Page 1: District Two May 9,  2013

District TwoMay 9, 2013

Strategic Intermodal System Funding Strategy

Page 2: District Two May 9,  2013

Strategic Intermodal System Funding Strategy

2nd Five2019-2023

Long Range Cost Feasible

Plan 2024-2040

Page 3: District Two May 9,  2013

Building the SIS Plan:

A Partnership

Page 4: District Two May 9,  2013

NFTPO No. 1 on SHS list.

First Coast Outer Beltway

Locally Preferred Alternative shown

Page 5: District Two May 9,  2013

295

10

95

301

95

First Coast Outer Beltway

$1,380,000

Page 6: District Two May 9,  2013

295

10

95

301

95

I-95 Corridor

$79,258

$42,837

Page 7: District Two May 9,  2013

295

10

95

301

95

I-95 Corridor$15,200

Page 8: District Two May 9,  2013

I-95 Corridor

295

10

95

95

301

$70,000 in 2nd Five

10

95

95

Page 9: District Two May 9,  2013

I-95 Corridor

295

10

95

95

$55,000

95

Page 10: District Two May 9,  2013

295

10

95

301

95

I-95 Corridor

Page 11: District Two May 9,  2013

WP Project No. 213323-1 I-95/I-295 North InterchangeFY Phase Amount 2015 RW

$ 7,000,000 2016CST$130,000,000

95

95

295

17

Page 12: District Two May 9,  2013

I-95 Corridor

295

10

95

301

95

$15,000

Page 13: District Two May 9,  2013

295

10

95

301

95

I-10 Corridor

$41,058$45,367$ 5,068$64,209$79,258

$234,96

0

Page 14: District Two May 9,  2013

295

10

95

301

95$58,503,000 in 2nd Five

Years

Page 15: District Two May 9,  2013

I-295

$70,392

$33,000

$168,279

$62,719

$16,148

$82,864

Page 16: District Two May 9,  2013

I-295209658-4 Add lanes and ReconstructWP Project No. 209658-4 I-295 (SR 9A) from I-95 to Dames Point BridgeFY Phase Amount 2014 ROW$ 4,013,000 2014ENV $ 3,225,000 2017

CST$123,670,000

209301-3 Add lanes and ReconstructWP Project No. 209301-3

I-295 (SR 9A) from SR 9B to JTBFY PhaseAmount 2015

RRU $ 3,250,000 2015

CST$29,366,000

WP Project No. 209301-4 I-295 (SR 9A) Dames Point Bridge to SR 202 JTBFY Phase Amount Design underway

209301-4 Add lanes and Reconstruct Constructio

n now funded in

CF$165,411

Page 17: District Two May 9,  2013

Strategic Intermodal System Funding Strategy

$1,288,200,000

Long Range Cost Feasible

Plan 2024-2040

Transportation has a tremendous Economic impact

Page 18: District Two May 9,  2013

Florida Department of Transportation

James G. Bennett, P.E.Urban Transportation Development Manager

(904) [email protected]