Retail Market Design Service
IGG Agenda 13th May 2015
Minutes from Previous IGG Meeting 14:00 – 14:05
Review of Action Items 14.05 – 14:25
CER Update 14:25 – 14:40
Gemserv Update 14:40 – 14:55
MRSO Update 14:55 – 15:10
ESB Networks Update
15:10 – 15:30
Retail Market Design Service Update 15:30 – 15:50
AOB 15:50 – 15:55
Next Steps 15:55 - 16:00
Retail Market Design Service
Minutes
Minutes from IGG meeting
4th March 2015
For Approval today
Retail Market Design Service
IGG Action Items
Updated IGG Action List issued in
advance of meeting
6 Actions closed since last IGG meeting:
16 IGG Actions carried forward:
Retail Market Design Service
Update on actions - Closed
AP No. Title
Org.
Assigned to Date Due Date Closed
922
RMDS to provide a list of outstanding approved MCRs including date raised and
any previous inclusion in a prioritisation exercise RMDS 04/03/2015 04/03/2015
941 ESBN to investigate the addition on UK addresses to BGE Customers ESBN 04/03/2015 04/03/2015
945
Suppliers to provide feedback to CER on CoS/Debt Transfer Workshops that
were held Q4 2014 Suppliers 10/04/2015 08/04/2015
946
CER with the assistance of MRSO to analyse and report back to IGG on the debt
flag trends for 2014 CER 08/04/2015 08/04/2015
947
LTNA Suppliers to review LTNA reports received from ESBN and provide
feedback to ESBN on any actual/potential initiatives or action taken in relation to
them Suppliers 04/03/2015 04/03/2015
955
Public Lighting Centrally Managed System - Suppliers to respond to RMDS if
they wish to be involved in this programme Suppliers 08/04/2015 08/04/2015
Retail Market Design Service
Update on actions – Open
AP No. Title
Org.
Assigned to Date Due Date Raised
917
Notification Address - Suppliers to complete data cleanse & update training
material as a preventative measure for future incidents. Suppliers 13/05/2015 10/09/2014
928
CER to convene a meeting re Disconnection Taskforce actions as well las
circulating actions CER 13/05/2015 05/11/2014
939
CER to review comments on processes from Suppliers (Action 938) and set up a
Revenue Protection Workshop. Action 923, 925, 926 to be used as supporting
documentation CER 13/05/2015 03/12/2014
944 CER to develop terms of reference for Revenue Protection (linked to action 933 CER 13/05/2015 14/01/2015
948
Data Protection - ESBN to report back on how the COLE process currently
records the moving out of an occupant to identify whether the moved out
customer details are retained in the ESBN system. If details are retained data
protection concerns need to be investigated ESBN 13/05/2015 14/01/2015
949 CER to adjudicate on Supplier's position on the Revenue Code of Practice. CER 13/05/2015 14/01/2015
950 Multi-site MPRNs. ESBN to send list of MPRNs with Multi-sites to SSE Airtricity ESBN 13/05/2015 14/01/2015
951
CER to clarify whether the draft Retail Code is included in the Compliance and
Enforcement Framework. Further details required around the impact of the
compliance framework on Suppliers CER 13/05/2015 04/03/2015
Retail Market Design Service
Update on actions – Open(Cont.)
AP No. Title
Org.
