23
SOLVING TRANSPORT NEEDS.

SOLVING TRANSPORT NEEDS. - LCS Cable Cranes Cable Cranes-ENG-SPA.pdf · 08 LCS SYSTEMS OVERCOMING CRITICAL TERRAIN WITH HEAVY LOADS. Construction projects and building sites in demanding

  • Upload
    vandien

  • View
    216

  • Download
    0

Embed Size (px)

Citation preview

Page 1: SOLVING TRANSPORT NEEDS. - LCS Cable Cranes Cable Cranes-ENG-SPA.pdf · 08 LCS SYSTEMS OVERCOMING CRITICAL TERRAIN WITH HEAVY LOADS. Construction projects and building sites in demanding

SOLVING TRANSPORT NEEDS.

Page 2: SOLVING TRANSPORT NEEDS. - LCS Cable Cranes Cable Cranes-ENG-SPA.pdf · 08 LCS SYSTEMS OVERCOMING CRITICAL TERRAIN WITH HEAVY LOADS. Construction projects and building sites in demanding

WHERE THE GOING IS TOUGH, LCS TAKES OVER.

SI EL TERRENO SE VUELVE DIFÍCIL, ES EL TURNO DE LCS.

Page 3: SOLVING TRANSPORT NEEDS. - LCS Cable Cranes Cable Cranes-ENG-SPA.pdf · 08 LCS SYSTEMS OVERCOMING CRITICAL TERRAIN WITH HEAVY LOADS. Construction projects and building sites in demanding

02

04 MISSION

06 COMPANY

08 SYSTEMS

14 PIPELINES

18 SOLUTIONS

20 SERVICE

24 QUALITY & SAFETY

28 ENVIRONMENT

30 INNOVATION

32 GLOBAL EXPERIENCE

Page 4: SOLVING TRANSPORT NEEDS. - LCS Cable Cranes Cable Cranes-ENG-SPA.pdf · 08 LCS SYSTEMS OVERCOMING CRITICAL TERRAIN WITH HEAVY LOADS. Construction projects and building sites in demanding

04

LCSMISSION

Christoph Ludescher and his core teamChristoph Ludescher y su equipo principal

Huge dams and penstocks in narrow Alpine valleys and the Rocky

Mountains, pipelines over steep mountain ranges, in deserts or

running through rain forests, bridges over rivers and marshlands,

cableways and mountain stations in places you can only reach by

air – these are all images that generate amazement and raise the

question: how is it possible to build there?

THE ROPE PROVIDED THE SOLUTION.

For over 25 years, LCS has been driven by complex transportation challenges

and a fascination for unconventional construction sites. This has led us to

develop new, innovative solutions constantly.

We design and construct secure ropeways to make the impossible possible:

bring heavy loads to locations which are difficult to reach – without impacting

the environment. That way, we make it possible for our customers to erect and

operate construction sites at locations nobody could have imagined.

Christoph Ludescher, Founder and CEO

Gigantescos diques y tuberías a presión en angostos valles alpinos y en las

Montañas Rocallosas, oleoductos que atraviesan escarpadas y rocosas ca-

denas montañosas, en desiertos o selvas tropicales, puentes sobre ríos y

regiones pantanosas, funiculares y estaciones de montaña en lugares a los

que en verdad solo se accede desde el aire: todas imágenes que despiertan

asombro y suscitan la pregunta ¿cómo se hizo para construir allí?

EL CABLE DIO LA SOLUCIÓN.

El desafío que presentan los problemas complejos de transporte y la fascina-

ción de obras no convencionales son desde hace 25 años el motor de LCS

que nos conduce una y otra vez a soluciones nuevas e innovadoras.

Diseñamos y construimos funiculares seguros que hacen posible lo imposi-

ble: llevar grandes cargas a lugares de difícil acceso, y sin grandes intromisio-

nes en la naturaleza. De este modo posibilitamos a nuestros clientes hacer y

explotar obras allí donde nadie se lo puede imaginar.

Christoph Ludescher, fundador y gerente

Page 5: SOLVING TRANSPORT NEEDS. - LCS Cable Cranes Cable Cranes-ENG-SPA.pdf · 08 LCS SYSTEMS OVERCOMING CRITICAL TERRAIN WITH HEAVY LOADS. Construction projects and building sites in demanding

06

LCSCOMPANY

AN AUSTRIAN COMPANY WITH TRADITION.

LCS was founded by Christoph Ludescher in 1989 in Vorarlberg, which

remains the company seat to this day.

