217
1 2 1 2 3 4 5 6 Village - Singodi S.No. USR Item no. 301/23 Site clearance o Ordinary shrub j removal of grass out 302/23 a.Area below 25% 303/23 b. 25% to 50% ar 304/23 c. Area above 50 401(a) p36 Excavation in soft and 1.5m lift with [A] Weir wall (Cre [B] Keys (K1+K2)(a [C] Wing walls (ap each bank) D/s&U/s apron (2+ Toe wall d/s &u/s 401(b) p36 Excavation in hard lift with dressing [A] Weir wall [C] Wing walls D/s&U/s apron (2+ Toe wall d/s &u/s 402 p36 Excavation in ha boulders i/c 50m dressing [A] Weir wall [B] Keys (K1+K2) [C] Wing walls D/s&U/s apron (2+ Toe wall d/s &u/s 403 p36 Excavation in disi and 1.5m lift with [A] Weir wall [B] Keys (K1+K2) [C] Wing walls 404 p36 Excavation in soft lift with dressing [A] Weir wall

Anicut Tender Sample Excel

Embed Size (px)

Citation preview

Page 1: Anicut Tender Sample Excel

1 2 31

2

3

4

5

6

Village- Singodi

S.N

o. USR Item no. Description

301/23 Site clearance of grass &crops I/c rooting out

Ordinary shrub jungle clearance involving removal of grass shrubs & twings I/c rooting out

302/23 a.Area below 25% covered by shrubs303/23 b. 25% to 50% area covered by shrubs304/23 c. Area above 50% covered by shrubs

401(a)p36

Excavation in soft or ordianry soil i/c 50m leadand 1.5m lift with dressing.[A] Weir wall (Crest length- L)

[B] Keys (K1+K2)(approx. 3.0m on each bank)

[C] Wing walls (approx. 0.25xL on U/S, D/S ofeach bank)D/s&U/s apron (2+8=10mtr)

Toe wall d/s &u/s

401(b)p36

Excavation in hard soil i/c 50m lead and 1.5mlift with dressing[A] Weir wall

[C] Wing wallsD/s&U/s apron (2+8=10mtr)

Toe wall d/s &u/s

402 p36 Excavation in hard moorum & moorum withboulders i/c 50m lead and 1.5m lift with dressing

[A] Weir wall

[B] Keys (K1+K2)

[C] Wing wallsD/s&U/s apron (2+8=10mtr)

Toe wall d/s &u/s

403 p36 Excavation in disintegrated rock i/c 50m leadand 1.5m lift with dressing[A] Weir wall[B] Keys (K1+K2)

[C] Wing walls

404 p36 Excavation in soft rock i/c 50m lead and 1.5mlift with dressing[A] Weir wall

[B] Keys (K1+K2)

Page 2: Anicut Tender Sample Excel

6

7

8

9

10

11

12

[C] Wing wallsD/s&U/s apron (2+8=10mtr)

Toe wall d/s &u/s

[B] Keys (K1+K2) 2 6.00 2.15 0.30 7.74 cu.m405 p36

[A] Weir wall

[B] Keys (K1+K2)

[C] Wing wallsD/s&U/s apron (2+8=10mtr)

Toe wall d/s &u/s

716(b)p52

Cement Concrete 1:3:6with graded metal ofmaximum size 40mm. [ in foundation bed][A] Weir wall

[B] Keys (K1+K2)

[C] Wing wallsD/s&U/s apron (2+8=10mtr)

Toe wall d/s &u/s

725(xib)p53

Extra rate for black trap basalt or granite metalfor one cu.m.

723 p53 Extra for mechanical vibration of CementConcrete or plum Concrete.

2206 p213 Drilling 35mm dia holes in rock by jack hammerupto 6m.

1304b p129 Supplying & fixing steel reinforcement bars(tested) for RCC i/c cleaning, straightening, cutting, bending all handling, placing in position and binding with 0.9 mm annealed binding wireconfirming to IS:280-1978 (i/c cost of bindingwire) : (b) Cold worked steel high strength bars confirming to grade Fe-415 of IS:1786.25 mmØ Tor Steel bars (Dowel bars) @ 1.5mc/c in Three rows

Excavation in hard rock i/c 50m lead and 1.5m .lift with dressing : [a] Blasting permitted

1314

1602 b p150 Providing and placing in position M-15 R.C.C.excluding cost of reinforcement, but including form work , vibration, finishing, curing etc complete with graded metal of maximum size-

(a) 20 mm1304b p129 Supplying & fixing steel reinforcement bars

(tested) for RCC i/c cleaning, straightening, cutting, bending all handling, placing in position and binding with 0.9 mm annealed binding wireconfirming to IS:280-1978 (i/c cost of bindingwire) : (b) Cold worked steel high strength bars confirming to grade Fe-415 of IS:1786.Mail Wall Portion

Horizontal and along LS , Provide Bars 8 mmdia @ 250 C/c

Page 3: Anicut Tender Sample Excel

19

20

21

1314

Vertical Bars and along CS, Provide Bars 10mm dia @ 250 C/cGate Portion

Horizontal and along LS , Provide Bars 8 mmdia @ 250 C/cVertical Bars and along CS, Provide Bars 10mm dia @ 250 C/c

1516

711c pg.52

Plum Cement Concrete1;3;6 with 75% gradedmetal of 40 mm.and 25% Plums of 150 mm In foundation and plinth.[A] Wier wall

715 c pg.52

Cement Concrete1;2;4 with graded metal ofmaximum size 20 mm. In foundation  and plinth

[B] Key wall

[C] Wing wall

Toe wall d/s &u/s

1718

711 c pg.52

[A] Wier wall

Deduct for openings in wier wall (Gates)

Net Quantity =715 c pg.

52Cement Concrete1;2;4 with graded metal ofmaximum size 20 mm. In Super Structure.[C] Wing wall

Toe wall d/s &u/s

MPLUN Item No. SMM163101

M.S. Fixed Wheel Gate upto 2 SQM size for 5MTR. Water Head with Manually operated rope drum hoisting mechanism, complete item.

2117 p200 Puddle filling of good clay including lead upto50m including mixing, watering and kneading by tamping, ramming and laying etc. [at Karri shutters]

1009 p71 22cm thick dry picked up boulder pitchingincluding picking of boulders with individual boulder of 22cm depth & atleast the dimension of boulders in any direction should not be less than 10cm.

Total -

[In Words - Rupees Seventy Four Lacs Sixty Thousands Only ]

Page 4: Anicut Tender Sample Excel

3 4 5 6 7 8 9.002 500 30 30000.00

2 100 30 6000.00

2 50 25 2500.00

2 50 20 2000.00

1 93.00 4.00 0.20 74.40

2 6.00 2.15 0.20 5.16

4 6.00 2.90 0.20 13.92

1 93.00 10.00 0.20 186.00

2 93.00 1.40 0.20 52.08

331.56

1 93.00 4.00 0.30 111.60

4 6.00 2.90 0.30 20.881 93.00 10.00 0.20 186.00

2 93.00 1.40 0.20 52.08

370.56

1 93.00 4.00 0.50 186.00

2 6.00 2.15 0.50 12.90

4 6.00 2.90 0.50 34.801 93.00 10.00 0.20 186.00

2 93.00 1.40 0.20 52.08

471.78

1 93.00 4.00 0.60 223.202 6.00 2.15 0.60 15.48

4 6.00 2.90 0.60 41.76

280.44

1 93.00 4.00 0.40 148.80

2 6.00 2.15 0.40 10.32

Block-

Description QuantityNos. L B H Other Total

Qtty.

Site clearance of grass &crops I/c rooting out

Ordinary shrub jungle clearance involving removal of grass shrubs & twings I/c rooting out

a.Area below 25% covered by shrubsb. 25% to 50% area covered by shrubsc. Area above 50% covered by shrubsExcavation in soft or ordianry soil i/c 50m leadand 1.5m lift with dressing.[A] Weir wall (Crest length- L)

[B] Keys (K1+K2)(approx. 3.0m on each bank)

[C] Wing walls (approx. 0.25xL on U/S, D/S of

D/s&U/s apron (2+8=10mtr)

TotalExcavation in hard soil i/c 50m lead and 1.5m

D/s&U/s apron (2+8=10mtr)

TotalExcavation in hard moorum & moorum withboulders i/c 50m lead and 1.5m lift with dressing

D/s&U/s apron (2+8=10mtr)

TotalExcavation in disintegrated rock i/c 50m leadand 1.5m lift with dressing

TotalExcavation in soft rock i/c 50m lead and 1.5m

Page 5: Anicut Tender Sample Excel

4 6.00 2.90 0.40 27.841 93.00 10.00 0.20 186.00

2 93.00 1.40 0.20 52.08

425.04

1 93.00 4.00 1.00 372.00

2 6.00 2.15 1.00 25.80

4 6.00 1.40 1.00 33.601 93.00 10.00 0.20 186.00

2 93.00 1.40 1.00 260.40

877.80

1 93.00 3.80 0.30 106.02

2 6.00 1.95 0.30 7.02

4 6.00 2.70 0.30 19.441 93.00 10.00 0.30 279.00

2 93.00 1.40 0.30 78.12

489.601 489.60

1 489.60

189 63 1.50 283.50

189 6.50 3.85 4729.73

1 93.00 17.20 0.30 479.88

140 94.00 0.395 5198.20

D/s&U/s apron (2+8=10mtr)

Total[B] Keys (K1+K2) 2 6.00 2.15 0.30 7.74 cu.m

D/s&U/s apron (2+8=10mtr)

TotalCement Concrete 1:3:6with graded metal ofmaximum size 40mm. [ in foundation bed]

D/s&U/s apron (2+8=10mtr)

TotalExtra rate for black trap basalt or granite metal

Extra for mechanical vibration of CementConcrete or plum Concrete.Drilling 35mm dia holes in rock by jack hammer

Supplying & fixing steel reinforcement bars(tested) for RCC i/c cleaning, straightening, cutting, bending all handling, placing in position and binding with 0.9 mm annealed binding wireconfirming to IS:280-1978 (i/c cost of bindingwire) : (b) Cold worked steel high strength bars confirming to grade Fe-415 of IS:1786.25 mmØ Tor Steel bars (Dowel bars) @ 1.5m Wt.

(kg/mtr.) =Excavation in hard rock i/c 50m lead and 1.5m .

Providing and placing in position M-15 R.C.C.excluding cost of reinforcement, but including form work , vibration, finishing, curing etc complete with graded metal

Supplying & fixing steel reinforcement bars(tested) for RCC i/c cleaning, straightening, cutting, bending all handling, placing in position and binding with 0.9 mm annealed binding wireconfirming to IS:280-1978 (i/c cost of bindingwire) : (b) Cold worked steel high strength bars confirming to grade Fe-415 of IS:1786.

Horizontal and along LS , Provide Bars 8 mm @ Kg/m

Page 6: Anicut Tender Sample Excel

784 8.40 0.395 2601.31

466 3.80 0.395 699.47

290 4.50 0.395 515.48

9014.45

1 93.00 3.20 2.70 803.52

2 6.00 1.75 4.00 84.00

4 6.00 2.50 4.00 240.00

1 93.00 1.20 1.40 156.24480.24

1 93.00 3.00 571.95

8 1.20 1.50 59.04512.91

4 6.00 4.00 112.80

1 93.00 0.90 3.30 276.21

269.048 1.20 4.00 38.40

1 93.00 1.50 3.00 418.50

5 15.00 5.80 0.22 95.70

Vertical Bars and along CS, Provide Bars 10mm dia @ 250 C/c

@ Kg/m

Horizontal and along LS , Provide Bars 8 mm @ Kg/m

Vertical Bars and along CS, Provide Bars 10mm dia @ 250 C/c

@ Kg/m

TotalPlum Cement Concrete1;3;6 with 75% gradedmetal of 40 mm.and 25% Plums of 150 mm In foundation and plinth.

Cement Concrete1;2;4 with graded metal ofmaximum size 20 mm. In foundation  and plinth

Total

(3.2+.9)/2Deduct for openings in wier wall (Gates) (3.2+.9)/2Net Quantity =

Cement Concrete1;2;4 with graded metal ofmaximum size 20 mm. In Super Structure.

(2.5+.6)

M.S. Fixed Wheel Gate upto 2 SQM size for 5MTR. Water Head with Manually operated rope drum hoisting mechanism, complete item.

Puddle filling of good clay including lead upto50m including mixing, watering and kneading by tamping, ramming and laying etc. [at Karri shutters]

22cm thick dry picked up boulder pitchingincluding picking of boulders with individual boulder of 22cm depth & atleast the dimension of boulders in any direction should not be less than 10cm.

=

Say Rs.Say, 7 LakhsRs.

Page 7: Anicut Tender Sample Excel

10 11 120.20 6000.00

0.30 1800.00

0.70 1750.00

1.40 2800.00

17.00 5637.00

23.00 8523.00

31.00 14625.00

62.00 17387.00

Amarwara

Rate[Rs.]

Amount[Rs.]Unit

sqmt

sqmtsqmtsqmt

cu.m

cu.m

cu.m

cu.m

cu.m

Cum

.

cu.m

cu.m

cu.m

cu.m

Cum

.

cu.m

cu.m

cu.m

cu.m

cu.m

Cum

.

cu.m

cu.m

cu.m

Cum

.

cu.m

cu.m

Page 8: Anicut Tender Sample Excel

106.00 45054.00

170.00 149226.00

1376.00 673690.00

18.00 8813.00

30.00 14688.00

330.00 93555.00

50.00 236486.00

2835.00 1360460.00

cu.m

cu.m

cu.m

Cum

cu.m

cu.m

cu.m

cu.m

cu.m

Cum

.

cu.m

cu.m

cu.m

cu.m

cu.m

Cum

cu.m

cu.m

m

.

Kg

Cum

Kg

Page 9: Anicut Tender Sample Excel

50.00 450723.00

1353.00 1087163.00

1839.00 883161.00

1353.00 693967.00

1839.00 494765.00

45000.00 1728000.00

92.00 38502.00

187.00 17896.00

8034671.00

80.30

Kg

Kg

Kg

Kg

.

cu.m.

cu.m.

cu.m.

Cu.m

Cum

cu.m.

cu.m.

cu.m.

cu.m.

sqmt

cu.m.

cu.m.

=

Say Rs.Say, 7 Lakhs

Page 10: Anicut Tender Sample Excel

9 10 11 1230000 0.20 6000.00

6000 0.30 1800.002500 0.70 1750.002000 1.40 2800.00

74.405.1613.92186.0052.08331.56 17.00 5636.52

111.60

20.88186.0052.08378.30 23.00 8700.90

186.0012.9034.80186.0052.08471.78 31.00 14625.18

223.2015.4841.76280.44 62.00 17387.28

148.8010.3227.84

Block- Amarwara

Rate[Rs.]

Amount[Rs.]Total

Qtty.Unit

sqmt

sqmtsqmtsqmt

cu.mcu.mcu.mcu.mcu.mCum

.cu.m

cu.mcu.mcu.mCum

.cu.mcu.mcu.mcu.mcu.mCum

.cu.mcu.mcu.mCum

.cu.mcu.mcu.m

Page 11: Anicut Tender Sample Excel

186.0052.08425.04 106.00 45054.24

372.0025.8033.60186.00260.40877.80 170.00 149226.00

106.027.0219.44279.0078.12489.60 1376.00 673689.60489.60 18.00 8812.80489.60 30.00 14688.00283.50 330.00 93555.00

4731.45 50.00 236572.63

479.88 2835.00 1360459.80

5185.822601.31

699.47515.489002.08 50.00 450103.82

803.52 1353.00 1087162.56

84.00240.00156.24324.00 1839.00 595836.00

571.95-59.04512.91 1353.00 693967.23

112.80156.24269.04 1839.00 207439.2038.40 45000.00 1728000.00418.50 92.00 38502.0095.70 187.00 17895.90

7459664.66

cu.mcu.mCum

cu.mcu.mcu.mcu.mcu.mCum

.cu.mcu.mcu.mcu.mcu.mCumcu.mcu.m

m.

Kg

Cum

KgKg

KgKgKg.

cu.m.

cu.m.cu.m.Cu.mCum

cu.m.cu.m.cu.m.

cu.m.sqmtcu.m.cu.m.

=

Page 12: Anicut Tender Sample Excel

74.60Say Rs.Say, 74.60 Lakhs

Page 13: Anicut Tender Sample Excel

1

2

3

4

5

6

7

8

9

10

11

12

GOVT. OF MADHYA PRADESHPublic Health Engineering DepartmentJabalpur Zone, Jabalpur (M.P.)Standard tender document – form ‘F’Design Construction and commissioning of R.C.C. Anicut Across River

Pench, Lenhth 93.0 m and height 3.0 m for Village Singodi Water Supply Scheme under fluoride project , Block Amarwara, District Chhindwara M.P. On lump sump contract basis(Rs. 74.60 lakh only)Cost of tender document Rs. 3575 OnlyExecutive EngineerPublic health Engineering DivisionChhindwara district Chhindwara (M.P.)Standard tender documentName of the work : Design Construction and commissioning of R.C.C.Anicut Across River Pench, Lenhth 93.0 m and height 3.0 m for Village Singodi Water Supply Scheme under fluoride project , Block Amarwara, District Chhindwara M.P.ContentsS.no. Particulars

Important points for the guidance of the tenderers

Detailed notice inviting tender

Tender for lump sum contract

Condition of contract

Model rules relating to labour, water supply and sanitation in labour camps annexure – “a”

Contractors labour regulations – annexure – “b”

Source of Materials – annexure – “c”

Form of Income tax – annexure “d”

Specification of the work – annexure – “e”

Break up schedule for valuation of work annexure – “f”

Form of Bank Guarantee Annexure “G”

Drawing annexure – “H”12.1 Layout Plan of Work.12.2 Cotour Plan of Site12.3 Tentative L- & Cross Section of of Proposed Anicut Structure.

Page 14: Anicut Tender Sample Excel

13 ANNEXURE ‘I’ :- Schedule of QuantityANNEXURE ‘J’ :- Detailed EstimateAnnexure “K” :- Guidelines For Online E procurement system.

IMPORTANT POINTS FOR THE GUIDANCE OF THE FIRMS / CONTRACTORSINTENDING TO SUBMIT TENDERS(THESE WILL FORM PART OF THE AGREEMENT)1.0 All the essential conditions have been incorporated in these under documentsand it may not be necessary for the contractor to give any additional conditions. If any conditions are given, common set of conditions shall be framed as per procedure prescribed in the PWD manual.2.0 No advance payment shall be applicable for this work, Full security deposit as per NIT shall have to be deposited within 10 days of intimation of acceptance of tender to the contractor if the contractor fails to do so, his earnest money shall be forfeited and his tender will be rejected.3.0 The tenderers requested to accept the Break up schedule given in tender documents as ANNEXURF for assessment of work done as per clause No. 15 of the term for “LUMP SUM CONTRACT”.4.0 The firms/contractors sometimes ask for the refund of security deposit in a manner & time not in conformity with the provision of the NIT. Any such condition of refund of security deposit shall not be accepted by the department and as such the tenderers are requested to agree to the condition of the NIT in this regard.5.0 The validity of the tenders shall be 180 days after opening of the last financial offers.6.0 The contractor shall be full responsible and accountable for obtaining all the required permission from the concerned authorities & for abiding all the laws, local regulations such as for water, power, extraction of sand and metal, excavation, blasting transportation of material, safety traffic related to this work.7.0 The contractor shall be fully responsible for safety of the work workmen and public etc. at all the stage of work of activities related to this work.8.0 All the relevant Indian Standard Specification (I.S. Codes) manual and codes of practices shall be applicable for this work. The decision of the PHED will be final in this matter.9.0 For all building and other contract work costing Rs. 10.00 Lakhs or more asurcharge @ 1% of the cost of work shall be deducted from the bills of thecontractor and shall be remitted to MP Building & Other Construction WorkersWelfare Board, Bhopal.PUBLIC HEALTH ENGINEERING DEPARTMENT DIVISION Chhindwara (M.P.)NIT No. 20 /2009-10/SAC/EE/PHEDn/ Chhindwara DATED 23/07/2009NOTICE INVITING TENDEROnline digitally sealed tenders are invited on behalf of the Governor of M.P. forthe following work in Form “F” from the office of the Executive Engineer, Public Health Engineering Department, Chhindwara   Division within the time mention in the key dates from categories A-2 or S-2 and above"A" Class contractors registered, in PHE Department."B" Class registered in the ...................N.A......................................... "C" Class in the office of the Executive Engineer of Chhindwara Division The bidders intending to participate in this tender are required to getenrolled/    registered    on   the   e    procurement    web   sight http://mpeprocurement.gov.in and get empanelled on the sub portal of Public Health Engineering Department http://phed.mpeprocurement.gov.in. Enrollment / registration and subsequent empanelment on the above portal and sub portal is mandatory. The bidders registered with other departments of Govt. of M.P. who are also eligible to participate in tenders processed by Public Health Engineering Department, are also required to registered on the e-procurement system on http://phed.mpeprocurement.gov.in and after sanction of the tender they will have to manage their registration in PHED or have to deposit total security depositin the approved form also as per provisions.DETAILS OF THE WORK :-S. N o.

Name of the Division

Name of theWork

Probable amount of

contract (Rs. in Lacs)

Earnest Money (Rs..

in Lacs)

Cost of tender documents

Time allowed for completion

Page 15: Anicut Tender Sample Excel

1 74600 3575Chhindwa ra Design Construction and commissioning of R.C.C.

Anicut Across River Pench, Lenhth

93.0 m and height 3.0 m for Village Singodi Water

Supply Scheme under fluoride project , Block

Amarwara, District Chhindwara M.P.

Rs. 74.60Lacs

6 month exlcuding Rainy Seasion

1.0 GENERAL1.1 Tender must be submitted in online form for “Lump Sump Contract” duly filled and digitally signed in as per instruction contained in this tender notice and in the guideline which are attached with this NIT.1.2 Lump Sump tender shall be inclusive of all the items of works.2.0 ISSUE OF TENDER DOCUMENTS2.1 Tender documents can be purchased only online from http://phed.mpeprocurement.gov.in by making online payment. The last date of purchase of tender document is as mention in keydates.2.2 The bid data should be filled and the bid seals (hashes) of all the envelops and the documents which are to be uploaded by the bidders should be submitted online up to as per time schedule (Key dates).2.3 The bidders shall have to submit their bids online (decrypt and encrypt the bids) and upload the relevant documents from as per time schedule (key dates).2.4 Other condition including qualification and details of work can be seen in theoffice of the undersigned during office hours and downloaded online directlyfrom the M.P. Public Health Engineering Department sub portalhttp://phed.mpeprocurement.gov.in. This NIT shall also form the part of agreement.2.5 For details on tendering procedure through the electronic tendering system, please refer to “Guidlines for Using the Electronic Tendering System” available along with the tender documents.2.6 The Bidders if needed training are advised to get in touch with the Service Provider of the e-Procurement System for confirming the time and date for their training session.3.0 SPECIFICATIONS3.1 General Specifications for work have been given in the enclosed annexure."E" However following order of priority regarding specification for the work shall be followed by the contractor.3.2 Specifications issued by the E.in.C. PHED and specification as detailed under this contractor under special conditions Annexure “D” and special condition.3.3 Relevant I.S. Specifications for work and material etc.3.4 Specifications as may be given in writing by the Engineer-in-charge from time to time.3.5 Maharashtra P.W.D. Specifications.3.6 Manual on water supply and treatment issued by the CPHEEO.3.7 Specifications for pipes, valves, specials, rubber, gaskets RCC and other civil works and materials shall be governed by the relevant latest IS codes, IRC specifications and National Building code of India (latest revision)4.0 CHANGE IN SPECIFICATIONS : Nothing in this clause, however, shall curtail theright of the “Engineering-in-charge” to alter the specification for any part of whole of the work, if he considers it necessary in the interest of work. On all matters where there is difference of opinion between the contractor and the Executive Engineer, P.H.E. Department, (M.P.) the matter will be referred to the C.E. PHED Jabalpur Zone. Jabalpur, S.E., PHED Chhindwara Project Circle chhindwara whose decision willbe final, conclusive and binding on the contractor.5.0 MATERIAL FOR CONSTRUCTION : All materials required for constructionpertaining to this tender shall be in accordance with standard specification of Building and Construction Department of Maharashtra Government (with all amendments issued up to date of receipt of tenders) BIS Code of practice BIS specification will begiven preference in case there is difference in Maharashtra P.W.D. specification &BIS specification issued up to date to issue of tender notice and the entire workpertaining to this tender shall be executed in accordance with the above specification.6.0 WORKMANSHIP :- The work shall be carried out according to the specifications referred to hereinafter & according to sound engineering practice. The structure should have even & smooth finish. The decision of the Engineer-in-charge in respect of workmanship shall be final.7.0 CONCRETE :- All concrete shall be mixed in concrete mixer and compacted by mechanical vibrators. Slump tests shall be carried out during concreting and sample test tubes prepared & tested in due course by the contractor at his cost. The result of the tests shall conform with the required standards and if the Engineer-in-charge considers that a structural test is necessary, the same shall be carried out as instructed by the Engineer-in-charge at contractors expenses and if the results of this be unsatisfactory the contractor will be bound to take down and reconstruct the particular portion of the work which has given unsatisfactory test results. The contractor shall have to use only steel shuttering so as to get smooth finish.8.0 STEEL FOR REINFORCEMENT : All the iron and steel required for the work will be procured by the contractor at his own cost. The department shall not supply any quantity of steel under any circumstances. Steel for reinforcement shall confirm to B.I.S. specifications 432-1966 (with up to date revision) and B.I.S. 1139-1966 (with up to date revision). The contractor shall be required to produce the test certificate of the manufactures to the department before use of steel for the work. No untested steel will be allowed to be used under any circumstances. The department however reserves the right to get the steel tested at the cost of contractor.9.0 CEMENT : In accordance to the instructions contained in Govt. of M.P. PHED, Bhopal memo no. F-16-28/34-2/87 dt. 28.01.91. Cement required for the work will be procured by the contractor at his own cost from time as per requirement. The cement to be used in the work shall be ordinary low heat port land cement conforming to B.I.S. 269/1976 & Portland Slag Cement conforming to B.I.S.455/1976 approved by the Engineer-in-charge.

Page 16: Anicut Tender Sample Excel

###

10.0 PIPES SPECIAL AND VALVES : All Specials should be flanged conforming to B.I.S.158-1976 PAN STOCK GATES shall be as per relevant B.I.S. specifications. The puddle collars inlet ports and strainers shall also be as per B.I.S. specifications.11.0 All material used in the civil work should be of quality approved by the Engineer-in- Charge. The rejected material should be removed from the site immediately at thecost of contractor. All component of civil work including electrical and mechanicalwork should be of such workmanship and quality that they are liable to perform withmaximum efficiency in the normal working condition. Use of non corrodible materials for conveying chemicals and to resist abrasive action of sand, and use of suitable paints and coating for under water fittings to prevent contamination of water are expected to be providing by the contractor.12.0 SUBMISSION OF TENDERS :- The Tenderer shall fill/upload the Bids online and the Bid Hashes of three envelopes shall be digitally signed and submitted online as per mentioned key dates. The Bidders shall also have to submit Bids online (decrypt the bids using their Digital Certificate and encrypt the bids) as per mentioned key dates. There shall be three separate Online envelopes as under:-13.0 ENVELOPE - A :- The first online envelope shall contain the details of Earnest Money, scanned copy of the Physical Earnest Money and scanned copy of following documents.13.1 Experience certificate of successful completion of work of Construction of R.C.C. Anicut on “TURN KEY JOB BASIS“ costing Rs 50.00 Lacs in contractor's/firm's/company's own name indicating agreement no., work order no. and date, amount of contract, stipulated period of completion, actual period of completion during last five year i.e. 2003-2004 to 2007-2008. An officer not below the rank of Executive Engineer should issue the certificate.13.2 The details of works in hand indicating name of work, Agreement no., work order no., and date, amount of contract, period of completion, value of work and balance work in hand with details of work on the date of submission of Tender.13.3 Valid registration certificate in appropriate class in M.P. PHE Department.13.4 Valid revenue solvency of F.D.R. of half of its amount.13.5 Financial turn over works during last five financial years.13.6 Proof of registration in commercial tax department.13.7 Current Income Tax clearance certificate.13.8 List of plants and machineries for successful completion of the works.The physical earnest money which is to be submitted manually in physical envelop-Awhere it should be clearly written on the envelope as under13.9 Ownership document of concrete batch mixing plant, material testing laboratory equipments for Crushing strength test of moulded concrete specimens, slump test of concrete, particle size analysis , silt content, percentage of soft materials etc.

ENVELOPE - AEARNEST MONEY

From - (… Name of Contractor…)and should reach Executive Engineer, PHE Division ............ as per date and time mentioned in the key dates14.0 ENVELOPE - B :- The Second Online envelope shall contain terms and conditions and all the technical details and specifications of the proposed work. The Scanned copy of terms and conditions, along with technical specifications and drawings etc. should be submitted online in Envelope “B”.15.0 ENVELOPE - C : This Envelope shall contain only the Lump-sum offer. The tenderer shall have to duly fill their Lump-sum offer in appropriate online form meant for it.16.0 Tender will be submitted with the Earnest Money, of Rs.74600 (In Words Seventy Four Thousands Six Hundreds Only ) In favour of the Executive Engineer, PHE Division ,Chhindwara (M.P.) which will be returned to the unsuccessful tenderer. The Earnest Money of the successful tenderer will be retained as part of the Security Deposit.17.0 FORM OF EARNEST MONEY : Where the tenderer proposes to pay the earnest money in cash he shall pay it to the where the. Tenderer proposes to pay the earnest money in cash he shall pay it to the credit of revenue deposit on behalf of Executive Engineer PHED, division Chhindwara (M.P.) in the branch of the state Bank of Government Treasury of Sub-treasury within the jurisdiction of the Executive Engineer mentioned above. If, however, the tenderer wishes to deposit the earnest money in any one of the following forms he may do so.17.1 Units of unit Trust of India.17.2 Treasury Receipts.17.3 Treasury Bonds.17.4 Approved interest bearing Security.17.5 Government Promissory Notes in National Loan Plan.17.6 Post Office Cash Certificate.17.7 10 Years Treasury saving/Deposit/Certificate.17.8 Demand Draft of State Bank of India or Scheduled Banks.17.9 National Saving Certificate.17.10 Bank Draft issued by big Urban Banks whose working Capital exceeds Rs. 5 crores for A, B & C Class, Central Co-operative Banks/Non Scheduled State Co-operative Banks, Subject to the conditions that the drafts are encased by accepting authority as soon as they are received and contracts are allottedonly after the encasement of drafts as per MPFD. No. F/2/18/77/R/5/(iv) Dt.13.02.1987.17.11 2 Yrs. National Plan Saving Certificate.17.12 10 Yrs. Defense Deposit Certificate.17.13 All Small Saving Securities and Post Office Saving Bank Accoung duly pledged to Government.17.14 National Saving Certificates duly hypothecated in the neme of the Governor ofMadhya Pradesh.17.15 Debentures of the Madhya Pradesh Hosing Board as approved by MadhyaPradesh Finance Department Memo No. 1319/2306/IV/R-5/75, Dt.

18.0 The amount of Earnest Money should be deposited in the Treasury/State Bank of India and the challan should be submitted in the envelope “A” as mentioned above under para (2.1).19.0 EARNEST MONEY IN SEPARATE COVERS:- The Earnest Money, in any one of the prescribed form should be deposited as mentioned under para 2.5 . If the Earnest Money is not found in accordance with the prescribed mode, the tender of the tenderer shall not be opened.20.0 ADJUSTMENT OF EARNEST MONEY:- The Earnest Money which has been deposited for a particular work will not ordinarily be adjusted towards the earnest money for another work, but if the tender of a contractor for a work in the same Division has been rejected and the Earnest Money has not been refunded to him due to some reasons it may be adjusted for this work by the Executive Engineer, provided amount retained is equal or more than required Earnest Money for this work.21.0 SECURITY DEPOSIT:- The Security Deposit to be taken for the due performances of the contact, under the terms and conditions given in the tender form, will be the Earnest money at the time of tender plus & sum to make it equal to 5% of the amount of contract to be paid within 10 days from the date of issue of letter of acceptance,failing which the tender shall be rejected & his EMD will be forfeited .22.0 IMPLICATION OF SUBMISSION OF TENDERS:- Bidders are advised to visit the site sufficiently in advance of the date fixed for the submission of the tender. The tenderer shall be deemed to have full knowledge of all relevant documents and site conditions etc. whether he inspects it or not.22.1 The submission of a tender by a contractor implies that he has read thenotice, conditions of the tender and all the contract documents and has made

Page 17: Anicut Tender Sample Excel

himself fully aware of all the standards and specifications in this respect laiddown in the relevant IS specifications, IRC specifications, manual on water supply and treatment, and Annexure-E having the scope and the specification of the work to be done. The contractor will be deemed to have seen the site of works.22.2 The contractor shall make his own arrangement for supply of water for construction, purposes. No lead and lift for any other material including water will be paid. The tender offer should be inclusive of all leads and lifts for the materials. The contractor should himself verify the leads of different materials before submitting his tender.23.0 ESCALATION:- The scope of work includes all costs, and no escalation will be paid on this account.24.0 LIST OF WORKS IN PROGRESS :- Tenders must be accompanied by a list of Contracts already held by the tenderer at the time of submitting the tender, in the Department and elsewhere showing therein.24.1 The amount of each contract24.2 Balance of work remaining to be done and24.3 The amount of solvency-certificate produced by him at the time of enrolment in the department25.0 RELATIONSHIP :- The contractor shall not be permitted to tender for works in the Division, (responsible for award and execution of contract ) in which his near relative is posted a Divisional Accountant. He shall intimate the names of his near relative working in M.P. Secretariat and P.H.E Department. He shall also intimate the name of person working with him in any capacity or subsequently employed by him and who are near relatives to any Gazetted Officer in the M.P. Secretariat and P.H.E Department. Any breach of this condition by the contractor would render him self liable to be removed form the approved list of contractors of the P.H.E. Department. NOTE :- By the term “near relative” is meant wife, husband, parents and son, Grand son, brothers, sisters, brothers in laws, father in law and mother in law.26.0 POWER OF EXECUTIVE ENGINEER : The Executive Engineer does no bind himself to or recommend for the acceptance to higher authority the lowest or any tender or to give any reason for his decision.27.0 CONDITIONAL TENDER : Conditional tenders are liable to be rejected.28.0 CANVASSING :- Canvassing in support of any firm/contractor for the acceptance of any tender is strictly prohibited. Any tenderer doing so will render himself liable to penalties which may include removal of his name from the register of approvedcontractors or penal action under sections 8 of M.P. Vinirdishtra Bharasta AcharanNiwaran Vidheyak, 1983.29.0 ONLINE SUBMISSION OF TENDER :- Only the bid submitted online and envelopes digitelly signed will be opened30.0 AUTHORITY OF EXECUTIVE ENGINEER :- The authority competent to accept a tender, reserves the right for accepting the tender for the whole work or for a distinct part of it, or distributing the work between two or more Bidders.31.0 VALIDITY OF OFFER : Tender shall remain open up to ....... days from the date of opening of the last financial price bids (Envelop "C") and in the event of the tenders withdrawing the offer before the aforesaid date for any reason whatsoever, earnest money deposit with the tender shall be forfeited by Government.32.0 TIME OF COMPLETION :- The time allowed for carrying out the work i.e. ..... months including rainy season shall be strictly observed and shall be reckoned from the date of issue of written order to commence the work. Delay beyond the specified time limit will be subject to liquidated damages according to clause 13 of Form “F” of Lump sum contract.33.0 TIME SCHEDULE:- The work shall be done by the contractor according to the schedule fixed in consultation with the competent authority. BAR/PERT/CPM chart showing detailed programme shall have to be submitted and adhered to by the contractor.34.0 PAYMENTS34.1 Payment to the contractor will be made as per clause 15 of the Tender form lump sum contract. No change in this payment schedule will be permitted.34.2 The Security deposit of the contractor shall not be refunded before the expiry of 6 months after successful testing of the work. It shall not be refunded also before the settlement and payment of the final bill in any case.34.3 No escalation shall be payable on any account.35.0 MISCELLANEOUS CONDITIONS:-35.1 SUBLETTING WORK:- The contractor shall not without the prior approval of the competent authority, in writing, sublet or assign to any other party or parties the whole, or any portion of the work under the contract. Where such approval is granted, the contractor shall not be relieved of any obligation or duty or responsibility, which he under takes under the contract.35.2 BLASTING:- In case limited/suppressed blasting resorted to by thecontractor in excavation of trenches, it will be the responsibility of the contractor to observe all rules and regulations permission licence, procurement, preservation and storage of explosive material etc.36.0 COMMERCIAL TAX :- All dues regarding taxes, and duties including the commercial Taxes, Royalties, Octroil Duties, Excise, Turnover, Taxes etc. on work, Contract etc. levied on the contractor’s work by Government and local bodies or private individuals will be payable by the contractor. The Executive Enineer will grant a certificate for the quantity actual used on the work but ewill not entertain any claim on this account .37.0 ROYALTY:-Minerals extracted for works carried out on behalf of the government, from the quarries in possession of and controlled by the State Government is subject to payment of Royalty by the contractor to whom it shall not be refundable.38.0 MODEL RULES RELATED TO LABOUR, WATER SUPPLY AND SANITATION IN LABOUR CAMPS. :-The contractor will be bound to follow the Madhya Pradesh Model Rules, relating to layout Water Supply and sanitation in labour camps, as per Annexure - A and the provisions of the National Building Code of India, in regard to construction and safety.39.0 FAIR WAGES:- The contractor(s) shall pay not less than the fair wages to labour engaged by him on the work ( copy of the Rules enclosed as Annexure - “A” )40.0 Works In The Vicinity :- The Executive Engineer, reserves the right to take up Departmental work or to award works on the contract in the vicinity without prejudice to the terms of contract.41.0 BEST QUALITY OF QUARRIED MATERIALS:- If the quarry material of more than one quality is found, the material approved by the Executive Engineer will only used by the contractor. If the materials of required Specification is not available in the near by area/quarry, the contractor shall have to arrange the same from the place where it is available.42.0 REMOVAL OF UNDESIRABLE PERSONS:- The contractor shall on receipt of the requisition from the Executive Engineer, at once remove any person employed by him on the work who in the opinion of the Executive Engineer is unsuitable or undesirable.43.0 AMOUNT DUE FORM CONTRACTOR:- Any amount due to Government from theContractor on any account of concerning work may be recovered form him as arrears of Land Revenue.44.0 TOOLS & PLANTS:- The contractor shall arrange at his own cost all Tools and Plantsrequired for proper execution of work. Certain plants, may however, be issued to the contractors by the Department, as special case as per provision of W.D. Manual Vol.1 if are available and sparable .45.0 RIGHT TO INCREASE OF DECREASE OF WORK: The competent authority reserves the right to increase or decrease any item of work during the currency of the contract and the contractor will be bound to comply with the order of the competent authority without any claim for compensation or higher rates for additions and alterations.46.0 LABOUR REPORT:- Contractor will submit a report on labour engaged to local employment office and copy of same may be attached with the running account bill, failing which Rs.50/- will be deducted from each running bill. Total recovery on this account may be effected on the final bill.47.0 LABOUR LICENCE :- Every contractor who employs on any day of the preceding 12 months, twenty or more workers on contract is required to obtain license from the Licensing Officer or the Contract as per provision contained under Sub-section 4 (b) of section 2 of the Contract Labour ( Regulation and Abolition ) Act 1970 as per provision contained in Section 12 of Act. No, contractor shall execute any work without obtaining licence, contravention of above is punishable and contractor is liable to be prosecuted. The successful tenderer is liable to produce licence as and when demanded by the Executive Engineer, obtained form labour Department as laid down in chapter 4 of Contract labour ( Regulation and abolition) Act 1970.48.0 LABOUR HUTMENT :- The contractor shall make arrangement, at his own cost, for housing his staff and stores for the work and Model Rules relating to labour Water supply and sanitation shall be followed.49.0 DEFECT LIABILITY PERIOD :- The defect liability period in respect of the entire work as a whole or in parts of individual components included in this contract shall be 6 months form the date of completion of work and certified by the Executive Engineer as per clause 10 of form F.50.0 TECHNICAL SUPERVISION :- The Contractor shall employ a Graduate Engineer during the execution of the work :-50.1 The technical staff should be available at site whenever required by theExecutive Engineer to give instructions.50.2 In case the contractor fails to employ a Graduate Engineer as aforesaid Deptt. shall have the right to take suitable remedial measures.50.3 The contractor should give the names and other details of the GraduateEngineer/Diploma holder Sub-Engineers when he intends to employ or who is under employment, before he commences the work.50.4 The contractor should give a certificate to the effect that the GraduateEngineer is exclusively in his employment.50.4.1 It is not necessary for the contractor (or partner in case of firm/company) who is himself an engineer to employ engineer for the supervision of the work so long as the Contractor/partner works similar to what would have been done by and Employed Engineer.50.4.2 The retired Engineer who is holding Diploma in Civil Engineer or a Diploma holder having 5 years or more experience will be treated as Graduate Engineer, for the operation of above clause.

