8
LHC Rotatable Phase II Collimators LHC Collimation Working Group - 7 December 2009 1 LARP Phase II Secondary Rotatable Collimator 5 minute status report April 26th, 2010

LARP Phase II Secondary Rotatable Collimator

  • Upload
    chad

  • View
    30

  • Download
    0

Embed Size (px)

DESCRIPTION

LARP Phase II Secondary Rotatable Collimator. 5 minute status report April 26th, 2010. SPS Tank and BPM housings. Resting on Base Plate. RF Foils. BeCu and Glidcop 0.25 and 0.2mm thick. Rotator mounted to Jaw. Rotator/actuator set-up for prototype tests. - PowerPoint PPT Presentation

Citation preview

Page 1: LARP Phase II Secondary Rotatable Collimator

LHC Rotatable Phase II CollimatorsLHC Collimation Working Group - 7 December 2009 1

LARP Phase II Secondary Rotatable Collimator

5 minute status report

April 26th, 2010

Page 2: LARP Phase II Secondary Rotatable Collimator

LHC Rotatable Phase II CollimatorsLHC Collimation Working Group - 7 December 2009

SPS Tank and BPM housings

2

Page 3: LARP Phase II Secondary Rotatable Collimator

LHC Rotatable Phase II CollimatorsLHC Collimation Working Group - 7 December 2009

Resting on Base Plate

3

Page 4: LARP Phase II Secondary Rotatable Collimator

LHC Rotatable Phase II CollimatorsLHC Collimation Working Group - 7 December 2009

RF Foils

•BeCu and

Glidcop

0.25 and 0.2mm

thick

4

Page 5: LARP Phase II Secondary Rotatable Collimator

LHC Rotatable Phase II CollimatorsLHC Collimation Working Group - 7 December 2009

Rotator mounted to Jaw

5

Page 6: LARP Phase II Secondary Rotatable Collimator

LHC Rotatable Phase II CollimatorsLHC Collimation Working Group - 7 December 2009

Rotator/actuator set-up for prototype tests

6

http://www-project.slac.stanford.edu/ilc/larp/rc/Photos/2010-04-22_rotation_mechanism_test/DSCN2398.MOV

http://www-project.slac.stanford.edu/ilc/larp/rc/Photos/2010-04-22_rotation_mechanism_test/DSCN2400.MOV

Page 7: LARP Phase II Secondary Rotatable Collimator

LHC Rotatable Phase II CollimatorsLHC Collimation Working Group - 7 December 2009

Next :Rotator qualification

•Align Rotator worm with respect to Jaw facet and pin worm to axle

•Grip inlet cooling tube and twist to test Rotator “stiffness” and facet backlash

•Grip outlet cooling tube and twist together with the inlet tube to simulate total backlash load

•Grip inlet cooling tube and actuate Motor drive to rotate Jaw against half the torque load

•Add outlet tube and repeat for total load required on Ratchet Actuator and Rotator

7

Page 8: LARP Phase II Secondary Rotatable Collimator

LHC Rotatable Phase II CollimatorsLHC Collimation Working Group - 7 December 2009

Coming up:

•Mount RF Foils to RF bearings and determine which material and thickness is most suitable

•Weld Flanges on to BPM Housings

•Mount both Jaws, Tank and BPMs for Stretched Wire tests

8