olde

rs -

Tubu

lar

Min

imum

50.0

050

.00

50.0

060

.00

52.5

050

.00

55.0

055

.00

50.0

052

.50

0.0

10.0

10.0

-16.

70.

0

Max

imum

90.0

010

5.00

80.0

090

.00

91.2

511

0.00

105.

0080

.00

98.0

098

.25

22.2

0.0

0.0

8.9

7.7

Com

mon

72.4

872

.39

67.3

973

.77

71.5

179

.58

74.7

868

.89

77.2

175

.12

9.8

3.3

2.2

4.7

5.0

Appe

ndix

3.2

0 A

vera

ge D

aily

Wag

e R

ates

for S

emi-

Skill

ed L

ocal

Con

stru

ctio

n W

orke

rs in

Pen

insu

lar M

alay

sia

in 2

013

and

2014

(RM

/day

) (2)

Page 36: CHAPTER 3 APPENDIX - Goverment Documents · CHAPTER 3 APPENDIX Appendix 3.16 ... E17 Kabel bawah tanah voltan rendah E35 Grid berkapasiti melebihi 72KW E18 Kabel bawah tanah …

STATISTICS AND CONSTRUCTION DEMAND 2015-2016

CHAPTER 3 APPENDIX

190

Wor

ker C

ateg

ory

Min

imum

/ M

axim

um

Wag

es

Year

Chan

ge (%

)20

1320

14

Cent

ral

Regi

onNo

rther

n Re

gion

East

ern

Regi

onSo

uthe

rn

Regi

onAv

erag

eCe

ntra

l Re

gion

North

ern

Regi

onEa

ster

n Re

gion

Sout

hern

Re

gion

Aver

age

Cent

ral

Regi

onNo

rther

n Re

gion

East

ern

Regi

onSo

uthe

rn

Regi

onAv

erag

e

Plas

tere

rs

Min

imum

50.0

050

.00

55.0

040

.00

48.7

550

.00

50.0

055

.00

45.0

050

.00

0.0

0.0

0.0

12.5

2.6

Max

imum

105.

0010

0.00

76.0

085

.00

91.5

012

0.00

108.

0079

.50

135.

0011

0.63

14.3

8.0

4.6

58.8

20.9

Com

mon

73.0

073

.92

67.7

867

.80

70.6

379

.45

81.3

969

.86

73.3

276

.01

8.8

10.1

3.1

8.1

7.6

Tile

rs

Min

imum

55.0

050

.00

55.0

050

.00

52.5

055

.00

55.0

058

.00

55.0

055

.75

0.0

10.0

5.5

10.0

6.2

Max

imum

120.

0010

5.00

88.0

090

.00

100.

7512

0.00

105.

0092

.50

120.

0010

9.38

0.0

0.0

5.1

33.3

8.6

Com

mon

86.4

375

.67

73.4

471

.58

76.7

890

.65

82.7

275

.33

78.3

881

.77

4.9

9.3

2.6

9.5

6.5

Pain

ters

- B

uild

ing

Min

imum

50.0

050

.00

45.0

055

.00

50.0

050

.00

50.0

050

.00

45.0

048

.75

0.0

0.0

11.1

-18.

2-2

.5

Max

imum

95.0

010

0.00

71.0

090

.00

89.0

013

0.00

100.

0074

.00

100.

0010

1.00

36.8

0.0

4.2

11.1

13.5

Com

mon

69.6

367

.72

62.7

267

.69

66.9

476

.88

72.7

865

.75

70.6

771

.52

10.4

7.5

4.8

4.4

6.8

Gen

eral

Con

stru

ctio

n W

orke

rs-C

ivil

Min

imum

--

--

--

--

--

--

--

-

Max

imum

--

--

--

--

--

--

--

-

Com

mon

--

--

--

--

--

--

--

-

Not

e:

Dat

a C

over

s:

Cen

tral

Reg

ion:

Per

ak, S

elan

gor a

nd K

uala

Lum

pur

N

orth

ern

Regi

on: K

edah

and

Pul

au P

inan

g

East

ern

Regi

on: P

ahan

g, K

elan

tan

and

Tere

ngga

nu

Sout

hern

Reg

ion:

Neg

eri S

embi

lan,

Mel

aka

and

Joho

r

Appe

ndix

3.2

0 A

vera

ge D

aily

Wag

e R

ates

for S

emi-

Skill

ed L

ocal

Con

stru

ctio

n W

orke

rs in

Pen

insu

lar M

alay

sia

in 2

013

and

2014

(RM

/day

) (3)

Page 37: CHAPTER 3 APPENDIX - Goverment Documents · CHAPTER 3 APPENDIX Appendix 3.16 ... E17 Kabel bawah tanah voltan rendah E35 Grid berkapasiti melebihi 72KW E18 Kabel bawah tanah …

STATISTICS AND CONSTRUCTION DEMAND 2015-2016

CHAPTER 3 APPENDIX

191

Appe

ndix

3.2

1 A

vera

ge D

aily

Wag

e R

ates

for S

kille

d Lo

cal C

onst

ruct

ion

Wor

kers

in 2

013

and

2014

(RM

/day

) (1)

Wor

ker C

ateg

ory

Min

imum

/ M

axim

um

Wag

es

Year

Cha

nge

(%)

2013

2014

K. K

inab

alu

Sand

akan

Taw

auAv

erag

eK.

Kin

abal

uSa

ndak

anTa

wau

Aver

age

K. K

inab

alu

Sand

akan

Taw

auAv

erag

e

Gen

eral

C

onst

ruct

ion

Wor

kers

- B

uild

ing

Min

imum

46.4

546

.68

46.0

046

.38

48.4

548

.00

48.0

048

.15

4.3

2.8

4.3

3.8

Max

imum

67.0

068

.00

70.0

068

.33

70.0

071

.00

73.0

071

.33

4.5

4.4

4.3

4.4

Com

mon

55.4

855

.50

55.5

055

.49

58.2

458

.08

58.2

358

.18

5.0

4.6

4.9

4.8

Con

cret

ers

Min

imum

84.4

371

.00

80.0

078

.48

86.4

373

.00

82.0

080

.48

2.4

2.8

2.5

2.5

Max

imum

108.

0090

.00

100.

6099

.53

111.

0094

.00

103.

6010

2.87

2.8

4.4

3.0

3.3

Com

mon

92.5

782

.67

89.6

788

.30

95.2

885

.50

92.5

091

.09

2.9

3.4

3.2

3.2

Bar B

ende

rs

Min

imum

83.0

080

.00

89.0

084

.00

85.0

082

.00

91.0

086

.00

2.4

2.5

2.2

2.4

Max

imum

117.

0092

.00

100.

0010

3.00

120.

0095

.00

103.

0010

6.00

2.6

3.3

3.0

2.9

Com

mon

96.8

087

.67

94.6

793

.05

99.5

590

.17

97.4

295

.71

2.8

2.9

2.9

2.9

Car

pent

ers

-Fo

rmw

ork

Min

imum

90.2

188

.00

88.0

088

.74

92.2

190

.00

90.0

090

.74

2.2

2.3

2.3

2.3

Max

imum

111.

0010

0.00

104.

0010

5.00

114.

0010

3.00

107.

0010

8.00

2.7

3.0

2.9

2.9

Com

mon

98.5

093

.83

97.4

396

.59

101.

2097

.00

100.

1099

.43

2.7

3.4

2.7

2.9

Bric

klay

ers

Min

imum

86.0

071

.00

82.2

079

.73

88.0

073

.00

84.2

081

.73

2.3

2.8

2.4

2.5

Max

imum

107.

0090

.00

100.

6099

.20

110.

0093

.00

103.

6010

2.20

2.8

3.3

3.0

3.0

Com

mon

96.7

481

.83

92.6

090

.39

99.2

984

.67

95.2

093

.05

2.6

3.5

2.8

2.9

Roof

ers

Min

imum

96.1

681

.00

91.0

089

.39

98.1

683

.00

93.0

091

.39

2.1

2.5

2.2

2.2

Max

imum

127.

0010

1.00

116.

0011

4.67

103.

0010

4.00

119.

0010

8.67

-18.

93.

02.

6-5

.2

Com

mon

104.

4788

.50

103.

4098

.79

107.

1791

.33

106.

1510

1.55

2.6

3.2

2.7

2.8

Car

pent

ers

-Jo

iner

y

Min

imum

99.0

097

.00

99.0

098

.33

101.

0099

.00

101.

0010

0.33

2.0

2.1

2.0

2.0

Max

imum

127.

0011

2.00

117.

0011

8.67

130.

0011

5.00

120.

0012

1.67

2.4

2.7

2.6

2.5

Com

mon

110.

2310

1.83

104.

3310

5.46

112.

9810

4.67

106.

9210

8.19

2.5

2.8

2.5

2.6

Stee

l Stru

ctur

eFa

bric

ator

s

Min

imum

96.1

679

.00

95.0

090

.05

98.1

681

.00

97.0

092

.05

2.1

2.5

2.1

2.2

Max

imum

127.

0010

1.00

119.

0011

5.67

130.

0010

4.00

122.

0011

8.67

2.4

3.0

2.5

2.6

Com

mon

108.

6488

.67

107.

3010

1.54

111.

2991

.50

110.

3010

4.36

2.4

3.2

2.8

2.8

Page 38: CHAPTER 3 APPENDIX - Goverment Documents · CHAPTER 3 APPENDIX Appendix 3.16 ... E17 Kabel bawah tanah voltan rendah E35 Grid berkapasiti melebihi 72KW E18 Kabel bawah tanah …

STATISTICS AND CONSTRUCTION DEMAND 2015-2016

CHAPTER 3 APPENDIX

192

Wor

ker C

ateg

ory

Min

imum

/ M

axim

um

Wag

es

Year

Cha

nge

(%)

2013

2014

K. K

inab

alu

Sand

akan

Taw

auAv

erag

eK.

Kin

abal

uSa

ndak

anTa

wau

Aver

age

K. K

inab

alu

Sand

akan

Taw

auAv

erag

e

Gen

eral

Wel

ders

Min

imum

84.2

671

.00

87.0

080

.75

86.2

673

.00

89.0

082

.75

2.4

2.8

2.3

2.5

Max

imum

120.

0010

0.00

113.

0011

1.00

125.

0010

2.00

116.

0011

4.33

4.2

2.0

2.7

3.0

Com

mon

102.

5783

.08

100.

0395

.23

105.

2785

.94

102.

9598

.05

2.6

3.4

2.9

3.0

Plum

bers

-Bui

ldin

g an

d Sa

nita

ry

Min

imum

90.2

193

.00

97.0

093

.40

92.2

195

.00

100.

0095

.74

2.2

2.2

3.1

2.5

Max

imum

116.

0010

5.00

111.

0011

0.67

119.

0010

8.00

114.

0011

3.67

2.6

2.9

2.7

2.7

Com

mon

100.

7498

.00

102.

6710

0.47

103.

4410

0.83

105.

3310

3.20

2.7

2.9

2.6

2.7

Plum

bers

-Re

ticul

atio

n

Min

imum

96.1

677

.00

97.0

090

.05

98.1

679

.00

99.0

092

.05

2.1

2.6

2.1

2.2

Max

imum

127.

0010

4.00

125.

0011

8.67

130.

0010

7.00

128.

0012

1.67

2.4

2.9

2.4

2.5

Com

mon

112.

1390

.92

110.

1810

4.41

114.

8893

.83

113.

0610

7.26

2.5

3.2

2.6

2.7

Build

ing

Wiri

ngIn

stal

lers

Min

imum

--

--

--

--

--

--

Max

imum

--

--

--

--

--

--

Com

mon

--

--

--

--

--

--

Elec

tric

al W

irem

en

PW2

(Mon

thly

RM

)

Min

imum

2,10

1.00

1,71

1.00

2,08

9.00

1,96

7.00

2,10

3.00

1,71

3.00

2,09

1.00

1,96

9.00

0.1

0.1

0.1

0.1

Max

imum

2,87

3.00

2,28

8.00

2,78

6.00

2,64

9.00

2,87

7.00

2,29

2.00

2,78

9.00

2,65

2.67

0.1

0.2

0.1

0.1

Com

mon

2,48

2.24

1,98

3.67

2,42

1.67

2,29

5.86

2,48

4.96

1,98

6.58

2,42

4.50

2,29

8.68

0.1

0.1

0.1

0.1

Elec

tric

al W

irem

enPW

4 (M

onth

ly R

M)

Min

imum

2,90

1.00

2,37

6.00

2,90

7.00

2,72

8.00

2,90

3.00

2,37

8.00

2,90

9.00

2,73

0.00

0.1

0.1

0.1

0.1

Max

imum

3,58

2.00

2,85

8.00

3,48

8.00

3,30

9.33

3,58

6.00

2,86

2.00

3,49

1.00

3,31

3.00

0.1

0.1

0.1

0.1

Com

mon

3,34

7.86

2,63

3.00

3,21

4.17

3,06

5.01

3,35

0.67

2,86

2.00

3,21

6.83

3,14

3.17

0.1

8.7

0.1

2.5

Scaff

olde

rs -

Pref

abric

ated

Min

imum

84.4

376

.00

82.2

080

.88

86.4

378

.00

84.2

082

.88

2.4

2.6

2.4

2.5

Max

imum

101.

0093

.00

99.0

097

.67

107.

0097

.00

102.

0010

2.00

5.9

4.3

3.0

4.4

Com

mon

93.6

785

.67

91.8

790

.40

96.3

788

.50

94.5

293

.13

2.9

3.3

2.9

3.0

Scaff

olde

rs -

Tubu

lar

Min

imum

84.4

376

.00

82.2

080

.88

86.4

378

.00

84.2

082

.88

2.4

2.6

2.4

2.5

Max

imum

110.

0092

.00

108.

0010

3.33

113.

0095

.00

111.

0010

6.33

2.7

3.3

2.8

2.9

Com

mon

96.8

582

.17

95.4

391

.48

99.6

385

.00

98.1

094

.24

2.9

3.4

2.8

3.0

Plas

tere

rs

Min

imum

86.0

079

.00

82.2

082

.40

88.0

081

.00

84.2

084

.40

2.3

2.5

2.4

2.4

Max

imum

114.

0094

.00

102.

0010

3.33

118.

0097

.00

105.

0010

6.67

3.5

3.2

2.9

3.2

Com

mon

99.6

486

.33

92.8

392

.93

102.

2489

.25

95.5

095

.66

2.6

3.4

2.9

2.9

Appe

ndix

3.2

1 A

vera

ge D

aily

Wag

e R

ates

for S

kille

d Lo

cal C

onst

ruct

ion

Wor

kers

in 2

013

and

2014

(RM

/day

) (2)

Page 39: CHAPTER 3 APPENDIX - Goverment Documents · CHAPTER 3 APPENDIX Appendix 3.16 ... E17 Kabel bawah tanah voltan rendah E35 Grid berkapasiti melebihi 72KW E18 Kabel bawah tanah …

STATISTICS AND CONSTRUCTION DEMAND 2015-2016

CHAPTER 3 APPENDIX

193

Wor

ker C

ateg

ory

Min

imum

/ M

axim

um

Wag

es

Year

Cha

nge

(%)

2013

2014

K. K

inab

alu

Sand

akan

Taw

auAv

erag

eK.

Kin

abal

uSa

ndak

anTa

wau

Aver

age

K. K

inab

alu

Sand

akan

Taw

auAv

erag

e

Tile

rs

Min

imum

102.

0084

.00

94.0

093

.33

104.

0086

.00

96.0

095

.33

2.0

2.4

2.1

2.1

Max

imum

133.

0010

0.00

107.

0011

3.33

138.

0010

3.00

110.

0011

7.00

3.8

3.0

2.8

3.2

Com

mon

116.

3793

.17

101.

7310

3.76

119.

1796

.08

104.

1510

6.47

2.4

3.1

2.4

2.6

Pain

ters

- B

uild

ing

Min

imum

80.0

072

.00

76.4

076

.13

82.0

074

.00

78.4

078

.13

2.5

2.8

2.6

2.6

Max

imum

107.

0091

.00

100.

6099

.53

111.

0094

.00

103.

6010

2.87

3.7

3.3

3.0

3.3

Com

mon

91.9

783

.17

86.9

087

.35

94.6

786

.00

89.5

390

.07

2.9

3.4

3.0

3.1

Gen

eral

C

onst

ruct

ion

Wor

kers

-Civ

il

Min

imum

66.5

553

.23

66.0

061

.93

68.5

555

.25

68.0

063

.93

3.0

3.8

3.0

3.2

Max

imum

90.0

076

.00

84.0

083

.33

93.0

079

.00

87.0

086

.33

3.3

3.9

3.6

3.6

Com

mon

76.1

162

.38

75.3

371

.27

78.7

665

.29

77.8

773

.97

3.5

4.7

3.4

3.8

Appe

ndix

3.2

1 A

vera

ge D

aily

Wag

e R

ates

for S

kille

d Lo

cal C

onst

ruct

ion

Wor

kers

in 2

013

and

2014

(RM

/day

) (3)

Page 40: CHAPTER 3 APPENDIX - Goverment Documents · CHAPTER 3 APPENDIX Appendix 3.16 ... E17 Kabel bawah tanah voltan rendah E35 Grid berkapasiti melebihi 72KW E18 Kabel bawah tanah …

STATISTICS AND CONSTRUCTION DEMAND 2015-2016

CHAPTER 3 APPENDIX

194

Appe

ndix

3.2

2 A

vera

ge D

aily

Wag

e Ra

tes

for S

emi-

Skill

ed L

ocal

Con

stru

ctio

n W

orke

rs in

Sab

ah in

201

3 an

d 20

14 (R

M/d

ay) (

1)

Wor

ker C

ateg

ory

Min

imum

/ M

axim

um

Wag

es

Year

Cha

nge

(%)

2013

2014

K. K

inab

alu

Sand

akan

Taw

auAv

erag

eK.

Kin

abal

uSa

ndak

anTa

wau

Aver

age

K. K

inab

alu

Sand

akan

Taw

auAv

erag

e

Gen

eral

C

onst

ruct

ion

Wor

kers

- B

uild

ing

Min

imum

--

--

--

--

--

--

Max

imum

--

--

--

--

--

--

Com

mon

--

--

--

--

--

--

Con

cret

ers

Min

imum

72.5

156

.00

68.0

065

.50

74.5

158

.00

70.0

067

.50

2.8

3.6

2.9

3.1

Max

imum

85.4

381

.00

91.0

085

.81

89.4

384

.00

94.0

089

.14

4.7

3.7

3.3

3.9

Com

mon

79.6

264

.75

78.3

074

.22

82.2

867

.50

81.0

576

.94

3.3

4.2

3.5

3.7

Bar B

ende

rs

Min

imum

66.4

253

.25

68.0

062

.56

68.4

255

.25

70.0

064

.56

3.0

3.8

2.9

3.2

Max

imum

86.0

076

.00

84.0

082

.00

90.0

079

.00

87.0

085

.33

4.7

3.9

3.6

4.1

Com

mon

76.6

862

.38

75.3

371

.46

79.4

165

.44

78.0

874

.31

3.6

4.9

3.7

4.0

Car

pent

ers

-Fo

rmw

ork

Min

imum

78.3

162

.75

77.0

072

.69

80.3

164

.75

79.0

074

.69

2.6

3.2

2.6

2.8

Max

imum

94.0

079

.00

90.0

087

.67

97.0

082

.00

93.0

090

.67

3.2

3.8

3.3

3.4

Com

mon

86.0

670

.33

85.0

080

.46

88.7

073

.10

87.6

783

.16

3.1

3.9

3.1

3.3

Bric

klay

ers

Min

imum

56.5

556

.00

55.0

055

.85

58.5

558

.00

57.0

057

.85

3.5

3.6

3.6

3.6

Max

imum

77.7

577

.00

77.0

077

.25

82.0

081

.00

80.0

081

.00

5.5

5.2

3.9

4.9

Com

mon

68.9

866

.00

66.1

767

.05

71.7

168

.83

69.1

769

.90

4.0

4.3

4.5

4.3

Roof

ers

Min

imum

81.0

064

.00

82.2

075

.73

83.0

066

.00

84.2

077

.73

2.5

3.1

2.4

2.6

Max

imum

96.0

080

.00

93.0

089

.67

100.

0083

.00

96.0

093

.00

4.2

3.8

3.2

3.7

Com

mon

88.3

271

.96

87.0

382

.44

91.0

074

.96

89.7

885

.25

3.0

4.2

3.2

3.4

Car

pent

ers

-Jo

iner

y

Min

imum

84.2

667

.50

82.2

077

.99

86.2

669

.50

84.2

079

.99

2.4

3.0

2.4

2.6

Max

imum

100.

0090

.00

101.

0097

.00

103.

0093

.00

104.

0010

0.00

3.0

3.3

3.0

3.1

Com

mon

90.1

074

.46

89.8

784

.81

92.8

977

.46

92.6

287

.66

3.1

4.0

3.1

3.4

Stee

l Stru

ctur

eFa

bric

ator

s

Min

imum

88.0

072

.00

88.0

082

.67

90.0

074

.00

90.0

084

.67

2.3

2.8

2.3

2.4

Max

imum

103.

0087

.00

101.

0097

.00

110.

0091

.00

104.

0010

1.67

6.8

4.6

3.0

4.8

Com

mon

94.8

977

.71

93.6

388

.74

97.6

980

.63

96.1

391

.48

3.0

3.8

2.7

3.1

Page 41: CHAPTER 3 APPENDIX - Goverment Documents · CHAPTER 3 APPENDIX Appendix 3.16 ... E17 Kabel bawah tanah voltan rendah E35 Grid berkapasiti melebihi 72KW E18 Kabel bawah tanah …

STATISTICS AND CONSTRUCTION DEMAND 2015-2016

CHAPTER 3 APPENDIX

195

Wor

ker C

ateg

ory

Min

imum

/ M

axim

um

Wag

es

Year

Cha

nge

(%)

2013

2014

K. K

inab

alu

Sand

akan

Taw

auAv

erag

eK.

Kin

abal

uSa

ndak

anTa

wau

Aver

age

K. K

inab

alu

Sand

akan

Taw

auAv

erag

e

Gen

eral

Wel

ders

Min

imum

84.2

664

.00

83.0

077

.09

86.2

666

.00

85.0

079

.09

2.4

3.1

2.4

2.6

Max

imum

100.

0081

.00

98.0

093

.00

104.

0089

.00

101.

0098

.00

4.0

9.9

3.1

5.4

Com

mon

92.7

974

.38

89.8

085

.66

95.4

977

.38

91.9

788

.28

2.9

4.0

2.4

3.1

Plum

bers

-Bui

ldin

g an

d Sa

nita

ry

Min

imum

72.3

758

.00

70.6

066

.99

74.3

760

.00

72.6

068

.99

2.8

3.4

2.8

3.0

Max

imum

90.0

081

.00

92.0

087

.67

93.0

084

.00

95.0

090

.67

3.3

3.7

3.3

3.4

Com

mon

78.3

064

.79

78.1

773

.75

81.1

267

.96

80.9

276

.67

3.6

4.9

3.5

4.0

Plum

bers

-Re

ticul

atio

n

Min

imum

90.2

172

.25

90.0

084

.15

92.2

174

.25

92.0

086

.15

2.2

2.8

2.2

2.4

Max

imum

110.

0096

.00

111.

0010

5.67

113.

0099

.00

114.

0010

8.67

2.7

3.1

2.7

2.8

Com

mon

99.0

981

.33

98.4

392

.95

101.

7484

.25

101.

2795

.75

2.7

3.6

2.9

3.0

Build

ing

Wiri

ngIn

stal

lers

Min

imum

102.

1081

.75

99.6

094

.48

104.

1083

.75

101.

6096

.48

2.0

2.4

2.0

2.1

Max

imum

120.

0097

.00

117.

0011

1.33

123.

0010

0.00

120.

0011

4.33

2.5

3.1

2.6

2.7

Com

mon

109.

1488

.54

107.

1310

1.60

111.

8891

.46

109.

7510

4.36

2.5

3.3

2.4

2.7

Elec

tric

al W

irem

en

PW2

(Mon

thly

RM

)

Min

imum

--

--

--

--

--

--

Max

imum

--

--

--

--

--

--

Com

mon

--

--

--

--

--

--

Elec

tric

al W

irem

enPW

4 (M

onth

ly R

M)

Min

imum

--

--

--

--

--

--

Max

imum

--

--

--

--

--

--

Com

mon

--

--

--

--

--

--

Scaff

olde

rs -

Pref

abric

ated

Min

imum

66.5

553

.25

64.8

061

.53

68.5

555

.25

66.8

063

.53

3.0

3.8

3.1

3.3

Max

imum

92.0

078

.00

90.0

086

.67

97.0

081

.00

93.0

090

.33

5.4

3.8

3.3

4.2

Com

mon

79.4

964

.83

78.3

074

.21

82.1

467

.90

81.1

377

.06

3.3

4.7

3.6

3.8

Scaff

olde

rs -

Tubu

lar

Min

imum

72.5

156

.00

70.6

066

.37

74.5

158

.00

72.6

068

.37

2.8

3.6

2.8

3.0

Max

imum

89.0

072

.00

90.0

083

.67

93.0

075

.00

93.0

087

.00

4.5

4.2

3.3

4.0

Com

mon

77.6

463

.96

77.1

772

.92

80.3

466

.88

79.7

875

.67

3.5

4.6

3.4

3.8

Appe

ndix

3.2

2 A

vera

ge D

aily

Wag

e Ra

tes

for S

emi-

Skill

ed L

ocal

Con

stru

ctio

n W

orke

rs in

Sab

ah in

201

3 an

d 20

14 (R

M/d

ay) (

2)

Page 42: CHAPTER 3 APPENDIX - Goverment Documents · CHAPTER 3 APPENDIX Appendix 3.16 ... E17 Kabel bawah tanah voltan rendah E35 Grid berkapasiti melebihi 72KW E18 Kabel bawah tanah …

STATISTICS AND CONSTRUCTION DEMAND 2015-2016

CHAPTER 3 APPENDIX

196

Wor

ker C

ateg

ory

Min

imum

/ M

axim

um

Wag

es

Year

Cha

nge

(%)

2013

2014

K. K

inab

alu

Sand

akan

Taw

auAv

erag

eK.

Kin

abal

uSa

ndak

anTa

wau

Aver

age

K. K

inab

alu

Sand

akan

Taw

auAv

erag

e

Plas

tere

rs

Min

imum

72.0

055

.00

70.6

065

.87

74.0

057

.00

72.6

067

.87

2.8

3.6

2.8

3.0

Max

imum

96.0

080

.00

91.0

089

.00

100.

0083

.00

94.0

092

.33

4.2

3.8

3.3

3.7

Com

mon

84.1

268

.13

82.1

378

.13

86.7

271

.04

84.8

880

.88

3.1

4.3

3.3

3.5

Tile

rs

Min

imum

78.0

058

.00

74.4

070

.13

80.0

060

.00

78.4

072

.80

2.6

3.4

5.4

3.8

Max

imum

96.0

086

.00

89.0

090

.33

99.0

089

.00

92.0

093

.33

3.1

3.5

3.4

3.3

Com

mon

85.5

269

.54

83.2

379

.43

88.2

772

.46

85.8

782

.20

3.2

4.2

3.2

3.5

Pain

ters

- B

uild

ing

Min

imum

60.5

952

.00

59.0

057

.20

62.5

954

.00

61.0

059

.20

3.3

3.8

3.4

3.5

Max

imum

88.0

072

.00

86.0

082

.00

94.0

075

.00

89.0

086

.00

6.8

4.2

3.5

4.9

Com

mon

75.9

061

.63

73.9

370

.49

78.6

064

.54

76.6

873

.27

3.6

4.7

3.7

4.0

Gen

eral

C

onst

ruct

ion

Wor

kers

-Civ

il

Min

imum

--

--

--

--

--

--

Max

imum

--

--

--

--

--

--

Com

mon

--

--

--

--

--

--

Appe

ndix

3.2

2 A

vera

ge D

aily

Wag

e Ra

tes

for S

emi-

Skill

ed L

ocal

Con

stru

ctio

n W

orke

rs in

Sab

ah in

201

3 an

d 20

14 (R

M/d

ay) (

3)

Page 43: CHAPTER 3 APPENDIX - Goverment Documents · CHAPTER 3 APPENDIX Appendix 3.16 ... E17 Kabel bawah tanah voltan rendah E35 Grid berkapasiti melebihi 72KW E18 Kabel bawah tanah …

STATISTICS AND CONSTRUCTION DEMAND 2015-2016

CHAPTER 3 APPENDIX

197

Appe

ndix

3.2

3 A

vera

ge D

aily

Wag

e R

ates

for S

kille

d Lo

cal C

onst

ruct

ion

Wor

kers

in S

araw

ak in

201

3 an

d 20

14 (R

M/d

ay) (

1)

Wor

ker C

ateg

ory

Min

imum

/ M

axim

um

Wag

es

Year

Cha

nge

(%)

2013

2014

Kuch

ing

Mir

iSi

buAv

erag

eKu

chin

gM

iri

Sibu

Aver

age

Kuch

ing

Mir

iSi

buAv

erag

e

Gen

eral

Con

stru

ctio

n W

orke

rs -

Bui

ldin

g

Min

imum

46.9

047

.00

46.0

046

.63

48.9

049

.00

48.0

048

.63

4.3

4.3

4.3

4.3

Max

imum

74.0

063

.00

67.0

068

.00

78.0

067

.50

70.0

071

.83

5.4

7.1

4.5

5.6

Com

mon

59.4

055

.33

55.3

356

.69

61.8

558

.25

57.6

759

.26

4.1

5.3

4.2

4.5

Con

cret

ers

Min

imum

77.2

582

.20

79.0

079

.48

79.2

584

.20

81.0

081

.48

2.6

2.4

2.5

2.5

Max

imum

100.

7110

0.60

107.

0010

2.77

104.

7110

3.60

110.

0010

6.10

4.0

3.0

2.8

3.2

Com

mon

89.9

389

.67

91.0

090

.20

92.6

392

.57

93.6

792

.96

3.0

3.2

2.9

3.1

Bar B

ende

rs

Min

imum

91.0

083

.00

86.0

086

.67

93.0

085

.00

88.0

088

.67

2.2

2.4

2.3

2.3

Max

imum

103.

0010

0.00

97.0

010

0.00

108.

0010

4.50

100.

0010

4.17

4.9

4.5

3.1

4.2

Com

mon

96.6

093

.17

92.8

394

.20

99.3

096

.00

95.5

096

.93

2.8

3.0

2.9

2.9

Car

pent

ers

-Fo

rmw

ork

Min

imum

93.1

788

.00

91.0

090

.72

90.9

890

.00

93.0

091

.33

-2.4

2.3

2.2

0.7

Max

imum

109.

0011

0.00

108.

0010

9.00

113.

0011

4.50

111.

0011

2.83

3.7

4.1

2.8

3.5

Com

mon

97.8

797

.37

98.6

597

.96

100.

5610

0.37

101.

3110

0.75

2.7

3.1

2.7

2.8

Bric

klay

ers

Min

imum

82.6

071

.00

87.0

080

.20

84.6

073

.00

89.0

082

.20

2.4

2.8

2.3

2.5

Max

imum

100.

7196

.00

101.

8899

.53

105.

0010

0.50

104.

8810

3.46

4.3

4.7

2.9

3.9

Com

mon

92.0

884

.83

93.9

890

.30

94.7

587

.83

97.0

693

.21

2.9

3.5

3.3

3.2

Roof

ers

Min

imum

95.1

293

.80

95.0

094

.64

97.1

295

.80

97.0

096

.64

2.1

2.1

2.1

2.1

Max

imum

111.

0011

8.00

117.

0011

5.33

116.

0012

2.50

120.

0011

9.50

4.5

3.8

2.6

3.6

Com

mon

103.

5610

3.40

104.

4610

3.81

106.

2510

6.25

107.

2110

6.57

2.6

2.8

2.6

2.7

Car

pent

ers

-Jo

iner

y

Min

imum

95.1

293

.80

96.0

094

.97

97.1

295

.80

98.0

096

.97

2.1

2.1

2.1

2.1

Max

imum

116.

0011

9.00

117.

0011

7.33

120.

0012

3.50

120.

0012

1.17

3.4

3.8

2.6

3.3

Com

mon

104.

2310

4.27

105.

4410

4.65

106.

9210

7.15

108.

3510

7.47

2.6

2.8

2.8

2.7

Stee

l Stru

ctur

eFa

bric

ator

s

Min

imum

87.9

698

.00

95.0

093

.65

89.9

610

0.00

97.0

095

.65

2.3

2.0

2.1

2.1

Max

imum

113.

0011

2.00

120.

0011

5.00

120.

0012

6.50

123.

0012

3.17

6.2

12.9

2.5

7.1

Com

mon

103.

3810

7.30

108.

4410

6.37

106.

1311

0.17

111.

3610

9.22

2.7

2.7

2.7

2.7

Page 44: CHAPTER 3 APPENDIX - Goverment Documents · CHAPTER 3 APPENDIX Appendix 3.16 ... E17 Kabel bawah tanah voltan rendah E35 Grid berkapasiti melebihi 72KW E18 Kabel bawah tanah …

STATISTICS AND CONSTRUCTION DEMAND 2015-2016

CHAPTER 3 APPENDIX

198

Wor

ker C

ateg

ory

Min

imum

/ M

axim

um

Wag

es

Year

Cha

nge

(%)

2013

2014

Kuch

ing

Mir

iSi

buAv

erag

eKu

chin

gM

iri

Sibu

Aver

age

Kuch

ing

Mir

iSi

buAv

erag

e

Gen

eral

Wel

ders

Min

imum

88.9

882

.20

83.2

584

.81

90.9

884

.20

85.2

586

.81

2.2

2.4

2.4

2.4

Max

imum

116.

0011

3.00

114.

0011

4.33

120.

0011

7.50

117.

0011

8.17

3.4

4.0

2.6

3.4

Com

mon

101.