The origins lay in the timber industry and transportation of timber across diffi-

cult terrain using mobile ropeways. The activities of LCS quickly became more

diverse – from the mid-1990s, with experience, motivation and innovative

drive, LCS was able to erect material cableways to transport heavy loads for

pipeline and dam construction as well as mountain construction sites among

others. Today, LCS is part of the LCS Holding, a group of companies special-

ized in innovative solutions and machinery for challenging material handling

in critical situations.

WORLD LEADER IN CHALLENGING TERRAIN.

Using innovative ideas based on the highest technological standards and the

know-how from 25 years in ropeway technology, LCS creates individual trans-

port solutions to meet exceptional challenges.

As a world leader in all-terrain transportation systems, LCS carries out a wide

range of projects on the basis of comprehensive project management and

with a dynamic and highly-motivated team. The company installs cable crane

systems and material ropeways that make sustainable and environmentally

sound transportation possible.

UNA EMPRESA AUSTRÍACA CON TRADICIÓN.

LCS fue fundada en 1989 por Christoph Ludescher en Vorarlberg, donde

sigue estando hasta el día de hoy la sede de la firma.

Los orígenes de la empresa se hallan en la industria maderera y el transporte

de madera por medio de grúas de cable en zonas de difícil acceso. Las ac-

tividades de LCS se diversificaron rápidamente; la experiencia, la motivación

y las ansias de innovar contribuyeron a que LCS fabricara, ya a mediados de

la década de 1990, grúas de cable estándar capaces de transportar cargas

pesadas la construcción de oleoductos, diques y obras de minería. Hoy día,

LCS forma parte de a LCS Holding, un grupo de empresas especializadas en

soluciones y maquinaria innovadora para el manejo de cargas pesadas en

situaciones complejas y desafiantes.

LÍDERANDO A NIVEL MUNDIAL ENTERRENOS DIFÍCILES.

Gracias a ideas innovadoras basadas en los estándares tecnológicos más

elevados y el know-how de 25 años de tecnología de funiculares, LCS crea

soluciones de transporte para desafíos especiales.

LCS, empresa líder mundial en sistemas de transporte para terrenos difíciles,

desarrolla, con un completo management de proyectos y un equipo dinámico

y motivado, los más diferentes proyectos y construye grúas de cable y funi-

culares para materiales que permiten un transporte sostenible y cuidadoso

del medio ambiente.

Page 6: SOLVING TRANSPORT NEEDS. - LCS Cable Cranes Cable Cranes-ENG-SPA.pdf · 08 LCS SYSTEMS OVERCOMING CRITICAL TERRAIN WITH HEAVY LOADS. Construction projects and building sites in demanding

08

LCSSYSTEMS

OVERCOMING CRITICAL TERRAINWITH HEAVY LOADS.

Construction projects and building sites in demanding terrain are often faced

with the challenge of transporting loads weighing several tons to a desired

location; a challenge which is almost impossible to meet.

However, huge loads can be transported with extreme precision and with the

greatest possible safety in the air using cable cranes, thereby overcoming a

wide range of terrain-specific problems.

UNIMAGINED POSSIBILITIES.

The most diverse situations can be mastered by LCS systems:

· Lay pipes for pipeline and penstock construction

· Transport construction plant, construction materials and personnel

(limited manpower transportation) through steepest terrain, to construction

sites on mountains or in valleys with no access roads

· Load and unload large volumes accurately and efficiently for dam or

bridge construction

· Cross rivers or lakes

· Transport loads over trees

· Supply construction sites continuously and under all climatic conditions

· Choose direct routes for pipelines over mountainous and hilly countryside

SUPERAR TERRENOS INTRANSITABLES CONCARGAS PESADAS

Los proyectos de construcción y las obras en terrenos intransitables suelen

encontrarse con el desafío casi insoluble de transportar toneladas de carga

al lugar que se desea.

Pero es posible transportar grandes cargas colgando en el aire con extrema

precisión y máxima seguridad. Se encuentran así las soluciones especiales

para cada uno de los problemas que se presentan.

POSIBILIDADES INSOSPECHADAS.

Por medio de los sistemas de grúas de cable LCS pueden manejarse las más

diversas situaciones:

· Tendido de caños en la construcción de oleoductos y tuberías a presión

· Transporte de máquinas para construcciones, material para construcciones

y personal (transporte de personal) por los terrenos más escarpados y a

sitios de obra sin acceso en montañas o valles.

