8/10/2019 EXW P006 0000 CS SHC MT 00096 Method Statement for Landscaping Rev.0
1/28
SINOHYDRO
GROUP
Ll
MITED
Doha
Expressway
8/10/2019 EXW P006 0000 CS SHC MT 00096 Method Statement for Landscaping Rev.0
2/28
SINOHYDRO
GROUP
LlMITED
Doha
Expressway Package
6
East Industrial
Road
Interchanges
at
Intersection with
Street 10 and
Street
23
Contract
No.
C2011 085
Submittal Information
1.
Document Number
EXW-P006-0000-CS-SHC-MT-00096
2.
Description
Method Statement for Landscaping
3.
Pages
21
4.
Revision
Rev.O
5.
Reference
Number
N/A
6.
ountry
of
Origin
Qatar
7.
Specification
Ref.
QCS 2010 Section 28 Part 1
8.
Drawing
Ref.
ERC1400/D20/LA6 7301 to 7309
Doha
- State of Qatar
Tel:
974
6 61 9 . Fax: 974
44
6 61 7 .
\V
ww.sinohydro.com
8/10/2019 EXW P006 0000 CS SHC MT 00096 Method Statement for Landscaping Rev.0
3/28
I
SINOHYDRO GROUP
Ll
MITED
Doha
Expressway
(Package
6
East
Industrial
Road Interchanges
at Intersection with
Street 10 and Street 23
Contract
No.
C2011 085
Index
1. SCOPE
2. REREFENCE DOCUMENTS
3.DRAWINGS
4. INSPECTION TESTING
5.
RESPONSIBI
Ll
TIES
6. RESOURCES
7. CONSTRUCTION
METHODOLOGY
8. PARTICULAR SAFETY PRECAUTIONS
9. PARTICULAR ENVIRONMENTAL PROTECTION MEASURES
10. HSE PROCEDURES
11. QUALlTY ASSURANCE AND QUALl
TY
CONTROL
12. APPENDCES
12.1
Job
Safety Analysis
12.2 Hazard Risk Assessment
12.3 Copy of Material Approval
Doha
-
State
of Qatar
.
Tel
: +97444606109 .
Fax
+97444606107 .
www
.sinohydro.com
8/10/2019 EXW P006 0000 CS SHC MT 00096 Method Statement for Landscaping Rev.0
4/28
Doha Expressway Package6)
Method
Statement
for
Landscaping
1. SCOPE
This method statement describes the construction methodology and safety measures for
Landscaping works. The works related to the Construction of Doha Expressway Package 6 -
East Industrial Road Interchanges
t
Intersections with Street 10 and Street 23.
Oatar Construction Specification 2010
2 REFERENCE DOCUMENTS
2.1 Qatar Construction Specifications 2010
S e c t i o n 28 Part
2.2
HSE
Plan EXW-P006-0000-HS-SHC-PL-00001 Rev 1
2.3 Project Quality Plan EXW-P006-0000-QM-SHC-PL-00003
Rev
1
3. DRAWINGS
3 1 Contract Drawings
The typical Standard Details Drawings for Landscaping provided with the Contract
Documents.
Which are in i u l r E R C 1 4 D 2 A 6 - 7301 to 7309.
4. INSPECTION TESTING
AII precast interlock paving block and loose aggregates delivered to site shall conform to the
Contract Documents Specification requirements.
AII deliveries must be visually checked for flaws in the production of precast interlock paving
and loose aggregates.
In accordance with the Contract Documents and Approved
Ouality Plan requirements ,
on satisfactory completion
of
the inspection by Supervision Consultants, clearance must be
obtained for the next activity.
5. RESPONSIBILITIES
Project Manager is responsible for ensuring that the work is r m e d in accordance with
the specifications and within the time and cost constraints. Control and monitor overall
project activities, including financial , technical , commercial , logistics, mechanical electrical ,
quality
,
safety health and environmental management functions.
Construction Manager is responsible for ensuring that the landscaping works are carried
in accordance with the contract drawings/approved shop drawings ,
s p e i f i
t i o n
EXW-P006
-0000-CS-SHC-MT-00096 Rev 0
22 Oct 2012
Page 1 of 10
8/10/2019 EXW P006 0000 CS SHC MT 00096 Method Statement for Landscaping Rev.0
5/28
m
- . .
Doha Expressway Package6) Method
St
atement for Landscaping
equipment and workmanship requirements
in
a safer environmen
t
He is also responsible for
ensuring that Site Engineer I Supervisor and workforce are informed and comply with Project
Quality Plan and HSE Plan requirements for earthworks.