2810

0.53

101.

6910

1.17

103.

9810

3.43

104.

4410

3.95

2.7

2.9

2.7

2.8

Plum

bers

-Bui

ldin

g an

d Sa

nita

ry

Min

imum

84.0

076

.40

83.0

081

.13

89.0

078

.00

85.0

084

.00

6.0

2.1

2.4

3.5

Max

imum

109.

0010

7.00

108.

0010

8.00

113.

0011

1.50

111.

0011

1.83

3.7

4.2

2.8

3.5

Com

mon

97.0

193

.17

93.6

994

.62

99.6

696

.05

96.6

097

.44

2.7

3.1

3.1

3.0

Plum

bers

-Re

ticul

atio

n

Min

imum

95.1

297

.00

99.0

097

.04

97.1

299

.00

101.

0099

.04

2.1

2.1

2.0

2.1

Max

imum

126.

0012

4.00

126.

0012

5.33

130.

0012

8.50

129.

0012

9.17

3.2

3.6

2.4

3.1

Com

mon

111.

3611

0.10

111.

4011

0.95

114.

0211

2.90

114.

0611

3.66

2.4

2.5

2.4

2.4

Build

ing

Wiri

ngIn

stal

lers

Min

imum

--

--

--

--

--

--

Max

imum

--

--

--

--

--

--

Com

mon

--

--

--

--

--

--

Elec

tric

al W

irem

en P

W2

(Mon

thly

RM

)

Min

imum

2,00

1.00

2,08

9.00

2,11

6.00

2,06

8.67

2,00

3.00

2,09

1.00

2,11

8.00

2,07

0.67

0.1

0.1

0.1

0.1

Max

imum

2,85

7.60

2,78

6.00

2,82

2.00

2,82

1.87

2,86

1.60

2,78

9.00

2,82

5.00

2,82

5.20

0.1

0.1

0.1

0.1

Com

mon

2,41

1.97

2,42

1.50

2,45

2.50

2,42

8.66

2,41

4.68

2,42

4.58

2,45

5.42

2,43

1.56

0.1

0.1

0.1

0.1

Elec

tric

al W

irem

enPW

4 (M

onth

ly R

M)

Min

imum

2,80

1.00

2,90

7.00

2,93

8.50

2,88

2.17

2,80

3.00

2,90

9.00

2,94

0.50

2,88

4.17

0.1

0.1

0.1

0.1

Max

imum

3,57

1.75

3,48

2.00

3,53

3.00

3,52

8.92

3,57

5.75

3,48

5.00

3,53

6.00

3,53

2.25

0.1

0.1

0.1

0.1

Com

mon

3,17

8.81

3,21

4.17

3,25

5.58

3,21

6.19

3,18

1.51

3,21

7.42

3,25

8.33

3,21

9.09

0.1

0.1

0.1

0.1

Scaff

olde

rs -

Pref

abric

ated

Min

imum

88.0

094

.00

90.0

090

.67

90.0

096

.00

92.0

092

.67

2.3

2.1

2.2

2.2

Max

imum

100.

0010

3.00

104.

0010

2.33

104.

0010

6.00

107.

0010

5.67

4.0

2.9

2.9

3.3

Com

mon

96.0

098

.17

97.6

797

.28

98.7

010

1.00

100.

5010

0.07

2.8

2.9

2.9

2.9

Scaff

olde

rs -

Tubu

lar

Min

imum

84.3

291

.00

86.0

087

.11

86.3

293

.00

88.0

089

.11

2.4

2.2

2.3

2.3

Max

imum

108.

0010

7.00

112.

0010

9.00

113.

0011

1.50

115.

0011

3.17

4.6

4.2

2.7

3.8

Com

mon

95.9

698

.80

98.6

797

.81

98.6

510

1.72

101.

2510

0.54

2.8

3.0

2.6

2.8

Plas

tere

rs

Min

imum

82.6

093

.00

91.0

088

.87

84.6

095

.00

93.0

090

.87

2.4

2.2

2.2

2.3

Max

imum

100.

7110

2.00

108.

0010

3.57

105.

0010

6.00

111.

0010

7.33

4.3

3.9

2.8

3.6

Com

mon

92.0

997

.50

98.3

395

.97

94.8

110

0.42

101.

1798

.80

3.0

3.0

2.9

2.9

Appe

ndix

3.2

3 A

vera

ge D

aily

Wag

e R

ates

for S

kille

d Lo

cal C

onst

ruct

ion

Wor

kers

in S

araw

ak in

201

3 an

d 20

14 (R

M/d

ay) (

2)

Page 45: CHAPTER 3 APPENDIX - Goverment Documents · CHAPTER 3 APPENDIX Appendix 3.16 ... E17 Kabel bawah tanah voltan rendah E35 Grid berkapasiti melebihi 72KW E18 Kabel bawah tanah …

STATISTICS AND CONSTRUCTION DEMAND 2015-2016

CHAPTER 3 APPENDIX

199

Wor

ker C

ateg

ory

Min

imum

/ M

axim

um

Wag

es

Year

Cha

nge

(%)

2013

2014

Kuch

ing

Mir

iSi

buAv

erag

eKu

chin

gM

iri

Sibu

Aver

age

Kuch

ing

Mir

iSi

buAv

erag

e

Tile

rs

Min

imum

89.0

093

.80

95.0

092

.60

91.0

095

.80

97.0

094

.60

2.2

2.1

2.1

2.2

Max

imum

106.

5711

3.00

110.

0010

9.86

111.

0011

7.50

113.

0011

3.83

4.2

4.0

2.7

3.6

Com

mon

98.8

810

0.27

101.

6510

0.27

101.

5810

3.25

104.

3110

3.05

2.7

3.0

2.6

2.8

Pain

ters

- B

uild

ing

Min

imum

75.5

277

.00

80.0

077

.51

77.5

279

.00

82.0

079

.51

2.6

2.6

2.5

2.6

Max

imum

111.

0010

0.60

101.

8810

4.49

115.

0010

3.60

104.

8810

7.83

3.6

3.0

2.9

3.2

Com

mon

87.4

686

.97

88.0

287

.48

90.1

190

.05

90.7

790

.31

3.0

3.5

3.1

3.2

Gen

eral

Con

stru

ctio

n W

orke

rs-C

ivil

Min

imum

66.4

664

.80

65.6

365

.63

68.4

666

.80

67.6

367

.63

3.0

3.1

3.0

3.0

Max

imum

82.0

084

.00

87.0

084

.33

87.0

088

.50

90.0

088

.50

6.1

5.4

3.4

4.9

Com

mon

74.9

675

.23

76.1

975

.46

77.6

678

.15

78.8

578

.22

3.6

3.9

3.5

3.7

Appe

ndix

3.2

3 A

vera

ge D

aily

Wag

e R

ates

for S

kille

d Lo

cal C

onst

ruct

ion

Wor

kers

in S

araw

ak in

201

3 an

d 20

14 (R

M/d

ay) (

3)

Page 46: CHAPTER 3 APPENDIX - Goverment Documents · CHAPTER 3 APPENDIX Appendix 3.16 ... E17 Kabel bawah tanah voltan rendah E35 Grid berkapasiti melebihi 72KW E18 Kabel bawah tanah …

STATISTICS AND CONSTRUCTION DEMAND 2015-2016

CHAPTER 3 APPENDIX

200

Appe

ndix

3.2

4 A

vera

ge D

aily

Wag

e R

ates

for S

emi-

Skill

ed L

ocal

Con

stru

ctio

n W

orke

rs in

Sar

awak

in 2

013

and

2014

(RM

/day

) (1)

Wor

ker C

ateg

ory

Min

imum

/ M

axim

um

Wag

es

Year

Cha

nge

(%)

2013

2014

Kuch

ing

Mir

iSi

buAv

erag

eKu

chin

gM

iri

Sibu

Aver

age

Kuch

ing

Miri

Sibu

Aver

age

Gen

eral

Con

stru

ctio

n W

orke

rs -

Bui

ldin

g

Min

imum

--

--

--

--

--

--

Max

imum

--

--

--

--

--

--

Com

mon

--

--

--

--

--

--

Con

cret

ers

Min

imum

68.0

067

.00

67.0

067

.33

70.0

069

.00

69.0

069

.33

2.9

3.0

3.0

3.0

Max

imum

91.0

090

.00

92.0

091

.00

95.0

095

.50

95.0

095

.17

4.4

6.1

3.3

4.6

Com

mon

79.2

578

.30

79.1

778

.91

81.7

881

.13

82.0

081

.64

3.2

3.6

3.6

3.5

Bar B

ende

rs

Min

imum

65.7

071

.00

71.0

069

.23

67.7

073

.00

73.0

071

.23

3.0

2.8

2.8

2.9

Max

imum

86.0

089

.00

87.0

087

.33

90.0

093

.50

90.0

091

.17

4.7

5.1

3.4

4.4

Com

mon

75.0

579

.00

79.5

077

.85

77.5

681

.83

82.1

780

.52

3.3

3.6

3.4

3.4

Car

pent

ers

-Fo

rmw

ork

Min

imum

76.7

082

.00

77.3

878

.69

78.7

084

.00

79.3

880

.69

2.6

2.4

2.6

2.5

Max

imum

96.0

096

.00

95.0

095

.67

102.

0010

0.50

98.0

010

0.17

6.3

4.7

3.2

4.7

Com

mon

86.3

886

.83

86.7

586

.65

89.0

889

.58

89.5

089

.39

3.1

3.2

3.2

3.2

Bric

klay

ers

Min

imum

52.0

062

.00

61.0

058

.33

54.0

064

.00

63.0

060

.33

3.8

3.2

3.3

3.4

Max

imum

81.0

079

.00

77.0

079

.00

86.0

082

.00

80.0

082

.67

6.2

3.8

3.9

4.6

Com

mon

68.6

869

.50

69.5

069

.23

71.3

672

.42

72.2

572

.01

3.9

4.2

4.0

4.0

Roof

ers

Min

imum

77.7

381

.00

83.0

080

.58

79.7

383

.00

85.0

082

.58

2.6

2.5

2.4

2.5

Max

imum

94.0

094

.00

95.0

094

.33

98.0

099

.50

98.0

098

.50

4.3

5.9

3.2

4.4

Com

mon

86.2

387

.03

88.0

687

.11

88.9

390

.03

90.5

689

.84

3.1

3.4

2.8

3.1

Car

pent

ers

-Jo

iner

y

Min

imum

85.0

082

.20

84.0

083

.73

87.0

084

.20

86.0

085

.73

2.4

2.4

2.4

2.4

Max

imum

98.0

010

1.00

102.

0010

0.33

102.

0010

5.50

105.

0010

4.17

4.1

4.5

2.9

3.8

Com

mon

92.8

090

.87

90.8

591

.51

95.3

593

.77

93.6

894

.27

2.7

3.2

3.1

3.0

Stee

l Stru

ctur

eFa

bric

ator

s

Min

imum

80.7

988

.00

86.0

084

.93

82.7

990

.00

88.0

086

.93

2.5

2.3

2.3

2.4

Max

imum

101.

0010

1.00

104.

0010

2.00

105.

0010

5.50

107.

0010

5.83

4.0

4.5

2.9

3.8

Com

mon

92.6

093

.63

94.6

993

.64

95.2

596

.47

97.3

496

.35

2.9

3.0

2.8

2.9

Page 47: CHAPTER 3 APPENDIX - Goverment Documents · CHAPTER 3 APPENDIX Appendix 3.16 ... E17 Kabel bawah tanah voltan rendah E35 Grid berkapasiti melebihi 72KW E18 Kabel bawah tanah …

STATISTICS AND CONSTRUCTION DEMAND 2015-2016

CHAPTER 3 APPENDIX

201

Wor

ker C

ateg

ory

Min

imum

/ M

axim

um

Wag

es

Year

Cha

nge

(%)

2013

2014

Kuch

ing

Mir

iSi

buAv

erag

eKu

chin

gM

iri

Sibu

Aver

age

Kuch

ing

Miri

Sibu

Aver

age

Gen

eral

Wel

ders

Min

imum

77.4

776

.40

81.0

078

.29

79.4

778

.40

83.0

080

.29

2.6

2.6

2.5

2.6

Max

imum

95.1

210

1.00

100.

0098

.71

99.1

210

4.00

103.

0010

2.04

4.2

3.0

3.0

3.4

Com

mon

88.2

289

.73

91.0

489

.66

90.8

792

.63

93.7

992

.43

3.0

3.2

3.0

3.1

Plum

bers

-Bui

ldin

g an

d Sa

nita

ry

Min

imum

71.5

970

.60

76.0

072

.73

73.5

972

.60

78.0

074

.73

2.8

2.8

2.6

2.7

Max

imum

90.0

094

.00

90.0

091

.33

95.0

098

.50

93.0

095

.50

5.6

4.8

3.3

4.6

Com

mon

78.4

581

.50

83.0

080

.98

81.2

384

.42

85.9

283

.86

3.5

3.6

3.5

3.5

Plum

bers

-Re

ticul

atio

n

Min

imum

89.2

388

.00

92.0

089

.74

91.2

390

.00

94.0

091

.74

2.2

2.3

2.2

2.2

Max

imum

112.

0011

7.00

113.

0011

4.00

116.

0012

1.50

116.

0011

7.83

3.6

3.8

2.7

3.4

Com

mon

99.4

698

.37

99.6

599

.16

102.

1510

1.37

102.

3110

1.94

2.7

3.0

2.7

2.8

Build

ing

Wiri

ngIn

stal

lers

Min

imum

101.

0099

.60

100.

8810

0.49

103.

0010

1.60

102.

8810

2.49

2.0

2.0

2.0

2.0

Max

imum

113.

0012

2.00

117.

0011

7.33

117.

0012

6.50

120.

0012

1.17

3.5

3.7

2.6

3.3

Com

mon

107.

1310

7.13

108.

4210

7.56

109.

7811

0.00

111.

0811

0.29

2.5

2.7

2.5

2.5

Elec

tric

al W

irem

en P

W2

(Mon

thly

RM

)

Min

imum

--

--

--

--

--

--

Max

imum

--

--

--

--

--

--

Com

mon

--

--

--

--

--

--

Elec

tric

al W

irem

enPW

4 (M

onth

ly R

M)

Min

imum

--

--

--

--

--

--

Max

imum

--

--

--

--

--

--

Com

mon

--

--

--

--

--

--

Scaff

olde

rs -

Pref

abric

ated

Min

imum

69.0

071

.00

74.0

071

.33

71.0

073

.00

76.0

073

.33

2.9

2.8

2.7

2.8

Max

imum

85.0

089

.00

92.0

088

.67

89.0

093

.50

95.0

092

.50

4.7

5.1

3.3

4.3

Com

mon

78.3

581

.37

82.8

880

.87

81.0

384

.20

85.5

483

.59

3.4

3.5

3.2

3.4

Scaff

olde

rs -

Tubu

lar

Min

imum

69.3

174

.00

73.0

072

.10

71.3

176

.00

75.0

074

.10

2.9

2.7

2.7

2.8

Max

imum

86.0

093

.00

91.0

090

.00

91.0

097

.50

94.0

094

.17

5.8

4.8

3.3

4.6

Com

mon

76.5

281

.67

81.6

779

.95

79.2

084

.50

84.3

382

.68

3.5

3.5

3.3

3.4

Plas

tere

rs

Min

imum

75.0

070

.60

71.5

072

.37

77.0

072

.60

73.5

074

.37

2.7

2.8

2.8

2.8

Max

imum

95.0

094

.00

91.0

093

.33

99.0

098

.50

94.0

097

.17

4.2

4.8

3.3

4.1

Com

mon

83.5

082

.00

82.1

382

.54

86.2

084

.83

84.7

985

.27

3.2

3.5

3.2

3.3

Appe

ndix

3.2

4 A

vera

ge D

aily

Wag

e R

ates

for S

emi-

Skill

ed L

ocal

Con

stru

ctio

n W

orke

rs in

Sar

awak

in 2

013

and

2014

(RM

/day

) (2)

Page 48: CHAPTER 3 APPENDIX - Goverment Documents · CHAPTER 3 APPENDIX Appendix 3.16 ... E17 Kabel bawah tanah voltan rendah E35 Grid berkapasiti melebihi 72KW E18 Kabel bawah tanah …

STATISTICS AND CONSTRUCTION DEMAND 2015-2016

CHAPTER 3 APPENDIX

202

Wor

ker C

ateg

ory

Min

imum

/ M

axim

um

Wag

es

Year

Cha

nge

(%)

2013

2014

Kuch

ing

Mir

iSi

buAv

erag

eKu

chin

gM

iri

Sibu

Aver

age

Kuch

ing

Miri

Sibu

Aver

age

Tile

rs

Min

imum

71.3

876

.40

71.5

073

.09

73.3

878

.40

73.5

075

.09

2.8

2.6

2.8

2.7

Max

imum

91.0

091

.00

97.0

093

.00

96.0

095

.50

100.

0097

.17

5.5

4.9

3.1

4.5

Com

mon

83.2

383

.90

85.0

884

.07

85.9

286

.78

87.7

586

.82

3.2

3.4

3.1

3.3

Pain

ters

- B

uild

ing

Min

imum

65.0

064

.00

66.0

065

.00

67.0

066

.00

68.0

067

.00

3.1

3.1

3.0

3.1

Max

imum

85.0

084

.00

87.0

085

.33

89.0

088

.50

90.0

089

.17

4.7

5.4

3.4

4.5

Com

mon

74.8

174

.33

75.1

574

.76

77.2

277

.25

77.5

677

.34

3.2

3.9

3.2

3.5

Gen

eral

Con

stru

ctio

n W

orke

rs-C

ivil

Min

imum

--

--

--

--

--

--

Max

imum

--

--

--

--

--

--

Com

mon

--

--

--

--

--

--

Appe

ndix

3.2

4 A

vera

ge D

aily

Wag

e R

ates

for S

emi-

Skill

ed L

ocal

Con

stru

ctio

n W

orke

rs in

Sar

awak

in 2

013

and

2014

(RM

/day

) (3)

Page 49: CHAPTER 3 APPENDIX - Goverment Documents · CHAPTER 3 APPENDIX Appendix 3.16 ... E17 Kabel bawah tanah voltan rendah E35 Grid berkapasiti melebihi 72KW E18 Kabel bawah tanah …

STATISTICS AND CONSTRUCTION DEMAND 2015-2016

CHAPTER 3 APPENDIX

203

Appe

ndix

3.2

5 Av

erag

e D

aily

Wag

e Ra

tes

for I

BS C

ompo

nent

Inst

alle

rs in

Pen

insu

lar M

alay

sia

in 2

013

and

2014

(RM

/day

)

Wor

ker

Cat

egor

y

Min

imum

/ M

axim

um

Wag

e

Skill

edSe

mi-

Skill

ed

2013

2014

Cha

nge

(%)

2013

2014

Cha

nge

(%)

Wes

t C

oast

East

C

oast

Aver

age

Wes

t C

oast

East

C

oast

Aver

age

Wes

t C

oast

East

C

oast

Wes

t C

oast

East

C

oast

Aver

age

Wes

t C

oast

East

C

oast

Aver

age

Wes

t C

oast

East

C

oast

IBS

Prec

ast

Con

cret

e In

stal

lers

Min

imum

60.0

060

.00

60.0

070

.00

89.0

079

.50

16.7

48.3

50.0

050

.00

50.0

050

.00

71.0

060

.50

0.0

42.0

Max

imum

156.

0015

7.00

156.

5017

3.00

185.

0017

9.00

10.9

17.8

130.

0013

0.00

130.

0012

5.00

113.

0011

9.00

-3.8

-13.

1

Com

mon

106.

3311

0.58

108.

4611

5.59

120.

2111

7.90

8.7

8.7

80.2

679

.92

80.0

984

.88

89.9

287

.40

5.8

12.5

IBS

Ligh

twei

ght

Pane

l Ins

talle

rs

Min

imum

60.0

060

.00

60.0

070

.00

83.0

076

.50

16.7

38.3

55.0

055

.00

55.0

050

.00

63.0

056

.50

-9.1

14.5

Max

imum

160.

0016

0.00

160.

0018

0.00

148.

0016

4.00

12.5

-7.5

135.

0013

5.00

135.

0015

0.00

115.

0013

2.50

11.1

-14.

8

Com

mon

100.

5710

0.25

100.

4110

8.23

109.

9610

9.10

7.69.

780

.28

76.0

078

.14

84.5

585

.96

85.2

65.

313

.1

Ligh

t Blo

ck W

all

Inst

alle

rs

Min

imum

65.0

065

.00

65.0

065

.00

85.0

075

.00

0.0

30.8

55.0

055

.00

55.0

055

.00

56.0

055

.50

0.0

1.8

Max

imum

150.

0015

0.00

150.

0016

0.00

117.0

013

8.50

6.7

-22.

011

0.00

110.

0011

0.00

110.

0092

.00

101.

000.

0-1

6.4

Com

mon

94.9

489

.67

92.3

110

3.74

99.6

310

1.69

9.3

11.1

72.2

663

.92

68.0

978

.50

73.9

676

.23

8.6

15.7

Syst

em

Form

wor

k In

stal

lers

Min

imum

60.0

060

.00

60.0

065

.00

81.0

073

.00

8.3

35.0

50.0

050

.00

50.0

050

.00

63.0

056

.50

0.0

26.0

Max

imum

150.

0015

0.00

150.

0021

0.00

145.

0017

7.50

40.0

-3.3

120.

0012

0.00

120.

0012

0.00

110.

0011

5.00

0.0

-8.3

Com

mon

97.9

892

.83

95.4

110

6.81

102.

8810

4.85

9.0

10.8

77.6

473

.83

75.7

481

.45

84.0

082

.73

4.9

13.8

Roof

Tru

ss

Inst

alle

rs (W

ood)

Min

imum

60.0

060

.00

60.0

060

.00

88.0

074

.00

0.0

46.7

50.0

050

.00

50.0

050

.00

58.0

054

.00

0.0

16.0

Max

imum

140.

0014

0.00

140.

0020

0.00

118.

0015

9.00

42.9

-15.

710

5.00

105.

0010

5.00

150.

0098

.00

124.

0042

.9-6

.7

Com

mon

95.8

393

.25

94.5

410

6.91

103.

2510

5.08

11.6

10.7

73.4

865

.42

69.4

579

.36

75.4

277

.39

8.0

15.3

Roof

Tru

ss

Ista

llers

(Lig

ht

Stee

l Gau

ge)

Min

imum

60.0

060

.00

60.0

065

.00

78.0

071

.50

8.3

30.0

50.0

050

.00

50.0

050

.00

60.0

055

.00

0.0

20.0

Max

imum

150.

0015

0.00

150.

0020

0.00

122.

0016

1.00

33.3

-18.

711

5.00

115.

0011

5.00

150.

0011

4.00

132.

0030

.4-0

.9

Com

mon

94.2

395

.00

94.6

210

6.14

105.

0010

5.57

12.6

10.5

74.4

871

.83

73.1

680

.90

81.8

381

.37

8.6

13.9

Not

e :

Dat

a co

vers

:

Wes

t Coa

st: K

uala

Lum

pur,

Sela

ngor

, Pul

au P

inan

g, N

eger

i Sem

bila

n an

d Jo

hor

Ea

st C

oast

: Kel

anta

n an

d Te

reng

ganu

.

Page 50: CHAPTER 3 APPENDIX - Goverment Documents · CHAPTER 3 APPENDIX Appendix 3.16 ... E17 Kabel bawah tanah voltan rendah E35 Grid berkapasiti melebihi 72KW E18 Kabel bawah tanah …

STATISTICS AND CONSTRUCTION DEMAND 2015-2016

CHAPTER 3 APPENDIX

204

Appe

ndix

3.2

6 Av

erag

e D

aily

Wag

e Ra

tes

for S

kille

d Fo

reig

n M

achi

ne O

pera

tors

in P

enin

sula

r Mal

aysi

a in

201

3 an

d 20

14 (R

M/d

ay) (

1)

Wor

ker C

ateg

ory

Min

imum

/ M

axim

um

Wag

es

Year

Cha

nge

(%)

2013

2014

Cent

ral

Regio

nNo

rthern

Re

gion

Easte

rn

Regio

nSo

uthe

rn

Regio

nAv

erage

Cent

ral

Regio

nNo

rthern

Re

gion

Easte

rn

Regio

nSo

uthe

rn

Regio

nAv

erage

Cent

ral

Regio

nNo

rthern

Re

gion

Easte

rn

Regio

nSo

uthe

rn

Regio

nAv

erage

Exac

avat

ors

Ope

rato

rs

Min

imum

40.0

055

.00

65.0

050

.00

52.5

040

.00

35.0

038

.00

40.0

038

.25

0.0

-36.

4-4

1.5

-20.

0-2

7.1

Max

imum

125.

0011

0.00

92.0

010

0.00

106.

7515

5.00

110.

0096

.00

115.

0011

9.00

24.0

0.0

4.3

15.0

11.5

Com

mon

78.4

077

.22

80.1

172

.08

76.9

586

.95

78.1

480

.86

73.6

179

.89

10.9

1.2

0.9

2.1

3.8

Pile

Rig

gers

Min

imum

50.0

055

.00

60.0

055

.00

55.0

050

.00

50.0

060

.00

60.0

055

.00

0.0

-9.1

0.0

9.1

0.0

Max

imum

130.

0013

5.00

105.

0095

.00

116.

2513

0.00

135.

0010

5.00

115.

0012

1.25

0.0

0.0

0.0

21.1

4.3

Com

mon

81.2

383

.42

76.5

873

.83

78.7

785

.00

85.2

879

.25

75.6

481

.29

4.6

2.2

3.5

2.5

3.2

Off

Road

Tru

ck O

pera

tors

Min

imum

50.0

050

.00

45.0

055

.00

50.0

050

.00

50.0

035

.00

55.0

047

.50

0.0

0.0

-22.

20.

0-5

.0

Max

imum

135.

0011

0.00

82.0

090

.00

104.

2513

5.00

110.

0085

.00

97.0

010

6.75

0.0

0.0

3.7

7.82.

4

Com

mon

75.7

575

.83

68.9

469

.88

72.6

082

.38

78.5

670

.36

72.0

875

.85

8.8

3.6

2.1

3.1

4.5

Back

hoe

Load

er O

pera

tors

Min

imum

45.0

048

.00

50.0

040

.00

45.7

545

.00

50.0

045

.00

40.0

045

.00

0.0

4.2

-10.

00.

0-1

.6

Max

imum

140.

0011

0.00

87.0

010

0.00

109.

2514

0.00

110.

0091

.50

100.

0011

0.38

0.0

0.0

5.2

0.0

1.0

Com

mon

79.9

071

.81

75.3

371

.90

74.7

482

.58

79.2

875

.64

73.1

777

.67

3.4

10.4

0.4

1.8

3.9

Rolle

r Ope

rato

rs

Min

imum

45.0

055

.00

50.0

045

.00

48.7

550

.00

58.0

055

.00

40.0

050

.75

11.1

5.5

10.0

-11.

14.

1

Max

imum

120.

0011

0.00

86.0

090

.00

101.

5012

0.00

110.

0090

.50

115.

0010

8.88

0.0

0.0

5.2

27.8

7.3

Com

mon

76.8

076

.88

73.5

873

.53

75.2

082

.55

80.7

176

.33

71.6

477

.81

7.5

5.0

3.7

-2.6

3.5

Rolle

r/C

ompa

ctor

O

pera

tors

Min

imum

45.0

055

.00

45.0

045

.00

47.5

030

.00

55.0

025

.00

30.0

035

.00

-33.

30.

0-4

4.4

-33.

3-2

6.3

Max

imum

120.

0011

0.00

90.0

090

.00

102.

5012

0.00

110.

0094

.50

95.0

010

4.88

0.0

0.0

5.0

5.6

2.3

Com

mon

77.2

576

.06

74.6

169

.77

74.4

277

.20

81.9

575

.39

67.8

675

.60

-0.1

7.71.

0-2

.71.

6

Scra

pper

Ope

rato

rs

Min

imum

45.0

050

.00

40.0

055

.00

47.5

035

.00

55.0

045

.00

40.0

043

.75

-22.

210

.012

.5-2

7.3

-7.9

Max

imum

100.

0011

0.00

95.0

091

.00

99.0

010

0.00

105.

0096

.50

96.0

099

.38

0.0

-4.5

1.6

5.5

0.4

Com

mon

78.8

578

.53

78.3

376

.39

78.0

378

.65

83.0

682

.14

73.3

079

.29

-0.3

5.8

4.9

-4.0

1.6

Mot

or L

oade

r Ope

rato

rs

Min

imum

50.0

045

.00

60.0

050

.00

51.2

550

.00

50.0

045

.00

50.0

048

.75

0.0

11.1

-25.

00.

0-4

.9

Max

imum

105.

0010

0.00

95.0

010

0.00

100.

0013

0.00

100.

0095

.00

106.

0010

7.75

23.8

0.0

0.0

6.0

7.8

Com

mon

79.1

074

.75

78.8

978

.11

77.7

182

.63

80.6

980

.42

76.5

680

.08

4.5

7.9

1.9

-2.0

3.0

Whe

el L

oade

r Ope

rato

rs

Min

imum

55.0

060

.00

55.0

050

.00

55.0

058

.00

60.0

050

.00

50.0

054

.50

5.5

0.0

-9.1

0.0

-0.9

Max

imum

130.

0013

0.00

90.0

090

.00

110.

0013

0.00

130.

0094

.50

95.5

011

2.50

0.0

0.0

5.0

6.1

2.3

Com

mon

81.4

083

.56

77.1

773

.39

78.8

884

.35

86.3

080

.11

72.6

980

.86

3.6

3.3

3.8

-1.0

2.5

Pave

r Ope

rato

rs

Min

imum

50.0

050

.00

67.0

045

.00

53.0

050

.00

60.0

069

.00

40.0

054

.75

0.0

20.0

3.0

-11.

13.

3

Max

imum

130.

0011

0.00

100.

0010

0.00

110.

0013

0.00

110.

0010

1.00

105.

5011

1.63

0.0

0.0

1.0

5.5

1.5

Com

mon

82.3

880

.06

82.5

078

.58

80.8

884

.88

83.0

586

.19

76.8

182

.73

3.0

3.7

4.5

-2.3

2.3

Page 51: CHAPTER 3 APPENDIX - Goverment Documents · CHAPTER 3 APPENDIX Appendix 3.16 ... E17 Kabel bawah tanah voltan rendah E35 Grid berkapasiti melebihi 72KW E18 Kabel bawah tanah …

STATISTICS AND CONSTRUCTION DEMAND 2015-2016

CHAPTER 3 APPENDIX

205

Wor

ker C

ateg

ory

Min

imum

/ M

axim

um

Wag

es

Year

Cha

nge

(%)

2013

2014

Cent

ral

Regio

nNo

rthern

Re

gion

Easte

rn

Regio

nSo

uthe

rn

Regio

nAv

erage

Cent

ral

Regio

nNo

rthern

Re

gion

Easte

rn

Regio

nSo

uthe

rn

Regio

nAv

erage

Cent

ral

Regio

nNo

rthern

Re

gion

Easte

rn

Regio

nSo

uthe

rn

Regio

nAv

erage

Mob

ile C

rane

Ope

rato

rs

Min

imum

60.0

060

.00

70.0

075

.00

66.2

560

.00

60.0

070

.00

60.0

062

.50

0.0

0.0

0.0

-20.

0-5

.7

Max

imum

110.

0015

0.00

110.

0011

0.00

120.

0025

0.00

145.

0011

6.50

117.

5015

7.25

127.

3-3

.35.

96.

831

.0

Com

mon

85.4

391

.83

90.9

491

.22

89.8

611

2.85

99.2

290

.58

90.4

998

.29

32.1

8.0

-0.4

-0.8

9.4

Cra

wle

r Cra

ne O

pera

tors

Min

imum

55.0

070

.00

70.0

065

.00

65.0

055

.00

70.0

080

.00

60.0

066

.25

0.0

0.0

14.3

-7.7

1.9

Max

imum

120.

0011

5.00

125.

0010

7.00

116.

7515

0.00

135.

0012

5.00

111.

0013

0.25

25.0

17.4

0.0

3.7

11.6

Com

mon

84.1

887

.77

93.8

689

.11

88.7

310

0.50

93.8

596

.89

87.3

994

.66

19.4

6.9

3.2

-1.9

6.7

Tow

er C

rane

Ope

rato

rs

Min

imum

60.0

055

.00

91.0

075

.00

70.2

555

.00

65.0

075

.00

60.0

063

.75

-8.3

18.2

-17.6

-20.

0-9

.3

Max

imum

150.

0014

0.00

125.

0013

5.00

137.

5017

0.00

140.

0012

5.00

150.

0014

6.25

13.3

0.0

0.0

11.1

6.4

Com

mon

88.7

898

.17

103.

8310

0.58

97.8

410

3.73

102.

9210

3.72

94.3

610

1.18

16.8

4.8

-0.1

-6.2

3.4

Fork

lift O

pera

tors

Min

imum

50.0

050

.00

70.0

045

.00

53.7

545

.00

55.0

060

.00

40.0

050

.00

-10.

010

.0-1

4.3

-11.

1-7

.0

Max

imum

95.0

010

0.00

96.0

088

.00

94.7

510

0.00

100.

0099

.00

95.0

098

.50

5.3

0.0

3.1

8.0

4.0

Com

mon

67.1

374

.33

81.3

969

.69

73.1

471

.63

77.5

383

.28

67.9

475

.10

6.7

4.3

2.3

-2.5

2.7

Slin

ger/

Dog

ger

Min

imum

50.0

050

.00

60.0

048

.00

52.0

048

.00

50.0

060

.00

40.0

049

.50

-4.0

0.0

0.0

-16.

7-4

.8

Max

imum

95.0

011

5.00

95.0

085

.00

97.5

010

0.00

120.