· Carga y descarga precisa y eficiente de masas enormes para construcción

de diques o puentes

· Cruce de ríos o lagos

· Transporte de cargas por sobre árboles

· Suministro continuo en todas las condiciones climáticas

· Rutas directas para la construcción de oleoductos a través de montañas y

terreno montuoso

Page 7: SOLVING TRANSPORT NEEDS. - LCS Cable Cranes Cable Cranes-ENG-SPA.pdf · 08 LCS SYSTEMS OVERCOMING CRITICAL TERRAIN WITH HEAVY LOADS. Construction projects and building sites in demanding

10Position pipes along the ROW in inaccessible terrain with the greatest possible precision.Posicionamiento preciso de los tubos a lo largo del oleoducto en terreno intransitable.

Highest capacity, great accuracy in all three spatial axes at the same time with parallel-cranes.Máxima capacidad y precisión simultáneamente en los tres ejes con grúas paralelas.

PIPELINE CONSTRUCTIONCONSTRUCCIÓN DE DUCTOS

DAM CONSTRUCTIONCONSTRUCCIÓN DE DIQUES

Page 8: SOLVING TRANSPORT NEEDS. - LCS Cable Cranes Cable Cranes-ENG-SPA.pdf · 08 LCS SYSTEMS OVERCOMING CRITICAL TERRAIN WITH HEAVY LOADS. Construction projects and building sites in demanding

12

MOUNTAIN CONSTRUCTION SITESOBRAS DE MINERÍA

BRIDGE CONSTRUCTIONCONSTRUCCIÓN DE PUENTES

Overcoming inaccessible terrain.Superación de terrenos inaccesibles.

Make impossible construction sites in the mountains possible.Obras imposibles hechas realidad en montañas.

High-performance cable-crane installations over lakes, rivers and marshland.Potentes grúas de cable sobre lagos, ríos y zonas pantanosas.

Page 9: SOLVING TRANSPORT NEEDS. - LCS Cable Cranes Cable Cranes-ENG-SPA.pdf · 08 LCS SYSTEMS OVERCOMING CRITICAL TERRAIN WITH HEAVY LOADS. Construction projects and building sites in demanding

14

LCSPIPELINESWWW.LCS-PIPELINES.COM

THE DIVISION FOR PIPELINE CONSTRUCTION –A CORE COMPETENCE OF LCS.

Many of the international projects we have completed are related to the

construction of pipelines. In steep and demanding terrain, the large machin-

ery which is normally used would soon reach its limits. Cable cranes provide

the possibility to choose direct routes, thereby saving costs. The use of heavy

machinery in critical terrain can be avoided and thus a higher level of safety

achieved.

EXPERTS FOR PIPELINE CONSTRUCTIONIN STEEP AREAS.

Our LCS pipeline division is specialized in the complete construction of pipe-

lines for critical and steep sections of the route. For these so-called “special

points” we provide a comprehensive service: logistics, blasting operations,

trench excavation with special machinery, pipe laying, welding, backfilling and

re-naturalization.

Through the expertise in pipeline construction which LCS has acquired, the

cable crane systems have been continually adapted, specialized and devel-

oped to meet exceptional challenges. They are distinguished by their great

versatility which can be fully exploited for pipeline construction. Separately

controlled lifting systems make it possible to lay pipes, position accurately and

weld them together without additional special equipment, as well as backfill

with covering material.

LA DIVISIÓN PARA CONSTRUCCIÓN DEDUCTOS – UNA ESPECIALIDAD DE LCS.

Muchos de nuestros proyectos internacionales realizados se relacionan con

la construcción de oleoductos en terrenos escarpados. Las grandes máqui-

nas llegan, tal como se las suele usar, rápidamente a sus límites. Con sis-

temas de grúas de cable pueden elegirse caminos directos y, de esa forma,

reducir significativamente los costes. Puede evitarse el uso de maquinaria

pesada en terrenos intransitables, con lo cual se logra una mayor seguridad.

EXPERTOS PARA LA CONSTRUCCIÓN DEDUCTOS EN TERRENOS ESCARPADOS.

Nuestra división LCS Pipelines se especializa en la construcción entera de

tuberías en tramos de gran exigencia. Ofrecemos servicios completos para

los llamados “special points”: logística, trabajos con explosivos, excavación

de zanjas con equipos especiales, tendido de tuberías, soldadura y renatu-

ralización.

