SIM group, which is consolidated on worldwide scale, is an Italian private me-
chanical construction company, specialized in fabrication/erection of piping,
structural steel and equipment. Management of all multidisciplinary construction
activities such as electrical, instrumental, tanks supply and erection.
Thanks to the experiences gained in many years of activities combined with in-
novation and special advanced technologies, and to its high level management
and staff, SIM is a Mechanical Contractor able to manage all type of projects in
terms of complexity, assuring the maximum health and safety control, quality
system and safeguarding the environmental aspects associated to work.
SIM is able to take complete responsibility during the period of the projects,
sharing risks and responsibilities that the project requires.
Our strategy is to accomplish extraordinary in our core business by delivering
top level performance in safety, quality and environment matters. Therefore,
SIM starts, performs, and completes projects - in the field of O&G, Chemical,
Petrochemical, Power plant -, with the same dedicated key-team respecting the
clients deadlines and budget.
Our company’s goal is to provide an overall service by developing innovative
technical solutions and it is committed to provide a result rather than making
resources available.
CAPA
BILI
TIESSIM implements a business model that is flexible, results-oriented,
capable of interpreting the global needs of our clients and able to
support clients through our locally-based companies, which can
operate on-site as fully integrated Local Contractors.
Through a carefully orchestrated growth strategy, SIM has ex-
panded its capabilities to become an important presence in the
mechanical European landscape.
MIS
SION Our reputation is well earned and it’s a reflection of our honest and forthright approach.
Our suggestions, recommendations and solutions all serve a single goal: serve the clients.
The different backgrounds and technical abilities of our team have enabled SIM to
grow in a highly competitive business. Hard work and continuous education enable
us to keep apprised of new innovative methods and techniques expanding our capa-
bilities and effectiveness.
The strength of having many years of business experience, technical knowledge,
and project management capabilities enable SIM to offer a product that can satisfy a
variety of client needs in all industrial fields.
ACTI
VITI
ESSIM has continuously increased its expe-
rience in plants construction by working
on complex projects in Italy and, in par-
ticular, abroad.
Thanks to this experience SIM is today an
important global contractor.
Our objective is to perform our project in
compliance with Client’s requirements
satisfying all safety and quality standards.
SIM is certified by UNI EN ISO 9001: 2008,
Apave, ISO 3834-2, and recently also by
SOA that enables SIM to realize different
type of plants in the field of public work.
Our main activities, carried out by a per-
manent staff of 750 people, are:
Construction activities Our human resources and sub-contractors for special-
ized activities allow us to provide multi-disciplinary con-
struction services for all types of industrial plants:
• Fabrication and assembly of piping systems;
• Erection of steel structures;
• Erection of equipments, rotating and alternative machinery;
• Complementary activities: painting, application of anti-
corrosion coatings, fire-proofing and thermal insulation;
• Assembly and erection of electrical and instrumenta-
tion systems;
• Pre-commissioning and commissioning of plants and
systems.
Maintenance activities Maintenance contracts are a regular step of any com-
pany that installs plants, modernizes them and shuts
them down.
SIM’s know-how is available to operators for mainte-
nance services of industrial plants.
The wide range of our business activities as well as the
experience we have acquired as “general contractor”
allow us to fulfill the most various client’s demands.
• Shut-downs
This is a short-term activity that involves all SIM skills
for the correct development of a considerable volume
of work.
In order to complete this type of work successfully, we
implement and coordinate:
- High-specialized human resources
- Modern equipments resources
- Methods tested using the most powerful tools
• Revamping
The particular experience necessary to develop this
type of activity is realized partly in “Onshore” , partly
in “Offshore” context. The know-how of our staff, the
management and the participation of our sub-contrac-
tors enable SIM to ensure Safety, Quality and Respect of
deadlines in every moment of the project. FACI
LITI
ES
With two strategically located fabricating facilities, SIM has the logistical advantage to serve the
needs of clients everywhere. Our workshops in the East Coast of Sicily - next to the important
petrochemical area - enable us to produce any pipe fabrication giving us the opportunity to control
costs, schedules and all the related activities so that safety and quality are maximized.
Two fully equipped workshops for piping fabrication are able to produce up to 200 T/month of CS
and SS piping.
