TFT-350R-SG RAYCHEM INSTALLATION MANUAL
Citation preview
TFT-350R-SG
35kV Cold Applied OutdoorTermination for Copper Tape,Wire Shield, Lead Sheath andUniShield Cable
Product Installation Instructions
Raychem Tyco Electronics-Energy8000 Purfoy RoadFuquay-Varina, NC 27526
PII-55099, Rev AGPCN 393397-000Effective Date: August 17, 2001
Energy Division * Unishield is a trademark of BICC General Cable Industries, INC.
PII-55099, Rev AG PCN 393397-000Effective Date: August 17, 2001
2
Cable Type SelectionsNote: There are separateinstructions for each cable typeaddressed in this instruction. Turnto the page denoted below for yourcable type.
Tape Shield Cable (page 4)
1
2
3
4
Wire Shield Cable (page 11)
UniShield Cable (page 17)
Lead Sheath Cable (page 23)
PII-55099, Rev AG PCN 393397-000Effective Date: August 17, 2001
3
General Instructions
1. Select product.
Check kit selection with cablediameter dimensions in table 1opposite.
Table 1
NominalConductor Min/max
Kit Size Insulation ODs*TFT-352R-SG 1/0-250 kcmil 0.85-1.45(22-37mm)TFT-353R-SG 4/0-500 kcmil 1.06-1.70(27-43mm)TFT-354R-SG 500-1250 kcmil 1.49-2.20(38-56mm)
Note: Insulation ODs and nominal conductor sizes are based on 100% compact and concentric stranded cable dimensions
Installation Instructions
Cable preparation tools Clean, lint-free cloths
Non-conducting abrasive cloth,120 grit or finer Electrician's tape
Connector(s) and installation toolsSuggested Installation Equipment (not supplied with kit)
Cleaning the Cable
Use an approved solvent, such asthe one supplied in the P63 CablePrep Kit, to clean the cable. Besure to follow the manufacturer'sinstructions. Failure to follow theseinstructions could lead to productfailure.
Some newer solvents do notevaporate quickly and need to beremoved with a clean, lint-freecloth. Failure to do so couldchange the electrical characteristicsof the cable or leave a residue onthe surface.
Please follow the manufacturer'sinstructions carefully.
Safety Instructions
Warning: When installing electricalpower system accessories, failure tofollow applicable personal safetyrequirements and written installationinstructions could result in serious orfatal injuries.
As Tyco Electronics has no controlover field conditions whichinfluence product installation, it isunderstood that the user must takethis into account and apply his ownexperience and expertise wheninstalling product.
Kit Contents
1 Installation Instruction2 Silicone housings on holdouts1 Stress control patch1 Roll spring1 Solder blocked ground braid2 Adhesive backed copper tape strips1 Cloth tape1 Leakage current collector
Sealant tape strips
Installation Instructions For Tape Shielded Cable
PII-55099, Rev AG PCN 393397-000Effective Date: August 17, 2001
4
2. Prepare cablesDetermine insulation cutback: length Z.
Figure 1: Insulation Cutback (Z)
Note: If no lug is used, Z = 2" (50mm) "Y"Length ofLug Barrel
+= "Z"InsulationCutback
1/4"(6mm)
(6mm)1/4"
Y
Z
481
Refer to Figure 1 and adjacentdrawing to prepare the cable asshown.
Remove the backing from a piece ofcopper foil provided and tape over theend of the shield as shown.
19"(483mm) + Z
Jacket Cutback + Z
Tape Shield Semi-Con
Z (25mm)1"
(25mm)1"
512
Adhesive Back Copper Foil Tape
512b
Installation Instructions
PII-55099, Rev AG PCN 393397-000Effective Date: August 17, 2001
5
Spring Clamp
1/4" (5mm)
Ground BraidMoistureBlock
516
516a
3. Install ground braid
Flare the moisture blocked end ofthe ground braid and place it ontothe tape shield butted up to thecable jacket. Attach the braid tothe shield by placing two wraps ofthe spring clamp over the braid 1/4from the jacket cutback. Fold thebraid back over the spring clampwraps. Continue to wrap theremaining clamp over the braid.Tighten clamp by twisting it in thedirection it is wrapped.