Assigned to Date Due Date Raised
952
Gemserv to review the level of detail undertaken by them in the PIR Assurance
provided to Suppliers with an objective of making the PIR fit for purpose GEMSERV 13/05/2015 04/03/2015
953
Customer Reads - Suppliers to review the level of meter read validation they
undertake Suppliers 13/05/2015 04/03/2015
954
Suppliers to revert back to ESBN (via RMDS) detailing how long it will take them
to implement the proposed changes for Eircodes as well as any questions or
design concerns Suppliers 13/05/2015 04/03/2015
956
CER/ESBN to review whether the lock moratorium over the Christmas period
should apply for IC sites CER/ESBN 13/05/2015 04/03/2015
957
Notification Address Defect – ESBN to provide an update to CER on the
Notification Address defect ESBN 13/05/2015 08/04/2015
958 Suppliers to provide feedback to CER on the Cooling Off period proposal Suppliers 10/04/2015 08/04/2015
959 CER to provide on update on the Vulnerable Customer Initiative CER 13/05/2015 08/04/2015
960 Suppliers to respond back to ESBN on the Vulnerable Customer Data Suppliers 15/04/2015 08/04/2015
CER Update
Industry Governance Group
13th May 2015
Retail Market Assurance
Services for the Irish Electricity
Market
Lizzie Montgomerie
Nirav Vyas
IGG
13 May 2015
Dublin
Assured Parties – April 2015
Gemserv 9
Number and type of live participants assured by Gemserv since 2005
NB this is not a reflection of the live market position.
Large 8
Small 7 Self
[VALUE]
DSU 8
Assurance Processes: April 2015
Gemserv 10
0
1
2
3
Parties in assurance by process
Assurance Services: April 2015
Gemserv 11
Re-Qualification
One Supplier
Market Design Releases
TIBCO Upgrade
Schema MDR
Non-Schema MDR
Non-Schema Assurance Strategy
• MCR1136 & 1151
• Scope
• Techniques
• Plan
Gemserv 12
Non-Schema – Assurance Techniques
Matrix
Gemserv 13
PARTICIPANT TYPE ESB
NETWORKS SUPPLIER –
LARGE SUPPLIER –
SMALL SUPPLIER –
SELF TSO
Self-Assessment MCR1136 MCR1151
MCR1151 MCR1151 N/A N/A
Formal Assessment MCR1136 MCR1151
MCR1151 MCR1151 Volunteers
Only N/A N/A
IPT N/A N/A N/A N/A N/A
Assurance Plan
Gemserv 14
Activity Non-Schema
Participant Questionnaire issued 21 August 2015
Participant Questionnaire returned 11 September 2015
Site Visit to ESB Networks During 12 September – 2 October 2015
Inter-Participant Testing N/A
Assurance Report to CER 16 October 2015
CER Go/No-go decision 30 October 2015
Cut over 20 – 22 November 2015
Assurance Services: Forward Work
Plan
Gemserv 15
April 2015 October 2015
IPT
•TIBCO
•Schema
RA Decisions
• TIBCO / Schema
• Non-Schema
No
v 2
01
5 ‘
Cu
t O
ver’
BSA
•1 Supplier Re-
Qualification
CER Decision
•1 Small Supplier
•1 Re-Qualification
Thank You
Lizzie Montgomerie
Head of Assurance
T: +44 (0) 20 7090 7750
W: www.gemserv.com
MRSO Update Gerry Halligan
13 May 2015
18 esbnetworks.ie
Market Message 010
January February March April May June July AugustSeptembe
rOctober November December
2013 22,930 24,475 26,327 28,580 29,120 26,426 32,371 29,258 26,997 27,646 25,232 19,063
2014 24,339 27,531 28,279 33,915 30,387 28,754 33,560 31,262 33,495 36,321 35,743 24,768
2015 29,927 32,316 31,311 30,378
0
5,000
10,000
15,000
20,000
25,000
30,000
35,000
40,000
2013 2014 2015
19 esbnetworks.ie
Market Message 105L
January February March April May June July AugustSeptembe
rOctober November December
2013 18,434 19,665 23,585 23,382 25,581 22,922 26,192 25,831 22,357 22,640 22,600 18,078
2014 18,159 22,308 24,568 28,254 30,517 22,914 28,014 26,735 28,590 28,553 33,776 24,219
2015 22,833 28,140 26,116 23,970
0
5,000
10,000
15,000
20,000
25,000
30,000
35,000
40,000
