BK SURCO Registration_15Nov11

Embed Size (px)

Citation preview

  • 8/3/2019 BK SURCO Registration_15Nov11

    1/4

    In

    C

    TR

    N

    T

    Ti

    Liw

    Di

    Thethe(CP

    BK SURCO Training will bemaking a donation from thisconference to the LighthouseClub Charities.

    Discounted fees for membersof the Chartered Institution ofCivil Engineering Surveyors(ICES), members of theLighthouse Club andemployees of Lighthouse ClubCorporate Members.

    This conference will be ofparticular interest to all thosewho are likely to be engaged

    on Hong Kong GovernmentsNEC contracts as well as thoseinvolved in other collaborativeforms of contracting such asthe MTR Target Cost contracts.

    B

    pres

    Improving Con

    NEW ENGINE

    roducing the NEC3 Contracts?

    ntract Strategy Choosing the Main Opt

    rget, Cost Reimbursable or Managementsponsibility

    C3 Management building on the UK Ex

    rget Cost Management contrasting NE

    me & Resources Management to reduce

    fe Cycle Safety Management where doeere does it end?

    spute Avoidance and Resolution DRA a

    ubject of this one-day conference will be of ionstruction Industry and has been designePoints applied for from the Law Society

    SURCO TRAINING

    nts its Annual Conference on

    ract Management Peusing the

    ERING CONTRACT15 November 2011

    The Langham Hong Kong

    ion: Lump Sum, BQ,

    and who takes Design

    perience

    3 and the MTR model

    isk

    s it start and

    nd Adjudication

    terest to everyone involved ind to meet CPD requirementsf Hong Kong).

    rformance

    S (NEC3)

  • 8/3/2019 BK SURCO Registration_15Nov11

    2/4

    BKConfusinNove

    Thetheintroinitiatcontr

    Sout

    SURcontrSURintromaxi

    Thispractof H

    collacons

    BK SURCO Training is an incorporabased operating company of the BKContract Management Services to tLtd, the information business of the

    BK SURCO Training was foundedtraining resources, advice and help fengineering, and for individuals enga

    BK SURCO Training combines the eand structured training programmengineering services and public seBKAsiaPacific in providing commerciin China, France, India, Japan, Mala

    BK SURCO Training also provides

    advising on training needs and worcourses, advising on any necessarythe training modules and assisting tendorsing same.

    About BK SURC

    Introduction

    URCO Training is delighted to presrence entitled Improving Contract Mathe NEW ENGINEERING CONTACTS (

    mber 2011 at the Langham Hong Kong H

    ong Kong Government has embarked onse of the NEC3 Contact for its conuction of this collaborative form of contives of the MTR Corporation in its intracts into Hong Kong and their use on MT

    Island Line projects.

    O Ltd has for many years beenactors in the UK on the effective use of

    O Training has also conducted trainingucing NEC3 and facilitating discussionsizing mutual benefits from target cost co

    conference therefore provides a uniqueitioners with many years experience in thng Kong and the UK and knowledge of

    orative contract thereby improving their eruction contracts.

    ed joint venture between Battersby KingsfiAsia Pacific Group, providing Project Mane Hong Kong and International Constructihartered Institution of Civil Engineering Sur

    s the International Training Company of ICr employers of construction personnel, esp

    ged in commercial activities within the const

    xperience of SURCO Trainings experiencees for many leading construction compinars in the United Kingdom over many yeal and contract management training in Hosia, Philippines, Singapore, Thailand and Vi

    an advisory and mentoring service to all

    experience required, helping them througfurther work experience to implement the

    hem with their preparation of membership

    Improving Contract Managem

    NEW ENGINEERING C15 November 2011

    Training

    nt its full day Annualagement Performance

    NEC3)" on Tuesday, 15thtel.

    several pilot schemes fortruction projects. Theacting complements the

    oduction of Target CostRs West Island Line and

    training employers andEC. In Hong Kong, BK

    seminars and workshopswithin project teams ontracts.

    pportunity to learn frome construction industriesEC3 and other forms of

    ffectiveness in managing

    ld Limited, the Hong Kongagement, Commercial andn Industries, and SURCOeyors (ICES).