Gracias a la experiencia que LCS ha hecho en construcción de ductos, los

sistemas de grúas de cable empleados pueden lograr una adaptación cada

vez mejor y adaptados a exigencias especiales. Se destacan por su gran ver-

satilidad, la cual puede ser plenamente aprovechada en la construcción de

oleoductos. Empleando sistemas de elevación controlados por separado es

posible tender tubos, posicionarlos con máxima precisión, soldarlos sin equi-

pos especiales adicionales, y cubrirlos finalmente con material.

Page 10: SOLVING TRANSPORT NEEDS. - LCS Cable Cranes Cable Cranes-ENG-SPA.pdf · 08 LCS SYSTEMS OVERCOMING CRITICAL TERRAIN WITH HEAVY LOADS. Construction projects and building sites in demanding

162. Trenching-works2. Abertura de fosas

3. Pipe-fitting3. Posicionamiento de tubos

4. Welding4. Soldadura

6. Padding6. Llenado

5. Sandbag Barriers5. Barreras de sacos de arena

1. Logistics1. Logística

7. Reinstatement7. Conservación

PIPELINE CONSTRUCTIONCONSTRUCCIÓN DE OLEODUCTOS

Page 11: SOLVING TRANSPORT NEEDS. - LCS Cable Cranes Cable Cranes-ENG-SPA.pdf · 08 LCS SYSTEMS OVERCOMING CRITICAL TERRAIN WITH HEAVY LOADS. Construction projects and building sites in demanding

18

LCSSOLUTIONS

FAST, EFFICIENT AND FLEXIBLE SOLUTIONS.

Great flexibility and versatility as well as accurate and individual design enable

a perfect adaptation to the respective requirements, the operating sector and

the terrain. As a result, the cable crane systems can be utilized in a variety of

ways. Among others, they can:

· run straight

· follow curves (ropeways with horizontal bends)

· cover areas applying moveable and slewing supports

(parallel, radial and slewing cable cranes)

· be approved for limited passenger traffic

HIGHEST PERFORMANCE.

· over 3,000 m length

· over 20 t payload

· up to 7 m/s transporting speed

· safe and accurate loading and unloading along the ropeway or

the covered area

· fast availability for temporary transportation projects due to

easy erection and dismantling

SOLUCIONES RÁPIDAS, EFICIENTES Y FLEXIBLES.

La gran flexibilidad y disponibilidad, y el diseño preciso y específico permiten

una perfecta adaptación a las necesidades, el ámbito de aplicación y el terre-

no. De ello resultan diversos enfoques de solución y propiedades de las grúas

de cable. Estas pueden:

· ir en vía recta,

· seguir curvas (grúas de cable con curvas),

· cubrir superficies mediante soportes móviles y giratorios

(grúas de cable paralelas, radiales y giratorias),

· ser aprobadas para un tráfico limitado de personas.

PRESTACIONES INSUPERABLES.

· longitud superior a 3.000 m

· más de 20 t de carga útil

· hasta 7 m/s de velocidad de transporte

· carga y descarga segura y precisa a lo largo de la guía de cable

o de la superficie cubierta

· rápida disponibilidad para proyectos temporales de transporte

gracias a un montaje y desmontaje sencillos

Cross spaces in lofty heights.Cruzando a grandes alturas.

Powerful power units with over 650 hp.Potente propulsión de más de 650 hp.

Following the curve directly to the destination.Siguiendo la curva, directo a destino.

Large diameter pipes (125”) in steep and rocky terrain.Tubo grande (125”) en terreno escarpado y rocoso.

Page 12: SOLVING TRANSPORT NEEDS. - LCS Cable Cranes Cable Cranes-ENG-SPA.pdf · 08 LCS SYSTEMS OVERCOMING CRITICAL TERRAIN WITH HEAVY LOADS. Construction projects and building sites in demanding

20

LCSSERVICE

COMPREHENSIVE SERVICE.

We utilize our know-how in designing solutions for transportation problems

and constructing customized plants. We offer an individual, comprehensive

and optimized service package: from the analysis of the project through the

consultation process and project planning to the actual design and construc-

tion of the cableway system, its sale, delivery, installation, commissioning and

operation.

PROFESSIONAL PROJECT MANAGEMENT.

LCS incorporates the numerous aspects of erecting the cable crane system

into an efficient project management structure to ensure effective and trans-

parent activities.

Competent project managers and direct contact persons provide a simple

handling process for our customers. LCS is a reliable partner who provides

and guarantees security.

SERVICIO COMPLETO.