2013 2014 2015
20 esbnetworks.ie
COS in-progress 7th May 2015 – 9,505
• Reviewed Monthly
• Suppliers notified of individual
switches outstanding and reason
• Switch outstanding for Energisation
or Token Meter Removal, will not
time-out
• Contact Customer or submit
cancellation
• 18 Switches held due to an existing
Open Service Order
Nov 2014 1
Dec 2014 0
Jan 2015 2
Feb 2015 14
21 esbnetworks.ie
COS and CoLE
Month
Explicit
CoLE
Inferred
CoLE
Total
CoLE
Total
010
%
Explicit
CoLE
% Total
CoLE
Feb-15 5,803 6,449 12,252 32,316 18% 38%
Mar-15 5,987 6,162 12,149 31,311 19% 39%
Apr-15 4,683 5,952 10,635 30,378 15% 35%
22 esbnetworks.ie
Registration Rejections %
January February March April May June July AugustSeptembe
rOctober November December
2013 1.7% 1.6% 2.2% 2.1% 1.7% 1.8% 2.1% 2.3% 2.7% 2.7% 3.0% 2.5%
2014 2.6% 2.0% 2.1% 2.1% 2.4% 2.3% 2.8% 2.6% 2.8% 2.9% 2.5% 2.9%
2015 2.2% 2.1% 2.2% 2.4% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0%
0.0%
0.5%
1.0%
1.5%
2.0%
2.5%
3.0%
3.5%
2013 2014 2015
23 esbnetworks.ie
Debt Flagging
Feb-15 Mar-15 Apr-15
Total MPRNs received 846 973 855
Total CoLEs returned to outgoing supplier 405 461 406
Returned for other reason to outgoing
supplier (invalid MPRN, switch completed) 63 67 87
Valid Debt Flags issued to gaining supplier 378 445 362
Total cancelled 150 175 154
Valid Debt Flags as % of total COS 1.3% 1.7% 1.5%
24 esbnetworks.ie
Debt Flagging
May-14 Jun-14 Jul-14 Aug-14 Sep-14 Oct-14 Nov-14 Dec-14 Jan-15 Feb-15 Mar-15 Apr-15
Total MPRNs received 857 1027 920 899 908 762 718 514 733 846 973 855
Valid Debt Flags issued 464 555 500 416 458 359 359 241 439 378 445 362
Total Cancelled 136 155 176 124 131 130 135 92 113 150 175 154
0
200
400
600
800
1000
1200
Total MPRNs received
Valid Debt Flags issued
Total Cancelled
25 esbnetworks.ie
Disputed Reads
186
164
182
137
113 120
101
121 130
105
178
206
244
169 173 175
194
265
155 151
194
205
186
158
0
50
100
150
200
250
300
26 esbnetworks.ie
Total Withdrawal of 310 reads for all Suppliers
996 1,059
1,549 1,529
1,297
1,121
885
646
824 901
848 868
999 923
1,322
1,197 1,279
1,184
1,050 985
1,092 1,099 1,078
948
0.0%
1.0%
2.0%
3.0%
4.0%
5.0%
6.0%
7.0%
0
200
400
600
800
1,000
1,200
1,400
1,600
1,800
2,000
2,200
Withdrawal of 310 Reads
Withdrawals as % of Completions
27 esbnetworks.ie
Objections – Erroneous Transfers
70
52
73
91
109
95 101
47
94
113 107
136
68
42
68
61
83
91
74
64
52 52 47
53
0
5,000
10,000
15,000
20,000
25,000
30,000
35,000
40,000
0
20
40
60
80
100
120
140
160
No
. o
f C
oS
Co
mp
leti
on
s
No
. o
f O
bje
cti
on
s
No. of Objections
CoS Completions
28 esbnetworks.ie
Objections
Feb-15 Mar-15 Apr-15
No. of Objections 52 47 53
Cancellations from Objections 23 34 41
Objection emails to MRSO 10 11 5
Reasons:
Uncontactable by phone 1
Written communication
COS confirmed 8 11 4
Other 1 1
Escalation emails 6 5 2
29 esbnetworks.ie
• Clear text email not secure and subject to malicious interference
• Best practise is encrypt for sensitive or personal data
• Alternative option is Gateway to Gateway email encryption such as
Transport Layer Security (TLS)
• ESB have the facility to set up TLS links between ESB and specific
external email Domains
• In order for this to work effectively these Domains must also have a
TLS enabled email gateway
Email encryption
30 esbnetworks.ie
Benefits of TLS
Stronger Security - Encrypts every part of all messages
When using TLS the text of the email and the attachment are
encrypted this offers stronger security than simply using a product
like Axcrypt or Winzip which will encrypt the email attachment but not
the email text.