Apply a small piece of copperadhesive tape foil on top of thespring clamp as shown.
Note: Wrap the copper adhesivetape foil in the same direction asthe spring clamp to tighten thewrap.
4. Make Lug Connection
Crimp the connector using properdie and tool. Clean lug barrel ofinhibitor and dirt and file off anysharp edges.
Lug
518
5. Abrade (sand) and cleaninsulation
Abrade and clean the surface of theprimary insulation using the solventsupplied with the termination or anyother approved solvent. Be sure toremove any conductive particles orcontamination.
Note: Use aluminum oxideabrasive strip only.
Abrade &Clean
518a
Copper Adhesive Tape
516b
Installation Instructions
PII-55099, Rev AG PCN 393397-000Effective Date: August 17, 2001
6
6. Install sealant
Start wrapping sealant at end of lugbarrel. Continue wrapping (no halflaps) until sealant is same thicknessas insulation (at least two wraps).
Continue wrapping on to the cableinsulation for 1/2. Snap off anyadditional mastic.
Solvent clean and abrade (sand)jacket. Using light tension, wrap onelayer of sealant onto the cable jacket,even with the jacket cutback asshown.
Press the solder-blocked portion ofthe braid into the sealant. Wrap anadditional layer of sealant over thebraid solder-block, sandwiching thesolder-block between layers ofsealant.
To ensure the correct positioning ofthe termination, place a marker tape4-1/4 (108mm) from the semi-concutback as shown.
Tape sealant 515
Note: Some Lug Barrel May Be Showing
Overlap Insulation1/2"(10mm)
518c
Tape sealant 515a
TapeSealant
Start Here
Insulation
Same ThicknessAs Insulation
500
501
Tape sealant
4-1/4"(108mm)
515d
7. Apply Stress Patch
Note: The stress patch easilysticks to itself and loose particles.
Note: The patch may berectangular. Follow the direction ofthe arrow on the backing paper ofthe stress patch. Longer dimensiongoes around the cable.
Remove backing paper from thepatch. Using light tension andoverlapping the semi-con by1(25mm), wrap the entire patcharound the semi-con as shown.Avoid wrinkles and creases.
StressRelief Patch
Overlap semi-conby 1"(25mm)
approx. 4-3/4"
(120mm)
519
8. Tape over sharp edges
Using cloth tape provided, tape overall sharp edges of the ground clampassembly.
Tape over sharp edges
1/4" (6.5mm) Gap519a
9. Loosening TerminationThis operation is vital to thesimple installation of theproduct.
There are two terminations inthis kit (one with three sheds,the other with five). Loosenboth in the manner shownopposite. Install the five shedtermination first.Hold the termination in one handand the holdout in the other.Gripping firmly, twist the terminationand holdout in opposite directions.Repeat twisting the termination andholdout, moving the hand in shortincrements up the termination untilthe entire termination is felt to moveon the holdout. Slide thetermination until it lines up with theend of the holdout tube as shown.
Note: Take care not to slide thetermination off the end of theholdout. Stop the terminationabout 1/4 from the end of theholdout.
Installation Instructions
PII-55099, Rev AG PCN 393397-000Effective Date: August 17, 2001
7
Holdout Sheds Lug symbol band
Flipped-back end
1/4" Stop Here
Termination
523ca
Installation Instructions
PII-55099, Rev AG PCN 393397-000Effective Date: August 17, 2001
8
1/4"(6mm)
1-1/4"(32mm)Sealant
15"(381mm)
Align end with edge of tape marker
Twist clockwise and counterclockwisewhile pulling out
Align the end of the holdout with the edge of the sealant
524jcn
526jcn
527jcn
528jcn
529jcn
10. Installing the termination.
Position the holdout over the cableuntil it meets the jacket cutback. Twistthe termination and slowly push it tothe end of the holdout.
