LARP Collimator Tasks

6 October 2005

LARP Collaboration Meeting-St. Charles, IL

Tom MarkiewiczSLAC

BNL - FNAL- LBNL - SLAC

US LHC Accelerator Research Program

Page 2: LARP Collimator Tasks

LARP Collaboration Meeting. - 6 Oct. 2005 Collimator Task Summary - T. Markiewicz Slide n° 2 / 46

Four LARP Collimation Program Tasks:Address Efficiency, Reliability and Design of Phase I & Propose a possible solution for Phase II Conundrum

Use RHIC data to benchmark the code used to predict the cleaning efficiency of the LHC collimation system and develop and test algorithms for setting collimator gaps that can be applied at the LHC

Responsible: Angelika Drees, BNL [Task #2]

Understand and improve the design of the tertiary collimation system that protects the LHC final focusing magnets and experiments

Responsible: Nikolai Mokhov, FNAL [Task #3]

Study, design, prototype and test collimators that can be dropped into 32 reserved lattice locations as a part of the “Phase II Collimation Upgrade” required if the LHC is to reach its nominal 1E34 luminosity

Responsible: Tom Markiewicz, SLAC [Task #1]

Use the facilities and expertise available at BNL and FNAL to irradiate and then measure the properties of the materials that will be used for phase 1 and phase 2 collimator jaws [proposed new work package]

Responsable: Nick Simos, BNL [Task #4]

Page 3: LARP Collimator Tasks

LARP Collaboration Meeting. - 6 Oct. 2005 Collimator Task Summary - T. Markiewicz Slide n° 3 / 46

2005-06-01 DOE Review of Collimation Program: A+

"The activity in collimation is impressive, with the work being approached in a very professional manner. It is a critical problem, and solving it will have great impact on the ability of the LHC to reach design luminosity. Even the task sheets for this project were done very professionally, lending confidence in a well-managed and well-focused activity. (The synergy with the ILC is clearly evident here.)"

Page 4: LARP Collimator Tasks

LARP Collaboration Meeting. - 6 Oct. 2005 Collimator Task Summary - T. Markiewicz Slide n° 4 / 46

Task 2: Use RHIC Data to Benchmark LHC Tracking Codes

Scope: – Install SixTrackwColl particle tracking code at BNL and configure it

to simulate RHIC performance for both ions and protons.– Take systematic proton and ion data and compare observed beam

loss with predictions– Test (and perhaps help to develop) algorithms proposed for the

automatic set up of a large number of collimators

Resources Required:– 50% postdoc/student + supervision + travel

Timescale:– Now until LHC beam commissioning

Comments– Preliminary data taken; comparison programs being improved– Postdoc search ongoing

Page 5: LARP Collimator Tasks

LARP Collaboration Meeting. - 6 Oct. 2005 Collimator Task Summary - T. Markiewicz Slide n° 5 / 46

Task 2: Progress Since Pt. Jeff Meeting

Guillaume Robert-Demolaize from CERN visited BNL for 3 weeks after PAC.

• ‘Special' loss proton data (1 h beam time, 2 times) taken at 100 GeV and in one ring only & loss maps with single collimators obtained.

• The newest version of the SixTrack ("colltrack") code was copied over from CERN and compiles; modifications were made to implement the RHIC style collimators (dual plane, single sided).

• A first pass on some simulations was made with a few hundred turns and a varying number of particles (up to a few thousands) and loss maps produced which were then compared with the data. However quantitative comparison was hindered by the necessary debugging required with the new code implementation.

• Robert-Demolaize plans to continue to debug the RHIC simulation code at CERN and to produce simulated loss maps which will then be compared with the datasets. It is thought that these comparisons may begin in August or September after his other CERN responsibilities are addressed.