Site ngineer
is responsible for the physical execution of landscaping works
in
the correct
location and in a safe and efficient manner in accordance with the contract requirements.
They are to ensure that the necessary
QNQ
documents are completed
in
a timely manner.
They are to ensure that the employees for whom they are responsible carry out the work in
accordance with this method statemen
t
Safety
ngineer
ensures that all operations are carried out
in
a safe manner and
in
accordance with the minimum requirements set out in HSE Safety Regulations for
Contractors, and the Site Specific Safety Plan. It
is
the responsibility of the Safety Engineer
to ensure that a Permit to Work covers all operations, and he d i r e t l y to the Project
Manager.
QAlQC ngineer ensures that all materials , testing and procedure are carried out strictly in
accordance with the Contract Documents and Quality Plan. He
Ii
aises directly with
the Supervision Consultant authorized site representative to arrange and witness inspections
and testing. He reports directly to the Project Manager and he should be reporting to the
corporate Quality Manager.
Site
Surveyor is responsible for setting out, monitoring and as built survey data. He is
responsible for computations, physical work and selection of survey equipment necessary for
the earthworks
in
the correct locations
on
the projec
t
Foreman
directly supervises the work activity on the site and has full control over the use of
the labor, plant and equipmen
t
He ensures that the work is carried out in full compliance
with the specification , and
in
a manner that conforms to the safety requirements. He reports
to the Site Engineer when the work
is
complete and ready for inspection.
6 RESOURCES
6 1 Manpower
The estimated manpower
is
tabulated below
which will subject
to
adjustment according
to
the
actual requirement during implementations.
Project Manager - 1
EXW-P006-0000-CS-SHC-MT-00096 Rev 0
22 Oct 2012 Page 2 of 10
8/10/2019 EXW P006 0000 CS SHC MT 00096 Method Statement for Landscaping Rev.0
6/28
...
Doha Expressway Package6)
Method Statement for Landscaping
Construction Manager - 1
HSE Engineer - 2
Site Engineer - 2
Q
Al
QC Inspector - 2
Site Surveyor - 1
Safety Officer - 2
Site Foreman - 2
Skilled worker/trained installer - TBD
Unskilled worker - TBD
6.2 Equipment and
Tools
6 2 1
The following
is
a list of mechanical equipment
to
utilize
in
these operations.
Plate compactor
Excavator
Tipper Truck
WaterTruck
Hand
gloves
and
safety goggles.
6.2.2 Upon mobilization of tools and equipment to site
,
inspection will be carried out by
Contractor inspection where required. Copies of these certificates should be made available
on site.
6.3 Materials
6.3.1 The following materials should be produces to execute the works. AII procured
materials shall comply with approval material submitta l.
Precast Block
Loose Aggregate
7
CONSTRUCTION METHODOLOGY
7.1
Work Permits
AII n e e s s
o r permits shall be obtained prior
to
the commencement of any activity
the site
,
and shall remain valid throughout
the
entire duration of the operation.
Hot / Cold Permit
to
Work
Road
Closure if applicable)
AII
interfacing activities shall be fully coordinated with Supervision Consultan
t
For
emergency response procedures please refer
to Job
Safety Analysis
EXW-P0060000-CS-SHC-MT-00096 Rev 0
22 Oct 2012
Page 3
of
10
8/10/2019 EXW P006 0000 CS SHC MT 00096 Method Statement for Landscaping Rev.0
7/28
r o u p
Doha Expressway (Package6)
Method
St
atement for Landscaping
7 2 Site Planning Preparation
A clean dry and level area of the site store will
be
made available for
l o a d i n g
of
materials.
of materials shall be suitable size
,
using proper lifting chains/slings.
Precast block shall be stacked
ground
on
timbers
,
and subsequent bundles if
placed on top of each other will be similarly separated.
7 3 Verge Hardscape works
The surveyor will set the designated line and the grade leve
l
The interlocking paving block shall be laid as per standard specification.
The area shall be excavated to formation level , watered and compacted.
A laying course of sand 50mm thick shall be placed over the approved surface shall be
compacted (slightly wetted with water).
The interlocking paving block shall be laid to the approved
e r n
The joints between paving blocks shall be filled with dry jointing sand by spreading it
over the surface and brushing it into the joints . The dry sand shall be natural and shall
comply with the standard specifications.
The block paving shall be vibrated by a plated compactor to ensure that the joints have
been completely filled.