Automated Encryption
TLS offers Gateway to Gateway email encryption which means that all
emails sent from the ESB Domain to nominated external Domain(s)
will automatically be encrypted, this removes the manual encryption
step necessary when encrypting email attachments.
Cost
There should not be any additional costs where the mail Gateway
already uses TLS technology.
ESB Networks Update
Theresa O’Neill & Carmel O’Connor
32 esbnetworks.ie
Prepayment Meter Stats
Keypad Meter Stats
● Total installed up to 5 May 2015: 68,480
● Total installed in 2015 up to 5 May 2015 : 5,622
Token Meter Stats
● Total installed up to 6 May 2015 : 11,718
● Token Meter Removed calls from 25 Feb – 6 May 2015 : 383 (173 due to COS)
● Token Meter Installation Calls from 25 Feb – 6 May 2015 : 0
● Token Meter Exchange calls from 25 Feb – 6 May 2015 : 45
Footer
33 esbnetworks.ie
Multi Site (1 to Many) Issue
● The issue originated during Market Opening with the original set up of ‘Multi sites’ e.g. commercial
retail blocks and apartment blocks
● The practice was discontinued several years ago and there is currently a 1:1 relationship only when
sites are set up
● A single SAP ‘Connection Object’ was set up for the building with multiple MPRNs associated with
it
● The problem is that if an address is changed on one it goes to all the associated MPRNs via
multiple market messages
● This issue has been discussed at previous IGG meetings but was raised again recently by SSE
Airtricity
● ESBN can confirm the following:
– 3,297 CO/Buildings are associated with 50,597 MPRNs
– 2,303 CO/Buildings are associated with 32,897 real MPRNs i.e. Energised
– ESBN have sent each supplier the list of their ‘multisite’ MPRNs this week
● Before the end of 2015 ESBN will process the connection objects and MPRNs to:
– Ensure that the old, created COs are never made live
– Break the links between multiple COs & MPRNs where all the data is available on the system
● Site visits will be required for 327 locations to verify data, these 669 MPRNs will take longer to sort
Footer
34 esbnetworks.ie
Data Retention
ESBN typically uses a 7 year retention period unless a longer period is required
(Health and safety records, etc).
• This period is in compliance with the Electricity and VAT regulations and
• The retention period aligns with SEMO data retention under AP5.
Electricity and VAT regulations - Preservation of records.
10. (1) Except where the Commissioners may otherwise allow or require, the records required under these Regulations
shall—
(a) be preserved for a period of not less than 6 years from the date of the last entry in such records, and
AP 5.0 SEMO – 2.2.7 Data Storage
• To maintain the integrity and availability of information processing and communication services data will be stored
at least two sites. The Market Operator shall employ an off-line electronic back-up solution of market data which
will allow recovery of data in the short-term (less than one week) for disaster recovery and also facilitate the
requirement to store market data over the long term.
• Market data will be stored for a period of not less than seven years.
• Market data relates to the Market Operator’s fulfilment of its rights and obligations where interaction with Parties
and Participants, or Publication is involved. Market data does not include internal communications within the
Market Operator, email with Parties or Participants (important functions are backed up by Type 1 communications),
except where defined explicitly as required for reporting purposes on an ongoing basis under the terms of the
Market Auditor Report.