Page 6: LARP Collimator Tasks

Tertiary Collimators in IP1/IP5

LARP Collaboration Meeting

Pheasant Run, St. Charles, IL

October 5-6, 2005

FermilabLARP Collaboration

Nikolai Mokhov, Fermilab

Page 7: LARP Collimator Tasks

LARP Collaboration Meeting. - 6 Oct. 2005 Collimator Task Summary - T. Markiewicz Slide n° 7 / 46

TERTIARY COLLIMATORS

Tertiary collimators at 8.4 around IR1/5 protect SC triplets from tertiary halo coming from particles leaking from 7 secondary collimators, upstream beam-gas and inefficiency of MPS if unsynchronized beam abort.

These TCTs must not induce peak energy deposition in the triplets above the quench limit (1.6mW/gm) with a safety margin of 3 nor induce detector backgrounds at level above IP produced backgrounds

80 x 25 x 1000mm Cu jaws at .4s 145m from IP added to MARS15; Halo > 8.4s assumed to go as 1/r; operational beam loss rate at TCTV/H assumed to be 1E6 p/s

Page 8: LARP Collimator Tasks

LARP Collaboration Meeting. - 6 Oct. 2005 Collimator Task Summary - T. Markiewicz Slide n° 8 / 46

TERTIARY BEAM HALO LOSS IN IP5

Without TCTs With Cu TCTH, TCTV

Page 9: LARP Collimator Tasks

LARP Collaboration Meeting. - 6 Oct. 2005 Collimator Task Summary - T. Markiewicz Slide n° 9 / 46

MARS15 RESULTS FOR COPPER TCTs

Peak power density is 0.35 mW/g in Q3. Particle fluxes on CMS similar tothose from earlier studied accelerator backgrounds. Conclusion: keep TCT scraping rates below 2x106 p/s.

Page 10: LARP Collimator Tasks

LARP Collaboration Meeting. - 6 Oct. 2005 Collimator Task Summary - T. Markiewicz Slide n° 10 / 46

TERTIARY COLLIMATORS PROGRESS & PLANS

MARS runs with & without TCTs; MARS runs with CU & W TCTs

File of TCT induced background rays sent to CMS

File of Beam1 loss in TCT region calculated by CERN 7 received 2005-09

– Need similar file for Beam2

– Need similar files for momentum cleaning insertion IR3

Plan to begin updating results using these files beginning mid-October

Page 11: LARP Collimator Tasks

The LARP Collimation Program

TASK 4 Summary

Material Irradiation Studies

Nick Simos

Nikolai Mokhov

BNL - FNAL- LBNL - SLAC

US LHC Accelerator Research Program

Page 12: LARP Collimator Tasks

LARP Collaboration Meeting. - 6 Oct. 2005 Collimator Task Summary - T. Markiewicz Slide n° 12 / 46

Task #4: Irradiation Damage Assessment of LHC collimator materials

Scope: Irradiate 2-D weave carbon-carbon and exact graphite used in Phase I jaws plus

materials considered viable for Phase II jaws• BNL AGS/BLIP (117 & 200 MeV protons)• FNAL120 GeV protons behind pbar target planned

Measure material properties: thermal expansion, mechanical properties, thermal conductivity/diffusivity and thermal shock

• BNL Hot Cell Sample Measurement Facility

Resources Required:– Irradiation & hot cell use fees– Sample prep, measurement apparatus improvement– Fraction of postdoc + fraction of physicist + travel

Timescale:– 2005,2006 proton runs + analysis into FY2007

Status:– Phase I Carbon-Carbon irradiation completed– Sample activation measurements completed– Thermal Expansion of specimens started– PLANNING of FY06 Post-Irradiation and Follow-up Irradiation Studies

Page 13: LARP Collimator Tasks

LARP Collaboration Meeting. - 6 Oct. 2005 Collimator Task Summary - T. Markiewicz Slide n° 13 / 46

C-C samples arrive from CERN supplier and are assembled and pre-tested before irradiation

Page 14: LARP Collimator Tasks

LARP Collaboration Meeting. - 6 Oct. 2005 Collimator Task Summary - T. Markiewicz Slide n° 14 / 46

LHC Phase I 2D carbon-carbon samples Irradiated at BNL, Disassembled, Inspected &

Dose/sample measured

Beam Spot during the short 200 MeV Irradiation at the end of the cycle

Integrated 2D carbon Exposure:micro-Amp Hours > 100,000

Preliminary Assessment:2D CC specimens normal to the planes of reinforcing fibers and close to the center of the beam (receiving high dose) experienced degradation.Less degradation was seen in the specimens along the reinforcement.

