cv of suresh latest (4)

Embed Size (px)

Citation preview

1. CURRICULAM VITAE SURESH R SINGH GOODWILL APPARTMENT FLAT-NO 175, PLOT NO 48 SECTOR-13, ROHANI, NEW DELHI-110085 PH-NO 9990628704, 097430108446 Email :[email protected] CARRER OBJECTIVE :- To obtain a challenging position, that will allow my engineering and technical skills to grow & to be a part of a successful team that helps to achieve the organizations goal. PERFORMANCE HIGHLIGHTS :- Posses strong organizational communication skills. Ability to conceptualize and develop new ideas. Employs innovation, creativity and enthusiasm. Proven ability to work effectively as a team member and individual. Deadline oriented, recognized for integrity and committed to success. Better coordinated efforts among juniors & other related departments to maintain the schedule of work and better IR. EXPERIENCE; HABATOOR LEIGHTON GROUP PROJECT- PIPE LINES FOR MEGA RESERVOIRS CLIENT - KAHRAMAA (QATAR) DESIGNATION PROJECT ENGINEER PERIOD 24TH AUGUST 2014 TILL DATE PROJECT COST - 1.09 BILLION ABOUT PROJECT GTC600/2013 PACKAGES A&B, PIPELINES FOR MEGA RESERVOIRS(CORRIDOR MAIN 1) RESPONSIBILITY OVERALL INCHAGE FOR PACKAGE B 1 Excavation of chamber as per drawing 2 identifying utilities and making arrangement for relocation with concern and permission with different agencies 3 Liasioning with different agencies for setting out , shop drawing approval 4 preparing method statement for different activities 5 Looking after all three aspects of projects like safety, quality and cost 6 Looking after all safety requirement mentioned as per the kahramaa specification 7 Looking after crusher and scalper establishment for lime stone crussing and screeing the limestone for bedding and backfilling material 8 Preparing and maintaining all related document for said job 9 1 2. EXPERIENCE :- LARSEN AND TOUBRO LIMITRD PROJECT Delhi metro rail corporation 3 phase CLIENT DMRC DESIGNATION CONSTRUCTION MANAGER PERIOD 14TH August 2012 till 22nd august 2014 PROJECT COST 300 CRORES ABOUT PROJECT Part design and construction of elevated viaduct, above ground ramp on both side and 3 eleavated stations viz moti bagh, dhaula kuan and delhi cantt including architectural finishing works of stations on mukundpur yammuna corridor line7 of phase 3 delhi mrts. RESPONSIBILITY SECTION HEAD FOR 2 KM VAIDUCT FROM DHAULA KUAN TO MATI BAGH Liaisoning with client and different agencies involved in the work Casting of pier, pier cap, open foundation and piling in all respect in the said stretch Planning and monitoring the work in day to day basis with all supporting agencies Responsibilities include creating clear and attainable project objectives, building the project requirement, and managing the triple constraint for projects which are cost, time and quality Anchoring on-site construction activities to ensure completion of project within the time & cost parameters and effective resource utilization to maximize the output. Developing site organization to suit the project needs; involved in selecting construction methodology & implementation. Planning effective manpower deployment & works scheduling of qualified workforce; addressing training needs of staff to enhance skills and productivity. Finalizing Method Statements, other management plans, responsible for progress, quality and occupational safety. EXPERIENCE : JKUMAR INFRAPROJECTS LIMITED PROJECT Delhi metro rail corporation 3phase CLIENT DMRC DESIGNATION PROJECT MANAGER PERIOD 08/12/2011 to jully 2012 PROJECT COST 152,83,05,035.00 ABOUT PROJECT Design and const of viaduct and two elevated stations namely rohini sector 18 and badly on jahangirpuri badly corridor of delhi mrts phase 3 RESPONSIBILITIES HANDLING : Incharge for overall project, activity involved are as follows Liaisoning with client and different agencies involved in the work Liaisoning with head office and design consultant to get the work in time Responsibilities include creating clear and attainable project objectives, building the project requirement, and managing the triple constraint for projects which are cost, time and quality 2 3. Anchoring on-site construction activities to ensure completion of project within the time & cost parameters and effective resource utilization to maximize the output. Developing site organization to suit the project needs; involved in selecting construction methodology & implementation. Planning effective manpower deployment & works scheduling of qualified workforce; addressing training needs of staff to enhance skills and productivity. Finalizing Method Statements, other management plans, responsible for progress, quality and occupational safety. GAMMON INDIA LIMITED (An ISO9001:2000 Certified Company) PROJECT : Signature Bridge Project and Construction of its Approaches, New Delhi. CLIENT : DTTDC (Delhi Tourism and Transportation Development Corporation) PRINCIPAL CONSULTANTS: Schlaich Bergermann And Partner Berlin & Construma Consultancy Private Ltd, Mumbai. PROOF CONSULTANT : Systra-Virogeux & Tandon Consultants CONTRACTOR : Gammon India Ltd. DESIGNATION :DEPUTY PROJECT MANAGER / Erection/ Open foundation for pylon PERIOD : 24 May 2010 to till date PROJECT COST : 965 crores ABOUT PROJECT : Construction of Future Land mark of Delhi ie; Signature Bridge which is a Cable stayed bridge over river Yamuna and its approaches that comprise of segmental flyover construction. RESPONSIBILITIES HANDLING:- Section head for open foundation for PYLON Responsible for execution of sheet pile, reinforcement and all other related activities Responsible for, erection of under slung and overhead launching girders. Erection of special overhead LG (with hinges system/675MT weight) to erect spans with steep horizontal radii to the tune of 150m. Calculation and fabrication of different temporary structures required for the erection of launching systems. (Around 300 MT) Segmental construction of main bridge approach / 3 span continuous units, that includes transportation, lifting, dry-matching of pre-cast segments, gluing, temporary and permanent post tensioning works using mechanized launching girder as well as conventional ground support system. Anchoring on-site construction activities to ensure completion of project within the time & cost parameters and effective resource utilization to maximize the output. Developing site organization to suit the project needs; involved in selecting construction methodology & implementation. Planning effective manpower deployment & works scheduling of qualified workforce; addressing training needs of staff to enhance skills and productivity. Finalizing Method Statements, other management plans, responsible for progress, quality and occupational safety. GAMMON INDIA LIMITED PROJECT : BANGLORE METRO RAIL CORPORATION LIMITED CLIENT : BMRCL CONSULTANTS: RIGHT-PBI-SYSTRA-GC) DESIGNATION DY project manager 1 PERIOD : 01/05/2009 to 24/6/2010 ABOUT PROJECT: casting of segment, parapet, cable duct and erection of segment at different location from baiphannali to Mg road RESPONSIBILITIES HANDLED:- 3 4. Erection incharge of segment by launchinh girder, goliath gantry,and underslung Structure in charge of all types of structures of section- Complete supervision of erection of segment, parapet and cast-in-situ span of 50m at mg road.It includes review and approval of all types of structural drawings, survey datas and BBS, pier casting, bearing fixing, casting of super structure and all types of post tensioning as well as grouting works. Review and approval of shop drawings & BBS for all other structures Supervision of all post tensioning and grouting works. Maintaining quality of works. Monitoring progress of work. Implementation and maintaining HSE norms at site. Coordination with contractor, design team & Resident Engineer. Casting of pre-cast segments both by Short line & Long line method. GAMMON INDIA LIMITED PROJECT :SANTACRUZ CHEMBUR LINK ROAD PROJECT. CLIENT : Maharashtra state road development corporation CONSULTANTS: LOUIS BERGER INDIA LIMITED DESIGNATION : Dy project manager-11 PERIOD : 29/01/2007 -30/4/2009 RESPONSIBILITIES HANDLED:- Working as a second man in command. Responsible for overall execution of site. Cast-in-situ of I girder , box girder. Boring of pile, casting of pile cap ,pier and pier cap Launching of I girder that to near to running rail Grouting of tendons, survey alignment checking of erected spans before bearing placing. Bridge bearing fixing (Pot and Elastomeric type, both). Preparation of daily, weekly and monthly progress reports. Review and finalizing Method Statements, Inspection and test plans, Field change requests and Non- conformance reports etc, Dealing contractor and clients representatives at site. GAMMON INDIA LIMITED) PROJECT : Construction of kaiga unit 3@4 CLIENT : Nuclear power corporation india limited CONSULTANTS : NPCIL DESIGNATION : SENIOR ENGIEER PERIOD : 14/04/2002 to 28/01/2007 ABOUT PROJECT: Construction of nuclear power plant of kaiga unit3@4 which consist of reactor bldg ,turbine bldg,control bldg service bldg ,sba, ssfb, ndct cooling tower,d2o bldg and tower ,water tank,administration bldg,rab bldg,crane pad areaand intake tunnel RESPONSIBILITIES HANDLED:- Worked as section head cum planning & billing engineer to deliver the following responsibilities :- Section head for reactor bldg,rab,and spent fuel storage tank. 4 5. Casting of 4 lift of containment in one month.it was first in npcil history Casting of inner continment dome in62 days it was agreat achivement. Casting of calandria vault by 5m ht shutter in one go Casting of outer containment dome in45days first time in npcil Preparation of work orders & BOQ for the sub-contractors. Certifying sub-contractors bill and preparing their payment certificates. Preparing of monthly MB and submit the same npcil for billing purpose. Successfully completed reactor bldg within a permissible limit Involve in all construction acitivity of sfsb GAMMON INDIA LIMITED PROJECT : J J HOSPITAL TO PALTON