Footer
ESBN Presentation to the IGG
Market Releases and Sundry Items
Theresa O’Neill
13th May 2015
36 esbnetworks.ie
Vulnerable Customers
• We have gotten a lot of feedback from Suppliers , updates have been made , Thank You
• ESBN would like to run the final report to send to Suppliers to confirm all changes that are needed have been made. We are proposing to run this by Thursday 28th May, 2015. Suppliers would have to send in their details to ESBN that day too , and for this we’ll be in touch next week.
• To do this, could Suppliers today confirm that all your changes are now, or will have been , submitted by the end of next week viz Friday 22 May, 2015
37 esbnetworks.ie
Update - 2 Reads sent in one message to suppliers
• This problem concerns cases where two meter readings for the one MPRN have come into ESBN from a Customer via the IVR at different times and, because of a code defect ,they both appear on a single 300-series Market Message even though there are different read dates for each reading and both reads are for the same register.
• Therefore these market messages are incorrectly populated. One Supplier reported that they are unable to process these market messages.
• And separately, as well as the code correction, we are doing some re-training
When all is finished, this will prevent future cases arising. However please note that where there are reversals of historical messages then the reversal and rebilling messages will show the original 2 readings.
We are planning for a Go-Live on Wednesday 27 May 2015
No Outage will be needed, the changes can go live during a working day
38 esbnetworks.ie
Market Release 2015
MCR Version Schema or Non-schema
Timeline Clarification And,
MCR1136
131 MM to be added to
Messages Tab on
Extranet
2.0 Non-Schema
With Tibco N/A The 131MM will be available on the Extranet in the same timeline
as the Tibco Upgrade
MCR1151
Add the Meter Multiplier
and Meter Category code
to Downloadable Files
2.0 Non-Schema
With Tibco
N/A The Meter Multiplier and Meter
Category code will be in the
scheduled Downloadable files
after the Tibco Upgrade ie.
December
MCR1111
Automated Debt Flagging
Solution
3.0 Schema
Ver 11.00.00
With Tibco
IGG
10th April 2013
The Automated Debt Flagging
Solution will be enabled in the
same timeline as the Tibco
Upgrade
MCR1122
Introduction of Flag into
the Market Design to
identify Sites with
Essential Plant (EP)
3.0 Schema Ver 11.00.00
With Tibco
IGG
10th April 2013
The Essential Plant Flag will be in
the next scheduled Downloadable
files after the Tibco Upgrade ie.
December
See Next 3 Slides for an
indication of the location of the
EP flag on three Extranet tabs
39 esbnetworks.ie
Extranet – Essential Plant Flag MCR1122 - MPRN Enquiry tab
MPRN Enquiry tab
In the section Meter Point Status, a new field 'Essential Plant‘ will be added under the field
Trading Site Flag. This new field will either be blank or populated with YES.
Essential
Plant
40 esbnetworks.ie
Essential
Plant
Extranet – Essential Plant Flag MCR1122 – TMPRN
Technical Unmetered MPRN (TMPRN) : MPRN Enquiry tab
In the section under TMPRN Status, a new field 'Essential Plant‘ will be added under the field
‘Meter Point Status’. This new field will either be blank or populated with YES.
41 esbnetworks.ie
Essential
Plant
Extranet – Essential Plant Flag MCR1122 - New Connections tab
New Connections tab
In the section Meter Point Status, a new field 'Essential Plant‘ will be added under the field
Trading Site Flag. This new field will either be blank or populated with YES.
Thank You
Footer
Retail Market Design Service
Retail Market Design Update
Jessica Gregory
RMDS
13th May 2015
Retail Market Design Service
DR 1165 V1.0 – Market Design Process Diagrams – conversion from ARIS to document format
In 2013 a decision was made to exit from ARIS as BPM for Market Design.
Project involves converting all Market Documentation from ARIS platform to Visio/Word
platform and publishing directly on the RMDS website.
The project is being delivered in stages with a new DR for each stage.
DR 1165 is for the approval of the final 11 MPDs completing the conversion project
As these MPDs were being drafted and converted there were some corrections
identified – these are highlighted in the DR and also recorded in the History of Changes
for each MPD.
