TFT-350R-SG 35kV Cold Applied Outdoor Termination for Copper Tape, Wire Shield, Lead Sheath and UniShield ®∗ Cable Product Installation Instructions Raychem Tyco Electronics-Energy 8000 Purfoy Road Fuquay-Varina, NC 27526 PII-55099, Rev AG PCN 393397-000 Effective Date: August 17, 2001 Energy Division * Unishield is a trademark of BICC General Cable Industries, INC.

RAYCHEM TFT-350R-SG

Embed Size (px)

DESCRIPTION

TFT-350R-SG RAYCHEM INSTALLATION MANUAL

Citation preview

  • TFT-350R-SG

    35kV Cold Applied OutdoorTermination for Copper Tape,Wire Shield, Lead Sheath andUniShield Cable

    Product Installation Instructions

    Raychem Tyco Electronics-Energy8000 Purfoy RoadFuquay-Varina, NC 27526

    PII-55099, Rev AGPCN 393397-000Effective Date: August 17, 2001

    Energy Division * Unishield is a trademark of BICC General Cable Industries, INC.

  • PII-55099, Rev AG PCN 393397-000Effective Date: August 17, 2001

    2

    Cable Type SelectionsNote: There are separateinstructions for each cable typeaddressed in this instruction. Turnto the page denoted below for yourcable type.

    Tape Shield Cable (page 4)

    1

    2

    3

    4

    Wire Shield Cable (page 11)

    UniShield Cable (page 17)

    Lead Sheath Cable (page 23)

  • PII-55099, Rev AG PCN 393397-000Effective Date: August 17, 2001

    3

    General Instructions

    1. Select product.

    Check kit selection with cablediameter dimensions in table 1opposite.

    Table 1

    NominalConductor Min/max

    Kit Size Insulation ODs*TFT-352R-SG 1/0-250 kcmil 0.85-1.45(22-37mm)TFT-353R-SG 4/0-500 kcmil 1.06-1.70(27-43mm)TFT-354R-SG 500-1250 kcmil 1.49-2.20(38-56mm)

    Note: Insulation ODs and nominal conductor sizes are based on 100% compact and concentric stranded cable dimensions

    Installation Instructions

    Cable preparation tools Clean, lint-free cloths

    Non-conducting abrasive cloth,120 grit or finer Electrician's tape

    Connector(s) and installation toolsSuggested Installation Equipment (not supplied with kit)

    Cleaning the Cable

    Use an approved solvent, such asthe one supplied in the P63 CablePrep Kit, to clean the cable. Besure to follow the manufacturer'sinstructions. Failure to follow theseinstructions could lead to productfailure.

    Some newer solvents do notevaporate quickly and need to beremoved with a clean, lint-freecloth. Failure to do so couldchange the electrical characteristicsof the cable or leave a residue onthe surface.

    Please follow the manufacturer'sinstructions carefully.

    Safety Instructions

    Warning: When installing electricalpower system accessories, failure tofollow applicable personal safetyrequirements and written installationinstructions could result in serious orfatal injuries.

    As Tyco Electronics has no controlover field conditions whichinfluence product installation, it isunderstood that the user must takethis into account and apply his ownexperience and expertise wheninstalling product.

    Kit Contents

    1 Installation Instruction2 Silicone housings on holdouts1 Stress control patch1 Roll spring1 Solder blocked ground braid2 Adhesive backed copper tape strips1 Cloth tape1 Leakage current collector

    Sealant tape strips

  • Installation Instructions For Tape Shielded Cable

    PII-55099, Rev AG PCN 393397-000Effective Date: August 17, 2001

    4

    2. Prepare cablesDetermine insulation cutback: length Z.

    Figure 1: Insulation Cutback (Z)

    Note: If no lug is used, Z = 2" (50mm) "Y"Length ofLug Barrel

    += "Z"InsulationCutback

    1/4"(6mm)

    (6mm)1/4"

    Y

    Z

    481

    Refer to Figure 1 and adjacentdrawing to prepare the cable asshown.

    Remove the backing from a piece ofcopper foil provided and tape over theend of the shield as shown.