Slide the termination off the holdoutwith a twisting motion holding thetermination that is on the holdout inone hand and pulling the holdout withthe other.
Note: Do NOT stretch thetermination.
Do NOT hold the termination that ispartially installed and attempt to pullthe remaining termination off theholdout, as this will stretch thetermination and generate animproperly installed termination if notrepositioned.
Using the pull tabs, pull the flip-backportion away from the maintermination, at the same time workingthe first two fingers of each handbetween the flip-back and maintermination. Pull the stretched out flip-back over the cable jacket andsealant.
After installation, gently slide thetermination so that the end aligns withthe edge of the marker tape installedin step 6. Make sure the terminationlength is in accordance with thedimensions shown.
Having positioned the termination,now wrap one layer tape sealant overthe end of the termination and1/4(6mm) onto the cable insulation asshown.
Remove tape marker.
Installation Instructions
PII-55099, Rev AG PCN 393397-000Effective Date: August 17, 2001
9
Slide the three-shedded termination over the cable until it meets the leading edge of the sealant strip as shown.Twist the termination and slowly push it to the end of the holdout.
Slide the termination completely off the holdout using a twisting and pulling motion as shown.
Using the pull tabs, pull the flip-back portion away from the main termination, at the same time working the firsttwo fingers of each hand between the flip-back and main termination. Pull the stretched out flip-back over thesealant.
Align the end of the holdout with the edge of the sealant
Twist clockwise and counterclockwisewhile pulling out
530jcn
532jcn
533jcn
11. Installing the termination (continued).
7Installation Instructions
PII-55099, Rev AG PCN 393397-000Effective Date: August 17, 2001
10
12. Complete installation
If necessary, adjust the three-sheddedtermination to overlap the sealant onthe lug barrel (see drawing below).Place the leakage current collector1/4(6mm) from the end of thetermination as shown. Use a copperwire to connect the current collector tothe ground braid.
Wipe over the surface of thetermination to remove any dirt orgrease.
Note: Be sure to position terminationat lug end so that there is a bead ofsealant exposed as shown.
This completes the installation.
Leakage CurrentCollector
1/4"(6mm)
Sealant 534jcn
Installation Instructions For Wire Shield Cable
PII-55099, Rev AG PCN 393397-000Effective Date: August 17, 2001
11
1. Prepare cablesDetermine insulation cutback: length Z.
Figure 1: Insulation Cutback (Z)
Note: If no lug is used, Z = 2" (50mm) "Y"Length ofLug Barrel
+= "Z"InsulationCutback
1/4"(6mm)
(6mm)1/4"
Y
Z
481
Refer to Figure 1 and adjacentdrawing to prepare the cable asshown. Pull back drain wires asshown. Do not pigtail wires at thistime. (50mm)
Cable Jacket Shield Wires
Semi-Con
2"
Z
19"(483mm)+ Z
513
2. Make Lug Connection
Crimp the connector using properdie and tool. Clean lug barrel ofinhibitor and dirt and file off anysharp edges.
Lug
518k
3. Abrade (sand) and cleaninsulation
Abrade and clean the surface of theprimary insulation using the solventsupplied with the termination or anyother approved solvent. Be sure toremove any conductive particles orcontamination.
Note: Use aluminum oxideabrasive strip only.
Abrade &Clean
518l
Installation Instructions
PII-55099, Rev AG PCN 393397-000Effective Date: August 17, 2001
12
Note: Some Lug Barrel May Be Showing
Overlap Insulation1/2"(10mm)
518m
TapeSealant
Start Here
Insulation
Same ThicknessAs Insulation
500d
501d
4. Install sealant
Start wrapping sealant at end of lugbarrel. Continue wrapping (no halflaps) until sealant is samethickness as insulation (at least twowraps).
Continue wrapping on to the cableinsulation for 1/2. Snap off anyadditional mastic.