Empleamos nuestro know-how en el diseño de soluciones para problemas

de transporte y en la construcción de plantas según los requerimientos de

nuestros clientes. Proveemos un paquete individual, completo y optimizado

de servicios: desde el análisis del proyecto, pasando por el asesoramiento,

la planificación del proyecto y el diseño de la grúa de cable, hasta la venta, la

entrega, el montaje, la puesta en servicio y el manejo de la instalación.

GESTIÓN DE PROYECTOS PROFESIONAL.

Con una tramitación bien organizada, LCS aúna los numerosos aspectos que

deben tenerse en cuenta en la construcción de una grúa de cable, y garantiza

procesos eficientes y transparentes.

Competentes directores de proyectos e interlocutores directos posibilitan una

sencilla tramitación para nuestros clientes. LCS es un socio confiable que

ofrece y garantiza seguridad.

Page 13: SOLVING TRANSPORT NEEDS. - LCS Cable Cranes Cable Cranes-ENG-SPA.pdf · 08 LCS SYSTEMS OVERCOMING CRITICAL TERRAIN WITH HEAVY LOADS. Construction projects and building sites in demanding

22

ENVIRONMENTALLY FRIENDLY, EFFICIENT, SAFE AND SIMPLE TO OPERATE.WITH OUR CABLE CRANE SYSTEMS WE SOLVE THE MOST COMPLEX TRANSPORTATION PROBLEMS.Christoph Ludescher, Founder and CEO

MANEJO EFICIENTE, SEGURO, SENCILLO Y CUIDADOSO DEL MEDIO AMBIENTE.CON NUESTRAS GRÚAS DE CABLE SOLUCIONAMOS COMPLEJOS PROBLEMAS DE TRANSPORTE.Christoph Ludescher, fundador y gerente

Page 14: SOLVING TRANSPORT NEEDS. - LCS Cable Cranes Cable Cranes-ENG-SPA.pdf · 08 LCS SYSTEMS OVERCOMING CRITICAL TERRAIN WITH HEAVY LOADS. Construction projects and building sites in demanding

24

LCSQUALITY & SAFETY

QUALITY AND SAFETY AS A MAXIM.

It is our principle to treat the health and safety of all employees and persons

involved at the construction site with top priority and therefore focus on the

implementation of safety and quality standards.

All components and machinery utilized by us are state-of-the-art, conform to

the highest standards (CE standards and O.I.T.A.F. guidelines) and are also

assessed in our test centres. As a result, LCS is able to guarantee safe and

trouble-free operation.

HIGH STANDARDS OF QUALITY AT ALL LEVELS.

However, we don’t just focus on technical progress, but also on the aware-

ness of all employees to comply with the high demands of our international

clientele.

The quality of our service and results of our efforts – from project managers to

assembly teams and operators – is of great importance to LCS.

CALIDAD Y SEGURIDAD COMO FUNDAMENTOS.

La salud y la protección de los empleados y de las personas involucradas en

la obra son una prioridad para nosotros. Damos el máximo valor a la imple-

mentación de normas de seguridad y calidad.

Todos los componentes y máquinas usados responden a las últimas tec-

nologías y a los máximos estándares (normas CE y directivas OITAF) y son,

además, testeadas en nuestras estaciones de prueba. De esta forma, LCS

garantiza un servicio continuo, impecable y seguro.

ALTOS ESTÁNDARES DE CALIDAD EN TODOSLOS PLANOS.

Sin embargo, no se apuesta solo al progreso técnico sino también a la acción

consiente de todo el personal para estar a la altura de las elevadas exigencias

de nuestro grupo de clientes internacionales.

La calidad de nuestro servicio y el resultado de nuestro trabajo –de los direc-

tores de proyectos pero también de montadores y obreros– es una prioridad

de LCS.

Page 15: SOLVING TRANSPORT NEEDS. - LCS Cable Cranes Cable Cranes-ENG-SPA.pdf · 08 LCS SYSTEMS OVERCOMING CRITICAL TERRAIN WITH HEAVY LOADS. Construction projects and building sites in demanding

26

Page 16: SOLVING TRANSPORT NEEDS. - LCS Cable Cranes Cable Cranes-ENG-SPA.pdf · 08 LCS SYSTEMS OVERCOMING CRITICAL TERRAIN WITH HEAVY LOADS. Construction projects and building sites in demanding

28

LCSENVIRONMENT

ENVIRONMENTALLY COMPATIBLE, SUSTAINABLEAND ECONOMICAL.

