tender_104_53215059c0a43.pdf

Embed Size (px)

Citation preview

  • 7/26/2019 tender_104_53215059c0a43.pdf

    1/8

    A SUPPLY

    Sl.

    No.Items Unit

    Provisional

    Quantity

    Rate in

    Rupees

    Amount in

    Rupees

    1Lattice-type towers (fabricated, galvanised steel) with stubs(Details in Apendix-A)

    MT 1139.4129 -

    2 Galvanised nuts & bolts, Washers,step bolts. (Apendix-A) MT 56.723 -

    3 Stub Template (Details in Apendix-A) MT 26.554 -

    4 Conductor, ACSR 'Panther' (al lowing 3% for sag and wastage) km 348.428 -

    5 Conductor accessories -

    a) Midspan compression joints. Nos 451 -

    b) Repair sleeves. Nos 124 -

    c) Vibration damper (stock-bridge type) for Tension locations Nos 1493 -

    d) P.G. Clamp (3 bolted) Nos 2124 -

    Total -

    6 Optical Power Ground Wire (OPGW) (allowing 3% for sag and

    wastage at joint)

    km 116.143 -

    7 OPGW accessories -

    a) Tension fittings Nos 476 -

    b) Suspension fittings Nos 10 -

    c) 24F Joint Box Nos 60 -

    d) Vibration Damper Nos 476 -

    e) Clamp assembly for Earthing wire Nos 476 -

    f) Structure attachment Clamp / Downlead clamp Nos 200 -

    g) Dead end clamp Nos 100 -

    Total -

    8 Disc insulators 120KN (Details in Appendix B) Nos 16360 -

    9 Hardware strain fittings

    a) Single Hardware strain fittings. (Details in Appendix B) Sets 1422 -

    b0 Double Hardware strain fittings. (Details in Appendix B) Sets 107 -

    Total -

    Total for supply -

    CONSTRUCTION OF 132kV S/C TRANSMISSION LINE FROM MELRIAT TO LUNGLEISCHEDULE OF ITEMS & PRICES

  • 7/26/2019 tender_104_53215059c0a43.pdf

    2/8

    B ERECTION

    Sl.No.Items of Works

    Unit

    Provisional

    QuantityRate in

    Rupees

    Amount in

    Repees

    1

    Earthwork for benching to get foundation width,level

    and site shapes and dressing to level (Appendix-C)a) Normal Soil cum 12470.652 -

    b) Hard Soil cum 4156.884 -

    c) Soft Rock cum 12470.652 -

    d) Hard Rock cum 12470.652 -

    Total -

    2

    Pit Excavation for foundation including Back filling

    and removal of surplus earth (Appendix -C)

    a) Normal Soil cum 4043.64 -

    b) Hard Soil cum 1347.88 -

    c) Soft Rock cum 4043.64 -

    d) Hard Rock cum 4043.64 -

    Total -

    3

    PCC work in foundatin in proportion 1:2:4 M20

    (Appendix -C) including supply of concreting

    materials, transportation up to tower location, mixing,

    placing ,leveling, shuttering curing etc cum 1792.092 -

    4

    Setting of stubs including transportation of

    template,stubs etc up to tower location

    a) B+0 Loc 61 -

    b) B+3 Loc 22 -

    c) B+6 Loc 8 -d) C+0 Loc 11 -

    e) C+3 Loc 1 -

    f) C+6 Loc 0 -

    g) S+0 Loc 56 -

    h) S+3 Loc 29 -

    i) S+6 Loc 48 -

    Total No 236 -

    5

    Erection of super structure including transportation

    of materials up to tower location.

    a) B+0 No 61 -

    b) B+3 No 22 -

    c) B+6 No 8 -

    d) C+0 No 11 -

    e) C+3 No 1 -

    f) C+6 No 0 -

    g) S+0 No 56 -

    h) S+3 No 29 -

    i) S+6 No 48 -

    Total No 236 -

  • 7/26/2019 tender_104_53215059c0a43.pdf

    3/8

    B ERECTION

    Sl.No.Items of Works

    Unit

    Provisional

    QuantityRate in

    Rupees

    Amount in

    Repees

    6

    Welding of Nuts & Bolts up to the bottom cross-arm

    level.

    a) B -type No 91 -b) C-type No 12 -

    c) S- type No 133 -

    Total No 236 -

    7 Punching of tower bolts as direreted by the owner Loc 236 -

    8

    Painting of tower with bituminous paint up to 3 metre

    from ground level. Loc 236 -

    9

    Stringing of power conductor including transportation

    of materials up to tower location,jungle clearance,laying, jointing, jumpering, fitting of insulator and

