    Precast Concrete Pipe and BoxPrecast Concrete Pipe and Box

    Culverts for Storm WaterCulverts for Storm Water

    Management StructuresManagement Structures

    Tyson H Hicks, PE

    Rinker Materials

    www.concrete-pipe.org

  • 8/12/2019 Tuburi Din Beton Precomprimat

    2/53

    2

    Why rainwater harvest?Why rainwater harvest?

    NPDES Phase II Regulations

    Provides supplemental water for non-potable uses.

    Mitigates urban flooding.

    Recharge ground water.

    Provides sustainability

    www.concrete-pipe.org

  • 8/12/2019 Tuburi Din Beton Precomprimat

    3/53

  • 8/12/2019 Tuburi Din Beton Precomprimat

    4/53

  • 8/12/2019 Tuburi Din Beton Precomprimat

    5/53

    5

    nonnon--potable usespotable uses

    www.concrete-pipe.org

  • 8/12/2019 Tuburi Din Beton Precomprimat

    6/53

    6

    Provides supplemental water forProvides supplemental water for

    nonnon--po a e usespo a e uses

    www.concrete-pipe.org

  • 8/12/2019 Tuburi Din Beton Precomprimat

    7/53

    7

    ga es r an oo ngga es r an oo ng

    Many communities require some type of onsite

    ra nwater storage. orma y, t e storage s es gne to

    accommodate the difference between the pre and post

    develo ed rainfall runoff

    www.concrete-pipe.org

  • 8/12/2019 Tuburi Din Beton Precomprimat

    8/53

    8

    ga es r an oo ngga es r an oo ng

    systems utilized in stand alone or in

    conjunction with storm water ponds

    helps control flooding.

    www.concrete-pipe.org

  • 8/12/2019 Tuburi Din Beton Precomprimat

    9/53

    9

    Sustainability seeks to balance theSustainability seeks to balance theeconomic, social and economiceconomic, social and economicimpacts, recognizing that populationimpacts, recognizing that population

    rowth will continue. Sustainablerowth will continue. Sustainableinfrastructure builds the facilities andinfrastructure builds the facilities and

    structures we need today withoutstructures we need today without

    futurefuture

    www.concrete-pipe.org

  • 8/12/2019 Tuburi Din Beton Precomprimat

    10/53

    10

    SS Credit 6.1 & 6.2 : Storm Water Design, Quality ControlIntent: Limit disruption of natural water hydrology by reducingimpervious cover, increasing onsite infiltration, reducing oreliminating pollution from storm water runoff.

    WE Credit 1.1 & 1.2 : Water Efficient LandscapingIntent: Limit or eliminate the use of potable water or other

    near the project site for landscape irrigation.

    WE Credit 2.0 : Innovative Wastewater Technologies

    demand while increasing the local aquifer recharge.

    www.concrete-pipe.org

  • 8/12/2019 Tuburi Din Beton Precomprimat

    11/53

    11

    Precast Concrete Pipe and Box CulvertPrecast Concrete Pipe and Box Culvert

    Structures for Underground CisternsStructures for Underground Cisterns

    AdvantagesAdvantages: Land above has

    alternate uses.

    Pollution removal-

    SWQ-BMPs

    Maintainable

    ruc ura y oun Minimizes Risk

    www.concrete-pipe.org

  • 8/12/2019 Tuburi Din Beton Precomprimat

    12/53

    12

    DESIGN CONSIDERATIONSDESIGN CONSIDERATIONS

    Storage Volume Vs Available Space.

    Structural Design at Shallow Depths.

    .

    Access for Periodic Inspection and

    Maintenance. Design Life & Risk of Premature Failure?

    Cost per CF of storage.

    www.concrete-pipe.org

  • 8/12/2019 Tuburi Din Beton Precomprimat

    13/53

    13

    recas n ergroun ys ems a e enserecas n ergroun ys ems a e ense

    100 year design life

    o spec a ac requ rements.

    No floatation possibilities

    -

    Easily Constructed

    Environmentally Friendly- All NaturalMaterials-No chlorides,ethylene's,zincleaching into the soil.

    www.concrete-pipe.org

  • 8/12/2019 Tuburi Din Beton Precomprimat

    14/53

    14

    What makes our precast concrete pipe

    and box culvert sections advantageous?

