Ir.Unggang Emban (PE.No.: 16877) No. 33 Taman Evergreen Residency, Jalan Sibiew , 97000 , Bintulu, Sarawak, Malaysia PERSONAL DETAILS Age: 44 years old Date of Birth: 09 December 1971 Marital Status: Married Identity Card: 711209-13-5661 Sex: Male Race: Iban Nationality: Malaysian (Sarawak) Language: Bahasa Malaysia, English and Iban Health: Excellent Interest: Sports, Traveling, Gardening Telephone No: 013- 831 7173 Email Address: [email protected] POSITION: Competent Electrical Engineer Qualification: Bachelor of Electrical Engineering (UTM), Malaysia Present Organization: Self-employed. Present Post: Expected Salary: Year of Service: 18 years

Ir. Unggang CV latest

Embed Size (px)

Citation preview

Page 1: Ir. Unggang CV latest

Ir.Unggang Emban (PE.No.: 16877)

No. 33 Taman Evergreen Residency,

Jalan Sibiew , 97000 , Bintulu, Sarawak, Malaysia

PERSONAL DETAILS

Age: 44 years old

Date of Birth: 09 December 1971

Marital Status: Married

Identity Card: 711209-13-5661

Sex: Male

Race: Iban

Nationality: Malaysian (Sarawak)

Language: Bahasa Malaysia, English and Iban

Health: Excellent

Interest: Sports, Traveling, Gardening

Telephone No: 013- 831 7173

Email Address: [email protected]

POSITION: Competent Electrical Engineer

Qualification: Bachelor of Electrical Engineering (UTM), Malaysia

Present Organization: Self-employed.

Present Post:

Expected Salary:

Year of Service: 18 years

Page 2: Ir. Unggang CV latest

PROFESSIONAL QUALIFICATION ACHIEVEMENT

Certified as a Professional Engineer by Board of Engineers Malaysia.

COMPETENCY QUALIFICATION

1. Holding Competency of Competent Electrical Engineer(CE00088):a. Substation Installation: up to 33KVb. Underground cable: up to 11KVc. LV equipment installationd. Authorized to perform switching: up to 11KVe. Electrical Installation Contractor & Authorized To Test (C010036)

2. Holding IECEX Competency Cert. – Cert No. : IECEx CPSRM14.0086

EDUCATION BACKGROUND

Year 1979-1984 - Sekolah Rendah Kerajaan Batu 36 Sg. Tamin, Jalan Oya,

Sibu, Sarawak,Malaysia.

Year 1985-1987 - Sekolah Menengah Luar Bandar Sibu, Batu 21, Jalan OyaSibu,Sarawak, Malaysia.

Year 1988-1989 - Sekolah Menengah Teknik Bintulu, Jalan TanjongKidurong, Bintulu, Sarawak, Malaysia.

July 1990-July 1993 - University Teknologi Malaysia, Sekudai JohorBaharu, Malaysia.

- Diploma in Electrical Engineering (Communication)

June 1994-April 1997 - Bachelor Degree in Electrical Engineering from UniversityTeknologi Malaysia, Sekudai Johor Baharu,Malaysia.

GPA: 3.53 CGPA:2.96

SKILLS & PERSONALITY TRAITS

Strong problem solving, organizational and communicative skills.

Welcome new challenges, and willing to learn new skills.

Page 3: Ir. Unggang CV latest

Responsible, trustworthy, cooperative, and able to work in team.

Able to develop a good relationship with people from all levels.

COMPUTER LITERACY

Computer: Proficient in the use of Microsoft Words, Excel, and Power point

WORKING EXPERIENCES

April 2012 – April 2015:

Competent Electrical Engineer in Murphy Sarawak Oil Company,Bintulu,Sarawak, Malaysia

A. Murphy’s Gas Turbine Compressor project at BORF

1. Involved in installation, inspection, testing and commissioning of electricalinstallation system as below:a. 6.6KV switchgear,b. 6.6KV/415V step down transformerc. UPS systemd. Gas Turbine unit fire fightinge. LV Main Switchboardf. Protection Relay Testingg. Electrical Motorh. Earthing system.i. HV and LV cable, Control cable laying.