Page 18: Anicut Tender Sample Excel

50.4.3 In case the contractor fails to employ the technical staff as aforesaid, he shall be liable to pay to the Government a sum of Rs. 10000.00 (Ten thousand) only for each month of defaults in case of Graduate Engineer and Rs. 5000.00 (Rs. Five thousands only) for each month of defaults in the cause of diploma holder Engineer.51.0 AGREEMENT :-51.1 The Notes and specifications given in the detailed notice inviting tenders and its annexure are to be read in conjunction with conditions given in the short notice inviting tenders and the conditions of Contract. These have been intended to supplement the provisions, in the NIT and the conditions of the Contract. All these will be binding on the contractor and shall form part of the agreement. However, in case of any contradiction between the common set of conditions and the NIT, the common set of conditions will supersede.51.2 EXECUTION OF AGREEMENT :- The Tenderer whose tender has been accepted shall have to execute the agreement with in a fortnight of the communication of the acceptance of his tender by the competent authority. Failure to do so will result in the Earnest Money being forfeited to Govt. and tender beingcancelled.52.0 ANNEXURE :- Other than form ‘F’ and condition of contract following documentsare appended as annexures with this N.I.T. and these shall be part of contract agreement.ANNEXURE ‘A’ :- Model Rules relating to labour, water supply and sanitation in labour camp etc.

ANNEXURE ‘B’ :- Contractor’s Labour Regulations

ANNEXURE ‘C’ :- Source of Materials (Not applicable for building works)

ANNEXURE ‘D’ :- Form of Income Tax clearance certificate

ANNEXURE ‘E’ :- Specifications of the work

ANNEXURE ‘F’ :- Schedule of Payment

ANNEXURE ‘G’ :- Form of Bank guaranteeANNEXURE ‘H' :- Drawing Attached separately

1 Layout Plan of Work.2 Cotour Plan of Site

3 Tentative L- & Cross Section of of Proposed Anicut Structure.ANNEXURE ‘I’ :- Schedule of Quantity

ANNEXURE ‘J’ :- Detailed Estimate

Annexure “K” :- Guidelines For Online E procurement system.

Annexure-"A"Model rules relating to labour, to water supply and sanitation in labour campas

NOTE : These model rules are intended primarily for labour camps which are not of apermanent nature. They lay down the minimum desirable standard which should be adhered to standards in permanent on semi permanent labour camps should not obviously be lower than for temporary camps.1. LOCATION : The camp should be located in elevated and well drained ground in. thelocality.2. Labour huts to be constructed for one family of 5 persons each. The layout to be shown inthe prescribed sketch.3. HUTTING: The huts to be built of local materials. Each hut should provide at least 20sqm. of living space.4. SANITARY FACILITIES : Latrines and urinals shall be provided atleast 15 mtrs. awayfrom the nearest quarters separately for men and women and specially so marked in the following scale.5. LATRINES : Pit provided at the rate of 10 user or families per seat. Separate are requiredas the privacy can also, be used for this purpose.6. DRINKING WATER : Adequate arrangements shall be made for the supply of drinkingwater. : practicable filtered and chlorinated supplies shall be arranged when supple is from intermittent source over head storage tank shall be provided with a capacity of five liters a per son per day. Where the supply is to be made from a well it shall confirm to the sanitary standard laid down in the report of the rural sanitation committee. The well should be at least 30 meters away from any latrine or other source of pollution. If possible the and pump should be installed for drawing the water from well. The well should be effectively disinfected one every month and the quality of the water should be got tested at the Public Health Institution between each work of disinfecting.7. BATHING AND WASHING : Separate bathing and washing place shall be provided formen and women for every 25 persons in the camp. There shall be one gap and space of2 sq. for washing and bathing. Proper drainage for wastewater should be provided.8. WASTE DISPOSAL : Dustbin shall be provided at suitable places in camp and theresidence shall be directed to throw all rubbish into those dustbins. The dustbin shall beprovided with cover. The contents shall be removed every day and disposed off bytrenching.9. MEDICAL FACILITIES :9.1 Every camp where 1000 or more persons reside shall be provided with wholetime doctor and dispensary. If there are women in the camp a whole timeNurse shall be employed.9.2 Every camp where less than 1000 but more than 250 persons resides shall be

Page 19: Anicut Tender Sample Excel

1

2

3

provided with a dispensary and a part time, Nurse/ Midwife.9.3 If there are less than 250 persons in any camp a first aid kit shall bemaintained in charge of whole time persons trained in first aid.All the medical facilities mentioned above shall be for the all residentsin the camp, including a dependent of workers, if any, free of costs.Sanitary Staff :- For each labour camp there should be qualified sanitary inspectorand sweepers should be provided in the following scales:-1.0 For camps with strength over 200 but not exceeding 500 persons- Onesweeper for every 75 persons above the first 200 for which 3 sweepers will be provided.2.0 For camps with strength over 500 persons- One sweeper for every 100 personsabove the first 500 for which 6 sweepers should be will be provided.

Annexure “B”Contractor's labour regulationons

The contractor shall pay not less than fair wage to labours engaged by him in the work.EXPLANATIONA. "FAIR WAGES" means whether for time of piece work as notified on the date of inviting tenders and where such wages have not been so notified the wagesprescribed by the competent authority for division in which the work is done.B. The contractor shall, notwithstanding the provision of any contract to the contrary, causeto be paid a fair to labours indirectly engaged on the work including any labour engaged by his sub-contractor in connection with the said work as if labours had been immediatelyemployed by him.C. In respect of all labour directly or indirectly employed on the works or the performance ofhis contract, the contractor shall comply with or cause to be complied with the LabourAct in-force.D. The Executive Engineer/Sub-Divisional officer shall have the right to deduct from themoney due to the contractor any sum required or estimated to be required for making good, the loss suffered by a worker or workers by reason of iron-fulfillment of the conditions of the contract for the benefit of the workers non payment of the wages or of deductions made from his or their wages which are not justified by their terms of contractor non-observance of regulations.E. The contractor shall be primarily liable for all payments to be made under and for theobservance of the regulations aforesaid without prejudice to his right to claim indemnity from his sub-contractor.F. The Regulations aforesaid shall be deemed to be a part of this contract and anybreach thereof shall be deemed to be a breach of this conduct.G. The contractor shall obtain -a valid license under the Contract (Regulation Abolition)Act, in force and rule made there under by the competent authority from time to time before commencement of work and continue to have a valid license until thecompletion of the work.Any failure to fulfill this requirement shall attract the penal provisions of this contractarising out of the resulted non-execution of the work assigned to the contractor.

ANNEXURE “C”Statement showing the lead of materials

S.No. Description Lead

Nil

Nil

Nil

Page 20: Anicut Tender Sample Excel

4

5

Nil

Nil

Note :- This statement is only for guidance of the contractors. The tenderer should satisfyhimself regarding the availability of the required quality and quantity of materials.

ANNEXURE “D”From of certificated of income tax to be submitted by c o n tr ac tor (S ) ten de ri n g fo r w orks c os tin g

Rs. 2.00 Lakes or morei. Name & Style (of the company, firm, H.U.F., or Individual) in which the applicant assessed toIncome Tax and Address for purposes of assessment.ii. The Income Tax Circle/Ward/District in which the applicant is assessed to Income Tax.iii. Following particulars concerning the last Income Tax Assessment made :-(a) Reference No, (Or G. I. R. No.) of the assessment.(b) Assessment year and Accounting year. (c) Amount of Total Income Assessed.(d) Amount of Tax Assessed 1. T., S. T., E. P. T., B. P.T. (e) Amount of Tax Paid 1. T., S. T., E. P. T., B. P. T.(f) Balance being tax not yet paid and reasons for such arrears.(g) Whether any attachment or certificate proceedings pending in respect of the arrears.(h) Whether the company or firm or H. U. F. on which the assessment was made has been or is being liquidated, roundup dissolved, petitioned or being declared insolvent as the case may be.(i) The position about later assignment namely, whether returns submitted under section 22(l) or (2) of the IT Act and whether tax paid under section 18(a) of the Act and the amount of tax so paid or in arrears. ,iv. In case there has been no Income Tax Assessment at all in the past, whether returns submitted under section 21 (1) or (2) and 18-A (3) and if so, the amount of Income TaxReturn or Tax paid and the Income Tax Circle/Ward/ District concerned.v. The name and address of branch (es) verified the particulars set out above and soundcorrect subject to the following remarks.

Signature of I.T. C.Circle/Ward/District.

ANNEXURE “E”The following are the main component of Anicut Structure.1. Main wall 93 m long and 3.0 meter high.2. Wing wall for protection against out flanking.3. Key Walls Left Bank and Right Bank.4. Up Streame Apron5. Down Streame Apron6. Toe Walls U/s and D/s7. Shutters for opening with mechanical arrangement for lifting etc.8. Provisions for silt extruders.9. other item as per design, specification,drawing and Detail NIT etc. Other details are as below

DETAILED TECHNICAL SPECIFICATION FOR DESIGN ANDCONSTRUCTION OF ANICUT

1. Name of Work –

Design construction and testing of RCC Anicut of 93 mtr in length and 3 mtr height above average river bed level including supplying, fixing and errection of manually operated shutters as per MP LUN specification item Code SMM

Page 21: Anicut Tender Sample Excel

163101 down stream, up stream bed and bank protection work on Pench

River.1.1 Location of Work –The anicut is proposed to be constructed across Pench river near village Singodi, Block Amarwara. The proposed site is above 22 KMs away from district hear quarter Chhindwara.1.2 Scope of work –1.2.1 Design and construction of anicut on Pench river including Hydraulic and structural design. The anicut will be conventional gravity structure with opening between piers for shutters and de-silting arrangement.1.2.2 Design and construction of up stream and down stream bed and bankprotection for maximum flood discharge.1.2.3 Construction of diversion/ spill channel, nalla training, diversion road,cross drainage etc which ever is required for the work.1.2.4 Design and construction of Bank protection including abutments, guidewalls, bank keys etc.1.2.5 Supply, fixing and erection of shutters as per MP LUN specification as peritem code No. SMM 163101 including fixing in opening of Anicut and packing to make it leak proof after end of rainy season.1.3 General Description of site –The proposed site is located in 1000 m upstream of bridge at Pench river Singodi village. River bed is covered with granite. The banks are made up of alluvium. The flood data at proposed site are not available. The flood discharge is calculated from imperial formulae. The maximum flood discharge is 3727 cumec and the observed HFL is above 6 mtr with average bed level at 91.4 mtr General Hydraulic and Geological data are given below –1.4 Geological and hydraulic data –a) Anicut –River Bed Level - RL. 91.40Sill level of Anicut - RL 93.00Top of Anicut - RL 94.50Clear Span at Axis - 93.0 Mtr Observed Peak Flood - 2310 cumec Discharge.Designed flood discharge - Not less than 3727 cumecRiver Bed strata - Granite Bank Strata - alluvium River Bed Slop - 1 : 10001.5 Design Criteria –1.6 Hydraulic Design –The observed HFL RL 101.75 mtr shall be taken as the basis of hydraulic calculation. The peak flood discharge must be taken less than 3727 cumec. As mentioned earlier there are flash floods iln the rivder. The hydraulic calculation including afflux level, scour depth, uplift pressure should based on relevant IRC publication.1.7 Stability –The over turning and sliding factor of safety should be calculated for the whole structure, pier section and all supporting structure as per IRC 78-1983 (with upto date amendment)1.8 General –The Anicut is proposed to be constructed across river Pench to store water to be supplied for drinking purposes to village Singodi. The scope of work given above and the specification given are not absolute and have been given for guidance to the contractors. This is a turn key job and includes all the provisions of civil and mechanical works required to fulfill the above mentioned objectiveswithout causing any determental effect to the banks to river or otherstructures constructed on the river on upstream and down stream site.2.0 SETING OUT WORKS –2.1 Bench Mark -Before starting any work, the contractor shall erect a permanent bench mark, reference line and check profiles, at convenient position approved by the Engineer in charge. The bench mark shall be 20x20x60 cm with 40 cm embaded underground and 20 cm above the ground. The top surface of the bench mark shall be truly horizontal and plain. The words B.M. with R.L. shall be consipiously carved and painted on the bench marks the reference line shall comprises of a base line properly dag belled on the ground with number of masonry pillars suitably spaced. The check profiles shall be of such materials and shall be located at such places as to ensure execution of all slopes, steps and elevation, to the profile or profiles indicated in the approved drawings or as directed by the Engineer – in – Charge.The mathematical surveying instruments all materials and labour for setting out works including construction of bench marks, reference lines, check profiles and surveys required at the various stages of the construction work, shall be made available by the contractor at his own cost.2.2 SELECTION OF DIVERSION WORK, CONSTRUCITON ANDMAINTENANCE.2.2.1 The general plan and arrangements of the diversion shall be prepared before hand and shown in the plan. The contractor shall submit within one month from the date of issue of work order or of such period as may be specified by the Engineer-in-Charge to submit his plans for the temporary diversion, care and maintenance during the construction.2.2.2 Submission of the plans for the temporary diversion works to theEngineer-in-charge shall not relieve the contractor for the responsibility of the adequacy and efficiency thereof and pumping plant and other all equipements, labour and materials necessary for dewatering the foundations and keeping the work areas free of water at all times necessary are within the scope of the contract. The changes, modifications or alteration required to suit the conditions during construction shall be borne by the contractor without extra charge. Any damage caused by failure or partial failure of his temporary diversion work during construction periodshall be repaired by the contractor at his own expenses without

Page 22: Anicut Tender Sample Excel

claiming any charge on the department.2.2.3 It will be the responsibility of the contractor to maintain all diversionworks in good order. He shall also be responsible for providing and maintaining, necessary banners, fencing lighting, warning signs, signals and boards, watching and patrolling and all other safe guards necessary to ensure safety of human and animals lives and vehicular pedestrian and animal traffic.2.3 DEWATERING –Dewatering shall be carried out as per approved method to enable excavation, making inspection, final preparation of surfaces, providing anchor bars, grouting, laying of founds on concrete, laying of reinforced concrete, laying of reinforcement and all other construction activities. Diesel/ electric pumps or requisite capacity shall be installed in order to handle the dewatering.2.4 BLASTING OPERATIONS :2.4.1 Blasting operations, wherever so certified by the Engineer-in-Charge, may be resorted on works for rock excavation for quarry operations. In conducting Blasting operation shall be taken by the contractor for the protection of persons, the work and property. The planning of works should be such that no blasting is required close to structures already erected or foundations already filled. All government laws and regulations relation to license the design and location of magazine, the transportation and handling of explosives and other measures required for the prevention of accidents shall be observed. Warming signs shall be displayed on all power magazines.2.4.2 Liability of the Contractor –In case of accidents in blasting operations the contractor shall be responsible for all damages and claims arising out of the workmen’s compensation Act.2.5 DISPOSAL OF EXCAVATED MATERIALS –Before an excavation is started, the deposition of spoil should be carefully planned. The excavated material shall be dumped sufficiently away from the edges of excavation, permitting, ample space for labour paths, movement of vehicles, other machine installations for lifting and dewatering and stacking construction material etc the excavated material will be transported to various works, or to stock waste piles, informing stock piles the usefulmaterials shall be stocked in separate areas with reference to thenature of the material. Materials from rock excavation which are fit for use will require special attention and should be preserved in defined areas. Similarly materials for use as chips or broken stones should be placed in the adjacent pile. Steps should be taken to keep the materials clean as subsequent cleaning will be difficult and imperfect. All other excavated materials shall be dumped in permanent banks or other approved location. Excavated materials shall not be carelessly thrown over the premises and should be deposited directly in permanent position so far as consistent with proper execution of the work.2.6 INVESTIGATION –The contractor will have to conduct all necessary investigations, planning and layout for the Anicut. The department has done Nine Nos. trial boresa at different points on the proposed anicut site to have an idea of the strata. These details are enclosed but are only for guidance to the contractor. The Geological reports submitted by the G.S.I. is also enclosed for the guidance to the contractor.The contractor will be deemed to have full knowledge of the actualsite conditions weather they carryout the investigations and test or not.B.3 DESIGN CRITERIA AND CONSTRUCTION CRITERIA OFANICUT -3.1 The criteria for structural design of Anicut shall be as per IS –11130-1984. Where followings will over ride on its provisions &followed –1. The proposed Anicut structure is an over flow section. Hencewill be designed for buoyancy for up stream water level according to the relevant I.S. code, even for foundation resting on Rock, where the structure and base may be subject to tension within the limitations of clause 708.2.2 of IRC 78-1983, for foundation resting on Rock.2. Factor of safety from considerations of stability of Anicutstructures and supporting structure of karri shutters shall be as per clause 706.2.2. of IRC 78-1983.3. The stability of structure will also be checked for seismic forcesas per latest I.S. code.

3.2 IS 11150-1984 code of practice for construction of concretebarrages shall be followed for construction of Anicut.

3.3 The anicut should be designed ad “Gravity Dam” as per theprocedure laid down on IS 5512-1972 (amended upto date). Design should be based on most adverse combination of “Probable” load conditions. All the load combination A.B.C.D.E.F. and G as given in IS 6512-1972 must be considered and the structure must be safe for all above load combinations.The stability should checked for whole structure and for piers at silllevel. The following loads must be taken in account for designing the structure –i) Water Pressure (during highest floods).ii) Uplifts.iii) Wave pressure.iv) Temperature stresses. v) Silt pressure.vi) Seismic force for seismic zone. vii) Wind pressure.viii) Any other load/ pressure acting on the structure.3.4 Safety Criteria –3.4.1 Over Turning –The resultant of all forces acting on dam should through the middle third of base of extreme load combination. The factor of Safety against over turning must be between 1.5 to 2.5.

Page 23: Anicut Tender Sample Excel

3.4.2 Sliding –The shear friction factor should be as per IS 6512-1972 (amended upto date).3.4.3 Stress –The stress in the structure should be within the specified limits.B.4 FOUNDATIONS –The foundation of Anicut should be designed and constructed keeping in view the strata met in foundation, maximum scour depth, dead load or super structure water load at M.W.L. forces, velocity forces, wind forces, live load on Anicut, Water thrust, seismic force, buoyancy etc. complete. The bottom shear key should be capable of withstanding uplift pressure when the river is in flood or at M.W.L. Any other forces required to be taken for safe design which are not mentioned here should also be taken into consideration for the design.4.1 The drawings for location of purposed site and the section of trialbores taken at the site are enclosed for guidance only. The work offoundation also include the work involved if any, for dewatering,shoring of sides of foundation, diversion of river flow, shoring of side of excavation, scaffolding, distilling of foundation, construction of coffer dam etc for which no extra payment shall be made by the department to the contractor. The contractors are therefore, advised to see the site of construction before submission of tender would mean that the contractor have full knowledge of at the relevant documents, proposed site construction, soil samples, strata at site, behaviour of river etc.4.2 Blasting in foundation shall be permitted only if the contractorguarantees that such operations shall not effect or damages to the existing rocks below and around the proposed anicut.4.3 The foundation of the Anicut shall be taken down to such depth thatit is safe against scouring and is adequately protected from it. This depth should also be sufficient from consideration of bearing capacity, settlement, suitability of strata at foundation level and below it and stability of structure as a whole against overturning, sliding and out flanking.The scouring will be calculated for maximum design discharge. Themaximum depth of scour near the Anicut shall be taken as 1.27 times the means depth of scour (as per IRC pocket book 4.4.3.1) for the design discharge. The mean depth of scour shall b calculated as given in the standard specification the code of practice for road bridges, IRC 78-1983.4.4 The depth of foundation / cut off wall below the scour line shall notbe les than 1.2 meters. The epth of embedment shall exclude that portion of rock which is weathered for fissured. The foundation shall be designed for worst combination of loads and forces.4.5 The Following precautions shall be taken for bonding offoundation of Anicut with bed rock –1. Loose sand and boulders shall be removed from the entirefoundation area of the Anicut.2. Fissures and cracks shall be opened to sufficient depth andfiling with M-10 cement concrete.4.6 For laying foundation concrete under water, it shall be done by skipboxes centremie pipe, Pumping out of water shall not be done be permitted from the time of placing of concrete upto 72 Hrs thereafter.The annular space around the foundation shall be filled with M-10cement concrete up to top of rock. The material for foundation shall be M-10 plum concrete encased all around by M-25 grade R.C.C. structure of minimum thickness of 20 cm only.4.7 The dowel are as required in design for safety against sliding shallbe provided in the foundation of the Anicut..4.8 Treatment of Foundation -In case, any treatment of foundation is required during actual execution, it will have to be carried out by the contractor without any extra payment for the same. The department proposed the curtain grouting at the up stream axis of anicut upto 4.0 m depth below average bed level, in a single row of 6.0 m spacing holes however if as per site condition extra treatment is needed then that shall be done by the contractor without any extra cost. The pressure of grouting should not be less than 1.60 Kg/sqm.4.9 Proper desilting arrangement through the stop dam should beprovided.B-5 SUPER STRUCTRUE –5.1 The super structure of anicut will be conventional unit comprisingRCC piers and opening for manually operated shutters as per MPLUN’s specifications item code SMM 163101. The width of opening may be between 1.20 m to 1.50 mt. The pear must be safe at sill level for over turning, shear etc. Considering worst conditions of loading and shutters closed and open both condition. The minimum top width of pier should be provided on each not be less than 1.0 m for fixing of shutters two nos grooves should be provided on each piers. A minimum temperature reinforcement shall be provided in encasing concrete work for piers.B-6 BANK AND BED PROTECTION –The left and right bank of river Pench on Upstream side as well as D/S side will be protected upto a minimum distance of 10 m from anicut by way of construction of toe wall cement concrete. A cantilever type RCC retaining toe waqll with proper anchorage in rock shall be provided to retain the bank protection work. The bank protection is also included in lump sum offer. The bank protection work shall be designed as per relevant IRC and IS codes. The suitable arrangement for protection of U/S and D/S bed of river is also included in lump sum offer.B-7 SHUTTERS FOR OPENINGS –Manually operated type shutters shall be provided as per MP LUN’s item code No. SMM 163101B-8 BANK KEY–Proper band key should be provided on both bank.B-9 DETAIL DESIGN AND WORKILNG DRAWING–

Page 24: Anicut Tender Sample Excel

Detailed drawing and design of geological, hydraulic and structural requirement for anicut structure, bank protections, key wall, wing walls, up stream and down stream protection and energy dissipation works etc shall be submitted along with the main structural design duly checked by the relevant department of the Govt. Engineering Collage. Detailed working drawings will be submitted in 6 copies. It will become the property of the Govt. Work will be executed as per approved drawing. In case of extra rebate contractor will have to submit design as per scope of work fixed in the contract and design for extra work or reduced work to assess the increase or decrease quantity of the work. No payment will be made for such additional design work. In case, during the course of execution, if contractor intend to modify or suggest any improvement and submit design in its support without asking any extra payment, it will also be subject to approval of the department.B-10 TESTING OF ANICUT STRUCTURE AND GATES –For all purpose the structure and gates will deem to be tested if they don’t show any sign of defect after passing of two rainy season and behave according to what it intend in to the contract. For this purpose, rainy season means four peak months of rains, i.e. 15June to 15 October.C – DETAIL SPECIFICATION FOR CONSTRUCTION OF ANICUT –C .1 – ACCURACY OF LINES, LEVELS & GRADES :The various works shall be done true to line, level and grade. The periodical of his responsibility regarding the accuracy. In case of any deviation or discrepancy in line, level or grade at the meeting faces, the contractor shall make good the discrepancy at his own cost and without any extra compensation for the additional work involved.C .2 – TESTING OF MATERIALS AND LABORATORY :C.2.1 All materials before being incorporated in the work shall beinspected and if necessary tested & approved by the Engineer-in- Charge. The Engineer-in-Charge has full power to get the material tested from the laboratory of any Govt. Engineering Collage or from the state laboratory on the cost of the contractor.C.2.2 The contractor will have to maintain a complete laboratory at site ofwork for all basic test of concrete like Cube test, Slump test & SieveAnalysis etc all.He will also maintain record of Cement brought at site, to no type,Grade and date of manufacturing procurement, on black board.All testing charges will be borne by the contractor. The sampling(making specimen) testing etc will be done as per standard laid down by Beuro of India standards.All tests will be carried out in presence of Engineer-in-Charge or hisauthorized representative.C .3 – CEMENT3.1 Cement required for the work will be arranged by the contractor athis own cost. Cement used in the work shall be as under –1. All PCC plum cement concreteUpto M200 grade - Grade 53 as per IS269:19892. All reinforcement C. C. - Grade 53 as per IS11112:19893.2 Handling and storage facilities shall be so arranged that no cementshall be kept in storage for more than 90 days, contend after the date of dispatch from the factory. If any cement be kept as long as90 days, it shall be tested at the local laboratory and if found defective in any way, it shall be condemned for use.3.3 As for as practicable, no consignment of cement shall be received and transported during the monsoon period. Cement stored during monsoon and to be used after the monsoon shall not be used unless it has been tested in the laboratory and approved by the Engineer in Charge.3.4 Cement should be received in bags only and to be stored properlyas per instruction Engineer-in-Chief.3.5 Following further precautions shall be taken in storage of cement –a. Having made sure of a good weather proof building certainprecautions must then be observed in strong the bags with a view to prevent cement from any possible contact with moisture and to ensure systematic working of the ware house.b. If the ware house is to be newly put into service, make sure thatsufficient time has been allowed for the interior to dry thoroughly.c. Do not pile bags against the wall. A space of 30 cm all roundshall be left between the exterior walls and the piles.d. Similarly bags should be piled off on the floor on wooden planksor logs of the bellies and bamboos. If, however, the floor is a well constructed dry concrete floor, the bags can be placed directly on it.e. Bags should be placed closely together in the pile to reducecirculation of air.

Page 25: Anicut Tender Sample Excel

f. Do not pile bags more than about 1.50 m high otherwise, itbecomes cumbersome to stack or remove them. The maximum width of pile should also be not more than about 3 m.g. If the pile is more that 7 or 8 bags high, arrange the bags inheader and stretcher fashion, that is alternatively length wise and cross wise so as to pile together and minimize the anger of toppling over.h. Owing to pressure on the lower layer of bags what is known as“Waste house pack” some times over laps in the bags. This can be removed by rolling the bag when the cement is taken out for use.i. When removing bags for use supply “First in first out” rule, thatis taken the oldest cement out first. For this purpose each consignment as it comes it should be stack separately and the date of arrival should be pinned on the pile.3.6 Temporary Storage at Site –When it is required to store cement bags at work site in the open for use on the work for one or two days they should be laid on a dry platform made of wooden planks resting on a brick masonry or concrete, platform about 15 cm (6”) above the ground. The number of bags shall be kept to a minimum preferably just sufficient for the day’s consumption. The pile shall be well covered by tarpaulin overlapping each other properly and protected against the moisture in the air and wind. This matter of temporary storage shall not be adopted in wet weather.3.7 Air Entraining Admixtures :a. The air entraining admixtures of approved quality may be usedto improve the quality of workability of the mix if approved by the Engineer-in-Charge. The amount of air entraining agent used shall be of such effect to the entrainment of 3 to 5 percent of air by volume of the concrete or 8 percent to 12 percent of air by volume of cement mortar. The agent shall be added to the batch in solution in a portion of the mixing water by means of a mechanical batcher capable of accurate measure.b. Test – Test of admixture shall be made in work laboratory inaccordance with Indian Standard Specification or as otherwise prescribed.C .4 – WATER -Water used for mixing and curing shall be clean and free frominjurious amounts of oil, acids, alkalis, salts, sugar, organic, materials or other substances that may be deleterious for concrete& steel. Potable water is generally considered satisfactory for mixing concrete. Water found satisfactory for mixing is also suitable for curing concrete. However water used for curing should not produce any objectionable, stain or deposit on the concrete surface. The presence of tannic acid or iron compound is objectionable.C .5 – SAND -5.1 The term sand is used to designate aggregate in which themaximum size of particles in 4.75 mm.5.2 The sand shall consists of hard, dense, durable, uncoated rockfragments and shall be free from injurious amount of dust, lumps of soft or flaky particles, shale, alkali, organic, matter, lom mica and other deterious substances.The sum of percentages of all deterious substances shall notexceed 5 percent by weight. The sand shall be free from injurious amount of organic impurities and shall confirm to Indian Standard Specifications I.S.S. 383:1970 (second revison).5.3 GRADING –The sand shall be well graded and screen analysis shall confirm toIS 383:1970.5.4 STORAGE –Arrangement shall be made to store natural sand in a way that would protect if from getting contaminated with dust, organic matter or other deleterious substances. In case the natural sand is not considered to be as per specification by the Engineer in Charge, it shall have to be washed and / or treated as directed by the Engineer-in-Charge, before being used or rejected.5.5 All classifying, batching or other operations and tests of the fineaggregate shall be done by the contractor.C .6 – COARSE AGGERGATE -6.1 The term coarse aggregate is used to designate aggregate rangingin size within such limits coarse aggregate for concrete sall consist of crushed rock well graded and blended uniformly.6.2 QUALITY –The coarse aggregate shall consist of hard, dense, durable, uncoated rock fragments, and shall be free from injurious amounts of soft, friable, thin elongated or laminated places, alkali, organic matter or other deterious substance.The sum of the percentage of all deleterious substances in any sizeshall not exceed 3 percent by weight. The coarse aggregate shall also confirm to requirements for abrasion and soundness specified under I.S.S. 383:1970 (second revision). The methods or tests for coarse aggregate as specified in I.S.S. 2386:1963 shall apply.6.3 GRADING –The Grading of course aggregate should confirm to IS 1983:1970. In case of variation of grading of divisible size aggregate. The combined grading or aggregate should confirm to any of standard for concrete mix design.6.4 STORING AND HANDLING OF COARSE AGGREGATE -The coarse aggregate shall be stacked separately accordingly to their grading. The stacks shall be laid out as approved by the Engineer-in-Charge. The stacks shall be so located as to avoid any undesirable material getting mixed up with the aggregate. The aggregate shall be so deposited in and removed from the stacks, as not to cause any excessive of change in the uniformity or grading.