    accessories,stringing, tensioning,clamping etc ckm 112.76 -

    10

    Stringing of OPGW including transportation of

    materials up to tower location,jungle clearance,

    laying, jointing, fitting of accessories,stringing,

    tensioning,clamping etc ckm 112.76 -

    11

    Earthing of tower including supply of material,

    transportation up to tower location and erection

    a) Pipe earthing Nos 472 -

    b) Counterpoise earthing Nos 92 -

    Total -

  • 7/26/2019 tender_104_53215059c0a43.pdf

    4/8

    B ERECTION

    Sl.No.Items of Works

    Unit

    Provisional

    QuantityRate in

    Rupees

    Amount in

    Repees

    12 Supply and Installation / fixing of tower accessories

    a) Danger plate No 236 -b) Number Plate No 236 -

    c) Phase Plate (Red,yellow,&Blue) Set 236 -

    d) Anti-climbing device Set 236 -

    Total -

    13 Revetment works

    a) Dry stone revetment Cum 20 -

    b) Boulder soling Cum 20 -

    c) Brick masonry with cement mortar Cum 10 -

    d) Concrete revetment 1:2:4 Cum 10 -

    Total -

    Total for Erection -

    GRAND TOTAL (Rs) (A+B) -

  • 7/26/2019 tender_104_53215059c0a43.pdf

    5/8

    A. TOWER WEIGHT

    Structure Nuts&Bolts Structure Nuts&Bolts

    1 B - Type TowerStubs 91 203.76 5.04 18542.16 458.640

    Superstructure 91 2650.48 143.91 241193.68 13095.810

    3m extension 22 563.72 18.11 12401.84 398.420

    6m extention 8 1266.16 35.41 10129.28 283.280

    Total(kg) 282266.96 14236.150

    2 C - Type Tower

    Stubs 12 326.88 6.72 3922.56 80.640

    Superstructure 12 3574.26 164.4 42891.12 1972.800

    3m extension 1 746.92 22.63 746.92 22.630

    6m extention 0 1546.76 46.89 0 0.000

    Total(kg) 47560.6 2076.0703 S - Type Tower

    Stubs 133 480.62 5.70 63922.46 758.100

    Superstructure 133 4750.72 256.11 631845.76 34062.630

    3m extension 29 878.88 39.68 25487.52 1150.720

    6m extention 48 1840.2 79.354 88329.6 3808.992

    Total(kg) 809585.34 39780.442

    Total weight of tower structure (MT) 1139.4129 56.093

    B. WEIGHT OF STUB-TEMPLATE

    Structure Nuts&Bolts Structure Nuts&Bolts1 B - Type Tower

    B+0 10 415.44 14.82 4154.4 148.200

    B+3 3 479.56 21.97 1438.68 65.910

    B+6 1 588.6 23.24 588.6 23.240

    2 C - Type Tower

    C+0 2 487.07 23.72 974.14 47.440

    C+3 1 560.17 24.32 560.17 24.320

    C+6 0 655.40 23.96 0 0.000

    3 S - Type Tower

    S+0 13 815.68 14.10 10603.84 183.300

    S+3 3 933.64 14.10 2800.92 42.300

    S+6 5 1086.6 19.22 5433 96.100

    Total weight of template structure (MT) 26.554 0.631

    C. Total weight of Nuts&Bolts for both tower & stub-template(MT) 56.723

    Appendix -A

    Break-up of Tower Weight

    Sl.No Description of towerQty of

    tower

    Weight per tower(kg) Total weight(kg)

    Sl.No. Tower type

    Qty of

    template

    Weight per template(kg) Total weight(kg)

  • 7/26/2019 tender_104_53215059c0a43.pdf

    6/8

    A. Disc Insulator 120kN

    Sl.No Description Unit Qty or Amt

    1 2 3 4

    1 No. of Disc per string Nos 10

    2 No, of strings per tower Nos 6

    3 No. of towers Nos 236

    4 No. of Disc for the line Nos 14220

    5 Assuming 15% for double tension assembly. Nos 2140

    6 No.of disc insulator required Nos 16360

    2. Hardware strain fittings

    Sl.No Description Unit Qty or Amt

    1 2 3 4

    1 No.Single Hardware sets per tower Nos 6

    2 No. of towers Nos 236

    3 No. of single hardware sets Nos 1422

    4 No.of double hardware sets (approx) Nos 107

    Appendix- B

    Insulators and Hardware Sets

  • 7/26/2019 tender_104_53215059c0a43.pdf

    7/8

    A. VOLUME OF FOUNDATION CONCRETE (P.C.C)

    12 3

    4 5

    1 B - Type 91 5.256 478.296

    2 C - Type 12 7.073 84.876

    3 S - Type 133 9.240 1228.92

    Volume of foundation concrete : 1792.092

    B. VOLUME OF EARTH EXCAVATION FOR PITS

    1 2 3 4 51 B - Type 91 45.864 4173.624

    2 C - Type 12 55.016 660.192

    3 S - Type 133 65.000 8645.000

    13478.816

    B. VOLUME OF EARTH EXCAVATION FOR BENCHING

    1 2 3 4 5

    1 B - 0 61 124.22 7577.42

    2 B+3 22 145.62 3203.64

    3 B+ 6 8 169.26 1354.08

    4 C + 0 11 151.21 1663.31

    5 C+ 3 1 177.56 177.56

    6 C+6 0 206.04 0

    7 S - 0 56 177.56 9943.36

    8 S + 3 29 208.15 6036.359 S + 6 48 241.94 11613.12

    Total 236 41568.84

    Appendix - C

    Volume of concrete and earth excavation

    Sl. No.

    Sl. No No. of Location

    Type of Tower No. of locationsVol.of concrete

    per locs(cum)

    Total concrete

    volume(cum)

    Type of Tower

    Sl. No Type of Tower No. of LocationVolume per

    location (cum)

    Total Volume

    (cum)

    Volume per

    location (cum)

    Toptal Volume

    (cum)

  • 7/26/2019 tender_104_53215059c0a43.pdf

    8/8

    C. EARTH EXCAVATION VOLUME AND ROCK CLASSIFICATION

    Sl. NoBenching volume

    (cum)

    Volume of Pit

    (cum)

    1 3 4

    1 Normal Soil 12470.652 4043.64482 Hard Soil 4156.884 1347.8816

    3 Soft Rock 12470.652 4043.6448

    4 Hard Rock 12470.652 4043.6448

    2

    Rock classification