0010

0.00

89.5

010

2.38

5.3

4.3

5.3

5.3

5.0

Com

mon

70.0

879

.31

78.8

670

.37

74.6

673

.80

82.8

380

.61

68.8

176

.51

5.3

4.4

2.2

-2.2

2.5

Not

e:

Dat

a C

over

s:

Cen

tral

Reg

ion:

Per

ak, S

elan

gor a

nd K

uala

Lum

pur

N

orth

ern

Regi

on: K

edah

and

Pul

au P

inan

g

East

ern

Regi

on: P

ahan

g, K

elan

tan

and

Tere

ngga

nu

Sout

hern

Reg

ion:

Neg

eri S

embi

lan,

Mel

aka

and

Joho

r

Appe

ndix

3.2

6 Av

erag

e D

aily

Wag

e Ra

tes

for S

kille

d Fo

reig

n M

achi

ne O

pera

tors

in P

enin

sula

r Mal

aysi

a in

201

3 an

d 20

14 (R

M/d

ay) (

2)

Page 52: CHAPTER 3 APPENDIX - Goverment Documents · CHAPTER 3 APPENDIX Appendix 3.16 ... E17 Kabel bawah tanah voltan rendah E35 Grid berkapasiti melebihi 72KW E18 Kabel bawah tanah …

STATISTICS AND CONSTRUCTION DEMAND 2015-2016

CHAPTER 3 APPENDIX

206

Appe

ndix

3.2

7 Av

erag

e D

aily

Wag

e Ra

tes

for S

emi-

Skill

ed F

orei

gn M

achi

ne O

pera

tors

in P

enin

sula

r Mal

aysi

a in

201

3 an

d 20

14 (R

M/d

ay) (

1)

Wor

ker C

ateg

ory

Min

imum

/ M

axim

um

Wag

es

Year

Cha

nge

(%)

2013

2014

Cent

ral

Regio

nNo

rthern

Re

gion

Easte

rn

Regio

nSo

uthe

rn

Regio

nAv

erage

Cent

ral

Regio

nNo

rthern

Re

gion

Easte

rn

Regio

nSo

uthe

rn

Regio

nAv

erage

Cent

ral

Regio

nNo

rthern

Re

gion

Easte

rn

Regio

nSo

uthe

rn

Regio

nAv

erage

Exac

avat

ors

Ope

rato

rs

Min

imum

--

--

--

--

--

--

--

-

Max

imum

--

--

--

--

--

--

--

-

Com

mon

--

--

--

--

--

--

--

-

Pile

Rig

gers

Min

imum

35.0

045

.00

45.0

040

.00

41.2

535

.00

40.0

055

.00

40.0

042

.50

0.0

-11.

122

.20.

03.

0

Max

imum

95.0

012

5.00

75.0

070

.00

91.2

595

.00

125.

0078

.00

95.0

098

.25

0.0

0.0

4.0

35.7

7.7

Com

mon

59.3

565

.92

64.7

255

.34

61.3

362

.85

68.9

467

.58

58.7

064

.52

5.9

4.6

4.4

6.1

5.2

Off

Road

Tru

ck O

pera

tors

Min

imum

40.0

035

.00

40.0

040

.00

38.7

540

.00

38.0

035

.00

40.0

038

.25

0.0

8.6

-12.

50.

0-1

.3

Max

imum

115.

0090

.00

70.0

064

.00

84.7

511

5.00

90.0

074

.00

85.0

091

.00

0.0

0.0

5.7

32.8

7.4

Com

mon

59.7

561

.25

58.8

653

.76

58.4

162

.13

63.0

860

.89

59.0

961

.30

4.0

3.0

3.4

9.9

5.0

Back

hoe

Load

er

Ope

rato

rs

Min

imum

--

--

--

--

--

--

--

-

Max

imum

--

--

--

--

--

--

--

-

Com

mon

--

--

--

--

--

--

--

-

Rolle

r Ope

rato

rs

Min

imum

40.0

040

.00

40.0

040

.00

40.0

040

.00

40.0

040

.00

40.0

040

.00

0.0

0.0

0.0

0.0

0.0

Max

imum

85.0

080

.00

77.0

070

.00

78.0

085

.00

80.0

081

.00

70.0

079

.00

0.0

0.0

5.2

0.0

1.3

Com

mon

58.0

359

.58

56.2

852

.16

56.5

161

.33

63.2

458

.97

52.4

158

.99

5.7

6.1

4.8

0.5

4.4

Rolle

r/C

ompa

ctor

O

pera

tors

Min

imum

35.0

040

.00

40.0

040

.00

38.7

530

.00

40.0

025

.00

30.0

031

.25

-14.

30.

0-3

7.5

-25.

0-1

9.4

Max

imum

75.0

085

.00

88.0

067

.00

78.7

510

0.00

85.0

092

.50

74.5

088

.00

33.3

0.0

5.1

11.2

11.7

Com

mon

56.2

060

.91

65.4

452

.28

58.7

173

.80

64.9

066

.83

52.1

464

.42

31.3

6.6

2.1

-0.3

9.7

Scra

pper

Ope

rato

rs

Min

imum

35.0

040

.00

40.0

040

.00

38.7

530

.00

40.0

040

.00

40.0

037

.50

-14.

30.

00.

00.

0-3

.2

Max

imum

75.0

086

.00

90.0

080

.00

82.7

575

.00

89.0

093

.00

87.5

086

.13

0.0

3.5

3.3

9.4

4.1

Com

mon

54.7

563

.14

68.3

960

.72

61.7

557

.20

65.4

970

.89

60.8

963

.62

4.5

3.7

3.7

0.3

3.0

Mot

or L

oade

r Ope

rato

rs

Min

imum

--

--

--

--

--

--

--

-

Max

imum

--

--

--

--

--

--

--

-

Com

mon

--

--

--

--

--

--

--

-

Whe

el L

oade

r Ope

rato

rs

Min

imum

35.0

040

.00

45.0

040

.00

40.0

038

.00

40.0

045

.00

40.0

040

.75

8.6

0.0

0.0

0.0

1.9

Max

imum

85.0

090

.00

83.0

070

.00

82.0

090

.00

90.0

087

.50

76.5

086

.00

5.9

0.0

5.4

9.3

4.9

Com

mon

55.9

364

.94

66.3

656

.67

60.9

860

.23

68.3

670

.31

56.2

763

.79

7.75.

36.

0-0

.74.

6

Page 53: CHAPTER 3 APPENDIX - Goverment Documents · CHAPTER 3 APPENDIX Appendix 3.16 ... E17 Kabel bawah tanah voltan rendah E35 Grid berkapasiti melebihi 72KW E18 Kabel bawah tanah …

STATISTICS AND CONSTRUCTION DEMAND 2015-2016

CHAPTER 3 APPENDIX

207

Wor

ker C

ateg

ory

Min

imum

/ M

axim

um

Wag

es

Year

Cha

nge

(%)

2013

2014

Cent

ral

Regio

nNo

rthern

Re

gion

Easte

rn

Regio

nSo

uthe

rn

Regio

nAv

erage

Cent

ral

Regio

nNo

rthern

Re

gion

Easte

rn

Regio

nSo

uthe

rn

Regio

nAv

erage

Cent

ral

Regio

nNo

rthern

Re

gion

Easte

rn

Regio

nSo

uthe

rn

Regio

nAv

erage

Pave

r Ope

rato

rs

Min

imum

40.0

035

.00

45.0

040

.00

40.0

040

.00

40.0

045

.00

40.0

041

.25

0.0

14.3

0.0

0.0

3.1

Max

imum

95.0

095

.00

89.0

074

.00

88.2

595

.00

95.0

092

.00

78.0

090

.00

0.0

0.0

3.4

5.4

2.0

Com

mon

56.9

064

.58

67.6

157

.28

61.5

960

.10

68.4

471

.86

57.5

364

.48

5.6

6.0

6.3

0.4

4.7

Mob

ile C

rane

Ope

rato

rs

Min

imum

40.0

045

.00

50.0

050

.00

46.2

540

.00

50.0

050

.00

45.0

046

.25

0.0

11.1

0.0

-10.

00.

0

Max

imum

85.0

090

.00

97.0

081

.00

88.2

518

0.00

93.0

010

0.00

87.5

011

5.13

111.

83.

33.

18.

030

.5

Com

mon

60.4

568

.81

71.6

767

.33

67.0

780

.65

74.0

173

.78

67.1

073

.89

33.4

7.62.

9-0

.310

.2

Cra

wle

r Cra

ne O

pera

tors

Min

imum

43.0

045

.00

50.0

045

.00

45.7

543

.00

45.0

055

.00

45.0

047

.00

0.0

0.0

10.0

0.0

2.7

Max

imum

90.0

095

.00

89.0

094

.00

92.0

010

0.00

95.0

093

.00

99.5

096

.88

11.1

0.0

4.5

5.9

5.3

Com

mon

62.9

569

.44

71.2

868

.50

68.0

473

.40

75.0

373

.19

69.4

772

.77

16.6

8.1

2.7

1.47.0

Tow

er C

rane

Ope

rato

rs

Min

imum

35.0

045

.00

77.0

055

.00

53.0

035

.00

45.0

055

.00

50.0

046

.25

0.0

0.0

-28.

6-9

.1-1

2.7

Max

imum

110.

0011

0.00

97.0

010

5.00

105.

5012

0.00

110.

0010

1.00

105.

0010

9.00

9.1

0.0

4.1

0.0

3.3

Com

mon

61.0

874

.72

87.0

677

.06

74.9

874

.75

80.2

887

.72

74.0

879

.21

22.4

7.40.

8-3

.95.

6

Fork

lift O

pera

tors

Min

imum

40.0

040

.00

55.0

038

.00

43.2

540

.00

40.0

055

.00

40.0

043

.75

0.0

0.0

0.0

5.3

1.2

Max

imum

65.0

085

.00

88.0

069

.00

76.7

570

.00

85.0

094

.00

74.5

080

.88

7.70.

06.

88.

05.

4

Com

mon

48.6

059

.53

72.2

253

.89

58.5

653

.75

62.8

974

.67

54.6

461

.49

10.6

5.6

3.4

1.45.

0

Slin

ger/

Dog

ger

Min

imum

40.0

040

.00

50.0

040

.00

42.5

040

.00

40.0

050

.00

40.0

042

.50

0.0

0.0

0.0

0.0

0.0

Max

imum

75.0

095

.00

84.0

077

.00

82.7

575

.00

95.0

089

.00

82.5

085

.38

0.0

0.0

6.0

7.1

3.2

Com

mon

51.4

561

.44

68.7

857

.71

59.8

554

.85

67.2

870

.67

58.6

662

.87

6.6

9.5

2.7

1.6

5.0

Not

e:

Dat

a C

over

s:

Cen

tral

Reg

ion:

Per

ak, S

elan

gor a

nd K

uala

Lum

pur

N

orth

ern

Regi

on: K

edah

and

Pul

au P

inan

g

East

ern

Regi

on: P

ahan

g, K

elan

tan

and

Tere

ngga

nu

Sout

hern

Reg

ion:

Neg

eri S

embi

lan,

Mel

aka

and

Joho

r

Appe

ndix

3.2

7 Av

erag

e D

aily

Wag

e Ra

tes

for S

emi-

Skill

ed F

orei

gn M

achi

ne O

pera

tors

in P

enin

sula

r Mal

aysi

a in

201

3 an

d 20

14 (R

M/d

ay) (

2)

Page 54: CHAPTER 3 APPENDIX - Goverment Documents · CHAPTER 3 APPENDIX Appendix 3.16 ... E17 Kabel bawah tanah voltan rendah E35 Grid berkapasiti melebihi 72KW E18 Kabel bawah tanah …

STATISTICS AND CONSTRUCTION DEMAND 2015-2016

CHAPTER 3 APPENDIX

208

Appe

ndix

3.2

8 Av

erag

e D

aily

Wag

e R

ates

for S

kille

d Fo

reig

n M

achi

ne O

pera

tors

in S

abah

in 2

013

and

2014

(RM

/day

) (1)

Wor

ker C

ateg

ory

Min

imum

/ M

axim

um

Wag

es

Year

Cha

nge

(%)

2013

2014

K. K

inab

alu

Sand

akan

Taw

auAv

erag

eK.

Kin

abal

uSa

ndak

anTa

wau

Aver

age

K. K

inab

alu

Sand

akan

Taw

auAv

erag

e

Exac

avat

ors

Ope

rato

rs

Min

imum

49.0

041

.00

51.0

047

.00

51.0

043

.00

53.0

049

.00

4.1

4.9

3.9

4.3

Max

imum

82.0

072

.00

70.0

074

.67

85.0

075

.00

73.0

077

.67

3.7

4.2

4.3

4.0

Com

mon

66.2

068

.85

57.0

064

.02

68.8

557

.17

62.5

862

.87

4.0

-17.

09.

8-1

.8

Pile

Rig

gers

Min

imum

56.0

046

.00

56.0

052

.67

58.0

048

.00

58.0

054

.67

3.6

4.3

3.6

3.8

Max

imum

80.0

070

.00

73.0

074

.33

83.0

073

.00

76.0

077

.33

3.8

4.3

4.1

4.0

Com

mon

65.5

067

.50

58.5

063

.83

68.1

560

.83

66.4

265

.13

4.0

-9.9

13.5

2.0

Off

Road

Tru

ck O

pera

tors

Min

imum

55.5

449

.00

47.0

050

.51

57.5

451

.00

49.0

052

.51

3.6

4.1

4.3

4.0

Max

imum

70.0

062

.00

65.9

565

.98

73.0

065

.00

68.9

568

.98

4.3

4.8

4.5

4.5

Com

mon

62.3

161

.91

56.0

060

.07

65.0

358

.08

59.4

960

.87

4.4

-6.2

6.2

1.3

Back

hoe

Load

er O

pera

tors

Min

imum

51.0

046

.00

46.0

047

.67

53.0

048

.00

48.0

049

.67

3.9

4.3

4.3

4.2

Max

imum

79.0

061

.00

67.0

069

.00

83.0

064

.00

70.0

072

.33

5.1

4.9

4.5

4.8

Com

mon

66.2

763

.39

54.0

061

.22

68.9

257

.25

61.0

062

.39

4.0

-9.7

13.0

1.9

Rolle

r Ope

rato

rs

Min

imum

56.0

048

.00

51.0

051

.67

58.0

050

.00

53.0

053

.67

3.6

4.2

3.9

3.9

Max

imum

80.0

060

.00

66.0

068

.67

84.0

063

.00

69.0

072

.00

5.0

5.0

4.5

4.9

Com

mon

66.2

262

.86

54.5

061

.19

68.9

957

.25

60.7

562

.33

4.2

-8.9

11.5

1.9

Rolle

r/C

ompa

ctor

O

pera

tors

Min

imum

55.6

551

.00

55.0

053

.88

57.6

553

.00

57.0

055

.88

3.6

3.9

3.6

3.7

Max

imum

80.0

070

.00

71.0

273

.67

84.0

073

.00

78.0

078

.33

5.0

4.3

9.8

6.3

Com

mon

66.3

067

.90

61.0

065

.07

69.1

161

.08

65.0

065

.06

4.2

-10.

06.

60.

0

Scra

pper

Ope

rato

rs

Min

imum

51.0

051

.00

46.0

049

.33

53.0

053

.00

48.0

051

.33

3.9

3.9

4.3

4.1

Max

imum

75.0

068

.00

69.0

070

.67

78.0

071

.00

72.0

073

.67

4.0

4.4

4.3

4.2

Com

mon

62.2

064

.85

60.0

062

.35

64.8

560

.83

59.0

061

.56

4.3

-6.2

-1.7

-1.3

Mot

or L

oade

r Ope

rato

rs

Min

imum

43.0

051

.00

36.0

043

.33

45.0

053

.00

38.0

045

.33

4.7

3.9

5.6

4.6

Max

imum

72.0

062

.00

75.0

069

.67

75.0

066

.00

78.0

073

.00

4.2

6.5

4.0

4.8

Com

mon

72.8

772

.19

64.5

069

.85

65.0

359

.08

57.4

260

.51

-10.

8-1

8.2

-11.

0-1

3.4

Whe

el L

oade

r Ope

rato

rs

Min

imum

51.0

050

.00

41.0

047

.33

53.0

052

.00

43.0

049

.33

3.9

4.0

4.9

4.2

Max

imum

72.0

060

.00

75.0

069

.00

76.0

063

.00

78.0

072

.33

5.6

5.0

4.0

4.8

Com

mon

62.2

060

.85

55.0

059

.35

64.9

557

.17

57.3

359

.82

4.4

-6.0

4.2

0.8

Page 55: CHAPTER 3 APPENDIX - Goverment Documents · CHAPTER 3 APPENDIX Appendix 3.16 ... E17 Kabel bawah tanah voltan rendah E35 Grid berkapasiti melebihi 72KW E18 Kabel bawah tanah …

STATISTICS AND CONSTRUCTION DEMAND 2015-2016

CHAPTER 3 APPENDIX

209

Wor

ker C

ateg

ory

Min

imum

/ M

axim

um

Wag

es

Year

Cha

nge

(%)

2013

2014

K. K

inab

alu

Sand

akan

Taw

auAv

erag

eK.

Kin

abal

uSa

ndak

anTa

wau

Aver

age

K. K

inab

alu

Sand

akan

Taw

auAv

erag

e

Pave

r Ope

rato

rs

Min

imum

56.0

049

.72

46.0

050

.57

58.0

051

.72

48.0

052

.57

3.6

4.0

4.3

4.0

Max

imum

70.0

062

.00

71.0

067

.67

73.0

065

.00

74.0

070

.67

4.3

4.8

4.2

4.4

Com

mon

62.2

061

.85

53.3

659

.14

64.9

557

.52

60.9

261

.13

4.4

-7.0

14.2

3.4

Mob

ile C

rane

Ope

rato

rs

Min

imum

71.7

071

.00

71.0

071

.23

73.7

073

.00

73.0

073

.23

2.8

2.8

2.8

2.8

Max

imum

101.

0092

.00

92.6

095

.20

104.

0095

.00

95.6

098

.20

3.0

3.3

3.2

3.2

Com

mon

88.5

990

.04

82.0

086

.88

91.0

383

.08

83.0

185

.71

2.8

-7.7

1.2

-1.3

Cra

wle

r Cra

ne O

pera

tors

Min

imum

78.0

071

.00

71.0

073

.33

80.0

073

.00

72.0

075

.00

2.6

2.8

1.4

2.3

Max

imum

102.

0090

.00

92.6

094

.87

105.

0093

.00

95.6

097

.87

2.9

3.3

3.2

3.2

Com

mon

88.6

089

.05

81.0

086

.22

91.2

583

.00

92.5

688

.94

3.0

-6.8

14.3

3.2

Tow

er C

rane

Ope

rato

rs

Min

imum

71.7

071

.00

71.0

071

.23

73.7

073

.00

72.0

072

.90

2.8

2.8

1.4

2.3

Max

imum

98.0

092

.00

92.6

094

.20

101.

0095

.00

95.6

097

.20

3.1

3.3

3.2

3.2

Com

mon

88.6

090

.05

82.0

086

.88

91.0

483

.04

82.4

385

.50

2.8

-7.8

0.5

-1.6

Fork

lift O

pera

tors

Min

imum

53.0

046

.00

46.0

048

.33

55.0

048

.00

47.0

050

.00

3.8

4.3

2.2

3.4

Max

imum

73.0

067

.00

75.0

071

.67

76.0

070

.00

78.0

074

.67

4.1

4.5

4.0

4.2

Com

mon

66.2

066

.35

57.0

063

.18

68.8

559

.50

63.5

863

.98

4.0

-10.

311

.51.

3

Slin

ger/

Dog

ger

Min

imum

51.0

044

.00

49.0

048

.00

53.0

046

.00

50.0

049

.67

3.9

4.5

2.0

3.5

Max

imum

87.0

067

.00

70.0

074

.67

90.0

070

.00

70.0

076

.67

3.4

4.5

0.0

2.7

Com

mon

62.3

264

.41

56.0

060

.91

64.9

757

.25

62.0

861

.43

4.3

-11.

110

.90.

9

Appe

ndix

3.2

8 Av

erag

e D

aily

Wag

e R

ates

for S

kille

d Fo

reig

n M

achi

ne O

pera

tors

in S

abah

in 2

013

and

2014

(RM

/day

) (2)

Page 56: CHAPTER 3 APPENDIX - Goverment Documents · CHAPTER 3 APPENDIX Appendix 3.16 ... E17 Kabel bawah tanah voltan rendah E35 Grid berkapasiti melebihi 72KW E18 Kabel bawah tanah …

STATISTICS AND CONSTRUCTION DEMAND 2015-2016

CHAPTER 3 APPENDIX

210

App

endi

x 3.

29 A

vera

ge D

aily

Wag

e R

ates

for

Sem

i-Sk

illed

Fo

reig

n M

achi

ne O

pera

tor

in S

abah

in 2

013

and

20

14 (R

M/d

ay) (

1)

Wor

ker C

ateg

ory

Min

imum

/ M

axim

um

Wag

es

Year

Cha

nge

(%)

2013

2014

K. K

inab

alu

Sand

akan

Taw

auAv

erag

eK.

Kin

abal

uSa

ndak

anTa

wau

Aver

age

K. K

inab

alu

Sand

akan

Taw

auAv

erag

e

Exac

avat

ors

Ope

rato

rs

Min

imum

--

--

--

--

--

--

Max

imum

--

--

--

--

--

--

Com

mon

--

--

--

--

--

--

Pile

Rig

gers

Min

imum

39.0

036

.00

31.0

035

.33

38.0

038

.00

38.0

038

.00

-2.6

5.6

22.6

7.5

Max

imum

60.0

050

.00

52.0

054

.00

60.0

052

.00

55.0

055

.67

0.0

4.0

5.8

3.1

Com

mon

45.5

046

.00

42.0

044

.50

48.1

545

.50

45.8

346

.49

5.8

-1.1

9.1

4.5

Off

Road

Tru

ck O

pera

tors

Min

imum

35.0

036

.00

31.0

034

.00

38.0

034

.00

36.0

036

.00

8.6

-5.6

16.1

5.9

Max

imum

62.0

047

.00

51.0

053

.33

61.0

053

.00

52.0

055

.33

-1.6

12.8

2.0

3.8

Com

mon

45.6

547

.58

41.5

044

.91

48.3

044

.25

44.4

245

.66

5.8

-7.0

7.0

1.7

Back

hoe

Load

er O

pera

tors

Min

imum

--

--

--

--

--

--

Max

imum

--

--

--

--

--

--

Com

mon

--

--

--

--

--

--

Rolle

r Ope

rato

rs

Min

imum

46.0

046

.00

44.0

045

.33

38.0

036

.40

41.0

038

.47

-17.4

-20.

9-6

.8-1

5.1

Max

imum

67.0

073

.00

57.0

065

.67

63.0

052

.00

50.0

055

.00

-6.0

-28.

8-1

2.3

-16.

2

Com

mon

45.5

847

.04

42.2

044

.94

48.2

344

.48

45.9

646

.22

5.8

-5.4

8.9

2.9

Rolle

r/C

ompa

ctor

O

pera

tors

Min

imum

51.0

046

.00

46.0

047

.67

41.0

036

.50

38.0

038

.50

-19.

6-2

0.7

-17.4

-19.

2

Max

imum

70.0

067

.00

55.0

064

.00

58.0

054

.00

55.0

055

.67

-17.

1-1

9.4

0.0

-13.

0

Com

mon

45.5

848

.04

43.2

545

.62

48.2

644

.31

44.5

645

.71

5.9

-7.8

3.0

0.2

Scra

pper

Ope

rato

rs

Min

imum

51.0

044

.00

36.0

043

.67

33.0

037

.00

38.0

036

.00

-35.

3-1

5.9

5.6

-17.

6

Max

imum

77.0

062

.00

65.0

068

.00

60.0

055

.00

55.0

056

.67

-22.

1-1

1.3

-15.

4-1

6.7

Com

mon

45.5

048

.50

44.0

046

.00

48.2

544

.33

44.0

045

.53

6.0

-8.6

0.0

-1.0

Mot

or L

oade

r Ope

rato

rs

Min

imum

--

--

--

--

--

--

Max

imum

--

--

--

--

--

--

Com

mon

--

--

--

--

--

--

Whe

el L

oade

r Ope

rato

rs

Min

imum

39.0

036

.00

31.0

035

.33

41.0

038

.00

33.0

037

.33

5.1

5.6

6.5

5.7

Max

imum

60.0

050

.00

52.0

054

.00

63.0

053

.00

55.0

057

.00

5.0

6.0

5.8

5.6

Com

mon

45.5

047

.50

43.5

045

.50

48.1

544

.25

44.2

545

.55

5.8

-6.8

1.7

0.1

Page 57: CHAPTER 3 APPENDIX - Goverment Documents · CHAPTER 3 APPENDIX Appendix 3.16 ... E17 Kabel bawah tanah voltan rendah E35 Grid berkapasiti melebihi 72KW E18 Kabel bawah tanah …

STATISTICS AND CONSTRUCTION DEMAND 2015-2016

CHAPTER 3 APPENDIX

211

Wor

ker C

ateg

ory

Min

imum

/ M

axim

um

Wag

es

Year

Cha

nge

(%)

2013

2014

K. K

inab

alu

Sand

akan

Taw

auAv

erag

eK.

Kin

abal

uSa

ndak

anTa

wau

Aver

age

K. K

inab

alu

Sand

akan

Taw

auAv

erag

e

Pave

r Ope

rato

rs

Min

imum

35.0

036

.00

31.0

034

.00

37.0

038

.00

33.0

036

.00

5.7

5.6

6.5

5.9

Max

imum

62.0

047

.00

51.0

053

.33

65.0

050

.00

54.0

056

.33

4.8

6.4

5.9

5.6

Com

mon

45.6

046

.05

42.0

044

.55

48.2

544

.25

44.2

545

.58

5.8

-3.9

5.4

2.3

Mob

ile C

rane

Ope

rato

rs

Min

imum

46.0

046

.00

44.0

045

.33

48.0

048

.00

46.0

047

.33

4.3

4.3

4.5

4.4

Max

imum

67.0

073

.00

57.0

065

.67

70.0

076

.00

60.0

068

.67

4.5

4.1

5.3

4.6

Com

mon

56.9

064

.70

60.0

060

.53

59.6

057

.17

52.7

556

.51

4.7

-11.

6-1

2.1

-6.7

Cra

wle

r Cra

ne O

pera

tors

Min

imum

51.0

046

.00

46.0

047

.67

53.0

048

.00

47.0

049

.33

3.9

4.3

2.2

3.5

Max

imum

70.0

067

.00

55.0

064

.00

74.0

070

.00

58.0

067

.33

5.7

4.5

5.5

5.2

Com

mon

60.5

963

.55

57.0

060

.38

63.3

957

.17

51.6

757

.41

4.6

-10.

0-9

.4-4

.9

Tow

er C

rane

Ope

rato

rs

Min

imum

51.0

044

.00

36.0

043

.67

52.0

046

.00

37.0

045

.00

2.0

4.5

2.8

3.1

Max

imum

77.0

062

.00

65.0

068

.00

80.0

065

.00

68.0

071

.00

3.9

4.8

4.6

4.4

Com

mon

60.6

261

.06

53.5

058

.39

63.4

257

.58

51.7

557

.58

4.6

-5.7

-3.3

-1.4

Fork

lift O

pera

tors

Min

imum

33.0

034

.00

31.0

032

.67

35.0

036

.00

32.0

034

.33

6.1

5.9

3.2

5.1

Max

imum

57.0

047

.00

55.0

053

.00

60.0

050

.00

58.0

056

.00

5.3

6.4

5.5

5.7

Com

mon

44.9

045

.70

41.0

043

.87

47.5

544

.08

45.0

845

.57

5.9

-3.5

10.0

3.9

Slin

ger/

Dog

ger

Min

imum

41.0

036

.00

34.0

037

.00

43.0

038

.00

35.0

038

.67

4.9

5.6

2.9

4.5

Max

imum

62.0

052

.00

52.0

055

.33

65.0

055

.00

55.0

058

.33

4.8

5.8

5.8

5.4

Com

mon

46.5

649

.03

44.5

046

.70

49.2

444

.17

44.6

746

.03

5.8

-9.9

0.4

-1.4

App

endi

x 3.

29 A

vera

ge D

aily

Wag

e R

ates

for

Sem

i-Sk

illed

Fo

reig

n M

achi

ne O

pera

tor

in S

abah

in 2

013

and

20

14 (R

M/d

ay) (

2)

Page 58: CHAPTER 3 APPENDIX - Goverment Documents · CHAPTER 3 APPENDIX Appendix 3.16 ... E17 Kabel bawah tanah voltan rendah E35 Grid berkapasiti melebihi 72KW E18 Kabel bawah tanah …

STATISTICS AND CONSTRUCTION DEMAND 2015-2016

CHAPTER 3 APPENDIX

212

App

endi

x 3.

30 A

vera

ge D

aily

Wag

e R

ates

for

Skill

ed F

ore

ign

Mac

hine

Ope

rato

r in

Sar

awak

in 2

013

and

20

14 (R

M/d

ay) (

1)

Wor

ker C

ateg

ory

Min

imum

/ M

axim

um

Wag

es

Year

Cha

nge

(%)

2013

2014

Kuch

ing

Mir

iSi

buAv

erag

eKu

chin

gM

iri

Sibu

Aver

age

Kuch

ing

Mir

iSi

buAv

erag

e

Exac

avat

ors

Ope

rato

rs

Min

imum

52.0

067

.00

79.0

066

.00

54.0

072

.50

83.0

069

.83

3.8

8.2

5.1

5.8

Max

imum

87.0

082

.00

121.

0096

.67

91.0

012

2.00

124.

0011

2.33

4.6

48.8

2.5

16.2

Com

mon

68.9

275

.21

75.0

073

.04

71.6

178

.17

102.

5884

.12

3.9

3.9

36.8

15.2

Pile

Rig

gers

Min

imum

56.0

071

.38

60.0

062

.46

58.0

062

.00

64.0

061

.33

3.6

-13.

16.

7-1

.8

Max

imum

82.5

889

.29

81.0

084

.29

87.0

095

.00

84.0

088

.67

5.4

6.4

3.7

5.2

Com

mon

70.9

579

.87

80.8

477

.22

73.6

581

.68

72.1

775

.83

3.8

2.3

-10.

7-1

.8

Off

Road

Tru

ck O

pera

tors

Min

imum

60.1

665

.26

73.4

466

.29

62.1

672

.00

80.0

071

.39

3.3

10.3

8.9

7.7

Max

imum

87.0

089

.00

93.0

089

.67

91.0

094

.00

96.0

093

.67

4.6

5.6

3.2

4.5

Com

mon

70.8

979

.69

77.6

376

.07

73.7

981

.53

88.7

981

.37

4.1

2.3

14.4

7.0

Back

hoe

Load

er O

pera

tors

Min

imum

46.0

056

.00

80.0

060

.67

48.0

061

.50

84.0

064

.50

4.3

9.8

5.0

6.3

Max

imum

77.0

077

.00

89.0

081

.00

80.0

090

.00

92.0

087

.33

3.9

16.9

3.4

7.8

Com

mon

61.5

069

.00

67.0

065

.83

64.1

569

.17

86.9

573

.42

4.3

0.2

29.8

11.5

Rolle

r Ope

rato

rs

Min

imum

48.0

051

.00

82.6

260

.54

50.0

056

.50

88.0

064

.83

4.2

10.8

6.5

7.1

Max

imum

79.0

083

.00

96.0

086

.00

82.0

097

.00

99.0

092

.67

3.8

16.9

3.1

7.8

Com

mon

59.9

071

.20

67.5

066

.20

62.6

569

.17

90.1

774

.00

4.6

-2.9

33.6

11.8

Rolle

r/C

ompa

ctor

Ope

rato

rs

Min

imum

56.0

060

.74

77.0

064

.58

58.0

066

.24

81.0

068

.41

3.6

9.1

5.2

5.9

Max

imum

87.0

096

.00

96.0

093

.00

91.0

099

.00

99.0

096

.33

4.6

3.1

3.1

3.6

Com

mon

70.9

083

.20

78.8

777

.66

73.5

578

.08

87.0

879

.57

3.7

-6.2

10.4

2.5

Scra

pper

Ope

rato

rs

Min

imum

72.7

578

.25

94.0

081

.67

74.7

583

.75

98.0

085

.50

2.7

7.0

4.3

4.7

Max

imum

91.0

093

.00

100.

0094

.67

95.0

010

1.00

103.

0099

.67

4.4

8.6

3.0

5.3

Com

mon

82.6

287

.56

86.1

385

.44

85.3

788

.35

100.

0891

.27

3.3

0.9

16.2

6.8

Mot

or L

oade

r Ope

rato

rs

Min

imum

58.0

071

.00

81.6

070

.20

60.0

076

.50

86.6

274

.37

3.4

7.7

6.2

5.9

Max

imum

97.0

099

.92

111.

0010

2.64

101.

0011

2.00

114.

0010

9.00

4.1

12.1

2.7

6.2

Com

mon

79.2

089

.31

85.9

684

.82

81.9

088

.07

95.3

688

.44

3.4

-1.4

10.9

4.3

Whe

el L

oade

r Ope

rato

rs

Min

imum

51.0

061

.00

82.0

064

.67

53.0

068

.00

86.0

069

.00

3.9

11.5

4.9

6.7

Max

imum

97.0

087

.00

104.

0096

.00

101.

0010

5.00

107.