7 4 Loose Aggregate
The surveyor will set the designated line.
The area shall be excavated to formation leve
l
(if required)
Allloose aggregate sample test result shall
be
submitted to the Supervision Consultant
for approval prior to them being used on site.
Prior to placing any material on the permanent works area , it shall be ensured with
subsequent written approval from the Supervision Consultan
t
Selected material from stockpile area , or imported material , will be transported to the
backfilling areas. Loaders with minimum half cubic will place the backfill material
place in layers according to the specification. Vibrator plates
,
vibrator rollers and
tampers will be used to compact the backfill materia l
Filling low-Ievel areas shall be to the level of subgrade as designated. After completion
clearing and grubbing , the Contractor shall the necessary levelling in order
to control the thickness of the layers.
The contractor shall be spreading the loose aggregate as per the contract drawings.
EXW-P006-0000-CS-SHC-MT-00096
Rev
0
22 Oct 2012
Page 4 o 10
8/10/2019 EXW P006 0000 CS SHC MT 00096 Method Statement for Landscaping Rev.0
8/28
r o u p
Doha Expressway (Package6)
Method Statement for
p
7 5
Bare
ground works
The surveyor will set the designated line.
The area shall be excavated to formation leve
l.
(if required)
AII
sub-grade sample test result shall be submitted to the Supervision Consultant for
approval prior to them being used on site, and shall comply in all respects with the QCS
2010 , Section 6 (Roadwork). No material will be used on site prior to receiving the
above-mentioned approvals.
Prior to placing any material on the permanent works area , it shall be ensured with
subsequent written approval from the Supervision Consultant.
Sub-grade material shall be brought to site directly from the stockpiles in covered truck
and tipped directly
on
to the area
in
which the material is to be used.
Vehicles shall
be
entering the areas through designated access points.
Spreading o the sub-grade material will be done by means of a mechanical grader.
Sub-grade shall be constructed in layers not exceeding 200 mm compacted
thicknesses, as detailed in the specification.
Wherever an overall thickness of sub-grade is greater than 200mm , the material shall
be placed and compacted in more than one equal layer
,
however
,
in no case shall be
the layers be less than 75mm thick.
The prepared sub-grade shall be compacted using by vibrating drum rollers of at least
15 ton operating weigh t
Rolling shall be continuous until the entire thickness of each layer in thoroughly
compacted to an average value of 95 of its MDD.
Any areas inaccessible by normal compaction equipment such as kerb lines, and
around gully pots, manholes etc. Shall be compacted by mechanical equipment, i e.
plate compactor or hand roller.
Upon completion of the compaction operations ,
each area/layers shall be submitted
the Supervision Consultant through an inspection request for his subsequent approval
8. PARTICULAR SAFETY PRECAUTIONS
AII
requirements related to safety including work permits are included
in
the Project
HSE Plan EXW-P006-0000-HS-SHC-PL-00001 Rev. 1
AII
key personnel on this section of works are to be experienced
in
landscaping works
and shall be inducted into this method statemen t. Records of attendance at the toolbox
meeting shall be kept and filed on site.
Works procedures shall be
in
accordance with the HSE risk assessments.
EXW-P006-0000-CS-SHC-MT-00096 Rev 0
22 Oct 2012 Page 5 of 10
8/10/2019 EXW P006 0000 CS SHC MT 00096 Method Statement for Landscaping Rev.0
9/28
m i t
~ Doha Expressway Package6) Method Statement for Landscaping
These shall be presented at toolbox meetings prior to commencement of these works
and then on regular intervals.
Before commencing any work the safe operation of the related equipment as well as
safe work method shall be explained to all personnel that are involved at a toolbox
meeting by the Supervisor Safety responsible for that area. Any new employee shall
also be inducted into the operating procedures of that area.
AII plant and equipment are to be inspected and approved as required by the contract
documents.
9 PARTICULAR ENVIRONMENTAL PROTECTION MEASURES
The environmental protection measures relating to landscaping works will be as
defined
in
the Health
,
Safety and Environmental Plan.
No
other special environmental
protection measures need to be considered then to keep the dust control to a level as
appropriate to the surrounding environment
10. HSE PROCEDURES
10 1 In the event of an emergency, the Supervisor in Charge shall act as the Rescue team
Leader and the following shall be activated:
10.2
In
the event
o
fire emergency procedures:
Warm inform all site personnel about the fire.
Evacuate them to assembly point and await further instructions.