    19"(483mm) + Z

    Jacket Cutback + Z

    Tape Shield Semi-Con

    Z (25mm)1"

    (25mm)1"

    512

    Adhesive Back Copper Foil Tape

    512b

  • Installation Instructions

    PII-55099, Rev AG PCN 393397-000Effective Date: August 17, 2001

    5

    Spring Clamp

    1/4" (5mm)

    Ground BraidMoistureBlock

    516

    516a

    3. Install ground braid

    Flare the moisture blocked end ofthe ground braid and place it ontothe tape shield butted up to thecable jacket. Attach the braid tothe shield by placing two wraps ofthe spring clamp over the braid 1/4from the jacket cutback. Fold thebraid back over the spring clampwraps. Continue to wrap theremaining clamp over the braid.Tighten clamp by twisting it in thedirection it is wrapped.

    Apply a small piece of copperadhesive tape foil on top of thespring clamp as shown.

    Note: Wrap the copper adhesivetape foil in the same direction asthe spring clamp to tighten thewrap.

    4. Make Lug Connection

    Crimp the connector using properdie and tool. Clean lug barrel ofinhibitor and dirt and file off anysharp edges.

    Lug

    518

    5. Abrade (sand) and cleaninsulation

    Abrade and clean the surface of theprimary insulation using the solventsupplied with the termination or anyother approved solvent. Be sure toremove any conductive particles orcontamination.

    Note: Use aluminum oxideabrasive strip only.

    Abrade &Clean

    518a

    Copper Adhesive Tape

    516b

  • Installation Instructions

    PII-55099, Rev AG PCN 393397-000Effective Date: August 17, 2001

    6

    6. Install sealant

    Start wrapping sealant at end of lugbarrel. Continue wrapping (no halflaps) until sealant is same thicknessas insulation (at least two wraps).

    Continue wrapping on to the cableinsulation for 1/2. Snap off anyadditional mastic.

    Solvent clean and abrade (sand)jacket. Using light tension, wrap onelayer of sealant onto the cable jacket,even with the jacket cutback asshown.

    Press the solder-blocked portion ofthe braid into the sealant. Wrap anadditional layer of sealant over thebraid solder-block, sandwiching thesolder-block between layers ofsealant.

    To ensure the correct positioning ofthe termination, place a marker tape4-1/4 (108mm) from the semi-concutback as shown.

    Tape sealant 515

    Note: Some Lug Barrel May Be Showing

    Overlap Insulation1/2"(10mm)

    518c

    Tape sealant 515a

    TapeSealant

    Start Here

    Insulation

    Same ThicknessAs Insulation

    500

    501

    Tape sealant

    4-1/4"(108mm)

    515d

  • 7. Apply Stress Patch

    Note: The stress patch easilysticks to itself and loose particles.

    Note: The patch may berectangular. Follow the direction ofthe arrow on the backing paper ofthe stress patch. Longer dimensiongoes around the cable.

    Remove backing paper from thepatch. Using light tension andoverlapping the semi-con by1(25mm), wrap the entire patcharound the semi-con as shown.Avoid wrinkles and creases.

    StressRelief Patch

    Overlap semi-conby 1"(25mm)

    approx. 4-3/4"

    (120mm)

    519

    8. Tape over sharp edges

    Using cloth tape provided, tape overall sharp edges of the ground clampassembly.

    Tape over sharp edges

    1/4" (6.5mm) Gap519a

    9. Loosening TerminationThis operation is vital to thesimple installation of theproduct.

    There are two terminations inthis kit (one with three sheds,the other with five). Loosenboth in the manner shownopposite. Install the five shedtermination first.Hold the termination in one handand the holdout in the other.Gripping firmly, twist the terminationand holdout in opposite directions.Repeat twisting the termination andholdout, moving the hand in shortincrements up the termination untilthe entire termination is felt to moveon the holdout. Slide thetermination until it lines up with theend of the holdout tube as shown.

    Note: Take care not to slide thetermination off the end of theholdout. Stop the terminationabout 1/4 from the end of theholdout.