    Simplicity

    Speed of Installation Local Suppliers Non- atented ASTM Specifications

    www.concrete-pipe.org

  • 8/12/2019 Tuburi Din Beton Precomprimat

    15/53

    15

    --

    Review:

    ys em oo pr n .

    Pipe Heights of Cover.

    Site Restraints- R.O.W.s,Property Lines, Building

    www.concrete-pipe.org

    Locations, Utilities, etc.

  • 8/12/2019 Tuburi Din Beton Precomprimat

    16/53

    16

    -

    One recast i e or Box Culvert canequal the area of 2-3 flexible pipes?

    Reduce number of i e runs andshorten lengths - (Savings onexcavation- backfilling-time of

    Installation-environmental impact). See if a precast box culvert would do

    www.concrete-pipe.org

    the trick.

  • 8/12/2019 Tuburi Din Beton Precomprimat

    17/53

    17

    --

    Review the i e la out.

    Review footprint and calculate the

    excavation and backfill savin s.

    This alone will result in significantsavin s.

    Inquire on pipe-system price.

    www.concrete-pipe.org

  • 8/12/2019 Tuburi Din Beton Precomprimat

    18/53

    18

    Example Project- Shows the

    vantage

    Project has two separate underground detention systems tostore storm water.

    Both systems were designed using 3 lines of 36 Flexible x104 with manifold/headers each end.

    www.concrete-pipe.org

  • 8/12/2019 Tuburi Din Beton Precomprimat

    19/53

    19

    - - x =

    Simplify the fittings

    Consider saddle-tee structuresEnd-Caps

    www.concrete-pipe.org

    .

  • 8/12/2019 Tuburi Din Beton Precomprimat

    20/53

    20

    Ste 2 & 3Ste 2 & 3

    Installation

    Savings

    17 x 5x 105=8,925 ft3

    select backfill

    with Flexible Pipe.

    70% additional

    trench width.

    11--60 Elliptical RCP60 Elliptical RCP

    www.concrete-pipe.org 10 x 3 x 112=3,360 ft3

    --

  • 8/12/2019 Tuburi Din Beton Precomprimat

    21/53

    21

    Franklin Site Photos

    www.concrete-pipe.org Outlet Structure with weir

  • 8/12/2019 Tuburi Din Beton Precomprimat

    22/53

    22

    3 Saddle Tees

    3 Precast Inlet/Outlet

    Structures

    www.concrete-pipe.org

  • 8/12/2019 Tuburi Din Beton Precomprimat

    23/53

    23

    Inlet Structure

    & Hydraulic Shape

    Forever.

    www.concrete-pipe.org

  • 8/12/2019 Tuburi Din Beton Precomprimat

    24/53

    24

    - -Franklin, TN

    Project has two separate underground BMPdetention systems to store storm water.

    Both systems were designed using 6 lines of 60 .

    Volume needed 35,300 ft3

    Limiting Factor was existing invert of existingstorm pipe in ROW that system would tie.

    This fixed invert meant 5 max pipe height (dia.)

    .

    www.concrete-pipe.org

  • 8/12/2019 Tuburi Din Beton Precomprimat

    25/53

    25

    The Original Layout of 60 Flexible PipeThe Original Layout of 60 Flexible Pipe

    Two I ent ca Systems Separate y Roa way

    6 Lines Each - 60 x 160

    www.concrete-pipe.org

  • 8/12/2019 Tuburi Din Beton Precomprimat

    26/53

    26

    Two S stems S lit b Road6 Lines 60 RCP x 152 EACH

    www.concrete-pipe.org

  • 8/12/2019 Tuburi Din Beton Precomprimat

    27/53

    27

    Franklin, TN

    www.concrete-pipe.org

  • 8/12/2019 Tuburi Din Beton Precomprimat

    28/53

    28

    MANWAY/INSPECTION PORTS

    www.concrete-pipe.org

    Equalization Piping

  • 8/12/2019 Tuburi Din Beton Precomprimat

    29/53

    29

    Manifold & Manway Access

    www.concrete-pipe.org

  • 8/12/2019 Tuburi Din Beton Precomprimat

    30/53

    30

    Horizontal La out Flexibilit Horizontal La out Flexibilit

    By USING BENDSBy USING BENDS

    BENDS PROVIDE Flexibility in layout

    Miss Trees!!!!