If it is safe to do so ,
to put out a fire with potable fire extinguisher. Attempt
extinguish only small fires and make sure there is a clear escape path.
If fire is extinguished and further action is required , then cleaning work can be carried
If the fire is out of control , call up the Fire Department at 999.
Provide the following important details:
1) Location of fire smoke.
2) Type of fire if known).
3) When the incident occurred.
4) Name of caller, location of caller and phone number.
Provide reasonable assistance to those in need.
Seek medical assistance for all types of burns and injuries.
10.3
In
the event of an accident occurrence:
Warm inform all site personnel about the accident
EXW-P006-0000-CS-SHC-MT-00096 Rev 0
22 Oct 2012
Page 6 of 10
8/10/2019 EXW P006 0000 CS SHC MT 00096 Method Statement for Landscaping Rev.0
10/28
Doha Expressway Package6)
Method Statement for Landscaping
Stop all site activities surrounding the incident place.
First aid may be provided to the victim by trained personnel provided consent given by
victim.
00
not attempt to move an injured person unless it is absolutely
n e c e s s a
prevent
further injury.
00 not allow patient to walk to car or clinic, always have medic male nurse to patient,
this action may safe life.
Calmly assure the injured person that assistance help is on the way.
If patient has stopped breathing it will be necessary to start CPR
,
remember
S
R A B.C
1) S.R.A B.C
2) S - Safety yours and that of the patient)
3) R - Response shout at the patient
,
or shake
,
to ascertain level
of
consclousness.
4) A Airway does the patient have airway of yes fine , if no-open airway)
5) B - Breathing is the patient breathing, if yes fine. If
NO
, start mouth to mouth
resuscitation)
6) C - Circulation does the patients have a pulse circulation) if yes fine, if NO ,
start external Cardiac compression CPR)
Assist emergency personnel in locating the victim and investigating the inciden t
Provide reasonable assistance to those
in
need.
10
4
In
the event of a hazardous material emergency:
AII
chemical spills on site must be reported immediately.
A hazardous material emergency exists when:
C l e a n u p
of a spill of a hazardous material is beyond the level knowledge ,
training or ability of the staft
in
the immediately dangerous to the lives and health
persons in the area of facility.
Remove all persons
in
immediate danger.
Evacuate them to assembly point and await further instructions.
Use eyewash or safety showers as needed to wash
s p i l l e d chemicals. Flush the
area with copious amounts of water at least
15
minutes.
Provide reasonable assistance to those in need. Seek medical assistance as required.
Isolate contaminated persons and do not allow them to leave or spread the
contamination.
10 5
Report of Accident
Ilncident
Occupational Oisease
EXW-P006-0000-CS-SHC-MT-00096 Rev 0 22 Oct 2012
Page 7 of 10
8/10/2019 EXW P006 0000 CS SHC MT 00096 Method Statement for Landscaping Rev.0
11/28
Group
Li
mited
..., Doha Expressway (Package6) Method Statement for a n d s
p m g
AII
accidents
,
dangerous incidents and occupational disease
,
however minor
,
must be
reported at once using Safety accident reporting form.
The immediate supervisor or supervisor's delegate should complete the form and
forward it to Supervision Consultants HSE Department within 24 hours of the inciden
t.
When a victim
is
involved , the person completing the form should obtain the victim's
signature if possible. When no injuries have been sustained , substitute the name of
victim with the name of the persons most closely involved with the inciden
t.
If assistance
in
completing the form is required , consult Supervision Consultant HSE
Departmen t
Where serious u r i e s or property damage are involved care must be taken to leave
everything
as
it is (unless this creates an unsafe situation by doing so) so tha
t:
T h e
cause of the accident and the extent of the damage incurred may be
investigated and
a m a g e d of defective equipment machinery can be retained for inspection by
insurance adjustors.
n being notified that an incident has occurs , the Department head will take
whatever action is necessary to:
1
Remove any hazards still present and assist the person(s) involved
prevent the incident leading to further
u r y
2) Meet personnel
in
the immediate victim to any dangers
,
which are still
present
3) Call for medical assistance.
4) Notify the HSE Manager.
5) Arrange to take statements from all witness, including the injured person
if practica
l.
6) Where necessary arrange for relevant documentation to be collected.
7) Complete the
report form in conjunction with the injured persons.
Preliminary Reporting of Injury
The following incidents shall
be
reported immediately to the
Manager and HSE
Manager (regardless of time of accidents):
1) Fatality
2) Injuries to people comprising of:
a) Serious bodying injury including;
Fracture
of
skull , spine, pelvis , arm , forearm , tight or leg.