0010

4.33

4.1

20.7

2.9

8.7

Com

mon

70.9

078

.70

74.5

074

.70

73.7

078

.17

98.6

783

.51

3.9

-0.7

32.4

11.8

Page 59: CHAPTER 3 APPENDIX - Goverment Documents · CHAPTER 3 APPENDIX Appendix 3.16 ... E17 Kabel bawah tanah voltan rendah E35 Grid berkapasiti melebihi 72KW E18 Kabel bawah tanah …

STATISTICS AND CONSTRUCTION DEMAND 2015-2016

CHAPTER 3 APPENDIX

213

Wor

ker C

ateg

ory

Min

imum

/ M

axim

um

Wag

es

Year

Cha

nge

(%)

2013

2014

Kuch

ing

Mir

iSi

buAv

erag

eKu

chin

gM

iri

Sibu

Aver

age

Kuch

ing

Mir

iSi

buAv

erag

e

Pave

r Ope

rato

rs

Min

imum

72.7

575

.16

79.0

075

.64

74.7

580

.66

84.0

079

.80

2.7

7.3

6.3

5.5

Max

imum

94.0

096

.00

99.0

096

.33

98.0

010

0.00

102.

0010

0.00

4.3

4.2

3.0

3.8

Com

mon

82.5

489

.02

86.0

885

.88

85.2

788

.26

92.0

888

.54

3.3

-0.9

7.0

3.1

Mob

ile C

rane

Ope

rato

rs

Min

imum

76.0

071

.00

91.0

079

.33

78.0

076

.50

95.0

083

.17

2.6

7.7

4.4

4.8

Max

imum

101.

0099

.00

112.

1810

4.06

104.

0011

3.18

115.

1811

0.79

3.0

14.3

2.7

6.5

Com

mon

87.5

093

.00

85.5

088

.67

90.2

088

.75

104.

2094

.38

3.1

-4.6

21.9

6.4

Cra

wle

r Cra

ne O

pera

tors

Min

imum

81.0

071

.00

92.0

081

.33

83.0

079

.50

96.0

086

.17

2.5

12.0

4.3

5.9

Max

imum

96.0

098

.00

112.

1810

2.06

100.

0011

3.18

115.

1810

9.45

4.2

15.5

2.7

7.2

Com

mon

87.5

092

.50

85.0

088

.33

90.1

588

.17

104.

2994

.20

3.0

-4.7

22.7

6.6

Tow

er C

rane

Ope

rato

rs

Min

imum

81.0

076

.00

92.0

083

.00

83.0

081

.50

96.0

086

.83

2.5

7.2

4.3

4.6

Max

imum

114.

0011

0.00

111.

0011

1.67

118.

0011

3.00

114.

0011

5.00

3.5

2.7

2.7

3.0

Com

mon

92.5

810

1.40

93.5

095

.83

95.3

395

.91

104.

6798

.64

3.0

-5.4

11.9

2.9

Fork

lift O

pera

tors

Min

imum

51.0

054

.00

70.0

058

.33

53.0

059

.50

78.0

063

.50

3.9

10.2

11.4

8.9

Max

imum

72.0

077

.00

91.0

080

.00

76.0

092

.00

94.0

087

.33

5.6

19.5

3.3

9.2

Com

mon

59.9

068

.20

66.0

064

.70

62.6

569

.42

83.0

071

.69

4.6

1.8

25.8

10.8

Slin

ger/

Dog

ger

Min

imum

51.0

051

.00

68.0

056

.67

53.0

056

.50

72.0

060

.50

3.9

10.8

5.9

6.8

Max

imum

72.0

082

.00

91.0

081

.67

75.0

092

.00

94.0

087

.00

4.2

12.2

3.3

6.5

Com

mon

59.9

070

.70

67.0

065

.87

62.6

569

.08

82.9

271

.55

4.6

-2.3

23.8

8.6

App

endi

x 3.

30 A

vera

ge D

aily

Wag

e R

ates

for

Skill

ed F

ore

ign

Mac

hine

Ope

rato

r in

Sar

awak

in 2

013

and

20

14 (R

M/d

ay) (

2)

Page 60: CHAPTER 3 APPENDIX - Goverment Documents · CHAPTER 3 APPENDIX Appendix 3.16 ... E17 Kabel bawah tanah voltan rendah E35 Grid berkapasiti melebihi 72KW E18 Kabel bawah tanah …

STATISTICS AND CONSTRUCTION DEMAND 2015-2016

CHAPTER 3 APPENDIX

214

Appe

ndix

3.3

1 A

vera

ge D

aily

Wag

e R

ates

for S

emi-

Skill

ed F

orei

gn M

achi

ne O

pera

tor i

n Sa

raw

ak in

201

3 an

d 20

14 (R

M/d

ay) (

1)

Wor

ker C

ateg

ory

Min

imum

/ M

axim

um

Wag

es

Year

Cha

nge

(%)

2013

2014

Kuch

ing

Mir

iSi

buAv

erag

eKu

chin

gM

iri

Sibu

Aver

age

Kuch

ing

Mir

iSi

buAv

erag

e

Exac

avat

ors

Ope

rato

rs

Min

imum

--

--

--

--

--

--

Max

imum

--

--

--

--

--

--

Com

mon

--

--

--

--

--

--

Pile

Rig

gers

Min

imum

51.0

060

.16

50.0

053

.72

53.0

052

.00

55.0

053

.33

3.9

-13.

610

.0-0

.7

Max

imum

67.0

077

.00

66.0

070

.00

70.2

681

.50

69.0

073

.59

4.9

5.8

4.5

5.1

Com

mon

59.9

868

.24

69.0

865

.77

62.8

171

.19

61.8

365

.28

4.7

4.3

-10.

5-0

.7

Off

Road

Tru

ck O

pera

tors

Min

imum

49.9

656

.08

58.0

054

.68

51.9

660

.00

65.0

058

.99

4.0

7.0

12.1

7.9

Max

imum

67.0

077

.00

89.0

077

.67

70.0

090

.00

92.0

084

.00

4.5

16.9

3.4

8.2

Com

mon

58.2

367

.36

67.0

464

.21

60.9

271

.17

77.7

569

.95

4.6

5.7

16.0

8.9

Back

hoe

Load

er O

pera

tors

Min

imum

--

--

--

--

--

--

Max

imum

--

--

--

--

--

--

Com

mon

--

--

--

--

--

--

Rolle

r Ope

rato

rs

Min

imum

41.0

045

.00

55.0

047

.00

43.0

050

.50

62.0

051

.83

4.9

12.2

12.7

10.3

Max

imum

61.1

676

.00

93.0

076

.72

65.1

694

.00

96.0

085

.05

6.5

23.7

3.2

10.9

Com

mon

49.9

262

.71

61.0

057

.88

52.6

761

.15

77.5

863

.80

5.5

-2.5

27.2

10.2

Rolle

r/C

ompa

ctor

Ope

rato

rs

Min

imum

50.2

050

.44

60.0

053

.55

52.2

054

.44

64.0

056

.88

4.0

7.9

6.7

6.2

Max

imum

82.0

087

.00

93.0

087

.33

86.0

094

.00

96.0

092

.00

4.9

8.0

3.2

5.3

Com

mon

59.9

573

.22

69.2

267

.46

62.6

469

.17

75.9

269

.24

4.5

-5.5

9.7

2.6

Scra

pper

Ope

rato

rs

Min

imum

62.2

070

.01

67.3

266

.51

64.2

069

.32

72.0

068

.51

3.2

-1.0

7.0

3.0

Max

imum

78.0

087

.00

96.0

087

.00

83.0

097

.00

99.0

093

.00

6.4

11.5

3.1

6.9

Com

mon

70.8

778

.69

79.0

176

.19

73.6

777

.65

81.1

777

.50

4.0

-1.3

2.7

1.7

Mot

or L

oade

r Ope

rato

rs

Min

imum

--

--

--

--

--

--

Max

imum

--

--

--

--

--

--

Com

mon

--

--

--

--

--

--

Whe

el L

oade

r Ope

rato

rs

Min

imum

41.0

056

.00

72.0

056

.33

43.0

061

.50

76.0

060

.17

4.9

9.8

5.6

6.8

Max

imum

78.0

070

.34

91.0

079

.78

83.0

092

.00

94.0

089

.67

6.4

30.8

3.3

12.4

Com

mon

59.9

164

.87

63.6

762

.82

62.5

667

.47

85.0

071

.68

4.4

4.0

33.5

14.1

Page 61: CHAPTER 3 APPENDIX - Goverment Documents · CHAPTER 3 APPENDIX Appendix 3.16 ... E17 Kabel bawah tanah voltan rendah E35 Grid berkapasiti melebihi 72KW E18 Kabel bawah tanah …

STATISTICS AND CONSTRUCTION DEMAND 2015-2016

CHAPTER 3 APPENDIX

215

Wor

ker C

ateg

ory

Min

imum

/ M

axim

um

Wag

es

Year

Cha

nge

(%)

2013

2014

Kuch

ing

Mir

iSi

buAv

erag

eKu

chin

gM

iri

Sibu

Aver

age

Kuch

ing

Mir

iSi

buAv

erag

e

Pave

r Ope

rato

rs

Min

imum

60.4

567

.95

65.0

064

.47

62.4

567

.00

70.0

066

.48

3.3

-1.4

7.7

3.1

Max

imum

85.0

083

.00

89.0

085

.67

89.0

090

.00

92.0

090

.33

4.7

8.4

3.4

5.4

Com

mon

68.3

075

.40

75.9

873

.23

70.8

877

.93

81.3

376

.71

3.8

3.4

7.0

4.8

Mob

ile C

rane

Ope

rato

rs

Min

imum

61.0

066

.00

72.4

266

.47

63.0

071

.50

76.4

270

.31

3.3

8.3

5.5

5.8

Max

imum

80.0

087

.00

89.0

085

.33

83.0

090

.00

92.0

088

.33

3.8

3.4

3.4

3.5

Com

mon

70.9

078

.70

77.0

075

.53

73.6

078

.42

83.2

578

.42

3.8

-0.4

8.1

3.8

Cra

wle

r Cra

ne O

pera

tors

Min

imum

56.0

069

.68

74.0

066

.56

58.0

071

.50

80.0

069

.83

3.6

2.6

8.1

4.9

Max

imum

81.0

087

.00

87.0

085

.00

85.0

090

.00

90.0

088

.33

4.9

3.4

3.4

3.9

Com

mon

70.9

578

.72

78.8

476

.17

73.7

377

.82

83.2

778

.27

3.9

-1.1

5.6

2.8

Tow

er C

rane

Ope

rato

rs

Min

imum

61.0

069

.68

71.0

067

.23

63.0

073

.00

75.0

070

.33

3.3

4.8

5.6

4.6

Max

imum

88.0

087

.00

89.0

088

.00

92.0

090

.00

92.0

091

.33

4.5

3.4

3.4

3.8

Com

mon

70.8

578

.67

78.8

476

.12

73.5

878

.07

83.0

278

.22

3.9

-0.8

5.3

2.8

Fork

lift O

pera

tors

Min

imum

41.0

041

.00

60.0

047

.33

43.0

046

.50

64.0

051

.17

4.9

13.4

6.7

8.1

Max

imum

62.0

067

.00

77.5

068

.83

66.0

078

.50

80.5

075

.00

6.5

17.2

3.9

9.0

Com

mon

49.9

058

.20

54.5

054

.20

52.6

058

.08

72.2

860

.99

5.4

-0.2

32.6

12.5

Slin

ger/

Dog

ger

Min

imum

39.0

046

.00

53.0

446

.01

41.0

051

.50

57.0

449

.85

5.1

12.0

7.5

8.3

Max

imum

57.0

064

.00

87.0

069

.33

61.0

088

.00

90.0

079

.67

7.0

37.5

3.4

14.9

Com

mon

49.9

156

.70

55.5

054

.04

52.5

658

.42

71.9

260

.97

5.3

3.0

29.6

12.8

Appe

ndix

3.3

1 A

vera

ge D

aily

Wag

e R

ates

for S

emi-

Skill

ed F

orei

gn M

achi

ne O

pera

tor i

n Sa

raw

ak in

201

3 an

d 20

14 (R

M/d

ay) (

2)

Page 62: CHAPTER 3 APPENDIX - Goverment Documents · CHAPTER 3 APPENDIX Appendix 3.16 ... E17 Kabel bawah tanah voltan rendah E35 Grid berkapasiti melebihi 72KW E18 Kabel bawah tanah …

STATISTICS AND CONSTRUCTION DEMAND 2015-2016

CHAPTER 3 APPENDIX

216

Appe

ndix

3.3

2 A

vera

ge D

aily

Wag

e Ra

tes

for S

kille

d Fo

reig

n C

onst

ruct

ion

Wor

kers

in P

enin

sula

r Mal

aysi

a in

201

3 an

d 20

14 (R

M/d

ay) (

1)

Wor

ker C

ateg

ory

Min

imum

/ M

axim

um

Wag

es

Year

Chan

ge (%

)20

1320

14

Cent

ral

Regi

onNo

rther

n Re

gion

East

ern

Regi

onSo

uthe

rn

Regi

onAv

erag

eCe

ntra

l Re

gion

North

ern

Regi

onEa

ster

n Re

gion

Sout

hern

Re

gion

Aver

age

Cent

ral

Regi

onNo

rther

n Re

gion

East

ern

Regi

onSo

uthe

rn

Regi

onAv

erag

e

Gen

eral

C

onst

ruct

ion

Wor

kers

- B

uild

ing

Min

imum

35.0

038

.00

40.0

035

.00

37.0

035

.00

38.0

030

.00

35.0

034

.50

0.0

0.0

-25.0

0.0

-6.8

Max

imum

70.0

071

.00

66.0

070

.00

69.2

585

.00

74.0

070

.50

100.

0082

.38

21.4

4.2

6.8

42.9

19.0

Com

mon

52.3

850

.30

52.5

852

.1651

.86

51.6

452

.29

54.2

555

.86

53.5

1-1

.44.

03.

27.1

3.2

Con

cret

ers

Min

imum

40.0

050

.00

45.0

040

.00

43.75

40.0

050

.00

45.0

040

.00

43.75

0.0

0.0

0.0

0.0

0.0

Max

imum

95.0

012

5.00

82.0

090

.00

98.0

010

0.00

125.0

086

.50

120.

0010

7.88

5.3

0.0

5.5

33.3

10.1

Com

mon

71.5

078

.64

68.4

268

.7871

.84

73.3

879

.89

71.3

370

.1273

.68

2.6

1.64.

31.9

2.6

Bar B

ende

rs

Min

imum

53.0

050

.00

50.0

045

.00

49.5

055

.00

55.0

050

.00

40.0

050

.00

3.8

10.0

0.0

-11.1

1.0

Max

imum

110.

0098

.00

78.0

090

.00

94.0

020

0.00

98.0

083

.50

120.

0012

5.38

81.8

0.0

7.133

.333

.4

Com

mon

75.5

373

.32

68.3

969

.67

71.73

82.10

74.9

170

.58

72.14

74.9

38.

72.

23.

23.

54.

5

Car

pent

ers

-Fo

rmw

ork

Min

imum

50.0

055

.00

50.0

060

.00

53.75

50.0

055

.00

50.0

040

.00

48.75

0.0

0.0

0.0

-33.

3-9

.3

Max

imum

110.

0010

0.00

84.0

095

.00

97.2

511

0.00

100.

0087

.00

115.0

010

3.00

0.0

0.0

3.621

.15.

9

Com

mon

75.3

877

.44

73.8

975

.49

75.5

579

.63

80.3

676

.31

77.75

78.5

15.6

3.8

3.3

3.03.

9

Bric

klay

ers

Min

imum

45.0

055

.00

50.0

050

.00

50.0

045

.00

55.0

050

.00

40.0

047

.50

0.0

0.0

0.0

-20.

0-5

.0

Max

imum

100.

0010

0.00

85.0

011

0.00

98.75

100.

0010

1.00

89.5

012

0.00

102.

630.

01.0

5.3

9.1

3.9

Com

mon

74.6

374

.94

71.19

72.2

773

.26

79.13

80.0

373

.03

75.0

076

.80

6.0

6.8

2.6

3.8

4.8

Roof

ers

Min

imum

50.0

060

.00

60.0

045

.00

53.75

50.0

060

.00

60.0

050

.00

55.0

00.

00.

00.

011

.12.

3

Max

imum

105.0

010

5.00

89.0

010

5.00

101.0

013

0.00

105.0

092

.00

105.0

010

8.00

23.8

0.0

3.40.

06.

9

Com

mon

77.4

082

.42

77.6

176

.1378

.39

83.8

884

.36

80.0

677

.1181

.35

8.42.4

3.2

1.33.

8

Car

pent

ers

-Jo

iner

y

Min

imum

55.0

050

.00

58.0

045

.00

52.0

055

.00

65.0

060

.00

50.0

057

.50

0.0

30.0

3.411

.110

.6

Max

imum

120.

0011

5.00

90.0

010

0.00

106.

2513

0.00

125.0

094

.50

135.0

012

1.13

8.3

8.7

5.035

.014

.0

Com

mon

82.2

590

.08

79.2

281

.69

83.3

192

.1594

.7282

.31

85.16

88.5

912

.05.

23.

94.

26.

3

Stee

l Stru

ctur

eFa

bric

ator

s

Min

imum

60.0

060

.00

60.0

050

.00

57.5

060

.00

60.0

065

.00

40.0

056

.25

0.0

0.0

8.3

-20.

0-2

.2

Max

imum

120.

0011

0.00

97.0

011

0.00

109.

2513

5.00

110.

0010

0.50

110.

0011

3.88

12.5

0.0

3.60.

04.

2

Com

mon

85.18

88.17

84.4

483

.81

85.4

095

.55

88.6

486

.08

82.9

488

.30

12.2

0.5

1.9-1

.03.4

Page 63: CHAPTER 3 APPENDIX - Goverment Documents · CHAPTER 3 APPENDIX Appendix 3.16 ... E17 Kabel bawah tanah voltan rendah E35 Grid berkapasiti melebihi 72KW E18 Kabel bawah tanah …

STATISTICS AND CONSTRUCTION DEMAND 2015-2016

CHAPTER 3 APPENDIX

217

Wor

ker C

ateg

ory

Min

imum

/ M

axim

um

Wag

es

Year

Chan

ge (%

)20

1320

14

Cent

ral

Regi

onNo

rther

n Re

gion

East

ern

Regi

onSo

uthe

rn

Regi

onAv

erag

eCe

ntra

l Re

gion

North

ern

Regi

onEa

ster

n Re

gion

Sout

hern

Re

gion

Aver

age

Cent

ral

Regi

onNo

rther

n Re

gion

East

ern

Regi

onSo

uthe

rn

Regi

onAv

erag

e

Gen

eral

Wel

ders

Min

imum

55.0

055

.00

55.0

054

.00

54.75

50.0

055

.00

33.0

050

.00

47.0

0-9

.10.

0-4

0.0

-7.4

-14.

2

Max

imum

120.

0099

.00

92.0

099

.00

102.

5015

0.00

104.

0097

.50

110.

0011

5.38

25.0

5.1

6.0

11.1

12.6

Com

mon

85.6

378

.53

79.0

075

.7579

.7392

.23

81.6

780

.7278

.1883

.20

7.74.

02.

23.

24.4

Plum

bers

-Bui

ldin

g an

d Sa

nita

ry

Min

imum

50.0

050

.00

45.0

050

.00

48.75

60.0

050

.00

50.0

055

.00

53.75

20.0

0.0

11.1

10.0

10.3

Max

imum

130.

0013

0.00

83.0

095

.00

109.

5015

0.00

130.

0086

.00

110.

0011

9.00

15.4

0.0

3.615

.88.

7

Com

mon

76.6

376

.7270

.61

72.4

274

.1089

.7580

.1774

.06

75.6

479

.91

17.1

4.5

4.9

4.47.8

Plum

bers

-Re

ticul

atio

n

Min

imum

50.0

055

.00

45.0

045

.00

48.75

60.0

055

.00

50.0

045

.00

52.5

020

.00.

011

.10.

07.7

Max

imum

100.

0012

0.00

96.0

010

0.00

104.

0016

0.00

145.0

010

0.50

110.

0012

8.88

60.0

20.8

4.7

10.0

23.9

Com

mon

76.9

580

.94

81.8

376

.39

79.0

394

.7584

.92

86.0

080

.81

86.6

223

.14.

95.

15.8

9.6

Build

ing

Wiri

ngIn

stal

lers

Min

imum

--

--

--

--

--

--

--

-

Max

imum

--

--

--

--

--

--

--

-

Com

mon

--

--

--

--

--

--

--

-

Elec

tric

al W

irem

en

PW2

(Mon

thly

RM

)

Min

imum

1,400

.00

700.

001,2

00.0

01,3

00.0

01,1

50.0

01,4

00.0

075

0.00

850.

001,0

00.0

01,0

00.0

00.

07.1

-29.

2-2

3.1

-13.0

Max

imum

3,600

.00

2,50

0.00

1,992

.00

2,75

0.00

2,71

0.50

4,50

0.00

2,450

.00

1,999

.00

3,700

.00

3,16

2.25

25.0

-2.0

0.4

34.5

16.7

Com

mon

2,22

7.50

1,744

.50

1,683

.94

1,809

.781,8

66.4

32,4

72.5

01,8

14.4

21,6

36.5

01,8

93.5

01,9

54.2

311

.04.

0-2

.84.

64.

7

Elec

tric

al W

irem

enPW

4 (M

onth

ly R

M)

Min

imum

1,800

.00

950.

001,6

00.0

01,4

00.0

01,4

37.5

01,8

00.0

01,0

00.0

01,4

80.0

01,0

00.0

01,3

20.0

00.

05.

3-7

.5-2

8.6

-8.2

Max

imum

3,750

.00

2,80

0.00

2,80

2.00

3,20

0.00

3,13

8.00

5,50

0.00

3,20

0.00

2,80

5.00

4,00

0.00

3,876

.25

46.7

14.3

0.1

25.0

23.5

Com

mon

2,494

.152,

247.6

12,

119.

562,

173.

392,

258.

682,

915.4

52,

356.

282,

087.0

62,

329.

392,4

22.0

516

.94.

8-1

.57.2

7.2

Scaff

olde

rs -

Pref

abric

ated

Min

imum

65.0

040

.00

55.0

060

.00

55.0

060

.00

45.0

055

.00

40.0

050

.00

-7.7

12.5

0.0

-33.

3-9

.1

Max

imum

115.0

014

0.00

83.0

010

0.00

109.

5013

0.00

140.

0087

.00

140.

0012

4.25

13.0

0.0

4.8

40.0

13.5

Com

mon

82.4

587

.33

71.0

679

.1980

.01

86.2

585

.61

74.6

181

.42

81.9

74.

6-2

.05.0

2.8

2.5

Scaff

olde

rs -

Tubu

lar

Min

imum

60.0

060

.00

55.0

055

.00

57.5

060

.00

60.0

055

.00

60.0

058

.750.

00.

00.

09.

12.

2

Max

imum

95.0

011

5.00

90.0

095

.00

98.75

130.

0011

5.00

90.0

011

5.00

112.

5036

.80.

00.

021

.113

.9

Com

mon

77.3

577

.81

73.2

876

.89

76.3

386

.43

80.0

075

.53

80.9

780

.7311

.72.

83.

15.

35.8

Plas

tere

rs

Min

imum

60.0

065

.00

55.0

040

.00

55.0

055

.00

70.0

055

.00

40.0

055

.00

-8.3

7.70.

00.

00.

0

Max

imum

110.

0010

5.00

80.0

090

.00

96.2

512

0.00

121.0

085

.00

140.

0011

6.50

9.1

15.2

6.3

55.6

21.0

Com

mon

79.6

382

.47

70.8

370

.39

75.8

385

.50

91.17

73.4

271

.28

80.3

47.4

10.5

3.7

1.36.

0

Appe

ndix

3.3

2 A

vera

ge D

aily

Wag

e Ra

tes

for S

kille

d Fo

reig

n C

onst

ruct

ion

Wor

kers

in P

enin

sula

r Mal

aysi

a in

201

3 an

d 20

14 (R

M/d

ay) (

2)

Page 64: CHAPTER 3 APPENDIX - Goverment Documents · CHAPTER 3 APPENDIX Appendix 3.16 ... E17 Kabel bawah tanah voltan rendah E35 Grid berkapasiti melebihi 72KW E18 Kabel bawah tanah …

STATISTICS AND CONSTRUCTION DEMAND 2015-2016

CHAPTER 3 APPENDIX

218

Wor

ker C

ateg

ory

Min

imum

/ M

axim

um

Wag

es

Year

Chan

ge (%

)20

1320

14

Cent

ral

Regi

onNo

rther

n Re

gion

East

ern

Regi

onSo

uthe

rn

Regi

onAv

erag

eCe

ntra

l Re

gion

North

ern

Regi

onEa

ster

n Re

gion

Sout

hern

Re

gion

Aver

age

Cent

ral

Regi

onNo

rther

n Re

gion

East

ern

Regi

onSo

uthe

rn

Regi

onAv

erag

e

Tile

rs

Min

imum

55.0

065

.00

60.0

050

.00

57.5

055

.00

60.0

050

.00

40.0

051

.25

0.0

-7.7

-16.

7-2

0.0

-10.

9

Max

imum

120.

0012

0.00

89.0

010

0.00

107.2

512

5.00

120.

0095

.00

120.

0011

5.00

4.2

0.0

6.7

20.0

7.2

Com

mon

81.5

883

.39

79.17

79.14

80.8

289

.98

88.3

181

.81

80.78

85.2

210

.35.

93.

32.

15.4

Pain

ters

- B

uild

ing

Min

imum

55.0

050

.00

45.0

045

.00

48.75

55.0

055

.00

50.0

040

.00

50.0

00.

010

.011

.1-1

1.12.

6

Max

imum

115.0

010

0.00

75.0

090

.00

95.0

013

0.00

105.0

078

.00

120.

0010

8.25

13.0

5.04.

033

.313

.9

Com

mon

76.13

73.6

365

.00

69.2

271

.00

82.6

378

.1066

.81

70.3

974

.48

8.5

6.1

2.8

1.74.

9

Gen

eral

C

onst

ruct

ion

Wor

kers

-Civ

il

Min

imum

40.0

035

.00

40.0

038

.00

38.2

535

.00

35.0

040

.00

35.0

036

.25

-12.

50.

00.

0-7

.9-5

.2

Max

imum

70.0

070

.00

74.0

066

.00

70.0

080

.00

86.0

077

.00

90.0

083

.25

14.3

22.9

4.1

36.4

18.9

Com

mon

52.13

53.5

353

.50

52.8

052

.99

55.75

61.5

355

.7558

.1957

.81

6.9

14.9

4.2

10.2

9.1

Not

e:

Dat

a C

over

s:

Cen

tral

Reg

ion:

Per

ak, S

elan

gor a

nd K

uala

Lum

pur

N

orth

ern

Regi

on: K

edah

and

Pul

au P

inan

g

East

ern

Regi

on: P

ahan

g, K

elan

tan

and

Tere

ngga

nu

Sout

hern

Reg

ion:

Neg

eri S

embi

lan,

Mel

aka

and

Joho

r

Appe

ndix

3.3

2 A

vera

ge D

aily

Wag

e Ra

tes

for S

kille

d Fo

reig

n C

onst

ruct

ion

Wor

kers

in P

enin

sula

r Mal

aysi

a in

201

3 an

d 20

14 (R

M/d

ay) (

3)

Page 65: CHAPTER 3 APPENDIX - Goverment Documents · CHAPTER 3 APPENDIX Appendix 3.16 ... E17 Kabel bawah tanah voltan rendah E35 Grid berkapasiti melebihi 72KW E18 Kabel bawah tanah …

STATISTICS AND CONSTRUCTION DEMAND 2015-2016

CHAPTER 3 APPENDIX

219

Appe

ndix

3.3

3 A

vera

ge D

aily

Wag

e R

ates

for S

emi-

Skill

ed F

orei

gn C

onst

ruct

ion

Wor

kers

in P

enin

sula

r Mal

aysi

a in

201

3 an

d 20

14 (R

M/d

ay) (

1)

Wor

ker C

ateg

ory

Min

imum

/ M

axim

um

Wag

es

Year

Chan

ge (%

)20

1320

14

Cent

ral

Regi

onNo

rther

n Re

gion

East

ern

Regi

onSo

uthe

rn

Regi

onAv

erag

eCe

ntra

l Re

gion

North

ern

Regi

onEa

ster

n Re

gion

Sout

hern

Re

gion

Aver

age

Cent

ral

Regi

onNo

rther

n Re

gion

East

ern

Regi

onSo

uthe

rn

Regi

onAv

erag

e

Gen

eral

Con

stru

ctio

n W

orke

rs -

Bui

ldin

g

Min

imum

--

--

--

--

--

--

--

-

Max

imum

--

--

--

--

--

--

--

-

Com

mon

--

--

--

--

--

--

--

-

Con

cret

ers

Min

imum

40.0

040

.00

40.0

040

.00

40.0

040

.00

40.0

040

.00

40.0

040

.00

0.0

0.0

0.0

0.0

0.0

Max

imum

75.0

010

0.00

70.0

075

.00

80.0

085

.00

100.

0075

.00

100.

0090

.00

13.3

0.0

7.133

.312

.5

Com

mon

54.7

560

.31

56.11

54.4

956

.42

58.13

62.0

058

.06

59.4

959

.42

6.2

2.8

3.5

9.2

5.3

Bar B

ende

rs

Min

imum

35.0

040

.00

40.0

040

.00

38.7

538

.00

38.0

040

.00

40.0

039

.00

8.6

-5.0

0.0

0.0

0.6

Max

imum

90.0

077

.00

66.0

070

.00

75.7

595

.00

80.0

069

.50

80.0

081

.135.

63.

95.

314

.37.1

Com

mon

57.3

355

.1654

.1755

.22

55.4

760

.83

55.4

756

.39

57.14

57.4

66.

10.

64.

13.

53.

6

Car

pent

ers

-Fo

rmw

ork

Min

imum

45.0

040

.00

40.0

040

.00

41.2

540

.00

40.0

040

.00

40.0

040

.00

-11.1

0.0

0.0

0.0

-3.0

Max

imum

90.0

085

.00

78.0

080

.00

83.2

590

.00

85.0

082

.50

84.0

085

.38

0.0

0.0

5.8

5.0

2.6

Com

mon

59.13

63.3

662

.1158

.89

60.8

762

.50

63.2

764

.08

60.6

762

.63

5.7

-0.1

3.2

3.0

2.9

Bric

klay

ers

Min

imum

35.0

040

.00

40.0

035

.00

37.5

038

.00

40.0

040

.00

40.0

039

.50

8.6

0.0

0.0

14.3

5.3

Max

imum

90.0

085

.00

70.0

070

.00

78.7

590

.00

80.0

074

.50

100.

0086

.130.

0-5

.96.

442

.99.

4

Com

mon

55.9

857

.23

57.2

854

.94

56.3

659

.78

60.8

458

.64

58.8

359

.52

6.8

6.3

2.4

7.15.

6

Roof

ers

Min

imum

40.0

040

.00

43.0

040

.00

40.7

545

.00

40.0

043

.00

40.0

042

.00

12.5

0.0

0.0

0.0

3.1

Max

imum

80.0

080

.00

72.0

080

.00

78.0

090

.00

81.0

076

.50

86.0

083

.38

12.5

1.36.

37.5

6.9

Com

mon

56.2

564

.00

60.6

158

.69

59.8

961

.25

65.8

663

.31

61.6

463

.02

8.9

2.9

4.5

5.0

5.2

Car

pent

ers

-Jo

iner

y

Min

imum

40.0

040

.00

40.0

038

.00

39.5

040

.00

45.0

045

.00

40.0

042

.50

0.0

12.5

12.5

5.3

7.6

Max

imum

90.0

095

.00

81.0

086

.00

88.0

090

.00

95.0

085

.50

92.0

090

.63

0.0

0.0

5.6

7.03.

0

Com

mon

60.6

372

.1866

.1761

.94

65.2

366

.00

75.2

267

.75

65.6

168

.65

8.9

4.2

2.4

5.9

5.2

Stee

l Stru

ctur

eFa

bric

ator

s

Min

imum

45.0

045

.00

40.0

040

.00

42.5

045

.00

45.0

040

.00

40.0

042

.50

0.0

0.0

0.0

0.0

0.0

Max

imum

90.0

085

.00

82.0

090

.00

86.7

595

.00

89.0

085

.00

96.0

091

.25

5.6

4.7

3.7

6.7

5.2

Com

mon

60.4

867

.1665

.22

61.5

663

.61

67.18

67.2

467

.94

63.7

566

.53

11.1

0.1

4.2

3.6

4.6

Gen

eral

Wel

ders

Min

imum

45.0

040

.00

40.0

038

.00

40.7

545

.00

40.0

045

.00

38.0

042

.00

0.0

0.0

12.5

0.0

3.1

Max

imum

90.0

086

.00

80.0

084

.00

85.0

010

0.00

89.0

083

.00

90.0

090

.50

11.1

3.5

3.8

7.16.

5

Com

mon

61.3

862

.31

65.5

060

.08

62.3

267

.60

63.5

067

.83

62.8

765

.45

10.1

1.93.

64.

65.

0

Page 66: CHAPTER 3 APPENDIX - Goverment Documents · CHAPTER 3 APPENDIX Appendix 3.16 ... E17 Kabel bawah tanah voltan rendah E35 Grid berkapasiti melebihi 72KW E18 Kabel bawah tanah …

STATISTICS AND CONSTRUCTION DEMAND 2015-2016

CHAPTER 3 APPENDIX

220

Wor

ker C

ateg

ory

Min

imum

/ M

axim

um

Wag

es

Year

Chan

ge (%

)20

1320

14

Cent

ral

Regi

onNo

rther

n Re

gion

East

ern

Regi

onSo

uthe

rn

Regi

onAv

erag

eCe

ntra

l Re

gion

North

ern

Regi

onEa

ster

n Re

gion

Sout

hern

Re

gion

Aver

age

Cent

ral

Regi

onNo

rther

n Re

gion

East

ern

Regi

onSo

uthe

rn

Regi

onAv

erag

e

Plum

bers

-Bui

ldin

g an

d Sa

nita

ry

Min

imum

40.0

040

.00

40.0

040

.00

40.0

040

.00

40.0

040

.00

40.0

040

.00

0.0

0.0

0.0

0.0

0.0

Max

imum

100.