5. Apply tape sealant
Lift the drain wires away from thecable jacket. Solvent clean andabrade jacket. Using light tension,wrap one layer of sealant onto thecable jacket as shown.
Lay the drain wires evenly backover the jacket and press them intothe sealant.
Wrap an additional layer of sealantover the drain wires and previouslyapplied sealant.
To ensure the correct positioning ofthe termination, place a markertape 4-1/4 (108mm) from the semi-con cutback as shown.
Tape sealant
Press wires into sealant
521b
533b
533c
4-1/4"(108mm)
533d
Installation Instructions
PII-55099, Rev AG PCN 393397-000Effective Date: August 17, 2001
13
6. Apply Stress Patch
Note: The stress patch easilysticks to itself and loose particles.
Note: The patch may berectangular. Follow the direction ofthe arrow on the backing paper ofthe stress patch. Longer dimensiongoes around the cable.
Remove backing paper from thepatch. Using light tension andoverlapping the semi-con by1(25mm), wrap the entire patcharound the semi-con as shown.Avoid wrinkles and creases.
StressRelief Patch
1" (25mm) Onto Semi-con
approx. 4-3/4"
(120mm)
519f
7. Loosening TerminationThis operation is vital to thesimple installation of theproduct.
There are two terminations inthis kit (one with three sheds,the other with five). Loosenboth in the manner shownopposite. Install the five shedtermination first.Hold the termination in one handand the holdout in the other.Gripping firmly, twist the terminationand holdout in opposite directions.Repeat twisting the termination andholdout, moving the hand in shortincrements up the termination untilthe entire termination is felt to moveon the holdout. Slide thetermination until it lines up with theend of the holdout tube as shown.
Note: Take care not to slide thetermination off the end of theholdout. Stop the terminationabout 1/4 from the end of theholdout
523ca
Holdout Sheds Lug symbol band
Flipped-back end
1/4" Stop Here
Termination
8. Installing termination
Position the holdout over the cableuntil it meets the jacket cutback. Twistthe termination and slowly push it tothe end of the holdout.
Slide the termination off the holdoutwith a twisting motion holding thetermination that is on the holdout inone hand and pulling the holdout withthe other.
Note: Do NOT stretch thetermination.
Do NOT hold the termination that ispartially installed and attempt to pullthe remaining termination off theholdout, as this will stretch thetermination and generate animproperly installed termination if notrepositioned.
Using the pull tabs, pull the flip-backportion away from the maintermination, at the same time workingthe first two fingers of each handbetween the flip-back and maintermination. Pull the stretched out flip-back over the cable jacket andsealant.
After installation, gently slide thetermination so that the end aligns withthe edge of the marker tape installedin step 5. Make sure the terminationlength is in accordance with thedimenisions shown.
Having positioned the termination,now wrap one layer tape sealant overthe end of the termination and 1/4(6mm) onto the cable insulation as shown.
Remove tape maker.
525ca
Installation Instructions
PII-55099, Rev AG PCN 393397-000Effective Date: August 17, 2001
14
Align the end of the holdout with the edge of the sealant
524ca
526ca
Twist clockwise and counterclockwise while pulling out
527ca
15"(381mm)
Align end with edge of tape marker
1/4"(6mm)
1-1/4"(32mm)Sealant
528ca
529ca
Installation Instructions
PII-55099, Rev AG PCN 393397-000Effective Date: August 17, 2001
15
Slide the three-shedded termination over the cable until it meets the leading edge of the sealant strip as shown.Twist the termination and slowly push it to the end of the holdout.
Slide the termination completely off the holdout using a twisting and pulling motion as shown.
Using the pull tabs, pull the flip-back portion away from the main termination, at the same time working the firsttwo fingers of each hand between the flip-back and main termination. Pull the stretched out flip-back over thesealant.