Thanks to its location facing the sea, SIM is working to implement its activities performing Com-
plete Modular Systems assembled in accordance with customer requirements: from simple skids
to complex piping modules complete with instruments and controls.
The fabrication of skid in our workshop will optimize all area’s resources in terms of local industries
and the transport by sea.
ENVI
RONM
ENTSIM takes its commitment to the environment
seriously and carries out a very clear policy.
In this perspective, the company has established
an Environmental Management System in com-
pliance with the UNI EN ISO 14001: 2004.
After an evaluation of the remarkable aspects
emerging from an environmental analysis, the
company undertakes to respect the following
principles:
• Proactive Attitude;
• Respect for the environment;
• Products and processes;
• Continuous improvement;
• Compliance with legislation and other environ-
mental regulations;
• Staff’s training;
• Preventive analysis of environmental effects;
• Public information;
• Components and suppliers.
The company is aware of the primary impor-
tance of the environmental factor for its stra-
tegic mission.
SAFE
TYOur employees are the most valuable asset
we have.
Our mission is to complete every project correct-
ly, efficiently and ACCIDENT FREE. At SIM safety
is more than a company goal, it’s a commitment.
From front office managers to field employees,
safety comes always first.
We have established an effective Safety Program
to prevent potential hazards at any level. This
program is based on regular training seminars,
safety meetings, toolbox talks, site inspections,
and pre-task planning that are mandatory for
SIM employees. This up-to-date training makes
our staff and personnel as knowledgeable as
possible about some of the potential hazards
that can occur within the job site.
SIM is constantly committed to educate its em-
ployees in safety rules/regulations, their safety is
for the company extremely important.
Our safety system is in compliance with the
most important regulations and it’s certified by
VCA for SCC Petrochemicals 2008/05; MASE
(in progress).
REFE
RENC
ESSince its establishment, SIM has always per-
formed projects all around Europe and also
in Venezuela.
We have successfully completed projects
for the major engineering companies such
as Technip, Foster Wheeler, Snamprogetti,
Tecnicas Reunidas.
Our projects are performed in a context of
World Client Class: Total, Heurtey, EDF, Erg,
Motor Oil, Hellenic Petroleum, Lukoil, CB&I
Lummus, Essent, Polimeri Europa, Air Liq-
uide, BP, that are just an example of some
of our clients.
SINCOR Project – Process unit 1100 & 1200Place: VenezuelaMain Contractor: Consorcio ContrinaClient: Sincrudo de OrienteManhours : 700.000 Peak personnel : 650
SINCOR Project – Process unit 6000Place: VenezuelaMain Contractor: Consorcio ContrinaClient: Sincrudo de OrienteManhours: 300.000Peak personnel: 220
Petrocarling 2000 VPL1Place : FranceMain Contractor : Technip FranceClient : AtofinaManhours : 180.000Peak personnel : 280
TC2R AchèrePlace : FranceMain Contractor: OTV France Nord(Vivendi Water)Client : SIAAPManhours : 25.000Peak personnel : 70
Agro Food SilosPlace: ItalyMain Contractor: SIRPLAST Client: SPMI Manhours: 10.000Peak personnel: 25
Reconstruction of the de-purifying stationPlace: FranceMain Contractor: OTV France NordClient: OTV France NordManhours : 14.000Peak personnel : 60
Mild Hydro Cracking UnitPlace : ItalyMain contractor : Paragon LitwinClient: Refinery IESManhours : 200.000Peak personnel: 150
Bauxilum ProjectUpgrading of Aluminia RefineryPlace: VenezuelaMain Contractor: Technip BolivarClient: Aluminia RefineryManhours: 480.000Peak personnel: 550