Page 26: Anicut Tender Sample Excel

6.5 All the sampling and tests shall be preformed by the contractor athis own cost.6.6 The contractor shall keep at all times a sufficient storage of coarseaggregate of all grades, so as to ensure smooth and continuous progress of works according to the time schedule.C.7 STEEL -The steel required for the work will be procured by the contractor at his own cost. The department shall not supply any quantity of steel under any circumstances steel for reinforcement shall confirm to I.S. Specification 1786-1985 (with upto date revision) only. Tor steel (tor 40) shall be used in the structure. However, Tor 50, may also be used in the structure which will be procured from any licensee of “Tor Steel Research Foundation of India” only. In case of Tor 50, every bar should show “tor mark, rolled on the every meter length.However in case of Tor 50 grade steel maximum stress in designwill be allowed as per IS 1786 only. The contractor shall be required to produce the test certificate of the manufacturers to the Department before use of steel for the work.C.8 – FORM WORK :8.1 Only steel shuttering plates will be allowed as form work. The formsshall have sufficient strength and rigidity to hold concrete and to withstand the pressure of vibration without deflection from the prescribed liens. The surface of all forms in contact with concrete shall be used to hold corners. Adjacent ends and edge of panels or other forms together in accurate alignment. Forms used should be easy to remove in section, without damaging the surface of the concrete. Tie bolts etc shall preferably be used for internal ties only. It should remain 1”(25mm) behind the surface of concrete. The design of centering, form work & its supporting arrangement shall be got approved before erection by the engineer in charge.8.2 At any stage, any grooves, set back etc, if orders to be provided bythe Engineer-in-Charge shall be provided as per instructions with no extra cost. M.S. Bars or nay steel pieces required to be kept projecting out of the concrete surface of any structure member, like pipe, nuts, bolts, red etc. the same shall be placed in position as per instruction of Engineer-in-Charge.8.3 USE OF FORMS ETC.All forms work shall be maintained in serviceable conditions and shall be thoroughly cleaned and smoothened before being reused. It shall be checked for shape and strength before reuse.8.4 ERECTION OF FORMS :Before placing concrete the surface of all forms shall be quoted with diesel and grease mix in ration 5:1 to prevent stacking of concrete & to facilitate the removal forms. Care shall be taken to prevent oil from surface of the construction joints and on reinforcement bars. Proper support to the form work shall be provided to withstand from against all possible forces on it.8.5 REMOVAL OF FORM WORK :Form work shall not be removed until the concrete has gained required strength. Form work shall be removed as per I.S. 456-1978 or as specified in the approved drawings.C.9 - CEMENT CONCRETE -The foundation sill and superstructure shall be comprised of plum, concrete and reinforced cement concrete. The plum concrete shall be in M-15 grade with maximum of 100 mm plum not more than50%. The maximum size of aggregate M-15 concrete shall be 40 mm. The plum concrete structure shall be encased all around by M-25 grade RCC structure of minimum thickness of 20 cms with required reinforcement for temperature and other stress.9.1 COMPOSIOTION –Concrete shall be composed of cement, sand coarse aggregate, water and any other admixture as required all well mixed and brought to proper consistency. Test of concrete shall be made at frequent intervals during the progress of work and the mixes will be changed where ever necessary to secure the required workability, density, impermeability and strength together with the maximum practical economy. The maximum size of coarse aggregate in concrete for any part of work shall be the largest of the specified sizes use of which is practicable from the point of satisfactory placing of concrete. The concrete shall in general contain 40 mm maximum size to heavily reinforced concrete having 20 mm as maximum size aggregate. The water cement ration shall be regulated by the requirements of the strength of durability Results of laboratory tests of durability and strength shall determine the most suitable water cement ratio for any mix. The proper ration of water to cement for any concrete shall be such as to produce a mixture which can work readily in the corner and angles of forms and around reinforcement bars with the methods of placing employed for the work, but without permitting the materials to segregate excess water collected on surface. Uniformly in the consistency from bath to batch shall be required. Specification for all concrete placed in the Anicut shall be in all respect conforming to the requirement laid down in IS-456-1978.9.2 CONCRETE CLASSIFICATION AND LOCATION OFPLACEMENT-Concrete classification are related to the specified 28 days compressive strength confirms to the strength requirement and acceptance criteria of IS 456-1978. (with upto date amendment)The maximum size of aggregate may be reduced to next lower size for congested steel portion.9.3 MIX DESIGN –The mix design shall be involved on the basis of laboratory tests for the prescribed strength of concrete as per the actual materials to be used at the site. Weight batching shall be used for cement concrete. The contractor shall be bound to give specified strength, workability, density and impermeability etc with the size of aggregate indicated in the specifications.9.4 SAMPLING –a) Frequency of Sampling –i) Random sampling procedure shall be adopted to ensure that each concrete batch shall have a reasonable chance of being tested, that is sampling should be spread over the entire period of concreting and clear all mixing units.ii) Frequency –The minimum frequency of sampling of concrete of each grade shall be accordance with the IS 456-1978.9.5 TEST SPECIMEN –Minimum size specimens of each lot shall be tested at 28 days. Additional cubes may be required for various purposes such as to determine the strength of concrete at 7 days or at the time of striking the form work, or to determine the duration of curing, or to check the testing error.9.6 TEST STRENGTH OF SAMPLES -The test strength of the sample shall be in accordance with the provisions & acceptance criteria of IS 456-1978 with up to date amendments.9.7 BATCHING & MIXING –a) The concrete shall be composed of water, cement fine aggregate and coarse aggregate, each materials being previously approved by the Department.b) All sand and aggregate, used on the works shall be carefully and accurately measured by weight of volume in

Page 27: Anicut Tender Sample Excel

suitable guage boxes and in quantities to the entiresatisfaction of the Engineer in Charge. The quantity of sand when partially wet shall be increased by the right quantity after determining the percentage of bulkage. Water should be added to the dry mix in a manner in which it can be properly controlled and measured.c) The ingredients of concrete shall be properly mixed in mechanical mixers designed so as to positively ensure uniform distribution of all the ingredients throughout the mass at the end of the mixing period. The mixing of each bath shall continue for about one and half to two minutes or as found best in practice, after all materials except the full amount of water, are in the mixer.The minimum mixing period specified above is after theintroduction of the materials including water. The mixing times shall b increased when the charging operation fails to produce the required uniformity of composition and consistency shall be avoided.The excessive mixing, requiring the additional waterproduce the required concrete consistency shall be avoided.The first batch of concrete materials placed in mixer shallcontain sufficient excess quantity of cement, sand and water for buttering of mixer, i.e. to aboid loss of Mortor in first batch, alternatively buttering of mixer by cement, sand & water ( @ 10% of one batch weight) should be done & thrown as waste before producing actual concrete.1. The following general principles shall be followed noperation of mixings.a) The ingredients shall be charges into the mixer simultaneously.b) A portion of water (approx. 50%) shall proceed and approximately equal quantity shall follow on introduction of other ingredients.c) Care shall be taken that mixing of concrete in mixer shall b uniform for all batches.d) The mixer shall be loaded with in its normal capacity.e) The minimum mixing sped shall not be less than 4 RPM.f) Hand mixing shall not be permitted under any circumstances unless ordered in writing by the Engineer- in-Charge and in that case extra 10% cement shall be added for which no payment shall be made. It would be used for a small quantity of work ( max 2.0 cum)9.8 PLACING OF CONCRETE :9.8.1 The placing of concrete shall be performed only in the presence of an authorized representative of the Engineer-in-Charge. Concrete shall be placed only in locations where it has been authorized. No concrete shall be placed until form work, reinforcement, preparation of surface and necessary clean-up has been done and approved. All concrete shall be placed directly in its final position within 30 minutes after being mixes.Any stiff concrete will not be used in the work. Concrete shall not bedropped from height exceeding 7 Ft (2m) and the free fall should be kept as minimum as possible. All surface of forms and metal work including reinforcement shall be cleaned before placing concrete.9.8.2 Concrete shall be deposited in continuous horizontal layers inthickness from approximately 45 cm in RCC work and 60 cm for max concrete. Construction joints shall be provided in the manner and at locations approved by the Engineer-in-Charge or as per drawing.9.9 UNDER WATER CONCRETE -9.9.1 In case of under water concrete 10% extra cement will be added for the same mix as unused for Dry conditions. The concrete should have slump not less than 100 mm for easy flow on depositing by any approved method.9.10.1 All concrete shall be mechanically vibrated to produce dense,concrete. Hand tamping rodding shall not be allowed for compaction of concrete should have slump not less than 100 mm for easy flow on depositing by any approved method.9.10.2 During vibration care shall be taken to maintain the location ofreinforcement and embedded parts.9.10.3 Only high frequency internal type vibrators having SYC RPM 5000or more will be allowed for compaction.9.10.4 In case of under water concrete no foreign efforts will be made forany kind of compaction.9.11 CURING AND PRO TECTION –9.11.1 Exposed finished surface of concrete shall be protected from directrays on sun for atleast 72 hours after placement. Concrete shall be kept continuously moist for not less than 28 days.Construction joints shall be cured in the same ways as adopted forconcrete. Horizontal surface shall be cured by the use of wet Gunny bags or making local pond over it. Approved curing agent may b used provided it is tested on specimen of concrete for effective curing.9.12 FINISHING FORMS SURFACES –The work shall be inspected by the Engineer-in-Charge, who will decide treatment for local building on exposed surface, finishing of Honey comb etc . When concrete is used for filling the chipping opening, it will not be less that 75 mm in depth and concretes filling shall be vibrated under strict watch by doing regular shuttering with an opening hole for vibration.9.13 FINISHING EXPOSES SURFACE –Except as otherwise specified or directed all permanently exposedconcrete surface and water way surface requiring durability under water will be finished in following manner, immediately upon the removal of the forms.The surface shall be wetted. Surface pits and air bubble shall be

Page 28: Anicut Tender Sample Excel

filled with mortar of cement and fine sand in proportion of 1:2. In order to ensure uniformly dense and smooth face.In case if the filling operation is being delayed and the surface pitsand air buble shall be filled with mortar of cement and fine sand proportion of 1:2. In order to ensure uniformly dense and smooth face.In case if the filling operation is being delayed and the surface ofpits become coated with dirt of other foreign materials. It will be removed by means of air/ water jets, brushing or other satisfactory means without damaging the surrounding concrete.All finishing surface pits shall be handled as quickly as practicable.It is to minimize the period curing which the concrete and the mortar filling are exposed to drying. On completion of treatment of surface finish. It should match with the colour and texture of the principle concrete.9.14 FILLING GROOVES –Necessary block cuts or Grooves shown or as directed shall be kept without any extra cost. After erection or embedment of various parts of gates etc these block outs or recesses would be filled in the cement concrete. No payment will however be made for embedding fixtures or providing grooves, block cuts etc Tie bolts, column bars grooves will be filled with the mortar.9.15 ANCHOR IN CONCRETE –All embedded parts, various anchorage structural members and guides for the gates and other articles placed in position by the contractor shall be carefully protected during concreting so as to maintain their alignments. All the embedded parts and instrument placed in position by the contractor or department shall be concreted by the contractor without any extra claim as shown in the drawing.9.16 VIBRATED COVER BLOCK –Cover block used to maintain cover around reinforcement steel shall be vibrated only. It will be made by the same grade of mortar as used in main concrete of the same work. Sufficient cover as specified in IS 456-1978 shall be provided to protect reinforcement from corrosion as indicated in the drawing.9.17 USE OF PLUMS –Stone plums shall not be used unless specified on the drawing. When used, the size of stone plums may be from 150 to 300 mm. The maximum dimension of these stones or plums shall not exceed1/3rd at the least dimension of members.All plums shall be hard, durable, clean and free from soft materialsor loose places or deleterious substance in them and shall not have sharp corners.During concreting the first layer of concrete of the specified mixshall be laid to a thickness of at least two and a half times thickness of the maximum size of plums to be used. The plums shall then be laid while the top portion of this concrete is still green but sufficient stiff to prevent complete submergence of the plums under their own weight. These plums shall be about half embedded in their concrete and remaining pat exposed so as to form a key with the next layer of concrete. No plums shall be used for concrete laid under water.While placing the plums, care shall be taken to see that the cleardistance between any two plums is not less than either the width or thickness of either of plums. The distance from plums to the outer surface or from ay steel reinforcement shall be equal to greatest width of the plum.If plums of stratified stone are used, they shall be laid on theirnatural bed. Stones with concave faces shall be laid with the concave upwards. The thickness of the next successive layers of concrete shall be at least twice that of the largest plums.The total volume of plums shall not exceed 15 percent of thevolume of the finished concrete.9.18 JOINTS AND KEYS –The water stops shall be provided in transverse joints for stopping to flow of water into joints. The 20 gauge copper or mocker ( alloy of mocker and copor) shall be used. The asphalt seal should be provided in between two water stops.C-10 TOLERANCE IN THE CONSTRUCTION OF ANICUT –Allowed tolerance in various components of civil works forming theanicut structure shall be as per IS 456-1978.D - DETAILS SPECIFICATIONS FOR GATES :1.1 Workmanship Defective Work and Materials –All work shall be performed and completed with good workmanship equal to the best modern practice in the manufacture and fabrication of the materials covered in these specifications. The work shall be carefully performed to the satisfaction of the Engineer-in-Charge. The contractor shall arrant all the materials and workmanship furnished by him to be free from injurious defects. He shall replace free of cost any defective materials or workmanship discovered during fabrication of erection. Workmanship shall confirm to the latest standards specification laid down in ISS.1.2 INSPECTION AND TESTS –All the materials, parts, equipments furnished shall be tested of quality and all works performed shall be subjected to rigid inspection. No articles, parts materials sand supplies shall be dispatched until all tests and shop inspections have completed or certified copies of reports, or results of tests and analysis shall have been accepted, if such workshop is approved as a sub site of work, the tenderer is required to transport the materials supplied to be given by the Department from the place specified to the sub site of work and no extra payment on account of transportation, loading and unloading of such materials to and from sub site shall be made by the Government.

Executive EngineerPublic Health Engg.Division

ChhindwaraAnnexure "F"Break-up Schedule of Payment

         - -P<;rllculars                                                            Payment       Cumulativej 0 Approval of des1gn and draw1ng OS% 05%

Page 29: Anicut Tender Sample Excel

20

30

0

50

70

E>·caval!on of foundat1on of ma1n anicut OS% 10%

Grout1ng and Anchorage of dower bars 15% 25%

Foundat1on concrete upto sill level 15% 40%

Construction oip1ers upto top level 27% 67%

0 'J•o•.ldii19 and 1nstallahon of shutters OS% 72%

::::cavatlon of foundahon tor Gutde Return".t: lls keys and t:'"lchorage of dower bars 03% 75%

EO ":•)f"Siruchon c'U/s & 0/s toe wall OS% 80%

;.;rqw?I!IXl o: G.::ce relurw, all, key wall 07% 8'1%

·- u l>J111plet,t.n of oanprote..;tlon work 05% 9/.%

- -; :l C.:.mpleltcn ciany other hems of main/.nicul no!cov;:red sn iten, 1.0 to 11.0 03% 95%

i2 0 F1n1shing teshng & comm1ssioning of

·:·hole work OS% 100%

\

·;·-:; - :11s !:··c. :ur. s:!· u-= .s onl·; r the valuation of the work. After valuallon of

"'Cm. ;ymen! s:;a It :r:oad= as per clause -15,Page..... of lump sum contractANNEXURE G-

(Revised form of Bank Guarantee Bond) GUARANTEE BOND(To be used by the approved Schedule Banks)

1. In consideration of the Governor of Madhya Pradesh (hereinafter called theGovernment) having agreed to exempt ......................................... (hereinafter called the said contractor) from the demand under the terms & condition of the agreement dated made between...............and........................for the work (hereinafter called the said agreement) of security deposit for the due fulfillment by the said contractor(s) of the terms and conditions contained in the said agreement, on production of a Bank Guarantee for Rs.......................... (Rupees)........................................................) said contractor(s) do hereby undertake to pay to the Govt. an amount not exceeding Rs....................................... against any loss or damage caused to or suffered or would be caused to or suffered by the government, by reasons of any breach by the said Contractor(s) of the terms or conditions contained in the said agreement.2. We ................................... Bank Limited do hereby undertake to pay the amounts due and payable under this guarantee without any demur merely on a demand from the government stating the amount claimed is due by way of loss or damage caused to or would e caused to or suffered by the Government by reason of breach by the said Contractor(s) of any of terms or conditions contained in the said agreement or by reasons of the Contractor(s) failure to perform the said agreement. Any such demand made on the Bank shall be conclusive, as regards the amount due and payable by the Bank under this guarantee. However, our liability under this guarantee shall be restricted to an amount not exceeding Rs......................3. We (*).................................... bank limited further agree that the guarantee herein contained shall remain in full force and effect during the period that would be taken for the performance of the said agreement and that it shall continue to be enforceable till all the dues of the government under or by virtue of the said agreement have been fully paid and its claims satisfied or discharged or till the Executive Engineer, PHED Division....... certifies that the terms and conditions of the said agreement have been fully and properly carried out by the said contractor(s) and accordingly discharges this guarantee. Unless a demand or claim under thisguarantee is made on us in writing on or before the (here indicate a date which fails9 months beyond the due date of completion of the work) .............................. weshall be discharged from all liability under this guarantee.4. We (*)................................... Bank Limited further agree with the government that the government shall have the fullest liberty without our consent and without effecting in any manner our obligation hereunder to vary any of the terms and conditions of the said agreement or to extend time of performance by the said contractor(s) from time to time or to postpone for any or for time to time any of the powers exercisable by the government against the said contractor(s) and to for bear or enforce any of the terms and conditions relating to the said agreement and we shall not be relieved from our liability by reason of any such variation, or extension being granted to the said contractor(s) or for bearance, act or commission on the part of the Government or any indulgence by the Government to the said contractor(s) by any such matter or thing whatsoever which under the law relating to sureties would, but for this provision have effect of so relieving us.6. This guarantee will not be discharged due to the change in the constitution of theBank or the Contractor(s).7. We..........................................................Bank Limited lastly undertake not to revoke this guarantee during its currency except with the previous consent of theGovernment in writing.Dated the..........................day of ...................for.(*)....................(indicate the name of the Bank)Annexure “H”

1 Layout Plan of Work.2 Cotour Plan of Site3 Tentative L- & Cross Section of of Proposed Anicut Structure.Attached separately

Name ofWork :

SCHEDULE OF QUANTITY           Annexure I

Page 30: Anicut Tender Sample Excel

1 331.56

2 378.30

3 471.78

4 280.44

5 425.04

6 877.80

7 489.60

8 489.60

9 489.60

10 283.50

11 4731.45

12 479.88

13 9002.08

14 803.52

15 324.00

16 512.91

17 269.04

18 38.40

19 418.50

20 95.70

Construction of Anicut at Village Singodi Water Surface (Pench River) Water Supply Scheme.Village- Singodi Block - AmarwaraS.No. SOR Item/pg. Description Qtty.

401(a)p33

Excavation in soft or ordianry soil i/c 50m lead and 1.5mlift with dressing.

401(b)p33

Excavation in hard soil i/c 50m lead and 1.5m lift withdressing

402 p33 Excavation in hard moorum & moorum with boulders i/c50m lead and 1.5m lift with dressing

403 p33 Excavation in disintegrated rock i/c 50m lead and 1.5mlift with dressing

404 p33 Excavation in soft rock i/c 50m lead and 1.5m lift withdressing

405 p33 Excavation in hard rock i/c 50m lead and 1.5m lift withdressing : [a] Blasting permitted

719(b)p52

Cement Concrete 1:3:6 with graded metal of maximumsize 40mm. [ in foundation bed]

733(x)p55

Extra rate for black trap basalt or granite metal for onecu.m.

731 p54 Extra for mechanical vibration of Cement Concrete orplum Concrete.

2206 p201 Drilling 35mm dia holes in rock by jack hammer upto 6m.

1304 p130 Supplying & fixing steel reinforcement bars (tested) forRCC i/c cleaning, straightening, cutting, bending all handling, placing in position and binding with 0.9 mm annealed binding wire confirming to IS:280-1978 (i/c cost of binding wire) : (b) Cold work

- Providing and fixing M15 RCC including cost of form workbut exluding cost of reinforcement etc all complete.

1304 p130 Supplying & fixing steel reinforcement bars (tested) forRCC i/c cleaning, straightening, cutting, bending all handling, placing in position and binding with 0.9 mm annealed binding wire confirming to IS:280-1978 (i/c costof binding wire) : (b) Cold work

818(k)(-) 827 p69

Plum Cement Concrete1;3;6 with 75% graded metal of 40mm.and 25% Plums of 150 mm In foundation and plinth.818(k)

p68Cement Concrete1;2;4 with graded metal of maximum size20 mm. In Super Structure.- Plum Cement Concrete1;3;6 with 75% graded metal of 40mm.and 25% Plums of 150 mm In Super Structure- Cement Concrete1;2;4 with graded metal of maximum size20 mm. In Super Structure.1203 p97 M.S. Fixed Wheel Gate upto 2 SQM size for 5 MTR. WaterHead with Manually operated rope drum hoisting mechanism, complete item.2117 p188 Puddle filling of good clay including lead upto 50mincluding mixing, watering and kneading by tamping, ramming and laying etc. [at Karri shutters]

1013 p80 22cm thick dry picked up boulder pitching includingpicking of boulders with individual boulder of 22cm depth & atleast the dimension of boulders in any direction should not be less than 10cm.

NAME OF WORK : DETAIL ESTIMATE FOR CONSTRUCTION OF ANICUT AT VILLAGE SINGODI Annexure “J”[Based on USR issued by The E-in-C, W.R.D., M.P., Bhopal, w.e.f. 1.7.2007]

Page 31: Anicut Tender Sample Excel

1 2 3 4 5 6 71 2 500 30

2 100 302 50 252 50 20

2

1 93.00 4.00 0.20

2 6.00 2.15 0.20

4 6.00 2.90 0.20

1 93.00 10.00 0.20

2 93.00 1.40 0.20

3

1 93.00 4.00 0.30

4 6.00 2.90 0.301 93.00 10.00 0.20

2 93.00 1.40 0.20

4

1 93.00 4.00 0.50

2 6.00 2.15 0.50

4 6.00 2.90 0.501 93.00 10.00 0.20

2 93.00 1.40 0.20

5

1 93.00 4.00 0.602 6.00 2.15 0.60

4 6.00 2.90 0.60

Estimated Cost[Rs.] - Lakhs

Village- Singodi

S.N

o. USR Item no.

Description QuantityNos. L B H

301/23 Site clearance of grass &crops I/c rooting outOrdinary shrub jungle clearance involving removal of grass shrubs & twings I/c rooting out

302/23 a.Area below 25% covered by shrubs303/23 b. 25% to 50% area covered by shrubs304/23 c. Area above 50% covered by shrubs

401(a)p36

Excavation in soft or ordianry soil i/c 50m leadand 1.5m lift with dressing.[A] Weir wall (Crest length- L)

[B] Keys (K1+K2)(approx. 3.0m on each bank)

[C] Wing walls (approx. 0.25xL on U/S, D/S ofeach bank)D/s&U/s apron (2+8=10mtr)

Toe wall d/s &u/s

401(b)p36

Excavation in hard soil i/c 50m lead and 1.5mlift with dressing[A] Weir wall

[C] Wing wallsD/s&U/s apron (2+8=10mtr)

Toe wall d/s &u/s

402 p36 Excavation in hard moorum & moorum withboulders i/c 50m lead and 1.5m lift with dressing[A] Weir wall

[B] Keys (K1+K2)

[C] Wing wallsD/s&U/s apron (2+8=10mtr)

Toe wall d/s &u/s

403 p36 Excavation in disintegrated rock i/c 50m leadand 1.5m lift with dressing[A] Weir wall[B] Keys (K1+K2)

[C] Wing walls

Page 32: Anicut Tender Sample Excel

6

1 93.00 4.00 0.40

2 6.00 2.15 0.40

4 6.00 2.90 0.401 93.00 10.00 0.20

2 93.00 1.40 0.20

7

1 93.00 4.00 1.00

2 6.00 2.15 1.00

4 6.00 1.40 1.001 93.00 10.00 0.20

2 93.00 1.40 1.00

8

1 93.00 3.80 0.30

2 6.00 1.95 0.30

4 6.00 2.70 0.301 93.00 10.00 0.30

2 93.00 1.40 0.30

9 1

10 1

11 189 63 1.50

12

189 6.50

lift with dressing : [a] Blasting permitted

1 93.00 17.20 0.30

404 p36 Excavation in soft rock i/c 50m lead and 1.5mlift with dressing[A] Weir wall

[B] Keys (K1+K2)

[C] Wing wallsD/s&U/s apron (2+8=10mtr)

Toe wall d/s &u/s

[B] Keys (K1+K2) 2 6.00 2.15 0.30 7.74 cu.m405 p36

[A] Weir wall

[B] Keys (K1+K2)

[C] Wing wallsD/s&U/s apron (2+8=10mtr)

Toe wall d/s &u/s

716(b)p52

Cement Concrete 1:3:6with graded metal ofmaximum size 40mm. [ in foundation bed][A] Weir wall

[B] Keys (K1+K2)

[C] Wing wallsD/s&U/s apron (2+8=10mtr)

Toe wall d/s &u/s

725(xib)p53

Extra rate for black trap basalt or granite metalfor one cu.m.

723 p53 Extra for mechanical vibration of CementConcrete or plum Concrete.2206 p213 Drilling 35mm dia holes in rock by jack hammerupto 6m.1304b p129 Supplying & fixing steel reinforcement bars(tested) for RCC i/c cleaning, straightening, cutting, bending all handling, placing in position and binding with 0.9 mm annealed binding wireconfirming to IS:280-1978 (i/c cost of bindingwire) : (b) Cold worked steel high strength bars confirming to grade Fe-415 of IS:1786.25 mmØ Tor Steel bars (Dowel bars) @ 1.5mc/c in Three rows

Wt.(kg/mtr.) =

Excavation in hard rock i/c 50m lead and 1.5m lift with dressing : [a] Blasting permitted .

1314

1602 b p150 Providing and placing in position M-15 R.C.C.excluding cost of reinforcement, but including form work , vibration, finishing, curing etc complete with graded metal of maximum size-

(a) 20 mm

Page 33: Anicut Tender Sample Excel

140 94.00 0.395

784 8.40 0.395

466 3.80 0.395

290 4.50 0.395

1 93.00 3.20 2.70

2 6.00 1.75 4.00

4 6.00 2.50 4.00

1 93.00 1.20 1.40

1 93.00 3.00

8 1.20 1.50

4 6.00 4.00

1 93.00 0.90 3.30

19 8 1.20 4.00

20 1 93.00 1.50 3.00

21 5 15.00 5.80 0.22

1314

1304b p129 Supplying & fixing steel reinforcement bars(tested) for RCC i/c cleaning, straightening, cutting, bending all handling, placing in position and binding with 0.9 mm annealed binding wireconfirming to IS:280-1978 (i/c cost of bindingwire) : (b) Cold worked steel high strength bars confirming to grade Fe-415 of IS:1786.Mail Wall Portion

Horizontal and along LS , Provide Bars 8 mmdia @ 250 C/c

@

Vertical Bars and along CS, Provide Bars 10mm dia @ 250 C/c

@

Gate Portion

Horizontal and along LS , Provide Bars 8 mmdia @ 250 C/c

@

Vertical Bars and along CS, Provide Bars 10mm dia @ 250 C/c

@

1516

711c pg.52

Plum Cement Concrete1;3;6 with 75% gradedmetal of 40 mm.and 25% Plums of 150 mm In foundation and plinth.[A] Wier wall

715 c pg.52

Cement Concrete1;2;4 with graded metal ofmaximum size 20 mm. In foundation  and plinth

[B] Key wall

[C] Wing wall

Toe wall d/s &u/s

1718

711 c pg.52

[A] Wier wall (3.2+.9)/2

Deduct for openings in wier wall (Gates) (3.2+.9)/2

Net Quantity =715 c pg.

52Cement Concrete1;2;4 with graded metal ofmaximum size 20 mm. In Super Structure.[C] Wing wall (2.5+.6)

Toe wall d/s &u/s

MPLUN Item No. SMM163101

M.S. Fixed Wheel Gate upto 2 SQM size for 5MTR. Water Head with Manually operated rope drum hoisting mechanism, complete item.

2117 p200 Puddle filling of good clay including lead upto50m including mixing, watering and kneading by tamping, ramming and laying etc. [at Karri shutters]

1009 p71 22cm thick dry picked up boulder pitchingincluding picking of boulders with individual boulder of 22cm depth & atleast the dimension of boulders in any direction should not be less than 10cm.

Page 34: Anicut Tender Sample Excel

Total -

[In Words - Rupees Seventy Four Lacs Sixty Thousands Only ]

Plum Cement Concrete1;3;6 with 75% graded .metal of 40 mm.and 25% Plums of 150 mm InSuper StructureExecutve EngineerP.H.E. Division ChhindwaraDistt. Chhindwara [M.P.]

Page 35: Anicut Tender Sample Excel

Pench, Lenhth 93.0 m and height 3.0 m for Village Singodi Water Supply Scheme under fluoride project , Block Amarwara, District Chhindwara M.P. On lump sump contract basis

Anicut Across River Pench, Lenhth 93.0 m and height 3.0 m for Village Singodi Water Supply Scheme under fluoride project , Block Amarwara, District Chhindwara M.P.

Model rules relating to labour, water supply and sanitation in labour camps annexure – “a”

Page 36: Anicut Tender Sample Excel

and it may not be necessary for the contractor to give any additional conditions. If any conditions are given, common set of conditions shall be framed as per procedure prescribed in the PWD manual.2.0 No advance payment shall be applicable for this work, Full security deposit as per NIT shall have to be deposited within 10 days of intimation of acceptance of tender to the contractor if the contractor fails to do so, his earnest money shall be forfeited and his tender will be rejected.3.0 The tenderers requested to accept the Break up schedule given in tender documents as ANNEXURF for assessment of work done as per clause No. 15 of the term for “LUMP SUM CONTRACT”.4.0 The firms/contractors sometimes ask for the refund of security deposit in a manner & time not in conformity with the provision of the NIT. Any such condition of refund of security deposit shall not be accepted by the department and as such the tenderers are requested to agree to the condition of the NIT in this regard.

6.0 The contractor shall be full responsible and accountable for obtaining all the required permission from the concerned authorities & for abiding all the laws, local regulations such as for water, power, extraction of sand and metal, excavation, blasting transportation of material, safety traffic related to this work.7.0 The contractor shall be fully responsible for safety of the work workmen and public etc. at all the stage of work of activities related to this work.8.0 All the relevant Indian Standard Specification (I.S. Codes) manual and codes of practices shall be applicable for this work. The decision of the PHED will be final in this matter.

Public Health Engineering Department, Chhindwara   Division within the time mention in the key dates from categories A-2 or S-2 and above

"B" Class registered in the ...................N.A......................................... "C" Class in the office of the Executive Engineer of Chhindwara Division The bidders intending to participate in this tender are required to gethttp://mpeprocurement.gov.in and get empanelled on the sub portal of Public Health Engineering Department http://phed.mpeprocurement.gov.in. Enrollment / registration and subsequent empanelment on the above portal and sub portal is mandatory. The bidders registered with other departments of Govt. of M.P. who are also eligible to participate in tenders processed by Public Health Engineering Department, are also required to registered on the e-procurement system on http://phed.mpeprocurement.gov.in and after sanction of the tender they will have to manage their registration in PHED or have to deposit total security deposit

Time allowed for completion

Class of contra

ctor

Page 37: Anicut Tender Sample Excel

6 month exlcuding Rainy Seasion

A-2 orS-2 and Above

1.1 Tender must be submitted in online form for “Lump Sump Contract” duly filled and digitally signed in as per instruction contained in this tender notice and in the guideline which are attached with this NIT.

2.1 Tender documents can be purchased only online from http://phed.mpeprocurement.gov.in by making online payment. The last date of purchase of tender document is as mention in keydates.2.2 The bid data should be filled and the bid seals (hashes) of all the envelops and the documents which are to be uploaded by the bidders should be submitted online up to as per time schedule (Key dates).2.3 The bidders shall have to submit their bids online (decrypt and encrypt the bids) and upload the relevant documents from as per time schedule (key dates).

2.5 For details on tendering procedure through the electronic tendering system, please refer to “Guidlines for Using the Electronic Tendering System” available along with the tender documents.2.6 The Bidders if needed training are advised to get in touch with the Service Provider of the e-Procurement System for confirming the time and date for their training session.

3.1 General Specifications for work have been given in the enclosed annexure."E" However following order of priority regarding specification for the work shall be followed by the contractor.3.2 Specifications issued by the E.in.C. PHED and specification as detailed under this contractor under special conditions Annexure “D” and special condition.

3.7 Specifications for pipes, valves, specials, rubber, gaskets RCC and other civil works and materials shall be governed by the relevant latest IS codes, IRC specifications and National Building code of India (latest revision)

right of the “Engineering-in-charge” to alter the specification for any part of whole of the work, if he considers it necessary in the interest of work. On all matters where there is difference of opinion between the contractor and the Executive Engineer, P.H.E. Department, (M.P.) the matter will be referred to the C.E. PHED Jabalpur Zone. Jabalpur, S.E., PHED Chhindwara Project Circle chhindwara whose decision will

pertaining to this tender shall be in accordance with standard specification of Building and Construction Department of Maharashtra Government (with all amendments issued up to date of receipt of tenders) BIS Code of practice BIS specification will be

6.0 WORKMANSHIP :- The work shall be carried out according to the specifications referred to hereinafter & according to sound engineering practice. The structure should have even & smooth finish. The decision of the Engineer-in-charge in respect of workmanship shall be final.7.0 CONCRETE :- All concrete shall be mixed in concrete mixer and compacted by mechanical vibrators. Slump tests shall be carried out during concreting and sample test tubes prepared & tested in due course by the contractor at his cost. The result of the tests shall conform with the required standards and if the Engineer-in-charge considers that a structural test is necessary, the same shall be carried out as instructed by the Engineer-in-charge at contractors expenses and if the results of this be unsatisfactory the contractor will be bound to take down and reconstruct the particular portion of the work which has given unsatisfactory test results. The contractor shall have to use only steel shuttering so as to get smooth finish.8.0 STEEL FOR REINFORCEMENT : All the iron and steel required for the work will be procured by the contractor at his own cost. The department shall not supply any quantity of steel under any circumstances. Steel for reinforcement shall confirm to B.I.S. specifications 432-1966 (with up to date revision) and B.I.S. 1139-1966 (with up to date revision). The contractor shall be required to produce the test certificate of the manufactures to the department before use of steel for the work. No untested steel will be allowed to be used under any circumstances. The department however reserves the right to get the steel tested at the cost of contractor.9.0 CEMENT : In accordance to the instructions contained in Govt. of M.P. PHED, Bhopal memo no. F-16-28/34-2/87 dt. 28.01.91. Cement required for the work will be procured by the contractor at his own cost from time as per requirement. The cement to be used in the work shall be ordinary low heat port land cement conforming to B.I.S. 269/1976 & Portland Slag Cement conforming to B.I.S.

Page 38: Anicut Tender Sample Excel

158-1976 PAN STOCK GATES shall be as per relevant B.I.S. specifications. The puddle collars inlet ports and strainers shall also be as per B.I.S. specifications.11.0 All material used in the civil work should be of quality approved by the Engineer-in- Charge. The rejected material should be removed from the site immediately at the

maximum efficiency in the normal working condition. Use of non corrodible materials for conveying chemicals and to resist abrasive action of sand, and use of suitable paints and coating for under water fittings to prevent contamination of water are expected to be providing by the contractor.12.0 SUBMISSION OF TENDERS :- The Tenderer shall fill/upload the Bids online and the Bid Hashes of three envelopes shall be digitally signed and submitted online as per mentioned key dates. The Bidders shall also have to submit Bids online (decrypt the bids using their Digital Certificate and encrypt the bids) as per mentioned key dates. There shall be three separate Online envelopes as under:-13.0 ENVELOPE - A :- The first online envelope shall contain the details of Earnest Money, scanned copy of the Physical Earnest Money and scanned copy of following documents.13.1 Experience certificate of successful completion of work of Construction of R.C.C. Anicut on “TURN KEY JOB BASIS“ costing Rs 50.00 Lacs in contractor's/firm's/company's own name indicating agreement no., work order no. and date, amount of contract, stipulated period of completion, actual period of completion during last five year i.e. 2003-2004 to 2007-2008. An officer not below the rank of Executive Engineer should issue the certificate.13.2 The details of works in hand indicating name of work, Agreement no., work order no., and date, amount of contract, period of completion, value of work and balance work in hand with details of work on the date of submission of Tender.

Ownership document of concrete batch mixing plant, material testing laboratory equipments for Crushing strength test of moulded concrete specimens, slump test of concrete, particle size analysis , silt content, percentage of soft materials etc.

and should reach Executive Engineer, PHE Division ............ as per date and time mentioned in the key dates14.0 ENVELOPE - B :- The Second Online envelope shall contain terms and conditions and all the technical details and specifications of the proposed work. The Scanned copy of terms and conditions, along with technical specifications and drawings etc. should be submitted online in Envelope “B”.15.0 ENVELOPE - C : This Envelope shall contain only the Lump-sum offer. The tenderer shall have to duly fill their Lump-sum offer in appropriate online form meant for it.16.0 Tender will be submitted with the Earnest Money, of Rs.74600 (In Words Seventy Four Thousands Six Hundreds Only ) In favour of the Executive Engineer, PHE Division ,Chhindwara (M.P.) which will be returned to the unsuccessful tenderer. The Earnest Money of the successful tenderer will be retained as part of the Security Deposit.17.0 FORM OF EARNEST MONEY : Where the tenderer proposes to pay the earnest money in cash he shall pay it to the where the. Tenderer proposes to pay the earnest money in cash he shall pay it to the credit of revenue deposit on behalf of Executive Engineer PHED, division Chhindwara (M.P.) in the branch of the state Bank of Government Treasury of Sub-treasury within the jurisdiction of the Executive Engineer mentioned above. If, however, the tenderer wishes to deposit the earnest money in any one of the following forms he may do so.

17.10 Bank Draft issued by big Urban Banks whose working Capital exceeds Rs. 5 crores for A, B & C Class, Central Co-operative Banks/Non Scheduled State Co-operative Banks, Subject to the conditions that the drafts are encased by accepting authority as soon as they are received and contracts are allotted

18.0 The amount of Earnest Money should be deposited in the Treasury/State Bank of India and the challan should be submitted in the envelope “A” as mentioned above under para (2.1).19.0 EARNEST MONEY IN SEPARATE COVERS:- The Earnest Money, in any one of the prescribed form should be deposited as mentioned under para 2.5 . If the Earnest Money is not found in accordance with the prescribed mode, the tender of the tenderer shall not be opened.20.0 ADJUSTMENT OF EARNEST MONEY:- The Earnest Money which has been deposited for a particular work will not ordinarily be adjusted towards the earnest money for another work, but if the tender of a contractor for a work in the same Division has been rejected and the Earnest Money has not been refunded to him due to some reasons it may be adjusted for this work by the Executive Engineer, provided amount retained is equal or more than required Earnest Money for this work.21.0 SECURITY DEPOSIT:- The Security Deposit to be taken for the due performances of the contact, under the terms and conditions given in the tender form, will be the Earnest money at the time of tender plus & sum to make it equal to 5% of the amount of contract to be paid within 10 days from the date of issue of letter of acceptance,failing which the tender shall be rejected & his EMD will be forfeited .22.0 IMPLICATION OF SUBMISSION OF TENDERS:- Bidders are advised to visit the site sufficiently in advance of the date fixed for the submission of the tender. The tenderer shall be deemed to have full knowledge of all relevant documents and site conditions etc. whether he inspects it or not.