Align the end of the holdout with the edge of the sealant
Twist clockwise and counterclockwisewhile pulling out
530jcn
532jcn
533jcn
9. Installing the termination (continued).
7Installation Instructions
PII-55099, Rev AG PCN 393397-000Effective Date: August 17, 2001
16
10. Complete installation
If necessary, adjust the three-sheddedtermination to overlap the sealant onthe lug barrel (see drawing below).Place the leakage current collector1/4(6mm) from the end of thetermination as shown. Use a copperwire to connect the current collector tothe ground braid.
Wipe over the surface of thetermination to remove any dirt orgrease.
Note: Be sure to position terminationat lug end so that there is a bead ofsealant exposed as shown.
This completes the installation.
Leakage CurrentCollector
1/4"(6mm)
Sealant 534lca
Installation Instructions For UniShield Cable
PII-55099, Rev AG PCN 393397-000Effective Date: August 17, 2001
17
1. Prepare cablesDetermine insulation cutback: length Z.
Figure 1: Insulation Cutback (Z)
Note: If no lug is used, Z = 2" (50mm) "Y"Length ofLug Barrel
+= "Z"InsulationCutback
1/4"(6mm)
(6mm)1/4"
Y
Z
481
Refer to Figure 1 and adjacentdrawing to prepare the cable asshown. Pull back drain wires asshown before cutting semi-con/jacket. (50mm)2"
Shield Wires Cable Jacket / Semi-Con
Z
19"(483mm)+ Z
514
2. Make Lug Connection
Crimp the connector using properdie and tool. Clean lug barrel ofinhibitor and dirt and file off anysharp edges.
Lug
518g
3. Abrade (sand) and cleaninsulation
Abrade and clean the surface of theprimary insulation using the solventsupplied with the termination or anyother approved solvent. Be sure toremove any conductive particles orcontamination.
Note: Use aluminum oxideabrasive strip only.
Abrade &Clean
518h
Installation Instructions
PII-55099, Rev AG PCN 393397-000Effective Date: August 17, 2001
18
Note: Some Lug Barrel May Be Showing
Overlap Insulation1/2"(10mm)
518i
TapeSealant
Start Here
Insulation
Same ThicknessAs Insulation
500c
501c
4. Install sealant
Start wrapping sealant at end of lugbarrel. Continue wrapping (no halflaps) until sealant is samethickness as insulation (at least twowraps).
Continue wrapping on to the cableinsulation for 1/2. Snap off anyadditional mastic.
5. Apply tape sealant
Lift the drain wires away from thecable jacket. Solvent clean andabrade jacket. Using light tension,wrap one layer of sealant onto thejacket as shown.
Lay the drain wires evenly backover the jacket and press them intothe sealant.
Wrap an additional layer of sealantover the drain wires and previouslyapplied sealant.
To ensure the correct positioning ofthe termination, place a markertape 4-1/4 (108mm) from the semi-con cutback as shown.
Tape sealant
Press wires into sealant
521
533a
533e
4-1/4"(108mm)
533t
Installation Instructions
PII-55099, Rev AG PCN 393397-000Effective Date: August 17, 2001
19
6. Apply Stress Patch
Note: The stress patch easilysticks to itself and loose particles.
Note: The patch may berectangular. Follow the direction ofthe arrow on the backing paper ofthe stress patch. Longer dimensiongoes around the cable.
Remove backing paper from thepatch. Using light tension andoverlapping the semi-con by1(25mm), wrap the entire patcharound the semi-con jacket asshown. Avoid wrinkles and creases.
StressRelief Patch
1"(25mm) Onto Semi-Con/Jacket
approx. 4-3/4"
(120mm)
519e
7. Loosening TerminationThis operation is vital to thesimple installation of theproduct.
There are two terminations inthis kit (one with three sheds,the other with five). Loosenboth in the manner shownopposite. Install the five shedtermination first.Hold the termination in one handand the holdout in the other.Gripping firmly, twist the terminationand holdout in opposite directions.Repeat twisting the termination andholdout, moving the hand in shortincrements up the termination untilthe entire termination is felt to moveon the holdout. Slide thetermination until it lines up with theend of the holdout tube as shown.