2. Involved in Gas Turbine Compressor Installation, Testing and commissioning systemas below:a. Cooling water system.b. Hydraulic oil system.c. Lube oil systemd. Unit Fire system( water mist system)e. Ventilation system.f. Electrical motor ( Emergency lube pump, hydraulic pump, lube oil pump)g. Spark plugsh. Pressure switchesi. Thermocouplej. Vibration monitoring system.k. Flame detectorl. Servo ratio valvem. Compressor dry gas seal dismantled and reassembled

Page 4: Ir. Unggang CV latest

B. Murphy’s Offshore Facilities

1. Involved in Gas Engine Generator maintenance and troubleshooting:a. AVR inspection and replacementb. Generator RTD, vibration sensor, diodec. Generator winding insulation megger.d. Current Transformer inspection.e. Generator Relay protection inspection and testing.f. Synchronizing systemg. Generator Circuit Breaker.h. Dismantle and installation of generator.i. Familiar with generator operation

2. Involved in Low Voltage Main Switchboard Maintenancea. Inspection Busbarb. Relay Protection inspection, Testingc. Inspection, testing on motor feedersd. Function testing and maintenance of ACB.e. Testing Thermal overloadf. Check current transformer terminal connection.g. Perform isolation and switching of the ACB as required.

3. Involved in UPS system Maintenance and Troubleshootinga. Replacement of Batteryb. Troubleshooting of UPS panelc. Servicing UPS panel.d. Battery discharge test.e. Battery inspection and maintenancef. Function test of the MCB.

Sept 2010- April 2012

Divisional Engineer in-charge SEB Sri Aman division , Sarawak, Malaysia.

1. Plan, develop and monitor SESCO Sri Aman Station budgets to ensure it meetscompany’s overall business goals and objectives.

2. To monitor all assets such as land, building and furniture, power transformer,underground cable, distribution pillar, overhead line, auto voltage regulator, autore-closer in distribution system to be registered in computerized system.

3. To approve list of disposal asset submitted to Board of Survey (BOS).

Page 5: Ir. Unggang CV latest

4. To monitor and ensure all the approved items listed in BOS for disposal todispose in proper manner as per guideline.

5. Develop and create sound strategies to achieve objectives and target with respectto safety, quality and reliability of power supply.

6. To provide accurate and up-to-date dissemination of corporate information tosubordinates, electrical consultants, electrical contractors and developers.

7. Provide input and recommendation to management with regards to enhancingsafety, reliability and quality electricity supply and good customer services.

8. Direct and manage the day-to-day function to ensure the smooth running of SriAman Station and its Outstations.

9. Manage and oversee the operation of Sri Aman Station to ensure KPIs areachieved and budgets effectively utilised.

10. Provide guidance and directions to subordinates in terms of executingresponsibilities to ensure a competent and motivated team.

11. Sararawak Energy Berhad(SEB)'s Project - Erection and installation, testing andcommissioning of 33KV overhead line from Engkili to Betong, Sri Aman.

12. SEB's Project - Erection and installation, testing and commissioning of 33KVoverhead line from Betong to Debak, Sri Aman.

13. SEB's Project - Laying, testing and commissioning of 33KV underground cablefrom Temudok to 33KV substation, Sri Aman.

14. SEB's Project - Erection and installation, testing and commissioning of 33KVoverhead line from Lubok Antu junction to Lubok Antu Bazaar.

15. SEB's Project - Erection and installation, testing and commissioning of 33KVoverhead line from Selalang to Seratok, Sri Aman.

16. SEB's Project - Erection and installation, testing and commissioning of 33KVoverhead line from Debak to Pusa, Sri Aman.