Page 39: Anicut Tender Sample Excel

down in the relevant IS specifications, IRC specifications, manual on water supply and treatment, and Annexure-E having the scope and the specification of the work to be done. The contractor will be deemed to have seen the site of works.22.2 The contractor shall make his own arrangement for supply of water for construction, purposes. No lead and lift for any other material including water will be paid. The tender offer should be inclusive of all leads and lifts for the materials. The contractor should himself verify the leads of different materials before submitting his tender.23.0 ESCALATION:- The scope of work includes all costs, and no escalation will be paid on this account.24.0 LIST OF WORKS IN PROGRESS :- Tenders must be accompanied by a list of Contracts already held by the tenderer at the time of submitting the tender, in the Department and elsewhere showing therein.

25.0 RELATIONSHIP :- The contractor shall not be permitted to tender for works in the Division, (responsible for award and execution of contract ) in which his near relative is posted a Divisional Accountant. He shall intimate the names of his near relative working in M.P. Secretariat and P.H.E Department. He shall also intimate the name of person working with him in any capacity or subsequently employed by him and who are near relatives to any Gazetted Officer in the M.P. Secretariat and P.H.E Department. Any breach of this condition by the contractor would render him self liable to be removed form the approved list of contractors of the P.H.E. Department. NOTE :- By the term “near relative” is meant wife, husband, parents and son, Grand son, brothers, sisters, brothers in laws, father in law and mother in law.26.0 POWER OF EXECUTIVE ENGINEER : The Executive Engineer does no bind himself to or recommend for the acceptance to higher authority the lowest or any tender or to give any reason for his decision.

28.0 CANVASSING :- Canvassing in support of any firm/contractor for the acceptance of any tender is strictly prohibited. Any tenderer doing so will render himself liable to penalties which may include removal of his name from the register of approved

29.0 ONLINE SUBMISSION OF TENDER :- Only the bid submitted online and envelopes digitelly signed will be opened30.0 AUTHORITY OF EXECUTIVE ENGINEER :- The authority competent to accept a tender, reserves the right for accepting the tender for the whole work or for a distinct part of it, or distributing the work between two or more Bidders.31.0 VALIDITY OF OFFER : Tender shall remain open up to ....... days from the date of opening of the last financial price bids (Envelop "C") and in the event of the tenders withdrawing the offer before the aforesaid date for any reason whatsoever, earnest money deposit with the tender shall be forfeited by Government.32.0 TIME OF COMPLETION :- The time allowed for carrying out the work i.e. ..... months including rainy season shall be strictly observed and shall be reckoned from the date of issue of written order to commence the work. Delay beyond the specified time limit will be subject to liquidated damages according to clause 13 of Form “F” of Lump sum contract.33.0 TIME SCHEDULE:- The work shall be done by the contractor according to the schedule fixed in consultation with the competent authority. BAR/PERT/CPM chart showing detailed programme shall have to be submitted and adhered to by the contractor.

34.1 Payment to the contractor will be made as per clause 15 of the Tender form lump sum contract. No change in this payment schedule will be permitted.34.2 The Security deposit of the contractor shall not be refunded before the expiry of 6 months after successful testing of the work. It shall not be refunded also before the settlement and payment of the final bill in any case.

35.1 SUBLETTING WORK:- The contractor shall not without the prior approval of the competent authority, in writing, sublet or assign to any other party or parties the whole, or any portion of the work under the contract. Where such approval is granted, the contractor shall not be relieved of any obligation or duty or responsibility, which he under takes under the contract.

contractor in excavation of trenches, it will be the responsibility of the contractor to observe all rules and regulations permission licence, procurement, preservation and storage of explosive material etc.36.0 COMMERCIAL TAX :- All dues regarding taxes, and duties including the commercial Taxes, Royalties, Octroil Duties, Excise, Turnover, Taxes etc. on work, Contract etc. levied on the contractor’s work by Government and local bodies or private individuals will be payable by the contractor. The Executive Enineer will grant a certificate for the quantity actual used on the work but ewill not entertain any claim on this account .37.0 ROYALTY:-Minerals extracted for works carried out on behalf of the government, from the quarries in possession of and controlled by the State Government is subject to payment of Royalty by the contractor to whom it shall not be refundable.38.0 MODEL RULES RELATED TO LABOUR, WATER SUPPLY AND SANITATION IN LABOUR CAMPS. :-The contractor will be bound to follow the Madhya Pradesh Model Rules, relating to layout Water Supply and sanitation in labour camps, as per Annexure - A and the provisions of the National Building Code of India, in regard to construction and safety.39.0 FAIR WAGES:- The contractor(s) shall pay not less than the fair wages to labour engaged by him on the work ( copy of the Rules enclosed as Annexure - “A” )40.0 Works In The Vicinity :- The Executive Engineer, reserves the right to take up Departmental work or to award works on the contract in the vicinity without prejudice to the terms of contract.41.0 BEST QUALITY OF QUARRIED MATERIALS:- If the quarry material of more than one quality is found, the material approved by the Executive Engineer will only used by the contractor. If the materials of required Specification is not available in the near by area/quarry, the contractor shall have to arrange the same from the place where it is available.42.0 REMOVAL OF UNDESIRABLE PERSONS:- The contractor shall on receipt of the requisition from the Executive Engineer, at once remove any person employed by him on the work who in the opinion of the Executive Engineer is unsuitable or undesirable.

required for proper execution of work. Certain plants, may however, be issued to the contractors by the Department, as special case as per provision of W.D. Manual Vol.

45.0 RIGHT TO INCREASE OF DECREASE OF WORK: The competent authority reserves the right to increase or decrease any item of work during the currency of the contract and the contractor will be bound to comply with the order of the competent authority without any claim for compensation or higher rates for additions and alterations.46.0 LABOUR REPORT:- Contractor will submit a report on labour engaged to local employment office and copy of same may be attached with the running account bill, failing which Rs.50/- will be deducted from each running bill. Total recovery on this account may be effected on the final bill.47.0 LABOUR LICENCE :- Every contractor who employs on any day of the preceding 12 months, twenty or more workers on contract is required to obtain license from the Licensing Officer or the Contract as per provision contained under Sub-section 4 (b) of section 2 of the Contract Labour ( Regulation and Abolition ) Act 1970 as per provision contained in Section 12 of Act. No, contractor shall execute any work without obtaining licence, contravention of above is punishable and contractor is liable to be prosecuted. The successful tenderer is liable to produce licence as and when demanded by the Executive Engineer, obtained form labour Department as laid down in chapter 4 of Contract labour ( Regulation and abolition) Act 1970.48.0 LABOUR HUTMENT :- The contractor shall make arrangement, at his own cost, for housing his staff and stores for the work and Model Rules relating to labour Water supply and sanitation shall be followed.49.0 DEFECT LIABILITY PERIOD :- The defect liability period in respect of the entire work as a whole or in parts of individual components included in this contract shall be 6 months form the date of completion of work and certified by the Executive Engineer as per clause 10 of form F.50.0 TECHNICAL SUPERVISION :- The Contractor shall employ a Graduate Engineer during the execution of the work :-

50.2 In case the contractor fails to employ a Graduate Engineer as aforesaid Deptt. shall have the right to take suitable remedial measures.

Engineer/Diploma holder Sub-Engineers when he intends to employ or who is under employment, before he commences the work.

50.4.1 It is not necessary for the contractor (or partner in case of firm/company) who is himself an engineer to employ engineer for the supervision of the work so long as the Contractor/partner works similar to what would have been done by and Employed Engineer.50.4.2 The retired Engineer who is holding Diploma in Civil Engineer or a Diploma holder having 5 years or more experience will be treated as Graduate Engineer, for the operation of above clause.

Page 40: Anicut Tender Sample Excel

50.4.3 In case the contractor fails to employ the technical staff as aforesaid, he shall be liable to pay to the Government a sum of Rs. 10000.00 (Ten thousand) only for each month of defaults in case of Graduate Engineer and Rs. 5000.00 (Rs. Five thousands only) for each month of defaults in the cause of diploma holder Engineer.

51.1 The Notes and specifications given in the detailed notice inviting tenders and its annexure are to be read in conjunction with conditions given in the short notice inviting tenders and the conditions of Contract. These have been intended to supplement the provisions, in the NIT and the conditions of the Contract. All these will be binding on the contractor and shall form part of the agreement. However, in case of any contradiction between the common set of conditions and the NIT, the common set of conditions will supersede.51.2 EXECUTION OF AGREEMENT :- The Tenderer whose tender has been accepted shall have to execute the agreement with in a fortnight of the communication of the acceptance of his tender by the competent authority. Failure to do so will result in the Earnest Money being forfeited to Govt. and tender being

Model Rules relating to labour, water supply and sanitation in labour camp etc.

permanent nature. They lay down the minimum desirable standard which should be adhered to standards in permanent on semi permanent labour camps should not obviously be lower than for temporary camps.

water. : practicable filtered and chlorinated supplies shall be arranged when supple is from intermittent source over head storage tank shall be provided with a capacity of five liters a per son per day. Where the supply is to be made from a well it shall confirm to the sanitary standard laid down in the report of the rural sanitation committee. The well should be at least 30 meters away from any latrine or other source of pollution. If possible the and pump should be installed for drawing the water from well. The well should be effectively disinfected one every month and the quality of the water should be got tested at the Public Health Institution between each work of disinfecting.

Page 41: Anicut Tender Sample Excel

A. "FAIR WAGES" means whether for time of piece work as notified on the date of inviting tenders and where such wages have not been so notified the wages

to be paid a fair to labours indirectly engaged on the work including any labour engaged by his sub-contractor in connection with the said work as if labours had been immediately

money due to the contractor any sum required or estimated to be required for making good, the loss suffered by a worker or workers by reason of iron-fulfillment of the conditions of the contract for the benefit of the workers non payment of the wages or of deductions made from his or their wages which are not justified by their terms of contract

observance of the regulations aforesaid without prejudice to his right to claim indemnity from his sub-contractor.

me before commencement of work and continue to have a valid license until the

Lead

Page 42: Anicut Tender Sample Excel

Name & Style (of the company, firm, H.U.F., or Individual) in which the applicant assessed to

(d) Amount of Tax Assessed 1. T., S. T., E. P. T., B. P.T. (e) Amount of Tax Paid 1. T., S. T., E. P. T., B. P. T.

(h) Whether the company or firm or H. U. F. on which the assessment was made has been or is being liquidated, roundup dissolved, petitioned or being declared insolvent as the case may be.(i) The position about later assignment namely, whether returns submitted under section 22(l) or (2) of the IT Act and whether tax paid under section 18(a) of the Act and the amount of tax so paid or in arrears. ,

In case there has been no Income Tax Assessment at all in the past, whether returns submitted under section 21 (1) or (2) and 18-A (3) and if so, the amount of Income Tax

Design construction and testing of RCC Anicut of 93 mtr in length and 3 mtr height above average river bed level including supplying, fixing and errection of manually operated shutters as per MP LUN specification item Code SMM

Page 43: Anicut Tender Sample Excel

The anicut is proposed to be constructed across Pench river near village Singodi, Block Amarwara. The proposed site is above 22 KMs away from district hear quarter Chhindwara.

1.2.1 Design and construction of anicut on Pench river including Hydraulic and structural design. The anicut will be conventional gravity structure with opening between piers for shutters and de-silting arrangement.

item code No. SMM 163101 including fixing in opening of Anicut and packing to make it leak proof after end of rainy season.

The proposed site is located in 1000 m upstream of bridge at Pench river Singodi village. River bed is covered with granite. The banks are made up of alluvium. The flood data at proposed site are not available. The flood discharge is calculated from imperial formulae. The maximum flood discharge is 3727 cumec and the observed HFL is above 6 mtr with average bed level at 91.4 mtr General Hydraulic and Geological data are given below –

Clear Span at Axis - 93.0 Mtr Observed Peak Flood - 2310 cumec Discharge.

River Bed strata - Granite Bank Strata - alluvium River Bed Slop - 1 : 1000

The observed HFL RL 101.75 mtr shall be taken as the basis of hydraulic calculation. The peak flood discharge must be taken less than 3727 cumec. As mentioned earlier there are flash floods iln the rivder. The hydraulic calculation including afflux level, scour depth, uplift pressure should based on relevant IRC publication.

The over turning and sliding factor of safety should be calculated for the whole structure, pier section and all supporting structure as per IRC 78-1983 (with upto date amendment)

The Anicut is proposed to be constructed across river Pench to store water to be supplied for drinking purposes to village Singodi. The scope of work given above and the specification given are not absolute and have been given for guidance to the contractors. This is a turn key job and includes all the provisions of civil and mechanical works required to fulfill the above mentioned objectives

Before starting any work, the contractor shall erect a permanent bench mark, reference line and check profiles, at convenient position approved by the Engineer in charge. The bench mark shall be 20x20x60 cm with 40 cm embaded underground and 20 cm above the ground. The top surface of the bench mark shall be truly horizontal and plain. The words B.M. with R.L. shall be consipiously carved and painted on the bench marks the reference line shall comprises of a base line properly dag belled on the ground with number of masonry pillars suitably spaced. The check profiles shall be of such materials and shall be located at such places as to ensure execution of all slopes, steps and elevation, to the profile or profiles indicated in the approved drawings or as directed by the Engineer – in – Charge.The mathematical surveying instruments all materials and labour for setting out works including construction of bench marks, reference lines, check profiles and surveys required at the various stages of the construction work, shall be made available by the contractor at his own cost.

2.2.1 The general plan and arrangements of the diversion shall be prepared before hand and shown in the plan. The contractor shall submit within one month from the date of issue of work order or of such period as may be specified by the Engineer-in-Charge to submit his plans for the temporary diversion, care and maintenance during the construction.

Engineer-in-charge shall not relieve the contractor for the responsibility of the adequacy and efficiency thereof and pumping plant and other all equipements, labour and materials necessary for dewatering the foundations and keeping the work areas free of water at all times necessary are within the scope of the contract. The changes, modifications or alteration required to suit the conditions during construction shall be borne by the contractor without extra charge. Any damage caused by failure or partial failure of his temporary diversion work during construction period

Page 44: Anicut Tender Sample Excel

works in good order. He shall also be responsible for providing and maintaining, necessary banners, fencing lighting, warning signs, signals and boards, watching and patrolling and all other safe guards necessary to ensure safety of human and animals lives and vehicular pedestrian and animal traffic.

Dewatering shall be carried out as per approved method to enable excavation, making inspection, final preparation of surfaces, providing anchor bars, grouting, laying of founds on concrete, laying of reinforced concrete, laying of reinforcement and all other construction activities. Diesel/ electric pumps or requisite capacity shall be installed in order to handle the dewatering.

Charge, may be resorted on works for rock excavation for quarry operations. In conducting Blasting operation shall be taken by the contractor for the protection of persons, the work and property. The planning of works should be such that no blasting is required close to structures already erected or foundations already filled. All government laws and regulations relation to license the design and location of magazine, the transportation and handling of explosives and other measures required for the prevention of accidents shall be observed. Warming signs shall be displayed on all power magazines.

In case of accidents in blasting operations the contractor shall be responsible for all damages and claims arising out of the workmen’s compensation Act.

Before an excavation is started, the deposition of spoil should be carefully planned. The excavated material shall be dumped sufficiently away from the edges of excavation, permitting, ample space for labour paths, movement of vehicles, other machine installations for lifting and dewatering and stacking construction material etc the excavated material will be transported to various works, or to stock waste piles, informing stock piles the useful

nature of the material. Materials from rock excavation which are fit for use will require special attention and should be preserved in defined areas. Similarly materials for use as chips or broken stones should be placed in the adjacent pile. Steps should be taken to keep the materials clean as subsequent cleaning will be difficult and imperfect. All other excavated materials shall be dumped in permanent banks or other approved location. Excavated materials shall not be carelessly thrown over the premises and should be deposited directly in permanent position so far as consistent with proper execution of the work.

The contractor will have to conduct all necessary investigations, planning and layout for the Anicut. The department has done Nine Nos. trial boresa at different points on the proposed anicut site to have an idea of the strata. These details are enclosed but are only for guidance to the contractor. The Geological reports submitted by the G.S.I. is also enclosed for the guidance to the contractor.

will be designed for buoyancy for up stream water level according to the relevant I.S. code, even for foundation resting on Rock, where the structure and base may be subject to tension within the limitations of clause 708.2.2 of IRC 78-1983, for foundation resting on Rock.

structures and supporting structure of karri shutters shall be as per clause 706.2.2. of IRC 78-1983.

procedure laid down on IS 5512-1972 (amended upto date). Design should be based on most adverse combination of “Probable” load conditions. All the load combination A.B.C.D.E.F. and G as given in IS 6512-1972 must be considered and the structure must be safe for all above load combinations.

The resultant of all forces acting on dam should through the middle third of base of extreme load combination. The factor of Safety against over turning must be between 1.5 to 2.5.

Page 45: Anicut Tender Sample Excel

The foundation of Anicut should be designed and constructed keeping in view the strata met in foundation, maximum scour depth, dead load or super structure water load at M.W.L. forces, velocity forces, wind forces, live load on Anicut, Water thrust, seismic force, buoyancy etc. complete. The bottom shear key should be capable of withstanding uplift pressure when the river is in flood or at M.W.L. Any other forces required to be taken for safe design which are not mentioned here should also be taken into consideration for the design.

shoring of sides of foundation, diversion of river flow, shoring of side of excavation, scaffolding, distilling of foundation, construction of coffer dam etc for which no extra payment shall be made by the department to the contractor. The contractors are therefore, advised to see the site of construction before submission of tender would mean that the contractor have full knowledge of at the relevant documents, proposed site construction, soil samples, strata at site, behaviour of river etc.

guarantees that such operations shall not effect or damages to the existing rocks below and around the proposed anicut.

it is safe against scouring and is adequately protected from it. This depth should also be sufficient from consideration of bearing capacity, settlement, suitability of strata at foundation level and below it and stability of structure as a whole against overturning, sliding and out flanking.

maximum depth of scour near the Anicut shall be taken as 1.27 times the means depth of scour (as per IRC pocket book 4.4.3.1) for the design discharge. The mean depth of scour shall b calculated as given in the standard specification the code of practice for road bridges, IRC 78-1983.

be les than 1.2 meters. The epth of embedment shall exclude that portion of rock which is weathered for fissured. The foundation shall be designed for worst combination of loads and forces.

boxes centremie pipe, Pumping out of water shall not be done be permitted from the time of placing of concrete upto 72 Hrs thereafter.

cement concrete up to top of rock. The material for foundation shall be M-10 plum concrete encased all around by M-25 grade R.C.C. structure of minimum thickness of 20 cm only.

In case, any treatment of foundation is required during actual execution, it will have to be carried out by the contractor without any extra payment for the same. The department proposed the curtain grouting at the up stream axis of anicut upto 4.0 m depth below average bed level, in a single row of 6.0 m spacing holes however if as per site condition extra treatment is needed then that shall be done by the contractor without any extra cost. The pressure of grouting should not be less than 1.60 Kg/sqm.

RCC piers and opening for manually operated shutters as per MPLUN’s specifications item code SMM 163101. The width of opening may be between 1.20 m to 1.50 mt. The pear must be safe at sill level for over turning, shear etc. Considering worst conditions of loading and shutters closed and open both condition. The minimum top width of pier should be provided on each not be less than 1.0 m for fixing of shutters two nos grooves should be provided on each piers. A minimum temperature reinforcement shall be provided in encasing concrete work for piers.

The left and right bank of river Pench on Upstream side as well as D/S side will be protected upto a minimum distance of 10 m from anicut by way of construction of toe wall cement concrete. A cantilever type RCC retaining toe waqll with proper anchorage in rock shall be provided to retain the bank protection work. The bank protection is also included in lump sum offer. The bank protection work shall be designed as per relevant IRC and IS codes. The suitable arrangement for protection of U/S and D/S bed of river is also included in lump sum offer.

Manually operated type shutters shall be provided as per MP LUN’s item code No. SMM 163101

Page 46: Anicut Tender Sample Excel

Detailed drawing and design of geological, hydraulic and structural requirement for anicut structure, bank protections, key wall, wing walls, up stream and down stream protection and energy dissipation works etc shall be submitted along with the main structural design duly checked by the relevant department of the Govt. Engineering Collage. Detailed working drawings will be submitted in 6 copies. It will become the property of the Govt. Work will be executed as per approved drawing. In case of extra rebate contractor will have to submit design as per scope of work fixed in the contract and design for extra work or reduced work to assess the increase or decrease quantity of the work. No payment will be made for such additional design work. In case, during the course of execution, if contractor intend to modify or suggest any improvement and submit design in its support without asking any extra payment, it will also be subject to approval of the department.

For all purpose the structure and gates will deem to be tested if they don’t show any sign of defect after passing of two rainy season and behave according to what it intend in to the contract. For this purpose, rainy season means four peak months of rains, i.e. 15

The various works shall be done true to line, level and grade. The periodical of his responsibility regarding the accuracy. In case of any deviation or discrepancy in line, level or grade at the meeting faces, the contractor shall make good the discrepancy at his own cost and without any extra compensation for the additional work involved.

inspected and if necessary tested & approved by the Engineer-in- Charge. The Engineer-in-Charge has full power to get the material tested from the laboratory of any Govt. Engineering Collage or from the state laboratory on the cost of the contractor.

(making specimen) testing etc will be done as per standard laid down by Beuro of India standards.

shall be kept in storage for more than 90 days, contend after the date of dispatch from the factory. If any cement be kept as long as90 days, it shall be tested at the local laboratory and if found defective in any way, it shall be condemned for use.3.3 As for as practicable, no consignment of cement shall be received and transported during the monsoon period. Cement stored during monsoon and to be used after the monsoon shall not be used unless it has been tested in the laboratory and approved by the Engineer in Charge.

precautions must then be observed in strong the bags with a view to prevent cement from any possible contact with moisture and to ensure systematic working of the ware house.

or logs of the bellies and bamboos. If, however, the floor is a well constructed dry concrete floor, the bags can be placed directly on it.

Page 47: Anicut Tender Sample Excel

becomes cumbersome to stack or remove them. The maximum width of pile should also be not more than about 3 m.

header and stretcher fashion, that is alternatively length wise and cross wise so as to pile together and minimize the anger of toppling over.

Waste house pack” some times over laps in the bags. This can be removed by rolling the bag when the cement is taken out for use.

is taken the oldest cement out first. For this purpose each consignment as it comes it should be stack separately and the date of arrival should be pinned on the pile.

When it is required to store cement bags at work site in the open for use on the work for one or two days they should be laid on a dry platform made of wooden planks resting on a brick masonry or concrete, platform about 15 cm (6”) above the ground. The number of bags shall be kept to a minimum preferably just sufficient for the day’s consumption. The pile shall be well covered by tarpaulin overlapping each other properly and protected against the moisture in the air and wind. This matter of temporary storage shall not be adopted in wet weather.

to improve the quality of workability of the mix if approved by the Engineer-in-Charge. The amount of air entraining agent used shall be of such effect to the entrainment of 3 to 5 percent of air by volume of the concrete or 8 percent to 12 percent of air by volume of cement mortar. The agent shall be added to the batch in solution in a portion of the mixing water by means of a mechanical batcher capable of accurate measure.

injurious amounts of oil, acids, alkalis, salts, sugar, organic, materials or other substances that may be deleterious for concrete& steel. Potable water is generally considered satisfactory for mixing concrete. Water found satisfactory for mixing is also suitable for curing concrete. However water used for curing should not produce any objectionable, stain or deposit on the concrete surface. The presence of tannic acid or iron compound is objectionable.

fragments and shall be free from injurious amount of dust, lumps of soft or flaky particles, shale, alkali, organic, matter, lom mica and other deterious substances.

exceed 5 percent by weight. The sand shall be free from injurious amount of organic impurities and shall confirm to Indian Standard Specifications I.S.S. 383:1970 (second revison).

Arrangement shall be made to store natural sand in a way that would protect if from getting contaminated with dust, organic matter or other deleterious substances. In case the natural sand is not considered to be as per specification by the Engineer in Charge, it shall have to be washed and / or treated as directed by the Engineer-in-Charge, before being used or rejected.

in size within such limits coarse aggregate for concrete sall consist of crushed rock well graded and blended uniformly.

The coarse aggregate shall consist of hard, dense, durable, uncoated rock fragments, and shall be free from injurious amounts of soft, friable, thin elongated or laminated places, alkali, organic matter or other deterious substance.

shall not exceed 3 percent by weight. The coarse aggregate shall also confirm to requirements for abrasion and soundness specified under I.S.S. 383:1970 (second revision). The methods or tests for coarse aggregate as specified in I.S.S. 2386:1963 shall apply.

The Grading of course aggregate should confirm to IS 1983:1970. In case of variation of grading of divisible size aggregate. The combined grading or aggregate should confirm to any of standard for concrete mix design.

The coarse aggregate shall be stacked separately accordingly to their grading. The stacks shall be laid out as approved by the Engineer-in-Charge. The stacks shall be so located as to avoid any undesirable material getting mixed up with the aggregate. The aggregate shall be so deposited in and removed from the stacks, as not to cause any excessive of change in the uniformity or grading.

Page 48: Anicut Tender Sample Excel

aggregate of all grades, so as to ensure smooth and continuous progress of works according to the time schedule.

The steel required for the work will be procured by the contractor at his own cost. The department shall not supply any quantity of steel under any circumstances steel for reinforcement shall confirm to I.S. Specification 1786-1985 (with upto date revision) only. Tor steel (tor 40) shall be used in the structure. However, Tor 50, may also be used in the structure which will be procured from any licensee of “Tor Steel Research Foundation of India” only. In case of Tor 50, every bar should show “tor mark, rolled on the every meter length.

will be allowed as per IS 1786 only. The contractor shall be required to produce the test certificate of the manufacturers to the Department before use of steel for the work.

shall have sufficient strength and rigidity to hold concrete and to withstand the pressure of vibration without deflection from the prescribed liens. The surface of all forms in contact with concrete shall be used to hold corners. Adjacent ends and edge of panels or other forms together in accurate alignment. Forms used should be easy to remove in section, without damaging the surface of the concrete. Tie bolts etc shall preferably be used for internal ties only. It should remain 1”(25mm) behind the surface of concrete. The design of centering, form work & its supporting arrangement shall be got approved before erection by the engineer in charge.

the Engineer-in-Charge shall be provided as per instructions with no extra cost. M.S. Bars or nay steel pieces required to be kept projecting out of the concrete surface of any structure member, like pipe, nuts, bolts, red etc. the same shall be placed in position as per instruction of Engineer-in-Charge.

All forms work shall be maintained in serviceable conditions and shall be thoroughly cleaned and smoothened before being reused. It shall be checked for shape and strength before reuse.

Before placing concrete the surface of all forms shall be quoted with diesel and grease mix in ration 5:1 to prevent stacking of concrete & to facilitate the removal forms. Care shall be taken to prevent oil from surface of the construction joints and on reinforcement bars. Proper support to the form work shall be provided to withstand from against all possible forces on it.

Form work shall not be removed until the concrete has gained required strength. Form work shall be removed as per I.S. 456-

The foundation sill and superstructure shall be comprised of plum, concrete and reinforced cement concrete. The plum concrete shall be in M-15 grade with maximum of 100 mm plum not more than50%. The maximum size of aggregate M-15 concrete shall be 40 mm. The plum concrete structure shall be encased all around by M-25 grade RCC structure of minimum thickness of 20 cms with required reinforcement for temperature and other stress.

Concrete shall be composed of cement, sand coarse aggregate, water and any other admixture as required all well mixed and brought to proper consistency. Test of concrete shall be made at frequent intervals during the progress of work and the mixes will be changed where ever necessary to secure the required workability, density, impermeability and strength together with the maximum practical economy. The maximum size of coarse aggregate in concrete for any part of work shall be the largest of the specified sizes use of which is practicable from the point of satisfactory placing of concrete. The concrete shall in general contain 40 mm maximum size to heavily reinforced concrete having 20 mm as maximum size aggregate. The water cement ration shall be regulated by the requirements of the strength of durability Results of laboratory tests of durability and strength shall determine the most suitable water cement ratio for any mix. The proper ration of water to cement for any concrete shall be such as to produce a mixture which can work readily in the corner and angles of forms and around reinforcement bars with the methods of placing employed for the work, but without permitting the materials to segregate excess water collected on surface. Uniformly in the consistency from bath to batch shall be required. Specification for all concrete placed in the Anicut shall be in all respect conforming to the requirement laid down in IS-456-1978.

Concrete classification are related to the specified 28 days compressive strength confirms to the strength requirement and acceptance criteria of IS 456-1978. (with upto date amendment)The maximum size of aggregate may be reduced to next lower size for congested steel portion.

The mix design shall be involved on the basis of laboratory tests for the prescribed strength of concrete as per the actual materials to be used at the site. Weight batching shall be used for cement concrete. The contractor shall be bound to give specified strength, workability, density and impermeability etc with the size of aggregate indicated in the specifications.

i) Random sampling procedure shall be adopted to ensure that each concrete batch shall have a reasonable chance of being tested, that is sampling should be spread over the entire period of concreting and clear all mixing units.

The minimum frequency of sampling of concrete of each grade shall be accordance with the IS 456-1978.

Minimum size specimens of each lot shall be tested at 28 days. Additional cubes may be required for various purposes such as to determine the strength of concrete at 7 days or at the time of striking the form work, or to determine the duration of curing, or to check the testing error.

The test strength of the sample shall be in accordance with the provisions & acceptance criteria of IS 456-1978 with up to date amendments.

a) The concrete shall be composed of water, cement fine aggregate and coarse aggregate, each materials being previously approved by the Department.b) All sand and aggregate, used on the works shall be carefully and accurately measured by weight of volume in

Page 49: Anicut Tender Sample Excel

satisfaction of the Engineer in Charge. The quantity of sand when partially wet shall be increased by the right quantity after determining the percentage of bulkage. Water should be added to the dry mix in a manner in which it can be properly controlled and measured.c) The ingredients of concrete shall be properly mixed in mechanical mixers designed so as to positively ensure uniform distribution of all the ingredients throughout the mass at the end of the mixing period. The mixing of each bath shall continue for about one and half to two minutes or as found best in practice, after all materials except the full amount of water, are in the mixer.

introduction of the materials including water. The mixing times shall b increased when the charging operation fails to produce the required uniformity of composition and consistency shall be avoided.

contain sufficient excess quantity of cement, sand and water for buttering of mixer, i.e. to aboid loss of Mortor in first batch, alternatively buttering of mixer by cement, sand & water ( @ 10% of one batch weight) should be done & thrown as waste before producing actual concrete.

b) A portion of water (approx. 50%) shall proceed and approximately equal quantity shall follow on introduction of other ingredients.

f) Hand mixing shall not be permitted under any circumstances unless ordered in writing by the Engineer- in-Charge and in that case extra 10% cement shall be added for which no payment shall be made. It would be used for a small quantity of work ( max 2.0 cum)

9.8.1 The placing of concrete shall be performed only in the presence of an authorized representative of the Engineer-in-Charge. Concrete shall be placed only in locations where it has been authorized. No concrete shall be placed until form work, reinforcement, preparation of surface and necessary clean-up has been done and approved. All concrete shall be placed directly in its final position within 30 minutes after being mixes.

dropped from height exceeding 7 Ft (2m) and the free fall should be kept as minimum as possible. All surface of forms and metal work including reinforcement shall be cleaned before placing concrete.

thickness from approximately 45 cm in RCC work and 60 cm for max concrete. Construction joints shall be provided in the manner and at locations approved by the Engineer-in-Charge or as per drawing.

9.9.1 In case of under water concrete 10% extra cement will be added for the same mix as unused for Dry conditions. The concrete should have slump not less than 100 mm for easy flow on depositing by any approved method.

concrete. Hand tamping rodding shall not be allowed for compaction of concrete should have slump not less than 100 mm for easy flow on depositing by any approved method.

rays on sun for atleast 72 hours after placement. Concrete shall be kept continuously moist for not less than 28 days.

concrete. Horizontal surface shall be cured by the use of wet Gunny bags or making local pond over it. Approved curing agent may b used provided it is tested on specimen of concrete for effective curing.

The work shall be inspected by the Engineer-in-Charge, who will decide treatment for local building on exposed surface, finishing of Honey comb etc . When concrete is used for filling the chipping opening, it will not be less that 75 mm in depth and concretes filling shall be vibrated under strict watch by doing regular shuttering with an opening hole for vibration.

concrete surface and water way surface requiring durability under water will be finished in following manner, immediately upon the removal of the forms.

Page 50: Anicut Tender Sample Excel

filled with mortar of cement and fine sand in proportion of 1:2. In order to ensure uniformly dense and smooth face.

and air buble shall be filled with mortar of cement and fine sand proportion of 1:2. In order to ensure uniformly dense and smooth face.

pits become coated with dirt of other foreign materials. It will be removed by means of air/ water jets, brushing or other satisfactory means without damaging the surrounding concrete.

It is to minimize the period curing which the concrete and the mortar filling are exposed to drying. On completion of treatment of surface finish. It should match with the colour and texture of the principle concrete.

Necessary block cuts or Grooves shown or as directed shall be kept without any extra cost. After erection or embedment of various parts of gates etc these block outs or recesses would be filled in the cement concrete. No payment will however be made for embedding fixtures or providing grooves, block cuts etc Tie bolts, column bars grooves will be filled with the mortar.

All embedded parts, various anchorage structural members and guides for the gates and other articles placed in position by the contractor shall be carefully protected during concreting so as to maintain their alignments. All the embedded parts and instrument placed in position by the contractor or department shall be concreted by the contractor without any extra claim as shown in the drawing.

Cover block used to maintain cover around reinforcement steel shall be vibrated only. It will be made by the same grade of mortar as used in main concrete of the same work. Sufficient cover as specified in IS 456-1978 shall be provided to protect reinforcement from corrosion as indicated in the drawing.

Stone plums shall not be used unless specified on the drawing. When used, the size of stone plums may be from 150 to 300 mm. The maximum dimension of these stones or plums shall not exceed

shall be laid to a thickness of at least two and a half times thickness of the maximum size of plums to be used. The plums shall then be laid while the top portion of this concrete is still green but sufficient stiff to prevent complete submergence of the plums under their own weight. These plums shall be about half embedded in their concrete and remaining pat exposed so as to form a key with the next layer of concrete. No plums shall be used for concrete laid under water.

distance between any two plums is not less than either the width or thickness of either of plums. The distance from plums to the outer surface or from ay steel reinforcement shall be equal to greatest width of the plum.

natural bed. Stones with concave faces shall be laid with the concave upwards. The thickness of the next successive layers of concrete shall be at least twice that of the largest plums.

The water stops shall be provided in transverse joints for stopping to flow of water into joints. The 20 gauge copper or mocker ( alloy of mocker and copor) shall be used. The asphalt seal should be provided in between two water stops.

All work shall be performed and completed with good workmanship equal to the best modern practice in the manufacture and fabrication of the materials covered in these specifications. The work shall be carefully performed to the satisfaction of the Engineer-in-Charge. The contractor shall arrant all the materials and workmanship furnished by him to be free from injurious defects. He shall replace free of cost any defective materials or workmanship discovered during fabrication of erection. Workmanship shall confirm to the latest standards specification laid down in ISS.

All the materials, parts, equipments furnished shall be tested of quality and all works performed shall be subjected to rigid inspection. No articles, parts materials sand supplies shall be dispatched until all tests and shop inspections have completed or certified copies of reports, or results of tests and analysis shall have been accepted, if such workshop is approved as a sub site of work, the tenderer is required to transport the materials supplied to be given by the Department from the place specified to the sub site of work and no extra payment on account of transportation, loading and unloading of such materials to and from sub site shall be made by the Government.

Page 51: Anicut Tender Sample Excel

Government) having agreed to exempt ......................................... (hereinafter called the said contractor) from the demand under the terms & condition of the agreement dated made between...............and........................for the work (hereinafter called the said agreement) of security deposit for the due fulfillment by the said contractor(s) of the terms and conditions contained in the said agreement, on production of a Bank Guarantee for Rs.......................... (Rupees)........................................................) said contractor(s) do hereby undertake to pay to the Govt. an amount not exceeding Rs....................................... against any loss or damage caused to or suffered or would be caused to or suffered by the government, by reasons of any breach by the said Contractor(s) of the terms or conditions contained in the said agreement.2. We ................................... Bank Limited do hereby undertake to pay the amounts due and payable under this guarantee without any demur merely on a demand from the government stating the amount claimed is due by way of loss or damage caused to or would e caused to or suffered by the Government by reason of breach by the said Contractor(s) of any of terms or conditions contained in the said agreement or by reasons of the Contractor(s) failure to perform the said agreement. Any such demand made on the Bank shall be conclusive, as regards the amount due and payable by the Bank under this guarantee. However, our liability under this guarantee shall be restricted to an amount not exceeding Rs......................3. We (*).................................... bank limited further agree that the guarantee herein contained shall remain in full force and effect during the period that would be taken for the performance of the said agreement and that it shall continue to be enforceable till all the dues of the government under or by virtue of the said agreement have been fully paid and its claims satisfied or discharged or till the Executive Engineer, PHED Division....... certifies that the terms and conditions of the said agreement have been fully and properly carried out by the said contractor(s) and accordingly discharges this guarantee. Unless a demand or claim under this

4. We (*)................................... Bank Limited further agree with the government that the government shall have the fullest liberty without our consent and without effecting in any manner our obligation hereunder to vary any of the terms and conditions of the said agreement or to extend time of performance by the said contractor(s) from time to time or to postpone for any or for time to time any of the powers exercisable by the government against the said contractor(s) and to for bear or enforce any of the terms and conditions relating to the said agreement and we shall not be relieved from our liability by reason of any such variation, or extension being granted to the said contractor(s) or for bearance, act or commission on the part of the Government or any indulgence by the Government to the said contractor(s) by any such matter or thing whatsoever which under the law relating to sureties would, but for this provision have effect of so relieving us.