While simultaneously providing the greatest efficiency, cable cranes manage

to impact the environment as little as possible. Extensive and above all cost-in-

tensive road construction with negative environmental impact can be avoided

by using a material ropeway.

LCS systems are ideal for critical areas that are subject to strict environmen-

tal regulations but have to be crossed or in which construction has to take

place. In general a material ropeway only requires a route of 6 – 8 m along the

pipeline; it is installed directly above the planned route of the pipeline, which

facilitates easy laying of the pipes.

CONSCIOUS ACTION.

Sustainability is an important concern for LCS. We design and construct our

systems to be as environmentally friendly as possible without trading in ef-

ficiency, by utilizing machinery with state-of-the-art diesel engines with the

lowest possible emissions and electric powertrains.

CUIDADO DEL MEDIO AMBIENTE,SUSTENTABILIDAD Y AHORRO.

Los sistemas de grúas de cable LCS logran, a pesar de su máxima eficiencia,

minimizar las intervenciones en el medio ambiente y la naturaleza. Utilizando

grúas de cable estándar puede evitarse la construcción de carreteras, que

causa impacto en la naturaleza y es especialmente costosa.

Las grúas de cable son ideales para zonas críticas con grandes restricciones

ambientales y que, no obstante, deben ser cruzadas y en las que debe cons-

truirse. En la construcción de oleoductos, una grúa de cable estándar puede

correr generalmente por un ancho de traza de 6–8 m a lo largo del oleoducto

directamente por sobre la ruta planeada para el oleoducto, con lo cual resulta

sencillo tender la tubería.

ACCIÓN CONSCIENTE.

La sustentabilidad es una prioridad de LCS. Planificamos nuestras instala-

ciones de la manera más ecológica posible sin perder por ello eficiencia,

utilizando máquinas con los más modernos motores diésel que minimizan los

desechos de gas, y motores eléctricos.

Page 17: SOLVING TRANSPORT NEEDS. - LCS Cable Cranes Cable Cranes-ENG-SPA.pdf · 08 LCS SYSTEMS OVERCOMING CRITICAL TERRAIN WITH HEAVY LOADS. Construction projects and building sites in demanding

30

LCSINNOVATION

INNOVATION AS AN INTRINSIC PART OF LCS.

For LCS, new ideas and developments are the key to successfully meeting

diverse challenges in transportation.

We are constantly searching for the best solutions for our customers and are

therefore in a permanent process of innovation. Together with our partners,

the best in the industry, we pursue permanent product development. In doing

so, we rely on cutting-edge technology, qualified personnel and above all the

dialogue with our customers.

Only in this way, we can be sure of continuing to provide the best solutions for

our customers in the future.

INNOVACIÓN COMO PARTE DE LCS.

Las ideas y los perfeccionamientos novedosos son para LCS la clave para

superar con éxito diversos desafíos de transporte.

Estamos continuamente en la búsqueda de las mejores soluciones para

nuestros clientes, con lo que nos encontramos en un permanente proceso

de innovación. Junto con nuestros socios, los mejores del sector, nos de-

dicamos a un desarrollo constante de productos. Para ello apostamos a la

tecnología más moderna, un personal cualificado y, sobre todo, al diálogo

con nuestros clientes.

Solo de esa manera podemos garantizar también en el futuro las mejores

soluciones para nuestros clientes.

NEW TECHNOLOGIES RUNNERS UP AWARD

LCS Cable Cranes was awarded a BP sponsored prize for

innovation by the International Pipe Line & Offshore Contractors

Association IPLOCA.

LCS Cable Cranes ha recibido de la IPLOCA

(International Pipe Line & Offshore Contractors Association)

una distinción por sus innovaciones creada por la BP.

Page 18: SOLVING TRANSPORT NEEDS. - LCS Cable Cranes Cable Cranes-ENG-SPA.pdf · 08 LCS SYSTEMS OVERCOMING CRITICAL TERRAIN WITH HEAVY LOADS. Construction projects and building sites in demanding

32

LCSGLOBAL EXPERIENCEPROJECTS IN OVER 20 COUNTRIES ON 5 CONTINENTS.PROYECTOS EN MÁS DE 20 PAÍSES EN 5 CONTINENTES.

