2
TUGAS EKTEK KELAS B SEMESTER GENAP 2014/2015 Ketentuan pengerjaan tugas: 1. Kerjakan secara berkelompok (maksimal 5 orang per kelompok). 2. Kerjakan setiap soal pada satu lembar A4. 3. Silahkan gunakan kertas A4 bekas, dengan catatan: bagian yang berisikan pengerjaan tugas Anda tidak kotor. 4. Tugas dikumpulkan pada hari Rabu, tanggal 25 Maret 2015, paling lambat jam 7.45. Problem 1. A loan of $10,000 is made today at an interest rate of 15%, and the first payment of $3000 is made 4 years later. The amount that is still due on the loan after the first payment is most nearly? Problem 2. With an interest rate of 8% compounded semiannually, the value of a $1000 investment after 5 years is most nearly? Problem 3. A new alloy can be produced by two Processes: Process A and Process B. Process A will costs $200.000 to implement. The operating cost will be $10.000 per quarter with a salvage value of $25.000 after its 2-year life. Process B will have a first cost of $250.000, an operating cost of $15.000 per quarter, and a $40.000 salvage value after its 4-year life. The interest rate is 8% per year compounded monthly. By using present value analysis which process should be selected? Problem 4. At age 30 you invest $5,000 into a mutual fund. If the fund averages an 8% annual return, your investment is worth how much at age 55? Problem 5. You are saving up for a big investment in six years. You estimate it will take $14,500 to secure this investment. How much do you need to put into a savings account at the end of each year if the savings account earns 4%? Neglect taxes. Problem 6. A new bridge project is being evaluated at i = 5%. Recommend an alternative based on the capitalized cost for each Construction Cost Annual O&M Life (years) Concrete $ 50 million $ 250.000 70 Steel $ 40 million $ 1.000.000 50 Problem 7. You are buying your first car and need to borrow $16,000 over 5 years. If interest is 6%, what are your monthly payments? Problem 8. You are considering investing in a 5-yr CD (certificate of deposit) with an annual yield of 6.5% and monthly compounding. If you invest $5,000, your effective interest earned is most nearly ... Problem 9. An investment option is available with continuous compounding at 5% interest. If you invest $8,000 now, how much interest income will you earn if you cash out in 3.5 years?

Tugas Ekonomi Teknik Kelas B 2015.pdf

Embed Size (px)

Citation preview

  • TUGAS EKTEK KELAS B

    SEMESTER GENAP 2014/2015

    Ketentuan pengerjaan tugas:

    1. Kerjakan secara berkelompok (maksimal 5 orang per kelompok).

    2. Kerjakan setiap soal pada satu lembar A4.

    3. Silahkan gunakan kertas A4 bekas, dengan catatan: bagian yang berisikan pengerjaan tugas

    Anda tidak kotor.

    4. Tugas dikumpulkan pada hari Rabu, tanggal 25 Maret 2015, paling lambat jam 7.45.

    Problem 1. A loan of $10,000 is made today at an interest rate of 15%, and the first payment of $3000 is made 4 years later. The amount that is still due on the loan after the first payment is most nearly? Problem 2. With an interest rate of 8% compounded semiannually, the value of a $1000 investment after 5 years is most nearly? Problem 3. A new alloy can be produced by two Processes: Process A and Process B. Process A will costs $200.000 to implement. The operating cost will be $10.000 per quarter with a salvage value of $25.000 after its 2-year life. Process B will have a first cost of $250.000, an operating cost of $15.000 per quarter, and a $40.000 salvage value after its 4-year life. The interest rate is 8% per year compounded monthly. By using present value analysis which process should be selected?

    Problem 4. At age 30 you invest $5,000 into a mutual fund. If the fund averages an 8% annual return, your investment is worth how much at age 55? Problem 5. You are saving up for a big investment in six years. You estimate it will take $14,500 to secure this investment. How much do you need to put into a savings account at the end of each year if the savings account earns 4%? Neglect taxes. Problem 6. A new bridge project is being evaluated at i = 5%. Recommend an alternative based on the capitalized cost for each

    Construction Cost

    Annual O&M Life (years)

    Concrete $ 50 million $ 250.000 70

    Steel $ 40 million $ 1.000.000 50

    Problem 7. You are buying your first car and need to borrow $16,000 over 5 years. If interest is 6%, what are your monthly payments? Problem 8. You are considering investing in a 5-yr CD (certificate of deposit) with an annual yield of 6.5% and monthly compounding. If you invest $5,000, your effective interest earned is most nearly ... Problem 9. An investment option is available with continuous compounding at 5% interest. If you invest $8,000 now, how much interest income will you earn if you cash out in 3.5 years?

  • TUGAS EKTEK KELAS B

    SEMESTER GENAP 2014/2015

    Problem 10. A firm is choosing between machines that perform the same task in the same time. Assume the minimum attractive return is 8%. Which machine would you choose?

    Machine X Machine Y

    First cost $ 5.000 $ 8.000

    Estimated life, in years 5 12

    Salvage value 0 $ 2.000

    Annual maintenance cost 0 $ 150

    Problem 11. Wayward Airfreight, Inc. has asked you to recommend a new automatic parcel sorter. You have obtained the following bids:

    SHIP-R SORT-Of U-SORT-M

    First cost $ 184.000 $ 235.000 $ 180.000

    Salvage value $ 38.300 $ 44.000 $ 14.400

    Annual benefit $ 75.300 $ 89.000 $ 68.000

    Yearly O&M cost $ 21.000 $ 21.000 $ 12.000

    Useful life, in years 7 7 7

    (a) Construct a choice table for interest rates from 0% to 100%. (b) Using MARR of 15% and a rate of return analysis, which alternative, if any, should be

    selected? Problem 12. Three mutually exclusive alternatives are being studied.

    Year SHIP-R SORT-Of U-SORT-M

    0 -$ 20.000 -$ 20.000 -$ 20.000

    1 $ 10.000 $ 10.000 $ 5.000

    2 $ 5.000 $ 10.000 $ 5.000

    3 $ 10.000 $ 10.000 $ 5.000

    4 $ 6.000 0 $ 15.000

    (a) Construct a choice table for interest rates from 0% to 100%. (b) If the MARR is 12%, which alternative should be selected?

    Problem 13. The manager in a canned food processing plant is trying to decide between two labeling machines.

    Machine A Machine B

    First cost $ 15.000 $ 25.000

    O&M cost $ 1.600 $ 400

    Annual benefit $ 8.000 $ 11.000

    Salvage value $ 3.000 $ 6.000

    Estimated life, in years 7 $ 10

    Assume an interest rate of 12%. Use annual cash flow analysis to determine which machine should be chosen.