    Installation Instructions

    PII-55099, Rev AG PCN 393397-000Effective Date: August 17, 2001

    7

    Holdout Sheds Lug symbol band

    Flipped-back end

    1/4" Stop Here

    Termination

    523ca

  • Installation Instructions

    PII-55099, Rev AG PCN 393397-000Effective Date: August 17, 2001

    8

    1/4"(6mm)

    1-1/4"(32mm)Sealant

    15"(381mm)

    Align end with edge of tape marker

    Twist clockwise and counterclockwisewhile pulling out

    Align the end of the holdout with the edge of the sealant

    524jcn

    526jcn

    527jcn

    528jcn

    529jcn

    10. Installing the termination.

    Position the holdout over the cableuntil it meets the jacket cutback. Twistthe termination and slowly push it tothe end of the holdout.

    Slide the termination off the holdoutwith a twisting motion holding thetermination that is on the holdout inone hand and pulling the holdout withthe other.

    Note: Do NOT stretch thetermination.

    Do NOT hold the termination that ispartially installed and attempt to pullthe remaining termination off theholdout, as this will stretch thetermination and generate animproperly installed termination if notrepositioned.

    Using the pull tabs, pull the flip-backportion away from the maintermination, at the same time workingthe first two fingers of each handbetween the flip-back and maintermination. Pull the stretched out flip-back over the cable jacket andsealant.

    After installation, gently slide thetermination so that the end aligns withthe edge of the marker tape installedin step 6. Make sure the terminationlength is in accordance with thedimensions shown.

    Having positioned the termination,now wrap one layer tape sealant overthe end of the termination and1/4(6mm) onto the cable insulation asshown.

    Remove tape marker.

  • Installation Instructions

    PII-55099, Rev AG PCN 393397-000Effective Date: August 17, 2001

    9

    Slide the three-shedded termination over the cable until it meets the leading edge of the sealant strip as shown.Twist the termination and slowly push it to the end of the holdout.

    Slide the termination completely off the holdout using a twisting and pulling motion as shown.

    Using the pull tabs, pull the flip-back portion away from the main termination, at the same time working the firsttwo fingers of each hand between the flip-back and main termination. Pull the stretched out flip-back over thesealant.

    Align the end of the holdout with the edge of the sealant

    Twist clockwise and counterclockwisewhile pulling out

    530jcn

    532jcn

    533jcn

    11. Installing the termination (continued).

  • 7Installation Instructions

    PII-55099, Rev AG PCN 393397-000Effective Date: August 17, 2001

    10

    12. Complete installation

    If necessary, adjust the three-sheddedtermination to overlap the sealant onthe lug barrel (see drawing below).Place the leakage current collector1/4(6mm) from the end of thetermination as shown. Use a copperwire to connect the current collector tothe ground braid.

    Wipe over the surface of thetermination to remove any dirt orgrease.

    Note: Be sure to position terminationat lug end so that there is a bead ofsealant exposed as shown.

    This completes the installation.

    Leakage CurrentCollector

    1/4"(6mm)

    Sealant 534jcn

  • Installation Instructions For Wire Shield Cable

    PII-55099, Rev AG PCN 393397-000Effective Date: August 17, 2001

    11

    1. Prepare cablesDetermine insulation cutback: length Z.

    Figure 1: Insulation Cutback (Z)

    Note: If no lug is used, Z = 2" (50mm) "Y"Length ofLug Barrel

    += "Z"InsulationCutback

    1/4"(6mm)

    (6mm)1/4"

    Y

    Z

    481

    Refer to Figure 1 and adjacentdrawing to prepare the cable asshown. Pull back drain wires asshown. Do not pigtail wires at thistime. (50mm)

    Cable Jacket Shield Wires

    Semi-Con

    2"

    Z

    19"(483mm)+ Z

    513

    2. Make Lug Connection

    Crimp the connector using properdie and tool. Clean lug barrel ofinhibitor and dirt and file off anysharp edges.

    Lug

    518k

    3. Abrade (sand) and cleaninsulation

    Abrade and clean the surface of theprimary insulation using the solventsupplied with the termination or anyother approved solvent. Be sure toremove any conductive particles orcontamination.

    Note: Use aluminum oxideabrasive strip only.

    Abrade &Clean

    518l

  • Installation Instructions

    PII-55099, Rev AG PCN 393397-000Effective Date: August 17, 2001

    12

    Note: Some Lug Barrel May Be Showing

    Overlap Insulation1/2"(10mm)

    518m

    TapeSealant

    Start Here

    Insulation

    Same ThicknessAs Insulation

    500d

    501d

    4. Install sealant

    Start wrapping sealant at end of lugbarrel. Continue wrapping (no halflaps) until sealant is samethickness as insulation (at least twowraps).