0010

5.00

70.0

072

.00

86.7

510

0.00

125.

0074

.50

80.0

094

.88

0.0

19.0

6.4

11.1

9.4

Com

mon

56.7

561

.89

58.3

955

.33

58.0

964

.25

64.6

260

.25

59.5

662

.1713

.24.

43.

27.6

7.0

Plum

bers

-Re

ticul

atio

n

Min

imum

40.0

040

.00

40.0

040

.00

40.0

040

.00

40.0

040

.00

40.0

040

.00

0.0

0.0

0.0

0.0

0.0

Max

imum

85.0

090

.00

87.0

087

.00

87.2

510

0.00

125.

0091

.50

93.0

010

2.38

17.6

38.9

5.2

6.9

17.3

Com

mon

60.8

863

.94

66.8

360

.21

62.9

769

.38

67.0

068

.89

63.4

967

.1914

.04.

83.

15.

46.

7

Build

ing

Wiri

ngIn

stal

lers

Min

imum

45.0

045

.00

45.0

040

.00

43.7

545

.00

40.0

050

.00

40.0

043

.75

0.0

-11.1

11.1

0.0

0.0

Max

imum

100.

0012

0.00

95.0

099

.00

103.

5013

0.00

120.

0098

.50

110.

0011

4.63

30.0

0.0

3.7

11.1

10.7

Com

mon

71.4

373

.91

78.9

471

.97

74.0

675

.60

76.15

81.2

575

.56

77.14

5.8

3.0

2.9

5.0

4.2

Elec

tric

al W

irem

en

PW2

(Mon

thly

RM

)

Min

imum

--

--

--

--

--

--

--

-

Max

imum

--

--

--

--

--

--

--

-

Com

mon

--

--

--

--

--

--

--

-

Elec

tric

al W

irem

enPW

4 (M

onth

ly R

M)

Min

imum

--

--

--

--

--

--

--

-

Max

imum

--

--

--

--

--

--

--

-

Com

mon

--

--

--

--

--

--

--

-

Scaff

olde

rs -

Pref

abric

ated

Min

imum

45.0

042

.00

45.0

045

.00

44.2

545

.00

42.0

045

.00

40.0

043

.00

0.0

0.0

0.0

-11.1

-2.8

Max

imum

95.0

010

5.00

73.0

090

.00

90.7

510

0.00

105.

0077

.00

100.

0095

.50

5.3

0.0

5.5

11.1

5.2

Com

mon

62.4

065

.1361

.28

64.3

163

.28

64.5

365

.80

62.6

165

.81

64.6

93.

41.0

2.2

2.3

2.2

Scaff

olde

rs -

Tubu

lar

Min

imum

40.0

035

.00

45.0

040

.00

40.0

040

.00

35.0

045

.00

40.0

040

.00

0.0

0.0

0.0

0.0

0.0

Max

imum

80.0

090

.00

67.0

077

.00

78.5

090

.00

90.0

071

.50

84.0

083

.88

12.5

0.0

6.7

9.1

6.8

Com

mon

58.0

359

.67

58.8

361

.31

59.4

662

.95

60.5

859

.94

64.11

61.9

08.

51.5

1.94.

64.

1

Plas

tere

rs

Min

imum

40.0

040

.00

40.0

035

.00

38.7

540

.00

40.0

040

.00

40.0

040

.00

0.0

0.0

0.0

14.3

3.2

Max

imum

80.0

096

.00

73.0

070

.00

79.7

590

.00

96.0

077

.50

95.0

089

.63

12.5

0.0

6.2

35.7

12.4

Com

mon

58.7

063

.94

59.3

954

.83

59.2

262

.90

70.0

261

.1958

.46

63.14

7.29.

53.

06.

66.

6

Appe

ndix

3.3

3 A

vera

ge D

aily

Wag

e R

ates

for S

emi-

Skill

ed F

orei

gn C

onst

ruct

ion

Wor

kers

in P

enin

sula

r Mal

aysi

a in

201

3 an

d 20

14 (R

M/d

ay) (

2)

Page 67: CHAPTER 3 APPENDIX - Goverment Documents · CHAPTER 3 APPENDIX Appendix 3.16 ... E17 Kabel bawah tanah voltan rendah E35 Grid berkapasiti melebihi 72KW E18 Kabel bawah tanah …

STATISTICS AND CONSTRUCTION DEMAND 2015-2016

CHAPTER 3 APPENDIX

221

Wor

ker C

ateg

ory

Min

imum

/ M

axim

um

Wag

es

Year

Chan

ge (%

)20

1320

14

Cent

ral

Regi

onNo

rther

n Re

gion

East

ern

Regi

onSo

uthe

rn

Regi

onAv

erag

eCe

ntra

l Re

gion

North

ern

Regi

onEa

ster

n Re

gion

Sout

hern

Re

gion

Aver

age

Cent

ral

Regi

onNo

rther

n Re

gion

East

ern

Regi

onSo

uthe

rn

Regi

onAv

erag

e

Tile

rs

Min

imum

40.0

045

.00

38.0

040

.00

40.7

540

.00

45.0

038

.00

40.0

040

.75

0.0

0.0

0.0

0.0

0.0

Max

imum

100.

0090

.00

74.0

080

.00

86.0

010

0.00

90.0

078

.50

90.0

089

.63

0.0

0.0

6.1

12.5

4.2

Com

mon

62.0

362

.00

62.8

358

.83

61.4

268

.20

69.2

864

.42

62.6

466

.149.

911

.72.

56.

57.7

Pain

ters

- B

uild

ing

Min

imum

40.0

040

.00

40.0

038

.00

39.5

040

.00

40.0

040

.00

40.0

040

.00

0.0

0.0

0.0

5.3

1.3

Max

imum

75.0

098

.00

62.0

070

.00

76.2

590

.00

85.0

068

.00

80.0

080

.75

20.0

-13.

39.

714

.35.

9

Com

mon

55.9

856

.83

52.6

154

.51

54.9

860

.23

59.5

655

.39

55.8

257

.75

7.64.

85.

32.

45.

0

Gen

eral

Con

stru

ctio

n W

orke

rs-C

ivil

Min

imum

--

--

--

--

--

--

--

-

Max

imum

--

--

--

--

--

--

--

-

Com

mon

--

--

--

--

--

--

--

-

Not

e:

Dat

a C

over

s:

Cen

tral

Reg

ion:

Per

ak, S

elan

gor a

nd K

uala

Lum

pur

N

orth

ern

Regi

on: K

edah

and

Pul

au P

inan

g

East

ern

Regi

on: P

ahan

g, K

elan

tan

and

Tere

ngga

nu

Sout

hern

Reg

ion:

Neg

eri S

embi

lan,

Mel

aka

and

Joho

r

Appe

ndix

3.3

3 A

vera

ge D

aily

Wag

e R

ates

for S

emi-

Skill

ed F

orei

gn C

onst

ruct

ion

Wor

kers

in P

enin

sula

r Mal

aysi

a in

201

3 an

d 20

14 (R

M/d

ay) (

3)

Page 68: CHAPTER 3 APPENDIX - Goverment Documents · CHAPTER 3 APPENDIX Appendix 3.16 ... E17 Kabel bawah tanah voltan rendah E35 Grid berkapasiti melebihi 72KW E18 Kabel bawah tanah …

STATISTICS AND CONSTRUCTION DEMAND 2015-2016

CHAPTER 3 APPENDIX

222

Appe

ndix

3.3

4 A

vera

ge D

aily

Wag

e R

ates

for S

kille

d Fo

reig

n C

onst

ruct

ion

Wor

kers

in S

abah

in 2

013

and

2014

(RM

/day

) (1)

Wor

ker C

ateg

ory

Min

imum

/ M

axim

um

Wag

es

Year

Cha

nge

(%)

2013

2014

K. K

inab

alu

Sand

akan

Taw

auAv

erag

eK.

Kin

abal

uSa

ndak

anTa

wau

Aver

age

K. K

inab

alu

Sand

akan

Taw

auAv

erag

e

Gen

eral

Con

stru

ctio

n W

orke

rs -

Bui

ldin

g

Min

imum

40.4

040

.00

40.0

040

.13

43.4

043

.00

43.0

043

.13

7.47.

57.

57.

5

Max

imum

58.0

055

.00

57.0

056

.67

63.0

060

.00

62.0

061

.67

8.6

9.1

8.8

8.8

Com

mon

48.0

847

.83

47.8

347

.91

50.6

850

.58

50.7

550

.67

5.4

5.7

6.1

5.8

Con

cret

ers

Min

imum

71.5

162

.00

69.6

067

.70

74.5

165

.00

72.6

070

.70

4.2

4.8

4.3

4.4

Max

imum

89.3

980

.00

94.0

087

.80

94.3

985

.00

99.0

092

.80

5.6

6.3

5.3

5.7

Com

mon

81.8

770

.92

82.1

378

.31

84.5

773

.83

84.8

081

.07

3.3

4.1

3.3

3.5

Bar B

ende

rs

Min

imum

71.3

770

.00

73.0

071

.46

74.3

774

.00

76.0

074

.79

4.2

5.7

4.1

4.7

Max

imum

88.0

080

.00

85.0

084

.33

93.0

085

.00

90.0

089

.33

5.7

6.3

5.9

5.9

Com

mon

80.8

477

.00

81.4

379

.76

83.6

080

.00

84.3

282

.64

3.4

3.9

3.5

3.6

Car

pent

ers

-Fo

rmw

ork

Min

imum

77.3

170

.00

75.4

074

.24

80.3

173

.00

83.0

078

.77

3.9

4.3

10.1

6.1

Max

imum

94.0

085

.00

89.0

089

.33

99.0

090

.00

94.0

094

.33

5.3

5.9

5.6

5.6

Com

mon

87.7

380

.17

86.0

384

.64

90.5

283

.33

88.6

887

.51

3.2

3.9

3.1

3.4

Bric

klay

ers

Min

imum

67.0

058

.00

81.2

068

.73

73.0

061

.00

53.0

062

.33

9.0

5.2

-34.

7-9

.3

Max

imum

85.0

077

.00

98.6

086

.87

90.0

082

.00

87.0

086

.33

5.9

6.5

-11.

8-0

.6

Com

mon

77.5

067

.33

73.6

772

.83

80.2

570

.42

76.2

575

.64

3.5

4.6

3.5

3.9

Roof

ers

Min

imum

83.2

666

.50

81.2

076

.99

86.2

669

.50

84.2

079

.99

3.6

4.5

3.7

3.9

Max

imum

99.0

088

.00

99.0

095

.33

104.

0093

.00

104.

0010

0.33

5.1

5.7

5.1

5.2

Com

mon

93.1

276

.92

92.5

087

.51

95.8

079

.75

95.1

590

.23

2.9

3.7

2.9

3.1

Car

pent

ers

-Jo

iner

y

Min

imum

88.0

071

.25

87.0

082

.08

91.0

074

.25

90.0

085

.08

3.4

4.2

3.4

3.7

Max

imum

110.

0095

.00

105.

0010

3.33

115.

0010

0.00

110.

0010

8.33

4.5

5.3

4.8

4.8

Com

mon

96.0

983

.88

95.4

791

.81

98.7

987

.04

98.1

394

.65

2.8

3.8

2.8

3.1

Stee

l Stru

ctur

eFa

bric

ator

s

Min

imum

89.2

171

.25

87.0

082

.49

92.2

176

.00

93.0

087

.07

3.4

6.7

6.9

5.6

Max

imum

110.

0093

.00

105.

0010

2.67

115.

0098

.00

110.

0010

7.67

4.5

5.4

4.8

4.9

Com

mon

100.

7782

.13

99.4

094

.10

103.

5685

.04

102.

0896

.89

2.8

3.5

2.7

3.0

Page 69: CHAPTER 3 APPENDIX - Goverment Documents · CHAPTER 3 APPENDIX Appendix 3.16 ... E17 Kabel bawah tanah voltan rendah E35 Grid berkapasiti melebihi 72KW E18 Kabel bawah tanah …

STATISTICS AND CONSTRUCTION DEMAND 2015-2016

CHAPTER 3 APPENDIX

223

Wor

ker C

ateg

ory

Min

imum

/ M

axim

um

Wag

es

Year

Cha

nge

(%)

2013

2014

K. K

inab

alu

Sand

akan

Taw

auAv

erag

eK.

Kin

abal

uSa

ndak

anTa

wau

Aver

age

K. K

inab

alu

Sand

akan

Taw

auAv

erag

e

Gen

eral

Wel

ders

Min

imum

83.2

666

.40

81.2

076

.95

86.2

669

.50

84.2

079

.99

3.6

4.7

3.7

3.9

Max

imum

108.

0093

.00

106.

0010

2.33

113.

0098

.00

111.

0010

7.33

4.6

5.4

4.7

4.9

Com

mon

96.7

178

.96

95.4

790

.38

99.3

681

.92

98.2

893

.19

2.7

3.7

2.9

3.1

Plum

bers

-Bui

ldin

g an

d Sa

nita

ry

Min

imum

76.1

275

.00

74.2

475

.12

79.1

278

.00

77.2

478

.12

3.9

4.0

4.0

4.0

Max

imum

96.0

091

.00

96.0

094

.33

103.

0096

.00

101.

0010

0.00

7.3

5.5

5.2

6.0

Com

mon

90.1

383

.17

88.2

187

.17

92.8

886

.08

90.7

789

.91

3.1

3.5

2.9

3.1

Plum

bers

-Re

ticul

atio

n

Min

imum

89.2

171

.25

87.0

082

.49

92.2

174

.25

95.0

087

.15

3.4

4.2

9.2

5.7

Max

imum

112.

0095

.00

110.

0010

5.67

117.

0010

0.00

116.

0011

1.00

4.5

5.3

5.5

5.0

Com

mon

101.

4883

.00

100.

4094

.96

104.

1785

.98

103.

1597

.77

2.7

3.6

2.7

3.0

Build

ing

Wiri

ngIn

stal

lers

Min

imum

--

--

--

--

--

--

Max

imum

--

--

--

--

--

--

Com

mon

--

--

--

--

--

--

Elec

tric

al W

irem

en

PW2

(Mon

thly

RM

)

Min

imum

1,54

9.34

1,23

5.00

1,50

8.00

1,43

0.78

1,55

2.34

1,23

8.00

1,51

1.00

1,43

3.78

0.2

0.2

0.2

0.2

Max

imum

2,38

5.00

2,00

6.00

2,32

0.00

2,23

7.00

2,39

1.00

2,01

2.00

2,32

5.00

2,24

2.67

0.3

0.3

0.2

0.3

Com

mon

2,00

7.79

1,66

7.83

1,91

8.67

1,86

4.76

2,01

0.51

1,67

0.58

1,92

1.58

1,86

7.56

0.1

0.2

0.2

0.1

Elec

tric

al W

irem

enPW

4 (M

onth

ly R

M)

Min

imum

2,20

0.00

1,71

6.00

2,08

8.00

2,00

1.33

2,20

3.00

1,71

9.00

2,09

1.00

2,00

4.33

0.1

0.2

0.1

0.1

Max

imum

3,00

0.00

2,38

1.00

2,90

6.00

2,76

2.33

3,00

5.00

2,38

7.00

2,91

1.00

2,76

7.67

0.2

0.3

0.2

0.2

Com

mon

2,63

6.18

2,07

0.92

2,52

7.83

2,41

1.64

2,63

8.85

2,07

4.21

2,53

0.58

2,41

4.55

0.1

0.2

0.1

0.1

Scaff

olde

rs -

Pref

abric

ated

Min

imum

71.5

161

.75

69.6

067

.62

74.5

164

.75

75.0

071

.42

4.2

4.9

7.8

5.6

Max

imum

94.0

080

.00

89.0

087

.67

100.

0086

.00

94.0

093

.33

6.4

7.5

5.6

6.5

Com

mon

84.4

975

.63

82.9

781

.03

87.1

678

.63

85.6

083

.80

3.2

4.0

3.2

3.4

Scaff

olde

rs -

Tubu

lar

Min

imum

71.5

165

.00

69.6

068

.70

74.5

169

.00

72.6

072

.04

4.2

6.2

4.3

4.9

Max

imum

95.0

080

.00

95.0

090

.00

100.

0085

.00

100.

0095

.00

5.3

6.3

5.3

5.6

Com

mon

83.5

774

.33

83.0

380

.31

86.2

977

.17

85.8

283

.09

3.3

3.8

3.4

3.5

Plas

tere

rs

Min

imum

68.0

061

.75

63.8

064

.52

75.0

064

.75

66.8

068

.85

10.3

4.9

4.7

6.7

Max

imum

95.0

085

.00

94.0

091

.33

101.

0090

.00

99.0

096

.67

6.3

5.9

5.3

5.8

Com

mon

84.3

272

.67

82.1

079

.70

86.9

275

.50

84.7

082

.37

3.1

3.9

3.2

3.4

Appe

ndix

3.3

4 A

vera

ge D

aily

Wag

e R

ates

for S

kille

d Fo

reig

n C

onst

ruct

ion

Wor

kers

in S

abah

in 2

013

and

2014

(RM

/day

) (2)

Page 70: CHAPTER 3 APPENDIX - Goverment Documents · CHAPTER 3 APPENDIX Appendix 3.16 ... E17 Kabel bawah tanah voltan rendah E35 Grid berkapasiti melebihi 72KW E18 Kabel bawah tanah …

STATISTICS AND CONSTRUCTION DEMAND 2015-2016

CHAPTER 3 APPENDIX

224

Wor

ker C

ateg

ory

Min

imum

/ M

axim

um

Wag

es

Year

Cha

nge

(%)

2013

2014

K. K

inab

alu

Sand

akan

Taw

auAv

erag

eK.

Kin

abal

uSa

ndak

anTa

wau

Aver

age

K. K

inab

alu

Sand

akan

Taw

auAv

erag

e

Tile

rs

Min

imum

78.0

066

.50

80.0

074

.83

81.0

069

.50

83.0

077

.83

3.8

4.5

3.8

4.0

Max

imum

98.0

094

.00

90.0

094

.00

103.

0099

.00

95.0

099

.00

5.1

5.3

5.6

5.3

Com

mon

90.8

281

.79

87.0

086

.54

93.5

384

.63

89.7

589

.30

3.0

3.5

3.2

3.2

Pain

ters

- B

uild

ing

Min

imum

71.5

160

.00

63.8

065

.10

74.5

164

.00

66.8

068

.44

4.2

6.7

4.7

5.1

Max

imum

100.

0080

.00

86.0

088

.67

106.

0085

.00

91.0

094

.00

6.0

6.3

5.8

6.0

Com

mon

81.6

070

.67

76.0

776

.11

84.3

573

.67

78.6

778

.90

3.4

4.2

3.4

3.7

Gen

eral

Con

stru

ctio

n W

orke

rs-C

ivil

Min

imum

53.6

342

.75

52.2

049

.53

56.6

345

.75

58.0

053

.46

5.6

7.0

11.1

7.9

Max

imum

75.0

065

.00

70.0

070

.00

80.0

070

.00

75.0

075

.00

6.7

7.7

7.1

7.1

Com

mon

65.4

553

.75

64.6

361

.28

68.1

256

.60

67.3

064

.01

4.1

5.3

4.1

4.5

Appe

ndix

3.3

4 A

vera

ge D

aily

Wag

e R

ates

for S

kille

d Fo

reig

n C

onst

ruct

ion

Wor

kers

in S

abah

in 2

013

and

2014

(RM

/day

) (2)

Page 71: CHAPTER 3 APPENDIX - Goverment Documents · CHAPTER 3 APPENDIX Appendix 3.16 ... E17 Kabel bawah tanah voltan rendah E35 Grid berkapasiti melebihi 72KW E18 Kabel bawah tanah …

STATISTICS AND CONSTRUCTION DEMAND 2015-2016

CHAPTER 3 APPENDIX

225

Appe

ndix

3.3

5 A

vera

ge D

aily

Wag

e R

ates

for S

emi-

Skill

ed F

orei

gn C

onst

ruct

ion

Wor

kers

in S

abah

in 2

013

and

2014

(RM

/day

) (1)

Wor

ker C

ateg

ory

Min

imum

/ M

axim

um

Wag

es

Year

Cha

nge

(%)

2013

2014

K. K

inab

alu

Sand

akan

Taw

auAv

erag

eK.

Kin

abal

uSa

ndak

anTa

wau

Aver

age

K. K

inab

alu

Sand

akan

Taw

auAv

erag

e

Gen

eral

Con

stru

ctio

n W

orke

rs -

Bui

ldin

g

Min

imum

--

--

--

--

--

--

Max

imum

--

--

--

--

--

--

Com

mon

--

--

--

--

--

--

Con

cret

ers

Min

imum

60.5

948

.50

59.0

056

.03

62.5

950

.50

61.0

058

.03

3.3

4.1

3.4

3.6

Max

imum

77.0

067

.00

78.0

074

.00

80.0

070

.00

81.0

077

.00

3.9

4.5

3.8

4.1

Com

mon

70.3

257

.00

68.4

365

.25

72.9

760

.00

71.1

068

.02

3.8

5.3

3.9

4.3

Bar B

ende

rs

Min

imum

54.5

243

.75

59.0

052

.42

56.5

245

.75

61.0

054

.42

3.7

4.6

3.4

3.8

Max

imum

79.0

067

.00

76.0

074

.00

85.0

070

.00

79.0

078

.00

7.6

4.5

3.9

5.4

Com

mon

67.0

154

.54

65.6

362

.39

69.7

657

.56

68.5

565

.29

4.1

5.5

4.4

4.6

Car

pent

ers

-Fo

rmw

ork

Min

imum

72.3

758

.00

70.6

066

.99

74.3

760

.00

72.6

068

.99

2.8

3.4

2.8

3.0

Max

imum

86.0

076

.00

84.0

082

.00

90.0

079

.00

87.0

085

.33

4.7

3.9

3.6

4.1

Com

mon

77.7

063

.96

77.1

772

.94

80.4

466

.88

79.9

275

.75

3.5

4.6

3.6

3.8

Bric

klay

ers

Min

imum

47.0

046

.00

48.0

047

.00

49.0

048

.00

50.0

049

.00

4.3

4.3

4.2

4.3

Max

imum

62.6

064

.00

62.0

062

.87

68.0

067

.00

65.0

066

.67

8.6

4.7

4.8

6.0

Com

mon

57.8

556

.17

56.1

756

.73

60.5

959

.17

59.0

859

.61

4.7

5.3

5.2

5.1

Roof

ers

Min

imum

64.0

053

.25

64.8

060

.68

66.0

055

.25

66.8

062

.68

3.1

3.8

3.1

3.3

Max

imum

8

6.00

76.

00

84.0

082

.00

9

0.00

79.

00

87.0

085

.33

4.7

3.9

3.6

4.1

Com

mon

7

3.00

60.

75

73.4

069

.05

7

5.68

63.

56

76.3

271

.85

3.7

4.6

4.0

4.1

Car

pent

ers

-Jo

iner

y

Min

imum

72.3

758

.00

70.6

066

.99

74.3

760

.00

72.6

068

.99

2.8

3.4

2.8

3.0

Max

imum

94.0

080

.00

90.0

088

.00

98.0

083

.00

93.0

091

.33

4.3

3.8

3.3

3.8

Com

mon

82.0

467

.29

81.1

776

.83

84.7

770

.54

83.8

379

.71

3.3

4.8

3.3

3.7

Stee

l Stru

ctur

eFa

bric

ator

s

Min

imum

72.3

758

.00

76.4

068

.92

74.3

760

.00

78.4

070

.92

2.8

3.4

2.6

2.9

Max

imum

96.0

077

.00

91.0

088

.00

100.

0083

.00

94.0

092

.33

4.2

7.8

3.3

4.9

Com

mon

85.9

768

.71

83.1

079

.26

88.7

471

.71

85.5

281

.99

3.2

4.4

2.9

3.4

Page 72: CHAPTER 3 APPENDIX - Goverment Documents · CHAPTER 3 APPENDIX Appendix 3.16 ... E17 Kabel bawah tanah voltan rendah E35 Grid berkapasiti melebihi 72KW E18 Kabel bawah tanah …

STATISTICS AND CONSTRUCTION DEMAND 2015-2016

CHAPTER 3 APPENDIX

226

Wor

ker C

ateg

ory

Min

imum

/ M

axim

um

Wag

es

Year

Cha

nge

(%)

2013

2014

K. K

inab

alu

Sand

akan

Taw

auAv

erag

eK.

Kin

abal

uSa

ndak

anTa

wau

Aver

age

K. K

inab

alu

Sand

akan

Taw

auAv

erag

e

Gen

eral

Wel

ders

Min

imum

72.3

758

.00

70.6

066

.99

74.3

760

.00

72.6

068

.99

2.8

3.4

2.8

3.0

Max

imum

96.0

078

.00

90.0

088

.00

100.

0083

.00

93.0

092

.00

4.2

6.4

3.3

4.5

Com

mon

83.8

768

.04

81.9

377

.95

86.6

270

.88

84.6

080

.70

3.3

4.2

3.3

3.5

Plum

bers

-Bui

ldin

g an

d Sa

nita

ry

Min

imum

60.4

749

.00

59.0

056

.16

62.4

751

.00

61.0

058

.16

3.3

4.1

3.4

3.6

Max

imum

80.0

071

.00

84.0

078

.33

83.0

074

.00

87.0

081

.33

3.8

4.2

3.6

3.8

Com

mon

70.1

857

.58

69.4

365

.73

72.9

360

.48

72.1

068

.50

3.9

5.0

3.8

4.2

Plum

bers

-Re

ticul

atio

n

Min

imum

78.3

162

.75

76.4

072

.49

80.3

164

.75

78.4

074

.49

2.6

3.2

2.6

2.8

Max

imum

101.

0084

.00

98.0

094

.33

105.

0088

.00

101.

0098

.00

4.0

4.8

3.1

3.9

Com

mon

90.7

171

.88

86.7

383

.11

93.4

074

.81

89.6

285

.94

3.0

4.1

3.3

3.4

Build

ing

Wiri

ngIn

stal

lers

Min

imum

90.2

172

.25

88.0

083

.49

92.2

174

.25

90.0

085

.49

2.2

2.8

2.3

2.4

Max

imum

110.

0092

.00

112.

0010

4.67

113.

0095

.00

115.

0010

7.67

2.7

3.3

2.7

2.9

Com

mon

96.6

979

.88

96.4

791

.01

99.3

982

.69

99.3

093

.79

2.8

3.5

2.9

3.1

Elec

tric

al W

irem

en

PW2

(Mon

thly

RM

)

Min

imum

--

--

--

--

--

--

Max

imum

--

--

--

--

--

--

Com

mon

--

--

--

--

--

--

Elec

tric

al W

irem

enPW

4 (M

onth

ly R

M)

Min

imum

--

--

--

--

--

--

Max

imum

--

--

--

--

--

--

Com

mon

--

--

--

--

--

--

Scaff

olde

rs -

Pref

abric

ated

Min

imum

60.5

952

.00

62.0

058

.20

62.5

954

.00

64.0

060

.20

3.3

3.8

3.2

3.4

Max

imum

87.0

068

.00

84.0

079

.67

91.0

071

.00

87.0

083

.00

4.6

4.4

3.6

4.2

Com

mon

74.4

160

.83

73.3

069

.51

77.0

864

.00

76.0

572

.38

3.6

5.2

3.8

4.1

Scaff

olde

rs -

Tubu

lar

Min

imum

61.7

849

.45

60.1

657

.13

63.7

851

.45

62.1

659

.13

3.2

4.0

3.3

3.5

Max

imum

81.0

070

.00

81.0

077

.33

84.0

073

.00

84.0

080

.33

3.7

4.3

3.7

3.9

Com

mon

69.4

757

.58

69.2

565

.43

72.2

060

.49

72.0

768

.25

3.9

5.1

4.1

4.3

Appe

ndix

3.3

5 A

vera

ge D

aily

Wag

e R

ates

for S

emi-

Skill

ed F

orei

gn C

onst

ruct

ion

Wor

kers

in S

abah

in 2

013

and

2014

(RM

/day

) (2)

Page 73: CHAPTER 3 APPENDIX - Goverment Documents · CHAPTER 3 APPENDIX Appendix 3.16 ... E17 Kabel bawah tanah voltan rendah E35 Grid berkapasiti melebihi 72KW E18 Kabel bawah tanah …

STATISTICS AND CONSTRUCTION DEMAND 2015-2016

CHAPTER 3 APPENDIX

227

Wor

ker C

ateg

ory

Min

imum

/ M

axim

um

Wag

es

Year

Cha

nge

(%)

2013

2014

K. K

inab

alu

Sand

akan

Taw

auAv

erag

eK.

Kin

abal

uSa

ndak

anTa

wau

Aver

age

K. K

inab

alu

Sand

akan

Taw

auAv

erag

e

Plas

tere

rs

Min

imum

54.6

347

.00

53.2

051

.61

56.6

349

.00

55.2

053

.61

3.7

4.3

3.8

3.9

Max

imum

87.0

072

.00

87.0

082

.00

90.0

075

.00

90.0

085

.00

3.4

4.2

3.4

3.7

Com

mon

77.1

960

.08

72.3

369

.87

79.7

962

.85

75.4

872

.71

3.4

4.6

4.4

4.1

Tile

rs

Min

imum

66.5

548

.50

64.8

059

.95

68.5

550

.50

66.8

061

.95

3.0

4.1

3.1

3.3

Max

imum

84.0

076

.00

84.0

081

.33

88.0

079

.00

87.0

084

.67

4.8

3.9

3.6

4.1

Com

mon

74.2

060

.75

73.3

769

.44

77.1

063

.83

76.0

372

.32

3.9

5.1

3.6

4.1

Pain

ters

- B

uild

ing

Min

imum

54.6

348

.00

53.2

051

.94

56.6

350

.00

55.2

053

.94

3.7

4.2

3.8

3.9

Max

imum

77.0

067

.00

72.0

072

.00

81.0

070

.00

75.0

075

.33

5.2

4.5

4.2

4.6

Com

mon

64.7

153

.04

63.5

360

.43

67.4

055

.79

66.2

863

.16

4.2

5.2

4.3

4.5

Gen

eral

Con

stru

ctio

n W

orke

rs-C

ivil

Min

imum

--

--

--

--

--

--

Max

imum

--

--

--

--

--

--

Com

mon

--

--

--

--

--

--

Appe

ndix

3.3

5 A

vera

ge D

aily

Wag

e R

ates

for S

emi-

Skill

ed F

orei

gn C

onst

ruct

ion

Wor

kers

in S

abah

in 2

013

and

2014

(RM

/day

) (3)

Page 74: CHAPTER 3 APPENDIX - Goverment Documents · CHAPTER 3 APPENDIX Appendix 3.16 ... E17 Kabel bawah tanah voltan rendah E35 Grid berkapasiti melebihi 72KW E18 Kabel bawah tanah …

STATISTICS AND CONSTRUCTION DEMAND 2015-2016

CHAPTER 3 APPENDIX

228

Appe

ndix

3.3

6 A

vera

ge D

aily

Wag

e fo

r Ski

lled

Fore

ign

Con

stru

ctio

n W

orke

rs in

Sar

awak

in 2

013

and

2014

(RM

/day

) (1)

Wor

ker C

ateg

ory

Min

imum

/ M

axim

um

Wag

es

Year

Cha

nge

(%)

2013

2014

Kuch

ing

Miri

Sibu

Aver

age

Kuch

ing

Miri

Sibu

Aver

age

Kuch

ing

Miri

Sibu

Aver

age

Gen

eral

Con

stru

ctio

n W

orke

rs -

Bui

ldin

g

Min

imum

41.8

041

.00

41.0

041

.27

43.8

043

.00

43.0

043

.27

4.8

4.9

4.9

4.8

Max

imum

63.0

054

.00

57.0

058

.00

67.0

058

.50

60.0

061

.83

6.3

8.3

5.3

6.6

Com

mon

50.3

248

.00

47.8

348

.72

53.1

351

.00

50.5

851

.57

5.6

6.3

5.7

5.9

Con

cret

ers

Min

imum

71.3

870

.60

71.5

071

.16

73.3

872

.60

73.5

073

.16

2.8

2.8

2.8

2.8

Max

imum

92.0

095

.00

97.0

094

.67

96.0

099

.50

100.

0098

.50

4.3

4.7

3.1

4.0

Com

mon

81.0

381

.87

83.0

881

.99

83.7

184

.62

86.0

884

.80

3.3

3.4

3.6

3.4

Bar B

ende

rs

Min

imum

71.5

970

.60

72.0

071

.40

73.5

972

.60

74.0

073

.40

2.8

2.8

2.8

2.8

Max

imum

86.0

090

.00

87.0

087

.67

90.0

094

.50

90.0

091

.50

4.7

5.0

3.4

4.4

Com

mon

78.2

379

.53

80.1

079

.29

80.8

882

.40

82.8

582

.04

3.4

3.6

3.4

3.5

Car

pent

ers

-Fo

rmw

ork

Min

imum

76.7

076

.40

77.3

876

.83

78.7

078

.40

79.3

878

.83

2.6

2.6

2.6

2.6

Max

imum

95.0

098

.00

95.0

096

.00

99.0

010

2.50

98.0

099

.83

4.2

4.6

3.2

4.0

Com

mon

86.9

187

.07

87.0

887

.02

89.5

989

.95

89.8

389

.79

3.1

3.3

3.2

3.2

Bric

klay

ers

Min

imum

52.0

066

.00

61.0

059

.67

54.0

068

.00

63.0

061

.67

3.8

3.0

3.3

3.4

Max

imum

86.0

079

.00

81.0

082

.00

91.0

082

.00

84.0

085

.67

5.8

3.8

3.7

4.5

Com

mon

70.0

970

.83

71.1

770

.70

72.7

473

.92

73.9

273

.53

3.8

4.4

3.9

4.0

Roof

ers

Min

imum

83.3

582

.80

83.2

583

.13

85.3

584

.20

85.2

584

.93

2.4

1.7

2.4

2.2

Max

imum

99.0

010

7.00

107.