This DR contains an embedded Conversion Project Close Out Document detailing
the entirety of the conversion project. It contains a full document cross reference
showing where documents and items previously held in ARIS can now be found on the
RMDS website.
At Today’s Meeting: Classified as RoI Specific at ReMCoWG earlier today.
Recommendation for Approval as a DR and fast track to MCR requested at IGG.
Retail Market Design Service
DR1166 - Export Only Supplier
Currently there are three categories of Suppliers with the Irish Retail Electricity Market(Self
Supplier, Large Supplier and Small Supplier).
The proposal is to create a new type of Market Entrant Category within the Retail Market,
this Supplier category would be termed “Export Only Supplier”.
Up to 10 Export deminimus/non participant sites can be registered under the single
Supplier Unit.
If an Export Only Supplier wished to increase the number of export sites to beyond 10 they
would be required to requalify to procure and implement the EMMA/TIBCO messaging
infrastructure. This would require requalification, assurance and IPT.
The Scope of Change to Design Documentation relates to amendments to the Market
Assurance and Market Entry Documentation.
At Today’s Meeting: Classified as RoI Specific at ReMCoWG earlier today.
Recommendation for Approval as a DR.
Retail Market Design Service
DR 1140 V1.0 – Introduction of Eircodes into the Retail Market
in Ireland
What is proposed in DR 1140
The Eircode Project is aiming to have ‘Eircodes’ available in June 2015
ESB Group have been asked to facilitate the Postcode Project
ESB Networks are the first step within the ESB Group in facilitating this process
A Data Sharing Agreement is in place between the Eircode Project and ESB Group to allow data from
the Central Market System be made available for Eircodes
Once Eircodes have been allocated to sites these will be made available back to ESBN where data
matching has been possible
ESBN have drafted DR1140 outlining what work would need to be done on the Central Market
System to allow for the addition of the new Eircode values.
ESBN have consolidated responses to questions raised by Suppliers in relation to Eircodes.
These questions were raised on foot of Action Item 954 and the responses were sent to all
Participants on 05 May 2015.
The ESBN information will hopefully provide sufficient clarifications to discuss further and approve the
proposed solution held within DR1140 at todays meeting.
At Today’s Meeting:
Recommendation for Approval
Retail Market Design Service
DR1167 – Public Lighting Proposal (Place Holder)
A Public Lighting Workshop was held at the CER offices on the 21st April 2015 Minutes for the meeting/workshop were issued to all attendees on 23.04.2015
A possible solution was identified at the workshop involving additional burn hour calendars.
Once stakeholders identify a suitable design, the holding DR will be populated and travel through the
existing Retail Market Change Control Process. All involved stakeholders will be involved in the approval process.
At Today’s Meeting:
For Information only
Retail Market Design Service
Market Releases
Non Schema Release 2015
Non Schema Release 2015 – Assurance Strategy
Requires IGG Participant approval
MCR Title Detail Delivered by
MCR 1136 131 MM to be added to Messages Tab on
Extranet ESBN have confirmed a possible
Q4 2015 Delivery ESBN - NSR/MMR
MCR1151
Add the Meter Multiplier and Meter Category
code value for each relevant MPRN to the
COM_REG and DOM_REG files available on
the Secure File ESBN have confirmed a possible
Q4 2015 Delivery. ESBN - NSR/MMR
Next Steps Date
Assurance Strategy presented to IGG 13.05.2015
Supplier Comment/ approval 22.05.2015
CER approval 29.05.2015
RMDS Publish to Non Schema Page on Website 01.06.2015
Retail Market Design Service
Market Releases
2nd Minor Market Release 2015
MCR Title Detail Delivered by Delivery Date
MCR 1149
Request that Suppliers ensure that
they submit only one active COLE
016MM for an MPRN
WP and Documentation changes
to be performed. WP is currently
in practice. RMDS - MMR 27.05.2015
MCR 1156 Cancellation Reason Code OS on
111A MM Once approved hope to be
included in MMR RMDS - MMR 27.05.2015
MCR 1165 Market Design Process Diagrams Final 11 MPDs.