    ES to provide commercialcially those working in civil

    ruction industry.

    of providing training adviceanies and employers ofars and the experience ofg Kong and internationallyetnam.

    ffiliate Members of ICES,

    h the professional trainingknowledge gained throughpplication documents and

    nt Performance using theONTRACTS (NEC3) The Langham Hong Kong

  • 8/3/2019 BK SURCO Registration_15Nov11

    3/4

    08:30 09:00 Registration and Coffee

    09:00 09:10 Welcome and Opening RemarksJohn Battersby, Group Managing Director, BK Asia Pacific Limited

    09:10 09:55 Introducing the NEC3 ContractsJulian Eynon-Lewis, Legal Counsel, Battersby Kingsfield Limited

    09:55 10:40 Contract Strategy Choosing the Main Option: Lump Sum, BQ, Target, CostReimbursable or Management? and who takes Design Responsibility?

    Gerry Tucker, Principal of Gerry Tucker Ltd

    10:40 11:00 Morning Refreshment Break

    11:00 11:45 NEC3 Management building on the UK ExperienceRobin Jones, Past President of ICES and Director of Training,SURCO Ltd.

    11:45 12:30 Target Cost ManagementJulian Eynon-Lewis, Legal Counsel, Battersby Kingsfield Limited

    12:30 14:00 Conference Luncheon

    14:00 14:45 Time and Resources Management to Reduce RiskJohn Battersby, Director, BK SURCO Limited

    14:45 15:30 Life Cycle Safety Management where does it start and where does it end?Brenda Yip, Director, BK SURCO Limited

    15:30 15:50 Afternoon Refreshment Break

    15:50 16:30 Dispute Avoidance and Resolution DRA and AdjudicationNicholas Seymour, Managing Director, Battersby Kingsfield Limited

    16:30 17:00 Panel Discussioninvolving the days Speakers

    Conference Programme

    Improving Contract Management Performance using theNEW ENGINEERING CONTRACTS (NEC3)

    15 November 2011 The Langham Hong Kong

  • 8/3/2019 BK SURCO Registration_15Nov11

    4/4

    I hereby register for the Conference on Improving Contract Management Performance using the New EngineeringContracts (NEC3) on 15

    thNovember 2011 and agree to the terms set out by the organizer, BK SURCO Limited:

    Title: Mr / Mrs / Ms / Dr / Prof. / Other, please specify : ___________________________________________

    Surname: First Name:

    Company:

    Position: Email:

    Tel: Fax: Mobile:

    Address:

    Contact Person:

    Name: Tel: Email:

    Conference Fees and Details

    FeesPlease select and

    tick the appropriate box

    Regular Fee HK$2,300

    Discounted Fee* HK$1,900 * Members of the Chartered Institution of Civil Engineering Surveyors (ICES) and the Lighthouse Club, employees of

    Lighthouse Club Corporate Member Companies are entitled to the discounted price.

    Fees include conference luncheon, morning and afternoon tea and coffee and all conference materials.

    Venue: The Langham Hong Kong, 8 Peking Road, Tsim Sha Tsui, Kowloon, Hong Kong

    Payment and Enrolment Methods

    By cheque made payable to: BK SURCO Limited.

    By Bank Transfer:Please quote booking reference BKHK111115

    Bank Name: Hong Kong and Shanghai Banking Corporation LimitedAddress: 1 Queens Road Central, Hong KongAccount Name: BK SURCO LimitedAccount Number: 004-053-067617-001Swift Code: HSBCHKHHHKH

    Bank charges to be borne by the payee. Please ensure that BKSURCO Ltd receives the full registration fees.

    Please return the registration form with thepayment (cheque or a copy of bank transfer)

    to BK SURCO Limited by:

    Email: [email protected]

    Fax: (852) 2687 2252

    Post: BK SURCO LimitedSuite 1901-2, 19th Floor,Hopewell Centre,183 Queen's Road East, Wan Chai,Hong Kong

    Terms and Conditions

    1 Registration will be confirmed upon receipt of payment.2 The conference programme is subject to change at any time without liability.3 A replacement is welcome with prior notice to the organizer at no extra charge should the registered delegate be unable to attend.4 Refund (less 20% administration charge) will be made for all cancellations received in writing by the organizers not later than 10 working

    days prior to the date of the conference.5 The conference will be cancelled if a No. 8 typhoon signal is hoisted or the Black storm warning is raised two hours prior to start of the

    conference.

    Improving Contract Management Performance using theNEW ENGINEERING CONTRACTS (NEC3)

    15 November 2011 The Langham Hong Kong

    Registration Form