Erection Protocols

  • Upload
    sam

  • View
    255

  • Download
    4

Embed Size (px)

Citation preview

  • 7/31/2019 Erection Protocols

    1/17

    APRESENTATION

    ONERECTION PROTOCOLS

  • 7/31/2019 Erection Protocols

    2/17

    CONTENTS

    PRELUDE

    QA PROGRAME

    FQPERECTION PROTOCOLS

  • 7/31/2019 Erection Protocols

    3/17

    PRELUDE

    Post Bid activities/discussions

    Contractual issues

    Commercial issues

    Technical issuesQuality issues

    http://standard-infrastr%20list/infrastr%20reqd%20before%20Zero%20date%20%20thermal.dochttp://standard-infrastr%20list/infrastr%20reqd%20before%20Zero%20date%20-%20Hydro.dochttp://standard-infrastr%20list/infrastr%20reqd%20before%20Zero%20date%20%20thermal.doc
  • 7/31/2019 Erection Protocols

    4/17

    QA PROGRAME

    QA Program

    To insure technical requirements

    To identify the responsibilities

    To look after the activities of

    Shop manufacturing

    BOI Inspection

    Field activities

    http://l2/ContentsL2-200.dochttp://l2/ContentsL2-500.dochttp://l3/weekly%20progress%20report.pdfhttp://l3/weeklyreviews.pdfhttp://crm/Sipat-II%20MOM%20CRM.pdfhttp://crm/Sipat-II%20MOM%20CRM.pdfhttp://l3/weeklyreviews.pdfhttp://l3/weekly%20progress%20report.pdfhttp://l2/ContentsL2-660.dochttp://l2/ContentsL2-500.dochttp://l2/ContentsL2-200.doc
  • 7/31/2019 Erection Protocols

    5/17

    QA PROGRAME

    BOI Inspection and Shop manufacturing

    MQP compliance.

    Model MQPMQP-Hoist.pdf

    Issuance of MDCC.

    http://mqp-hoist.pdf/http://mqp-hoist.pdf/http://mqp-hoist.pdf/http://mqp-hoist.pdf/
  • 7/31/2019 Erection Protocols

    6/17

    FIELD QUALITY PLAN

    Before starting of site activities, FQP issubmitted by contractor and a suitable fieldquality organization with adequate manpoweris set up to effectively implement the FQP

    requirements.Various checks/tests are performed anddocuments are prepared in different stagesaccordingly.

    Class of checks performed are-

    A Class (Critical)

    B Class (Major)

    C Class (Minor)

  • 7/31/2019 Erection Protocols

    7/17

    ERECTION PROTOCOLS

    Protocols/Records are prepared as per FQP inthe following stages of the project execution-

    Material receipt & storage

    Pre-erection activities Erection activities

    Pre-commissioning

    Commissioning and RIOC

    TO and TOC

  • 7/31/2019 Erection Protocols

    8/17

    MATERIAL RECEIPT AND STORAGEPROTOCOLS

    Check for transit damage

    Check for type, make, rating, quantity

    Checking of MDCC, Challan, MTC etcStorage as specified FQP- Storage.doc

    MRC

    http://fqp-%20storage.doc/http://fqp-%20storage.doc/http://fqp-%20storage.doc/http://fqp-%20storage.doc/http://fqp-%20storage.doc/
  • 7/31/2019 Erection Protocols

    9/17

    PRE-ERECTION PROTOCOLS

    Civil works FQP-civil.xlsChecking of insertsClearance for civil foundationProtocols for handing over of foundationsStructural work FQP-str.xls

    WPSWelder test formatTests for welded jointsShop assemblySand blasting and painting

    Alignment checksErection welding format Protocols.xls

    http://fqp-civil.xls/http://fqp-str.xls/http://format%20protocols.xls/http://format%20protocols.xls/http://fqp-str.xls/http://fqp-str.xls/http://fqp-str.xls/http://fqp-civil.xls/http://fqp-civil.xls/http://fqp-civil.xls/
  • 7/31/2019 Erection Protocols

    10/17

    ERECTION PROTOCOLS

    Handing over of structures for flooring andcasting of machine foundations

    Checking of layouts

    Leveling of foundations

    Erection of equipments

    Alignment of equipments & GroutingSample FQP-ME.pdf

    http://fqp-me.pdf/http://fqp-me.pdf/http://fqp-me.pdf/http://fqp-me.pdf/
  • 7/31/2019 Erection Protocols

    11/17

    Electrical works cable tray power and control cables

    motors transformers HT and LT switchgears cable testing and termination

    earthing of equipments

    Sample FQP FQP-EE.pdf

    ERECTION PROTOCOLS

    http://fqp-ee.pdf/http://fqp-ee.pdf/http://fqp-ee.pdf/http://fqp-ee.pdf/
  • 7/31/2019 Erection Protocols

    12/17

    PRE-COMMISSIONING

    Equipment healthiness

    Safety clearance

    Checking of protection and interlocksChecks during initial running

    Sample IAC.pdf

    http://iac.pdf/http://iac.pdf/
  • 7/31/2019 Erection Protocols

    13/17

    Commissioning

    Recoding the parameters in prescribedformat for initial run

    RIOC

    Sample IAC.pdf

    List of defects observed during initial run

    http://iac.pdf/http://iac.pdf/
  • 7/31/2019 Erection Protocols

    14/17

    TRIAL OPERATION

    After initial running of equipments individually, the totalsystem is put on the trial run for specified number ofdays.

    Protocols are prepared for the start of TO

    During TO, performance of the system is observed andany discrepancies found are recorded in log sheet.

    After successful completion of TO, protocol for TOcompletion is signed.

  • 7/31/2019 Erection Protocols

    15/17

    TAKING OVER BY O&M

    Following successful completion of all facilities,for a particular unit, Projects Dept requests O&MDept for issuing Unit-wise Taking Over

    Certificate (ITOC), enclosing the followingdocuments for all the systems/ equipmentspertaining to the specific unit

    As-built Drawings, Manuals, Signed Quality Plans

    List of EquipmentsCopies of RIOC

    Copies of Factory & Site Test Reports

  • 7/31/2019 Erection Protocols

    16/17

    Submission of PG test procedure

    Pre-requisites to be ensured by Employer

    Pre-requisites to be ensured by ContractorJoint inspection protocol for PGTreadiness

    Capacity tests and Power consumptionmeasurement

    PG TEST

  • 7/31/2019 Erection Protocols

    17/17