    Continue wrapping on to the cableinsulation for 1/2. Snap off anyadditional mastic.

    5. Apply tape sealant

    Lift the drain wires away from thecable jacket. Solvent clean andabrade jacket. Using light tension,wrap one layer of sealant onto thecable jacket as shown.

    Lay the drain wires evenly backover the jacket and press them intothe sealant.

    Wrap an additional layer of sealantover the drain wires and previouslyapplied sealant.

    To ensure the correct positioning ofthe termination, place a markertape 4-1/4 (108mm) from the semi-con cutback as shown.

    Tape sealant

    Press wires into sealant

    521b

    533b

    533c

    4-1/4"(108mm)

    533d

  • Installation Instructions

    PII-55099, Rev AG PCN 393397-000Effective Date: August 17, 2001

    13

    6. Apply Stress Patch

    Note: The stress patch easilysticks to itself and loose particles.

    Note: The patch may berectangular. Follow the direction ofthe arrow on the backing paper ofthe stress patch. Longer dimensiongoes around the cable.

    Remove backing paper from thepatch. Using light tension andoverlapping the semi-con by1(25mm), wrap the entire patcharound the semi-con as shown.Avoid wrinkles and creases.

    StressRelief Patch

    1" (25mm) Onto Semi-con

    approx. 4-3/4"

    (120mm)

    519f

    7. Loosening TerminationThis operation is vital to thesimple installation of theproduct.

    There are two terminations inthis kit (one with three sheds,the other with five). Loosenboth in the manner shownopposite. Install the five shedtermination first.Hold the termination in one handand the holdout in the other.Gripping firmly, twist the terminationand holdout in opposite directions.Repeat twisting the termination andholdout, moving the hand in shortincrements up the termination untilthe entire termination is felt to moveon the holdout. Slide thetermination until it lines up with theend of the holdout tube as shown.

    Note: Take care not to slide thetermination off the end of theholdout. Stop the terminationabout 1/4 from the end of theholdout

    523ca

    Holdout Sheds Lug symbol band

    Flipped-back end

    1/4" Stop Here

    Termination

  • 8. Installing termination

    Position the holdout over the cableuntil it meets the jacket cutback. Twistthe termination and slowly push it tothe end of the holdout.

    Slide the termination off the holdoutwith a twisting motion holding thetermination that is on the holdout inone hand and pulling the holdout withthe other.

    Note: Do NOT stretch thetermination.

    Do NOT hold the termination that ispartially installed and attempt to pullthe remaining termination off theholdout, as this will stretch thetermination and generate animproperly installed termination if notrepositioned.

    Using the pull tabs, pull the flip-backportion away from the maintermination, at the same time workingthe first two fingers of each handbetween the flip-back and maintermination. Pull the stretched out flip-back over the cable jacket andsealant.

    After installation, gently slide thetermination so that the end aligns withthe edge of the marker tape installedin step 5. Make sure the terminationlength is in accordance with thedimenisions shown.

    Having positioned the termination,now wrap one layer tape sealant overthe end of the termination and 1/4(6mm) onto the cable insulation as shown.

    Remove tape maker.

    525ca

    Installation Instructions

    PII-55099, Rev AG PCN 393397-000Effective Date: August 17, 2001

    14

    Align the end of the holdout with the edge of the sealant

    524ca

    526ca

    Twist clockwise and counterclockwise while pulling out

    527ca

    15"(381mm)

    Align end with edge of tape marker

    1/4"(6mm)

    1-1/4"(32mm)Sealant

    528ca

    529ca

  • Installation Instructions

    PII-55099, Rev AG PCN 393397-000Effective Date: August 17, 2001

    15

    Slide the three-shedded termination over the cable until it meets the leading edge of the sealant strip as shown.Twist the termination and slowly push it to the end of the holdout.

    Slide the termination completely off the holdout using a twisting and pulling motion as shown.