Dislocation of shoulder
,
elbow
,
hip
,
knee or spine.
Amputation of any limb, or part of limb.
EXW-P006-0000-CS-SHC-MT-00096 Rev 0 22 Oct 2012 p ge 8 of 10
8/10/2019 EXW P006 0000 CS SHC MT 00096 Method Statement for Landscaping Rev.0
12/28
... Doha Expressway (Package6) Method Statement for Landscap ing
Loss of sight of
an
eye.
Should any incident arise which is not clearly defined
in
d o u m e the HSE
Manager should be contacted for advice.
He shall inform the emergency controller Manager) of the accident
,
Manager's name
is
Xian Shijun
,
and mobile number is 66969753.
I n the absence of the Manager
,
the Construction Manager shall act as the
Emergency Controller.
The emergency controller shall alert the emergency response team
,
comprising of first
aiders to attend the accident when required.
The emergency controller shall alert the firefighting team should there be a fire.
The rescue team leader shall alert the emergency controller for additional assistance
from other rescue team leaders
The emergency controller shall arrange for t r n s p o a t i o n to send the injured person
the clinic or hospital if required
The accident area shall be barricaded and nothing shall be removed from the area.
A watchman shall
be
engaged to protect the area from unauthorized entry
The emergency controller shall call for a post mortem meeting after the emergency with
the people involved
in
the emergency.
The
S H representative shall organize the safety committee to perform a full accident
investigation. EHS Manager Mr Fang Xinchang
,
and mobile number is 5388562.
AII information leading to the accident including information , description, photos, time,
location , sources, witness statements, police and medical reports shall be prepared
and submitted by the Manager.
Contact Numbers involved
Designation
Mobile#
in the Work: Name
Sun Jinhui Director 55854510
Xian Shijun
Manager 66969753
Fang Xinchang
EHS Manager
55388562
Zhang Hong Construction Manager (Bridge) 66122363
Tong Jianhua
Construction Manager (Roads) 33141887
Yang Chun Sheng
Construction Supervisor 33589831
Abas
QC Engineer 55059403
Cao Xilai
QC I nspector 66492613
Kamallmad
Safety Manager 66879957
Fasasi
Safety Engineer 55137219
EXW-P006-0000-CS-SHC-MT-00096 Rev 0 22 Oct 2012 Page 9 of 10
8/10/2019 EXW P006 0000 CS SHC MT 00096 Method Statement for Landscaping Rev.0
13/28
Doha Expressway (Package6)
Method Statement for Landscapmg
11.
U
Ll
TY ASSURANCE AND
U
Ll
TY CONTROL
Landscaping
,
planting and soil preparation shall conform
to
the relevant requirements
of the respective standards
,
unless otherwise directed by the Engineer.
Landscape work must be undertaken by an experienced Main Contractor or
Subcontractor specializing in landscape work. Work shall be performed and supervised
at all times by qualified personne l
AII
landscape materials shall be shipped with certificates of inspection as required by
the Engineer. Manufacturer s certified analysis for standard packaged products shall be
provided.
- AII stages of activities shall be checked by the QNQC Engineer prior to the testing by
the approved Independent Laboratory
,
and the final inspection and approval by the
Supervision Consultant
Quality control for the works shall be operated and recorded with project Quality Plan
EXW-P006-0000-QM-SHC-PL-00003 Rev 1
12. PPENDICES
12 1 Job Safety Analysis
12.2 Hazard Risk Assessment
12.3 Copy
of
Material Approval
EXW-P006-0000-CS-SHC-MT-00096 Rev 0 22 Oct 2012
Page 10 of 10
8/10/2019 EXW P006 0000 CS SHC MT 00096 Method Statement for Landscaping Rev.0
14/28
PPENDIX
Job
Safety
nalysis
8/10/2019 EXW P006 0000 CS SHC MT 00096 Method Statement for Landscaping Rev.0
15/28
Job Safetv nalvsis
Job:
project
Manager: Construction Manager:
Commencement
JSA
for :
Landscao
i
ng
. Xian Shijun Zhang Hong Date:22 .10.2012
List of Activity
Potential Hazards/Risks
Preventive Measures
Manpower
Unfamiliar
of
Site Safety Rules
Managers, Engineers, Supervisors, Foremen and Workers shall
and Regulations
undergo safety
orientation induction
to be conducted by the ESH S
Department
of
Sinohydro
as
per
requ
irementsof Qata r Labour Laws and
in compliance with the approved Proj
ect Safety
Panprior to work on site.