17. SEB's Project - Installation, testing and commissioning of 5MVA 33/11KVstepdown transformer at Lubok Antu, Sri Aman.

18. SEB's Project - Installation, testing and commissioning of 5MVA 33/11KVstepdown transformer at Betong, Sri Aman.

Page 6: Ir. Unggang CV latest

19. SEB's Project - Erection, installation, testing and commissioning of 11/.415KVdistribution power transformer in Sri Aman.

20. SEB's Project - Installation, Testing, and commissioning of 33KV new Sri Amansubstation in Sri Aman.

21. SEB's Project - Laying, testing and commissioning of 33KV and 11KVunderground in Sri Aman division.

22. SEB's Project - Erection and installation, testing and commissioning of 33KVvoltage regulator install at 33KV overhead line from Engkili to Seratok.

23. SEB's Project - Erection and installation, testing and commissioning of 33KVAuto-Voltage regulator installed at 33KV overhead line from Engkili to Seratok.

24. Carry out switching power isolation for maintenance purpose, and powerrestoration during power failure.

Aug 2005 – Sept 2010

Customer Services and Revenue Management Engineer -Syarikat SESCO RegionalOffice in Bintulu, Sarawak, Malaysia.

1. To plan and monitor all yearly activities related to customer service section.

2. To monitor energy meter registration in computerized system.

3. To approve list of faulty/dismantled energy meter submitted to Board of Survey(BOS) for approval.

4. To monitor and ensure approved faulty/dismantled energy meter listed in BOS fordisposal to dispose in proper manner as guideline.

5. Develop and create sound strategies to achieve objectives and target with respectto safety, quality and reliability of power supply.

6. To provide feedback to customers (Internal and External) enquiry and complaints.

7. To monitor and control the age of debtor (AOD).

8. To open CWO and implement approved projects.

9. To arrange and coordinate of meter maintenance in the region.

10. To verify and approve the payments certificate for CD refund

Page 7: Ir. Unggang CV latest

11. To plan, manage, & control the overall of the section man-power & budget.

12. To conduct any training or coaching to his subordinates and other staffs.

13. Carry out maintenance of 33KV power transformer at Jepak Substation, SESCO.

14. Carry out maintenance of 33KV ABB switchgear at Kemena Substation, SESCO.

15. Carry out maintenance of 11KV Tamco switchgear at Kidjun Substation, SESCO.

16. Carry out maintenance of 33KV overhead line from Sebauh Junction to Sebauh

Bazaar.

17. Carry out cable fault locating at Kemena Industrial area, Bintulu

18. Check and approve Main Switchboard drawing submitted by

consultant/contractor.

19. Check and approve internal wiring drawing submitted by contractor.

20. Carry out Inspection, testing and commissioning of main switchboard

21. Carry out Inspection and testing internal wiring for domestic, commercial and

industrial installation

22. Witness testing of LV switchboard.

Dec 1997- Oct 2005

Electrical and Instrument Engineer (Maintenance)- SESCO GAS Turbine PowerStation in Bintulu, Sarawak, Malaysia.

1. Involved in Electrical and Instrument maintenance activities for Gas turbine(Frame 6 GEC and Frame 9E –European Gas Turbines) and its auxiliariesduring Combustion inspection, Hot gas path Inspection, Major Inspection andnew installation.

a. Generator maintenance:-

Page 8: Ir. Unggang CV latest

Dismantling and installation of exciter stator, generator bearing, andgenerator rotor

Rewedging of generator stator winding. Generator busbar inspection, Generator stator winding insulation testing Stator winding resistance test. Resistance Temperature Detectors test Bearing insulation test. Air gap measuring between stator and rotor winding. Generator relay protection testing and servicing Servicing, Maintenance and calibration of Pressure Transmitter, Pressure

switches, Limit switches, Thermocouple, Thermistor, Vibration sensor,Resistance Temperature Detector(RTD), and Pressure Gauges,

Vibration monitoring system. Servo ratio valve and dump valve servicing and maintenance. Spark plugs servicing and maintenance. Mark IV and V Gas Turbine control system maintenance. Electrical motor maintenance Gas turbine and station fire protection system maintenance.