ROAD FLYOVER CLIENT M S R D C CONSULTANTS : DAR INDIA LIMITED DESIGNATION : ASST ENGINEER PERIOD : 01/05/1999 to 13/04/2002 ABOUT PROJECT: Construction of segmental flyover from jj hospital to cst station approx 2.8 km. RESPONSIBILITIES HANDELED- worked as a Asst engineer in the Billing and QS department and was also responsible for site works which includes :- Responsible for execution of pile,pile cap and pier Construction of 56 pier with single shutter Precast pier casting andshifting to location and fixing as per the requirement Piling & Cyclic vertical pile load test for 1000mm , 600mm , 500mm & 450mm piles below 13 mts.from ground level, using well point dewatering system. Maintaining daily records of measurement. Preparing Client R.A.Bills. Preparing work orders. Certifying and preparing Sub-contractors payment certificates Record keeping of all related documents GAMMON INDIA LTD. (An ISO9001:2000 Certified Company) PROJECT : VASHI FLYOVER AT NAVI MUMBAI) CLIENT : M.S.R.D.C) CONSULTANTS : COUNSULTING ENGINEER SERVICE (CES) DESIGNATION : Junior Engineer PERIOND : 05/11/1998 to 30/04/1999 ABOUT PROJECT: It was four line viaduct consisting of 2 box girder of 40m .Flyover was about1.2km RESPONSIBILITIES HANDLED:- Worked as shift in-charge for delivering the following responsibilities:- Responsible for over all execution of box girder of 40m each Erection of I girder as per required line and level Casting of I girder 20m lenth. Casting of pile of 1.2m dia. Around 3 pile in 24hrs. Planning of daily works. Implementation of safety and ISO: 14001 Environmental norms. R/F cage tying and checking + all shuttering and concreting works 5 6. GAMMON INDIA LIMITED PROJECT ; RELIANCE PETROLEUM INDIA LIMITED CLIENT ; RPIL CONSULTANT; BECTEL DESIGNATION; Junior engineer PERIOD; 26/11/1997 to 04/11/1998 ABOUT PROJECT; It was a petroleum project at sikha patia at Jamnagar gujrat.we have been awarded with 3nos chimney and pipe rack project RESPONSIBILITIES HANDLED; Worked as a shift incharge for delivering the following responsibilities; Casting of foundation for chimney R/F cage tying and checking + all shuttering and concreting works Erection of slipform as per the requirement Planning of daily works Maintaining daily records of measurement. Preparing Client R.A.Bills. Preparing work orders. Certifying and preparing Sub-contractors payment certificates Record keeping of all related documents GAMMON INDIA LIMITED PROJECT ; GUJARAT ELECTRICITY BOARD CLIENT; G E B DESIGNATION; ENGG ASST PERIOD; 01/07/1996 to 24/11/1997 ABOUT PROJECT; It was athermal power project in which gammon has been awarded by multiflue chimney project of 220m ht RESPONSIBILITIES HANDLED; Worked as a shift incharge for delivering the following responsibilities; R/F cage tying and checking + all shuttering and concreting works Erection of slipform as per the requirement Planning of daily works Maintaining daily records of measurement. Preparing Client R.A.Bills. Preparing work orders. Certifying and preparing Sub-contractors payment certificates Record keeping of all related documents Training :- 5 Days workshop training in Project Management on March 2010. 3 Days workshop training in Taxation on April 2010. 6 Days training in ISO on October 2008. 3 Days training in ERP on March 2006. EDUCATIONAL QUALIFICATIONS :- Passed HSC IN 1993 from CBSE with First Division. Diploma in civil engeering from Mumbai unversity. 6 7. Btech in civil engg SUBJECTS OF SPECIALIZATION :- Concrete Technology Experimental Stress Analysis COMPUTER KNOWLEDGE :- Operating system Windows AutoCAD SPECIAL ACHIEVEMENTS : Got special performance awardfrom npcil for achiving a rector bldg in a record time Got appreciation certificates from RITES & GAMMON for putting best efforts at site and record production of bridge segments and erection of segment at cmh road with 3.5%gradient with 28m ht Launching of span around 15 span in a month. Launching of span above running train was a difficult task Has undergone various in -house Skill development, project manager, costing and taxation& HSE related training programmes of gammon. Represented College Cricket & Table Tennis team at University level tournaments. Won many prizes in debate competitions at school level. PERSONAL DETAILS:- Name Suresh r singh Languages known English, Hindi, Marathi Father's Name Rajnath singh Permanent Address Suresh r singh s/o rajnath singh Village- niwa Post- sitlaha, distt- Rewa Madhya pradesh Sex Male INDIA Date of Birth 08/10/1976 Marital Status Married 09755188681 Nationality Indian Passport No. J9957102 Date of expiry 08/02/2022 Present & Permanent address SURESH R SINGH Flat- 175, plot no 48 Goodwill apartment Sector- 13, rohini New delhi 110085 E mail [email protected] [email protected] Blood group B+VE Contact No. (India) 9990628704, 8860002690 Qatar driving licence 27635639060 Valid India Driving License No. 0058841 I hereby declare that all the informations given above are true to the best of my knowledge and belief 7