7. We..........................................................Bank Limited lastly undertake not to revoke this guarantee during its currency except with the previous consent of the

Page 52: Anicut Tender Sample Excel

Construction of Anicut at Village Singodi Water Surface (Pench River) Water Supply Scheme. Amarwara

Unit

cu.m.

cu.m.

cu.m.

cu.m.

cu.m.

cu.m.

cu.m.

cu.m.

cu.m.

Meter

kg

cu.m.

kg

cu.m.

cu.m.

cu.m.

cu.m.

sq.m.

cu.m.

cu.m.

Page 53: Anicut Tender Sample Excel

7 8 9 10 11 1230000 0.20 6000.00

6000 0.30 1800.00

2500 0.70 1750.00

2000 1.40 2800.00

0.20 74.40

0.20 5.16

0.20 13.92

0.20 186.00

0.20 52.08

331.56 17.00 5636.52

0.30 111.60

0.30 20.880.20 186.00

0.20 52.08

378.30 23.00 8700.90

0.50 186.00

0.50 12.90

0.50 34.800.20 186.00

0.20 52.08

471.78 31.00 14625.18

0.60 223.200.60 15.48

0.60 41.76

280.44 62.00 17387.28

Block- Amarwara

Quantity Rate[Rs.]

Amount[Rs.]H Other Total

Qtty.Unit

sqmt

sqmtsqmtsqmt

cu.m

cu.m

cu.m

cu.m

cu.m

Total Cum

.

cu.m

cu.m

cu.m

cu.m

Total Cum

.

cu.m

cu.m

cu.m

cu.m

cu.m

Total Cum

.

cu.m

cu.m

cu.m

Total Cum

Page 54: Anicut Tender Sample Excel

0.40 148.80

0.40 10.32

0.40 27.840.20 186.00

0.20 52.08

425.04 106.00 45054.24

1.00 372.00

1.00 25.80

1.00 33.600.20 186.00

1.00 260.40

877.80 170.00 149226.00

0.30 106.02

0.30 7.02

0.30 19.440.30 279.00

0.30 78.12

489.60 1376.00 673689.60489.60 18.00 8812.80

489.60 30.00 14688.00

1.50 283.50 330.00 93555.00

3.85 4731.45 50.00 236572.63

0.30 479.88 2835.00 1360459.80

.

cu.m

cu.m

cu.m

cu.m

cu.m

Total Cum

[B] Keys (K1+K2) 2 6.00 2.15 0.30 7.74 cu.m

cu.m

cu.m

cu.m

cu.m

cu.m

Total Cum

.

cu.m

cu.m

cu.m

cu.m

cu.m

Total Cum

cu.m

cu.m

m

.

Wt.(kg/mtr.) =

Kg

Excavation in hard rock i/c 50m lead and 1.5m lift with dressing : [a] Blasting permitted .

Cum

Page 55: Anicut Tender Sample Excel

0.395 5185.82

0.395 2601.31

0.395 699.47

0.395 515.48

9002.08 50.00 450103.82

2.70 803.52 1353.00 1087162.56

4.00 84.00

4.00 240.00

1.40 156.24324.00 1839.00 595836.00

3.00 571.95

1.50 -59.04512.91 1353.00 693967.23

4.00 112.80

3.30 156.24

269.04 1839.00 207439.2038.40 45000.00 1728000.00

3.00 418.50 92.00 38502.00

0.22 95.70 187.00 17895.90

Kg/m Kg

Kg/m Kg

Kg/m Kg

Kg/m Kg

Total Kg

.

cu.m.

cu.m.

cu.m.

Cu.m

Total Cum

cu.m.

cu.m.

cu.m.

cu.m.

sqmt

cu.m.

cu.m.

Page 56: Anicut Tender Sample Excel

7459664.66

74.60

=

Say Rs.Say, 74.60 LakhsRs.

Plum Cement Concrete1;3;6 with 75% graded .

Page 57: Anicut Tender Sample Excel

and it may not be necessary for the contractor to give any additional conditions. If any conditions are given, common set of conditions shall be framed as per procedure prescribed in the PWD manual.2.0 No advance payment shall be applicable for this work, Full security deposit as per NIT shall have to be deposited within 10 days of intimation of acceptance of tender to the contractor if the contractor fails to do so, his earnest money shall be forfeited and his tender will be rejected.3.0 The tenderers requested to accept the Break up schedule given in tender documents as ANNEXURF for assessment of work done as per clause No. 15 of the term for “LUMP SUM CONTRACT”.4.0 The firms/contractors sometimes ask for the refund of security deposit in a manner & time not in conformity with the provision of the NIT. Any such condition of refund of security deposit shall not be accepted by the department and as such the tenderers are requested to agree to the condition of the NIT in this regard.

6.0 The contractor shall be full responsible and accountable for obtaining all the required permission from the concerned authorities & for abiding all the laws, local regulations such as for water, power, extraction of sand and metal, excavation, blasting transportation of material, safety traffic related to this work.

from categories A-2 or S-2 and above

The bidders intending to participate in this tender are required to getHealth Engineering Department http://phed.mpeprocurement.gov.in. Enrollment / registration and subsequent empanelment on the above portal and sub portal is mandatory. The bidders registered with other departments of Govt. of M.P. who are also eligible to participate in tenders processed by Public Health Engineering Department, are also required to registered on the e-procurement system on http://phed.mpeprocurement.gov.in and after sanction of the tender they will have to manage their registration in PHED or have to deposit total security deposit

Page 58: Anicut Tender Sample Excel

2.2 The bid data should be filled and the bid seals (hashes) of all the envelops and the documents which are to be uploaded by the bidders should be submitted online up to as per time schedule (Key dates).

3.7 Specifications for pipes, valves, specials, rubber, gaskets RCC and other civil works and materials shall be governed by the relevant latest IS codes, IRC specifications and National Building code of India (latest revision)

right of the “Engineering-in-charge” to alter the specification for any part of whole of the work, if he considers it necessary in the interest of work. On all matters where there is difference of opinion between the contractor and the Executive Engineer, P.H.E. Department, (M.P.) the matter will be referred to the C.E. PHED Jabalpur Zone. Jabalpur, S.E., PHED Chhindwara Project Circle chhindwara whose decision will

pertaining to this tender shall be in accordance with standard specification of Building and Construction Department of Maharashtra Government (with all amendments issued up to date of receipt of tenders) BIS Code of practice BIS specification will be

6.0 WORKMANSHIP :- The work shall be carried out according to the specifications referred to hereinafter & according to sound engineering practice. The structure should have even & smooth finish. The decision of the Engineer-in-charge in respect of workmanship shall be final.7.0 CONCRETE :- All concrete shall be mixed in concrete mixer and compacted by mechanical vibrators. Slump tests shall be carried out during concreting and sample test tubes prepared & tested in due course by the contractor at his cost. The result of the tests shall conform with the required standards and if the Engineer-in-charge considers that a structural test is necessary, the same shall be carried out as instructed by the Engineer-in-charge at contractors expenses and if the results of this be unsatisfactory the contractor will be bound to take down and reconstruct the particular portion of the work which has given unsatisfactory test results. The contractor shall have to use only steel shuttering so as to get smooth finish.8.0 STEEL FOR REINFORCEMENT : All the iron and steel required for the work will be procured by the contractor at his own cost. The department shall not supply any quantity of steel under any circumstances. Steel for reinforcement shall confirm to B.I.S. specifications 432-1966 (with up to date revision) and B.I.S. 1139-1966 (with up to date revision). The contractor shall be required to produce the test certificate of the manufactures to the department before use of steel for the work. No untested steel will be allowed to be used under any circumstances. The department however reserves the right to get the steel tested at the cost of contractor.9.0 CEMENT : In accordance to the instructions contained in Govt. of M.P. PHED, Bhopal memo no. F-16-28/34-2/87 dt. 28.01.91. Cement required for the work will be procured by the contractor at his own cost from time as per requirement. The cement to be used in the work shall be ordinary low heat port land cement conforming to B.I.S. 269/1976 & Portland Slag Cement conforming to B.I.S.

Page 59: Anicut Tender Sample Excel

maximum efficiency in the normal working condition. Use of non corrodible materials for conveying chemicals and to resist abrasive action of sand, and use of suitable paints and coating for under water fittings to prevent contamination of water are expected to be providing by the contractor.12.0 SUBMISSION OF TENDERS :- The Tenderer shall fill/upload the Bids online and the Bid Hashes of three envelopes shall be digitally signed and submitted online as per mentioned key dates. The Bidders shall also have to submit Bids online (decrypt the bids using their Digital Certificate and encrypt the bids) as per mentioned key dates. There shall be three separate Online envelopes as under:-

13.1 Experience certificate of successful completion of work of Construction of R.C.C. Anicut on “TURN KEY JOB BASIS“ costing Rs 50.00 Lacs in contractor's/firm's/company's own name indicating agreement no., work order no. and date, amount of contract, stipulated period of completion, actual period of completion during last five year i.e. 2003-2004 to 2007-2008. An officer not below the rank of Executive Engineer should issue the certificate.13.2 The details of works in hand indicating name of work, Agreement no., work order no., and date, amount of contract, period of completion, value of work and balance work in hand with details of work on the date of submission of Tender.

Ownership document of concrete batch mixing plant, material testing laboratory equipments for Crushing strength test of moulded concrete specimens, slump test of concrete, particle size analysis , silt content, percentage of soft materials etc.

14.0 ENVELOPE - B :- The Second Online envelope shall contain terms and conditions and all the technical details and specifications of the proposed work. The Scanned copy of terms and conditions, along with technical specifications and drawings etc. should be submitted online in Envelope “B”.

16.0 Tender will be submitted with the Earnest Money, of Rs.74600 (In Words Seventy Four Thousands Six Hundreds Only ) In favour of the Executive Engineer, PHE Division ,Chhindwara (M.P.) which will be returned to the unsuccessful tenderer. The Earnest Money of the successful tenderer will be retained as part of the Security Deposit.17.0 FORM OF EARNEST MONEY : Where the tenderer proposes to pay the earnest money in cash he shall pay it to the where the. Tenderer proposes to pay the earnest money in cash he shall pay it to the credit of revenue deposit on behalf of Executive Engineer PHED, division Chhindwara (M.P.) in the branch of the state Bank of Government Treasury of Sub-treasury within the jurisdiction of the Executive Engineer mentioned above. If, however, the tenderer wishes to deposit the earnest money in any one of the following forms he may do so.

17.10 Bank Draft issued by big Urban Banks whose working Capital exceeds Rs. 5 crores for A, B & C Class, Central Co-operative Banks/Non Scheduled State Co-operative Banks, Subject to the conditions that the drafts are encased by accepting authority as soon as they are received and contracts are allotted

19.0 EARNEST MONEY IN SEPARATE COVERS:- The Earnest Money, in any one of the prescribed form should be deposited as mentioned under para 2.5 . If the Earnest Money is not found in accordance with the prescribed mode, the tender of the tenderer shall not be opened.20.0 ADJUSTMENT OF EARNEST MONEY:- The Earnest Money which has been deposited for a particular work will not ordinarily be adjusted towards the earnest money for another work, but if the tender of a contractor for a work in the same Division has been rejected and the Earnest Money has not been refunded to him due to some reasons it may be adjusted for this work by the Executive Engineer, provided amount retained is equal or more than required Earnest Money for this work.21.0 SECURITY DEPOSIT:- The Security Deposit to be taken for the due performances of the contact, under the terms and conditions given in the tender form, will be the Earnest money at the time of tender plus & sum to make it equal to 5% of the amount of contract to be paid within 10 days from the date of issue of letter of acceptance,failing which the tender shall be rejected & his EMD will be forfeited .22.0 IMPLICATION OF SUBMISSION OF TENDERS:- Bidders are advised to visit the site sufficiently in advance of the date fixed for the submission of the tender. The tenderer shall be deemed to have full knowledge of all relevant documents and site conditions etc. whether he inspects it or not.

Page 60: Anicut Tender Sample Excel

down in the relevant IS specifications, IRC specifications, manual on water supply and treatment, and Annexure-E having the scope and the specification of the work to be done. The contractor will be deemed to have seen the site of works.22.2 The contractor shall make his own arrangement for supply of water for construction, purposes. No lead and lift for any other material including water will be paid. The tender offer should be inclusive of all leads and lifts for the materials. The contractor should himself verify the leads of different materials before submitting his tender.

24.0 LIST OF WORKS IN PROGRESS :- Tenders must be accompanied by a list of Contracts already held by the tenderer at the time of submitting the tender, in the Department and elsewhere showing therein.

25.0 RELATIONSHIP :- The contractor shall not be permitted to tender for works in the Division, (responsible for award and execution of contract ) in which his near relative is posted a Divisional Accountant. He shall intimate the names of his near relative working in M.P. Secretariat and P.H.E Department. He shall also intimate the name of person working with him in any capacity or subsequently employed by him and who are near relatives to any Gazetted Officer in the M.P. Secretariat and P.H.E Department. Any breach of this condition by the contractor would render him self liable to be removed form the approved list of contractors of the P.H.E. Department. NOTE :- By the term “near relative” is meant wife, husband, parents and son, Grand son, brothers, sisters, brothers in laws, father in law and mother in law.

28.0 CANVASSING :- Canvassing in support of any firm/contractor for the acceptance of any tender is strictly prohibited. Any tenderer doing so will render himself liable to penalties which may include removal of his name from the register of approved

30.0 AUTHORITY OF EXECUTIVE ENGINEER :- The authority competent to accept a tender, reserves the right for accepting the tender for the whole work or for a distinct part of it, or distributing the work between two or more Bidders.31.0 VALIDITY OF OFFER : Tender shall remain open up to ....... days from the date of opening of the last financial price bids (Envelop "C") and in the event of the tenders withdrawing the offer before the aforesaid date for any reason whatsoever, earnest money deposit with the tender shall be forfeited by Government.32.0 TIME OF COMPLETION :- The time allowed for carrying out the work i.e. ..... months including rainy season shall be strictly observed and shall be reckoned from the date of issue of written order to commence the work. Delay beyond the specified time limit will be subject to liquidated damages according to clause 13 of Form “F” of Lump sum contract.33.0 TIME SCHEDULE:- The work shall be done by the contractor according to the schedule fixed in consultation with the competent authority. BAR/PERT/CPM chart showing detailed programme shall have to be submitted and adhered to by the contractor.

34.2 The Security deposit of the contractor shall not be refunded before the expiry of 6 months after successful testing of the work. It shall not be refunded also before the settlement and payment of the final bill in any case.

35.1 SUBLETTING WORK:- The contractor shall not without the prior approval of the competent authority, in writing, sublet or assign to any other party or parties the whole, or any portion of the work under the contract. Where such approval is granted, the contractor shall not be relieved of any obligation or duty or responsibility, which he under takes under the contract.

36.0 COMMERCIAL TAX :- All dues regarding taxes, and duties including the commercial Taxes, Royalties, Octroil Duties, Excise, Turnover, Taxes etc. on work, Contract etc. levied on the contractor’s work by Government and local bodies or private individuals will be payable by the contractor. The Executive Enineer will grant a certificate for the quantity actual used on the work but ewill not entertain any claim on this account .37.0 ROYALTY:-Minerals extracted for works carried out on behalf of the government, from the quarries in possession of and controlled by the State Government is subject to payment of Royalty by the contractor to whom it shall not be refundable.38.0 MODEL RULES RELATED TO LABOUR, WATER SUPPLY AND SANITATION IN LABOUR CAMPS. :-The contractor will be bound to follow the Madhya Pradesh Model Rules, relating to layout Water Supply and sanitation in labour camps, as per Annexure - A and the provisions of the National Building Code of India, in regard to construction and safety.

41.0 BEST QUALITY OF QUARRIED MATERIALS:- If the quarry material of more than one quality is found, the material approved by the Executive Engineer will only used by the contractor. If the materials of required Specification is not available in the near by area/quarry, the contractor shall have to arrange the same from the place where it is available.42.0 REMOVAL OF UNDESIRABLE PERSONS:- The contractor shall on receipt of the requisition from the Executive Engineer, at once remove any person employed by him on the work who in the opinion of the Executive Engineer is unsuitable or undesirable.

45.0 RIGHT TO INCREASE OF DECREASE OF WORK: The competent authority reserves the right to increase or decrease any item of work during the currency of the contract and the contractor will be bound to comply with the order of the competent authority without any claim for compensation or higher rates for additions and alterations.46.0 LABOUR REPORT:- Contractor will submit a report on labour engaged to local employment office and copy of same may be attached with the running account bill, failing which Rs.50/- will be deducted from each running bill. Total recovery on this account may be effected on the final bill.47.0 LABOUR LICENCE :- Every contractor who employs on any day of the preceding 12 months, twenty or more workers on contract is required to obtain license from the Licensing Officer or the Contract as per provision contained under Sub-section 4 (b) of section 2 of the Contract Labour ( Regulation and Abolition ) Act 1970 as per provision contained in Section 12 of Act. No, contractor shall execute any work without obtaining licence, contravention of above is punishable and contractor is liable to be prosecuted. The successful tenderer is liable to produce licence as and when demanded by the Executive Engineer, obtained form labour Department as laid down in chapter 4 of Contract labour ( Regulation and abolition) Act 1970.

49.0 DEFECT LIABILITY PERIOD :- The defect liability period in respect of the entire work as a whole or in parts of individual components included in this contract shall be 6 months form the date of completion of work and certified by the Executive Engineer as per clause 10 of form F.

50.4.1 It is not necessary for the contractor (or partner in case of firm/company) who is himself an engineer to employ engineer for the supervision of the work so long as the Contractor/partner works similar to what would have been done by and Employed Engineer.

Page 61: Anicut Tender Sample Excel

50.4.3 In case the contractor fails to employ the technical staff as aforesaid, he shall be liable to pay to the Government a sum of Rs. 10000.00 (Ten thousand) only for each month of defaults in case of Graduate Engineer and Rs. 5000.00 (Rs. Five thousands only) for each month of defaults in the cause of diploma holder Engineer.

51.1 The Notes and specifications given in the detailed notice inviting tenders and its annexure are to be read in conjunction with conditions given in the short notice inviting tenders and the conditions of Contract. These have been intended to supplement the provisions, in the NIT and the conditions of the Contract. All these will be binding on the contractor and shall form part of the agreement. However, in case of any contradiction between the common set of conditions and the NIT, the common set of conditions will supersede.51.2 EXECUTION OF AGREEMENT :- The Tenderer whose tender has been accepted shall have to execute the agreement with in a fortnight of the communication of the acceptance of his tender by the competent authority. Failure to do so will result in the Earnest Money being forfeited to Govt. and tender being

permanent nature. They lay down the minimum desirable standard which should be adhered to standards in permanent on semi permanent labour camps should not obviously be lower than for temporary camps.

water. : practicable filtered and chlorinated supplies shall be arranged when supple is from intermittent source over head storage tank shall be provided with a capacity of five liters a per son per day. Where the supply is to be made from a well it shall confirm to the sanitary standard laid down in the report of the rural sanitation committee. The well should be at least 30 meters away from any latrine or other source of pollution. If possible the and pump should be installed for drawing the water from well. The well should be effectively disinfected one every month and the quality of the water should be got tested at the Public Health Institution between each work of disinfecting.

Page 62: Anicut Tender Sample Excel

money due to the contractor any sum required or estimated to be required for making good, the loss suffered by a worker or workers by reason of iron-fulfillment of the conditions of the contract for the benefit of the workers non payment of the wages or of deductions made from his or their wages which are not justified by their terms of contract

Page 63: Anicut Tender Sample Excel

(h) Whether the company or firm or H. U. F. on which the assessment was made has been or is being liquidated, roundup dissolved, petitioned or being declared insolvent as the case may be.(i) The position about later assignment namely, whether returns submitted under section 22(l) or (2) of the IT Act and whether tax paid under section 18(a) of the Act and the amount of tax so paid or in arrears. ,

Design construction and testing of RCC Anicut of 93 mtr in length and 3 mtr height above average river bed level including supplying, fixing and errection of manually operated shutters as per MP LUN specification item Code SMM

Page 64: Anicut Tender Sample Excel

1.2.1 Design and construction of anicut on Pench river including Hydraulic and structural design. The anicut will be conventional gravity structure with opening between piers for shutters and de-silting arrangement.

The proposed site is located in 1000 m upstream of bridge at Pench river Singodi village. River bed is covered with granite. The banks are made up of alluvium. The flood data at proposed site are not available. The flood discharge is calculated from imperial formulae. The maximum flood discharge is 3727 cumec and the observed HFL is above 6 mtr with average bed level at 91.4 mtr General Hydraulic and Geological data are given below –

The observed HFL RL 101.75 mtr shall be taken as the basis of hydraulic calculation. The peak flood discharge must be taken less than 3727 cumec. As mentioned earlier there are flash floods iln the rivder. The hydraulic calculation including afflux level, scour depth, uplift pressure should based on relevant IRC publication.

The Anicut is proposed to be constructed across river Pench to store water to be supplied for drinking purposes to village Singodi. The scope of work given above and the specification given are not absolute and have been given for guidance to the contractors. This is a turn key job and includes all the provisions of civil and mechanical works required to fulfill the above mentioned objectives

Before starting any work, the contractor shall erect a permanent bench mark, reference line and check profiles, at convenient position approved by the Engineer in charge. The bench mark shall be 20x20x60 cm with 40 cm embaded underground and 20 cm above the ground. The top surface of the bench mark shall be truly horizontal and plain. The words B.M. with R.L. shall be consipiously carved and painted on the bench marks the reference line shall comprises of a base line properly dag belled on the ground with number of masonry pillars suitably spaced. The check profiles shall be of such materials and shall be located at such places as to ensure execution of all slopes, steps and elevation, to the profile or profiles indicated in the approved drawings or as directed by the Engineer – in – Charge.The mathematical surveying instruments all materials and labour for setting out works including construction of bench marks, reference lines, check profiles and surveys required at the various stages of the construction work, shall be made available by the contractor at his own cost.

2.2.1 The general plan and arrangements of the diversion shall be prepared before hand and shown in the plan. The contractor shall submit within one month from the date of issue of work order or of such period as may be specified by the Engineer-in-Charge to submit his plans for the temporary diversion, care and maintenance during the construction.

Engineer-in-charge shall not relieve the contractor for the responsibility of the adequacy and efficiency thereof and pumping plant and other all equipements, labour and materials necessary for dewatering the foundations and keeping the work areas free of water at all times necessary are within the scope of the contract. The changes, modifications or alteration required to suit the conditions during construction shall be borne by the contractor without extra charge. Any damage caused by failure or partial failure of his temporary diversion work during construction period

Page 65: Anicut Tender Sample Excel

works in good order. He shall also be responsible for providing and maintaining, necessary banners, fencing lighting, warning signs, signals and boards, watching and patrolling and all other safe guards necessary to ensure safety of human and animals lives and vehicular pedestrian and animal traffic.

Dewatering shall be carried out as per approved method to enable excavation, making inspection, final preparation of surfaces, providing anchor bars, grouting, laying of founds on concrete, laying of reinforced concrete, laying of reinforcement and all other construction activities. Diesel/ electric pumps or requisite capacity shall be installed in order to handle the dewatering.

Charge, may be resorted on works for rock excavation for quarry operations. In conducting Blasting operation shall be taken by the contractor for the protection of persons, the work and property. The planning of works should be such that no blasting is required close to structures already erected or foundations already filled. All government laws and regulations relation to license the design and location of magazine, the transportation and handling of explosives and other measures required for the prevention of accidents shall be observed. Warming signs shall be displayed on all power magazines.

Before an excavation is started, the deposition of spoil should be carefully planned. The excavated material shall be dumped sufficiently away from the edges of excavation, permitting, ample space for labour paths, movement of vehicles, other machine installations for lifting and dewatering and stacking construction material etc the excavated material will be transported to various works, or to stock waste piles, informing stock piles the useful

nature of the material. Materials from rock excavation which are fit for use will require special attention and should be preserved in defined areas. Similarly materials for use as chips or broken stones should be placed in the adjacent pile. Steps should be taken to keep the materials clean as subsequent cleaning will be difficult and imperfect. All other excavated materials shall be dumped in permanent banks or other approved location. Excavated materials shall not be carelessly thrown over the premises and should be deposited directly in permanent position so far as consistent with proper execution of the work.

The contractor will have to conduct all necessary investigations, planning and layout for the Anicut. The department has done Nine Nos. trial boresa at different points on the proposed anicut site to have an idea of the strata. These details are enclosed but are only for guidance to the contractor. The Geological reports submitted by the G.S.I. is also enclosed for the guidance to the contractor.

will be designed for buoyancy for up stream water level according to the relevant I.S. code, even for foundation resting on Rock, where the structure and base may be subject to tension within the limitations of clause 708.2.2 of IRC 78-1983, for foundation resting on Rock.

procedure laid down on IS 5512-1972 (amended upto date). Design should be based on most adverse combination of “Probable” load conditions. All the load combination A.B.C.D.E.F. and G as given in IS 6512-1972 must be considered and the structure must be safe for all above load combinations.

Page 66: Anicut Tender Sample Excel

The foundation of Anicut should be designed and constructed keeping in view the strata met in foundation, maximum scour depth, dead load or super structure water load at M.W.L. forces, velocity forces, wind forces, live load on Anicut, Water thrust, seismic force, buoyancy etc. complete. The bottom shear key should be capable of withstanding uplift pressure when the river is in flood or at M.W.L. Any other forces required to be taken for safe design which are not mentioned here should also be taken into consideration for the design.

shoring of sides of foundation, diversion of river flow, shoring of side of excavation, scaffolding, distilling of foundation, construction of coffer dam etc for which no extra payment shall be made by the department to the contractor. The contractors are therefore, advised to see the site of construction before submission of tender would mean that the contractor have full knowledge of at the relevant documents, proposed site construction, soil samples, strata at site, behaviour of river etc.

it is safe against scouring and is adequately protected from it. This depth should also be sufficient from consideration of bearing capacity, settlement, suitability of strata at foundation level and below it and stability of structure as a whole against overturning, sliding and out flanking.

maximum depth of scour near the Anicut shall be taken as 1.27 times the means depth of scour (as per IRC pocket book 4.4.3.1) for the design discharge. The mean depth of scour shall b calculated as given in the standard specification the code of practice for road bridges, IRC 78-1983.

be les than 1.2 meters. The epth of embedment shall exclude that portion of rock which is weathered for fissured. The foundation shall be designed for worst combination of loads and forces.

In case, any treatment of foundation is required during actual execution, it will have to be carried out by the contractor without any extra payment for the same. The department proposed the curtain grouting at the up stream axis of anicut upto 4.0 m depth below average bed level, in a single row of 6.0 m spacing holes however if as per site condition extra treatment is needed then that shall be done by the contractor without any extra cost. The pressure of grouting should not be less than 1.60 Kg/sqm.

RCC piers and opening for manually operated shutters as per MPLUN’s specifications item code SMM 163101. The width of opening may be between 1.20 m to 1.50 mt. The pear must be safe at sill level for over turning, shear etc. Considering worst conditions of loading and shutters closed and open both condition. The minimum top width of pier should be provided on each not be less than 1.0 m for fixing of shutters two nos grooves should be provided on each piers. A minimum temperature reinforcement shall be provided in encasing concrete work for piers.

The left and right bank of river Pench on Upstream side as well as D/S side will be protected upto a minimum distance of 10 m from anicut by way of construction of toe wall cement concrete. A cantilever type RCC retaining toe waqll with proper anchorage in rock shall be provided to retain the bank protection work. The bank protection is also included in lump sum offer. The bank protection work shall be designed as per relevant IRC and IS codes. The suitable arrangement for protection of U/S and D/S bed of river is also included in lump sum offer.

Page 67: Anicut Tender Sample Excel

Detailed drawing and design of geological, hydraulic and structural requirement for anicut structure, bank protections, key wall, wing walls, up stream and down stream protection and energy dissipation works etc shall be submitted along with the main structural design duly checked by the relevant department of the Govt. Engineering Collage. Detailed working drawings will be submitted in 6 copies. It will become the property of the Govt. Work will be executed as per approved drawing. In case of extra rebate contractor will have to submit design as per scope of work fixed in the contract and design for extra work or reduced work to assess the increase or decrease quantity of the work. No payment will be made for such additional design work. In case, during the course of execution, if contractor intend to modify or suggest any improvement and submit design in its support without asking any extra payment, it will also be subject to approval of the department.

For all purpose the structure and gates will deem to be tested if they don’t show any sign of defect after passing of two rainy season and behave according to what it intend in to the contract. For this purpose, rainy season means four peak months of rains, i.e. 15

The various works shall be done true to line, level and grade. The periodical of his responsibility regarding the accuracy. In case of any deviation or discrepancy in line, level or grade at the meeting faces, the contractor shall make good the discrepancy at his own cost and without any extra compensation for the additional work involved.

inspected and if necessary tested & approved by the Engineer-in- Charge. The Engineer-in-Charge has full power to get the material tested from the laboratory of any Govt. Engineering Collage or from the state laboratory on the cost of the contractor.

3.3 As for as practicable, no consignment of cement shall be received and transported during the monsoon period. Cement stored during monsoon and to be used after the monsoon shall not be used unless it has been tested in the laboratory and approved by the Engineer in Charge.

Page 68: Anicut Tender Sample Excel

When it is required to store cement bags at work site in the open for use on the work for one or two days they should be laid on a dry platform made of wooden planks resting on a brick masonry or concrete, platform about 15 cm (6”) above the ground. The number of bags shall be kept to a minimum preferably just sufficient for the day’s consumption. The pile shall be well covered by tarpaulin overlapping each other properly and protected against the moisture in the air and wind. This matter of temporary storage shall not be adopted in wet weather.

to improve the quality of workability of the mix if approved by the Engineer-in-Charge. The amount of air entraining agent used shall be of such effect to the entrainment of 3 to 5 percent of air by volume of the concrete or 8 percent to 12 percent of air by volume of cement mortar. The agent shall be added to the batch in solution in a portion of the mixing water by means of a mechanical batcher capable of accurate measure.

& steel. Potable water is generally considered satisfactory for mixing concrete. Water found satisfactory for mixing is also suitable for curing concrete. However water used for curing should not produce any objectionable, stain or deposit on the concrete surface. The presence of tannic acid or iron compound is objectionable.

Arrangement shall be made to store natural sand in a way that would protect if from getting contaminated with dust, organic matter or other deleterious substances. In case the natural sand is not considered to be as per specification by the Engineer in Charge, it shall have to be washed and / or treated as directed by the Engineer-in-Charge, before being used or rejected.

The coarse aggregate shall consist of hard, dense, durable, uncoated rock fragments, and shall be free from injurious amounts of soft, friable, thin elongated or laminated places, alkali, organic matter or other deterious substance.

shall not exceed 3 percent by weight. The coarse aggregate shall also confirm to requirements for abrasion and soundness specified under I.S.S. 383:1970 (second revision). The methods or tests for coarse aggregate as specified in I.S.S. 2386:1963 shall apply.

The Grading of course aggregate should confirm to IS 1983:1970. In case of variation of grading of divisible size aggregate. The combined grading or aggregate should confirm to any of standard for concrete mix design.

The coarse aggregate shall be stacked separately accordingly to their grading. The stacks shall be laid out as approved by the Engineer-in-Charge. The stacks shall be so located as to avoid any undesirable material getting mixed up with the aggregate. The aggregate shall be so deposited in and removed from the stacks, as not to cause any excessive of change in the uniformity or grading.

Page 69: Anicut Tender Sample Excel

The steel required for the work will be procured by the contractor at his own cost. The department shall not supply any quantity of steel under any circumstances steel for reinforcement shall confirm to I.S. Specification 1786-1985 (with upto date revision) only. Tor steel (tor 40) shall be used in the structure. However, Tor 50, may also be used in the structure which will be procured from any licensee of “Tor Steel Research Foundation of India” only. In case of Tor 50, every bar should show “tor mark, rolled on the every meter length.

shall have sufficient strength and rigidity to hold concrete and to withstand the pressure of vibration without deflection from the prescribed liens. The surface of all forms in contact with concrete shall be used to hold corners. Adjacent ends and edge of panels or other forms together in accurate alignment. Forms used should be easy to remove in section, without damaging the surface of the concrete. Tie bolts etc shall preferably be used for internal ties only. It should remain 1”(25mm) behind the surface of concrete. The design of centering, form work & its supporting arrangement shall be got approved before erection by the engineer in charge.

the Engineer-in-Charge shall be provided as per instructions with no extra cost. M.S. Bars or nay steel pieces required to be kept projecting out of the concrete surface of any structure member, like pipe, nuts, bolts, red etc. the same shall be placed in position as per instruction of Engineer-in-Charge.

All forms work shall be maintained in serviceable conditions and shall be thoroughly cleaned and smoothened before being reused. It shall be checked for shape and strength before reuse.

Before placing concrete the surface of all forms shall be quoted with diesel and grease mix in ration 5:1 to prevent stacking of concrete & to facilitate the removal forms. Care shall be taken to prevent oil from surface of the construction joints and on reinforcement bars. Proper support to the form work shall be provided to withstand from against all possible forces on it.

The foundation sill and superstructure shall be comprised of plum, concrete and reinforced cement concrete. The plum concrete shall be in M-15 grade with maximum of 100 mm plum not more than

Concrete shall be composed of cement, sand coarse aggregate, water and any other admixture as required all well mixed and brought to proper consistency. Test of concrete shall be made at frequent intervals during the progress of work and the mixes will be changed where ever necessary to secure the required workability, density, impermeability and strength together with the maximum practical economy. The maximum size of coarse aggregate in concrete for any part of work shall be the largest of the specified sizes use of which is practicable from the point of satisfactory placing of concrete. The concrete shall in general contain 40 mm maximum size to heavily reinforced concrete having 20 mm as maximum size aggregate. The water cement ration shall be regulated by the requirements of the strength of durability Results of laboratory tests of durability and strength shall determine the most suitable water cement ratio for any mix. The proper ration of water to cement for any concrete shall be such as to produce a mixture which can work readily in the corner and angles of forms and around reinforcement bars with the methods of placing employed for the work, but without permitting the materials to segregate excess water collected on surface. Uniformly in the consistency from bath to batch shall be required. Specification for all concrete placed in the Anicut shall be in all respect conforming to the requirement laid down in IS-456-1978.

Concrete classification are related to the specified 28 days compressive strength confirms to the strength requirement and acceptance criteria of IS 456-1978. (with upto date amendment)

The mix design shall be involved on the basis of laboratory tests for the prescribed strength of concrete as per the actual materials to be used at the site. Weight batching shall be used for cement concrete. The contractor shall be bound to give specified strength, workability, density and impermeability etc with the size of aggregate indicated in the specifications.

i) Random sampling procedure shall be adopted to ensure that each concrete batch shall have a reasonable chance of being tested, that is sampling should be spread over the entire period of concreting and clear all mixing units.

Minimum size specimens of each lot shall be tested at 28 days. Additional cubes may be required for various purposes such as to determine the strength of concrete at 7 days or at the time of striking the form work, or to determine the duration of curing, or to check the testing error.

Page 70: Anicut Tender Sample Excel

satisfaction of the Engineer in Charge. The quantity of sand when partially wet shall be increased by the right quantity after determining the percentage of bulkage. Water should be added to the dry mix in a manner in which it can be properly controlled and measured.c) The ingredients of concrete shall be properly mixed in mechanical mixers designed so as to positively ensure uniform distribution of all the ingredients throughout the mass at the end of the mixing period. The mixing of each bath shall continue for about one and half to two minutes or as found best in practice, after all materials except the full amount of water, are in the mixer.

introduction of the materials including water. The mixing times shall b increased when the charging operation fails to produce the required uniformity of composition and consistency shall be avoided.

contain sufficient excess quantity of cement, sand and water for buttering of mixer, i.e. to aboid loss of Mortor in first batch, alternatively buttering of mixer by cement, sand & water ( @ 10% of one batch weight) should be done & thrown as waste before producing actual concrete.

f) Hand mixing shall not be permitted under any circumstances unless ordered in writing by the Engineer- in-Charge and in that case extra 10% cement shall be added for which no payment shall be made. It would be used for a small quantity of work ( max 2.0 cum)

9.8.1 The placing of concrete shall be performed only in the presence of an authorized representative of the Engineer-in-Charge. Concrete shall be placed only in locations where it has been authorized. No concrete shall be placed until form work, reinforcement, preparation of surface and necessary clean-up has been done and approved. All concrete shall be placed directly in its final position within 30 minutes after being mixes.

dropped from height exceeding 7 Ft (2m) and the free fall should be kept as minimum as possible. All surface of forms and metal work including reinforcement shall be cleaned before placing concrete.

thickness from approximately 45 cm in RCC work and 60 cm for max concrete. Construction joints shall be provided in the manner and at locations approved by the Engineer-in-Charge or as per drawing.