Note: Take care not to slide thetermination off the end of theholdout. Stop the terminationabout 1/4 from the end of theholdout.
Holdout Sheds Lug symbol band
Flipped-back end
1/4" Stop Here
Termination
523ca
8. Installing termination
Position the holdout over the cableuntil it meets the jacket cutback. Twistthe termination and slowly push it tothe end of the holdout.
Slide the termination off the holdoutwith a twisting motion holding thetermination that is on the holdout inone hand and pulling the holdout withthe other.
Note: Do NOT stretch thetermination.
Do NOT hold the termination that ispartially installed and attempt to pullthe remaining termination off theholdout, as this will stretch thetermination and generate animproperly installed termination if notrepositioned.
Using the pull tabs, pull the flip-backportion away from the maintermination, at the same time workingthe first two fingers of each handbetween the flip-back and maintermination. Pull the stretched out flip-back over the cable jacket andsealant.
After installation, gently slide thetermination so that the end aligns withthe edge of the marker tape installedin step 5. Make sure the terminationlength is in accordance with thedimenisons shown.
Having positioned the termination,now wrap one layer tape sealant overthe end of the termination and 1/4(6mm) onto the cable insulation asshown.
Remove tape meter.
525ca
Installation Instructions
PII-55099, Rev AG PCN 393397-000Effective Date: August 17, 2001
20
Align the end of the holdout with the edge of the sealant
524ca
526ca
Twist clockwise and counterclockwise while pulling out
527ca
15"(381mm)
Align end with edge of tape marker 528ca
1/4"(6mm)
1-1/4"(32mm)Sealant
529ca
Installation Instructions
PII-55099, Rev AG PCN 393397-000Effective Date: August 17, 2001
21
Slide the three-shedded termination over the cable until it meets the leading edge of the sealant strip as shown.Twist the termination and slowly push it to the end of the holdout.
Slide the termination completely off the holdout using a twisting and pulling motion as shown.
Using the pull tabs, pull the flip-back portion away from the main termination, at the same time working the firsttwo fingers of each hand between the flip-back and main termination. Pull the stretched out flip-back over thesealant.
Align the end of the holdout with the edge of the sealant
Twist clockwise and counterclockwisewhile pulling out
530jcn
532jcn
533jcn
9. Installing the termination (continued).
PII-55099, Rev AG PCN 393397-000Effective Date: August 17, 2001
22
Installation Instructions
7
10. Complete installation
If necessary, adjust the three-sheddedtermination to overlap the sealant onthe lug barrel (see drawing below).Place the leakage current collector1/4(6mm) from the end of thetermination as shown. Use a copperwire to connect the current collector tothe ground braid.
Wipe over the surface of thetermination to remove any dirt orgrease.
Note: Be sure to position terminationat lug end so that there is a bead ofsealant exposed as shown.
This completes the installation.
Leakage CurrentCollector
1/4"(6mm)
Sealant 534lca
Installation Instructions For Lead Sheath Cable
PII-55099, Rev AG PCN 393397-000Effective Date: August 17, 2001
23
1. Prepare cables.Determine insulation cutback: length Z.
Figure 1: Insulation Cutback (Z)
Note: If no lug is used, Z = 2" (50mm) "Y"Length ofLug Barrel
+= "Z"InsulationCutback
1/4"(6mm)
(6mm)1/4"
Y
Z
481
Refer to Figure 1 and adjacentdrawing to prepare the cable asshown.
Z(25mm)1"
(25mm)1"
(50mm)2"
Cable Jacket Lead Sheath
Semi-Con
19"(483mm)+ Z
512a
Installation Instructions
PII-55099, Rev AG PCN 393397-000Effective Date: August 17, 2001
24
GroundBraid
MoistureBlock 519y
2. Install ground braid
Flare the moisture blocked end ofthe ground braid and place it ontothe lead sheath butted up to thecable jacket and solder to the leadsheath.