Selections of projects Selección de proyectos

OCP PIPELINE (EC)

Payload: 4.0 t / Total Lenght: 11,000 m

11 Ropeways (60° slopes) with curves in cloud-forest

Carga útil: 4,0 t / longitud total: 11.000 m

11 grúas de cable con curvas con inclinación de 60°

BEAR CREEK HYDRO-POWER PLANT (CA)

Payload: 16.0 t / Total Lenght: 1,400 m

Heavy-load ropeway incl. limited manpower transport

Carga útil: 16,0 t / longitud total: Teleférico para

material pesado con transporte de personal limitado

ZAWTIKA ONSHORE PIPELINE (MM)

Payload: 8.0 t / Total Lenght: 6,000 m

Complete pipeline-construction at special points

Carga útil: 8,0 t / longitud total:

Servicio completo en secciones especiales de 6.000

EAST-WEST PIPELINE (IN)

Payload: 12 t / Total Lenght: 1,200 m

Very steep ropeway (67°) and re-instatement works

Carga útil: 12 t / longitud total: 1.200 m

Grúa empinada (67º) y tareas de conservación

RIO WELE BRIDGE (GQ)

Payload: 9.0 t / Total Lenght: 300 m

Cable crane for a bridge-construction in marshland

Carga útil: 9,0 t / longitud total: 300 m

Para la construcción de un puente en zona pantanosa

TAMAZUNCHALE GAS-PIPELINE (MX)

Payload: 6.0 t / Total Lenght: 800 m

Cable crane for a gas-pipeline in 70° steep terrain

Carga útil: 6,0 t / longitud total: 800 m

Grúa de cable en una zona con pendiente de 70°

MARTIRANO – MORANO CALABRO (IT)

Payload: 12.0 t / Total Lenght: 900 m

Cable crane running parallel to a gas-pipeline

Carga útil: 12,0 t / longitud total

Grúas de cable paralela a un gasoducto ya existente

HELESCE DAM (HR)

Payload: 9.0 t / Total Lenght: 270 m

Maneuverable parallel-crane for a dam-construction

Carga útil: 9,0 t / longitud total: 270 m

Grúa paralela móvil para la construcción de un dique

FANSIPAN CABLECAR (VN)

Payload: 5.0 t / Total Lenght: 7.250 m

4 Ropeways in a row to construct a cable car

Carga útil: 5,0 t / longitud total: 7.250 m

4 instalaciones para la construcción de un funicular

HYDRO-POWER PLANT KLL2015 (CH)

Payload: 7.0 t / Total Lenght: 2,200 m

Cable crane for a hydro-power plant construction

Carga útil: 7,0 t / longitud total: 2.200 m

Funicular para construir una central hidroeléctrica

SOCHI SKI RESORT (RU)

Payload: 6.0 t / Total Lenght: 6,000 m

3 ropeways for constructions for Sochi 2014

Carga útil: 6,0 t / longitud total: 6.000 m

3 sistemas para instalaciones para Sochi 2014

OBERVERMUNTWERK II (AT)

Payload: 20.0 t / Total Lenght: 2.600 m

Enables large scale construction site during winter

Carga útil: 20,0 t / longitud total: 2.600 m

Permite la construcción también en invierno

HYDRO-POWER PLANT LIMBERG II (AT)

Payload: 12.0 t / Total Lenght: 1,200 m

Cable crane with limited manpower-transportation

Carga útil: 12,0 t / longitud total: Grúa de cable de

1.200 m con transporte de personal limitado

KWOIEK CREEK HYDRO PROJECT (CA)

Payload: 20.0 t / Total Lenght: 600 m

Permanent ropeway incl. limited manpower transport

Carga útil: 20,0 t / longitud total: 600 m

Instalación fija con transporte de personal limitado

URAN CHAKAN PIPELINE (IN)

Payload: 5.0 t / Total Lenght: 1,100 m

Narrow ROW (8 m) running through sensitive terrain

Carga útil: 20,0 t / longitud total: 2.600 m

ROW angosto por zona ambientalmente sensible

ADCOP PIPELINE (AE)

Payload: 9.5 t / Total Lenght: 1,400 m

Pipeline construction in desert-like area

Carga útil: 9,5 t / longitud total: Construcción de

oleoducto de 1.400 m en zona cuasi desértica

LNG ONSHORE PIPELINE (PG)

Payload: 8.0 t / Total Lenght: 1,000 m

Cable crane & trenching work for a gas-pipeline

Carga útil: 8,0 t / longitud total: 1.000 m

Grúa de cable y excavaciónes para un gasoducto

LOS RAMONES PIPELINE (MX)

Payload: 8.0 t / Total Lenght: 450 m

Short mobilization for a system for a 42” pipeline

Carga útil: 8.0 t / longitud total: 450 m

Corto plazo para sistema para un gasoducto de 42”