NOTE: Total dose received MUCH HIGHER than what LHC collimator jaws will see.

Page 15: LARP Collimator Tasks

LARP Collaboration Meeting. - 6 Oct. 2005 Collimator Task Summary - T. Markiewicz Slide n° 15 / 46

LHC Phase I and Phase II Planned Activities

Irradiation Damage Assessment of 2D Carbon of Phase I: Using the nickel foils of the irradiation assembly and deduce exact beam position and profile through radiographic analysis. These results, combined with the exposure record will provide the number of protons seen by the different specimens. USE results for irradiation damage (dpa) estimation. Refine model for dpa estimation (based on MCNPX code and damage cross-sections)

Isotope generation: The isotopes generated in the composite will be fully assessed. Preliminary results show that the predominant is Be-7. Such result is important for collimator servicing.

CTE set-up for 250 C thermal Cycling: Thermal expansion measurements with cyclic temperature profile between room temperature and 250 degrees C (as requested by LHC collimator group. Measure effects of irradiation on the coefficient of thermal expansion (CTE).

Upgrade Apparatus to Measure Irradiation Effects on:•Thermal Condutivity/Diffusivity•Electrical Resistivity

PLAN and Conduct New Irradiation Experiments that include Phase II Materials:

- Irradiate At BNL BLIP candidate materials of Phase II (copper, superInvar, Inconel, 3D CC, etc.)- Irradiate at FNAL at the Pbar target area using much higher energy protons and assess irradiation damage

as well as damage dependence on proton energies

Page 16: LARP Collimator Tasks

LARP Collaboration Meeting. - 6 Oct. 2005 Collimator Task Summary - T. Markiewicz Slide n° 16 / 46

Irradiation Tests at FNAL Pbar Target Area

PRELIMINARY Layout for FNAL Pbar Target Irradiation

Beam time “free” but need to hire/pay for technician

Proposed Target Stack

Page 17: LARP Collimator Tasks

LARP Collaboration Meeting. - 6 Oct. 2005 Collimator Task Summary - T. Markiewicz Slide n° 17 / 46

Task#1: Studies of a Rotatable Metallic Collimator for Possible Use in LHC Phase II

Collimation System

If we ALLOW (rare) ASYNCH. BEAM ABORTS to DAMAGE METAL JAWS, is it possible to build a ROTATING COLLIMATOR

– that we can cool to ~<10kW, keeping T<TFRACTURE and PH2O<1 atm.

– that has reasonable collimation system efficiency– that satisfies mechanical space & 25um accuracy requirements

Scope: – Tracking studies to understand efficiency and loss maps of any

proposed configuration (SixTrack)– Energy deposition studies to understand heat load under defined

“normal” conditions & damage extent in accident (FLUKA & MARS)– Engineering studies for cooling & deformation– Construct 2 prototypes with eventual beam test at LHC in 2008– After technical choice by CERN, engineering support– Commissioning support after installation by CERN

Page 18: LARP Collimator Tasks

LARP Collaboration Meeting. - 6 Oct. 2005 Collimator Task Summary - T. Markiewicz Slide n° 18 / 46

Status of Phase II Collimator Conceptual Designat 2005-06-01 DOE Review

Adequate software in place and MANY studies have been done but …

We do NOT yet have a conceptual design for the 1st of the 11 collimators needed (per beam) in IR7– 28 of 30 Phase II collimators will not have a heating problem