9.9.1 In case of under water concrete 10% extra cement will be added for the same mix as unused for Dry conditions. The concrete should have slump not less than 100 mm for easy flow on depositing by any approved method.

concrete. Hand tamping rodding shall not be allowed for compaction of concrete should have slump not less than 100 mm for easy flow on depositing by any approved method.

concrete. Horizontal surface shall be cured by the use of wet Gunny bags or making local pond over it. Approved curing agent may b used provided it is tested on specimen of concrete for effective curing.

The work shall be inspected by the Engineer-in-Charge, who will decide treatment for local building on exposed surface, finishing of Honey comb etc . When concrete is used for filling the chipping opening, it will not be less that 75 mm in depth and concretes filling shall be vibrated under strict watch by doing regular shuttering with an opening hole for vibration.

Page 71: Anicut Tender Sample Excel

It is to minimize the period curing which the concrete and the mortar filling are exposed to drying. On completion of treatment of surface finish. It should match with the colour and texture of the principle concrete.

Necessary block cuts or Grooves shown or as directed shall be kept without any extra cost. After erection or embedment of various parts of gates etc these block outs or recesses would be filled in the cement concrete. No payment will however be made for embedding fixtures or providing grooves, block cuts etc Tie bolts, column bars grooves will be filled with the mortar.

All embedded parts, various anchorage structural members and guides for the gates and other articles placed in position by the contractor shall be carefully protected during concreting so as to maintain their alignments. All the embedded parts and instrument placed in position by the contractor or department shall be concreted by the contractor without any extra claim as shown in the drawing.

Cover block used to maintain cover around reinforcement steel shall be vibrated only. It will be made by the same grade of mortar as used in main concrete of the same work. Sufficient cover as specified in IS 456-1978 shall be provided to protect reinforcement from corrosion as indicated in the drawing.

Stone plums shall not be used unless specified on the drawing. When used, the size of stone plums may be from 150 to 300 mm. The maximum dimension of these stones or plums shall not exceed

shall be laid to a thickness of at least two and a half times thickness of the maximum size of plums to be used. The plums shall then be laid while the top portion of this concrete is still green but sufficient stiff to prevent complete submergence of the plums under their own weight. These plums shall be about half embedded in their concrete and remaining pat exposed so as to form a key with the next layer of concrete. No plums shall be used for concrete laid under water.

distance between any two plums is not less than either the width or thickness of either of plums. The distance from plums to the outer surface or from ay steel reinforcement shall be equal to greatest width of the plum.

The water stops shall be provided in transverse joints for stopping to flow of water into joints. The 20 gauge copper or mocker ( alloy of mocker and copor) shall be used. The asphalt seal should be provided in between two water stops.

All work shall be performed and completed with good workmanship equal to the best modern practice in the manufacture and fabrication of the materials covered in these specifications. The work shall be carefully performed to the satisfaction of the Engineer-in-Charge. The contractor shall arrant all the materials and workmanship furnished by him to be free from injurious defects. He shall replace free of cost any defective materials or workmanship discovered during fabrication of erection. Workmanship shall confirm to the latest standards specification laid down in ISS.

All the materials, parts, equipments furnished shall be tested of quality and all works performed shall be subjected to rigid inspection. No articles, parts materials sand supplies shall be dispatched until all tests and shop inspections have completed or certified copies of reports, or results of tests and analysis shall have been accepted, if such workshop is approved as a sub site of work, the tenderer is required to transport the materials supplied to be given by the Department from the place specified to the sub site of work and no extra payment on account of transportation, loading and unloading of such materials to and from sub site shall be made by the Government.

Page 72: Anicut Tender Sample Excel

Government) having agreed to exempt ......................................... (hereinafter called the said contractor) from the demand under the terms & condition of the agreement dated made between...............and........................for the work (hereinafter called the said agreement) of security deposit for the due fulfillment by the said contractor(s) of the terms and conditions contained in the said agreement, on production of a Bank Guarantee for Rs.......................... (Rupees)........................................................) said contractor(s) do hereby undertake to pay to the Govt. an amount not exceeding Rs....................................... against any loss or damage caused to or suffered or would be caused to or suffered by the government, by reasons of any breach by the said Contractor(s) of the terms or conditions contained in the said agreement.2. We ................................... Bank Limited do hereby undertake to pay the amounts due and payable under this guarantee without any demur merely on a demand from the government stating the amount claimed is due by way of loss or damage caused to or would e caused to or suffered by the Government by reason of breach by the said Contractor(s) of any of terms or conditions contained in the said agreement or by reasons of the Contractor(s) failure to perform the said agreement. Any such demand made on the Bank shall be conclusive, as regards the amount due and payable by the Bank under this guarantee. However, our liability under this guarantee shall be restricted to an amount not exceeding Rs......................3. We (*).................................... bank limited further agree that the guarantee herein contained shall remain in full force and effect during the period that would be taken for the performance of the said agreement and that it shall continue to be enforceable till all the dues of the government under or by virtue of the said agreement have been fully paid and its claims satisfied or discharged or till the Executive Engineer, PHED Division....... certifies that the terms and conditions of the said agreement have been fully and properly carried out by the said contractor(s) and accordingly discharges this guarantee. Unless a demand or claim under this

4. We (*)................................... Bank Limited further agree with the government that the government shall have the fullest liberty without our consent and without effecting in any manner our obligation hereunder to vary any of the terms and conditions of the said agreement or to extend time of performance by the said contractor(s) from time to time or to postpone for any or for time to time any of the powers exercisable by the government against the said contractor(s) and to for bear or enforce any of the terms and conditions relating to the said agreement and we shall not be relieved from our liability by reason of any such variation, or extension being granted to the said contractor(s) or for bearance, act or commission on the part of the Government or any indulgence by the Government to the said contractor(s) by any such matter or thing whatsoever which under the law relating to sureties would, but for this provision have effect of so relieving us.

Page 73: Anicut Tender Sample Excel

4.0 The firms/contractors sometimes ask for the refund of security deposit in a manner & time not in conformity with the provision of the NIT. Any such condition of refund of security deposit shall not be accepted by the department and as such the tenderers are requested to agree to the condition of the NIT in this regard.

6.0 The contractor shall be full responsible and accountable for obtaining all the required permission from the concerned authorities & for abiding all the laws, local regulations such as for water, power, extraction of sand and metal, excavation, blasting transportation of material, safety traffic related to this work.

mandatory. The bidders registered with other departments of Govt. of M.P. who are also eligible to participate in tenders processed by Public Health Engineering Department, are also required to registered on the e-procurement system on http://phed.mpeprocurement.gov.in and after sanction of the tender they will have to manage their registration in PHED or have to deposit total security deposit

Page 74: Anicut Tender Sample Excel

right of the “Engineering-in-charge” to alter the specification for any part of whole of the work, if he considers it necessary in the interest of work. On all matters where there is difference of opinion between the contractor and the Executive Engineer, P.H.E. Department, (M.P.) the matter will be referred to the C.E. PHED Jabalpur Zone. Jabalpur, S.E., PHED Chhindwara Project Circle chhindwara whose decision will

7.0 CONCRETE :- All concrete shall be mixed in concrete mixer and compacted by mechanical vibrators. Slump tests shall be carried out during concreting and sample test tubes prepared & tested in due course by the contractor at his cost. The result of the tests shall conform with the required standards and if the Engineer-in-charge considers that a structural test is necessary, the same shall be carried out as instructed by the Engineer-in-charge at contractors expenses and if the results of this be unsatisfactory the contractor will be bound to take down and reconstruct the particular portion of the work which has given unsatisfactory test results. The contractor shall have to use only steel shuttering so as to get smooth finish.8.0 STEEL FOR REINFORCEMENT : All the iron and steel required for the work will be procured by the contractor at his own cost. The department shall not supply any quantity of steel under any circumstances. Steel for reinforcement shall confirm to B.I.S. specifications 432-1966 (with up to date revision) and B.I.S. 1139-1966 (with up to date revision). The contractor shall be required to produce the test certificate of the manufactures to the department before use of steel for the work. No untested steel will be allowed to be used under any circumstances. The department however reserves the right to get the steel tested at the cost of contractor.9.0 CEMENT : In accordance to the instructions contained in Govt. of M.P. PHED, Bhopal memo no. F-16-28/34-2/87 dt. 28.01.91. Cement required for the work will be procured by the contractor at his own cost from time as per requirement. The cement to be used in the work shall be ordinary low heat port land cement conforming to B.I.S. 269/1976 & Portland Slag Cement conforming to B.I.S.

Page 75: Anicut Tender Sample Excel

12.0 SUBMISSION OF TENDERS :- The Tenderer shall fill/upload the Bids online and the Bid Hashes of three envelopes shall be digitally signed and submitted online as per mentioned key dates. The Bidders shall also have to submit Bids online (decrypt the bids using their Digital Certificate and encrypt the bids) as per mentioned key dates. There shall be three separate Online envelopes as under:-

13.1 Experience certificate of successful completion of work of Construction of R.C.C. Anicut on “TURN KEY JOB BASIS“ costing Rs 50.00 Lacs in contractor's/firm's/company's own name indicating agreement no., work order no. and date, amount of contract, stipulated period of completion, actual period of completion during last five year i.e. 2003-2004 to 2007-2008. An officer not below the rank of Executive Engineer should issue the certificate.

16.0 Tender will be submitted with the Earnest Money, of Rs.74600 (In Words Seventy Four Thousands Six Hundreds Only ) In favour of the Executive Engineer, PHE Division ,Chhindwara (M.P.) which will be returned to the unsuccessful tenderer. The Earnest Money of the successful tenderer will be retained as part of the Security Deposit.17.0 FORM OF EARNEST MONEY : Where the tenderer proposes to pay the earnest money in cash he shall pay it to the where the. Tenderer proposes to pay the earnest money in cash he shall pay it to the credit of revenue deposit on behalf of Executive Engineer PHED, division Chhindwara (M.P.) in the branch of the state Bank of Government Treasury of Sub-treasury within the jurisdiction of the Executive Engineer mentioned above. If, however, the tenderer wishes to deposit the earnest money in any one of the following forms he may do so.

20.0 ADJUSTMENT OF EARNEST MONEY:- The Earnest Money which has been deposited for a particular work will not ordinarily be adjusted towards the earnest money for another work, but if the tender of a contractor for a work in the same Division has been rejected and the Earnest Money has not been refunded to him due to some reasons it may be adjusted for this work by the Executive Engineer, provided amount retained is equal or more than required Earnest Money for this work.21.0 SECURITY DEPOSIT:- The Security Deposit to be taken for the due performances of the contact, under the terms and conditions given in the tender form, will be the Earnest money at the time of tender plus & sum to make it equal to 5% of the amount of contract to be paid within 10 days from the date of issue of letter of acceptance,failing which the tender shall be rejected & his EMD will be forfeited .

Page 76: Anicut Tender Sample Excel

22.2 The contractor shall make his own arrangement for supply of water for construction, purposes. No lead and lift for any other material including water will be paid. The tender offer should be inclusive of all leads and lifts for the materials. The contractor should himself verify the leads of different materials before submitting his tender.

25.0 RELATIONSHIP :- The contractor shall not be permitted to tender for works in the Division, (responsible for award and execution of contract ) in which his near relative is posted a Divisional Accountant. He shall intimate the names of his near relative working in M.P. Secretariat and P.H.E Department. He shall also intimate the name of person working with him in any capacity or subsequently employed by him and who are near relatives to any Gazetted Officer in the M.P. Secretariat and P.H.E Department. Any breach of this condition by the contractor would render him self liable to be removed form the approved list of contractors of the P.H.E. Department. NOTE :- By the term “near relative” is meant wife, husband, parents and son, Grand son, brothers, sisters, brothers in laws, father in law and mother in law.

32.0 TIME OF COMPLETION :- The time allowed for carrying out the work i.e. ..... months including rainy season shall be strictly observed and shall be reckoned from the date of issue of written order to commence the work. Delay beyond the specified time limit will be subject to liquidated damages according to clause 13 of Form “F” of Lump sum contract.

35.1 SUBLETTING WORK:- The contractor shall not without the prior approval of the competent authority, in writing, sublet or assign to any other party or parties the whole, or any portion of the work under the contract. Where such approval is granted, the contractor shall not be relieved of any obligation or duty or responsibility, which he under takes under the contract.

36.0 COMMERCIAL TAX :- All dues regarding taxes, and duties including the commercial Taxes, Royalties, Octroil Duties, Excise, Turnover, Taxes etc. on work, Contract etc. levied on the contractor’s work by Government and local bodies or private individuals will be payable by the contractor. The Executive Enineer will grant a certificate for the quantity actual used on the work but ewill not entertain any claim on this account .

38.0 MODEL RULES RELATED TO LABOUR, WATER SUPPLY AND SANITATION IN LABOUR CAMPS. :-The contractor will be bound to follow the Madhya Pradesh Model Rules, relating to layout Water Supply and sanitation in labour camps, as per Annexure - A and the provisions of the National Building Code of India, in regard to construction and safety.

41.0 BEST QUALITY OF QUARRIED MATERIALS:- If the quarry material of more than one quality is found, the material approved by the Executive Engineer will only used by the contractor. If the materials of required Specification is not available in the near by area/quarry, the contractor shall have to arrange the same from the place where it is available.

45.0 RIGHT TO INCREASE OF DECREASE OF WORK: The competent authority reserves the right to increase or decrease any item of work during the currency of the contract and the contractor will be bound to comply with the order of the competent authority without any claim for compensation or higher rates for additions and alterations.

47.0 LABOUR LICENCE :- Every contractor who employs on any day of the preceding 12 months, twenty or more workers on contract is required to obtain license from the Licensing Officer or the Contract as per provision contained under Sub-section 4 (b) of section 2 of the Contract Labour ( Regulation and Abolition ) Act 1970 as per provision contained in Section 12 of Act. No, contractor shall execute any work without obtaining licence, contravention of above is punishable and contractor is liable to be prosecuted. The successful tenderer is liable to produce licence as and when demanded by the Executive Engineer, obtained form labour Department as laid down in chapter 4 of Contract labour ( Regulation and abolition) Act 1970.

Page 77: Anicut Tender Sample Excel

50.4.3 In case the contractor fails to employ the technical staff as aforesaid, he shall be liable to pay to the Government a sum of Rs. 10000.00 (Ten thousand) only for each month of defaults in case of Graduate Engineer and Rs. 5000.00 (Rs. Five thousands only) for each month of defaults in the cause of diploma holder Engineer.

51.1 The Notes and specifications given in the detailed notice inviting tenders and its annexure are to be read in conjunction with conditions given in the short notice inviting tenders and the conditions of Contract. These have been intended to supplement the provisions, in the NIT and the conditions of the Contract. All these will be binding on the contractor and shall form part of the agreement. However, in case of any contradiction between the common set of conditions and the NIT, the common set of conditions will supersede.

water. : practicable filtered and chlorinated supplies shall be arranged when supple is from intermittent source over head storage tank shall be provided with a capacity of five liters a per son per day. Where the supply is to be made from a well it shall confirm to the sanitary standard laid down in the report of the rural sanitation committee. The well should be at least 30 meters away from any latrine or other source of pollution. If possible the and pump should be installed for drawing the water from well. The well should be effectively disinfected one every month and the quality of the water should be got tested at the Public Health Institution between each work of disinfecting.

Page 78: Anicut Tender Sample Excel

money due to the contractor any sum required or estimated to be required for making good, the loss suffered by a worker or workers by reason of iron-fulfillment of the conditions of the contract for the benefit of the workers non payment of the wages or of deductions made from his or their wages which are not justified by their terms of contract

Page 79: Anicut Tender Sample Excel

The proposed site is located in 1000 m upstream of bridge at Pench river Singodi village. River bed is covered with granite. The banks are made up of alluvium. The flood data at proposed site are not available. The flood discharge is calculated from imperial formulae. The maximum flood discharge is 3727 cumec and the observed HFL is above 6 mtr with average bed level at 91.4 mtr General Hydraulic and Geological data are given below –

The observed HFL RL 101.75 mtr shall be taken as the basis of hydraulic calculation. The peak flood discharge must be taken less than 3727 cumec. As mentioned earlier there are flash floods iln the rivder. The hydraulic calculation including afflux level, scour depth, uplift pressure should based on relevant IRC publication.

The Anicut is proposed to be constructed across river Pench to store water to be supplied for drinking purposes to village Singodi. The scope of work given above and the specification given are not absolute and have been given for guidance to the contractors. This is a turn key job and includes all the provisions of civil and mechanical works required to fulfill the above mentioned objectives

Before starting any work, the contractor shall erect a permanent bench mark, reference line and check profiles, at convenient position approved by the Engineer in charge. The bench mark shall be 20x20x60 cm with 40 cm embaded underground and 20 cm above the ground. The top surface of the bench mark shall be truly horizontal and plain. The words B.M. with R.L. shall be consipiously carved and painted on the bench marks the reference line shall comprises of a base line properly dag belled on the ground with number of masonry pillars suitably spaced. The check profiles shall be of such materials and shall be located at such places as to ensure execution of all slopes, steps and elevation, to the profile or profiles indicated in the approved drawings or as directed by the Engineer – in – Charge.The mathematical surveying instruments all materials and labour for setting out works including construction of bench marks, reference lines, check profiles and surveys required at the various stages of the construction work, shall be made available by the contractor at his own cost.

2.2.1 The general plan and arrangements of the diversion shall be prepared before hand and shown in the plan. The contractor shall submit within one month from the date of issue of work order or of such period as may be specified by the Engineer-in-Charge to submit his plans for the temporary diversion, care and maintenance during the construction.

Engineer-in-charge shall not relieve the contractor for the responsibility of the adequacy and efficiency thereof and pumping plant and other all equipements, labour and materials necessary for dewatering the foundations and keeping the work areas free of water at all times necessary are within the scope of the contract. The changes, modifications or alteration required to suit the conditions during construction shall be borne by the contractor without extra charge. Any damage caused by failure or partial failure of his temporary diversion work during construction period

Page 80: Anicut Tender Sample Excel

works in good order. He shall also be responsible for providing and maintaining, necessary banners, fencing lighting, warning signs, signals and boards, watching and patrolling and all other safe guards necessary to ensure safety of human and animals lives and vehicular pedestrian and animal traffic.

Dewatering shall be carried out as per approved method to enable excavation, making inspection, final preparation of surfaces, providing anchor bars, grouting, laying of founds on concrete, laying of reinforced concrete, laying of reinforcement and all other construction activities. Diesel/ electric pumps or requisite capacity shall be installed in order to handle the dewatering.

Charge, may be resorted on works for rock excavation for quarry operations. In conducting Blasting operation shall be taken by the contractor for the protection of persons, the work and property. The planning of works should be such that no blasting is required close to structures already erected or foundations already filled. All government laws and regulations relation to license the design and location of magazine, the transportation and handling of explosives and other measures required for the prevention of accidents shall be observed. Warming signs shall be displayed on all power magazines.

Before an excavation is started, the deposition of spoil should be carefully planned. The excavated material shall be dumped sufficiently away from the edges of excavation, permitting, ample space for labour paths, movement of vehicles, other machine installations for lifting and dewatering and stacking construction material etc the excavated material will be transported to various works, or to stock waste piles, informing stock piles the useful

nature of the material. Materials from rock excavation which are fit for use will require special attention and should be preserved in defined areas. Similarly materials for use as chips or broken stones should be placed in the adjacent pile. Steps should be taken to keep the materials clean as subsequent cleaning will be difficult and imperfect. All other excavated materials shall be dumped in permanent banks or other approved location. Excavated materials shall not be carelessly thrown over the premises and should be deposited directly in permanent position so far as consistent with proper execution of the work.

The contractor will have to conduct all necessary investigations, planning and layout for the Anicut. The department has done Nine Nos. trial boresa at different points on the proposed anicut site to have an idea of the strata. These details are enclosed but are only for guidance to the contractor. The Geological reports submitted by the G.S.I. is also enclosed for the guidance to the contractor.

will be designed for buoyancy for up stream water level according to the relevant I.S. code, even for foundation resting on Rock, where the structure and base may be subject to tension within the limitations of clause 708.2.2 of IRC 78-1983, for foundation resting on Rock.

procedure laid down on IS 5512-1972 (amended upto date). Design should be based on most adverse combination of “Probable” load conditions. All the load combination A.B.C.D.E.F. and G as given in IS 6512-1972 must be considered and the structure must be safe for all above load combinations.

Page 81: Anicut Tender Sample Excel

The foundation of Anicut should be designed and constructed keeping in view the strata met in foundation, maximum scour depth, dead load or super structure water load at M.W.L. forces, velocity forces, wind forces, live load on Anicut, Water thrust, seismic force, buoyancy etc. complete. The bottom shear key should be capable of withstanding uplift pressure when the river is in flood or at M.W.L. Any other forces required to be taken for safe design which are not mentioned here should also be taken into consideration for the design.

shoring of sides of foundation, diversion of river flow, shoring of side of excavation, scaffolding, distilling of foundation, construction of coffer dam etc for which no extra payment shall be made by the department to the contractor. The contractors are therefore, advised to see the site of construction before submission of tender would mean that the contractor have full knowledge of at the relevant documents, proposed site construction, soil samples, strata at site, behaviour of river etc.

it is safe against scouring and is adequately protected from it. This depth should also be sufficient from consideration of bearing capacity, settlement, suitability of strata at foundation level and below it and stability of structure as a whole against overturning, sliding and out flanking.

maximum depth of scour near the Anicut shall be taken as 1.27 times the means depth of scour (as per IRC pocket book 4.4.3.1) for the design discharge. The mean depth of scour shall b calculated as given in the standard specification the code of practice for road bridges, IRC 78-1983.

In case, any treatment of foundation is required during actual execution, it will have to be carried out by the contractor without any extra payment for the same. The department proposed the curtain grouting at the up stream axis of anicut upto 4.0 m depth below average bed level, in a single row of 6.0 m spacing holes however if as per site condition extra treatment is needed then that shall be done by the contractor without any extra cost. The pressure of grouting should not be less than 1.60 Kg/sqm.

RCC piers and opening for manually operated shutters as per MPLUN’s specifications item code SMM 163101. The width of opening may be between 1.20 m to 1.50 mt. The pear must be safe at sill level for over turning, shear etc. Considering worst conditions of loading and shutters closed and open both condition. The minimum top width of pier should be provided on each not be less than 1.0 m for fixing of shutters two nos grooves should be provided on each piers. A minimum temperature reinforcement shall be provided in encasing concrete work for piers.

The left and right bank of river Pench on Upstream side as well as D/S side will be protected upto a minimum distance of 10 m from anicut by way of construction of toe wall cement concrete. A cantilever type RCC retaining toe waqll with proper anchorage in rock shall be provided to retain the bank protection work. The bank protection is also included in lump sum offer. The bank protection work shall be designed as per relevant IRC and IS codes. The suitable arrangement for protection of U/S and D/S bed of river is also included in lump sum offer.

Page 82: Anicut Tender Sample Excel

Detailed drawing and design of geological, hydraulic and structural requirement for anicut structure, bank protections, key wall, wing walls, up stream and down stream protection and energy dissipation works etc shall be submitted along with the main structural design duly checked by the relevant department of the Govt. Engineering Collage. Detailed working drawings will be submitted in 6 copies. It will become the property of the Govt. Work will be executed as per approved drawing. In case of extra rebate contractor will have to submit design as per scope of work fixed in the contract and design for extra work or reduced work to assess the increase or decrease quantity of the work. No payment will be made for such additional design work. In case, during the course of execution, if contractor intend to modify or suggest any improvement and submit design in its support without asking any extra payment, it will also be subject to approval of the department.

The various works shall be done true to line, level and grade. The periodical of his responsibility regarding the accuracy. In case of any deviation or discrepancy in line, level or grade at the meeting faces, the contractor shall make good the discrepancy at his own cost and without any extra compensation for the additional work involved.

3.3 As for as practicable, no consignment of cement shall be received and transported during the monsoon period. Cement stored during monsoon and to be used after the monsoon shall not be used unless it has been tested in the laboratory and approved by the Engineer in Charge.

Page 83: Anicut Tender Sample Excel

When it is required to store cement bags at work site in the open for use on the work for one or two days they should be laid on a dry platform made of wooden planks resting on a brick masonry or concrete, platform about 15 cm (6”) above the ground. The number of bags shall be kept to a minimum preferably just sufficient for the day’s consumption. The pile shall be well covered by tarpaulin overlapping each other properly and protected against the moisture in the air and wind. This matter of temporary storage shall not be adopted in wet weather.

to improve the quality of workability of the mix if approved by the Engineer-in-Charge. The amount of air entraining agent used shall be of such effect to the entrainment of 3 to 5 percent of air by volume of the concrete or 8 percent to 12 percent of air by volume of cement mortar. The agent shall be added to the batch in solution in a portion of the mixing water by means of a mechanical batcher capable of accurate measure.

& steel. Potable water is generally considered satisfactory for mixing concrete. Water found satisfactory for mixing is also suitable for curing concrete. However water used for curing should not produce any objectionable, stain or deposit on the concrete surface. The presence of tannic acid or iron compound is objectionable.

Arrangement shall be made to store natural sand in a way that would protect if from getting contaminated with dust, organic matter or other deleterious substances. In case the natural sand is not considered to be as per specification by the Engineer in Charge, it shall have to be washed and / or treated as directed by the Engineer-in-Charge, before being used or rejected.

The coarse aggregate shall be stacked separately accordingly to their grading. The stacks shall be laid out as approved by the Engineer-in-Charge. The stacks shall be so located as to avoid any undesirable material getting mixed up with the aggregate. The aggregate shall be so deposited in and removed from the stacks, as not to cause any excessive of change in the uniformity or grading.

Page 84: Anicut Tender Sample Excel

The steel required for the work will be procured by the contractor at his own cost. The department shall not supply any quantity of steel under any circumstances steel for reinforcement shall confirm to I.S. Specification 1786-1985 (with upto date revision) only. Tor steel (tor 40) shall be used in the structure. However, Tor 50, may also be used in the structure which will be procured from any licensee of “Tor Steel Research Foundation of India” only. In case of Tor 50, every bar should show “tor mark, rolled on the every meter length.

shall have sufficient strength and rigidity to hold concrete and to withstand the pressure of vibration without deflection from the prescribed liens. The surface of all forms in contact with concrete shall be used to hold corners. Adjacent ends and edge of panels or other forms together in accurate alignment. Forms used should be easy to remove in section, without damaging the surface of the concrete. Tie bolts etc shall preferably be used for internal ties only. It should remain 1”(25mm) behind the surface of concrete. The design of centering, form work & its supporting arrangement shall be got approved before erection by the engineer in charge.

the Engineer-in-Charge shall be provided as per instructions with no extra cost. M.S. Bars or nay steel pieces required to be kept projecting out of the concrete surface of any structure member, like pipe, nuts, bolts, red etc. the same shall be placed in position as per instruction of Engineer-in-Charge.

Before placing concrete the surface of all forms shall be quoted with diesel and grease mix in ration 5:1 to prevent stacking of concrete & to facilitate the removal forms. Care shall be taken to prevent oil from surface of the construction joints and on reinforcement bars. Proper support to the form work shall be provided to withstand from against all possible forces on it.

Concrete shall be composed of cement, sand coarse aggregate, water and any other admixture as required all well mixed and brought to proper consistency. Test of concrete shall be made at frequent intervals during the progress of work and the mixes will be changed where ever necessary to secure the required workability, density, impermeability and strength together with the maximum practical economy. The maximum size of coarse aggregate in concrete for any part of work shall be the largest of the specified sizes use of which is practicable from the point of satisfactory placing of concrete. The concrete shall in general contain 40 mm maximum size to heavily reinforced concrete having 20 mm as maximum size aggregate. The water cement ration shall be regulated by the requirements of the strength of durability Results of laboratory tests of durability and strength shall determine the most suitable water cement ratio for any mix. The proper ration of water to cement for any concrete shall be such as to produce a mixture which can work readily in the corner and angles of forms and around reinforcement bars with the methods of placing employed for the work, but without permitting the materials to segregate excess water collected on surface. Uniformly in the consistency from bath to batch shall be required. Specification for all concrete placed in the Anicut shall be in all respect conforming to the requirement laid down in IS-456-1978.

The mix design shall be involved on the basis of laboratory tests for the prescribed strength of concrete as per the actual materials to be used at the site. Weight batching shall be used for cement concrete. The contractor shall be bound to give specified strength, workability, density and impermeability etc with the size of aggregate indicated in the specifications.

Minimum size specimens of each lot shall be tested at 28 days. Additional cubes may be required for various purposes such as to determine the strength of concrete at 7 days or at the time of striking the form work, or to determine the duration of curing, or to check the testing error.

Page 85: Anicut Tender Sample Excel

c) The ingredients of concrete shall be properly mixed in mechanical mixers designed so as to positively ensure uniform distribution of all the ingredients throughout the mass at the end of the mixing period. The mixing of each bath shall continue for about one and half to two minutes or as found best in practice, after all materials except the full amount of water, are in the mixer.

contain sufficient excess quantity of cement, sand and water for buttering of mixer, i.e. to aboid loss of Mortor in first batch, alternatively buttering of mixer by cement, sand & water ( @ 10% of one batch weight) should be done & thrown as waste before producing actual concrete.

9.8.1 The placing of concrete shall be performed only in the presence of an authorized representative of the Engineer-in-Charge. Concrete shall be placed only in locations where it has been authorized. No concrete shall be placed until form work, reinforcement, preparation of surface and necessary clean-up has been done and approved. All concrete shall be placed directly in its final position within 30 minutes after being mixes.

The work shall be inspected by the Engineer-in-Charge, who will decide treatment for local building on exposed surface, finishing of Honey comb etc . When concrete is used for filling the chipping opening, it will not be less that 75 mm in depth and concretes filling shall be vibrated under strict watch by doing regular shuttering with an opening hole for vibration.

Page 86: Anicut Tender Sample Excel

Necessary block cuts or Grooves shown or as directed shall be kept without any extra cost. After erection or embedment of various parts of gates etc these block outs or recesses would be filled in the cement concrete. No payment will however be made for embedding fixtures or providing grooves, block cuts etc Tie bolts, column bars grooves will be filled with the mortar.

All embedded parts, various anchorage structural members and guides for the gates and other articles placed in position by the contractor shall be carefully protected during concreting so as to maintain their alignments. All the embedded parts and instrument placed in position by the contractor or department shall be concreted by the contractor without any extra claim as shown in the drawing.

Cover block used to maintain cover around reinforcement steel shall be vibrated only. It will be made by the same grade of mortar as used in main concrete of the same work. Sufficient cover as specified in IS 456-1978 shall be provided to protect reinforcement from corrosion as indicated in the drawing.

shall be laid to a thickness of at least two and a half times thickness of the maximum size of plums to be used. The plums shall then be laid while the top portion of this concrete is still green but sufficient stiff to prevent complete submergence of the plums under their own weight. These plums shall be about half embedded in their concrete and remaining pat exposed so as to form a key with the next layer of concrete. No plums shall be used for concrete laid under water.

All work shall be performed and completed with good workmanship equal to the best modern practice in the manufacture and fabrication of the materials covered in these specifications. The work shall be carefully performed to the satisfaction of the Engineer-in-Charge. The contractor shall arrant all the materials and workmanship furnished by him to be free from injurious defects. He shall replace free of cost any defective materials or workmanship discovered during fabrication of erection. Workmanship shall confirm to the latest standards specification laid down in ISS.

All the materials, parts, equipments furnished shall be tested of quality and all works performed shall be subjected to rigid inspection. No articles, parts materials sand supplies shall be dispatched until all tests and shop inspections have completed or certified copies of reports, or results of tests and analysis shall have been accepted, if such workshop is approved as a sub site of work, the tenderer is required to transport the materials supplied to be given by the Department from the place specified to the sub site of work and no extra payment on account of transportation, loading and unloading of such materials to and from sub site shall be made by the Government.

Page 87: Anicut Tender Sample Excel

Government) having agreed to exempt ......................................... (hereinafter called the said contractor) from the demand under the terms & condition of the agreement dated made between...............and........................for the work (hereinafter called the said agreement) of security deposit for the due fulfillment by the said contractor(s) of the terms and conditions contained in the said agreement, on production of a Bank Guarantee for Rs.......................... (Rupees)........................................................) said contractor(s) do hereby undertake to pay to the Govt. an amount not exceeding Rs....................................... against any loss or damage caused to or suffered or would be caused to or suffered by the government, by reasons of any breach by the said Contractor(s) of the terms or conditions contained in the said agreement.2. We ................................... Bank Limited do hereby undertake to pay the amounts due and payable under this guarantee without any demur merely on a demand from the government stating the amount claimed is due by way of loss or damage caused to or would e caused to or suffered by the Government by reason of breach by the said Contractor(s) of any of terms or conditions contained in the said agreement or by reasons of the Contractor(s) failure to perform the said agreement. Any such demand made on the Bank shall be conclusive, as regards the amount due and payable by the Bank under this guarantee. However, our liability under this guarantee shall be restricted to an amount not exceeding Rs......................3. We (*).................................... bank limited further agree that the guarantee herein contained shall remain in full force and effect during the period that would be taken for the performance of the said agreement and that it shall continue to be enforceable till all the dues of the government under or by virtue of the said agreement have been fully paid and its claims satisfied or discharged or till the Executive Engineer, PHED Division....... certifies that the terms and conditions of the said agreement have been fully and properly carried out by the said contractor(s) and accordingly discharges this guarantee. Unless a demand or claim under this

4. We (*)................................... Bank Limited further agree with the government that the government shall have the fullest liberty without our consent and without effecting in any manner our obligation hereunder to vary any of the terms and conditions of the said agreement or to extend time of performance by the said contractor(s) from time to time or to postpone for any or for time to time any of the powers exercisable by the government against the said contractor(s) and to for bear or enforce any of the terms and conditions relating to the said agreement and we shall not be relieved from our liability by reason of any such variation, or extension being granted to the said contractor(s) or for bearance, act or commission on the part of the Government or any indulgence by the Government to the said contractor(s) by any such matter or thing whatsoever which under the law relating to sureties would, but for this provision have effect of so relieving us.

Page 88: Anicut Tender Sample Excel

are also eligible to participate in tenders processed by Public Health Engineering Department, are also required to registered on the e-procurement system on http://phed.mpeprocurement.gov.in and after sanction of the tender they will have to manage their registration in PHED or have to deposit total security deposit

Page 89: Anicut Tender Sample Excel

7.0 CONCRETE :- All concrete shall be mixed in concrete mixer and compacted by mechanical vibrators. Slump tests shall be carried out during concreting and sample test tubes prepared & tested in due course by the contractor at his cost. The result of the tests shall conform with the required standards and if the Engineer-in-charge considers that a structural test is necessary, the same shall be carried out as instructed by the Engineer-in-charge at contractors expenses and if the results of this be unsatisfactory the contractor will be bound to take down and reconstruct the particular portion of the work which has given unsatisfactory test results. The contractor shall have to use only steel shuttering so as to get smooth finish.8.0 STEEL FOR REINFORCEMENT : All the iron and steel required for the work will be procured by the contractor at his own cost. The department shall not supply any quantity of steel under any circumstances. Steel for reinforcement shall confirm to B.I.S. specifications 432-1966 (with up to date revision) and B.I.S. 1139-1966 (with up to date revision). The contractor shall be required to produce the test certificate of the manufactures to the department before use of steel for the work. No untested steel will be allowed to be used under any circumstances. The department however reserves the right to get the steel tested at the cost of contractor.

Page 90: Anicut Tender Sample Excel

13.1 Experience certificate of successful completion of work of Construction of R.C.C. Anicut on “TURN KEY JOB BASIS“ costing Rs 50.00 Lacs in contractor's/firm's/company's own name indicating agreement no., work order no. and date, amount of contract, stipulated period of completion, actual period of completion during last five year i.e. 2003-2004 to 2007-2008. An officer not below the rank of Executive Engineer should issue the certificate.

17.0 FORM OF EARNEST MONEY : Where the tenderer proposes to pay the earnest money in cash he shall pay it to the where the. Tenderer proposes to pay the earnest money in cash he shall pay it to the credit of revenue deposit on behalf of Executive Engineer PHED, division Chhindwara (M.P.) in the branch of the state Bank of Government Treasury of Sub-treasury within the jurisdiction of the Executive Engineer mentioned above. If, however, the tenderer wishes to deposit the earnest money in any one of the following forms he may do so.