    Using the pull tabs, pull the flip-back portion away from the main termination, at the same time working the firsttwo fingers of each hand between the flip-back and main termination. Pull the stretched out flip-back over thesealant.

    Align the end of the holdout with the edge of the sealant

    Twist clockwise and counterclockwisewhile pulling out

    530jcn

    532jcn

    533jcn

    9. Installing the termination (continued).

  • 7Installation Instructions

    PII-55099, Rev AG PCN 393397-000Effective Date: August 17, 2001

    16

    10. Complete installation

    If necessary, adjust the three-sheddedtermination to overlap the sealant onthe lug barrel (see drawing below).Place the leakage current collector1/4(6mm) from the end of thetermination as shown. Use a copperwire to connect the current collector tothe ground braid.

    Wipe over the surface of thetermination to remove any dirt orgrease.

    Note: Be sure to position terminationat lug end so that there is a bead ofsealant exposed as shown.

    This completes the installation.

    Leakage CurrentCollector

    1/4"(6mm)

    Sealant 534lca

  • Installation Instructions For UniShield Cable

    PII-55099, Rev AG PCN 393397-000Effective Date: August 17, 2001

    17

    1. Prepare cablesDetermine insulation cutback: length Z.

    Figure 1: Insulation Cutback (Z)

    Note: If no lug is used, Z = 2" (50mm) "Y"Length ofLug Barrel

    += "Z"InsulationCutback

    1/4"(6mm)

    (6mm)1/4"

    Y

    Z

    481

    Refer to Figure 1 and adjacentdrawing to prepare the cable asshown. Pull back drain wires asshown before cutting semi-con/jacket. (50mm)2"

    Shield Wires Cable Jacket / Semi-Con

    Z

    19"(483mm)+ Z

    514

    2. Make Lug Connection

    Crimp the connector using properdie and tool. Clean lug barrel ofinhibitor and dirt and file off anysharp edges.

    Lug

    518g

    3. Abrade (sand) and cleaninsulation

    Abrade and clean the surface of theprimary insulation using the solventsupplied with the termination or anyother approved solvent. Be sure toremove any conductive particles orcontamination.

    Note: Use aluminum oxideabrasive strip only.

    Abrade &Clean

    518h

  • Installation Instructions

    PII-55099, Rev AG PCN 393397-000Effective Date: August 17, 2001

    18

    Note: Some Lug Barrel May Be Showing

    Overlap Insulation1/2"(10mm)

    518i

    TapeSealant

    Start Here

    Insulation

    Same ThicknessAs Insulation

    500c

    501c

    4. Install sealant

    Start wrapping sealant at end of lugbarrel. Continue wrapping (no halflaps) until sealant is samethickness as insulation (at least twowraps).

    Continue wrapping on to the cableinsulation for 1/2. Snap off anyadditional mastic.

    5. Apply tape sealant

    Lift the drain wires away from thecable jacket. Solvent clean andabrade jacket. Using light tension,wrap one layer of sealant onto thejacket as shown.

    Lay the drain wires evenly backover the jacket and press them intothe sealant.

    Wrap an additional layer of sealantover the drain wires and previouslyapplied sealant.

    To ensure the correct positioning ofthe termination, place a markertape 4-1/4 (108mm) from the semi-con cutback as shown.

    Tape sealant

    Press wires into sealant

    521

    533a

    533e

    4-1/4"(108mm)

    533t

  • Installation Instructions

    PII-55099, Rev AG PCN 393397-000Effective Date: August 17, 2001

    19

    6. Apply Stress Patch

    Note: The stress patch easilysticks to itself and loose particles.

    Note: The patch may berectangular. Follow the direction ofthe arrow on the backing paper ofthe stress patch. Longer dimensiongoes around the cable.

    Remove backing paper from thepatch. Using light tension andoverlapping the semi-con by1(25mm), wrap the entire patcharound the semi-con jacket asshown. Avoid wrinkles and creases.

    StressRelief Patch

    1"(25mm) Onto Semi-Con/Jacket

    approx. 4-3/4"

    (120mm)

    519e

    7. Loosening TerminationThis operation is vital to thesimple installation of theproduct.

    There are two terminations inthis kit (one with three sheds,the other with five). Loosenboth in the manner shownopposite. Install the five shedtermination first.Hold the termination in one handand the holdout in the other.Gripping firmly, twist the terminationand holdout in opposite directions.Repeat twisting the termination andholdout, moving the hand in shortincrements up the termination untilthe entire termination is felt to moveon the holdout. Slide thetermination until it lines up with theend of the holdout tube as shown.