Minimum
personal protective equipments: helmet
,
safety/reflectorized vest
,
safety shoes
,
su itable oth ing; etc.and
must be worn at all times when worki ng inside project premises.
Transport /Equipments
Mechanical Hazards
AII
operators mus t have
th
ird part certificate and Qatari Driver s
cense, registration and plate numbers shall be forwarded to ESH S
Department for
the
issuance of gate pass . No Stickers
,
No Entry
Policy will be strictl y
imp
lemented
on
site.
Heavy equipments shall undergo and pass internal safety inspection
prior
to mobilize on site.
Operators and drivers to conduct regular inspection (walk around
8/10/2019 EXW P006 0000 CS SHC MT 00096 Method Statement for Landscaping Rev.0
16/28
check
prior and after operation and
any
defects to
be
found subject
Hazards
for immediately repair.
Minimum o 30 KPH and maximum o 40 KPH are allowable speed
limit inside project premises. Over speeding
on
site is strictly
prohibited and violators will be dealt accordingly or subject for
disciplinary action.
Turn
on head
lights for service vehicles and rotating/revolving for
heavy equipments while inside project premises and in ongoing
operations.
Riding outside service vehcles and heavy equpments while in
motion is strictly prohibited.
Rigging failure leading
to
material
Ensure rigging activities
to
be carried out by a competent rigger rigger.
Lifting operation
falls
Ensure
proper
signals to be given by
competent rigger
to the crane
operator
Crane
overloads, failure of lifting
Periodical inspection of
lifting tools ackles by
M
E
dept
/
third
party
tools
II electronic
safety devices
of the crane
to
be in working conditions
Personal
injury
by
falling
equipment
Experienced welders
/ gas
cutters to carry
out the jobs .
Electrical failure or o m p r e s s
Electrical connections
to be checked before use
in
case
of
welding
gas failure
resulting
in
burns
,
Proper
PPE to
be wom during activity
shocks
Safety
devices
like flash back s t o r s
to
be fixed
on
lines
Fire extinQuishers to be kept durinQ these activities
Manual handling
,and use
o
hand
tools
Physical injury
Assigned workers shall undergo hands on training for safe operating
power tools
procedures for hand power tools.
Appropriate personal protective equipments (safety glass with
side
shields or face shields , ear plugs , respirator or dust masks, hand
gloves, etc.) must be provided and must be worn at all times when
operating and using
hand
power tools.
Safety: Protecting our Health, Environment, Family and Business
8/10/2019 EXW P006 0000 CS SHC MT 00096 Method Statement for Landscaping Rev.0
17/28
Excavations
Struck by Accidents
Electrocution and Property
Damage
Fall
of equipments
to
excavated trench
Fall of workers
Safety: Protecting
our
Health, Environment, Family and Business
Equipment working radius area must
be
free from any obstruction
equipment
,
construction materials and workers).
Spotter
or
Flagman
to be
designated.
Accomplished permits
, underground utilit ies plan electrical ,
telecommunications and water pipe lines).
Area shall be properly identified
with
markings and safety signs prior
to digging.
Equipment must be setting up on stable and level ground and having
a safe distance from the edge of excavation area.
Provision of rigid railings
,
concrete barriers
,
plastic barriers
,
safety
nets
,
directional arrow signs
,
flashing lights and adequate
informative safety signs in every excavation area.
Workers are not allowed to stay near the unprotected edge ofthe
shaft.
Workers and equipment operator shall be hoisted down only wi th
man basket
,
which must have third
e r t i f i t e
and must be
inspected and tagged.
Workers hoisted down using excavator bucket is strictly prohibited.
Supervisor
or
Foreman In-charge
to
discuss during ST RRT Card
Meeti ng and 0sely
monitor for
strict compliance.
Excavated materials shall be stacked away minimum 2-3 meters)
from the edge of the tren hjpit and immediately shifted
to
8/10/2019 EXW P006 0000 CS SHC MT 00096 Method Statement for Landscaping Rev.0
18/28
fall
of
materials
designated area.
Provision and install ation
of
safety barriers surround
the
edge
of the
shaft
to
prevent
from
erosion
of
loosen materials.
Backfilled unstable materials on top shall be removed away from the
edge and properly protected.
Housekeeping is required before and after working
Housekeeping
Slipping /
tripping
hazards
Working
area
must
be free
of
any obstructed construction materials
and safe access
must
be clearly
identified
.
