UNITED STIJTES POSTIJL SERVICE
12
NPMHU
To: [xl Pacific Area Local(s) [ ] Western Area [x I Withholding Info ---~"~,
[xJ Staffing [ J Please review. take action and reduce issues to writing [xl Comments: Prepare & Review 12.S.C.S & 12.S.C.6 Omar Coordinator
is to advise you of the intent of the San Diego District to utilize the provisions of Article 12.6.C.5 of the National Agreement to involuntarily reassign three (3) full-time regular mail handlers and four part-time regular mail handlers from the craft and/or installation at the San Bernardino bid cluster (Event 39991). The basis for this event is a staffing & scheduling review based on BPI efficiency improvements.
The impacted employees will be notified of their involuntary reassignments by separate letter.
By copy of this notice, authorization is being given to withhold three (3) full-time residual assignments and four (4) part-time regular mail handler residual assignments in the mail handler and custodial crafts in post offices and plants within a radius of 900 miles of the San Bernardino bid cluster.
Attached you will find copies of the automated impact statement, the operational data supporting the need to excess, the list of sites where withholding is authorized and a list of the junior impacted mail handlers.
I will be contacting you shortly to confirm a meeting date. In the interim, if you have any questions you may contact me at (858) 674-3193 or Linda Shumate, Area Complement Coordinator at (858) 674-3183.
/); I {1/ t~ ~Roberts
Manager, Labor Relations
WorkHour Impact Report
Impacted Bid Cluster
Installation Address
Area Name
Impact Type
Date of Impact
Period (Dates) of Review Performed
Report Prepared By
Report Prepared Date
Reviewed By
Phone
SAN BERNARDINO POST OFFICE EVENT 39991
BPI EFFICIENCY IMPROVEMENT
PACIFIC
Reduction Other Than Attrition
11/1712012
07/2312011 thru 08/03/2012
Sharon
07/30/2012
Abelardo Munoz
(858) 674-3110
WorkHour Impact Report Craft = MAIL HANDLER
A B C D E F G Current Planned Annual Annual FTE Current
Work Hours FTE Hrs Hr Rate
Total 7574 7268 -306 -1224 -15912 -9 1820
OverTime Impact
Current OT Current Planned OT Additional Percent Planned OT Planned OT OT Rate per Week Planned OT Planned OT Hours per Rate
from changes per Week per Week Week
Total 384 5.1% -67.25 0 317 4.4%
WorkHour Impact Report Casuals
a. Current Number of MAIL HANDLER Casuals on Rolls
b. Current Total Non-OverTime MAIL HANDLER Casuals Hours per tvlonth
c. Planned Reduction in Total Non-OverTime MAIL HANDLER Casuals Hours per Month
d. Number of MAIL HANDLER Casuals that will have Reduced Hours
e. Number of MAIL HANDLER Casuals that will be Terminated
f. Number of MAIL HANDLER Casuals After Impact
g. Provide Narrative need for MAIL HANDLER Casuals
Casual MH hours will be reduced and cannot be combined to make full-time ""c"nc,n"
Part Time Flexible (PTFs)
a. Current Number of MAIL HANDLER PTFs on Rolls
b. Current Total Non-OverTime MAIL HANDLER PTFs Hours per Month
c. Planned Reduction in Total Non-OverTime MAIL HANDLER PTFs Hours per Month
d. Number of MAIL HANDLER PTFs that will have Reduced Hours
e. Will there be any MAIL HANDLER PTFs Excessed from Craft or Installation
If Yes how Many MAIL HANDLER PTFs
f. Provide Narrative Explaining need for Excessing
PTF hours were reduced.