• No magic design or material which could simultaneously provide good efficiency with combination of energy absorption, thermal conductivity, & thermal expansion to maintain 25 um flatness tolerance over length of jaw during 1hr/12min (90/450kW) beam lifetime transients for nominal jaw length (1m) and gap setting (7)

• Focus on – 150mm O.D. 25mm wall Cu jaws with helical cooling tubes– 150mm O.D. “solid” Cu jaws cooled with axial flow over 36° of arc

Page 19: LARP Collimator Tasks

LARP Collaboration Meeting. - 6 Oct. 2005 Collimator Task Summary - T. Markiewicz Slide n° 19 / 46

Limited cooling arc: free wheeling distributor – orientation controlled by gravity – directs flow to beam-side axial channels.

Pro: Far side not cooled, reducing T and thermal distortion.

Con: peak temperature higher; no positive control over flow distributor (could jam); difficult fabrication.

360o cooling by means of helical (or axial) channels.

Pro: Lowers peak temperatures.

Con: by cooling back side of jaw, increases net T through the jaw, and therefore thermal distortion; axial flow wastes cooling capacity on back side of jaw.

water

beam

Helical and axial cooling channels

Page 20: LARP Collimator Tasks

LARP Collaboration Meeting. - 6 Oct. 2005 Collimator Task Summary - T. Markiewicz Slide n° 20 / 46

ANSYS thermal and structural results for full ID cooling and limited cooling arc showing 64% less

distortion with limited cooling

61C

x=221 m

Spec: 25msupport

support

89C

x=79 m

Note more swelling than bending

Note transverse gradient causes bending

Note axial gradient

64% less distortion

360° cooling

of I.D.

36° cooling

arc

Page 21: LARP Collimator Tasks

LARP Collaboration Meeting. - 6 Oct. 2005 Collimator Task Summary - T. Markiewicz Slide n° 21 / 46

Material evaluations

Material Reasons for rejection in favor of Copper

BeCu Beryllium is forbidden by CERN management, low cleaning efficiency due to few particles absorbed

Super Invar Poor thermal conductivity => high temperature (866°C), exceeding (by 4x) temperature at which the material loses its low thermal expansion coefficient

Inconel 718 Poor thermal conductivity => high temperature & very high deflection (1039 um)

Titanium Poor thermal conductivity => deflection 2.7 x Cu

2219 Aluminum Relatively poor cleaning efficiency, water channel fabrication difficulty

Tungsten High temperature on water side (207°C - 18bar to suppress boiling); high power density - can't transfer without boiling

Page 22: LARP Collimator Tasks

LARP Collaboration Meeting. - 6 Oct. 2005 Collimator Task Summary - T. Markiewicz Slide n° 22 / 46

Directions under investigation & negotiation at time of 2005-06-01 DOE Review

• Redefine secondary hybrid system to treat 1st collimator as special – Break 1st secondary into two (unequal?) lengths of perhaps different

materials– Grooved “expansion slots” to limit deformation– Adjust gaps of the first carbon & metal secondary to reduce heat load

while maintaining efficiency with remainder of secondary system– Keep 1st C-C secondary collimator’s jaws at 7 and leave out 1st metal

secondary collimator– Relax deformation tolerance relaxed to if jaws expand AWAY from beam

• Begin to deal with LHC infrastructure & operational constraints– 45mm jaw gap at injection incompatible with NLC inspired

circumferentially mounted gap adjustor• Look into adopting Phase I adjustment mechanism

– Spatial constraints of LHC beam pipes & tunnel a challenge• Jaw dimensions, tank dimension

Page 23: LARP Collimator Tasks

LARP Collaboration Meeting. - 6 Oct. 2005 Collimator Task Summary - T. Markiewicz Slide n° 23 / 46

IR7 Collimator Layout

Beam Direction

Primary Collimators

Hard Hit Secondary Collimators

Page 24: LARP Collimator Tasks

LARP Collaboration Meeting. - 6 Oct. 2005 Collimator Task Summary - T. Markiewicz Slide n° 24 / 46