0010

4.33

104.

0011

1.50

110.

0010

8.50

5.1

4.2

2.8

4.0

Com

mon

92.5

092

.50

93.8

892

.96

95.3

495

.42

96.4

495

.73

3.1

3.2

2.7

3.0

Car

pent

ers

-Jo

iner

y

Min

imum

85.9

188

.00

89.1

387

.68

87.9

190

.00

91.1

389

.68

2.3

2.3

2.2

2.3

Max

imum

100.

0010

7.00

108.

0010

5.00

105.

0011

1.50

111.

0010

9.17

5.0

4.2

2.8

4.0

Com

mon

93.7

195

.47

96.8

595

.34

96.3

698

.38

99.5

298

.09

2.8

3.0

2.8

2.9

Stee

l Stru

ctur

eFa

bric

ator

s

Min

imum

86.0

093

.00

89.1

389

.38

88.0

095

.00

91.1

391

.38

2.3

2.2

2.2

2.2

Max

imum

106.

0011

3.00

109.

0010

9.33

111.

0011

7.50

112.

0011

3.50

4.7

4.0

2.8

3.8

Com

mon

99.2

099

.37

100.

1799

.58

101.

8510

2.20

101.

8310

1.96

2.7

2.8

1.7

2.4

Page 75: CHAPTER 3 APPENDIX - Goverment Documents · CHAPTER 3 APPENDIX Appendix 3.16 ... E17 Kabel bawah tanah voltan rendah E35 Grid berkapasiti melebihi 72KW E18 Kabel bawah tanah …

STATISTICS AND CONSTRUCTION DEMAND 2015-2016

CHAPTER 3 APPENDIX

229

Wor

ker C

ateg

ory

Min

imum

/ M

axim

um

Wag

es

Year

Cha

nge

(%)

2013

2014

Kuch

ing

Miri

Sibu

Aver

age

Kuch

ing

Miri

Sibu

Aver

age

Kuch

ing

Miri

Sibu

Aver

age

Gen

eral

Wel

ders

Min

imum

85.0

088

.00

83.0

085

.33

87.0

090

.00

85.0

087

.33

2.4

2.3

2.4

2.3

Max

imum

106.

0010

8.00

111.

0010

8.33

110.

0011

2.50

114.

0011

2.17

3.8

4.2

2.7

3.5

Com

mon

96.4

395

.63

96.6

796

.24

99.1

898

.63

99.3

399

.05

2.9

3.1

2.8

2.9

Plum

bers

-Bui

ldin

g an

d Sa

nita

ry

Min

imum

75.6

875

.24

76.2

075

.71

77.6

877

.24

78.2

077

.71

2.6

2.7

2.6

2.6

Max

imum

93.0

097

.00

92.0

094

.00

98.0

010

1.50

95.0

098

.17

5.4

4.6

3.3

4.4

Com

mon

83.2

683

.65

84.7

283

.88

85.9

786

.70

87.4

786

.71

3.3

3.6

3.2

3.4

Plum

bers

-Re

ticul

atio

n

Min

imum

89.2

388

.00

93.0

090

.08

91.2

390

.00

95.0

092

.08

2.2

2.3

2.2

2.2

Max

imum

116.

0011

9.00

116.

0011

7.00

120.

0012

3.50

119.

0012

0.83

3.4

3.8

2.6

3.3

Com

mon

101.

4310

0.33

101.

4810

1.08

104.

1310

3.18

104.

0610

3.79

2.7

2.8

2.5

2.7

Build

ing

Wiri

ngIn

stal

lers

Min

imum

--

--

--

--

--

--

Max

imum

--

--

--

--

--

--

Com

mon

--

--

--

--

--

--

Elec

tric

al W

irem

en

PW2

(Mon

thly

RM

)

Min

imum

1,54

8.33

1,50

9.00

1,52

8.50

1,52

8.61

1,55

0.33

1,51

1.00

1,53

0.50

1,53

0.61

0.1

0.1

0.1

0.1

Max

imum

2,38

1.50

2,32

2.00

2,35

2.00

2,35

1.83

2,38

5.50

2,32

5.00

2,35

5.00

2,35

5.17

0.2

0.1

0.1

0.1

Com

mon

1,93

1.00

1,91

8.67

1,94

3.33

1,93

1.00

1,93

3.68

1,92

1.67

1,94

6.04

1,93

3.80

0.1

0.2

0.1

0.1

Elec

tric

al W

irem

enPW

4 (M

onth

ly R

M)

Min

imum

2,06

8.93

2,08

9.00

2,11

6.00

2,09

1.31

2,07

0.93

2,09

1.00

2,11

8.00

1,53

0.61

-25.

1-2

7.7

-27.

7-2

6.8

Max

imum

2,97

6.63

2,90

8.00

2,94

6.00

2,94

3.54

2,98

0.63

2,91

1.00

2,94

9.00

2,35

5.17

-19.

9-2

0.0

-20.

1-2

0.0

Com

mon

2,46

5.20

2,52

7.83

2,56

0.38

2,51

7.80

2,46

7.92

2,53

0.83

2,56

3.29

1,93

3.80

-21.

6-2

4.0

-24.

0-2

3.2

Scaff

olde

rs -

Pref

abric

ated

Min

imum

72.4

270

.60

71.5

071

.51

74.4

272

.60

73.5

073

.51

2.8

2.8

2.8

2.8

Max

imum

90.2

794

.00

94.0

092

.76

95.0

097

.00

97.0

096

.33

5.2

3.2

3.2

3.9

Com

mon

82.6

383

.13

84.1

383

.30

85.2

886

.13

86.8

886

.10

3.2

3.6

3.3

3.4

Scaff

olde

rs -

Tubu

lar

Min

imum

71.4

276

.40

75.0

074

.27

74.4

278

.40

77.0

076

.61

4.2

2.6

2.7

3.1

Max

imum

90.2

797

.00

100.

0095

.76

94.2

710

1.50

103.

0099

.59

4.4

4.6

3.0

4.0

Com

mon

82.4

583

.27

84.1

083

.27

85.2

086

.35

87.0

286

.19

3.3

3.7

3.5

3.5

Appe

ndix

3.3

6 A

vera

ge D

aily

Wag

e fo

r Ski

lled

Fore

ign

Con

stru

ctio

n W

orke

rs in

Sar

awak

in 2

013

and

2014

(RM

/day

) (2)

Page 76: CHAPTER 3 APPENDIX - Goverment Documents · CHAPTER 3 APPENDIX Appendix 3.16 ... E17 Kabel bawah tanah voltan rendah E35 Grid berkapasiti melebihi 72KW E18 Kabel bawah tanah …

STATISTICS AND CONSTRUCTION DEMAND 2015-2016

CHAPTER 3 APPENDIX

230

Wor

ker C

ateg

ory

Min

imum

/ M

axim

um

Wag

es

Year

Cha

nge

(%)

2013

2014

Kuch

ing

Miri

Sibu

Aver

age

Kuch

ing

Miri

Sibu

Aver

age

Kuch

ing

Miri

Sibu

Aver

age

Plas

tere

rs

Min

imum

75.0

071

.00

65.6

370

.54

77.0

073

.00

67.6

372

.54

2.7

2.8

3.0

2.8

Max

imum

95.0

096

.00

97.0

096

.00

99.0

010

0.50

100.

0099

.83

4.2

4.7

3.1

4.0

Com

mon

84.4

384

.20

83.1

783

.93

87.0

887

.20

85.8

686

.71

3.1

3.6

3.2

3.3

Tile

rs

Min

imum

82.0

081

.00

72.0

078

.33

84.0

083

.00

74.0

080

.33

2.4

2.5

2.8

2.6

Max

imum

96.0

095

.00

98.0

096

.33

101.

0099

.50

101.

0010

0.50

5.2

4.7

3.1

4.3

Com

mon

89.3

486

.87

87.0

687

.76

92.0

589

.87

89.9

090

.61

3.0

3.5

3.3

3.2

Pain

ters

- B

uild

ing

Min

imum

66.4

666

.00

68.0

066

.82

68.4

668

.00

70.0

068

.82

3.0

3.0

2.9

3.0

Max

imum

86.0

084

.00

90.0

086

.67

90.0

088

.50

93.0

090

.50

4.7

5.4

3.3

4.4

Com

mon

75.4

575

.33

76.3

175

.70

78.0

578

.20

79.0

678

.44

3.4

3.8

3.6

3.6

Gen

eral

Con

stru

ctio

n W

orke

rs-C

ivil

Min

imum

54.5

653

.20

53.8

853

.88

56.5

655

.20

55.8

855

.88

3.7

3.8

3.7

3.7

Max

imum

71.0

072

.00

77.0

073

.33

76.0

076

.50

80.0

077

.50

7.0

6.3

3.9

5.7

Com

mon

64.1

764

.50

65.4

264

.70

66.8

467

.58

68.0

967

.50

4.2

4.8

4.1

4.3

Appe

ndix

3.3

6 A

vera

ge D

aily

Wag

e fo

r Ski

lled

Fore

ign

Con

stru

ctio

n W

orke

rs in

Sar

awak

in 2

013

and

2014

(RM

/day

) (3)

Page 77: CHAPTER 3 APPENDIX - Goverment Documents · CHAPTER 3 APPENDIX Appendix 3.16 ... E17 Kabel bawah tanah voltan rendah E35 Grid berkapasiti melebihi 72KW E18 Kabel bawah tanah …

STATISTICS AND CONSTRUCTION DEMAND 2015-2016

CHAPTER 3 APPENDIX

231

Appe

ndix

3.3

7 A

vera

ge D

aily

Wag

e fo

r Sem

i-Sk

illed

For

eign

Con

stru

ctio

n W

orke

rs in

Sar

awak

in 2

013

and

2014

(RM

/day

) (1)

Wor

ker C

ateg

ory

Min

imum

/ M

axim

um

Wag

es

Year

Cha

nge

(%)

2013

2014

Kuch

ing

Miri

Sibu

Aver

age

Kuch

ing

Miri

Sibu

Aver

age

Kuch

ing

Miri

Sibu

Aver

age

Gen

eral

Con

stru

ctio

n W

orke

rs -

Bui

ldin

g

Min

imum

--

--

--

--

--

--

Max

imum

--

--

--

--

--

--

Com

mon

--

--

--

--

--

--

Con

cret

ers

Min

imum

57.1

059

.00

59.7

558

.62

59.1

061

.00

61.7

560

.62

3.5

3.4

3.3

3.4

Max

imum

76.0

077

.00

77.0

076

.67

80.0

080

.00

80.0

080

.00

5.3

3.9

3.9

4.3

Com

mon

67.7

668

.43

69.3

868

.52

70.5

071

.60

71.9

871

.36

4.0

4.6

3.7

4.1

Bar B

ende

rs

Min

imum

56.0

059

.00

56.0

057

.00

58.0

061

.00

58.0

059

.00

3.6

3.4

3.6

3.5

Max

imum

73.0

072

.00

77.0

074

.00

77.0

076

.50

80.0

077

.83

5.5

6.3

3.9

5.2

Com

mon

64.8

265

.57

66.4

065

.60

67.5

668

.58

69.2

368

.46

4.2

4.6

4.3

4.4

Car

pent

ers

-Fo

rmw

ork

Min

imum

70.5

670

.60

71.5

070

.89

72.5

672

.60

73.5

072

.89

2.8

2.8

2.8

2.8

Max

imum

86.0

087

.00

91.0

088

.00

90.0

091

.50

94.0

091

.83

4.7

5.2

3.3

4.4

Com

mon

77.0

477

.17

78.0

677

.42

79.6

980

.08

80.8

180

.19

3.4

3.8

3.5

3.6

Bric

klay

ers

Min

imum

46.9

051

.00

52.0

049

.97

48.9

053

.00

54.0

051

.97

4.3

3.9

3.8

4.0

Max

imum

69.0

067

.00

70.0

068

.67

73.0

070

.00

73.0

072

.00

5.8

4.5

4.3

4.9

Com

mon

58.2

559

.00

61.3

359

.53

60.9

062

.00

64.0

062

.30

4.5

5.1

4.4

4.7

Roof

ers

Min

imum

65.7

064

.80

65.6

365

.38

67.7

066

.80

67.6

367

.38

3.0

3.1

3.0

3.1

Max

imum

82.0

090

.00

87.0

086

.33

87.0

094

.50

90.0

090

.50

6.1

5.0

3.4

4.8

Com

mon

73.4

773

.33

74.3

573

.72

76.0

176

.50

77.0

576

.52

3.5

4.3

3.6

3.8

Car

pent

ers

-Jo

iner

y

Min

imum

71.5

970

.60

71.5

071

.23

73.5

972

.60

73.5

073

.23

2.8

2.8

2.8

2.8

Max

imum

90.0

090

.00

97.0

092

.33

94.0

094

.50

100.

0096

.17

4.4

5.0

3.1

4.2

Com

mon

81.5

581

.10

82.0

481

.56

84.2

584

.10

84.7

184

.35

3.3

3.7

3.3

3.4

Stee

l Stru

ctur

eFa

bric

ator

s

Min

imum

69.5

476

.40

75.0

073

.65

71.5

478

.40

77.0

075

.65

2.9

2.6

2.7

2.7

Max

imum

90.0

092

.00

90.1

390

.71

95.0

095

.00

93.1

394

.38

5.6

3.3

3.3

4.0

Com

mon

82.6

883

.10

84.0

683

.28

85.3

785

.98

86.8

186

.05

3.3

3.5

3.3

3.3

Page 78: CHAPTER 3 APPENDIX - Goverment Documents · CHAPTER 3 APPENDIX Appendix 3.16 ... E17 Kabel bawah tanah voltan rendah E35 Grid berkapasiti melebihi 72KW E18 Kabel bawah tanah …

STATISTICS AND CONSTRUCTION DEMAND 2015-2016

CHAPTER 3 APPENDIX

232

Wor

ker C

ateg

ory

Min

imum

/ M

axim

um

Wag

es

Year

Cha

nge

(%)

2013

2014

Kuch

ing

Miri

Sibu

Aver

age

Kuch

ing

Miri

Sibu

Aver

age

Kuch

ing

Miri

Sibu

Aver

age

Gen

eral

Wel

ders

Min

imum

71.5

970

.60

71.5

071

.23

73.5

972

.60

73.5

073

.23

2.8

2.8

2.8

2.8

Max

imum

90.0

095

.00

92.0

092

.33

95.0

098

.00

95.0

096

.00

5.6

3.2

3.3

4.0

Com

mon

82.0

382

.03

82.9

482

.33

84.7

585

.07

85.6

085

.14

3.3

3.7

3.2

3.4

Plum

bers

-Bui

ldin

g an

d Sa

nita

ry

Min

imum

59.8

259

.00

59.7

559

.52

61.8

261

.00

61.7

561

.52

3.3

3.4

3.3

3.4

Max

imum

80.0

082

.00

80.0

080

.67

85.0

086

.50

83.0

084

.83

6.3

5.5

3.8

5.2

Com

mon

69.9

969

.37

70.4

069

.92

72.6

972

.22

73.0

072

.64

3.9

4.1

3.7

3.9

Plum

bers

-Re

ticul

atio

n

Min

imum

77.0

076

.40

81.0

078

.13

79.0

078

.40

83.0

080

.13

2.6

2.6

2.5

2.6

Max

imum

101.

0094

.80

96.0

097

.27

105.

0097

.80

99.0

010

0.60

4.0

3.2

3.1

3.4

Com

mon

86.9

485

.73

87.8

586

.84

89.6

988

.73

90.6

089

.67

3.2

3.5

3.1

3.3

Build

ing

Wiri

ngIn

stal

lers

Min

imum

89.2

388

.00

89.1

388

.79

91.2

390

.00

91.1

390

.79

2.2

2.3

2.2

2.3

Max

imum

109.

0012

0.00

112.

0011

3.67

114.

0012

4.50

115.

0011

7.83

4.6

3.8

2.7

3.7

Com

mon

97.7

096

.43

97.6

997

.27

100.

3999

.43

100.

3410

0.05

2.8

3.1

2.7

2.9

Elec

tric

al W

irem

en P

W2

(Mon

thly

RM

)

Min

imum

--

--

--

--

--

--

Max

imum

--

--

--

--

--

--

Com

mon

--

--

--

--

--

--

Elec

tric

al W

irem

enPW

4 (M

onth

ly R

M)

Min

imum

--

--

--

--

--

--

Max

imum

--

--

--

--

--

--

Com

mon

--

--

--

--

--

--

Scaff

olde

rs -

Pref

abric

ated

Min

imum

60.5

159

.00

59.7

559

.75

62.5

161

.00

61.7

561

.75

3.3

3.4

3.3

3.3

Max

imum

83.0

084

.00

90.0

085

.67

87.0

088

.50

93.0

089

.50

4.8

5.4

3.3

4.5

Com

mon

72.9

873

.40

74.1

973

.52

75.6

376

.32

77.0

476

.33

3.6

4.0

3.8

3.8

Scaff

olde

rs -

Tubu

lar

Min

imum

61.7

060

.16

60.9

360

.93

63.7

062

.16

62.9

362

.93

3.2

3.3

3.3

3.3

Max

imum

77.0

078

.00

85.0

080

.00

81.0

082

.50

88.0

083

.83

5.2

5.8

3.5

4.8

Com

mon

68.5

769

.13

69.8

869

.19

71.2

772

.04

72.6

471

.98

3.9

4.2

3.9

4.0

Plas

tere

rs

Min

imum

53.7

953

.20

53.8

853

.62

55.7

955

.20

55.8

855

.62

3.7

3.8

3.7

3.7

Max

imum

90.0

084

.00

87.0

087

.00

94.0

088

.50

90.0

090

.83

4.4

5.4

3.4

4.4

Com

mon

73.7

372

.27

73.1

973

.16

76.4

175

.18

75.8

675

.82

3.6

4.0

3.6

3.8

Appe

ndix

3.3

7 A

vera

ge D

aily

Wag

e fo

r Sem

i-Sk

illed

For

eign

Con

stru

ctio

n W

orke

rs in

Sar

awak

in 2

013

and

2014

(RM

/day

) (2)

Page 79: CHAPTER 3 APPENDIX - Goverment Documents · CHAPTER 3 APPENDIX Appendix 3.16 ... E17 Kabel bawah tanah voltan rendah E35 Grid berkapasiti melebihi 72KW E18 Kabel bawah tanah …

STATISTICS AND CONSTRUCTION DEMAND 2015-2016

CHAPTER 3 APPENDIX

233

Wor

ker C

ateg

ory

Min

imum

/ M

axim

um

Wag

es

Year

Cha

nge

(%)

2013

2014

Kuch

ing

Miri

Sibu

Aver

age

Kuch

ing

Miri

Sibu

Aver

age

Kuch

ing

Miri

Sibu

Aver

age

Tile

rs

Min

imum

59.0

064

.80

61.0

061

.60

61.0

066

.80

63.0

063

.60

3.4

3.1

3.3

3.2

Max

imum

86.0

084

.00

90.0

086

.67

90.0

088

.50

93.0

090

.50

4.7

5.4

3.3

4.4

Com

mon

72.8

073

.20

74.1

773

.39

75.5

376

.08

76.9

276

.18

3.8

3.9

3.7

3.8

Pain

ters

- B

uild

ing

Min

imum

54.5

653

.20

55.0

054

.25

56.5

655

.20

57.0

056

.25

3.7

3.8

3.6

3.7

Max

imum

75.0

072

.00

77.0

074

.67

79.0

076

.50

80.0

078

.50

5.3

6.3

3.9

5.1

Com

mon

64.1

163

.50

64.5

664

.06

66.7

966

.50

67.5

666

.95

4.2

4.7

4.6

4.5

Gen

eral

Con

stru

ctio

n W

orke

rs-C

ivil

Min

imum

--

--

--

--

--

--

Max

imum

--

--

--

--

--

--

Com

mon

--

--

--

--

--

--

Appe

ndix

3.3

7 A

vera

ge D

aily

Wag

e fo

r Sem

i-Sk

illed

For

eign

Con

stru

ctio

n W

orke

rs in

Sar

awak

in 2

013

and

2014

(RM

/day

) (3)

Page 80: CHAPTER 3 APPENDIX - Goverment Documents · CHAPTER 3 APPENDIX Appendix 3.16 ... E17 Kabel bawah tanah voltan rendah E35 Grid berkapasiti melebihi 72KW E18 Kabel bawah tanah …

STATISTICS AND CONSTRUCTION DEMAND 2015-2016

CHAPTER 3 APPENDIX

234

Appe

ndix

3.3

8 A

vera

ge D

aily

Ren

tal R

ates

for M

ajor

Mac

hine

ries

in P

enin

sula

r Mal

aysi

a in

201

3 an

d 20

14 (R

M/u

nit)

(1)

Type

of w

ork

Cate

gory

Type

Min

imum

/ M

axim

um

Pric

e

Year

2013

2014

Chan

ge (%

)

Cen

tral

Regio

n No

rthern

Re

gion

Easte

rn

Regio

nSo

uthe

rn

Regio

nAv

erage

Cen

tral

Regio

n No

rthern

Re

gion

Easte

rn

Regio

nSo

uthe

rn

Regio

nAv

erage

Cen

tral

Regio

n No

rthern

Re

gion

Easte

rn

Regio

nSo

uthe

rn

Regio

nAv

erage

Land

Wor

k

Exca

vato

r

Whe

eled

Ex

cava

tor

Min

imum

500.

0045

0.00

500.

0043

3.33

470.

8350

0.00

450.

0050

0.00

450.

0047

5.00

0.0

0.0

0.0

3.8

0.9

Max

imum

586.

6755

0.00

600.

0052

3.33

565.

0060

0.00

550.

0060

0.00

540.

0057

2.50

2.3

0.0

0.0

3.2

1.3

Hyd

raul

ic

Exca

vato

r

Min

imum

375.

0035

0.00

350.

0031

6.67

347.9

237

5.00

350.

0038

0.00

316.

6735

5.42

0.0

0.0

8.6

0.0

2.2

Max

imum

1,600

.00

1,500

.00

1,500

.00

1,450

.00

1,512

.50

1,600

.00

1,500

.00

1,500

.00

1,450

.00

1,512

.50

0.0

0.0

0.0

0.0

0.0

Trac

ked

Exca

vato

r

Min

imum

370.

0035

0.00

400.

0035

0.00

367.5

037

0.00

350.

0040

0.00

350.

0036

7.50

0.0

0.0

0.0

0.0

0.0

Max

imum

1,293

.33

1,233

.33

1,250

.00

1,216

.67

1,248

.33

1,293

.33

1,233

.33

1,250

.00

1,216

.67

1,248

.33

0.0

0.0

0.0

0.0

0.0

Load

er

Whe

eled

Lo

ader

Min

imum

370.

0034

5.00

360.

0035

3.33

357.0

837

0.00

345.

0036

0.00

353.

3335

7.08

0.0

0.0

0.0

0.0

0.0

Max

imum

1,406

.67

1,350

.00

1,500

.00

1,400

.00

1,414

.171,4

06.6

71,3

50.0

01,5

00.0

01,4

00.0

01,4

14.17

0.0

0.0

0.0

0.0

0.0

Skid

Ste

er

Load

er

Min

imum

376.

6732

5.00

380.

0035

0.00

357.9

237

6.67

325.

0038

0.00

350.

0035

7.92

0.0

0.0

0.0

0.0

0.0

Max

imum

523.

3350

0.00

550.

0050

0.00

518.

3352

3.33

500.

0055

0.00

500.

0051

8.33

0.0

0.0

0.0

0.0

0.0

Trac

k Lo

ader

Min

imum

445.

0044

5.00

500.

0050

0.00

472.

5044

5.00

445.

0050

0.00

500.

0047

2.50

0.0

0.0

0.0

0.0

0.0

Max

imum

686.

6765

0.00

700.

0065

0.00

671.6

769

3.33

650.

0070

0.00

650.

0067

3.33

1.00.

00.

00.

00.

2

Doz

er

Bulld

ozer

Min

imum

700.

0065

0.00

650.

0063

3.33

658.

3370

0.00

650.

0065

0.00

633.

3365

8.33

0.0

0.0

0.0

0.0

0.0

Max

imum

1,150

.00

1,000

.00

1,100

.00

953.

331,0

50.8

31,1

50.0

01,0

00.0

01,1

00.0

095

3.33

1,050

.83

0.0

0.0

0.0

0.0

0.0

Doz

er

Shov

el

Min

imum

716.

6775

0.00

750.

0073

3.33

737.5

071

6.67

750.

0075

0.00

733.

3373

7.50

0.0

0.0

0.0

0.0

0.0

Max

imum

816.

6780

0.00

800.

0088

6.67

825.

8483

3.33

800.

0080

0.00

866.

6782

5.00

2.0

0.0

0.0

-2.3

-0.1

Whe

el

Doz

er

Min

imum

788.

3375

0.00

750.

0078

3.33

767.9

278

8.33

750.

0075

0.00

783.

3376

7.92

0.0

0.0

0.0

0.0

0.0

Max

imum

900.

0090

0.00

900.

0093

3.33

908.

3391

6.67

900.

0090

0.00

933.

3391

2.50

1.90.

00.

00.

00.

5

Com

pact

or

Soil

Com

pact

or

Min

imum

536.

6756

0.00

600.

0053

3.33

557.5

053

6.67

560.

0060

0.00

533.

3355

7.50

0.0

0.0

0.0

0.0

0.0

Max

imum

671.6

769

3.33

750.

0065

0.00

691.2

567

1.67

693.

3375

0.00

650.

0069

1.25

0.0

0.0

0.0

0.0

0.0

Land

fill

Com

pact

or

Min

imum

491.6

754

1.67

550.

0051

6.67

525.

0049

1.67

508.

3355

0.00

516.

6751

6.67

0.0

-6.2

0.0

0.0

-1.6

Max

imum

531.6

750

8.33

600.

0053

3.33

543.

3353

1.67

541.6

760

0.00

533.

3355

1.67

0.0

6.6

0.0

0.0

1.5

Vibr

ator

y So

il Co

mpa

ctor

Min

imum

580.

0056

0.00

600.

0056

0.00

575.

0058

0.00

570.

0060

0.00

560.

0057

7.50

0.0

1.80.

00.

00.

4

Max

imum

580.

0057

0.00

600.

0056

0.00

577.5

059

6.67

576.

6760

0.00

560.

0058

3.34

2.9

1.20.

00.

01.0

Vibr

ator

y As

phal

t Co

mpa

ctor

Min

imum

663.

3365

1.67

600.

0063

3.33

637.0

866

3.33

661.6

760

0.00

633.

3363

9.58

0.0

1.50.

00.

00.

4

Max

imum

691.6

768

1.67

750.

0071

0.00

708.

3469

1.67

680.

0075

0.00

710.

0070

7.92

0.0

-0.2

0.0

0.0

-0.1

Mot

or

Gra

der

Mot

or

Gra

der

Min

imum

536.

6753

3.33

600.

0050

0.00

542.

5053

6.67

533.

3360

0.00

500.

0054

2.50

0.0

0.0

0.0

0.0

0.0

Max

imum

638.

3363

3.33

700.

0060

0.00

642.

9263

8.33

633.

3370

0.00

600.

0064

2.92

0.0

0.0

0.0

0.0

0.0

Back

hoe

Back

hoe

Min

imum

450.

0045

0.00

450.

0044

3.33

448.

3345

0.00

450.

0046

0.00

450.

0045

2.50

0.0

0.0

2.2

1.50.

9

Max

imum

450.

0045

0.00

450.

0045

0.00

450.

0045

0.00

460.

0046

0.00

450.

0045

5.00

0.0

2.2

2.2

0.0

1.1

Page 81: CHAPTER 3 APPENDIX - Goverment Documents · CHAPTER 3 APPENDIX Appendix 3.16 ... E17 Kabel bawah tanah voltan rendah E35 Grid berkapasiti melebihi 72KW E18 Kabel bawah tanah …

STATISTICS AND CONSTRUCTION DEMAND 2015-2016

CHAPTER 3 APPENDIX

235

Type

of w

ork

Cate

gory

Type

Min

imum

/ M

axim

um

Pric

e

Year

2013

2014

Chan

ge (%

)

Cen

tral

Regio

n No

rthern

Re

gion

Easte

rn

Regio

nSo

uthe

rn

Regio

nAv

erage

Cen

tral

Regio

n No

rthern

Re

gion

Easte

rn

Regio

nSo

uthe

rn

Regio

nAv

erage

Cen

tral

Regio

n No

rthern

Re

gion

Easte

rn

Regio

nSo

uthe

rn

Regio

nAv

erage

Road

wor

kPa

ving

Equi

pmen

t

Asph

alt

Pave

r

Min

imum

475.

0045

0.00

516.

6740

0.00

460.

4247

5.00

450.

0051

6.67

400.

0046

0.42

0.0

0.0

0.0

0.0

0.0

Max

imum

576.

6756

0.00

616.

6750

0.00

563.

3459

3.33

560.

0061

6.67

500.

0056

7.50

2.9

0.0

0.0

0.0

0.7

Asph

alt

Trac

k Pa

vers

Min

imum

520.

0050

0.00

616.

6750

0.00

534.

1752

0.00

500.

0061

6.67

500.

0053

4.17

0.0

0.0

0.0

0.0

0.0

Max

imum

621.6

761

3.33

666.

6760

0.00

625.

4262

1.67

613.

3366

6.67

600.

0062

5.42

0.0

0.0

0.0

0.0

0.0

Scre

eds

Min

imum

276.

6729

3.33

316.

6730

0.00

296.

6727

6.67

293.

3331

6.67

300.

0029

6.67

0.0

0.0

0.0

0.0

0.0

Max

imum

376.

6736

0.00

416.

6730

0.00

363.

3437

6.67

360.

0041

6.67

316.

6736

7.50

0.0

0.0

0.0

5.6

1.1

Truc

k an

d H

aula

ge

Dum

p Tr

uck

Dum

p Tr

uck

Min

imum

508.

3347

0.00

500.

0045

0.00

482.

0850

8.33

470.

0051

6.67

450.

0048

6.25

0.0

0.0

3.3

0.0

0.9

Max

imum

693.

3368

3.33

716.

6767

0.00

690.

8369

3.33

683.

3371

6.67

670.

0069

0.83

0.0

0.0

0.0

0.0

0.0

Lorry

Lorry

Min

imum

400.

0040

0.00

450.

0045

0.00

425.

0040

0.00

400.

0045

0.00

450.

0042

5.00

0.0

0.0

0.0

0.0

0.0

Max

imum

893.

3392

0.00

950.

0095

0.00

928.

3391

0.00

920.

0095

0.00

950.

0093

2.50

1.90.

00.

00.

00.

4

Hoi

stin

g an

d Li

fting

Cran

e

Hyd

raul

ic

Craw

ler

Cran

e

Min

imum

1,133

.33

1,100

.00

1,200

.00

1,100

.00

1,133

.33

1,133

.33

1,116

.67

1,200

.00

1,166

.67

1,154

.170.

01.5

0.0

6.1

1.8

Max

imum

1,766

.67

1,683

.33

1,700

.00

1,683

.33

1,708

.33

1,766

.67

1,683

.33

1,700

.00

1,683

.33

1,708

.33

0.0

0.0

0.0

0.0

0.0

Mob

ile

Cran

e

Min

imum

500.

0050

0.00

566.

6750

0.00

516.

6750

0.00

516.

6756

6.67

500.

0052

0.84

0.0

3.3

0.0

0.0

0.8

Max

imum

1,150

.00

1,116

.67

1,200

.00

1,100

.00

1,141

.67

1,150

.00

1,116

.67

1,200

.00

1,100

.00

1,141

.67

0.0

0.0

0.0

0.0

0.0

Not

e:

Cen

tral

Reg

ion:

Sel

ango

r and

Kua

la L

umpu

r;

Nor

ther

n Re

gion

: Pul

au P

inan

g;

East

ern

Regi

on: P

ahan

g;

Sout

hern

Reg

ion:

Joh

or.