    Note: Take care not to slide thetermination off the end of theholdout. Stop the terminationabout 1/4 from the end of theholdout.

    Holdout Sheds Lug symbol band

    Flipped-back end

    1/4" Stop Here

    Termination

    523ca

  • 8. Installing termination

    Position the holdout over the cableuntil it meets the jacket cutback. Twistthe termination and slowly push it tothe end of the holdout.

    Slide the termination off the holdoutwith a twisting motion holding thetermination that is on the holdout inone hand and pulling the holdout withthe other.

    Note: Do NOT stretch thetermination.

    Do NOT hold the termination that ispartially installed and attempt to pullthe remaining termination off theholdout, as this will stretch thetermination and generate animproperly installed termination if notrepositioned.

    Using the pull tabs, pull the flip-backportion away from the maintermination, at the same time workingthe first two fingers of each handbetween the flip-back and maintermination. Pull the stretched out flip-back over the cable jacket andsealant.

    After installation, gently slide thetermination so that the end aligns withthe edge of the marker tape installedin step 5. Make sure the terminationlength is in accordance with thedimenisons shown.

    Having positioned the termination,now wrap one layer tape sealant overthe end of the termination and 1/4(6mm) onto the cable insulation asshown.

    Remove tape meter.

    525ca

    Installation Instructions

    PII-55099, Rev AG PCN 393397-000Effective Date: August 17, 2001

    20

    Align the end of the holdout with the edge of the sealant

    524ca

    526ca

    Twist clockwise and counterclockwise while pulling out

    527ca

    15"(381mm)

    Align end with edge of tape marker 528ca

    1/4"(6mm)

    1-1/4"(32mm)Sealant

    529ca

  • Installation Instructions

    PII-55099, Rev AG PCN 393397-000Effective Date: August 17, 2001

    21

    Slide the three-shedded termination over the cable until it meets the leading edge of the sealant strip as shown.Twist the termination and slowly push it to the end of the holdout.

    Slide the termination completely off the holdout using a twisting and pulling motion as shown.

    Using the pull tabs, pull the flip-back portion away from the main termination, at the same time working the firsttwo fingers of each hand between the flip-back and main termination. Pull the stretched out flip-back over thesealant.

    Align the end of the holdout with the edge of the sealant

    Twist clockwise and counterclockwisewhile pulling out

    530jcn

    532jcn

    533jcn

    9. Installing the termination (continued).

  • PII-55099, Rev AG PCN 393397-000Effective Date: August 17, 2001

    22

    Installation Instructions

    7

    10. Complete installation

    If necessary, adjust the three-sheddedtermination to overlap the sealant onthe lug barrel (see drawing below).Place the leakage current collector1/4(6mm) from the end of thetermination as shown. Use a copperwire to connect the current collector tothe ground braid.

    Wipe over the surface of thetermination to remove any dirt orgrease.

    Note: Be sure to position terminationat lug end so that there is a bead ofsealant exposed as shown.

    This completes the installation.

    Leakage CurrentCollector

    1/4"(6mm)

    Sealant 534lca

  • Installation Instructions For Lead Sheath Cable

    PII-55099, Rev AG PCN 393397-000Effective Date: August 17, 2001

    23

    1. Prepare cables.Determine insulation cutback: length Z.

    Figure 1: Insulation Cutback (Z)

    Note: If no lug is used, Z = 2" (50mm) "Y"Length ofLug Barrel

    += "Z"InsulationCutback

    1/4"(6mm)

    (6mm)1/4"

    Y

    Z

    481

    Refer to Figure 1 and adjacentdrawing to prepare the cable asshown.

    Z(25mm)1"

    (25mm)1"

    (50mm)2"

    Cable Jacket Lead Sheath

    Semi-Con

    19"(483mm)+ Z

    512a

  • Installation Instructions

    PII-55099, Rev AG PCN 393397-000Effective Date: August 17, 2001

    24

    GroundBraid

    MoistureBlock 519y

    2. Install ground braid

    Flare the moisture blocked end ofthe ground braid and place it ontothe lead sheath butted up to thecable jacket and solder to the leadsheath.