Workers to wear
minimum
personal protective equipment e.g
Hand and foot
injury
safety hand gloves and safety shoes
Forms, timbers and ply woods with
protruding
nails must be
properly segregated and isolated.
II
rubbish materials must be put on designated trash cans and
Environmental hazards
regularly collected on site. Scattered
of
any rubbish materials on site
is strictly prohibited.
Rubbish materials must be disposed
off
to designated garbage
disposal area.
Construction Materials
Hazardous material, inhalation,
Wear g|oves
and
kept
skicn
clsov eprerod widhe
esrefeevty
r
preocsasuibtioen
Too|box
tab
skin
infections Maintain MSDS of chemicals orovide safetv orecautions to workers
Heat stress
Proactive measures
Hot work permit must be issued and signed by HSE department
before work
Heat stress checklist must be submitted every day in
Temperature must be taken every 1
hour
Flag
must
be installed on site according
to the
heat stress table and
must
be visible
to
all employees.
Safety: Protecting our Health
,
Environment
,
Family and Business
8/10/2019 EXW P006 0000 CS SHC MT 00096 Method Statement for Landscaping Rev.0
19/28
Anticipate high heat days on the weather forecast and prepare
for
them in proactive measures.
Begin drinking fluid early in the day
Waiting until the hottest of the day
to
replenish
Avoid alcohol and caffeine the night before and during the day
Dress
for
conditions, Iightweight, loose 0thing is best, avoid
layering 0thing underneath coveralls.
Use sunscreen/ safety eye glasses
,
cover your face and neck from
the sun .
Provide shaded areas
for
mini breaks and water stations cold
water).
Ensure water stations accessible so workers can take frequent
breaks.
First aid training to deal with heat stress wi ll be widely given to all
employees.
Note
This Job Safety Analysis Worksheet will discuss to al l Sinohydro personne
l/
workers and Subcontractors involved pr i
or
to commence in every
activity on site using Safety Task Analysis Risk Reduction Talk STARRT) Card Form. AII workers and personnel involved must be signed with
signature affixed after the discussion and copy will be forwarded
to
Sinohydro Group HSE Department Office for file.
Rev iwed by;
.
,
,
U-MHUKH
i-
-
l
onH
U
5
{
Safety: Protecting our Health, Environment, Family and Business
8/10/2019 EXW P006 0000 CS SHC MT 00096 Method Statement for Landscaping Rev.0
20/28
PPENDIXB
Risk ssessment
8/10/2019 EXW P006 0000 CS SHC MT 00096 Method Statement for Landscaping Rev.0
21/28
Health and Safety Management System
Risk Assessment
Site:
Doha
Expressway
package 6
Industrial area -Qatar
Activities
Potential Hazard Risk Rating
S
L
PR
Mobilization
Unfamiliar
of
6
2 2
ofmanpower
site safety rules
and regulations
Mobilization
Mechanical
6
2
2
of equipment,
hazards
servlce
vehicles
,
etc.
Traffic hazards
Activity:
Landscaping
Category
H
H
Safety: Protecting our Health, Environment, Family and Business
[ 2 1 1 2 1 2
Hazard Control Residual Risk
Emergency Action
S
L R
Managers, Engineers ,
Supervisors
,
Foremen and
3 3
Site emergency response plan
Workers shall undergo safety
to be adhered to .
orientationjinduction to be
Transportation supervisor
conducted by the
ESH S
responsible to action in the
Department
of
Sinohydro
as
per
case of unwanted even
t.
requirements of Qatar Labour
Laws
and in compliance with the
Contact Emergency Dept.
approved Project Safety
First Aid
Planprior to work on site.
inimum personal protective
equipment: helmet,
safetyjreflectorized vest
,
safety shoes
,
suitable clothing;
etc. and must be worn at all
times when working inside
project premises.
3
3 Site emergency response plan
. Copy of Driver s License,
to
be adhered to.
registration and plate
Transportation supervisor
numbers shall
be
forwarded
responsible to action in the
to ESH S Department
case
of
unwanted event.
assessment. No Stickers, No
Entry policy will be strictly
Contact Emergency Dept.
Page 1
8/10/2019 EXW P006 0000 CS SHC MT 00096 Method Statement for Landscaping Rev.0
22/28
2
implemented on site.
First Aid
Heavy equipment shall
undergo and pass internal
safety inspection prior
to
mobilize on site.
Operators and drivers
to
conduct regular inspection
walk around check) pri or and
after
operation and any
defects
to
be found subject
for
immediately repair.