Possible Path to Immediate RC1 Prototype: Leave TCS#1 Carbon-Carbon, Remainder Cu

Relative Energy Deposition in C-C Secondary Collimators in IR7 [P(1)=23kW at 4E11 p/s]

0

0.2

0.4

0.6

0.8

1

1.2

0 5 10 15 20 25

Collimator Number

P/P

(1)

Beam 1

Beam 2

Inefficiency   1C-10Cu All Cu

Horizontal 2.84x10-4  3.72x10-4 

Vertical 3.63x10-4   4.36x10-4 

Skew   4.57x10-4     3.85x10-4 

Page 25: LARP Collimator Tasks

LARP Collaboration Meeting. - 6 Oct. 2005 Collimator Task Summary - T. Markiewicz Slide n° 25 / 46

Mechanical Model 2005-06-01 Used NLC Concept of Central Strongback with mid-

collimator jaw gap adjuster

beam

beam

Page 26: LARP Collimator Tasks

LARP Collaboration Meeting. - 6 Oct. 2005 Collimator Task Summary - T. Markiewicz Slide n° 26 / 46

June 15-17 CERN/SLAC Collaboration Meeting

Attendees– CERN: Ralph Assmann (Project Leader, Tracking), Allesandro

Bertarelli (Mechanical Eng.), Markus Brugger (Radiation Issues), Mario Santana (FLUKA)

– SLAC: Tom Markiewicz, Eric Doyle (ME), Lew Keller (FLUKA), Yunhai Cai (Tracking), Tor Raubenheimer• Radiation Physics Group: Alberto Fasso, Heinz Vincke

Results– Agreement on basic design of RC1 (1st rotatable prototype)– Transfer of many of CERN mechanical CAD files– Lists of

• Further studies required

• Outstanding Engineering Issues requiring more design work

• Project Milestone List & Action Items List

– Test Installation of “New FLUKA”

Page 27: LARP Collimator Tasks

LARP Collaboration Meeting. - 6 Oct. 2005 Collimator Task Summary - T. Markiewicz Slide n° 27 / 46

Conceptual Design of RC1 (1 of 2)

Mechanics must fit within CERN Phase I C-C envelope– 224mm center-to-center with 88mm OD beampipes– 1480mm longitudinal flange-to-flange– 25mm adjustment/jaw (22.5mm relative to beam w/±5mm allowed beam

center motion and use Phase I alignment and adjustment scheme

– Two 75cm Cu cylindrical jaws with 10cm tapered ends, 95cm overall length with axes connected to vertical mover shafts

– 136mm OD with 9mm taper– Each jaw end independently moved in 10um steps– Vacuum vessel sized to provide 8mm clearance to adjacent beam and

allow gross/fine 0°, 45°, 90° positionsRelaxed mechanical deformation specifications

– <25 um INTO beam guaranteed by adjustable mechanical stop(s)• Ride on groove deep enough to not be damaged in accident case• Adjustable between ±5 and ±15 sigma (2-6mm) & centered on beam

– <325 um (750um) AWAY FROM beam @ 0.8E1p/s loss (4E11p/s)• Flexible support on adjustment

Page 28: LARP Collimator Tasks

LARP Collaboration Meeting. - 6 Oct. 2005 Collimator Task Summary - T. Markiewicz Slide n° 28 / 46

Conceptual Design of RC1 (2 of 2)

Assumed worst case heat load (FLUKA)– 11.3 kW/jaw steady state, 56.5kW/jaw transient (10 sec)

Cooling boundary conditions– 200 °C maximum temperature of Cu– 27 °C input H2O temperature– 42 °C maximum allowed return H2O temperature

Two Cooling Schemes under consideration– Helical tube: more secure H2O-vacuum interface– Axial channels w/ diverter: superior thermal mechanical performance– Sufficient pressure (3 atm.) to prevent local boiling in transient– Flexible supply lines to provide 360° rotation