    3. Make Lug Connection

    Crimp the connector using properdie and tool. Clean lug barrel ofinhibitor and dirt and file off anysharp edges.

    Lug

    518b

    4. Abrade (sand) and cleaninsulation

    Abrade and clean the surface of theprimary insulation using the solventsupplied with the termination or anyother approved solvent. Be sure toremove any conductive particles orcontamination.

    Note: Use aluminum oxideabrasive strip only.

    Abrade &Clean

    518d

  • Installation Instructions

    PII-55099, Rev AG PCN 393397-000Effective Date: August 17, 2001

    25

    5. Install sealant

    Start wrapping sealant at end of lugbarrel. Continue wrapping (no halflaps) until sealant is same thicknessas insulation (at least two wraps).

    Continue wrapping on to the cableinsulation for 1/2. Snap off anyadditional mastic.

    Solvent clean and abrade (sand)jacket. Using light tension, wrap onelayer of sealant onto the cable jacket,even with the jacket cutback asshown.

    Press the solder-blocked portion ofthe braid into the sealant. Wrap anadditional layer of sealant over thebraid solder-block, sandwiching thesolder-block between layers ofsealant.

    To ensure the correct positioning ofthe termination, place a marker tape4-1/4 (108mm) from the semi-concutback as shown.

    Tape sealant 515b

    Note: Some Lug Barrel May Be Showing

    Overlap Insulation1/2"(10mm)

    518e

    Tape sealant 515c

    TapeSealant

    Start Here

    Insulation

    Same ThicknessAs Insulation

    500a

    501a

    Tape sealant

    4-1/4"(108mm)

    515s

  • 6. Apply Stress Patch

    Note: The stress patch easilysticks to itself and loose particles.

    Note: The patch may berectangular. Follow the direction ofthe arrow on the backing paper ofthe stress patch. Longer dimensiongoes around the cable.

    Remove backing paper from thepatch. Using light tension andoverlapping the semi-con by1(25mm), wrap the entire patcharound the semi-con as shown.Avoid wrinkles and creases.

    StressRelief Patch

    approx. 4-3/4"

    (120mm)

    Overlap semi-conby 1"(25mm)

    519c

    8. Loosening TerminationThis operation is vital to thesimple installation of theproduct.

    There are two terminations inthis kit (one with three sheds,the other with five). Loosenboth in the manner shownopposite. Install the five shedtermination first.Hold the termination in one handand the holdout in the other.Gripping firmly, twist the terminationand holdout in opposite directions.Repeat twisting the termination andholdout, moving the hand in shortincrements up the termination untilthe entire termination is felt to moveon the holdout. Slide thetermination until it lines up with theend of the holdout tube as shown.

    Note: Take care not to slide thetermination off the end of theholdout. Stop the terminationabout 1/4 from the end of theholdout.

    Installation Instructions

    PII-55099, Rev AG PCN 393397-000Effective Date: August 17, 2001

    26

    Holdout Sheds Lug symbol band

    Flipped-back end

    1/4" Stop Here

    Termination

    523ca

    7. Tape over sharp edges

    Using cloth tape provided, tape overall sharp edges of the ground clampassembly.

    Tape over sharp edges

    1/4" (6.5mm) Gap519z

  • Installation Instructions9. Installing termination

    Position the holdout over the cableuntil it meets the jacket cutback. Twistthe termination and slowly push it tothe end of the holdout.

    Slide the termination off the holdoutwith a twisting motion holding thetermination that is on the holdout inone hand and pulling the holdout withthe other.

    Note: Do NOT stretch thetermination.

    Do NOT hold the termination that ispartially installed and attempt to pullthe remaining termination off theholdout, as this will stretch thetermination and generate animproperly installed termination if notrepositioned.

    Using the pull tabs, pull the flip-backportion away from the maintermination, at the same time workingthe first two fingers of each handbetween the flip-back and maintermination. Pull the stretched out flip-back over the cable jacket andsealant.

    After installation, gently slide thetermination so that the end aligns withthe edge of the marker tape installedin step 5. Make sure the terminationlength is in accordance with thedimensions shown.