Transitional Employees (TEs)
a. Current Number of MAIL HANDLER TEs on Rolls
b. Current Total Non-OverTime !VlAlL HANDLER TE Hours per iVlonth
c. Planned Reduction in Total Non-OverTime MAIL HANDLER TE Hours per Month
MAIL HANDLER TEs that have Reduced
19
2660
-380
19
o 19
7
896
-28
7
NO
o
o o o o
b. Current Total Non-OverTime MAIL HANDLER PSE Hours per tvlonth
c. Planned Reduction in Total Non-OverTime MAIL HANDLER PSE Hours per Month
d. Number of MAIL HANDLER PSE that have Reduced Hours o e. Number of tvlAIL HANDLER PSE that will be Terminated
f. Number of fvlAIL HANDLER PSE After
g. Provide Narrative need for MAIL HANDLER PSE
PSEs are not authorized per the CBA.
WorkHour Impact Report
Part Time Regular (PTRs)
a, Current Number of MAIL HANDLER PTRs on Rolls
b. Planned Number of MAIL HANDLER PTR Positions after
c. Estimated Number of MAIL HANDLER PTR Attrition
d. Will there be any MAIL HANDLER PTRs Excessed from Craft or Installation
MAIL HANDLER PTRs
e. Provide Narrative Explaining need for
Based upon the review of the Fl Baseline Model to increase BPI F't'tlrit:>I'1/"V for the San Bernardino Bid Installation, there is a need to excess up to 3 Part-Time Mailhandler employees from the installation.
Full Time Regular (FTRs)
a. Current Number of MAIL HANDLER FTRs on Rolls
b. Planned Number of MAIL HANDLER FTR Positions After Impact
c. Estimated Number of MAIL HANDLER FTR Attrition
d. Will there be any MAIL HANDLER FTRs Excessed from Craft or Installation
If Yes how Many MAIL HANDLER FTRs
e. Provide Narrative Explaining need for Excessing
Based upon the review of the Fl Baseline Staffing Model to increase BPI Efficiency for the San Bernardino Bid Installation, there is a need to excess up to 3 Full-Time Mailhandler employees from the craft/bid installation
15
12
o YES
3
179
176
o YES
3
WorkHour Impact Report-MAIL HANDLER
Preliminary Summary
a. Total Planned Non-OT Reduction per Month for and PTRs
b. Planned Reduction in Total OT Hours per Month
c. Planned Reduction in Casual Non-OT Hours per Month
d. Planned Reduction in PTF Non-OT Hours per Month
e. Planned Reduction in TE Non-OT Hours per Month
f. Planned Reduction in PSE Non-OT Hours per Month
g. Total Planned Non-OT Hours per Month
h. Total FTE Savings
-816
-269
-380
-28
o o
29072
-9
Baseline Staffing Model San Bernardino P&DC - Reduce 25 FTEs with BPI Improvement of 5%
File date: July 20, 2012
Tour 1
Tour 2
Tour 3
Total ORNAlNRP-NOT LOC 67
(long-term unavailable only)
Total F1 LOC 67 (Clerk, MH, EAS)
Grand Total
Craft Ratios Clerk
FT NTH
Casual (still in COINS) PSE
Mail Handler H
PTR PTF
Casual
Proposed Staffing
Current Staffing (WebCoins On-Rolls)
+1- Current
BPI Impacts:
Use last four non-holiday weeks data, jf feasible; enter BPI achievement, Work Hr
and # of weeks
Baseline Staffing Model
WebCOINS On-Rolls of
Clerk MH 171 98
2 1
134 113
307 212
16 2
307 212 24 2
331 214
On-Rolls
274 89.3% 8 2.6% 0 0.0% 25 8.1%
307 100.0"/ ..
179 84.4% 15 7.1% 7 3.3%
11 5.2% 212 100.0%
Clerk MH 288 206
307 212
-19 -6
Data Source: Variance WebSite/BPI
I I
Proposed Staffing
Clerk MH 164 87
2 14
122 105
288 206
0 0
288 206
0 2 288 208
Proposed
257 97.0% 8 3.0% 0 23 8.7%
288 108.7%
168 81.6% 12 5.8% 7 3.4%
19 9.2% 206 100.0%
Total Craft 494
519
-25
San Bernardino P&OC -Reduce 25 FTEs with BPI
Improvement of 5%-- File date: July 20, 2012
66.5% 33.5%
48 13.5%
-76
4
!