3. Make Lug Connection
Crimp the connector using properdie and tool. Clean lug barrel ofinhibitor and dirt and file off anysharp edges.
Lug
518b
4. Abrade (sand) and cleaninsulation
Abrade and clean the surface of theprimary insulation using the solventsupplied with the termination or anyother approved solvent. Be sure toremove any conductive particles orcontamination.
Note: Use aluminum oxideabrasive strip only.
Abrade &Clean
518d
Installation Instructions
PII-55099, Rev AG PCN 393397-000Effective Date: August 17, 2001
25
5. Install sealant
Start wrapping sealant at end of lugbarrel. Continue wrapping (no halflaps) until sealant is same thicknessas insulation (at least two wraps).
Continue wrapping on to the cableinsulation for 1/2. Snap off anyadditional mastic.
Solvent clean and abrade (sand)jacket. Using light tension, wrap onelayer of sealant onto the cable jacket,even with the jacket cutback asshown.
Press the solder-blocked portion ofthe braid into the sealant. Wrap anadditional layer of sealant over thebraid solder-block, sandwiching thesolder-block between layers ofsealant.
To ensure the correct positioning ofthe termination, place a marker tape4-1/4 (108mm) from the semi-concutback as shown.
Tape sealant 515b
Note: Some Lug Barrel May Be Showing
Overlap Insulation1/2"(10mm)
518e
Tape sealant 515c
TapeSealant
Start Here
Insulation
Same ThicknessAs Insulation
500a
501a
Tape sealant
4-1/4"(108mm)
515s
6. Apply Stress Patch
Note: The stress patch easilysticks to itself and loose particles.
Note: The patch may berectangular. Follow the direction ofthe arrow on the backing paper ofthe stress patch. Longer dimensiongoes around the cable.
Remove backing paper from thepatch. Using light tension andoverlapping the semi-con by1(25mm), wrap the entire patcharound the semi-con as shown.Avoid wrinkles and creases.
StressRelief Patch
approx. 4-3/4"
(120mm)
Overlap semi-conby 1"(25mm)
519c
8. Loosening TerminationThis operation is vital to thesimple installation of theproduct.
There are two terminations inthis kit (one with three sheds,the other with five). Loosenboth in the manner shownopposite. Install the five shedtermination first.Hold the termination in one handand the holdout in the other.Gripping firmly, twist the terminationand holdout in opposite directions.Repeat twisting the termination andholdout, moving the hand in shortincrements up the termination untilthe entire termination is felt to moveon the holdout. Slide thetermination until it lines up with theend of the holdout tube as shown.
Note: Take care not to slide thetermination off the end of theholdout. Stop the terminationabout 1/4 from the end of theholdout.
Installation Instructions
PII-55099, Rev AG PCN 393397-000Effective Date: August 17, 2001
26
Holdout Sheds Lug symbol band
Flipped-back end
1/4" Stop Here
Termination
523ca
7. Tape over sharp edges
Using cloth tape provided, tape overall sharp edges of the ground clampassembly.
Tape over sharp edges
1/4" (6.5mm) Gap519z
Installation Instructions9. Installing termination
Position the holdout over the cableuntil it meets the jacket cutback. Twistthe termination and slowly push it tothe end of the holdout.
Slide the termination off the holdoutwith a twisting motion holding thetermination that is on the holdout inone hand and pulling the holdout withthe other.
Note: Do NOT stretch thetermination.
Do NOT hold the termination that ispartially installed and attempt to pullthe remaining termination off theholdout, as this will stretch thetermination and generate animproperly installed termination if notrepositioned.
Using the pull tabs, pull the flip-backportion away from the maintermination, at the same time workingthe first two fingers of each handbetween the flip-back and maintermination. Pull the stretched out flip-back over the cable jacket andsealant.
After installation, gently slide thetermination so that the end aligns withthe edge of the marker tape installedin step 5. Make sure the terminationlength is in accordance with thedimensions shown.
Having positioned the termination,now wrap one layer tape sealant overthe end of the termination and 1/4(6mm) onto the cable insulation asshown.