    Having positioned the termination,now wrap one layer tape sealant overthe end of the termination and 1/4(6mm) onto the cable insulation asshown.

    Remove tape marker.

    PII-55099, Rev AG PCN 393397-000Effective Date: August 17, 2001

    27

    1/4"(6mm)

    1-1/4"(32mm)Sealant

    15"(381mm)

    Align end with edge of tape marker

    Twist clockwise and counterclockwisewhile pulling out

    Align the end of the holdout with the edge of the sealant

    524jcn

    526jcn

    527jcn

    528jcn

    529jcn

  • Installation Instructions

    PII-55099, Rev AG PCN 393397-000Effective Date: August 17, 2001

    28

    Slide the three-shedded termination over the cable until it meets the leading edge of the sealant strip as shown.Twist the termination and slowly push it to the end of the holdout.

    Slide the termination completely off the holdout using a twisting and pulling motion as shown.

    Using the pull tabs, pull the flip-back portion away from the main termination, at the same time working the firsttwo fingers of each hand between the flip-back and main termination. Pull the stretched out flip-back over thesealant.

    Align the end of the holdout with the edge of the sealant

    Twist clockwise and counterclockwisewhile pulling out

    530jcn

    532jcn

    533jcn

    10. Installing the termination (continued).

  • PII-55099, Rev AGPCN 393397-000Effective Date: August 17, 2001

    2001 Tyco Electronics CorporationPrinted USA 8/17/2001

    29

    The Information contained in these installation instructions is for use only by installers trained to make electrical power installations and is intended to describe thecorrect method of installation for this product. However, Tyco Electronics has no control over the field conditions which influence product installation. It is theuser's responsibility to determine the suitability of the installation method in the user's field conditions. Tyco Electronics' only obligations are those in TycoElectronics' standard Conditions of Sale for this product and in no case will Tyco Electronics be liable for any other incidental, indirect or consequential damagesarising from the use or misuse of the products. Raychem is a trade mark of Tyco Electronics Corporation.

    7* Unishield is a trademark of BICC General Cable Industries, INC.

    Installation Instructions11. Complete installation

    If necessary, adjust the three-sheddedtermination to overlap the sealant onthe lug barrel (see drawing below).Place the leakage current collector1/4(6mm) from the end of thetermination as shown. Use a copperwire to connect the current collector tothe ground braid.

    Wipe over the surface of thetermination to remove any dirt orgrease.

    Note: Be sure to position terminationat lug end so that there is a bead ofsealant exposed as shown.

    This completes the installation.

    Leakage CurrentCollector

    1/4"(6mm)

    Sealant 534jcn

    /ColorImageDict > /JPEG2000ColorACSImageDict > /JPEG2000ColorImageDict > /AntiAliasGrayImages false /DownsampleGrayImages true /GrayImageDownsampleType /Bicubic /GrayImageResolution 300 /GrayImageDepth -1 /GrayImageDownsampleThreshold 1.50000 /EncodeGrayImages true /GrayImageFilter /DCTEncode /AutoFilterGrayImages true /GrayImageAutoFilterStrategy /JPEG /GrayACSImageDict > /GrayImageDict > /JPEG2000GrayACSImageDict > /JPEG2000GrayImageDict > /AntiAliasMonoImages false /DownsampleMonoImages true /MonoImageDownsampleType /Bicubic /MonoImageResolution 1200 /MonoImageDepth -1 /MonoImageDownsampleThreshold 1.50000 /EncodeMonoImages true /MonoImageFilter /CCITTFaxEncode /MonoImageDict > /AllowPSXObjects false /PDFX1aCheck false /PDFX3Check false /PDFXCompliantPDFOnly false /PDFXNoTrimBoxError true /PDFXTrimBoxToMediaBoxOffset [ 0.00000 0.00000 0.00000 0.00000 ] /PDFXSetBleedBoxToMediaBox true /PDFXBleedBoxToTrimBoxOffset [ 0.00000 0.00000 0.00000 0.00000 ] /PDFXOutputIntentProfile () /PDFXOutputCondition () /PDFXRegistryName (http://www.color.org) /PDFXTrapped /Unknown