RMDS - MMR
27.05.2015
Non
Conformances
Changes to 7 MPDs, MPD 01, MPD
02, MPD 08 1.2, MPD 10, MPD 11,
MPD 16 2.1 & MPD 35.
Minor cosmetic changes as well
as minor errors identified during
the preparation for the Smart
Metering Workshops.
RMDS - MMR
27.05.2015
Retail Market Design Service
Market Releases
TIBCO
All details delivered by TIBCO programme and TIBCO workshop 1 and 2.
Schema Release
MCR 1111 - Automated Debt Flagging Solution
MCR 1122 - Introduction of Flag into the Market Design to identify Sites with Essential Plant
MCR 1133 – working practice for group unmetered Debt flagging (non-Schema)
TIBCO / Schema Release 2015
High Level Assurance Plan
Area Assurance Strategy WG approval SG approval Publicised
Schema
Release Co-ordinated Assurance Strategy being
drafted & reviewed by Assurance Team 20-22 May 2015 27 – 29May 2015 By 31 May 2015
TIBCO
Strategy Implement Evaluate RA
Review Go Live
November June May October
Retail Market Design Service 13TH May 2015
Action Item 922
Supplier Response to Action Item 922
MCR MP1 MP2 MP3 MP4
MCR 1135 Relevant Relevant
MCR 1114 Relevant Withdraw
MCR 1096 Relevant Relevant
MCR 1001 Relevant Withdraw Relevant
MCR 0176 Not Relevant Relevant Relevant
MCR 0175 Relevant Relevant Relevant
MCR 0073 Not Relevant Withdraw Relevant
MCR 0069 Relevant Withdraw
MCR 0062 Withdraw Relevant
Next Steps
Items which unilaterally indicated as relevant – retained.
No unilateral withdraw/non relevant MCR. MCR 73 – first name mandatory is only one with 2 withdraw/non
relevant.
Should all MCRs be brought to IGG for re-contextualisation? Another market sweep for more responses?
Retail Market Design Service
Other
LTCA – CER to provide a position on the external auditor following ESBN
response to CER questions.
RMDS Website - Private/Sensitive Information RMDS is in the process of building a private website which will sit behind their existing website.
Due for delivery 22nd May 2015
It will function similarly to the Smart Metering private site which RMDS built.
Private document repository
Private project/working information pages
Login/password required per organisation and administered by RMDS.
RMDS will run an access exercise in the next few weeks for all Participants.
Private ReMCoDS documents can also be housed on the website.
ROI Assurance Body Appointment An EU tender process led to the publication of a contract notice in the EU Journal (OJEU) during
October 2014.
RFT’s were submitted to all applicants
Gemserv, through rigorous evaluation, was selected as the Assurance Body for a 3 year period
beginning April 2015 – March 2018
Retail Market Design Service
Upcoming Outages for ROI
http://rmdservice.com/outages-2015/
http://rmdservice.com/outages-2015/http://rmdservice.com/outages-2015/http://rmdservice.com/outages-2015/http://rmdservice.com/outages-2015/
Retail Market Design Service
IGG Meeting
AOB
Retail Market Design Service
Next Steps
Diary dates for next IGG meeting:
Wednesday 8th July 2015 - Belfast
Dates included on Calendar of Events on
RMDS website www.rmdservice.com
http://www.rmdservice.com/
Retail Market Design Service
Next Steps
Diary Dates for next Conference Call:
Wednesday 10th June 2015
Dates included on Calendar of Events on
RMDS website www.rmdservice.com
Call details are as follows:
Ireland Local Call Dial-In Number: 01 2475479
Std International Dial-In Number: +44 (0) 203 4333578
Conference code: 1663328269
http://www.rmdservice.com/
Retail Market Design Service
Thank You