WELCOME

  • Upload
    jess

  • View
    22

  • Download
    0

Embed Size (px)

DESCRIPTION

WELCOME. Asia BRTS Conference 2012 Ahmedabad BRTS PROJECTS IN PCMC AREA, PIMPRI, PUNE. 6-8 September 2012. We would like to share with you. 1. About Pimpri Chinchwad City. 2. Institutional set up and key responsibility. 3. Information about BRTS projects. 4. BRTS system. - PowerPoint PPT Presentation

Citation preview

  • WELCOME Asia BRTS Conference 2012Ahmedabad

    BRTS PROJECTS IN PCMC AREA, PIMPRI, PUNE.

    6-8 September 2012.

  • We would like to share with you

    1About Pimpri Chinchwad City2Institutional set up and key responsibility34Information about BRTS projects BRTS system

  • About Pimpri Chinchwad City

  • Located towards North of Pune Area of 181 sq. kms.Population: 1.7 million (approx)PCMC received BEST CITY award 0n 13th December From GOI for its best performance in JnNURM

    Pimpri Chinchwad at a GlanceArea under Green Cover: 27%Aual Bunndget (2012-2013): Rs. 2862 Crs.Credit Rating: AA+ (SO) by CRISIL Ratings (S&P)

  • Vibrant city in the state of Maharashtra, IndiaStrong industrial baseSmall & medium industrial units of about 6,000 Large industrial units of about 50Auto and ancillary industrial Hub

  • Presence of International IT Firms

  • Social and recreational facilitiesStrong Social Infrastructure with Municipal Hospitals and Dispensaries, Public Gardens, Libraries, Auditoriums, Play grounds etc.Strong educational infrastructure including Municipal Schools, Medical, Engineering, IT and Management institutes.

  • Population growthThe city has a population of about 1.7 millions growing over 7.2% p.a. (national average 2.1%) Growth is fuelled by prospects of economic activity, good quality of infrastructure services and strong connectivity to the industrial capital of India i.e. Mumbai

    Chart2

    26367

    39654

    98572

    251769

    520639

    1006417

    Population Growth of PCMC

    Year

    Population

    Population Growth

    Sheet1

    Census YearPopulation Growth of PCMCDecadal ChangeGrowth Rate (%)

    195126,367

    196139,65413,28750.39

    197198,57258,918148.58

    1981251,769153,197155.42

    1991520,639268,870106.79

    20011,006,417485,77893.3

    Sheet1

    Population Growth of PCMC

    Year

    Population

    Population Growth

    Sheet2

    Sheet3

  • Urban Sprawl Patterns & Future Growth Scenario - 2031NOTE: MAP NOT TO SCALEPune CityHinjewadi IT ParkTalwade IT ParkDehuTalgaonChakan New International AirportMumbai-Pune Exp WayProjected Population for PCMC 29 lakhs (CDP) in 2031

    StageYearArea (Sq. km)% IncreaseI199170.64-II 200187.6924.13III2007173.0797.37Scenario 12021288.3066.58Scenario 22031371.1028.72

  • Institutional Set-upKey Responsibilities

  • Institutional set upPimpri Chinchwad Municipal Corporation (PCMC) constituted in the year 1982 The body constitutes ofElected wing headed by MayorAdministrative wing headed by Municipal CommissionerWe manage about 181 sq.kms of area through 4 Ward officesWe have over 40 departments with a workforce of about 7500 employees

  • Institutional set upWe are fully e-governed CorporationWe have received International Organization of Standard (ISO) Certification (ISO 9001:2008) for Quality Management System in March 2012.

  • Responsible forArea planningInfrastructure planning, implementation and operation & maintenance of services in the areas ofWater Supply, Sewerage and Sanitation, Solid Waste Management, Roads and Transportation,Street lighting, Health and recreational facilities, Education (134 primary and 18 secondary schools)Preservation of natural heritage (river conservation), Development of housing facility for urban poor/ slums.

  • Vision To make Pimpri Chinchwad, a city of and for the next generation Economically vibrant, attracting top business houses And to meet the requirements of all its citizensA city to Live, Spend and Entertain

  • Key initiatives taken Promoting developmentCorridor densification along Bus Rapid Transit System (BRTS), leveraging TDR

    Providing infrastructure ahead of its timeImplementing Rs. 26000 Millions projects sanctioned by JNNURMProviding water securityInvestments in sanitation and waste management

    Making the city slum freeSlum rehabilitation and EWS housing to provide 32,000 houses

    E Initiatives for better governanceWi fi cityGIS based dynamic administrationWater Supply Total Project Cost(` in Millions)4987260002401SewerageSolid waste management7048032BRTS & purchase of city transport busesHousing for slums86311163Storm water drainage 92E-governanceInfrastructure Projects

  • PROJECTS EXECUTEDPune Mumbai RoadSubway at VallabhnagarIntersection at Finolex PimpriGrade Separator at Pimpri

  • INFORMATION OF BRTS PROJECT

  • BRTS PROJECTS IN PCMC AREAAUNDH RAWET ROAD Length = 14.50 Km. Tender Cost =191.40KALEWADI ROAD Length = 10.275 Km. Tender Cost =219.20NASHIK PHATA ROAD Length = 7.90 Km. Tender Cost =206.80PUNE MUMBAI ROAD Length = 11.90 Km. Tender Cost =120.74Total BRTS Corridor Length = 44.575 Km. First IntersectionSecond Intersection

  • OLD MUMBAI PUNE CORRIDOR (DAPODI TO BHAKTI SHAKTI) 12 KM

    AUNDH RAVET 14.5 KM

    NASHIK PHATA WAKAD 8 KM

    KALEWADI PHATA DEHU ROAD 10.5 KM

    Total Length = 45 km

    BRTS Phase- I Corridors

  • BRT SYSTEM

  • Cross Section of 45 m Wide BRTS Road

  • Principal elements for considerationConvenient boarding and alightingEfficient fare collectionComfortable and attractive stationsEasy safe signalized/dedicated approaches to Bus StationsModal integrationExcellence in customer service Bus Rapid Transit Bus Stations

  • Conceptual Layout

    BRTS STATIONS -60.0 X 4.0 M SIZE FOR BOTH SIDE DOCKING

  • Think Railway Stations, Use Bus Stations!

    BRT Bus Stations can give the same quality of service as Metro/Railway Stations to a large number of citizens across the city.

  • Hybrid BRT ! On & Off the CorridorRIGHT SIDE LEVEL BOARDING ON THE CORRIDOR LIKE METRO RAILLEFT SIDE STEPPED BOARDING OFF THE CORRIDOR ( OUTSIDE BRT CORRIDOR)

  • BRT station side entry from right side door

  • BUS STATION DESIGN AND COMPONENTS

  • PCMC, PIMPRI, PUNE

    ****This photo collage was prepared by Mr. Sudhir on behest of Mr. Poman*********New bus designs are transforming how we view buses. These high-quality, buses that resemble rail cars are going into new Bus Rapid Transit systems in North America and Europe. Such designs have generated a new slogan amongst city officials: Think rail, but use buses.***