Other– Vacuum: <1E-7 Pa (1.3E-5 torr)– RF: shielding scheme has been proposed

Page 29: LARP Collimator Tasks

LARP Collaboration Meeting. - 6 Oct. 2005 Collimator Task Summary - T. Markiewicz Slide n° 29 / 46

Proposed layout: 136mm diameter x 950mm long jaws, vacuum tank, jaw support mechanism and

support base derived from CERN Phase I

Page 30: LARP Collimator Tasks

LARP Collaboration Meeting. - 6 Oct. 2005 Collimator Task Summary - T. Markiewicz Slide n° 30 / 46

Vacuum tank enlarged to accommodate jaw motion. Relative location of opposing beam pipe – near interference in skew orientations 10° deviation

Page 31: LARP Collimator Tasks

LARP Collaboration Meeting. - 6 Oct. 2005 Collimator Task Summary - T. Markiewicz Slide n° 31 / 46

Based on CERN’s design – no weld or braze between water & vacuum

• Tube formed as helix, slightly smaller O.D. than jaw I.D.

• O.D. of helix wrapped with braze metal shim

• Helix inserted into bore, two ends twisted wrt each other to expand, ensure contact

• Fixture (not shown) holds twist during heat cycle

Variations:

1. Pitch may vary with length to concentrate cooling

2. Two parallel helixes to double flow

3. Spacer between coils adds thermal mass, strength

4. Electroform jaw body onto coil

Helical cooling passages – fabrication concept

Page 32: LARP Collimator Tasks

LARP Collaboration Meeting. - 6 Oct. 2005 Collimator Task Summary - T. Markiewicz Slide n° 32 / 46

•Stop prevents gap closing as jaw bows inward due to heat

•Jaw ends spring-loaded to the table assemby … move outward in response to bowing

•May use two stops to control tilt

•Slot deep enough to avoid damage in accident

•Stop far enough from beam to never be damaged & is out of way at injection

Adjustable central gap-defining stop

Page 33: LARP Collimator Tasks

LARP Collaboration Meeting. - 6 Oct. 2005 Collimator Task Summary - T. Markiewicz Slide n° 33 / 46

Self aligning bearing

Leaf springs allow jaw end motion up to 1mm away from beam

Adjustable central jaw stops (not shown) define gap

Flexible bearing supports allow jaw thermal distortion away from beam

CERN’s jaw support/positioning mechanism. Vacuum tank, bellows, steppers not shown.

Flexible end supports used in conjunction with central gap-defining mechanism

Page 34: LARP Collimator Tasks

LARP Collaboration Meeting. - 6 Oct. 2005 Collimator Task Summary - T. Markiewicz Slide n° 34 / 46

Rigid round-square transition

Spring loaded fingers ground two jaws through range of motion

Jaw support & gap adjustment borrowed from CERN

RF Contact Overview

Page 35: LARP Collimator Tasks

LARP Collaboration Meeting. - 6 Oct. 2005 Collimator Task Summary - T. Markiewicz Slide n° 35 / 46

Clearance problems with RF contacts

Jaw Support Concept – unresolved issues interferences with RF parts

Page 36: LARP Collimator Tasks

LARP Collaboration Meeting. - 6 Oct. 2005 Collimator Task Summary - T. Markiewicz Slide n° 36 / 46

CERN design:

Jaw supported on individually moveable shaft at each end, controlled by steppers external to tank.

Bellows allows full range of jaw motion

Continuous one-piece cooling tube brazed to jaw, exits tank at each end through shaft.

Unresolved interferences between RF parts and cooling and support parts

Jaw rotation mechanism not devised

Substantial forces to rotate jaw

Mandrel to support coil not shown

Flex cooling supply tube concept

Page 37: LARP Collimator Tasks

LARP Collaboration Meeting. - 6 Oct. 2005 Collimator Task Summary - T. Markiewicz Slide n° 37 / 46

Contiguous with helical tube inside jaw.

Formed after assembly-brazing of jaw and installation of bearing on stub-shaft

Exits through support shaft per CERN design

Material: CuNi10Fe1, 10mm O.D., 8mm I.D.