20.0 ADJUSTMENT OF EARNEST MONEY:- The Earnest Money which has been deposited for a particular work will not ordinarily be adjusted towards the earnest money for another work, but if the tender of a contractor for a work in the same Division has been rejected and the Earnest Money has not been refunded to him due to some reasons it may be adjusted for this work by the Executive Engineer, provided amount retained is equal or more than required Earnest Money for this work.

Page 91: Anicut Tender Sample Excel

25.0 RELATIONSHIP :- The contractor shall not be permitted to tender for works in the Division, (responsible for award and execution of contract ) in which his near relative is posted a Divisional Accountant. He shall intimate the names of his near relative working in M.P. Secretariat and P.H.E Department. He shall also intimate the name of person working with him in any capacity or subsequently employed by him and who are near relatives to any Gazetted Officer in the M.P. Secretariat and P.H.E Department. Any breach of this condition by the contractor would render him self liable to be removed form the approved list of contractors of the P.H.E. Department. NOTE :- By the term “near relative” is meant wife, husband, parents and son, Grand son, brothers, sisters, brothers in laws, father in law and mother in law.

36.0 COMMERCIAL TAX :- All dues regarding taxes, and duties including the commercial Taxes, Royalties, Octroil Duties, Excise, Turnover, Taxes etc. on work, Contract etc. levied on the contractor’s work by Government and local bodies or private individuals will be payable by the contractor. The Executive Enineer will grant a certificate for the quantity actual used on the work but ewill not entertain any claim on this account .

47.0 LABOUR LICENCE :- Every contractor who employs on any day of the preceding 12 months, twenty or more workers on contract is required to obtain license from the Licensing Officer or the Contract as per provision contained under Sub-section 4 (b) of section 2 of the Contract Labour ( Regulation and Abolition ) Act 1970 as per provision contained in Section 12 of Act. No, contractor shall execute any work without obtaining licence, contravention of above is punishable and contractor is liable to be prosecuted. The successful tenderer is liable to produce licence as and when demanded by the Executive Engineer, obtained form labour Department as laid down in chapter 4 of Contract labour ( Regulation and abolition) Act 1970.

Page 92: Anicut Tender Sample Excel

51.1 The Notes and specifications given in the detailed notice inviting tenders and its annexure are to be read in conjunction with conditions given in the short notice inviting tenders and the conditions of Contract. These have been intended to supplement the provisions, in the NIT and the conditions of the Contract. All these will be binding on the contractor and shall form part of the agreement. However, in case of any contradiction between the common set of conditions and the NIT, the common set of conditions will supersede.

water. : practicable filtered and chlorinated supplies shall be arranged when supple is from intermittent source over head storage tank shall be provided with a capacity of five liters a per son per day. Where the supply is to be made from a well it shall confirm to the sanitary standard laid down in the report of the rural sanitation committee. The well should be at least 30 meters away from any latrine or other source of pollution. If possible the and pump should be installed for drawing the water from well. The well should be effectively disinfected one every month and the quality of the water should be got tested at the Public Health Institution between each work of disinfecting.

Page 93: Anicut Tender Sample Excel

The proposed site is located in 1000 m upstream of bridge at Pench river Singodi village. River bed is covered with granite. The banks are made up of alluvium. The flood data at proposed site are not available. The flood discharge is calculated from imperial formulae. The maximum flood discharge is 3727 cumec and the observed HFL is above 6 mtr with average bed level at 91.4 mtr General Hydraulic and Geological data are given below –

The Anicut is proposed to be constructed across river Pench to store water to be supplied for drinking purposes to village Singodi. The scope of work given above and the specification given are not absolute and have been given for guidance to the contractors. This is a turn key job and includes all the provisions of civil and mechanical works required to fulfill the above mentioned objectives

Before starting any work, the contractor shall erect a permanent bench mark, reference line and check profiles, at convenient position approved by the Engineer in charge. The bench mark shall be 20x20x60 cm with 40 cm embaded underground and 20 cm above the ground. The top surface of the bench mark shall be truly horizontal and plain. The words B.M. with R.L. shall be consipiously carved and painted on the bench marks the reference line shall comprises of a base line properly dag belled on the ground with number of masonry pillars suitably spaced. The check profiles shall be of such materials and shall be located at such places as to ensure execution of all slopes, steps and elevation, to the profile or profiles indicated in the approved drawings or as directed by the Engineer – in – Charge.

Engineer-in-charge shall not relieve the contractor for the responsibility of the adequacy and efficiency thereof and pumping plant and other all equipements, labour and materials necessary for dewatering the foundations and keeping the work areas free of water at all times necessary are within the scope of the contract. The changes, modifications or alteration required to suit the conditions during construction shall be borne by the contractor without extra charge. Any damage caused by failure or partial failure of his temporary diversion work during construction period

Page 94: Anicut Tender Sample Excel

Dewatering shall be carried out as per approved method to enable excavation, making inspection, final preparation of surfaces, providing anchor bars, grouting, laying of founds on concrete, laying of reinforced concrete, laying of reinforcement and all other construction activities. Diesel/ electric pumps or requisite capacity shall be installed in order to handle the dewatering.

Charge, may be resorted on works for rock excavation for quarry operations. In conducting Blasting operation shall be taken by the contractor for the protection of persons, the work and property. The planning of works should be such that no blasting is required close to structures already erected or foundations already filled. All government laws and regulations relation to license the design and location of magazine, the transportation and handling of explosives and other measures required for the prevention of accidents shall be observed. Warming signs shall be displayed on all power magazines.

Before an excavation is started, the deposition of spoil should be carefully planned. The excavated material shall be dumped sufficiently away from the edges of excavation, permitting, ample space for labour paths, movement of vehicles, other machine installations for lifting and dewatering and stacking construction material etc the excavated material will be transported to various works, or to stock waste piles, informing stock piles the useful

nature of the material. Materials from rock excavation which are fit for use will require special attention and should be preserved in defined areas. Similarly materials for use as chips or broken stones should be placed in the adjacent pile. Steps should be taken to keep the materials clean as subsequent cleaning will be difficult and imperfect. All other excavated materials shall be dumped in permanent banks or other approved location. Excavated materials shall not be carelessly thrown over the premises and should be deposited directly in permanent position so far as consistent with proper execution of the work.

The contractor will have to conduct all necessary investigations, planning and layout for the Anicut. The department has done Nine Nos. trial boresa at different points on the proposed anicut site to have an idea of the strata. These details are enclosed but are only for guidance to the contractor. The Geological reports submitted by the G.S.I. is also enclosed for the guidance to the contractor.

Page 95: Anicut Tender Sample Excel

The foundation of Anicut should be designed and constructed keeping in view the strata met in foundation, maximum scour depth, dead load or super structure water load at M.W.L. forces, velocity forces, wind forces, live load on Anicut, Water thrust, seismic force, buoyancy etc. complete. The bottom shear key should be capable of withstanding uplift pressure when the river is in flood or at M.W.L. Any other forces required to be taken for safe design which are not mentioned here should also be taken into consideration for the design.

shoring of sides of foundation, diversion of river flow, shoring of side of excavation, scaffolding, distilling of foundation, construction of coffer dam etc for which no extra payment shall be made by the department to the contractor. The contractors are therefore, advised to see the site of construction before submission of tender would mean that the contractor have full knowledge of at the relevant documents, proposed site construction, soil samples, strata at site, behaviour of river etc.

In case, any treatment of foundation is required during actual execution, it will have to be carried out by the contractor without any extra payment for the same. The department proposed the curtain grouting at the up stream axis of anicut upto 4.0 m depth below average bed level, in a single row of 6.0 m spacing holes however if as per site condition extra treatment is needed then that shall be done by the contractor without any extra cost. The pressure of grouting should not be less than 1.60 Kg/sqm.

RCC piers and opening for manually operated shutters as per MPLUN’s specifications item code SMM 163101. The width of opening may be between 1.20 m to 1.50 mt. The pear must be safe at sill level for over turning, shear etc. Considering worst conditions of loading and shutters closed and open both condition. The minimum top width of pier should be provided on each not be less than 1.0 m for fixing of shutters two nos grooves should be provided on each piers. A minimum temperature reinforcement shall be provided in encasing concrete work for piers.

The left and right bank of river Pench on Upstream side as well as D/S side will be protected upto a minimum distance of 10 m from anicut by way of construction of toe wall cement concrete. A cantilever type RCC retaining toe waqll with proper anchorage in rock shall be provided to retain the bank protection work. The bank protection is also included in lump sum offer. The bank protection work shall be designed as per relevant IRC and IS codes. The suitable arrangement for protection of U/S and D/S bed of river is also included in lump sum offer.

Page 96: Anicut Tender Sample Excel

Detailed drawing and design of geological, hydraulic and structural requirement for anicut structure, bank protections, key wall, wing walls, up stream and down stream protection and energy dissipation works etc shall be submitted along with the main structural design duly checked by the relevant department of the Govt. Engineering Collage. Detailed working drawings will be submitted in 6 copies. It will become the property of the Govt. Work will be executed as per approved drawing. In case of extra rebate contractor will have to submit design as per scope of work fixed in the contract and design for extra work or reduced work to assess the increase or decrease quantity of the work. No payment will be made for such additional design work. In case, during the course of execution, if contractor intend to modify or suggest any improvement and submit design in its support without asking any extra payment, it will also be subject to approval of the department.

Page 97: Anicut Tender Sample Excel

When it is required to store cement bags at work site in the open for use on the work for one or two days they should be laid on a dry platform made of wooden planks resting on a brick masonry or concrete, platform about 15 cm (6”) above the ground. The number of bags shall be kept to a minimum preferably just sufficient for the day’s consumption. The pile shall be well covered by tarpaulin overlapping each other properly and protected against the moisture in the air and wind. This matter of temporary storage shall not be adopted in wet weather.

to improve the quality of workability of the mix if approved by the Engineer-in-Charge. The amount of air entraining agent used shall be of such effect to the entrainment of 3 to 5 percent of air by volume of the concrete or 8 percent to 12 percent of air by volume of cement mortar. The agent shall be added to the batch in solution in a portion of the mixing water by means of a mechanical batcher capable of accurate measure.

Arrangement shall be made to store natural sand in a way that would protect if from getting contaminated with dust, organic matter or other deleterious substances. In case the natural sand is not considered to be as per specification by the Engineer in Charge, it shall have to be washed and / or treated as directed by the Engineer-in-Charge, before being used or rejected.

The coarse aggregate shall be stacked separately accordingly to their grading. The stacks shall be laid out as approved by the Engineer-in-Charge. The stacks shall be so located as to avoid any undesirable material getting mixed up with the aggregate. The aggregate shall be so deposited in and removed from the stacks, as not to cause any excessive of change in the uniformity or grading.

Page 98: Anicut Tender Sample Excel

The steel required for the work will be procured by the contractor at his own cost. The department shall not supply any quantity of steel under any circumstances steel for reinforcement shall confirm to I.S. Specification 1786-1985 (with upto date revision) only. Tor steel (tor 40) shall be used in the structure. However, Tor 50, may also be used in the structure which will be procured from any licensee of “Tor Steel Research Foundation of India” only. In case of Tor 50, every bar should show “tor mark, rolled on the every meter length.

shall have sufficient strength and rigidity to hold concrete and to withstand the pressure of vibration without deflection from the prescribed liens. The surface of all forms in contact with concrete shall be used to hold corners. Adjacent ends and edge of panels or other forms together in accurate alignment. Forms used should be easy to remove in section, without damaging the surface of the concrete. Tie bolts etc shall preferably be used for internal ties only. It should remain 1”(25mm) behind the surface of concrete. The design of centering, form work & its supporting arrangement shall be got approved before erection by the engineer in charge.

Before placing concrete the surface of all forms shall be quoted with diesel and grease mix in ration 5:1 to prevent stacking of concrete & to facilitate the removal forms. Care shall be taken to prevent oil from surface of the construction joints and on reinforcement bars. Proper support to the form work shall be provided to withstand from against all possible forces on it.

Concrete shall be composed of cement, sand coarse aggregate, water and any other admixture as required all well mixed and brought to proper consistency. Test of concrete shall be made at frequent intervals during the progress of work and the mixes will be changed where ever necessary to secure the required workability, density, impermeability and strength together with the maximum practical economy. The maximum size of coarse aggregate in concrete for any part of work shall be the largest of the specified sizes use of which is practicable from the point of satisfactory placing of concrete. The concrete shall in general contain 40 mm maximum size to heavily reinforced concrete having 20 mm as maximum size aggregate. The water cement ration shall be regulated by the requirements of the strength of durability Results of laboratory tests of durability and strength shall determine the most suitable water cement ratio for any mix. The proper ration of water to cement for any concrete shall be such as to produce a mixture which can work readily in the corner and angles of forms and around reinforcement bars with the methods of placing employed for the work, but without permitting the materials to segregate excess water collected on surface. Uniformly in the consistency from bath to batch shall be required. Specification for all concrete placed in the Anicut shall be in all respect conforming to the requirement laid down in IS-456-1978.

The mix design shall be involved on the basis of laboratory tests for the prescribed strength of concrete as per the actual materials to be used at the site. Weight batching shall be used for cement concrete. The contractor shall be bound to give specified strength, workability, density and impermeability etc with the size of aggregate indicated in the specifications.

Page 99: Anicut Tender Sample Excel

c) The ingredients of concrete shall be properly mixed in mechanical mixers designed so as to positively ensure uniform distribution of all the ingredients throughout the mass at the end of the mixing period. The mixing of each bath shall continue for about one and half to two minutes or as found best in practice, after all materials except the full amount of water, are in the mixer.

9.8.1 The placing of concrete shall be performed only in the presence of an authorized representative of the Engineer-in-Charge. Concrete shall be placed only in locations where it has been authorized. No concrete shall be placed until form work, reinforcement, preparation of surface and necessary clean-up has been done and approved. All concrete shall be placed directly in its final position within 30 minutes after being mixes.

Page 100: Anicut Tender Sample Excel

Necessary block cuts or Grooves shown or as directed shall be kept without any extra cost. After erection or embedment of various parts of gates etc these block outs or recesses would be filled in the cement concrete. No payment will however be made for embedding fixtures or providing grooves, block cuts etc Tie bolts, column bars grooves will be filled with the mortar.

All embedded parts, various anchorage structural members and guides for the gates and other articles placed in position by the contractor shall be carefully protected during concreting so as to maintain their alignments. All the embedded parts and instrument placed in position by the contractor or department shall be concreted by the contractor without any extra claim as shown in the drawing.

shall be laid to a thickness of at least two and a half times thickness of the maximum size of plums to be used. The plums shall then be laid while the top portion of this concrete is still green but sufficient stiff to prevent complete submergence of the plums under their own weight. These plums shall be about half embedded in their concrete and remaining pat exposed so as to form a key with the next layer of concrete. No plums shall be used for concrete laid under water.

All work shall be performed and completed with good workmanship equal to the best modern practice in the manufacture and fabrication of the materials covered in these specifications. The work shall be carefully performed to the satisfaction of the Engineer-in-Charge. The contractor shall arrant all the materials and workmanship furnished by him to be free from injurious defects. He shall replace free of cost any defective materials or workmanship discovered during fabrication of erection. Workmanship shall confirm to the latest standards specification laid down in ISS.

All the materials, parts, equipments furnished shall be tested of quality and all works performed shall be subjected to rigid inspection. No articles, parts materials sand supplies shall be dispatched until all tests and shop inspections have completed or certified copies of reports, or results of tests and analysis shall have been accepted, if such workshop is approved as a sub site of work, the tenderer is required to transport the materials supplied to be given by the Department from the place specified to the sub site of work and no extra payment on account of transportation, loading and unloading of such materials to and from sub site shall be made by the Government.

Page 101: Anicut Tender Sample Excel

Government) having agreed to exempt ......................................... (hereinafter called the said contractor) from the demand under the terms & condition of the agreement dated made between...............and........................for the work (hereinafter called the said agreement) of security deposit for the due fulfillment by the said contractor(s) of the terms and conditions contained in the said agreement, on production of a Bank Guarantee for Rs.......................... (Rupees)........................................................) said contractor(s) do hereby undertake to pay to the Govt. an amount not exceeding Rs....................................... against any loss or damage caused to or suffered or would be caused to or suffered by the government, by reasons of any breach by the said Contractor(s) of the terms or conditions contained in the said agreement.2. We ................................... Bank Limited do hereby undertake to pay the amounts due and payable under this guarantee without any demur merely on a demand from the government stating the amount claimed is due by way of loss or damage caused to or would e caused to or suffered by the Government by reason of breach by the said Contractor(s) of any of terms or conditions contained in the said agreement or by reasons of the Contractor(s) failure to perform the said agreement. Any such demand made on the Bank shall be conclusive, as regards the amount due and payable by the Bank under this guarantee. However, our liability under this guarantee shall be restricted to an amount not exceeding Rs......................3. We (*).................................... bank limited further agree that the guarantee herein contained shall remain in full force and effect during the period that would be taken for the performance of the said agreement and that it shall continue to be enforceable till all the dues of the government under or by virtue of the said agreement have been fully paid and its claims satisfied or discharged or till the Executive Engineer, PHED Division....... certifies that the terms and conditions of the said agreement have been fully and properly carried out by the said contractor(s) and accordingly discharges this guarantee. Unless a demand or claim under this

4. We (*)................................... Bank Limited further agree with the government that the government shall have the fullest liberty without our consent and without effecting in any manner our obligation hereunder to vary any of the terms and conditions of the said agreement or to extend time of performance by the said contractor(s) from time to time or to postpone for any or for time to time any of the powers exercisable by the government against the said contractor(s) and to for bear or enforce any of the terms and conditions relating to the said agreement and we shall not be relieved from our liability by reason of any such variation, or extension being granted to the said contractor(s) or for bearance, act or commission on the part of the Government or any indulgence by the Government to the said contractor(s) by any such matter or thing whatsoever which under the law relating to sureties would, but for this provision have effect of so relieving us.

Page 102: Anicut Tender Sample Excel

Department, are also required to registered on the e-procurement system on http://phed.mpeprocurement.gov.in and after sanction of the tender they will have to manage their registration in PHED or have to deposit total security deposit

Page 103: Anicut Tender Sample Excel

7.0 CONCRETE :- All concrete shall be mixed in concrete mixer and compacted by mechanical vibrators. Slump tests shall be carried out during concreting and sample test tubes prepared & tested in due course by the contractor at his cost. The result of the tests shall conform with the required standards and if the Engineer-in-charge considers that a structural test is necessary, the same shall be carried out as instructed by the Engineer-in-charge at contractors expenses and if the results of this be unsatisfactory the contractor will be bound to take down and reconstruct the particular portion of the work which has given unsatisfactory test results. The contractor shall have to use only steel shuttering so as to get smooth finish.8.0 STEEL FOR REINFORCEMENT : All the iron and steel required for the work will be procured by the contractor at his own cost. The department shall not supply any quantity of steel under any circumstances. Steel for reinforcement shall confirm to B.I.S. specifications 432-1966 (with up to date revision) and B.I.S. 1139-1966 (with up to date revision). The contractor shall be required to produce the test certificate of the manufactures to the department before use of steel for the work. No untested steel will be allowed to be used under any circumstances. The department however reserves the right to get the steel tested at the cost of contractor.

Page 104: Anicut Tender Sample Excel

17.0 FORM OF EARNEST MONEY : Where the tenderer proposes to pay the earnest money in cash he shall pay it to the where the. Tenderer proposes to pay the earnest money in cash he shall pay it to the credit of revenue deposit on behalf of Executive Engineer PHED, division Chhindwara (M.P.) in the branch of the state Bank of Government Treasury of Sub-treasury within the jurisdiction of the Executive Engineer mentioned above. If, however, the tenderer wishes to deposit the earnest money in any one of the following forms he may do so.

Page 105: Anicut Tender Sample Excel

25.0 RELATIONSHIP :- The contractor shall not be permitted to tender for works in the Division, (responsible for award and execution of contract ) in which his near relative is posted a Divisional Accountant. He shall intimate the names of his near relative working in M.P. Secretariat and P.H.E Department. He shall also intimate the name of person working with him in any capacity or subsequently employed by him and who are near relatives to any Gazetted Officer in the M.P. Secretariat and P.H.E Department. Any breach of this condition by the contractor would render him self liable to be removed form the approved list of contractors of the P.H.E. Department. NOTE :- By the term “near relative” is meant wife, husband, parents and son, Grand son, brothers, sisters, brothers in laws, father in law and mother in law.

47.0 LABOUR LICENCE :- Every contractor who employs on any day of the preceding 12 months, twenty or more workers on contract is required to obtain license from the Licensing Officer or the Contract as per provision contained under Sub-section 4 (b) of section 2 of the Contract Labour ( Regulation and Abolition ) Act 1970 as per provision contained in Section 12 of Act. No, contractor shall execute any work without obtaining licence, contravention of above is punishable and contractor is liable to be prosecuted. The successful tenderer is liable to produce licence as and when demanded by the Executive Engineer, obtained form labour Department as laid down in chapter 4 of Contract labour ( Regulation and abolition) Act 1970.

Page 106: Anicut Tender Sample Excel

51.1 The Notes and specifications given in the detailed notice inviting tenders and its annexure are to be read in conjunction with conditions given in the short notice inviting tenders and the conditions of Contract. These have been intended to supplement the provisions, in the NIT and the conditions of the Contract. All these will be binding on the contractor and shall form part of the agreement. However, in case of any contradiction between the common set of conditions and the NIT, the common set of conditions will supersede.

water. : practicable filtered and chlorinated supplies shall be arranged when supple is from intermittent source over head storage tank shall be provided with a capacity of five liters a per son per day. Where the supply is to be made from a well it shall confirm to the sanitary standard laid down in the report of the rural sanitation committee. The well should be at least 30 meters away from any latrine or other source of pollution. If possible the and pump should be installed for drawing the water from well. The well should be effectively disinfected one every month and the quality of the water should be got tested at the Public Health Institution between each work of disinfecting.

Page 107: Anicut Tender Sample Excel

Before starting any work, the contractor shall erect a permanent bench mark, reference line and check profiles, at convenient position approved by the Engineer in charge. The bench mark shall be 20x20x60 cm with 40 cm embaded underground and 20 cm above the ground. The top surface of the bench mark shall be truly horizontal and plain. The words B.M. with R.L. shall be consipiously carved and painted on the bench marks the reference line shall comprises of a base line properly dag belled on the ground with number of masonry pillars suitably spaced. The check profiles shall be of such materials and shall be located at such places as to ensure execution of all slopes, steps and elevation, to the profile or profiles indicated in the approved drawings or as directed by the Engineer – in – Charge.

Engineer-in-charge shall not relieve the contractor for the responsibility of the adequacy and efficiency thereof and pumping plant and other all equipements, labour and materials necessary for dewatering the foundations and keeping the work areas free of water at all times necessary are within the scope of the contract. The changes, modifications or alteration required to suit the conditions during construction shall be borne by the contractor without extra charge. Any damage caused by failure or partial failure of his temporary diversion work during construction period

Page 108: Anicut Tender Sample Excel

Charge, may be resorted on works for rock excavation for quarry operations. In conducting Blasting operation shall be taken by the contractor for the protection of persons, the work and property. The planning of works should be such that no blasting is required close to structures already erected or foundations already filled. All government laws and regulations relation to license the design and location of magazine, the transportation and handling of explosives and other measures required for the prevention of accidents shall be observed. Warming signs shall be displayed on all power magazines.

nature of the material. Materials from rock excavation which are fit for use will require special attention and should be preserved in defined areas. Similarly materials for use as chips or broken stones should be placed in the adjacent pile. Steps should be taken to keep the materials clean as subsequent cleaning will be difficult and imperfect. All other excavated materials shall be dumped in permanent banks or other approved location. Excavated materials shall not be carelessly thrown over the premises and should be deposited directly in permanent position so far as consistent with proper execution of the work.

Page 109: Anicut Tender Sample Excel

The foundation of Anicut should be designed and constructed keeping in view the strata met in foundation, maximum scour depth, dead load or super structure water load at M.W.L. forces, velocity forces, wind forces, live load on Anicut, Water thrust, seismic force, buoyancy etc. complete. The bottom shear key should be capable of withstanding uplift pressure when the river is in flood or at M.W.L. Any other forces required to be taken for safe design which are not mentioned here should also be taken into consideration for the design.

shoring of sides of foundation, diversion of river flow, shoring of side of excavation, scaffolding, distilling of foundation, construction of coffer dam etc for which no extra payment shall be made by the department to the contractor. The contractors are therefore, advised to see the site of construction before submission of tender would mean that the contractor have full knowledge of at the relevant documents, proposed site construction, soil samples, strata at site, behaviour of river etc.

In case, any treatment of foundation is required during actual execution, it will have to be carried out by the contractor without any extra payment for the same. The department proposed the curtain grouting at the up stream axis of anicut upto 4.0 m depth below average bed level, in a single row of 6.0 m spacing holes however if as per site condition extra treatment is needed then that shall be done by the contractor without any extra cost. The pressure of grouting should not be less than 1.60 Kg/sqm.

RCC piers and opening for manually operated shutters as per MPLUN’s specifications item code SMM 163101. The width of opening may be between 1.20 m to 1.50 mt. The pear must be safe at sill level for over turning, shear etc. Considering worst conditions of loading and shutters closed and open both condition. The minimum top width of pier should be provided on each not be less than 1.0 m for fixing of shutters two nos grooves should be provided on each piers. A minimum temperature reinforcement shall be provided in encasing concrete work for piers.

The left and right bank of river Pench on Upstream side as well as D/S side will be protected upto a minimum distance of 10 m from anicut by way of construction of toe wall cement concrete. A cantilever type RCC retaining toe waqll with proper anchorage in rock shall be provided to retain the bank protection work. The bank protection is also included in lump sum offer. The bank protection work shall be designed as per relevant IRC and IS codes. The suitable arrangement for protection of U/S and D/S bed of river is also included in lump sum offer.

Page 110: Anicut Tender Sample Excel

Detailed drawing and design of geological, hydraulic and structural requirement for anicut structure, bank protections, key wall, wing walls, up stream and down stream protection and energy dissipation works etc shall be submitted along with the main structural design duly checked by the relevant department of the Govt. Engineering Collage. Detailed working drawings will be submitted in 6 copies. It will become the property of the Govt. Work will be executed as per approved drawing. In case of extra rebate contractor will have to submit design as per scope of work fixed in the contract and design for extra work or reduced work to assess the increase or decrease quantity of the work. No payment will be made for such additional design work. In case, during the course of execution, if contractor intend to modify or suggest any improvement and submit design in its support without asking any extra payment, it will also be subject to approval of the department.

Page 111: Anicut Tender Sample Excel

When it is required to store cement bags at work site in the open for use on the work for one or two days they should be laid on a dry platform made of wooden planks resting on a brick masonry or concrete, platform about 15 cm (6”) above the ground. The number of bags shall be kept to a minimum preferably just sufficient for the day’s consumption. The pile shall be well covered by tarpaulin overlapping each other properly and protected against the moisture in the air and wind. This matter of temporary storage shall not be adopted in wet weather.

Page 112: Anicut Tender Sample Excel

The steel required for the work will be procured by the contractor at his own cost. The department shall not supply any quantity of steel under any circumstances steel for reinforcement shall confirm to I.S. Specification 1786-1985 (with upto date revision) only. Tor steel (tor 40) shall be used in the structure. However, Tor 50, may also be used in the structure which will be procured from any licensee of “Tor Steel Research Foundation of India” only. In case of Tor 50, every bar should show “tor mark, rolled on the every meter length.

shall have sufficient strength and rigidity to hold concrete and to withstand the pressure of vibration without deflection from the prescribed liens. The surface of all forms in contact with concrete shall be used to hold corners. Adjacent ends and edge of panels or other forms together in accurate alignment. Forms used should be easy to remove in section, without damaging the surface of the concrete. Tie bolts etc shall preferably be used for internal ties only. It should remain 1”(25mm) behind the surface of concrete. The design of centering, form work & its supporting arrangement shall be got approved before erection by the engineer in charge.

Concrete shall be composed of cement, sand coarse aggregate, water and any other admixture as required all well mixed and brought to proper consistency. Test of concrete shall be made at frequent intervals during the progress of work and the mixes will be changed where ever necessary to secure the required workability, density, impermeability and strength together with the maximum practical economy. The maximum size of coarse aggregate in concrete for any part of work shall be the largest of the specified sizes use of which is practicable from the point of satisfactory placing of concrete. The concrete shall in general contain 40 mm maximum size to heavily reinforced concrete having 20 mm as maximum size aggregate. The water cement ration shall be regulated by the requirements of the strength of durability Results of laboratory tests of durability and strength shall determine the most suitable water cement ratio for any mix. The proper ration of water to cement for any concrete shall be such as to produce a mixture which can work readily in the corner and angles of forms and around reinforcement bars with the methods of placing employed for the work, but without permitting the materials to segregate excess water collected on surface. Uniformly in the consistency from bath to batch shall be required. Specification for all concrete placed in the Anicut shall be in all respect conforming to the requirement laid down in IS-456-1978.

Page 113: Anicut Tender Sample Excel

shall be laid to a thickness of at least two and a half times thickness of the maximum size of plums to be used. The plums shall then be laid while the top portion of this concrete is still green but sufficient stiff to prevent complete submergence of the plums under their own weight. These plums shall be about half embedded in their concrete and remaining pat exposed so as to form a key with the next layer of concrete. No plums shall be used for concrete laid under water.

All work shall be performed and completed with good workmanship equal to the best modern practice in the manufacture and fabrication of the materials covered in these specifications. The work shall be carefully performed to the satisfaction of the Engineer-in-Charge. The contractor shall arrant all the materials and workmanship furnished by him to be free from injurious defects. He shall replace free of cost any defective materials or workmanship discovered during fabrication of erection. Workmanship shall confirm to the latest standards specification laid down in ISS.

All the materials, parts, equipments furnished shall be tested of quality and all works performed shall be subjected to rigid inspection. No articles, parts materials sand supplies shall be dispatched until all tests and shop inspections have completed or certified copies of reports, or results of tests and analysis shall have been accepted, if such workshop is approved as a sub site of work, the tenderer is required to transport the materials supplied to be given by the Department from the place specified to the sub site of work and no extra payment on account of transportation, loading and unloading of such materials to and from sub site shall be made by the Government.

Page 114: Anicut Tender Sample Excel

Government) having agreed to exempt ......................................... (hereinafter called the said contractor) from the demand under the terms & condition of the agreement dated made between...............and........................for the work (hereinafter called the said agreement) of security deposit for the due fulfillment by the said contractor(s) of the terms and conditions contained in the said agreement, on production of a Bank Guarantee for Rs.......................... (Rupees)........................................................) said contractor(s) do hereby undertake to pay to the Govt. an amount not exceeding Rs....................................... against any loss or damage caused to or suffered or would be caused to or suffered by the government, by reasons of any breach by the said Contractor(s) of the terms or conditions contained in the said agreement.2. We ................................... Bank Limited do hereby undertake to pay the amounts due and payable under this guarantee without any demur merely on a demand from the government stating the amount claimed is due by way of loss or damage caused to or would e caused to or suffered by the Government by reason of breach by the said Contractor(s) of any of terms or conditions contained in the said agreement or by reasons of the Contractor(s) failure to perform the said agreement. Any such demand made on the Bank shall be conclusive, as regards the amount due and payable by the Bank under this guarantee. However, our liability under this guarantee shall be restricted to an amount not exceeding Rs......................3. We (*).................................... bank limited further agree that the guarantee herein contained shall remain in full force and effect during the period that would be taken for the performance of the said agreement and that it shall continue to be enforceable till all the dues of the government under or by virtue of the said agreement have been fully paid and its claims satisfied or discharged or till the Executive Engineer, PHED Division....... certifies that the terms and conditions of the said agreement have been fully and properly carried out by the said contractor(s) and accordingly discharges this guarantee. Unless a demand or claim under this

4. We (*)................................... Bank Limited further agree with the government that the government shall have the fullest liberty without our consent and without effecting in any manner our obligation hereunder to vary any of the terms and conditions of the said agreement or to extend time of performance by the said contractor(s) from time to time or to postpone for any or for time to time any of the powers exercisable by the government against the said contractor(s) and to for bear or enforce any of the terms and conditions relating to the said agreement and we shall not be relieved from our liability by reason of any such variation, or extension being granted to the said contractor(s) or for bearance, act or commission on the part of the Government or any indulgence by the Government to the said contractor(s) by any such matter or thing whatsoever which under the law relating to sureties would, but for this provision have effect of so relieving us.

Page 115: Anicut Tender Sample Excel

have to manage their registration in PHED or have to deposit total security deposit

Page 116: Anicut Tender Sample Excel

7.0 CONCRETE :- All concrete shall be mixed in concrete mixer and compacted by mechanical vibrators. Slump tests shall be carried out during concreting and sample test tubes prepared & tested in due course by the contractor at his cost. The result of the tests shall conform with the required standards and if the Engineer-in-charge considers that a structural test is necessary, the same shall be carried out as instructed by the Engineer-in-charge at contractors expenses and if the results of this be unsatisfactory the contractor will be bound to take down and reconstruct the particular portion of the work which has given unsatisfactory test results. The contractor shall have to use only steel shuttering so as to get smooth finish.8.0 STEEL FOR REINFORCEMENT : All the iron and steel required for the work will be procured by the contractor at his own cost. The department shall not supply any quantity of steel under any circumstances. Steel for reinforcement shall confirm to B.I.S. specifications 432-1966 (with up to date revision) and B.I.S. 1139-1966 (with up to date revision). The contractor shall be required to produce the test certificate of the manufactures to the department before use of steel for the work. No untested steel will be allowed to be used under any circumstances. The department however reserves the right to get the steel tested at the cost of contractor.

Page 117: Anicut Tender Sample Excel

25.0 RELATIONSHIP :- The contractor shall not be permitted to tender for works in the Division, (responsible for award and execution of contract ) in which his near relative is posted a Divisional Accountant. He shall intimate the names of his near relative working in M.P. Secretariat and P.H.E Department. He shall also intimate the name of person working with him in any capacity or subsequently employed by him and who are near relatives to any Gazetted Officer in the M.P. Secretariat and P.H.E Department. Any breach of this condition by the contractor would render him self liable to be removed form the approved list of contractors of the P.H.E. Department. NOTE :- By the term “near relative” is meant wife, husband, parents and son, Grand son, brothers, sisters, brothers in laws, father in law and mother in law.

47.0 LABOUR LICENCE :- Every contractor who employs on any day of the preceding 12 months, twenty or more workers on contract is required to obtain license from the Licensing Officer or the Contract as per provision contained under Sub-section 4 (b) of section 2 of the Contract Labour ( Regulation and Abolition ) Act 1970 as per provision contained in Section 12 of Act. No, contractor shall execute any work without obtaining licence, contravention of above is punishable and contractor is liable to be prosecuted. The successful tenderer is liable to produce licence as and when demanded by the Executive Engineer, obtained form labour Department as laid down in chapter 4 of Contract labour ( Regulation and abolition) Act 1970.

Page 118: Anicut Tender Sample Excel

water. : practicable filtered and chlorinated supplies shall be arranged when supple is from intermittent source over head storage tank shall be provided with a capacity of five liters a per son per day. Where the supply is to be made from a well it shall confirm to the sanitary standard laid down in the report of the rural sanitation committee. The well should be at least 30 meters away from any latrine or other source of pollution. If possible the and pump should be installed for drawing the water from well. The well should be effectively disinfected one every month and the quality of the water should be got tested at the Public Health Institution between each work of disinfecting.

Page 119: Anicut Tender Sample Excel

Before starting any work, the contractor shall erect a permanent bench mark, reference line and check profiles, at convenient position approved by the Engineer in charge. The bench mark shall be 20x20x60 cm with 40 cm embaded underground and 20 cm above the ground. The top surface of the bench mark shall be truly horizontal and plain. The words B.M. with R.L. shall be consipiously carved and painted on the bench marks the reference line shall comprises of a base line properly dag belled on the ground with number of masonry pillars suitably spaced. The check profiles shall be of such materials and shall be located at such places as to ensure execution of all slopes, steps and elevation, to the profile or profiles indicated in the approved drawings or as directed by the Engineer – in – Charge.