Appe

ndix

3.3

8 A

vera

ge D

aily

Ren

tal R

ates

for M

ajor

Mac

hine

ries

in P

enin

sula

r Mal

aysi

a in

201

3 an

d 20

14 (R

M/u

nit)

(2)

Page 82: CHAPTER 3 APPENDIX - Goverment Documents · CHAPTER 3 APPENDIX Appendix 3.16 ... E17 Kabel bawah tanah voltan rendah E35 Grid berkapasiti melebihi 72KW E18 Kabel bawah tanah …

STATISTICS AND CONSTRUCTION DEMAND 2015-2016

CHAPTER 3 APPENDIX

236

Appe

ndix

3.3

9 A

vera

ge M

onth

ly R

enta

l Rat

es fo

r Maj

or M

achi

neri

es in

Pen

insu

lar M

alay

sia

in 2

013

and

2014

(RM

/uni

t) (1

)

Type

of w

ork

Cate

gory

Type

Min

imum

/ M

axim

um

Pric

e

Year

2013

2014

Chan

ge (%

)

Cen

tral

Regio

n No

rthern

Re

gion

Easte

rn

Regio

nSo

uthe

rn

Regio

nAv

erage

Cen

tral

Regio

n No

rthern

Re

gion

Easte

rn

Regio

nSo

uthe

rn

Regio

nAv

erage

Cen

tral

Regio

n No

rthern

Re

gion

Easte

rn

Regio

nSo

uthe

rn

Regio

nAv

erage

Land

Wor

k

Exca

vato

r

Whe

eled

Ex

cava

tor

Min

imum

7,416

.67

7,433

.33

7,633

.33

7,050

.00

7,383

.33

7,416

.67

7,433

.33

7,633

.33

7,116

.67

7,400

.00

0.0

0.0

0.0

0.9

0.2

Max

imum

8,50

0.00

8,43

3.33

8,50

0.00

7,750

.00

8,29

5.83

8,50

0.00

8,43

3.33

8,50

0.00

7,750

.00

8,29

5.83

0.0

0.0

0.0

0.0

0.0

Hyd

raul

ic

Exca

vato

r

Min

imum

5,88

3.33

5,80

0.00

6,16

6.67

5,00

0.00

5,71

2.50

5,88

3.33

5,80

0.00

6,16

6.67

5,00

0.00

5,71

2.50

0.0

0.0

0.0

0.0

0.0

Max

imum

16,5

50.0

016

,433

.33

16,6

33.3

316

,033

.33

16,4

12.5

016

,550

.00

16,4

33.3

316

,633

.33

16,0

33.3

316

,412

.50

0.0

0.0

0.0

0.0

0.0

Trac

ked

Exca

vato

r

Min

imum

6,82

6.67

6,60

0.00

7,000

.00

6,50

0.00

6,73

1.67

6,82

6.67

6,60

0.00

7,000

.00

6,50

0.00

6,73

1.67

0.0

0.0

0.0

0.0

0.0

Max

imum

15,5

66.6

715

,383

.33

16,0

00.0

015

,600

.00

15,6

37.5

015

,566

.67

15,3

83.3

316

,000

.00

15,6

00.0

015

,637

.50

0.0

0.0

0.0

0.0

0.0

Load

er

Whe

eled

Lo

ader

Min

imum

6,82

6.67

6,65

0.00

6,80

0.00

6,50

0.00

6,69

4.17

6,84

3.33

6,65

0.00

6,80

0.00

6,50

0.00

6,69

8.33

0.2

0.0

0.0

0.0

0.1

Max

imum

16,0

66.6

715

,600

.00

16,0

00.0

015

,500

.00

15,7

91.6

716

,066

.67

15,6

00.0

016

,000

.00

15,5

00.0

015

,791

.67

0.0

0.0

0.0

0.0

0.0

Skid

Ste

er

Load

er

Min

imum

6,82

6.67

6,50

0.00

6,63

3.33

6,56

6.67

6,63

1.67

6,82

6.67

6,50

0.00

6,63

3.33

6,56

6.67

6,63

1.67

0.0

0.0

0.0

0.0

0.0

Max

imum

9,05

0.00

8,80

0.00

9,16

6.67

8,66

6.67

8,92

0.84

9,05

0.00

8,80

0.00

9,16

6.67

8,66

6.67

8,92

0.84

0.0

0.0

0.0

0.0

0.0

Trac

k Lo

ader

Min

imum

8,91

6.67

8,91

6.67

9,26

6.67

9,23

3.33

9,08

3.34

8,91

6.67

8,91

6.67

9,26

6.67

9,23

3.33

9,08

3.34

0.0

0.0

0.0

0.0

0.0

Max

imum

12,5

00.0

012

,183.

3312

,666

.67

12,16

6.67

12,3

79.17

12,5

00.0

012

,183.

3312

,666

.67

12,3

33.3

312

,420

.83

0.0

0.0

0.0

1.40.

3

Doz

er

Bulld

ozer

Min

imum

9,73

3.33

9,65

0.00

9,66

6.67

9,60

0.00

9,66

2.50

9,73

3.33

9,65

0.00

9,73

3.33

9,60

0.00

9,67

9.17

0.0

0.0

0.7

0.0

0.2

Max

imum

13,6

66.6

713

,100.

0013

,800

.00

13,5

00.0

013

,516

.67

13,6

66.6

713

,100.

0013

,800

.00

13,5

00.0

013

,516

.67

0.0

0.0

0.0

0.0

0.0

Doz

er

Shov

el

Min

imum

9,93

3.33

9,93

3.33

9,93

3.33

9,58

3.33

9,84

5.83

9,93

3.33

9,93

3.33

9,93

3.33

9,60

0.00

9,85

0.00

0.0

0.0

0.0

0.2

0.0

Max

imum

11,0

00.0

011

,000

.00

11,0

00.0

011

,533

.33

11,13

3.33

11,0

00.0

011

,000

.00

11,0

00.0

011

,533

.33

11,13

3.33

0.0

0.0

0.0

0.0

0.0

Whe

el

Doz

er

Min

imum

10,9

00.0

010

,800

.00

10,8

00.0

010

,500

.00

10,7

50.0

010

,950

.00

10,8

00.0

010

,800

.00

10,5

00.0

010

,762

.50

0.5

0.0

0.0

0.0

0.1

Max

imum

11,8

33.3

311

,800

.00

11,8

00.0

011

,666

.67

11,7

75.0

011

,833

.33

11,8

00.0

011

,800

.00

11,6

66.6

711

,775

.00

0.0

0.0

0.0

0.0

0.0

Com

pact

or

Soil

Com

pact

or

Min

imum

7,700

.00

7,700

.00

8,28

3.33

7,250

.00

7,733

.33

7,700

.00

7,700

.00

8,28

3.33

7,300

.00

7,745

.83

0.0

0.0

0.0

0.7

0.2

Max

imum

8,95

0.00

8,95

0.00

9,23

3.33

8,60

0.00

8,93

3.33

8,95

0.00

8,95

0.00

9,23

3.33

8,60

0.00

8,93

3.33

0.0

0.0

0.0

0.0

0.0

Land

fill

Com

pact

or

Min

imum

7,833

.33

7,833

.33

8,30

0.00

7,500

.00

7,866

.67

7,833

.33

7,833

.33

8,30

0.00

7,500

.00

7,866

.67

0.0

0.0

0.0

0.0

0.0

Max

imum

8,90

0.00

8,88

3.33

9,31

6.67

8,63

3.33

8,93

3.33

8,90

0.00

8,88

3.33

9,31

6.67

8,63

3.33

8,63

3.33

0.0

0.0

0.0

0.0

-3.4

Vibr

ator

y So

il Co

mpa

ctor

Min

imum

8,63

3.33

8,60

0.00

9,28

3.33

8,65

0.00

8,79

1.67

8,63

3.33

8,60

0.00

9,33

3.33

8,71

6.67

8,82

0.83

0.0

0.0

0.5

0.8

0.3

Max

imum

8,63

3.33

8,60

0.00

9,28

3.33

8,65

0.00

8,79

1.67

8,63

3.33

8,60

0.00

9,33

3.33

8,71

6.67

8,82

0.83

0.0

0.0

0.5

0.8

0.3

Vibr

ator

y As

phal

t Co

mpa

ctor

Min

imum

9,41

6.67

9,38

3.33

9,53

3.33

9,33

3.33

9,41

6.67

9,41

6.67

9,38

3.33

9,53

3.33

9,33

3.33

9,41

6.67

0.0

0.0

0.0

0.0

0.0

Max

imum

9,88

3.33

9,86

6.67

10,3

33.3

39,

833.

339,

979.

179,

883.

339,

866.

6710

,333

.33

9,83

3.33

9,97

9.17

0.0

0.0

0.0

0.0

0.0

Mot

or

Gra

der

Mot

or

Gra

der

Min

imum

8,63

3.33

8,50

0.00

9,00

0.00

8,00

0.00

8,53

3.33

8,60

0.00

8,50

0.00

9,00

0.00

8,06

6.67

8,54

1.67

-0.4

0.0

0.0

0.8

0.1

Max

imum

9,76

6.67

9,60

0.00

9,80

0.00

9,00

0.00

9,54

1.67

9,76

6.67

9,60

0.00

9,80

0.00

9,00

0.00

9,54

1.67

0.0

0.0

0.0

0.0

0.0

Back

hoe

Back

hoe

Min

imum

6,65

0.00

6,66

6.67

7,000

.00

6,76

6.67

6,77

0.84

6,70

0.00

6,76

6.67

7,050

.00

6,76

6.67

6,82

0.84

0.8

1.50.

70.

00.

7

Max

imum

6,66

6.67

6,66

6.70

7,000

.00

6,76

6.67

6,77

5.01

6,70

0.00

6,83

3.33

7,050

.00

6,76

6.67

6,83

7.50

0.5

2.5

0.7

0.0

0.9

Page 83: CHAPTER 3 APPENDIX - Goverment Documents · CHAPTER 3 APPENDIX Appendix 3.16 ... E17 Kabel bawah tanah voltan rendah E35 Grid berkapasiti melebihi 72KW E18 Kabel bawah tanah …

STATISTICS AND CONSTRUCTION DEMAND 2015-2016

CHAPTER 3 APPENDIX

237

Type

of w

ork

Cate

gory

Type

Min

imum

/ M

axim

um

Pric

e

Year

2013

2014

Chan

ge (%

)

Cen

tral

Regio

n No

rthern

Re

gion

Easte

rn

Regio

nSo

uthe

rn

Regio

nAv

erage

Cen

tral

Regio

n No

rthern

Re

gion

Easte

rn

Regio

nSo

uthe

rn

Regio

nAv

erage

Cen

tral

Regio

n No

rthern

Re

gion

Easte

rn

Regio

nSo

uthe

rn

Regio

nAv

erage

Road

wor

kPa

ving

Equi

pmen

t

Asph

alt

Pave

r

Min

imum

7,066

.67

7,000

.00

7,500

.00

7,166

.67

7,183

.34

7,066

.67

7,000

.00

7,500

.00

7,250

.00

7,204

.170.

00.

00.

01.2

0.3

Max

imum

8,23

3.33

8,08

3.33

8,53

3.33

8,08

3.33

8,23

3.33

8,23

3.33

8,08

3.33

8,53

3.33

8,16

6.67

8,25

4.17

0.0

0.0

0.0

1.00.

3

Asph

alt

Trac

k Pa

vers

Min

imum

7,650

.00

7,500

.00

8,00

0.00

7,500

.00

7,662

.50

7,066

.67

7,500

.00

8,00

0.00

7,500

.00

7,516

.67

-7.6

0.0

0.0

0.0

-1.9

Max

imum

9,28

3.33

9,15

0.00

9,00

0.00

9,35

0.00

9,19

5.83

9,28

3.33

9,15

0.00

9,00

0.00

9,35

0.00

9,19

5.83

0.0

0.0

0.0

0.0

0.0

Scre

eds

Min

imum

5,30

0.00

5,33

3.33

6,00

0.00

5,75

0.00

5,59

5.83

5,30

0.00

5,33

3.33

6,00

0.00

5,75

0.00

5,59

5.83

0.0

0.0

0.0

0.0

0.0

Max

imum

6,46

6.67

6,38

3.33

6,50

0.00

5,75

0.00

6,27

5.00

6,46

6.67

6,38

3.33

6,50

0.00

5,75

0.00

6,27

5.00

0.0

0.0

0.0

0.0

0.0

Truc

k an

d H

aula

ge

Dum

p Tr

uck

Dum

p Tr

uck

Min

imum

8,93

3.33

8,60

0.00

9,00

0.00

8,60

0.00

8,78

3.33

8,93

3.33

8,60

0.00

9,00

0.00

8,60

0.00

8,78

3.33

0.0

0.0

0.0

0.0

0.0

Max

imum

12,0

00.0

011

,666

.67

12,0

00.0

011

,666

.67

11,8

33.3

412

,000

.00

11,6

66.6

712

,000

.00

11,6

66.6

711

,833

.34

0.0

0.0

0.0

0.0

0.0

Lorry

Lorry

Min

imum

8,53

3.33

8,43

3.33

9,00

0.00

8,70

0.00

8,66

6.67

8,53

3.33

8,43

3.33

9,00

0.00

8,80

0.00

8,69

1.67

0.0

0.0

0.0

1.10.

3

Max

imum

16,10

0.00

16,6

66.6

716

,500

.00

16,4

33.3

316

,425

.00

16,16

6.67

16,16

6.67

16,5

50.0

016

,600

.00

16,3

70.8

40.

4-3

.00.

31.0

-0.3

Hoi

stin

g an

d Li

fting

Cran

e

Hyd

raul

ic

Craw

ler

Cran

e

Min

imum

16,13

3.33

16,0

00.0

016

,500

.00

15,16

6.67

15,9

50.0

016

,133.

3316

,000

.00

16,5

00.0

015

,166.

6715

,950

.00

0.0

0.0

0.0

0.0

0.0

Max

imum

20,3

33.3

319

,667

.67

20,0

00.0

019

,833

.33

19,9

58.5

820

,333

.33

19,6

66.6

720

,000

.00

19,8

33.3

319

,958

.33

0.0

0.0

0.0

0.0

0.0

Mob

ile

Cran

e

Min

imum

7,850

.00

7,800

.00

8,00

0.00

7,666

.67

7,829

.177,8

50.0

07,8

00.0

08,

000.

007,6

66.6

77,8

29.17

0.0

0.0

0.0

0.0

0.0

Max

imum

16,16

6.67

16,0

00.0

016

,500

.00

16,0

00.0

016

,166.

6716

,166.

6716

,000

.00

16,5

00.0

016

,000

.00

16,16

6.67

0.0

0.0

0.0

0.0

0.0

Not

e:

Cen

tral

Reg

ion:

Sel

ango

r and

Kua

la L

umpu

r;

Nor

ther

n Re

gion

: Pul

au P

inan

g;

East

ern

Regi

on: P

ahan

g;

Sout

hern

Reg

ion:

Joh

or.

Appe

ndix

3.3

9 A

vera

ge M

onth

ly R

enta

l Rat

es fo

r Maj

or M

achi

neri

es in

Pen

insu

lar M

alay

sia

in 2

013

and

2014

(RM

/uni

t) (2

)

Page 84: CHAPTER 3 APPENDIX - Goverment Documents · CHAPTER 3 APPENDIX Appendix 3.16 ... E17 Kabel bawah tanah voltan rendah E35 Grid berkapasiti melebihi 72KW E18 Kabel bawah tanah …

STATISTICS AND CONSTRUCTION DEMAND 2015-2016

CHAPTER 3 APPENDIX

238

Ap

pen

dix

3.4

0 A

vera

ge

Dai

ly R

enta

l Rat

es f

or

Maj

or

Mac

hin

erie

s in

Sab

ah a

nd

Sar

awak

in 2

013

an

d 2

014

(RM

/un

it) (

1)

Type

of w

ork

Cat

egor

yTy

peM

inim

um /

Max

imum

Pr

ice

Saba

hSa

raw

ak

K. K

inab

alu

Cha

nge

(%)

Kuch

ing

Peru

baha

n (%

)

Dai

ly R

enta

l (R

M p

er u

nit)

Dai

ly R

enta

l

(R

M p

er u

nit)

Dai

ly

Rent

al

(RM

per

un

it)

Dai

ly

Rent

al

(R

M p

er

unit)

Dai

ly R

enta

l (R

M p

er u

nit)

Dai

ly R

enta

l

(R

M p

er u

nit)

Dai

ly

Rent

al

(RM

per

un

it)

Dai

ly

Rent

al

(R

M p

er

unit)

(RM

per

un

it)20

1420

1320

1420

1320

1420

1320

14

Land

Wor

k

Exca

vato

rW

heel

ed

Exca

vato

r

Min

imum

550.

0055

0.00

8,60

0.00

8,60

0.00

0.0

0.0

483.

3348

3.00

8,26

6.67

8,26

6.67

-0.1

0.0

Max

imum

600.

0060

0.00

9,30

0.00

9,30

0.00

0.0

0.0

550.

0055

0.00

9,20

0.00

9,20

0.00

0.0

0.0

Hyd

raul

ic

Exca

vato

r

Min

imum

420.

0042

0.00

6,50

0.00

6,50

0.00

0.0

0.0

383.

3340

0.00

6,26

6.67

6,30

0.00

4.3

0.5

Max

imum

1,70

0.00

1,70

0.00

18,7

50.0

018

,750

.00

0.0

0.0

1,50

0.00

1,50

0.00

18,1

50.0

018

,150

.00

0.0

0.0

Trac

ked

Exca

vato

r

Min

imum

450.

0045

0.00

8,15

0.00

7,78

3.33

0.0

-4.5

400.

0040

0.00

7,23

3.33

7,23

3.33

0.0

0.0

Max

imum

1,51

0.00

1,35

8.33

18,0

00.0

017

,316

.67

-10.

0-3

.81,

233.

331,

233.

3316

,283

.33

16,2

83.3

30.

00.

0

Load

erW

heel

ed L

oade

r M

inim

um45

0.00

450.

008,

150.

008,

150.

000.

00.

040

0.00

400.

007,

300.

007,

300.

000.

00.

0

Max

imum

1,51

0.00

1,51

0.00

18,0

00.0

018

,333

.33

0.0

1.9

1,38

3.33

1,38

3.33

17,2

00.0

017

,200

.00

0.0

0.0

Skid

Ste

er

Load

er

Min

imum

420.

0042

5.00

7,450

.00

7,450

.00

1.2

0.0

391.

6739

1.67

7,18

3.33

7,18

3.33

0.0

0.0

Max

imum

578.

3357

8.33

9,51

6.67

9,51

6.67

0.0

0.0

503.

3350

3.33

9,03

3.33

9,03

3.33

0.0

0.0

Trac

k Lo

ader

Min

imum

528.

3352

8.33

9,38

3.33

9,38

3.33

0.0

0.0

495.

0049

5.00

9,38

3.33

9,38

3.33

0.0

0.0

Max

imum

783.

3378

3.33

13,4

83.3

313

,483

.33

0.0

0.0

728.

3372

8.33

13,2

66.6

713

,266

.67

0.0

0.0

Doz

erBu

lldoz

erM

inim

um70

0.00

710.

0010

,933

.33

10,9

33.3

31.4

0.0

726.

7072

6.67

10,1

66.6

710

,166

.67

0.0

0.0

Max

imum

1,18

6.67

1,18

6.67

14,9

50.0

014

,950

.00

0.0

0.0

1,19

3.33

1,19

3.33

14,4

66.6

714

,466

.67

0.0

0.0

Doz

er S

hove

lM

inim

um75

3.33

753.

3310

,800

.00

10,8

00.0

00.

00.

066

6.67

666.

6710

,000

.00

10,0

00.0

00.

00.

0

Max

imum

850.

0085

0.00

11,8

66.6

711

,866

.67

0.0

0.0

793.

3379

3.33

11,3

33.3

311

,333

.33

0.0

0.0

Whe

el D

ozer

Min

imum

816.

6781

6.67

11,8

00.0

011

,800

.00

0.0

0.0

783.

3378

3.33

11,1

16.6

711

,116

.67

0.0

0.0

Max

imum

883.

3388

3.33

12,3

50.0

012

,350

.00

0.0

0.0

865.

0086

5.00

12,4

33.3

312

,433

.33

0.0

0.0

Com

pact

orSo

il C

ompa

ctor

Min

imum

600.

0060

0.00

7,80

0.00

7,80

0.00

0.0

0.0

550.

0055

0.00

7,70

0.00

7,70

0.00

0.0

0.0

Max

imum

733.

3373

3.33

9,31

6.67

9,31

6.67

0.0

0.0

693.

3369

3.33

9,10

0.00

9,10

0.00

0.0

0.0

Land

fill

Com

pact

or

Min

imum

611.

6761

5.00

7,73

3.33

7,73

3.33

0.5

0.0

546.

6754

6.67

8,00

0.00

8,00

0.00

0.0

0.0

Max

imum

621.

6762

1.67

7,73

3.33

7,73

3.33

0.0

0.0

556.

6755

6.67

9,03

3.33

9,03

3.33

0.0

0.0

Vibr

ator

y So

il C

ompa

ctor

Min

imum

643.

3365

1.67

8,00

0.00

8,00

0.00

1.3

0.0

610.

0061

0.00

8,83

3.33

8,83

3.33

0.0

0.0

Max

imum

651.

6766

0.00

8,00

0.00

8,00

0.00

1.3

0.0

610.

0061

0.00

8,83

3.33

8,83

3.33

0.0

0.0

Vibr

ator

y As

phal

t C

ompa

ctor

Min

imum

643.

3366

0.00

9,30

0.00

9,30

0.00

2.6

0.0

653.

3365

3.33

9,26

6.67

9,26

6.67

0.0

0.0

Max

imum

710.

0071

0.00

9,73

3.33

9,73

3.33

0.0

0.0

680.

0068

0.00

9,71

6.67

9,71

6.67

0.0

0.0

Mot

or G

rade

rM

otor

Gra

der

Min

imum

550.

0055

0.00

8,63

3.33

8,63

3.33

0.0

0.0

553.

3356

0.00

8,50

0.00

8,50

0.00

1.2

0.0

Max

imum

650.

0065

0.00

10,3

33.3

310

,333

.33

0.0

0.0

600.

0060

0.00

9,50

0.00

9,50

0.00

0.0

0.0

Back

hoe

Back

hoe

Min

imum

450.

0045

0.00

7,00

0.00

7,00

0.00

0.0

0.0

416.

6743

3.33

7,00

0.00

7,06

6.67

4.0

1.0

Max

imum

450.

0046

0.00

7,00

0.00

7,06

6.67

2.2

1.0

416.

6743

3.33

7,00

0.00

7,13

3.33

4.0

1.9

Page 85: CHAPTER 3 APPENDIX - Goverment Documents · CHAPTER 3 APPENDIX Appendix 3.16 ... E17 Kabel bawah tanah voltan rendah E35 Grid berkapasiti melebihi 72KW E18 Kabel bawah tanah …

STATISTICS AND CONSTRUCTION DEMAND 2015-2016

CHAPTER 3 APPENDIX

239

Ap

pen

dix

3.4

0 A

vera

ge

Dai

ly R

enta

l Rat

es f

or

Maj

or

Mac

hin

erie

s in

Sab

ah a

nd

Sar

awak

in 2

013

an

d 2

014

(RM

/un

it) (

1)

Type

of w

ork

Cat

egor

yTy

peM

inim

um /

Max

imum

Pr

ice

Saba

hSa

raw

ak

K. K

inab

alu

Cha

nge

(%)

Kuch

ing

Peru

baha

n (%

)

Dai

ly R

enta

l (R

M p

er u

nit)

Dai

ly R

enta

l

(R

M p

er u

nit)

Dai

ly

Rent

al

(RM

per

un

it)

Dai

ly

Rent

al

(R

M p

er

unit)

Dai

ly R

enta

l (R

M p

er u

nit)

Dai

ly R

enta

l

(R

M p

er u

nit)

Dai

ly

Rent

al

(RM

per

un

it)

Dai

ly

Rent

al

(R

M p

er

unit)

(RM

per

un

it)20

1420

1320

1420

1320

1420

1320

14

Land

Wor

k

Exca

vato

rW

heel

ed

Exca

vato

r

Min

imum

550.

0055

0.00

8,60

0.00

8,60

0.00

0.0

0.0

483.

3348

3.00

8,26

6.67

8,26

6.67

-0.1

0.0

Max

imum

600.

0060

0.00

9,30

0.00

9,30

0.00

0.0

0.0

550.

0055

0.00

9,20

0.00

9,20

0.00

0.0

0.0

Hyd

raul

ic

Exca

vato

r

Min

imum

420.

0042

0.00

6,50

0.00

6,50

0.00

0.0

0.0

383.

3340

0.00

6,26

6.67

6,30

0.00

4.3

0.5

Max

imum

1,70

0.00

1,70

0.00

18,7

50.0

018

,750

.00

0.0

0.0

1,50

0.00

1,50

0.00

18,1

50.0

018

,150

.00

0.0

0.0

Trac

ked

Exca

vato

r

Min

imum

450.

0045

0.00

8,15

0.00

7,78

3.33

0.0

-4.5

400.

0040

0.00

7,23

3.33

7,23

3.33

0.0

0.0

Max

imum

1,51

0.00

1,35

8.33

18,0

00.0

017

,316

.67

-10.

0-3

.81,

233.

331,

233.

3316

,283

.33

16,2

83.3

30.

00.

0

Load

erW

heel

ed L

oade

r M

inim

um45

0.00

450.

008,

150.

008,

150.

000.

00.

040

0.00

400.

007,

300.

007,

300.

000.

00.

0

Max

imum

1,51

0.00

1,51

0.00

18,0

00.0

018

,333

.33

0.0

1.9

1,38

3.33

1,38

3.33

17,2

00.0

017

,200

.00

0.0

0.0

Skid

Ste

er

Load

er

Min

imum

420.

0042

5.00

7,450

.00

7,450

.00

1.2

0.0

391.

6739

1.67

7,18

3.33

7,18

3.33

0.0

0.0

Max

imum

578.

3357

8.33

9,51

6.67

9,51

6.67

0.0

0.0

503.

3350

3.33

9,03

3.33

9,03

3.33

0.0

0.0

Trac

k Lo

ader

Min

imum

528.

3352

8.33

9,38

3.33

9,38

3.33

0.0

0.0

495.

0049

5.00

9,38

3.33

9,38

3.33

0.0

0.0

Max

imum

783.

3378

3.33

13,4

83.3

313

,483

.33

0.0

0.0

728.

3372

8.33

13,2

66.6

713

,266

.67

0.0

0.0

Doz

erBu

lldoz

erM

inim

um70

0.00

710.

0010

,933

.33

10,9

33.3

31.4

0.0

726.

7072

6.67

10,1

66.6

710

,166

.67

0.0

0.0

Max

imum

1,18

6.67

1,18

6.67

14,9

50.0

014

,950

.00

0.0

0.0

1,19

3.33

1,19

3.33

14,4

66.6

714

,466

.67

0.0

0.0

Doz

er S

hove

lM

inim

um75

3.33

753.

3310

,800

.00

10,8

00.0

00.

00.

066

6.67

666.

6710

,000

.00

10,0

00.0

00.

00.

0

Max

imum

850.

0085

0.00

11,8

66.6

711

,866

.67

0.0

0.0

793.

3379

3.33

11,3

33.3

311

,333

.33

0.0

0.0

Whe

el D

ozer

Min

imum

816.

6781

6.67

11,8

00.0

011

,800

.00

0.0

0.0

783.

3378

3.33

11,1

16.6

711

,116

.67

0.0

0.0

Max

imum

883.

3388

3.33

12,3

50.0

012

,350

.00

0.0

0.0

865.

0086

5.00

12,4

33.3

312

,433

.33

0.0

0.0

Com

pact

orSo

il C

ompa

ctor

Min

imum

600.

0060

0.00

7,80

0.00

7,80

0.00

0.0

0.0

550.

0055

0.00

7,70

0.00

7,70

0.00

0.0

0.0

Max

imum

733.

3373

3.33

9,31

6.67

9,31

6.67

0.0

0.0

693.

3369

3.33

9,10

0.00

9,10

0.00

0.0

0.0

Land

fill

Com

pact

or

Min

imum

611.

6761

5.00

7,73

3.33

7,73

3.33

0.5

0.0

546.

6754

6.67

8,00

0.00

8,00

0.00

0.0

0.0

Max

imum

621.

6762

1.67

7,73

3.33

7,73

3.33

0.0

0.0

556.

6755

6.67

9,03

3.33

9,03

3.33

0.0

0.0

Vibr

ator

y So

il C

ompa

ctor

Min

imum

643.

3365

1.67

8,00

0.00

8,00

0.00

1.3

0.0

610.

0061

0.00

8,83

3.33

8,83

3.33

0.0

0.0

Max

imum

651.

6766

0.00

8,00

0.00

8,00

0.00

1.3

0.0

610.

0061

0.00

8,83

3.33

8,83

3.33

0.0

0.0

Vibr

ator

y As

phal

t C

ompa

ctor

Min

imum

643.

3366

0.00

9,30

0.00

9,30

0.00

2.6

0.0

653.

3365

3.33

9,26

6.67

9,26

6.67

0.0

0.0

Max

imum

710.

0071

0.00

9,73

3.33

9,73

3.33

0.0

0.0

680.

0068

0.00

9,71

6.67

9,71

6.67

0.0

0.0

Mot

or G

rade

rM

otor

Gra

der

Min

imum

550.

0055

0.00

8,63

3.33

8,63

3.33

0.0

0.0

553.

3356

0.00

8,50

0.00

8,50

0.00

1.2

0.0

Max

imum

650.

0065

0.00

10,3

33.3

310

,333

.33

0.0

0.0

600.

0060

0.00

9,50

0.00

9,50

0.00

0.0

0.0

Back

hoe

Back

hoe

Min

imum

450.

0045

0.00

7,00

0.00

7,00

0.00

0.0

0.0

416.

6743

3.33

7,00

0.00

7,06

6.67

4.0

1.0

Max

imum

450.

0046

0.00

7,00

0.00

7,06

6.67

2.2

1.0

416.

6743

3.33

7,00

0.00

7,13

3.33

4.0

1.9

Type

of w

ork

Cat

egor

yTy

peM

inim

um /

Max

imum

Pr

ice

Saba

hSa

raw

ak

K. K

inab

alu

Cha

nge

(%)

Kuch

ing

Peru

baha

n (%

)

Dai

ly R

enta

l (R

M p

er u

nit)

Dai

ly R

enta

l

(R

M p

er u

nit)

Dai

ly

Rent

al

(RM

per

un

it)

Dai

ly

Rent

al

(R

M p

er

unit)

Dai

ly R

enta

l (R

M p

er u

nit)

Dai

ly R

enta

l

(R

M p

er u

nit)

Dai

ly

Rent

al

(RM

per

un

it)

Dai

ly

Rent

al

(R

M p

er

unit)

(RM

per

un

it)20

1420

1320

1420

1320

1420

1320

14

Road

wor

k

Pavi

ng

Equi

pmen

tAs

phal

t Pav

erM

inim

um55

3.33

553.

337,

583.

337,

600.

000.

00.

250

0.00

500.

007,4

00.0

07,4

00.0

00.

00.

0

Max

imum

650.

0065

0.00

8,78

3.33

8,78

3.33

0.0

0.0

600.

0060

0.00

8,50

0.00

8,50

0.00

0.0

0.0

Asph

alt T

rack

Pa

vers

Min

imum

638.

3363

8.33

8,31

6.67

8,31

6.67

0.0

0.0

600.

0060

0.00

7,80

0.00

7,80

0.00

0.0

0.0

Max

imum

716.

6771

6.67

9,51

6.67

9,51

6.67

0.0

0.0

700.

0070

0.00

9,23

3.33

9,23

3.33

0.0

0.0

Scre

eds

Min

imum

300.

0030

0.00

5,21

6.67

5,21

6.67

0.0

0.0

288.

3328

8.33

4,86

6.67

4,86

6.67

0.0

0.0

Max

imum

400.

0040

0.00

6,35

0.00

6,35

0.00

0.0

0.0

400.

0040

0.00

6,16

6.67

6,16

6.67

0.0

0.0

Truc

k an

d H

aula

ge

Dum

p Tr

uck

Dum

p Tr

uck

Min

imum

533.

3353

3.33

9,18

3.33

9,18

3.33

0.0

0.0

510.

0051

0.00

9,11

6.67

9,11

6.67

0.0

0.0

Max

imum

750.

0075

0.00

11,6

33.3

311

,633

.33

0.0

0.0

700.

0070

0.00

11,7

83.3

311

,783

.33

0.0

0.0

Lorr

yLo

rry

Min

imum

400.

0040

0.00

8,53

3.33

8,53

3.33

0.0

0.0

416.

6741

6.67

8,36

6.67

8,36

6.67

0.0

0.0

Max

imum

1,06

6.67

1,06

6.67

17,5

33.3

317

,533

.33

0.0

0.0

950.

0095

0.00

17,4

33.3

317

,433

.33

0.0

0.0

Hoi

stin

g an

d Li

ftin

g

Cra

neH

ydra

ulic

C

raw

ler C

rane

Min

imum

1,66

6.67

1,66

6.67

20,0

00.0

020

,000

.00

0.0

0.0

1,13

3.33

1,13

3.33

15,8

33.3

315

,833

.33

0.0

0.0

Max

imum

1,90

0.00

1,93

3.33

22,6

00.0

022

,600

.00

1.8

0.0

2,15

0.00

2,15

0.00

24,8

33.3

324

,833

.33

0.0

0.0

Mob

ile C

rane

Min

imum

516.

6751

6.67

8,16

6.67

8,16

6.67

0.0

0.0

500.

0050

0.00

7,50

0.00

7,50

0.00

0.0

0.0

Max

imum

1,26

6.67

1,26

6.67

17,2

33.3

317

,233

.33

0.0

0.0

1,26

6.67

1,26

6.67

16,0

00.0

016

,000

.00

0.0

0.0

Ap

pen

dix

3.4

0 A

vera

ge

Dai

ly R

enta

l Rat

es f

or

Maj

or

Mac

hin

erie

s in

Sab

ah a

nd

Sar

awak

in 2

013

an

d 2

014

(RM

/un

it) (

2)

Page 86: CHAPTER 3 APPENDIX - Goverment Documents · CHAPTER 3 APPENDIX Appendix 3.16 ... E17 Kabel bawah tanah voltan rendah E35 Grid berkapasiti melebihi 72KW E18 Kabel bawah tanah …

STATISTICS AND CONSTRUCTION DEMAND 2015-2016

CHAPTER 3 APPENDIX

240

Appe

ndix

3.4

1 A

vera

ge C

ost f

or B

uild

ing

Mat

eria

l Ind

ex b

y Bu

ildin

g C

ateg

ory

and

Regi

on in

Pen

insu

lar M

alay

sia

in 2

013

and

2014

(Jul

y 20

12 =

100

)

Build

ing

Cat

egor

y

2013

2014

AB

CD

EF

Aver

age

AB

CD

EF

Aver

age

Resi

dent

ial

99.8

99.6

101.

410

2.5

101.

898

.810

0.7

101.

710

1.1

103.

310

4.6

104.

410

1.1

102.

7

Hot

el99

.999

.410

1.4

102.

210

1.5

98.8

100.

510

1.7

101.

010

3.2

104.

510

3.9

101.

110

2.6

Offi

ce99

.699

.210

1.3

101.

910

1.6

98.6

100.

410

1.2

100.

110

2.9

103.

910

4.6

100.

810

2.3

Com

mer

cial

and

Indu

stria

l10

0.5

100.

010

1.3

102.

410

2.9

99.6

101.

110

2.1

100.

410

2.9

103.

810

5.4

101.

710

2.7

Educ

atio

n10

0.2

99.8

101.

810

2.9

102.

099

.010

1.0

102.