Remove tape marker.
PII-55099, Rev AG PCN 393397-000Effective Date: August 17, 2001
27
1/4"(6mm)
1-1/4"(32mm)Sealant
15"(381mm)
Align end with edge of tape marker
Twist clockwise and counterclockwisewhile pulling out
Align the end of the holdout with the edge of the sealant
524jcn
526jcn
527jcn
528jcn
529jcn
Installation Instructions
PII-55099, Rev AG PCN 393397-000Effective Date: August 17, 2001
28
Slide the three-shedded termination over the cable until it meets the leading edge of the sealant strip as shown.Twist the termination and slowly push it to the end of the holdout.
Slide the termination completely off the holdout using a twisting and pulling motion as shown.
Using the pull tabs, pull the flip-back portion away from the main termination, at the same time working the firsttwo fingers of each hand between the flip-back and main termination. Pull the stretched out flip-back over thesealant.
Align the end of the holdout with the edge of the sealant
Twist clockwise and counterclockwisewhile pulling out
530jcn
532jcn
533jcn
10. Installing the termination (continued).
PII-55099, Rev AGPCN 393397-000Effective Date: August 17, 2001
2001 Tyco Electronics CorporationPrinted USA 8/17/2001
29
The Information contained in these installation instructions is for use only by installers trained to make electrical power installations and is intended to describe thecorrect method of installation for this product. However, Tyco Electronics has no control over the field conditions which influence product installation. It is theuser's responsibility to determine the suitability of the installation method in the user's field conditions. Tyco Electronics' only obligations are those in TycoElectronics' standard Conditions of Sale for this product and in no case will Tyco Electronics be liable for any other incidental, indirect or consequential damagesarising from the use or misuse of the products. Raychem is a trade mark of Tyco Electronics Corporation.
7* Unishield is a trademark of BICC General Cable Industries, INC.
Installation Instructions11. Complete installation
If necessary, adjust the three-sheddedtermination to overlap the sealant onthe lug barrel (see drawing below).Place the leakage current collector1/4(6mm) from the end of thetermination as shown. Use a copperwire to connect the current collector tothe ground braid.
Wipe over the surface of thetermination to remove any dirt orgrease.
Note: Be sure to position terminationat lug end so that there is a bead ofsealant exposed as shown.
This completes the installation.
Leakage CurrentCollector
1/4"(6mm)
Sealant 534jcn
/ColorImageDict > /JPEG2000ColorACSImageDict > /JPEG2000ColorImageDict > /AntiAliasGrayImages false /DownsampleGrayImages true /GrayImageDownsampleType /Bicubic /GrayImageResolution 300 /GrayImageDepth -1 /GrayImageDownsampleThreshold 1.50000 /EncodeGrayImages true /GrayImageFilter /DCTEncode /AutoFilterGrayImages true /GrayImageAutoFilterStrategy /JPEG /GrayACSImageDict > /GrayImageDict > /JPEG2000GrayACSImageDict > /JPEG2000GrayImageDict > /AntiAliasMonoImages false /DownsampleMonoImages true /MonoImageDownsampleType /Bicubic /MonoImageResolution 1200 /MonoImageDepth -1 /MonoImageDownsampleThreshold 1.50000 /EncodeMonoImages true /MonoImageFilter /CCITTFaxEncode /MonoImageDict > /AllowPSXObjects false /PDFX1aCheck false /PDFX3Check false /PDFXCompliantPDFOnly false /PDFXNoTrimBoxError true /PDFXTrimBoxToMediaBoxOffset [ 0.00000 0.00000 0.00000 0.00000 ] /PDFXSetBleedBoxToMediaBox true /PDFXBleedBoxToTrimBoxOffset [ 0.00000 0.00000 0.00000 0.00000 ] /PDFXOutputIntentProfile () /PDFXOutputCondition () /PDFXRegistryName (http://www.color.org) /PDFXTrapped /Unknown