Stub-shaft (bearing not shown)

Support shaft

Detail of flex cooling supply tube

Relaxed (as shown)

# coils 4

O.D. 111mm (4.4in)

full 360° rotation # coils 5

O.D. 91mm (3.6in)

torque 9.1N-m (81in-lb)

Page 38: LARP Collimator Tasks

LARP Collaboration Meeting. - 6 Oct. 2005 Collimator Task Summary - T. Markiewicz Slide n° 38 / 46

Final Expected Performance of RC1 Design

Table 3. Axial cooling (36o arc) vs helical cooling: 136mm x 950mm copper jaws compared. Heat input 11.3kW (steady state) 56.5kW (transient for 10 sec). Transient results at 10 sec. Incoming water temperature 20oC. Deflection is bending and some swelling of mid-jaw relative to edge supports at jaw ends. Provisional limits on deflection (Appendix B): 325um (steady state) and 750um (transient) if constrained to deflect away from beam. Axial (36o) Helical 1

# channels 2 1 Diam (m) .006 .008 Velocity (m/s) 3 3

Cooling

Total flow (l/min) 10 9 Jaw peak 85.5 78 Cooling channel peak 65.4 62.9

SS

Water out 34.2 34.5 Jaw peak 201 205 Cooling channel peak 119 139

Temperature (oC )

transient

Water out 43 40.3 SS 63 281 Deflection (um) transient 540 869

Notes: 1. the preferred cooling channel configuratio

Page 39: LARP Collimator Tasks

LARP Collaboration Meeting. - 6 Oct. 2005 Collimator Task Summary - T. Markiewicz Slide n° 39 / 46

Outstanding RC1 Unresolved Issues

• Jaw positioning– Acceptance of estimated deflection by CERN:281/869um– Design concept for central stop: gap adjust, 5 central position float,..– Bearings & springs attaching jaws to vertical movers– Load capacity of steppers– Jaw alignment perpendicular to collimation direction

• Jaw rotation– Specification of mechanism on crowded jaw– Force required to rotate jaws against cooling coil

• Misc– Spring arrangement for H, V, S orientations– Springs to ensure that device fails open– Motors, cables, temperature sensors, position probes, …

• Cooling– Possible local boiling in transient condition & need for P~3 atm. H2O system– More flexible yet vacuum safe water supply for helical cooling– Vacuum safe water connection/diverter for axial cooling scheme

Page 40: LARP Collimator Tasks

LARP Collaboration Meeting. - 6 Oct. 2005 Collimator Task Summary - T. Markiewicz Slide n° 40 / 46

Other Studies Planned

• Tracking Studies: Hit maps for each of 11 IR7 collimators/beam and efficiency with 60cm C-C primaries and Cylindrical 75cm jaws which includes effect of tertiary collimators and absorbers

• FLUKA energy deposition with 60cm primaries & cylindrical 75 cm jaws Complete self consistent package of tracking, FLUKA & ANSYS results to support design choices unambiguously

• Better definition of RC1 thermal tests• Remnant & Prompt Dose Rate calculations • Engineer damage assessment mechanism into design• Thermal shock studies• Studies/experiments to verify

– assumed extent of damage in accident: assume 1mm for now• Where metal slag will wind up

– acceptable peak temperature of jaw: assume 200 °C for now

Page 41: LARP Collimator Tasks

LARP Collaboration Meeting. - 6 Oct. 2005 Collimator Task Summary - T. Markiewicz Slide n° 41 / 46

FY2005 Deliverables

Collimator Assembly & Test Area (SLAC-ESB)

RC1 CDR Draft9/30/05

32 pages + figures

Page 42: LARP Collimator Tasks

LARP Collaboration Meeting. - 6 Oct. 2005 Collimator Task Summary - T. Markiewicz Slide n° 42 / 46