2. Involved in Electrical maintenance in SESCO Gas Turbine Power Plant Stationin Bintulu, Sarawak, Malaysia as follows:

a. Station Fire protection system maintenance.

b. UPS and Station battery maintenance.

c. Step up transformer routine maintenance.

d. Collecting oil sample and perform oil breakdown voltage.

e. LV switchgear maintenance.

f. Gas Station and water heating system maintenance.

g. 11KV and 6.6KV Switchgear maintenance.

h. Electrical motor maintenance

Page 9: Ir. Unggang CV latest

July 1992- July 1993

Electrical Engineering Assistant (Electrical Maintenance) - SESCO hydro PowerPlant in Batang Ai , Sarawak, Malaysia.

1. Carry out routine maintenance for station power transformer.

2. Generators relay protection calibration and servicing.

3. UPS and battery maintenance.

4. LV Main Switchboard servicing and maintenance.

5. Electrical Motor maintenance.

6. Compound Lighting Maintenance.

7. Earthing system maintenance.

8. Fire fighting servicing and maintenance.

9. Generator routine maintenance and servicing.

PERSONAL DEVELOPMENT/ COURSES ATTENDED

a. GEC Alsthom/GE – Gas Turbine Power Plant and compressor Training

1. Site training on Frame 6 GEC/GE Frame 5 Gas Turbines

(a) Maintenance(b) Operation(c) Generator Excitation And Controls(d) Mark IV and Mark V(e) Aux./Supports Systems.(f) Gas Station and Hot Water Heating Systems

2. Frame 9E EGT Gas Turbine Factory Based Training (BELFORT, France)(a) Maintenance(b) Operation(c) Generator Excitation And Controls(d) Mark V(e) Aux. System(f) Witnessed Generator testing(g) Visited Gas Turbine Assembly Line

b. STEAMSAFE -Internal Combustion Engine course to DOSH certified.

Page 10: Ir. Unggang CV latest

c. SESCO- Internal Wiring Installation Coursed. SESCO - Internal Wiring Testing Coursee. Rockwell - Programmable controllerf. Asia Consultants - Safety Induction for construction workers (CIDB)g. Dwell - Finance for non- financial managersh. SESCO - 11KV Distribution System Practices Coursei. SESCO - Refresher Course for Switching Personnelj. SESCO - 33KV Swiching Requirements Coursek. ESECO - IEE 16th Edition Wiring Regulations.l. SESCO – 33KV Switching Requirements Coursem. SESCO – Refresher Course for Engineers Series 3n. SESCO – IHE3 Electrical Distribution Systems.o. TNB – Condition Monitoring – Vibration Basedp. SEB – Distribution Substation Design Courseq. Sirim – IECEx Cerificate Personnel Competecer. MSTS ASIA- Fire Team Member Level 1s. WSO- Supervising Health, Safety & Environmentt. SESCO – Basic First Aidu. GEC Alsthom – Gas Turbine Power Plant Trainingv. VI Power – Switchgear, Protection & Safetyw. SESCO - Refresher Course For Enguneer Series 4x. VI Power – Specialised Course in Industrial Power System Protectiony. SESCO - Refresher Course for 132/275KV Switching Personnelz. SESCO - Safety Coursesaa. ISO 9001, ISO 14001 and OSHSAS18001bb. SESCO -Switching Requirement for Major power stations.

REFERENCES:

1. Henry Uliu Jenang(SSO No.:300011930)GE Energy ManagementH/p no.: 012-9045860

2. Justin PadanMurphy Sarawak Oil Co. LtdGas Turbine CompressorBintulu Onshore Receiving Facility (BORF)Jalan Tg. Kidurong,Sarawak, MalaysiaH/p no.:019-8671066