SOO Ratio MOO Ratio (1 (1:22 -1
Current Earned Current Earned 11 10 2 1
0 1 0 0
10 9 1 1
21 20 3 3
0 0 0 0
21 20 3 3 0 0 0 0
21 20 3 3
01 A 110 - 50% or more of Career CI, Of A 210 - NTE 50% of F1 Career Cle O/A 610 - N/A. O/A 813 - Non Career. NTE 20% of
O/A 120 Of A 320 O/A 420 O/A 620 - NTE 12.5% of Total Mail!-
-"
-" Pt..210
R........,...'" ""
P\.2B4
-"
"-"
San Bemardlno J>&OC - Reduee :zs FTEs with BPI'_", of 5%
"_ .. "'-362. --~(6) .~·tftO\I'tIw310
"-"
San Bernardino P&oc . Re-d-uu 25 FT& wtth BPI tmprovemem of 5%
San Bernardino P&OC • Redo«: 2S FTEs with 8?t Improvement of $% NOTE: Onty m.aU dat:t N1tno
,--------------------==-:--='"-""""1"":""-"'7:::-----.::---:---------------------,(TheOt'llY$hacJ&(j ~ Ilre 10
R.--..."
R~"
san Beman:!lno P&DC - __ 25 FTEs with BP1lmpn>wment of 5% NOTE; Onty mao !Sate «1lt'\I
r-----------------------------------------~~~~~~~~~~~~--------------------------------------------,~~y~~~~~'o
R_"
R_'"
R_"
Station/Branch Fin. No.:SAN BERNARDINO P&DC (056745) FROM
Pay Pd 21 FY 2010
Pay Pd 21 FY 2011 I Change
in Months
RESTRICTED INFORMATION Pane 2 of 2
CAP Actual vsCAP
· Station/Branch Fin. No.:SAN BERNARDINO P&DC (056745)
FROM TO Pay Pd 21 FY 2011
PayPd15 Change FY 2012 in Months
RESTRICTED INFORMATION P::ll1R? (jf?
CAP Actual vsCAP
7.17
J1
)3
)8 10
l4 l5 l7 LS 11
)01
J1.1
Weekly Flash Report. Week 41 2012 Finance SAN BERNARDINO P&DC - 056745
ADMIN/VMF /PI,ANTS FLASH Ildays 6 Sply Ddays 6-- -Act Ddaya 10 Sply Ddaya 12- - - Act
07-07""2012 - 07-13-2012 Act/Plan 07-01-2012 - 07-13-2012 Act/Plan 07-09-2011 07-15-2011 SP1.Y 07-01-2011 - 07-15-2011 S.1.Y Current Week **.*.*.* •• *
Plan '\sPlan '\sInN 35 14.3 0.0 o 0.0 -100.0
69 -42.0 -37.5 208
o 312
1 0.32
5,021 372
1,566 2,122
18 6,206 1,113
44 17,438
394
2.26 1
690 3 96 0.00
94 540 634
18 .84
o 29
2,237 540
1,086 236
o 4,307
83 1.93
2 135
Q
15.4 0.0
-17.9 -100.0 -100.0 -100.0
1.4 -9.9 38.8 12.8
-38.9 -10.8 19.2
-45.5 2.0
31.2
28.7 -100.0
9.7 7.6 0.0
95.7 6.9
20.0 44.4 20.3 0.0
-23.0 -28.8
0.0 -9.2
~37.3
-31. 0
-100.0 42.2
-4.3 0.0
-15.S 0.0 0.0
-100.0
-6.1 -26.2 -11.S
22.S -35.3
0.5 -2.2 0.0
-1. B -29.2 -27.8
-100.0 2.6 4.5
-2.0
130.0 -1. 9 13.9