FY2006 Work PlanNon-beam Mechanical & Thermal Performance of RC1

1. Single jaw thermal test: one jaw with internal helical cooling channels to be thermally loaded for testing the cooling effectiveness and measuring thermal deformations. – Heating by commercial electric resistance heaters coupled to the jaw with

thermal grease– Operated in a tank purged with inert gas to protect the copper jaw from

oxidation.– Flexible cooling supply that won’t be intended to allow rotation of the jaw. – A FE model of the test jaw will be used as a benchmark to evaluate the

response of the test jaw to the test conditions.2. Full RC1 prototype: a working prototype for bench top testing of the jaw

positioning mechanism, supported to simulate operation in all necessary orientations, but not intended for mounting on actual beamline supports with actual beamline, cooling, control and instrumentation connections. • Lidded vacuum tank for easy access. • Cooling water feed-throughs and flexible connections as realistic as possible.

• A reasonable effort will be made to test RC1 under heat loading but this will

probably prove to be impractical.

Page 43: LARP Collimator Tasks

LARP Collaboration Meeting. - 6 Oct. 2005 Collimator Task Summary - T. Markiewicz Slide n° 43 / 46

FY 2006 Deliverables

1. Final version of RC1 CDR• Nov. 1, 2005 ?

2. External review of RC1 CDR• Nov. 14-18, 2005 ?• Dec 12-17, 2005 ?

3. Performance report on RC1– Sept.30, 2006

Page 44: LARP Collimator Tasks

LARP Collaboration Meeting. - 6 Oct. 2005 Collimator Task Summary - T. Markiewicz Slide n° 44 / 46

Inter-Lab Collaboration

• Excellent good will & cooperation limited only by busy work loads on other systems– Exchange of mechanical drawing files– Installation of latest FLUKA at SLAC– Transfer of latest mod to SixTrack– Latest hit maps with 60cm primaries

• Invaluable 3 day visit by 4 CERN staff• Monthly video meetings mostly killed April-present due to visit, other meetings, summer,

…• Next video meeting Oct 11, 2005• CERN review of SLAC draft CDR• CERN participation in RC1 CDR review

• Exchange of detailed technical information will be crucial to delivering prototypes on time

– Drawing of support structures for H, V Skew– Ideally, CERN would send old prototype parts (i.e. everything [support structure with

steppers, motors, bellows, LVDTs,…] except for the tank & cylinder jaws) rather than have SLAC re-fab from drawings or from transcriptions of drawings

Page 45: LARP Collimator Tasks

LARP Collaboration Meeting. - 6 Oct. 2005 Collimator Task Summary - T. Markiewicz Slide n° 45 / 46

Task 1 Conclusions

To meet the Jan.1, 2008 RC2 ship date requirement SLAC and CERN collaborators have agreed on an initial set of specifications for the first mechanical prototype RC1– based on extensive but incomplete studies done to date– consistent with CERN beam & mechanical constraints & which

uses Phase I design to maximum extentRC1 Prototype Conceptual Design, while not 100% complete, has been

written up and serves as a start point for construction.– report to be finalized & reviewed in FY2006

Fabrication of RC1 in two main steps in FY2006, with appropriate thermal mechanical tests, should validate most of the design issues

Design extension to RC2, a beam-test-capable prototype, will occur in parallel

Good (but of course could always be better) communication and exchange of information marks collaboration between labs

100% devoted manpower required to ensure success

Page 46: LARP Collimator Tasks

LARP Collaboration Meeting. - 6 Oct. 2005 Collimator Task Summary - T. Markiewicz Slide n° 46 / 46

Action Items from Session

Tertiary Collimators• Prepare a better defined schedule of required inputs from CERN and

delivered results from MARS team

Radiation Studies• Specify when results of first irradiation cycle will be ready• Understand financial requirements of both continued BNL program

and expansion of effort to Fermilab 120 GeV area

Crystal Collimation• Develop a proposal LARP sponsored R&D required to incorporate

crystal collimation into LHC: where, when, etc.

Rotatable Secondary Collimator Prototypes• Continue work on lists shown at session