SRU Revamping UnitPlace: ItalyMain Contractor: Technip Italy – KTIClient: Refinery I.E.S.Manhours: 34.000Peak personnel: 80
RN DHC EPSCC14(underground piping works)Place: FranceMain Contractor: Technip FranceClient: TotalManhours: 133.000Peak personnel: 80
RN DHC EPSCC14 (piping prefabrication)Place: FranceMain Contractor: Technip FranceClient: TotalManhours: 80.000Peak personnel: 85
RN DHC EPSCC14(piping erection & mechanical works)Place: FranceMain Contractor: Technip FranceClient: TotalManhours: 850.000Peak personnel: 450
UDSPlace: ItalyMain Contractor: ERGClient: Foster WheelerManhours: 100.000Peak personnel: 95
Interconnecting LA - RABIDA Place: SpainMain Contractor: EMSAClient: CEPSAManhours: 50.000Peak personnel: 75
CR42-C343Place: ItalyMain Contractor: SNAMPROGETTIClient: ERGManhours: 200.000Peak personnel: 150
Heater RevampingPlace: ItalyMain Contractor: Consorzio T800(Maireengineering Techint)Client: EDI PowerManhours: 45.000Peak personnel: 75
Scandale Air Cooled Condenser Place: ItalyMain Contractor: Ansaldo CaldaieClient: Ansaldo CaldaiePeak personnel: 46
Critical PipingPlace: ItalyMain Contractor: Consorzio T800 (Maireengi-neering Techint)Client: EDI PowerManhours: 45.000Peak personnel: 65
NuCePlace: ItalyMain Contractor: ERGClient: ERGManhours: 125.000Peak personnel: 120
Air Steam Condensators Unit 1&2Place: ItalyMain Contractor: SPXCooling Technologies ItaliaClient: Alstom PowerManhours: 90.000Peak personnel: 100
EB/SM Modernisation ProjectPlace: FranceMain Contractor: Total PetrochemicalsClient: Foster Wheeler FranceManhours: 400.000Peak personnel: 300
Modernization Total Chicago Project Place: BelgiumMain Contractor: Technip FranceClient: Total PetrochemicalsManhours: 60.000Peak personnel: 60
PTA2/PTA3 RevampingPlace: BelgiumMain Contractor: Technip Italy/BP Amoco Client: BP AmocoManhours: 450.000Peak personnel: 380
Hydrocracker complexPlace: CroatiaMain Contractor: CB & I Lummus s.r.o.Client: INA – Rijeka Refinery Manhours: 120.000Peak personnel: 80
Modernization Hydro fining Unit Place: RomaniaMain Contractor: Refinery LUKOILClient: S.C. ICVAN s.r.l.Manhours: 25.000Peak personnel: 50
Hellenic Petroleum ProjectPlace: GreeceMain Contractor: Heurtey PetrochemClient: Hellenic PetroleumManhours: 104.000Peak personnel: 154
Hellenic Petroleum ProjectPlace: GreeceMain Contractor: Heurtey PetrochemClient: Hellenic PetroleumManhours: 185.000Peak personnel: 145
NEW CDU ComplexPlace: GreeceMain Contractor: Technip Italy/Motor OilClient: Motor OilManhours: 520.000Peak personnel: 380
West Burton Power GenerationPlace: United KingdomMain Contractor: STF Client: EDFManhours: 45.000Peak personnel: 30
Methanol OSBL Project Place: BelgiumMain Contractor: Technip BeneluxClient: Oil TankingManhours: 25.000Peak personnel: 40
Erg New Power PlantPlace: ItalyMain Contractor: Erg Nuce Client: Erg NuceManhours: 65.000Peak personnel: 85
EKB VIKING PROJECT – 07045H Place: GermanyMain Contractor: EKB – AGF (Technip Germany)Client: ETZEL-KAVERNENBETRIEB-SGESELSHAFT mbh & Co.Manhours: 353.250Peak personnel: 215
DNK L51 PROJECTPlace: FranceMain Contractor: Foster Wheeler FranceClient: Polimeri Europa Manhours: 205.000Peak personnel: 200
PROJECT CCGTPlace: Holland Main Contractor: Tecnicas ReunidasClient: ESSENTManhours: 140.000Peak personnel: 140
Maintenance utilitiesPlace: FranceMain Contractor: Polimeri Europa FranceClient: Polimeri Europa FranceManhours: 17.500Peak personnel: 45
NF 09018/307-00 ProjectPlace: FranceMain Contractor: Heurtey Petrochem Client: Total PetrochemicalsManhours: 38.000Peak personnel: 55
CLIE
NTS
SIM
SIM s.p.a.Ex S.S. 114 n.136-B
96010 Priolo Gargallo - Siracusa (IT)T.: +39 0931.761416F.: +39 0931.761957
www.simspa.net