    Follow Critical

    www.concrete-pipe.org

  • 8/12/2019 Tuburi Din Beton Precomprimat

    31/53

    31

    a e w u eaa e w u ea

    www.concrete-pipe.org

  • 8/12/2019 Tuburi Din Beton Precomprimat

    32/53

    32

    The University of Kentucky Dorm Expansion

    www.concrete-pipe.org

  • 8/12/2019 Tuburi Din Beton Precomprimat

    33/53

    33

    Freedom Center Mall

    e eve opmen ro ec

    254, 680 gallons

    Rainwater used to flush toilets and

    irri ation

    www.concrete-pipe.org

  • 8/12/2019 Tuburi Din Beton Precomprimat

    34/53

    34

    www.concrete-pipe.org

  • 8/12/2019 Tuburi Din Beton Precomprimat

    35/53

    35

    www.concrete-pipe.org

  • 8/12/2019 Tuburi Din Beton Precomprimat

    36/53

    36

    www.concrete-pipe.org

  • 8/12/2019 Tuburi Din Beton Precomprimat

    37/53

    37

    www.concrete-pipe.org

    38

  • 8/12/2019 Tuburi Din Beton Precomprimat

    38/53

    38

    www.concrete-pipe.org

    39

  • 8/12/2019 Tuburi Din Beton Precomprimat

    39/53

    39

    Storm Drainage

    Culverts

    Bridges

    www.concrete-pipe.org

    40

  • 8/12/2019 Tuburi Din Beton Precomprimat

    40/53

    40

    Parkridge Hospital Phase 1

    a anooga,

    www.concrete-pipe.org

    3 cells of 6 x 3

    41

  • 8/12/2019 Tuburi Din Beton Precomprimat

    41/53

    41

    Boxes connected to each other

    All Holes/Weir Slots

    www.concrete-pipe.org

    Cut on Site. onnect w t equa zat on p pes.

    42

  • 8/12/2019 Tuburi Din Beton Precomprimat

    42/53

    42

    Parkridge Phase II

    www.concrete-pipe.org

    Twin 8 x 3

    43

  • 8/12/2019 Tuburi Din Beton Precomprimat

    43/53

    Detention System

    Ford Dealership

    Total of 312 feet.

    ,

    Double line of 6 x 4 (2 @ 156)

    Total installation time - 5 da s 2 days of excavation.

    1 da to re are sub rade & install

    bedding. 2 days to install & backfill.

    www.concrete-pipe.org

    44

  • 8/12/2019 Tuburi Din Beton Precomprimat

    44/53

    Knoxville--Total of 312 feet.ou e ne o x

    www.concrete-pipe.org

    45

  • 8/12/2019 Tuburi Din Beton Precomprimat

    45/53

    3-10 Pipe Connections For Flow Equalization

    www.concrete-pipe.org

    - anways e

    4 Endcaps, 1 with Outlet Control Flow Openings

    46

  • 8/12/2019 Tuburi Din Beton Precomprimat

    46/53

    Backfill Placed withBackfill Placed with

    g t ac neryg t ac nery

    All Boxes Set In 1 1/2 Days.

    www.concrete-pipe.org

    Backfill Completed By End Of 2nd Day, Ready For

    Pavement.

    47

  • 8/12/2019 Tuburi Din Beton Precomprimat

    47/53

    Westshore Yacht Club, Tampa FL

    ,

    256 feet of 10x4 RCB with removable tops

    www.concrete-pipe.org

    48

  • 8/12/2019 Tuburi Din Beton Precomprimat

    48/53

    www.concrete-pipe.org

    49

  • 8/12/2019 Tuburi Din Beton Precomprimat

    49/53

    www.concrete-pipe.org

    50

  • 8/12/2019 Tuburi Din Beton Precomprimat

    50/53

    www.concrete-pipe.org

    51

  • 8/12/2019 Tuburi Din Beton Precomprimat

    51/53

    ox u vertox u vert

    ,

    whereas pipe systems may require deeperburial. Design for shallow

    cover w t - oa ng.

    storage is competitive

    with other systems

    www.concrete-pipe.org

    52

  • 8/12/2019 Tuburi Din Beton Precomprimat

    52/53

    Why Use Concrete for Your

    Underground Detention System?

    ruc ura n egr y

    Maximize Land Use and Your Investment

    Always a Superior Choice to Flexible Pipe

    Reduce Financial Risk

    True Environmental Benefits

    www.concrete-pipe.org