15

Click here to load reader

Case study: 160 Tooley Street

Embed Size (px)

DESCRIPTION

Nic Crawley, associate and head of sustainability, Allford Hall Monaghan Morris

Citation preview

Page 1: Case study: 160 Tooley Street

NSM=qççäÉó=píêÉÉíSouthwarkSouthwark

Page 2: Case study: 160 Tooley Street

what was delivered site

Page 3: Case study: 160 Tooley Street

ground floor

first floor

what was delivered plans

Page 4: Case study: 160 Tooley Street

north-south section

east-west section

what was delivered sections

Page 5: Case study: 160 Tooley Street

facade construction

Page 6: Case study: 160 Tooley Street

what was delivered internal atrium

Page 7: Case study: 160 Tooley Street

interior typical upper floor

Page 8: Case study: 160 Tooley Street

interior recessed high level lighting runs and suspended fittings

Page 9: Case study: 160 Tooley Street

building services integration

Page 10: Case study: 160 Tooley Street

construction permanent formwork to p/t slabs

Page 11: Case study: 160 Tooley Street
Page 12: Case study: 160 Tooley Street

P i i lPerimeter air supply• minimum horizontal distribution• distributed vertical ducts• motorised damper provisionmotorised damper provision

• separate ventilation control• allow ‘clear’ void for tenant

building services ducting

Page 13: Case study: 160 Tooley Street

building services thermal mass

Page 14: Case study: 160 Tooley Street

Effect of exposed thermal mass – perimeter bay

30

35

p p y

25

30

C

20

Tem

pera

ture

, ˚C

10

15

Res

ulta

nt T

Exposed Thermal Mass & NightCooling

No Exposed Thermal Mass

5Outside Temperature

01 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

Time, hrs

building services Arup ROOM analysis

Page 15: Case study: 160 Tooley Street

Tooley Street – Carbon Emissions Comparison

Tooley Street - Carbon Emissions Comparison1600

y p

1200

1400

1600

small power (unregulated)

800

1000

1200

kgC

O2

Lighting, heating, cooling, ventilation

400

6001000

0

200

Notional Building Target Building (Part L) Actual BuildingNotional Building Target Building (Part L) Actual Building

building services energy calculations