Engineer-in-charge shall not relieve the contractor for the responsibility of the adequacy and efficiency thereof and pumping plant and other all equipements, labour and materials necessary for dewatering the foundations and keeping the work areas free of water at all times necessary are within the scope of the contract. The changes, modifications or alteration required to suit the conditions during construction shall be borne by the contractor without extra charge. Any damage caused by failure or partial failure of his temporary diversion work during construction period

Page 120: Anicut Tender Sample Excel

Charge, may be resorted on works for rock excavation for quarry operations. In conducting Blasting operation shall be taken by the contractor for the protection of persons, the work and property. The planning of works should be such that no blasting is required close to structures already erected or foundations already filled. All government laws and regulations relation to license the design and location of magazine, the transportation and handling of explosives and other measures required for the prevention of accidents shall be observed. Warming signs shall be displayed on all power magazines.

nature of the material. Materials from rock excavation which are fit for use will require special attention and should be preserved in defined areas. Similarly materials for use as chips or broken stones should be placed in the adjacent pile. Steps should be taken to keep the materials clean as subsequent cleaning will be difficult and imperfect. All other excavated materials shall be dumped in permanent banks or other approved location. Excavated materials shall not be carelessly thrown over the premises and should be deposited directly in permanent position so far as consistent with proper execution of the work.

Page 121: Anicut Tender Sample Excel

RCC piers and opening for manually operated shutters as per MPLUN’s specifications item code SMM 163101. The width of opening may be between 1.20 m to 1.50 mt. The pear must be safe at sill level for over turning, shear etc. Considering worst conditions of loading and shutters closed and open both condition. The minimum top width of pier should be provided on each not be less than 1.0 m for fixing of shutters two nos grooves should be provided on each piers. A minimum temperature reinforcement shall be provided in encasing concrete work for piers.

The left and right bank of river Pench on Upstream side as well as D/S side will be protected upto a minimum distance of 10 m from anicut by way of construction of toe wall cement concrete. A cantilever type RCC retaining toe waqll with proper anchorage in rock shall be provided to retain the bank protection work. The bank protection is also included in lump sum offer. The bank protection work shall be designed as per relevant IRC and IS codes. The suitable arrangement for protection of U/S and D/S bed of river is also included in lump sum offer.

Page 122: Anicut Tender Sample Excel

Detailed drawing and design of geological, hydraulic and structural requirement for anicut structure, bank protections, key wall, wing walls, up stream and down stream protection and energy dissipation works etc shall be submitted along with the main structural design duly checked by the relevant department of the Govt. Engineering Collage. Detailed working drawings will be submitted in 6 copies. It will become the property of the Govt. Work will be executed as per approved drawing. In case of extra rebate contractor will have to submit design as per scope of work fixed in the contract and design for extra work or reduced work to assess the increase or decrease quantity of the work. No payment will be made for such additional design work. In case, during the course of execution, if contractor intend to modify or suggest any improvement and submit design in its support without asking any extra payment, it will also be subject to approval of the department.

Page 123: Anicut Tender Sample Excel

When it is required to store cement bags at work site in the open for use on the work for one or two days they should be laid on a dry platform made of wooden planks resting on a brick masonry or concrete, platform about 15 cm (6”) above the ground. The number of bags shall be kept to a minimum preferably just sufficient for the day’s consumption. The pile shall be well covered by tarpaulin overlapping each other properly and protected against the moisture in the air and wind. This matter of temporary storage shall not be adopted in wet weather.

Page 124: Anicut Tender Sample Excel

shall have sufficient strength and rigidity to hold concrete and to withstand the pressure of vibration without deflection from the prescribed liens. The surface of all forms in contact with concrete shall be used to hold corners. Adjacent ends and edge of panels or other forms together in accurate alignment. Forms used should be easy to remove in section, without damaging the surface of the concrete. Tie bolts etc shall preferably be used for internal ties only. It should remain 1”(25mm) behind the surface of concrete. The design of centering, form work & its supporting arrangement shall be got approved before erection by the engineer in charge.

Concrete shall be composed of cement, sand coarse aggregate, water and any other admixture as required all well mixed and brought to proper consistency. Test of concrete shall be made at frequent intervals during the progress of work and the mixes will be changed where ever necessary to secure the required workability, density, impermeability and strength together with the maximum practical economy. The maximum size of coarse aggregate in concrete for any part of work shall be the largest of the specified sizes use of which is practicable from the point of satisfactory placing of concrete. The concrete shall in general contain 40 mm maximum size to heavily reinforced concrete having 20 mm as maximum size aggregate. The water cement ration shall be regulated by the requirements of the strength of durability Results of laboratory tests of durability and strength shall determine the most suitable water cement ratio for any mix. The proper ration of water to cement for any concrete shall be such as to produce a mixture which can work readily in the corner and angles of forms and around reinforcement bars with the methods of placing employed for the work, but without permitting the materials to segregate excess water collected on surface. Uniformly in the consistency from bath to batch shall be required. Specification for all concrete placed in the Anicut shall be in all respect conforming to the requirement laid down in IS-456-1978.

Page 125: Anicut Tender Sample Excel

All work shall be performed and completed with good workmanship equal to the best modern practice in the manufacture and fabrication of the materials covered in these specifications. The work shall be carefully performed to the satisfaction of the Engineer-in-Charge. The contractor shall arrant all the materials and workmanship furnished by him to be free from injurious defects. He shall replace free of cost any defective materials or workmanship discovered during fabrication of erection. Workmanship shall confirm to the latest standards specification laid down in ISS.

All the materials, parts, equipments furnished shall be tested of quality and all works performed shall be subjected to rigid inspection. No articles, parts materials sand supplies shall be dispatched until all tests and shop inspections have completed or certified copies of reports, or results of tests and analysis shall have been accepted, if such workshop is approved as a sub site of work, the tenderer is required to transport the materials supplied to be given by the Department from the place specified to the sub site of work and no extra payment on account of transportation, loading and unloading of such materials to and from sub site shall be made by the Government.

Page 126: Anicut Tender Sample Excel

Government) having agreed to exempt ......................................... (hereinafter called the said contractor) from the demand under the terms & condition of the agreement dated made between...............and........................for the work (hereinafter called the said agreement) of security deposit for the due fulfillment by the said contractor(s) of the terms and conditions contained in the said agreement, on production of a Bank Guarantee for Rs.......................... (Rupees)........................................................) said contractor(s) do hereby undertake to pay to the Govt. an amount not exceeding Rs....................................... against any loss or damage caused to or suffered or would be caused to or suffered by the government, by reasons of any breach by the said Contractor(s) of the terms or conditions contained in the said agreement.2. We ................................... Bank Limited do hereby undertake to pay the amounts due and payable under this guarantee without any demur merely on a demand from the government stating the amount claimed is due by way of loss or damage caused to or would e caused to or suffered by the Government by reason of breach by the said Contractor(s) of any of terms or conditions contained in the said agreement or by reasons of the Contractor(s) failure to perform the said agreement. Any such demand made on the Bank shall be conclusive, as regards the amount due and payable by the Bank under this guarantee. However, our liability under this guarantee shall be restricted to an amount not exceeding Rs......................3. We (*).................................... bank limited further agree that the guarantee herein contained shall remain in full force and effect during the period that would be taken for the performance of the said agreement and that it shall continue to be enforceable till all the dues of the government under or by virtue of the said agreement have been fully paid and its claims satisfied or discharged or till the Executive Engineer, PHED Division....... certifies that the terms and conditions of the said agreement have been fully and properly carried out by the said contractor(s) and accordingly discharges this guarantee. Unless a demand or claim under this

4. We (*)................................... Bank Limited further agree with the government that the government shall have the fullest liberty without our consent and without effecting in any manner our obligation hereunder to vary any of the terms and conditions of the said agreement or to extend time of performance by the said contractor(s) from time to time or to postpone for any or for time to time any of the powers exercisable by the government against the said contractor(s) and to for bear or enforce any of the terms and conditions relating to the said agreement and we shall not be relieved from our liability by reason of any such variation, or extension being granted to the said contractor(s) or for bearance, act or commission on the part of the Government or any indulgence by the Government to the said contractor(s) by any such matter or thing whatsoever which under the law relating to sureties would, but for this provision have effect of so relieving us.

Page 127: Anicut Tender Sample Excel

7.0 CONCRETE :- All concrete shall be mixed in concrete mixer and compacted by mechanical vibrators. Slump tests shall be carried out during concreting and sample test tubes prepared & tested in due course by the contractor at his cost. The result of the tests shall conform with the required standards and if the Engineer-in-charge considers that a structural test is necessary, the same shall be carried out as instructed by the Engineer-in-charge at contractors expenses and if the results of this be unsatisfactory the contractor will be bound to take down and reconstruct the particular portion of the work which has given unsatisfactory test results. The contractor shall have to use only steel shuttering so as to get smooth finish.

Page 128: Anicut Tender Sample Excel

25.0 RELATIONSHIP :- The contractor shall not be permitted to tender for works in the Division, (responsible for award and execution of contract ) in which his near relative is posted a Divisional Accountant. He shall intimate the names of his near relative working in M.P. Secretariat and P.H.E Department. He shall also intimate the name of person working with him in any capacity or subsequently employed by him and who are near relatives to any Gazetted Officer in the M.P. Secretariat and P.H.E Department. Any breach of this condition by the contractor would render him self liable to be removed form the approved list of contractors of the P.H.E. Department. NOTE :- By the term “near relative” is meant wife, husband, parents and son, Grand son, brothers, sisters, brothers in laws, father in law and mother in law.

47.0 LABOUR LICENCE :- Every contractor who employs on any day of the preceding 12 months, twenty or more workers on contract is required to obtain license from the Licensing Officer or the Contract as per provision contained under Sub-section 4 (b) of section 2 of the Contract Labour ( Regulation and Abolition ) Act 1970 as per provision contained in Section 12 of Act. No, contractor shall execute any work without obtaining licence, contravention of above is punishable and contractor is liable to be prosecuted. The successful tenderer is liable to produce licence as and when demanded by the Executive Engineer, obtained form labour Department as laid down in chapter 4 of Contract labour ( Regulation and abolition) Act 1970.

Page 129: Anicut Tender Sample Excel

Before starting any work, the contractor shall erect a permanent bench mark, reference line and check profiles, at convenient position approved by the Engineer in charge. The bench mark shall be 20x20x60 cm with 40 cm embaded underground and 20 cm above the ground. The top surface of the bench mark shall be truly horizontal and plain. The words B.M. with R.L. shall be consipiously carved and painted on the bench marks the reference line shall comprises of a base line properly dag belled on the ground with number of masonry pillars suitably spaced. The check profiles shall be of such materials and shall be located at such places as to ensure execution of all slopes, steps and elevation, to the profile or profiles indicated in the approved drawings or as directed by the Engineer – in – Charge.

Page 130: Anicut Tender Sample Excel

Detailed drawing and design of geological, hydraulic and structural requirement for anicut structure, bank protections, key wall, wing walls, up stream and down stream protection and energy dissipation works etc shall be submitted along with the main structural design duly checked by the relevant department of the Govt. Engineering Collage. Detailed working drawings will be submitted in 6 copies. It will become the property of the Govt. Work will be executed as per approved drawing. In case of extra rebate contractor will have to submit design as per scope of work fixed in the contract and design for extra work or reduced work to assess the increase or decrease quantity of the work. No payment will be made for such additional design work. In case, during the course of execution, if contractor intend to modify or suggest any improvement and submit design in its support without asking any extra payment, it will also be subject to approval of the department.

Page 131: Anicut Tender Sample Excel

shall have sufficient strength and rigidity to hold concrete and to withstand the pressure of vibration without deflection from the prescribed liens. The surface of all forms in contact with concrete shall be used to hold corners. Adjacent ends and edge of panels or other forms together in accurate alignment. Forms used should be easy to remove in section, without damaging the surface of the concrete. Tie bolts etc shall preferably be used for internal ties only. It should remain 1”(25mm) behind the surface of concrete. The design of centering, form work & its supporting arrangement shall be got approved before erection by the engineer in charge.

Concrete shall be composed of cement, sand coarse aggregate, water and any other admixture as required all well mixed and brought to proper consistency. Test of concrete shall be made at frequent intervals during the progress of work and the mixes will be changed where ever necessary to secure the required workability, density, impermeability and strength together with the maximum practical economy. The maximum size of coarse aggregate in concrete for any part of work shall be the largest of the specified sizes use of which is practicable from the point of satisfactory placing of concrete. The concrete shall in general contain 40 mm maximum size to heavily reinforced concrete having 20 mm as maximum size aggregate. The water cement ration shall be regulated by the requirements of the strength of durability Results of laboratory tests of durability and strength shall determine the most suitable water cement ratio for any mix. The proper ration of water to cement for any concrete shall be such as to produce a mixture which can work readily in the corner and angles of forms and around reinforcement bars with the methods of placing employed for the work, but without permitting the materials to segregate excess water collected on surface. Uniformly in the consistency from bath to batch shall be required. Specification for all concrete placed in the Anicut shall be in all respect conforming to the requirement laid down in IS-456-1978.

Page 132: Anicut Tender Sample Excel

All the materials, parts, equipments furnished shall be tested of quality and all works performed shall be subjected to rigid inspection. No articles, parts materials sand supplies shall be dispatched until all tests and shop inspections have completed or certified copies of reports, or results of tests and analysis shall have been accepted, if such workshop is approved as a sub site of work, the tenderer is required to transport the materials supplied to be given by the Department from the place specified to the sub site of work and no extra payment on account of transportation, loading and unloading of such materials to and from sub site shall be made by the Government.

Page 133: Anicut Tender Sample Excel

Government) having agreed to exempt ......................................... (hereinafter called the said contractor) from the demand under the terms & condition of the agreement dated made between...............and........................for the work (hereinafter called the said agreement) of security deposit for the due fulfillment by the said contractor(s) of the terms and conditions contained in the said agreement, on production of a Bank Guarantee for Rs.......................... (Rupees)........................................................) said contractor(s) do hereby undertake to pay to the Govt. an amount not exceeding Rs....................................... against any loss or damage caused to or suffered or would be caused to or suffered by the government, by reasons of any breach by the said Contractor(s) of the terms or conditions contained in the said agreement.2. We ................................... Bank Limited do hereby undertake to pay the amounts due and payable under this guarantee without any demur merely on a demand from the government stating the amount claimed is due by way of loss or damage caused to or would e caused to or suffered by the Government by reason of breach by the said Contractor(s) of any of terms or conditions contained in the said agreement or by reasons of the Contractor(s) failure to perform the said agreement. Any such demand made on the Bank shall be conclusive, as regards the amount due and payable by the Bank under this guarantee. However, our liability under this guarantee shall be restricted to an amount not exceeding Rs......................

4. We (*)................................... Bank Limited further agree with the government that the government shall have the fullest liberty without our consent and without effecting in any manner our obligation hereunder to vary any of the terms and conditions of the said agreement or to extend time of performance by the said contractor(s) from time to time or to postpone for any or for time to time any of the powers exercisable by the government against the said contractor(s) and to for bear or enforce any of the terms and conditions relating to the said agreement and we shall not be relieved from our liability by reason of any such variation, or extension being granted to the said contractor(s) or for bearance, act or commission on the part of the Government or any indulgence by the Government to the said contractor(s) by any such matter or thing whatsoever which under the law relating to sureties would, but for this provision have effect of so relieving us.

Page 134: Anicut Tender Sample Excel

Before starting any work, the contractor shall erect a permanent bench mark, reference line and check profiles, at convenient position approved by the Engineer in charge. The bench mark shall be 20x20x60 cm with 40 cm embaded underground and 20 cm above the ground. The top surface of the bench mark shall be truly horizontal and plain. The words B.M. with R.L. shall be consipiously carved and painted on the bench marks the reference line shall comprises of a base line properly dag belled on the ground with number of masonry pillars suitably spaced. The check profiles shall be of such materials and shall be located at such places as to ensure execution of all slopes, steps and elevation, to the profile or profiles indicated in the approved drawings or as directed by the Engineer – in – Charge.

Page 135: Anicut Tender Sample Excel

Detailed drawing and design of geological, hydraulic and structural requirement for anicut structure, bank protections, key wall, wing walls, up stream and down stream protection and energy dissipation works etc shall be submitted along with the main structural design duly checked by the relevant department of the Govt. Engineering Collage. Detailed working drawings will be submitted in 6 copies. It will become the property of the Govt. Work will be executed as per approved drawing. In case of extra rebate contractor will have to submit design as per scope of work fixed in the contract and design for extra work or reduced work to assess the increase or decrease quantity of the work. No payment will be made for such additional design work. In case, during the course of execution, if contractor intend to modify or suggest any improvement and submit design in its support without asking any extra payment, it will also be subject to approval of the department.

Page 136: Anicut Tender Sample Excel

Concrete shall be composed of cement, sand coarse aggregate, water and any other admixture as required all well mixed and brought to proper consistency. Test of concrete shall be made at frequent intervals during the progress of work and the mixes will be changed where ever necessary to secure the required workability, density, impermeability and strength together with the maximum practical economy. The maximum size of coarse aggregate in concrete for any part of work shall be the largest of the specified sizes use of which is practicable from the point of satisfactory placing of concrete. The concrete shall in general contain 40 mm maximum size to heavily reinforced concrete having 20 mm as maximum size aggregate. The water cement ration shall be regulated by the requirements of the strength of durability Results of laboratory tests of durability and strength shall determine the most suitable water cement ratio for any mix. The proper ration of water to cement for any concrete shall be such as to produce a mixture which can work readily in the corner and angles of forms and around reinforcement bars with the methods of placing employed for the work, but without permitting the materials to segregate excess water collected on surface. Uniformly in the consistency from bath to batch shall be required. Specification for all concrete placed in the Anicut shall be in all respect conforming to the requirement laid down in IS-456-1978.

Page 137: Anicut Tender Sample Excel

4. We (*)................................... Bank Limited further agree with the government that the government shall have the fullest liberty without our consent and without effecting in any manner our obligation hereunder to vary any of the terms and conditions of the said agreement or to extend time of performance by the said contractor(s) from time to time or to postpone for any or for time to time any of the powers exercisable by the government against the said contractor(s) and to for bear or enforce any of the terms and conditions relating to the said agreement and we shall not be relieved from our liability by reason of any such variation, or extension being granted to the said contractor(s) or for bearance, act or commission on the part of the Government or any indulgence by the Government to the said contractor(s) by any such matter or thing whatsoever which under the law relating to sureties would, but for this provision have effect of so relieving us.

Page 138: Anicut Tender Sample Excel

Detailed drawing and design of geological, hydraulic and structural requirement for anicut structure, bank protections, key wall, wing walls, up stream and down stream protection and energy dissipation works etc shall be submitted along with the main structural design duly checked by the relevant department of the Govt. Engineering Collage. Detailed working drawings will be submitted in 6 copies. It will become the property of the Govt. Work will be executed as per approved drawing. In case of extra rebate contractor will have to submit design as per scope of work fixed in the contract and design for extra work or reduced work to assess the increase or decrease quantity of the work. No payment will be made for such additional design work. In case, during the course of execution, if contractor intend to modify or suggest any improvement and submit design in its support without asking any extra payment, it will also be subject to approval of the department.

Page 139: Anicut Tender Sample Excel

Concrete shall be composed of cement, sand coarse aggregate, water and any other admixture as required all well mixed and brought to proper consistency. Test of concrete shall be made at frequent intervals during the progress of work and the mixes will be changed where ever necessary to secure the required workability, density, impermeability and strength together with the maximum practical economy. The maximum size of coarse aggregate in concrete for any part of work shall be the largest of the specified sizes use of which is practicable from the point of satisfactory placing of concrete. The concrete shall in general contain 40 mm maximum size to heavily reinforced concrete having 20 mm as maximum size aggregate. The water cement ration shall be regulated by the requirements of the strength of durability Results of laboratory tests of durability and strength shall determine the most suitable water cement ratio for any mix. The proper ration of water to cement for any concrete shall be such as to produce a mixture which can work readily in the corner and angles of forms and around reinforcement bars with the methods of placing employed for the work, but without permitting the materials to segregate excess water collected on surface. Uniformly in the consistency from bath to batch shall be required. Specification for all concrete placed in the Anicut shall be in all respect conforming to the requirement laid down in IS-456-1978.

Page 140: Anicut Tender Sample Excel

4. We (*)................................... Bank Limited further agree with the government that the government shall have the fullest liberty without our consent and without effecting in any manner our obligation hereunder to vary any of the terms and conditions of the said agreement or to extend time of performance by the said contractor(s) from time to time or to postpone for any or for time to time any of the powers exercisable by the government against the said contractor(s) and to for bear or enforce any of the terms and conditions relating to the said agreement and we shall not be relieved from our liability by reason of any such variation, or extension being granted to the said contractor(s) or for bearance, act or commission on the part of the Government or any indulgence by the Government to the said contractor(s) by any such matter or thing whatsoever which under the law relating to sureties would, but for this provision have effect of so relieving us.

Page 141: Anicut Tender Sample Excel

Detailed drawing and design of geological, hydraulic and structural requirement for anicut structure, bank protections, key wall, wing walls, up stream and down stream protection and energy dissipation works etc shall be submitted along with the main structural design duly checked by the relevant department of the Govt. Engineering Collage. Detailed working drawings will be submitted in 6 copies. It will become the property of the Govt. Work will be executed as per approved drawing. In case of extra rebate contractor will have to submit design as per scope of work fixed in the contract and design for extra work or reduced work to assess the increase or decrease quantity of the work. No payment will be made for such additional design work. In case, during the course of execution, if contractor intend to modify or suggest any improvement and submit design in its support without asking any extra payment, it will also be subject to approval of the department.

Page 142: Anicut Tender Sample Excel

Concrete shall be composed of cement, sand coarse aggregate, water and any other admixture as required all well mixed and brought to proper consistency. Test of concrete shall be made at frequent intervals during the progress of work and the mixes will be changed where ever necessary to secure the required workability, density, impermeability and strength together with the maximum practical economy. The maximum size of coarse aggregate in concrete for any part of work shall be the largest of the specified sizes use of which is practicable from the point of satisfactory placing of concrete. The concrete shall in general contain 40 mm maximum size to heavily reinforced concrete having 20 mm as maximum size aggregate. The water cement ration shall be regulated by the requirements of the strength of durability Results of laboratory tests of durability and strength shall determine the most suitable water cement ratio for any mix. The proper ration of water to cement for any concrete shall be such as to produce a mixture which can work readily in the corner and angles of forms and around reinforcement bars with the methods of placing employed for the work, but without permitting the materials to segregate excess water collected on surface. Uniformly in the consistency from bath to batch shall be required. Specification for all concrete placed in the Anicut shall be in all respect conforming to the requirement laid down in IS-456-1978.

Page 143: Anicut Tender Sample Excel

Concrete shall be composed of cement, sand coarse aggregate, water and any other admixture as required all well mixed and brought to proper consistency. Test of concrete shall be made at frequent intervals during the progress of work and the mixes will be changed where ever necessary to secure the required workability, density, impermeability and strength together with the maximum practical economy. The maximum size of coarse aggregate in concrete for any part of work shall be the largest of the specified sizes use of which is practicable from the point of satisfactory placing of concrete. The concrete shall in general contain 40 mm maximum size to heavily reinforced concrete having 20 mm as maximum size aggregate. The water cement ration shall be regulated by the requirements of the strength of durability Results of laboratory tests of durability and strength shall determine the most suitable water cement ratio for any mix. The proper ration of water to cement for any concrete shall be such as to produce a mixture which can work readily in the corner and angles of forms and around reinforcement bars with the methods of placing employed for the work, but without permitting the materials to segregate excess water collected on surface. Uniformly in the consistency from bath to batch shall be required. Specification for all concrete placed in the Anicut shall be in all respect conforming to the requirement laid down in IS-456-1978.

Page 144: Anicut Tender Sample Excel

Concrete shall be composed of cement, sand coarse aggregate, water and any other admixture as required all well mixed and brought to proper consistency. Test of concrete shall be made at frequent intervals during the progress of work and the mixes will be changed where ever necessary to secure the required workability, density, impermeability and strength together with the maximum practical economy. The maximum size of coarse aggregate in concrete for any part of work shall be the largest of the specified sizes use of which is practicable from the point of satisfactory placing of concrete. The concrete shall in general contain 40 mm maximum size to heavily reinforced concrete having 20 mm as maximum size aggregate. The water cement ration shall be regulated by the requirements of the strength of durability Results of laboratory tests of durability and strength shall determine the most suitable water cement ratio for any mix. The proper ration of water to cement for any concrete shall be such as to produce a mixture which can work readily in the corner and angles of forms and around reinforcement bars with the methods of placing employed for the work, but without permitting the materials to segregate excess water collected on surface. Uniformly in the consistency from bath to batch shall be required. Specification for all concrete placed in the Anicut shall be in all respect conforming to the requirement laid down in IS-456-1978.

Page 145: Anicut Tender Sample Excel

Concrete shall be composed of cement, sand coarse aggregate, water and any other admixture as required all well mixed and brought to proper consistency. Test of concrete shall be made at frequent intervals during the progress of work and the mixes will be changed where ever necessary to secure the required workability, density, impermeability and strength together with the maximum practical economy. The maximum size of coarse aggregate in concrete for any part of work shall be the largest of the specified sizes use of which is practicable from the point of satisfactory placing of concrete. The concrete shall in general contain 40 mm maximum size to heavily reinforced concrete having 20 mm as maximum size aggregate. The water cement ration shall be regulated by the requirements of the strength of durability Results of laboratory tests of durability and strength shall determine the most suitable water cement ratio for any mix. The proper ration of water to cement for any concrete shall be such as to produce a mixture which can work readily in the corner and angles of forms and around reinforcement bars with the methods of placing employed for the work, but without permitting the materials to segregate excess water collected on surface. Uniformly in the consistency from bath to batch shall be required. Specification for all concrete placed in the Anicut shall be in all respect conforming to the requirement laid down in IS-456-1978.

Page 146: Anicut Tender Sample Excel

Concrete shall be composed of cement, sand coarse aggregate, water and any other admixture as required all well mixed and brought to proper consistency. Test of concrete shall be made at frequent intervals during the progress of work and the mixes will be changed where ever necessary to secure the required workability, density, impermeability and strength together with the maximum practical economy. The maximum size of coarse aggregate in concrete for any part of work shall be the largest of the specified sizes use of which is practicable from the point of satisfactory placing of concrete. The concrete shall in general contain 40 mm maximum size to heavily reinforced concrete having 20 mm as maximum size aggregate. The water cement ration shall be regulated by the requirements of the strength of durability Results of laboratory tests of durability and strength shall determine the most suitable water cement ratio for any mix. The proper ration of water to cement for any concrete shall be such as to produce a mixture which can work readily in the corner and angles of forms and around reinforcement bars with the methods of placing employed for the work, but without permitting the materials to segregate excess water collected on surface. Uniformly in the consistency from bath to batch shall be required. Specification for all concrete placed in the Anicut shall be in all respect conforming to the requirement laid down in IS-456-1978.

Page 147: Anicut Tender Sample Excel

Concrete shall be composed of cement, sand coarse aggregate, water and any other admixture as required all well mixed and brought to proper consistency. Test of concrete shall be made at frequent intervals during the progress of work and the mixes will be changed where ever necessary to secure the required workability, density, impermeability and strength together with the maximum practical economy. The maximum size of coarse aggregate in concrete for any part of work shall be the largest of the specified sizes use of which is practicable from the point of satisfactory placing of concrete. The concrete shall in general contain 40 mm maximum size to heavily reinforced concrete having 20 mm as maximum size aggregate. The water cement ration shall be regulated by the requirements of the strength of durability Results of laboratory tests of durability and strength shall determine the most suitable water cement ratio for any mix. The proper ration of water to cement for any concrete shall be such as to produce a mixture which can work readily in the corner and angles of forms and around reinforcement bars with the methods of placing employed for the work, but without permitting the materials to segregate excess water collected on surface. Uniformly in the consistency from bath to batch shall be required. Specification for all concrete placed in the Anicut shall be in all respect conforming to the requirement laid down in IS-456-1978.

Page 148: Anicut Tender Sample Excel

Concrete shall be composed of cement, sand coarse aggregate, water and any other admixture as required all well mixed and brought to proper consistency. Test of concrete shall be made at frequent intervals during the progress of work and the mixes will be changed where ever necessary to secure the required workability, density, impermeability and strength together with the maximum practical economy. The maximum size of coarse aggregate in concrete for any part of work shall be the largest of the specified sizes use of which is practicable from the point of satisfactory placing of concrete. The concrete shall in general contain 40 mm maximum size to heavily reinforced concrete having 20 mm as maximum size aggregate. The water cement ration shall be regulated by the requirements of the strength of durability Results of laboratory tests of durability and strength shall determine the most suitable water cement ratio for any mix. The proper ration of water to cement for any concrete shall be such as to produce a mixture which can work readily in the corner and angles of forms and around reinforcement bars with the methods of placing employed for the work, but without permitting the materials to segregate excess water collected on surface. Uniformly in the consistency from bath to batch shall be required. Specification for all concrete placed in the Anicut shall be in all respect conforming to the requirement laid down in IS-456-1978.

Page 149: Anicut Tender Sample Excel

S. No.

1 3 4 5 61 2 500 30

2

2 100 302 50 252 50 20

3

1 60.00 4.00

2 6.00 2.15

4 6.00 2.90

1 60.00 10.00

2 60.00 1.40

4

1 60.00 4.00[B] Wing walls 4 6.00 2.90

1 60.00 10.002 60.00 1.40

5

1 60.00 4.002 6.00 2.154 6.00 2.901 60.00 10.002 60.00 1.40

6

1 60.00 4.002 6.00 2.154 6.00 2.90

7

1 60.00 4.002 6.00 2.154 6.00 2.901 60.00 10.00

Description QuantityNos. L B

Site clearance of grass &crops I/c rooting out

Ordinary shrub jungle clearance involving removal of grass shrubs & twings I/c rooting out

a.Area below 25% covered by shrubsb. 25% to 50% area covered by shrubsc. Area above 50% covered by shrubsExcavation in soft or ordianry soil i/c 50m leadand 1.5m lift with dressing.[A] Weir wall (Crest length- L)

[B] Keys (K1+K2)(approx. 3.0m on each bank)

[C] Wing walls (approx. 0.25xL on U/S, D/S ofeach bank)D/s&U/s apron (2+8=10mtr)

Toe wall d/s &u/s

Excavation in hard soil i/c 50m lead and 1.5mlift with dressing[A] Weir wall

D/s&U/s apron (2+8=10mtr)Toe wall d/s &u/s

Excavation in hard moorum & moorum withboulders i/c 50m lead and 1.5m lift with dressing[A] Weir wall[B] Keys (K1+K2)[C] Wing wallsD/s&U/s apron (2+8=10mtr)Toe wall d/s &u/s

Excavation in disintegrated rock i/c 50m leadand 1.5m lift with dressing[A] Weir wall[B] Keys (K1+K2)[C] Wing walls

Excavation in soft rock i/c 50m lead and 1.5mlift with dressing[A] Weir wall[B] Keys (K1+K2)[C] Wing wallsD/s&U/s apron (2+8=10mtr)

Page 150: Anicut Tender Sample Excel

2 60.00 1.408

1 60.00 4.002 6.00 2.154 6.00 1.401 60.00 10.002 60.00 1.40

9

1 60.00 3.802 6.00 1.954 6.00 2.701 60.00 10.002 60.00 1.40

10 1

11 1

12 122 63

13

122 6.50

14

1 60.00 17.20

15

90 61.00

505 8.40

300 3.80

188 4.50

Toe wall d/s &u/sExcavation in hard rock i/c 50m lead and 1.5m lift with dressing : [a] Blasting permitted [A] Weir wall[B] Keys (K1+K2)[C] Wing wallsD/s&U/s apron (2+8=10mtr)Toe wall d/s &u/s

Cement Concrete 1:3:6with graded metal ofmaximum size 40mm. [ in foundation bed][A] Weir wall[B] Keys (K1+K2)[C] Wing wallsD/s&U/s apron (2+8=10mtr)Toe wall d/s &u/s

Extra rate for black trap basalt or granite metalfor one cu.m.Extra for mechanical vibration of CementConcrete or plum Concrete.Drilling 35mm dia holes in rock by jack hammerupto 6m.Supplying & fixing steel reinforcement bars(tested) for RCC i/c cleaning, straightening, cutting, bending all handling, placing in position and binding with 0.9 mm annealed binding wireconfirming to IS:280-1978 (i/c cost of bindingwire) : (b) Cold worked steel high strength bars confirming to grade Fe-415 of IS:1786.25 mmØ Tor Steel bars (Dowel bars) @ 1.5mc/c in Three rowsProviding and placing in position M-15 R.C.C.excluding cost of reinforcement, but including form work , vibration, finishing, curing etc complete with graded metal of maximum size-

(a) 20 mm

Supplying & fixing steel reinforcement bars(tested) for RCC i/c cleaning, straightening, cutting, bending all handling, placing in position and binding with 0.9 mm annealed binding wireconfirming to IS:280-1978 (i/c cost of bindingwire) : (b) Cold worked steel high strength bars confirming to grade Fe-415 of IS:1786.Mail Wall Portion

Horizontal and along LS , Provide Bars 8 mmdia @ 250 C/c

@

Vertical Bars and along CS, Provide Bars 10mm dia @ 250 C/c

@

Horizontal and along LS , Provide Bars 8 mmdia @ 250 C/c

@

Vertical Bars and along CS, Provide Bars 10mm dia @ 250 C/c

@

Page 151: Anicut Tender Sample Excel

16

1 60.00 3.2017

2 6.00 1.75

4 6.00 2.50

1 60.00 1.20

1 60.00

18

4 6.00

1 60.00 0.90

19 8 1.20 4.00

20 1 60.00 1.50

21 5 15.00 5.80

Plum Cement Concrete1;3;6 with 75% gradedmetal of 40 mm.and 25% Plums of 150 mm In foundation and plinth.

[A] Wier wallCement Concrete1;2;4 with graded metal ofmaximum size 20 mm. In foundation  and plinth

[B] Key wall

[C] Wing wall

Toe wall d/s &u/s

[A] Wier wall (3.2+.9)/2Net Quantity =

Cement Concrete1;2;4 with graded metal ofmaximum size 20 mm. In Super Structure.[C] Wing wall (2.5+.6)

Toe wall d/s &u/s

M.S. Fixed Wheel Gate upto 2 SQM size for 5MTR. Water Head with Manually operated rope drum hoisting mechanism, complete item.

Puddle filling of good clay including lead upto50m including mixing, watering and kneading by tamping, ramming and laying etc. [at Karri shutters]

22cm thick dry picked up boulder pitchingincluding picking of boulders with individual boulder of 22cm depth & atleast the dimension of boulders in any direction should not be less than 10cm.

Page 152: Anicut Tender Sample Excel

7 8 9 10 11 1230000.00 0.20 6000.00

6000.00 0.30 1800.00

2500.00 0.70 1750.00

2000.00 1.40 2800.00

0.20 48.00

0.20 5.16

0.20 13.92

0.20 120.00

0.20 33.60

220.68 17.00 3752.00

0.30 72.00

0.30 20.880.20 120.000.20 33.60

246.48 23.00 5669.00

0.50 120.000.50 12.900.50 34.800.20 120.000.20 33.60

321.30 31.00 9960.00

0.60 144.000.60 15.480.60 41.76

201.24 62.00 12477.00

0.40 96.000.40 10.320.40 27.840.20 120.00

Quantity Rate[Rs.]

Amount[Rs.]H Other Total

Qtty.Unit

sqmt

sqmtsqmtsqmt

cu.m

cu.m

cu.m

cu.m

cu.m

Total Cum

.

cu.m

cu.mcu.mcu.m

Total Cum.

cu.mcu.mcu.mcu.mcu.m

Total Cum.

cu.mcu.mcu.m

Total Cum.

cu.mcu.mcu.mcu.m

Page 153: Anicut Tender Sample Excel

0.20 33.60287.76 106.00 30503.00

1.00 240.001.00 25.801.00 33.60

0.20 120.001.00 168.00

587.40 170.00 99858.00

0.30 68.400.30 7.020.30 19.44

0.30 180.000.30 50.40

325.26 1376.00 447558.00325.26 18.00 5855.00

325.26 30.00 9758.00

1.50 183.00 330.00 60390.00

3.85 3053.05 50.00 152653.00

0.30 309.60 2835.00 877716.00

0.395 2168.55

0.395 1675.59

0.395 450.30

0.395 334.17

cu.mTotal Cum

cu.mcu.mcu.mcu.mcu.m

Total Cum.

cu.mcu.mcu.mcu.mcu.m

Total Cumcu.m

cu.m

m

.

Wt.(kg/

mtr.) =

Kg

Cum

Kg/m Kg

Kg/m Kg

Kg/m Kg

Kg/m Kg

Page 154: Anicut Tender Sample Excel

4628.61 50.00 231431.00

2.70 518.40 1353.00 701395.00

4.00 84.00

4.00 240.00

1.40 100.80424.80 1839.00 781207.00

3.00 369.00

369.00 1353.00 499257.00

4.00 112.80

3.30 178.20

269.04 1839.00 494765.0038.40 45000.00 0.00

3.00 270.00 92.00 24840.00

0.22 95.70 187.00 17896.00

4479290.00

44.80

Total Kg

.

cu.m.

cu.m.

cu.m.

Cu.m

Total Cum

cu.m.

cu.m.

cu.m.

sqmt

cu.m.

cu.m.

=

Say Rs.Say, Rs. 45 Lakhs