550.0 470.6
-100.0 0.0
1.6 -4.1
-34.6 -79.1 -11.2 57.6 77.5
-100.0 59.7
Actual MTIl 72 o
56 288
o 416
o 0.00
o
679 4,166 4,490
25 9,632 2,271
30 31,872
919 2.88
o 1,270
3.98 14.52
280 1,042 1,322
63 4.77
1 49
3,498 873
1,520 314
92 7,087
101 1. 43
o 334
o
Month to Date ••••••• *** Plan MTIl
60 o
119 359
o 538
1 0.19
2,663 3,609
31 10,555
1,894 75
29,659 74B
2.S2 3
1,151 3.88 0.00
158 921
1,079 . 32
2.97 a
49
3,836 925
1,863 404
o 7,384
14B 2.00
3 225
o
'\sP MTIl 20.0 0.0
52.9 -19.8
0.0 -22.7
-100.0 -100.0 -100.0
5.5 7.3
56.4 24.4
-19.4 -8.7 19.9
-60.0 7.5
22.9 14.3
-100.0 10.3
2.7 0.0
77.2 13 .1 22.5 96.9 60.7
0.0
-8.S -5.6
-18.4 -22.3
0.0 -4.0
-31.8 -28.9 100.0
49.4
'\sS MTD 50.0
-100.0 61.1
-28.0 0.0
-35.0 0.0 0.0
-100.0
-17 . ., -24.4
-17.0 14.0
-21. 9 -12.0 -16.1
0.0 -12.4 -31. 0
-21. 3 -100.0
-22.2 11. 2
3.2
52.2 -13.8 -5.1
687.5 729.8
-25.9 -12.9 -19.3 -35.3 -42.9 -22.4 83.6
136.5 -100.0
30.0
o 0
Actual YTIl 1,517
o 2,040 8,637
33 12,227
••••••••• * Year Plan Yl'D
1,439 o
,aal 8,639
o ,959
0.05 80
96,676 529
221,402 52,905
265 738,520
31,90'1 4.32
as 39,560
5.36 9.99
4,959 23,886 28,745
914 3.18
16
41,205 7,645 4,101
175,210 2,090 1.19
:n
O.
209,666 15, 65,405 a8,603
744 259,141
46,503 1,920
728,114 25,345
3 48 266
28,
3. 0.00
4,273 , B43
27, 921
3 40
9:;,441
21, 875 45,341
9,572
178,670 3,483 1.95
*.,;,***.* .. ***
.4 0.0
.0 o 0
.0 ··78. S
50
.6 13 B
.4
.4
.1
.9
7 4
.0 -O.B
.4 14. S1. 4
-'I.
O.
38.8 .,
YTD lO.tl
100 0 n 5 a.s 0.0 a.s
.0
.2
27.3 ·2.7 1.7
-0.6 -14 9
tJ 42.S
.2 -6.9 1.4
-86.9 1 4
12. l.?
• 4 1.1 a .,
.8
-4 4 30.
.2
3
Weekly Flash Report, Week 41 2012 Finance SAN BERNARDINO P&DC - 056745
ADMIN/VMF/PLANTS FLASH Ddaya 6 Sply Ddays 6- - --Act Ddays 10 Sply Ddays 12-
07-07-2012 07-13--2012 Act/Plan 07-01-2012 07-13-2012 09-2011 - 07-15-2011 SPL'l 07-01-2011 07-15-2011
Current Weak *****.**.*. Plan I\;Plan I\;SPL'l
•••....••. Actual MTD
o
Month to Date .* .. **.* •• Plan MTD 1\;1' MTD I\;S MTD
o 0.0 0.0
34 34
1 94
17.6 17.6
100.0 -100.0
0.0 0.0 0.0 0.0
69 69
3 4.35
o 0.0 0.0
58 58
3.45
19.0 19 a 50 0 26.1
-4.2 -4.2 o 0 0.0
IIctual 'lTD 6
1, 1,336
78 5.64
SPL'l • .... * ••• *. Year
Plan 'lTD o
,374 1,374
. '11
07
52.