010

1.1

103.

610

5.0

104.

410

1.4

102.

9

Hea

lth99

.599

.110

1.2

101.

910

1.4

98.6

100.

310

1.3

100.

310

3.0

103.

910

3.8

100.

810

2.2

Soci

al F

acili

ty10

1.1

99.8

101.

610

2.5

101.

898

.910

1.0

101.

810

1.1

103.

410

4.7

104.

110

1.1

102.

7

Secu

rity

100.

299

.810

1.6

102.

710

2.0

99.1

100.

910

2.1

101.

310

3.3

104.

810

4.3

101.

410

2.9

Anci

llary

Bui

ldin

gs10

1.1

100.

710

2.7

103.

810

2.0

99.3

101.

610

3.4

103.

210

4.7

106.

610

3.8

102.

110

4.0

Not

e:

Regi

on A

: Pul

au P

inan

g, K

edah

and

Per

lis;

Re

gion

B: P

erak

;

Regi

on C

: Kua

la L

umpu

r, M

elak

a, N

eger

i Sem

bila

n an

d Se

lang

or;

Re

gion

D: J

ohor

;

Regi

on E

: Pah

ang;

Re

gion

F: K

elan

tan

and

Tere

ngga

nu.

Page 87: CHAPTER 3 APPENDIX - Goverment Documents · CHAPTER 3 APPENDIX Appendix 3.16 ... E17 Kabel bawah tanah voltan rendah E35 Grid berkapasiti melebihi 72KW E18 Kabel bawah tanah …

STATISTICS AND CONSTRUCTION DEMAND 2015-2016

CHAPTER 3 APPENDIX

241

Appendix 3.42 Average Cost for Building Material Index by Building Category and Region in Sabah in 2013 and 2014 (July 2012 = 100)

Building Category

2013 2014

Kota Kinabalu

Sandakan Tawau AverageKota

KinabaluSandakan Tawau Average

Residential 100.2 100.2 101.3 100.6 100.7 101.1 102.0 101.3

Hotel 100.2 100.1 101.2 100.5 100.5 101.2 101.9 101.2

Office 99.9 99.9 101.4 100.4 100.1 100.8 102.0 101.0

Commercial and Industrial 100.2 100.4 101.2 100.6 100.7 101.8 102.0 101.5

Education 100.2 100.2 101.2 100.5 100.7 101.2 102.1 101.3

Health 100.0 100.1 101.1 100.4 100.3 101.2 101.9 101.1

Social Facility 100.2 100.4 101.3 100.6 100.5 101.5 102.0 101.3

Security 100.3 100.5 101.2 100.7 100.8 101.7 102.0 101.5

Ancillary Buildings 100.6 100.5 101.4 100.8 101.4 101.8 102.4 101.9

Appendix 3.43 Average Cost for Building Material Index by Building Category and Region in Sarawak in 2013 and 2014 (July 2012 = 100)

Building Category2013 2014

Kuching Sibu Miri Average Kuching Sibu Miri Average

Residential 100.1 99.9 100.1 100.0 102.2 101.7 102.1 102.0

Hotel 100.1 99.8 100.2 100.0 102.0 101.7 102.2 102.0

Office 99.7 99.6 100.1 99.8 102.0 101.3 101.9 101.7

Commercial and Industrial 99.6 99.5 99.6 99.6 101.1 100.8 100.6 100.8

Education 100.1 99.9 100.1 100.0 102.1 101.8 102.1 102.0

Health 99.9 99.7 100.3 100.0 101.7 101.4 102.1 101.7

Social Facility 100.0 99.8 100.2 100.0 102.1 101.7 102.1 102.0

Security 100.1 99.8 100.1 100.0 102.0 101.7 101.9 101.9

Ancillary Buildings 100.5 100.4 100.3 100.4 103.0 103.2 102.7 103.0

Page 88: CHAPTER 3 APPENDIX - Goverment Documents · CHAPTER 3 APPENDIX Appendix 3.16 ... E17 Kabel bawah tanah voltan rendah E35 Grid berkapasiti melebihi 72KW E18 Kabel bawah tanah …

STATISTICS AND CONSTRUCTION DEMAND 2015-2016

CHAPTER 3 APPENDIX

242

Appendix 3.44 Average Cost Index for a Unit of Construction Materials by Region in Peninsular Malaysia in 2013 and 2014 (July 2012 = 100)

Construction Material2013 2014

A B C D E F Average A B C D E F Average

Cement 101.2 104.0 102.9 103.1 100.0 101.5 102.1 105.1 106.8 109.5 108.9 100.0 106.1 106.1

Aggregate 103.5 100.4 107.0 100.2 100.4 98.9 101.7 106.0 102.7 115.6 104.3 105.4 98.6 105.4

Sand 102.3 99.9 101.4 105.0 100.9 103.3 102.1 111.3 100.0 104.3 108.6 104.8 107.0 106.0

Steel Reinforcement 97.5 94.6 98.8 95.0 100.8 97.9 97.4 95.0 91.7 97.3 94.8 104.6 97.2 96.8

Ready Mix Concrete 102.9 101.5 101.4 102.5 100.2 97.1 100.9 103.4 103.2 102.5 109.4 100.8 99.9 103.2

Bricks 100.2 99.7 99.2 99.0 98.2 100.7 99.5 102.5 99.6 101.9 100.0 98.6 104.1 101.1

Roofing 100.0 100.1 99.7 101.3 100.1 100.1 100.2 100.6 100.6 99.9 102.2 100.7 100.2 100.7

Wall & Floor Tiles 100.5 100.5 100.5 100.0 100.5 100.1 100.4 109.0 106.6 107.1 100.0 113.8 107.2 107.3

Ceiling Board 99.0 99.5 99.3 99.6 119.8 99.0 102.7 101.1 100.8 99.7 103.0 129.6 100.2 105.7

Plumbing Works 101.2 100.6 100.0 99.4 100.1 101.5 100.5 103.0 102.2 100.7 101.9 102.4 103.3 102.3

Sanitary Fittings 100.6 102.3 100.0 101.5 100.0 100.1 100.8 101.5 106.1 99.8 100.1 100.1 103.0 101.8

Paint 101.0 101.0 103.0 100.3 100.2 102.0 101.3 103.2 101.8 104.5 100.4 100.9 104.6 102.6

Glass 102.0 100.2 102.2 102.0 100.0 100.2 101.1 104.0 101.7 105.7 104.5 105.7 104.3 104.3

Steel & Metal Sections 99.6 96.9 97.3 98.7 105.6 99.8 99.7 100.3 93.5 95.9 97.2 110.5 101.0 99.7

Timber 84.4 84.4 84.4 84.4 84.4 84.4 84.4 87.7 87.7 87.7 87.7 87.7 87.7 87.7

Plywood 75.2 75.2 75.2 75.2 75.2 75.2 75.2 68.1 68.1 68.1 68.1 68.1 68.1 68.1

Ironmongery 100.0 100.0 100.0 100.0 100.0 100.0 100.0 100.0 100.0 100.0 98.4 100.0 100.0 99.7

Note: Region A: Pulau Pinang, Kedah and Perlis; Region B: Perak; Region C: Kuala Lumpur, Melaka, Negeri Sembilan and Selangor; Region D: Johor; Region E: Pahang; Region F: Kelantan and Terengganu.

Page 89: CHAPTER 3 APPENDIX - Goverment Documents · CHAPTER 3 APPENDIX Appendix 3.16 ... E17 Kabel bawah tanah voltan rendah E35 Grid berkapasiti melebihi 72KW E18 Kabel bawah tanah …

STATISTICS AND CONSTRUCTION DEMAND 2015-2016

CHAPTER 3 APPENDIX

243

Appendix 3.45 Average Cost Index for a Unit of Construction Materials by Major City in Sabah in 2013 and 2014 (July 2012 = 100)

Construction Material2013 2014

K. Kinabalu Sandakan Tawau Average K. Kinabalu Sandakan Tawau Average

Cement 100.5 100.4 100.0 100.3 102.1 101.5 100.0 101.2

Aggregate 101.9 101.7 100.3 101.3 101.9 102.8 100.4 101.7

Sand 104.0 97.1 100.0 100.4 105.1 97.9 100.0 101.0

Steel Reinforcement 95.6 97.8 99.6 97.7 92.7 97.4 99.5 96.5

Ready Mix Concrete 101.0 100.0 102.1 101.0 101.0 100.0 102.1 101.0

Bricks 100.7 99.7 100.0 100.1 100.4 100.5 100.0 100.3

Roofing 100.2 108.2 100.0 102.8 100.4 116.8 100.0 105.7

Wall & Floor Tiles 100.9 99.4 104.3 101.5 103.8 99.7 104.3 102.6

Ceiling Board 100.0 100.0 100.0 100.0 100.4 103.7 100.0 101.4

Plumbing Works 102.8 99.5 99.2 100.5 104.6 100.5 99.2 101.4

Sanitary Fittings 104.1 99.7 102.6 102.1 104.7 99.8 102.7 102.4

Paint 101.5 100.0 102.4 101.3 102.0 100.3 102.4 101.6

Glass 100.0 100.0 100.0 100.0 99.7 100.0 100.0 99.9

Steel & Metal Sections 99.3 98.4 100.0 99.2 99.0 97.7 100.0 98.9

Timber 100.0 100.0 100.0 100.0 100.0 100.0 100.0 100.0

Plywood 97.9 97.9 97.9 97.9 82.9 82.9 82.9 82.9

Ironmongery 101.1 99.9 100.0 100.3 101.1 102.6 100.0 101.2

Appendix 3.46 Average Cost Index for a Unit of Construction Materials by Major City in Sarawak in 2013 and 2014 (July 2012 = 100)

Construction Material2013 2014

Kuching Sibu Miri Average Kuching Sibu Miri Average

Cement 100.0 100.0 100.0 100.0 104.8 106.5 100.0 103.8

Aggregate 100.5 102.4 100.1 101.0 102.0 103.0 100.4 101.8

Sand 99.2 100.0 99.3 99.5 99.2 100.0 97.7 99.0

Steel Reinforcement 96.0 95.3 99.7 97.0 94.7 93.1 99.7 95.8

Ready Mix Concrete 100.2 101.0 94.6 98.6 104.5 106.6 100.7 103.9

Bricks 101.6 100.1 100.6 100.8 99.9 101.8 102.0 101.2

Roofing 98.7 96.5 99.6 98.3 100.3 96.5 100.2 99.0

Wall & Floor Tiles 99.8 100.0 100.6 100.1 108.4 100.0 102.5 103.6

Ceiling Board 100.0 100.1 100.0 100.0 100.0 101.6 100.1 100.6

Plumbing Works 101.5 99.9 96.6 99.3 104.7 100.1 104.7 103.2

Sanitary Fittings 104.0 100.0 101.9 102.0 104.3 100.0 101.9 102.1

Paint 101.0 99.8 102.8 101.2 98.9 99.1 104.0 100.7

Glass 100.1 100.3 100.0 100.1 103.6 104.2 100.0 102.6

Steel & Metal Sections 97.1 97.3 96.3 96.9 95.2 95.2 92.1 94.2

Timber 100.0 100.0 100.0 100.0 100.0 100.0 100.0 100.0

Plywood 102.9 102.9 102.9 102.9 103.5 103.5 103.5 103.5

Ironmongery 100.0 100.0 100.0 100.0 100.0 101.7 100.0 100.6

Page 90: CHAPTER 3 APPENDIX - Goverment Documents · CHAPTER 3 APPENDIX Appendix 3.16 ... E17 Kabel bawah tanah voltan rendah E35 Grid berkapasiti melebihi 72KW E18 Kabel bawah tanah …

STATISTICS AND CONSTRUCTION DEMAND 2015-2016

CHAPTER 3 APPENDIX

244

Appendix 3.47 Average Cost Index for Construction Materials by Building Category and Region in Peninsular Malaysia in 2013 and 2014 (July 2012 = 100)

Building Category2013 2014

A B C D E F Average A B C D E F Average

Residental 100.7 100.7 100.7 100.0 100.3 100.3 100.5 101.6 101.6 101.8 102.6 100.8 100.8 101.5

Hotel 100.8 100.8 100.7 98.8 100.6 100.6 100.4 101.6 101.6 101.8 103.3 101.1 101.1 101.8

Office 100.8 100.8 100.7 99.3 100.5 100.5 100.4 101.6 101.6 101.8 102.9 101.0 101.0 101.7

Commercial and Industrial 100.8 100.8 100.7 100.4 100.2 100.2 100.5 101.7 101.7 101.8 102.0 100.6 100.6 101.4

Education 100.8 100.8 100.7 99.5 100.4 100.4 100.4 101.6 101.6 101.8 102.9 100.9 100.9 101.6

Health 100.7 100.7 100.7 99.6 100.4 100.4 100.4 101.5 101.5 101.7 103.0 101.0 101.0 101.6

Social Facility 100.6 100.6 100.6 99.9 100.5 100.5 100.5 101.4 101.4 101.5 103.1 101.0 101.0 101.6

Security 101.2 101.2 100.7 100.1 100.3 100.3 100.6 101.6 101.6 101.8 102.5 100.8 100.8 101.5

Ancillary Buildings 100.5 100.5 100.5 100.8 100.3 100.3 100.5 101.3 101.3 101.5 102.8 100.9 100.9 101.5

Note: Region A: Pulau Pinang, Kedah and Perlis; Region B: Perak; Region C: Kuala Lumpur, Melaka, Negeri Sembilan and Selangor; Region D: Johor; Region E: Pahang; Region F: Kelantan and Terengganu.

Appendix 3.48 Average Cost Index for Construction Materials by Building Category and Major City in Sabah in 2013 and 2014 (July 2012 = 100)

Building Category2013 2014

K. Kinabalu Sandakan Tawau Average K. Kinabalu Sandakan Tawau Average

Residential 100.7 100.7 100.7 100.7 101.4 101.4 101.4 101.4

Hotel 100.8 100.8 100.8 100.8 101.6 101.6 101.6 101.6

Office 100.8 100.8 100.8 100.8 101.5 101.5 101.5 101.5

Commercial and Industrial 100.6 100.6 100.6 100.6 101.4 101.4 101.4 101.4

Education 100.7 100.7 100.7 100.7 101.5 101.5 101.5 101.5

Health 100.7 100.7 100.7 100.7 101.4 101.4 101.4 101.4

Social Facility 100.0 100.0 100.0 100.0 101.4 101.4 101.4 101.4

Security 99.4 99.4 99.4 99.4 101.4 101.4 101.4 101.4

Ancillary Buildings 100.0 100.0 100.0 100.0 101.2 101.2 101.2 101.2

Page 91: CHAPTER 3 APPENDIX - Goverment Documents · CHAPTER 3 APPENDIX Appendix 3.16 ... E17 Kabel bawah tanah voltan rendah E35 Grid berkapasiti melebihi 72KW E18 Kabel bawah tanah …

STATISTICS AND CONSTRUCTION DEMAND 2015-2016

CHAPTER 3 APPENDIX

245

Appendix 3.49 Average Average Cost Index for Construction Materials by Building Category and Region in Sarawak in 2013 and 2014 (July 2012 = 100)

Building Category2013 2014

Kuching Sibu Miri Average Kuching Sibu Miri Average

Residential 99.7 99.7 99.7 99.7 100.4 100.4 100.4 100.4

Hotel 99.3 99.3 99.3 99.3 100.4 100.4 100.4 100.4

Office 99.4 99.4 99.4 99.4 100.2 100.2 100.2 100.2

Commercial and Industrial 99.9 100.4 99.9 100.1 100.2 100.2 100.2 100.2

Education 99.5 99.5 99.5 99.5 100.4 100.4 100.4 100.4

Health 99.6 99.6 99.6 99.6 100.5 100.5 100.5 100.5

Social Facility 97.9 97.9 97.9 97.9 100.6 100.6 100.6 100.6

Security 97.9 97.9 97.9 97.9 100.4 100.4 100.4 100.4

Ancillary Buildings 98.2 98.2 98.2 98.2 100.6 100.6 100.6 100.6

Appendix 3.50 Average Cost Index for a Construction Workers by Region in Peninsular Malaysia in 2013 and 2014 (July 2012 = 100)

Construction Workers2013 2014

A B C D E F Average A B C D E F Average

General Workers 105.1 110.4 116.9 118.6 114.9 103.5 111.6 109.2 109.3 119.6 115.8 112.5 108.7 112.5

Concreters 102.9 110.0 107.4 109.7 104.8 102.3 106.2 106.5 108.3 111.1 114.3 109.8 106.1 109.4

Steel Bar Benders 101.1 103.4 108.9 117.4 105.1 101.9 106.3 106.7 103.1 114.4 122.8 110.6 105.3 110.5

Carpenters (Formwork) 100.9 102.9 105.6 117.2 103.9 101.9 105.4 106.6 104.6 111.0 122.7 108.7 105.6 109.9

Carpenters (Joinery) 101.2 98.7 104.1 103.1 102.2 101.7 101.8 105.7 107.4 113.1 112.3 107.6 105.0 108.5

Bricklayers 107.4 100.5 107.1 114.9 106.6 102.0 106.4 115.6 109.1 113.2 120.7 105.8 105.9 111.7

Roofers 102.0 106.3 104.2 106.6 104.0 101.8 104.2 104.4 109.9 111.5 110.9 106.5 105.1 108.1

Structural Steel Workers 102.4 104.8 100.4 105.2 105.8 101.6 103.4 105.1 106.7 109.1 106.6 108.4 104.8 106.8

Plumbers 103.5 106.8 103.3 109.7 105.6 102.0 105.2 108.3 108.9 116.4 117.7 113.5 105.8 111.8

Plasterers 107.7 102.2 105.3 105.4 103.7 102.0 104.4 113.0 124.7 107.9 112.4 107.8 106.0 112.0

Tillers 100.5 104.8 105.2 107.0 107.0 101.8 104.4 102.7 118.3 110.4 111.7 110.4 105.3 109.8

Painters 101.4 104.4 101.9 105.1 104.9 102.2 103.3 105.0 112.1 107.6 110.7 109.7 106.4 108.6

Note: Region A: Pulau Pinang, Kedah and Perlis; Region B: Perak; Region C: Kuala Lumpur, Melaka, Negeri Sembilan and Selangor; Region D: Johor; Region E: Pahang; Region F: Kelantan and Terengganu.

Page 92: CHAPTER 3 APPENDIX - Goverment Documents · CHAPTER 3 APPENDIX Appendix 3.16 ... E17 Kabel bawah tanah voltan rendah E35 Grid berkapasiti melebihi 72KW E18 Kabel bawah tanah …

STATISTICS AND CONSTRUCTION DEMAND 2015-2016

CHAPTER 3 APPENDIX

246

Appendix 3.51 Average Cost Index for a Construction Workers by Major City in Sabah in 2013 and 2014 (July 2012 = 100)

Construction Workers2013 2014

K. Kinabalu Sandakan Tawau Average K. Kinabalu Sandakan Tawau Average

General Workers 102.9 103.0 103 103.0 108.1 108.3 108.7 108.4

Concreters 101.8 102.0 101.8 101.9 105.1 105.9 105.1 105.4

Steel Bar Benders 101.7 101.9 101.7 101.8 104.7 105.3 105 105.0

Carpenters (Formwork) 101.7 101.8 101.7 101.7 104.6 105.5 104.6 104.9

Carpenters (Joinery) 101.5 101.7 101.5 101.6 104.1 105 104.2 104.4

Bricklayers 101.8 102.1 101.9 101.9 105.0 106.2 105.1 105.4

Roofers 101.5 101.9 101.6 101.7 104.4 105.4 104.4 104.7

Structural Steel Workers 101.4 101.8 104.1 102.4 104.2 105.2 106.9 105.4

Plumbers 101.6 101.7 103.3 102.2 104.5 104.9 106.1 105.2

Plasterers 101.7 101.9 101.8 101.8 104.7 105.7 104.9 105.1

Tillers 101.5 101.8 101.6 101.6 104.2 105.1 104.4 104.6

Painters 101.8 102.0 101.9 101.9 105.0 105.9 105.2 105.4

Appendix 3.52 Average Cost Index for a Construction Workers by Major City in Sarawak in 2013 and 2014 (July 2012 = 100)

Construction Workers2013 2014

Kuching Sibu Miri Average Kuching Sibu Miri Average

General Workers 103.2 103 103 103.1 108.8 108.2 108.9 108.6

Concreters 101.8 101.8 101.8 101.8 104.8 105.1 105.1 105.0

Steel Bar Benders 101.8 101.8 101.8 101.8 104.7 105.0 105.2 105.0

Carpenters (Formwork) 101.7 101.6 101.7 101.7 104.5 104.6 104.9 104.7

Carpenters (Joinery) 101.5 101.5 101.5 101.5 104.1 104.3 104.5 104.3

Bricklayers 102.0 101.9 102.0 102.0 105.4 105.5 106.0 105.6

Roofers 101.6 101.5 101.6 101.6 104.4 104.3 104.6 104.4

Structural Steel Workers 101.5 101.2 101.5 101.4 104.2 103.4 104.3 104.0

Plumbers 101.7 101.7 101.7 101.7 104.5 104.9 105.2 104.9

Plasterers 101.7 101.7 101.7 101.7 104.7 104.9 105 104.9

Tillers 101.6 101.6 101.6 101.6 104.3 104.6 104.9 104.6

Painters 101.8 101.3 101.9 101.7 104.9 104.7 105.6 105.1

Page 93: CHAPTER 3 APPENDIX - Goverment Documents · CHAPTER 3 APPENDIX Appendix 3.16 ... E17 Kabel bawah tanah voltan rendah E35 Grid berkapasiti melebihi 72KW E18 Kabel bawah tanah …

STATISTICS AND CONSTRUCTION DEMAND 2015-2016

CHAPTER 3 APPENDIX

247

Appendix 3.53 Average Cost Index for a Construction Workers by Building Category and Region in Peninsular Malaysia in 2013 and 2014 (July 2012 = 100)

Building Category2013 2014

A B C D E F Average A B C D E F Average

Residential 103.5 105.5 108.8 113.7 107.6 102.4 106.9 108.3 110.6 113.4 117.0 110.0 106.5 111.0

Hotel 103.9 105.2 108.8 113.8 107.5 102.4 106.9 108.9 110.6 113.5 117.4 109.8 106.5 111.1

Office 103.1 105.5 109.2 114.8 107.6 102.4 107.1 108.0 108.8 113.8 118.0 110.1 106.5 110.9

Commercial and Industrial 103.6 105.9 108.1 112.3 107.9 102.4 106.7 107.9 109.7 113.2 114.8 109.6 106.4 110.3

Education 103.8 105.5 109.3 114.2 107.8 102.4 107.2 108.7 110.2 113.7 117.3 109.9 106.6 111.1

Health 103.9 105.5 109.3 114.1 107.9 102.4 107.2 108.8 110.2 113.9 117.3 110.0 106.7 111.2

Social Facility 103.6 105.5 108.9 113.6 107.6 102.4 106.9 108.3 110.2 113.5 116.8 109.8 106.5 110.9

Security 104.0 105.4 108.9 113.6 107.6 102.4 107.0 108.8 110.6 113.5 116.8 109.7 106.5 111.0

Ancillary Buildings 104.6 105.5 109.5 113.4 107.9 102.5 107.2 109.6 112.2 113.3 116.5 109.6 106.7 111.3

Note: Region A: Pulau Pinang, Kedah and Perlis; Region B: Perak; Region C: Kuala Lumpur, Melaka, Negeri Sembilan and Selangor; Region D: Johor; Region E: Pahang; Region F: Kelantan and Terengganu.

Appendix 3.54 Average Cost Index for a Construction Workers by Building Category and Major City in Sabah in 2013 and 2014 (July 2012 = 100)

Building Category2013 2014

K. Kinabalu Sandakan Tawau Average K. Kinabalu Sandakan Tawau Average

Residential 102.0 102.2 102.1 102.1 105.6 106.2 105.9 105.9

Hotel 102.0 102.2 102.2 102.1 105.5 106.2 105.9 105.9

Office 102.0 102.2 102.1 102.1 105.6 106.3 105.9 105.9

Commercial and Industrial 102.0 102.2 102.5 102.2 105.6 106.3 106.3 106.1

Education 102.0 102.2 102.2 102.1 105.7 106.3 106.0 106.0

Health 102.1 102.2 102.2 102.2 105.7 106.4 106.0 106.0

Social Facility 102.0 102.2 102.2 102.1 105.6 106.3 105.9 105.9

Security 102.0 102.2 102.2 102.1 105.6 106.3 105.9 105.9

Ancillary Buildings 102.1 102.3 102.1 102.2 105.7 106.5 106.0 106.1

Page 94: CHAPTER 3 APPENDIX - Goverment Documents · CHAPTER 3 APPENDIX Appendix 3.16 ... E17 Kabel bawah tanah voltan rendah E35 Grid berkapasiti melebihi 72KW E18 Kabel bawah tanah …

STATISTICS AND CONSTRUCTION DEMAND 2015-2016

CHAPTER 3 APPENDIX

248

Appendix 3.55 Average Cost Index for a Construction Workers by Building Category and Major City in Sarawak in 2013 and 2014 (July 2012 = 100)

Building Category2013 2014

Kuching Sibu Miri Average Kuching Sibu Miri Average

Residential 102.1 102.1 102.1 102.1 105.8 105.7 106.2 105.9

Hotel 102.1 102.1 102.1 102.1 105.8 105.8 106.2 105.9

Office 102.1 102.1 102.1 102.1 105.8 105.8 106.2 105.9

Commercial and Industrial 102.1 102.0 102.1 102.1 105.8 105.6 106.1 105.8

Education 102.2 102.1 102.1 102.1 105.9 105.9 106.3 106.0

Health 102.2 102.1 102.1 102.1 106.0 105.9 106.4 106.1

Social Facility 102.1 102.1 102.1 102.1 105.8 105.7 106.2 105.9

Security 102.1 102.1 102.1 102.1 105.9 105.8 106.2 106.0

Ancillary Buildings 102.2 102.1 102.2 102.2 106.0 106.0 106.4 106.1

Appendix 3.56 Average Cost Index for a Unit of Machinery by Region in Peninsular Malaysia in 2013 and 2014 (July 2012 = 100)

Machinery Category2013 2014

A B C D E F Average A B C D E F Average

Excavator / Backhoe 100.0 100.0 100.0 102.5 100.3 100.3 100.5 100.4 100.4 105.0 104.2 101.3 101.3 102.1

Mobile Crane 100.9 100.9 100.8 100.7 100.0 100.0 100.6 101.9 101.9 102.1 101.2 100.3 100.3 101.3

Bar Cutter / Bender 101.2 101.2 100.8 94.5 101.4 101.4 100.1 101.6 101.6 101.4 106.3 102.0 102.0 102.5

Concrete Mixer 100.4 100.4 100.4 101.4 100.6 100.6 100.6 101.3 101.3 101.9 102.1 101.3 101.3 101.5

Power Trowel 100.0 100.0 101.5 101.1 102.2 102.2 101.2 100.0 100.0 99.3 102.3 102.2 102.2 101.0

Vibrator c/w Poker 96.9 96.9 101.0 102.1 100.1 100.1 99.5 102.0 102.0 103.8 103.4 100.8 100.8 102.1

Marble / Granite Polisher 100.0 100.0 100.0 101.2 100.0 100.0 100.2 100.0 100.0 103.1 103.6 100.0 100.0 101.1

Note: Region A: Pulau Pinang, Kedah and Perlis; Region B: Perak; Region C: Kuala Lumpur, Melaka, Negeri Sembilan and Selangor; Region D: Johor; Region E: Pahang; Region F: Kelantan and Terengganu.

Page 95: CHAPTER 3 APPENDIX - Goverment Documents · CHAPTER 3 APPENDIX Appendix 3.16 ... E17 Kabel bawah tanah voltan rendah E35 Grid berkapasiti melebihi 72KW E18 Kabel bawah tanah …

STATISTICS AND CONSTRUCTION DEMAND 2015-2016

CHAPTER 3 APPENDIX

249

Appendix 3.57 Average Cost Index for a Unit of Machinery by Major City in Sabah in 2013 and 2014 (July 2012 = 100)

Machinery Category2013 2014

K. Kinabalu Sandakan Tawau Average K. Kinabalu Sandakan Tawau Average

Excavator / Backhoe 100.1 100.1 100.1 100.1 100.7 100.7 100.7 100.7

Mobile Crane 100.6 100.6 100.6 100.6 101.4 101.4 101.4 101.4

Bar Cutter / Bender 101.3 101.3 101.3 101.3 102.1 102.1 102.1 102.1

Concrete Mixer 100.8 100.8 100.8 100.8 101.3 101.3 101.3 101.3

Power Trowel 101.3 101.3 101.3 101.3 101.5 101.5 101.5 101.5

Vibrator c/w Poker 101.6 101.6 101.6 101.6 102.4 102.4 102.4 102.4

Marble / Granite Polisher 100.0 100.0 100.0 100.0 100.0 100.0 100.0 100.0

Appendix 3.58 Average Cost Index for a Unit of Machinery by Major City in Sarawak in 2013 and 2014 (July 2012 = 100)

Machinery Category2013 2014

Kuching Sibu Miri Average Kuching Sibu Miri Average

Excavator / Backhoe 100.5 100.5 100.5 100.5 101.8 101.8 101.8 101.8

Mobile Crane 100.0 100.0 100.0 100.0 100.0 100.0 100.0 100.0

Bar Cutter / Bender 97.8 97.8 97.8 97.8 100.6 100.6 100.6 100.6

Concrete Mixer 100.0 100.0 100.0 100.0 100.0 100.0 100.0 100.0

Power Trowel 101.4 101.4 101.4 101.4 101.4 101.4 101.4 101.4

Vibrator c/w Poker 100.3 100.3 100.3 100.3 101.0 101.0 101.0 101.0

Marble / Granite Polisher 100.0 100.0 100.0 100.0 100.0 100.0 100.0 100.0

Page 96: CHAPTER 3 APPENDIX - Goverment Documents · CHAPTER 3 APPENDIX Appendix 3.16 ... E17 Kabel bawah tanah voltan rendah E35 Grid berkapasiti melebihi 72KW E18 Kabel bawah tanah …

STATISTICS AND CONSTRUCTION DEMAND 2015-2016

CHAPTER 3 APPENDIX

250

Appendix 3.59 Average Cost Index for a Unit of Machinery by Building Category and Region in Peninsular Malaysia in 2013 and 2014 (July 2012 = 100)

Building Category2013 2014

A B C D E F Average A B C D E F Average

Residential 97.8 96.5 97.7 96.9 98.9 96.9 97.5 98.5 96.3 98.3 98.4 101.8 98.5 98.6

Hotel 98.0 96.7 97.9 97.0 98.7 97.0 97.6 98.4 96.5 98.5 98.7 101.2 98.5 98.6

Office 98.3 96.9 98.4 97.2 99.4 97.2 97.9 98.8 96.8 99.0 98.8 102.7 98.7 99.1

Commercial and Industrial 99.2 97.5 98.5 98.3 101.0 98.4 98.8 99.6 96.5 98.5 99.3 103.9 99.7 99.6

Education 98.3 96.8 98.1 97.3 99.1 97.2 97.8 98.7 96.5 98.6 98.9 101.7 98.7 98.9

Health 97.6 96.3 97.7 96.6 98.6 96.9 97.3 98.1 96.0 98.3 98.1 101.2 98.3 98.3

Social Facility 98.4 97.1 98.4 97.6 99.2 97.3 98.0 98.8 96.9 98.8 99.2 101.7 98.7 99.0

Security 98.5 97.2 98.2 97.7 99.4 97.5 98.1 99.1 96.9 98.7 99.2 101.9 99.0 99.1

Ancillary Buildings 99.2 98.0 98.9 98.4 98.8 97.5 98.5 100.0 98.2 100.0 101.1 100.6 99.5 99.9

Appendix 3.60 Average Cost Index for a Unit of Machinery by Building Category and Major City in Sabah in 2013 and 2014 (July 2012 = 100)

Building Category2013 2014

K. Kinabalu Sandakan Tawau Average K. Kinabalu Sandakan Tawau Average

Residential 99.4 99.2 100.9 99.8 98.2 98.5 100.1 98.9

Hotel 99.3 99.2 100.7 99.7 98.2 98.9 100.1 99.1

Office 99.0 99.1 101.1 99.7 98.1 98.7 100.5 99.1

Commercial and Industrial 99.4 99.7 100.6 99.9 98.6 99.9 100.3 99.6

Education 99.2 99.1 100.8 99.7 98.1 98.6 100.1 98.9

Health 99.1 99.2 100.7 99.7 97.9 99.0 100.1 99.0

Social Facility 99.3 99.5 100.9 99.9 98.1 99.3 100.2 99.2

Security 99.5 99.6 100.8 100.0 98.5 99.6 100.1 99.4

Ancillary Buildings 99.8 99.5 101.0 100.1 98.9 99.2 100.4 99.5

Appendix 3.61 Average Cost Index for a Unit of Machinery by Building Category and Major City in Sarawak in 2013 and 2014 (July 2012 = 100)

Building Category2013 2014

Kuching Sibu Miri Average Kuching Sibu Miri Average

Residential 99.1 98.9 99.2 99.1 100.5 99.8 100.1 100.1

Hotel 99.2 98.8 99.3 99.1 100.2 99.8 100.4 100.1

Office 98.9 98.7 99.4 99.0 100.7 99.7 100.5 100.3

Commercial and Industrial 98.6 98.3 98.5 98.5 99.1 98.7 98.4 98.7

Education 99.0 98.8 99.1 99.0 100.2 99.8 100.1 100.0

Health 99.0 98.6 99.4 99.0 99.8 99.4 100.3 99.8

Social Facility 99.1 98.7 99.3 99.0 100.5 99.8 100.3 100.2

Security 99.2 98.8 99.1 99.0 100.3 99.8 100 100.0

Ancillary Buildings 99.6 99.5 99.2 99.4 101.4 101.7 100.6 101.2