Turn on head lights
for
service
vehicles and
rotating/revolving
for
heavy
equipment while inside
project premises and in
ongoing operations.
Riding outside service vehicles
and heavy equipment while in
motion is strictly prohibited.
Failure
of
Damageto
6
2
2 H
3
3
Site emergency response plan
lifting
equipment and
lllifting equipment is to be
to be adhered to.
equipment
injurv/death to
certified and inspected
Transportation supervisor
personnel regularly
as
per
i
fting responsible
to
action in the
Regulations.
case of unwanted event.
A copy of certification/ third
Contact Emergency Dept.
party certificate is
to
be
First Aid
retained on site
for
record
keeping and reference.
Safety: Protecting our Health, Environment, Family and Business
Page 2
8/10/2019 EXW P006 0000 CS SHC MT 00096 Method Statement for Landscaping Rev.0
23/28
3
Qualified Singer / Signaller,
Rigger/Operator to carry out
visual inspection prior
to
use
Third party certificate
for
lifting equipment.
Tool box talks
Close Supervision
Excavation
6 3
8
H
Equipment working radius
3
3
Site emergency response plan
Works
Struck by
area must
be
free from any
to
be
adhered to.
Accidents
obstruction equipment,
Transportation supervisor
construction materials and
responsible
to
action in the
workers).
case
of unwanted event.
Spotter
or
Flagman to be
Electrocution
designated
Contact Emergency Depart.
and Property
First Aid
Damage
Accomplished permi ts,
underground utilities plan
Fall
of
electrical
,
equipment to
telecommunications and
excavated
w ter pipe lines).
trench
Area shall be properly
identified with markings and
Fall of
workers
safety signs pri or
to
digging
Equipment must
be
setting up
Erosion
or
fall
of
on stable and level ground
excavated
and having a safe distance
materials
from the edge
of
excavation
area.
Provision of rigid railings,
concrete barriers, plastic
barriers, safety nets,
. Safety: Protecting our Health, Environment, Family and Business
Page 3
8/10/2019 EXW P006 0000 CS SHC MT 00096 Method Statement for Landscaping Rev.0
24/28
4
directional a rrow signs
flashing lights and adequate
informative safety signs in
every excavation area.
Workers are
not
allowed to
stay near the unprotected
edge of
th
shaft.
Workers and equipment
operator shall be hoisted
down only with man basket
and riding standing or a
worker hoisted down using
excavator bucket is strictly
prohibited.
Supervisor
or
Foreman In-
charge
to
discuss during
ST RRT
Card
Meeting and
closely monitor for strict
compliance.
Provision and installation
of
safety net surround t he edge
of the shaft
to
prevent from
erosion of loosen materials.
Backfilled unstable materials
on
top
shall be removed away
from t he edge and properly
protected.
Manual
Personnel injuries
3 6 M
II
persons shall
be
instructed
3
1
3
Site emergency response plan
handling
on correct manual techniques.
to
be
adhered to.
Transportation supervisor
Safety: Protecting our Health Environment Family and Business
Page 4
8/10/2019 EXW P006 0000 CS SHC MT 00096 Method Statement for Landscaping Rev.0
25/28
8/10/2019 EXW P006 0000 CS SHC MT 00096 Method Statement for Landscaping Rev.0
26/28
Risk rating score:
1>4
5>1
12>
L Low risk
no
furth r
action required
M= Medium risk shall be reduced
6
H High risk not acceptable shall be reduced by means of additional controls
Safety: Protecting our Health Environment Family and Business
Page 6
8/10/2019 EXW P006 0000 CS SHC MT 00096 Method Statement for Landscaping Rev.0
27/28
PPENDIXC
Copy
of
Material pproval
8/10/2019 EXW P006 0000 CS SHC MT 00096 Method Statement for Landscaping Rev.0
28/28
. . ,
v
SINOHYDRO GROUP
LlMITED
Doha Expressway
Package
6
East Industrial
Road
Interchanges
at
Intersection
with Street
10 and Street
23
Contract No. C2011/085
Document No.
EXW P006 0
000-MQ-SHC-MS-00096
Material
Submittal for
Precast
Concrete
Paving lock
for Footway
and
~ d S c p e
O
Revlslon
J R E E I
l I f 1
2 ~ u
24-Jun-12
I
Resubmittal
as
per Engineer's Representative's Comments
Date I Reason
for
Issue
Reviewed by
Contractor Check Llst
Checked by Approved by