'lTD O.
.4
.4 4
.8
Page 4
~R~m~~~~.m_U~Dm~ __ ~ __ ._ •• o_.~~w~m~~~~~~~~~~~_~W~~~~"_. __ .gQW_~_~"_W~~ __ g=~_R=_._W __ ~_U __ • ___ * __ .~ __ =_Q=~~UQ_g=_A ___ .~~~Q_~ .. _=w~~q==u_~u~~~~ ___ q~_~~~m~~~~~~~~WW~N~~~~~.~~~=~_um~~
WK
40 35 o o
75 :I
2.67 3
22,800 998,668
498 2.18
3
S6B 3.81
o a.oo
o o 00
o 0.00
o 0.00
o
o
-100.0 14 .3
0.0 o 0
-45.3 150.0 357.3
0.3 2.1
20.5 20 1
100.0
13. a 12 'I
o 0 0.0 0.0 0.0 0.0 0.0
0.0 0.0 0.0
0.0 0.0
100.0 66.7
-91. 7 (l.0
-46.1 0.0 0.0
-3.1 -2.9
-21.8 -19.2
-100.0
9.1 12.7
393.8 409.7 -33.3 -31.2
6.2 11.7
5.4 B.a
-3.5
0.0
o 72
3 o
75 10
13.33
40,943 1,857,550
1,093 2.67
1
1,655 4.04
110 0.27
35 0.09
668 1. 63
4,341 10.60
0.00 o
72 sa o o
130 2
1. 54
5
38,B48 1,765,636
931 2.40
6
1,449 3.73
o 0.00
o 0.00
o 0.00
o 0.00
o
0.00 a
-100.0 24.1
0.0 0.0
-42.3 400.0 766.7
-100.0
5.2
17 4 11.4
-83.3
14.2 8.4
0.0 0.0 o 0
0.0 0.0 0.0
o 0
0.0 0.0
100.0 28.6
-05.0 0.0
-49.3 0.0
-14.3 -15.7
-21. 6 -8.6
-96.7
-16.3 -2.4
214.3 266.6 -39.7 -29.6 -25.7 13.3
-3.8
0.0
1,448 345
o 906
19
959,164 42,292,001
34,935 .64 125
49,B43 .20
,259 0.24
1,290 O.
23,372 2 44
a.34 4
1,504 1,406
o o
2,910
951, 42,406,819
816 l.13
345
37,697
.00 o
.00 o
0.00
o 0.00
o
00
.7
-4-0.0 o 0 O.
.4
17.
.B
o. O.
.0 O.
o O.
o 0.0 0.0
o
-7.
0.0 O.
o .4-
-83.
.4 0.9
7 8 16.
e. 17.
.4
· . Station/Branch Fin. No.:SAN BERNARDINO P&DC (056745)
Pay Pd 21 FY 2011
TO Pay Pd 15 FY 2012 Change
in Months
RESTRICTED INFORMATION
CAP Actual vsCAP
• 'Wi ......... , .... ....,. .."""..., •• at"'" •• ". a. W....,;tl ............. 1"' .......
Station/Branch Fin. No.:SAN BERNARDINO P&DC (056745) FROM TO
Pay Pd 21 FY 2010
Pay Pd 21 FY 2011
Months
RESTRICTED INFORMATION
CAP Actual vsCAP
··':SENi# .'",,,~,
5 -567451 SAN BERNARDINO P&DCIESPARZA TERESA 37491071 704542111 MAIL HANDLER 4 320 1 13 8/4/2007 1 6 567451 SAN BERNARDINO P&DC I DODSON TIANN R 1 37502661 704542121MAIL HANDLER 4 320 1 13 8/18/2007 567451SAN BERNARDINO P&DC!SUKATON IRIANTO R I 37514331 702817661 MAIL HANDLER 4 320 1 17 9/1/2007
..