PALO VIEJO HYDRO-POWER PLANT (GT)

Payload: 10.0 t / Total Lenght: 600 m

Cable crane with 105 m height for 125” pipes

Carga útil: 10,0 t / longitud total: Grúa de cable de

600 m con para tubos de 125”

SKIRESORT AROSA LENZERHEIDE (CH)

Payload: 10.0 t / Total Lenght: 1,900 m

Crossing a valley for a construction of a skilift

Carga útil: 10,0 t / longitud total: 1.900 m

Cruce de un valle para construir un teleférico

GASODUCTO SUR PERUANO (PE)

Payload: 6.0 t / Total Lenght: 14,500 m

4 cable crane system for 16” double joint pipes

Carga útil: 6,0 t / longitud total: 14.500 m

4 sistemas para transportar tubos de 16” y 24 m

2

4

6

7

1

3

5

9 16

11 18

13 20

2114

8 15

10 17

12 19

1

21

7

20

16

12

8

6

2

11

15

13

9

3

1014

45

18

1917

Page 19: SOLVING TRANSPORT NEEDS. - LCS Cable Cranes Cable Cranes-ENG-SPA.pdf · 08 LCS SYSTEMS OVERCOMING CRITICAL TERRAIN WITH HEAVY LOADS. Construction projects and building sites in demanding

34

6. Padding6. Verfüllen

Containers of 20 tons are transported by heavy material rope-way.Contenedores de 20 t estan transportados con una instalación para pesos elevados.

Loading station of a heavy-duty material ropeway.Área de carga de un teleférico para cargas pesadas.

Front-view of a pipeline in rocky terrain.Vista frontal de un ducto en terreno roccoso.

Assembling of a 30 m tower.Montaje de un soporte de 30 m.

Double tower after a long span.Soporte doble después de tramo muy largo.

Transport of a 12 m long pipe with a GC200 crane unit.Transporte de un tubo de 12 m con la unidad de grúa GC200.

Page 20: SOLVING TRANSPORT NEEDS. - LCS Cable Cranes Cable Cranes-ENG-SPA.pdf · 08 LCS SYSTEMS OVERCOMING CRITICAL TERRAIN WITH HEAVY LOADS. Construction projects and building sites in demanding

36Crane unit GC200 in action.Unidad de grúa GC200 en acción.

Pipelaying in steep terrain.Tendido de tuberías en areas inclinadas.

Remote control of the carriage during loading.Control remoto de la unidad de grúa durante la fase de carga.

Environmentally friendly transport.Transporte ecologico.

Innovative tower construction.Construcción de soportes innovadora.

Machinery transport.Transporte de maquinaria.

Page 21: SOLVING TRANSPORT NEEDS. - LCS Cable Cranes Cable Cranes-ENG-SPA.pdf · 08 LCS SYSTEMS OVERCOMING CRITICAL TERRAIN WITH HEAVY LOADS. Construction projects and building sites in demanding

38

HEAD OFFICE

LCS Cable Cranes GmbH

Industriestraße 8

6832 Sulz, Austria

T 0043 5522 39 412

F 0043 5522 32 483-44

[email protected]

www.lcs-cablecranes.com

CANADA OFFICE

LCS Cablecranes Ltd.

833 – 4th Avenue SW

Calgary, Alberta, T2P 3T5

T 001 587 997 9433

[email protected]

www.lcs-cablecranes.ca

Associate Member of theInternational Pipeline & OffshoreContractors Association

Page 22: SOLVING TRANSPORT NEEDS. - LCS Cable Cranes Cable Cranes-ENG-SPA.pdf · 08 LCS SYSTEMS OVERCOMING CRITICAL TERRAIN WITH HEAVY LOADS. Construction projects and building sites in demanding

POWERFUL, FLEXIBLE, DIRECT, ENVIRONMENTALLY SOUND.LCS SYSTEMS ARE VERSATILE.

FUERTE, FLEXIBLE, DIRECTO, CUIDADOSO DEL MEDIO AMBIENTE. LOS SISTEMAS LCS SON ADAPTABLES.

Page 23: SOLVING TRANSPORT NEEDS. - LCS Cable Cranes Cable Cranes-ENG-SPA.pdf · 08 LCS SYSTEMS OVERCOMING CRITICAL TERRAIN WITH HEAVY LOADS. Construction projects and building sites in demanding

www.lcs-cablecranes.com

Part of