AMBER calibration update 1) test from Coihueco: Nov2011 Goal: check sinchronization RM/Manoa (on behalf of RM/Malargue) UH Manoa , Nov.7, 2011

AMBER calibration update - University of Hawaiʻiidlab/taskAndSchedule/ARA/... · 2011. 11. 7. · AMBER orientation East 19.12 North AMBER near calibration stand Rishi:Plan to transmit

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

Page 1: AMBER calibration update - University of Hawaiʻiidlab/taskAndSchedule/ARA/... · 2011. 11. 7. · AMBER orientation East 19.12 North AMBER near calibration stand Rishi:Plan to transmit

AMBER calibration update1) test from Coihueco: Nov2011

Goal: check sinchronization

RM/Manoa (on behalf of RM/Malargue)

UH Manoa , Nov.7, 2011

Page 2: AMBER calibration update - University of Hawaiʻiidlab/taskAndSchedule/ARA/... · 2011. 11. 7. · AMBER orientation East 19.12 North AMBER near calibration stand Rishi:Plan to transmit

HEATLET zoomed view

airplane

Trigger THESE 3 TANKS:CHAYACOHEATLET1=Tanguito JrHEATLET2=Valentin Jr

From Coihueco FD || Amber site

. All the equipment for transmitting the 4Ghz pulse was carried by myself to Malargue

. I will finish putting together parts in the next few days (batteries, cabling, momentary switch, mounting and heatsink for power amp). Plan to test (at the AB) by the end of the week.

Page 3: AMBER calibration update - University of Hawaiʻiidlab/taskAndSchedule/ARA/... · 2011. 11. 7. · AMBER orientation East 19.12 North AMBER near calibration stand Rishi:Plan to transmit

HEATLET-1HEATLET-1 HEATLET-2HEATLET-2

HEATLET-3HEATLET-3

Distance=1.27 kmHeight=0.73 km

T in FoV= 3.7 sec

1.4 km (3D)

1.6 km (3D)

Distance=3.1 kmHeight=1.75 kmT in FoV=9 sec2 km (3

D)

1

2

Coihueco in GoogleEarth: Calibration points for AMBER

RISHI: “Friday Jorge and I installed flags on the three tanks, Chayo-co,Valentin-Jr, Tanguito-Jr. I also have six batteries for use at these tanks(two per tank--> 24V), along with battery boxes and cabling to the top of the tanks”

Page 4: AMBER calibration update - University of Hawaiʻiidlab/taskAndSchedule/ARA/... · 2011. 11. 7. · AMBER orientation East 19.12 North AMBER near calibration stand Rishi:Plan to transmit

View from Coihueco Gallery

Heatlet-2Valentin Jr

Heatlet-1Tanguito JrChayaco

Train StationAMBER

RISHI: We also had a look from the top of the FD building at CO, and we can see Val.-Jr and Tan.-Jr easily, Chaya-co you can see between Heat2 and Heat3. Plan to transmit from the top of the FD building at CO, if this fails to be seen at Chaya-co, then ...

Page 5: AMBER calibration update - University of Hawaiʻiidlab/taskAndSchedule/ARA/... · 2011. 11. 7. · AMBER orientation East 19.12 North AMBER near calibration stand Rishi:Plan to transmit

Heatlet-2Valentin Jr

Heatlet-1Tanguito Jr... behind the bush !!!

Chayaco

Probably 30 m forward is necessary, to have visibility on HEATLET-1: all other tanks are TOO FAR...

Page 6: AMBER calibration update - University of Hawaiʻiidlab/taskAndSchedule/ARA/... · 2011. 11. 7. · AMBER orientation East 19.12 North AMBER near calibration stand Rishi:Plan to transmit

AMBER orientation

East

19.12

North

AMBER near calibration stand AMBER near calibration stand

Rishi:Plan to transmit from the top of the FD building at CO, if this fails to be seen at Chaya-co, then we can set up approx 30 meters in front of AMBER with scaffolding so that we can see by both AMBER and the tanks. Tomorrow we will take the scaffolding out to CO

Page 7: AMBER calibration update - University of Hawaiʻiidlab/taskAndSchedule/ARA/... · 2011. 11. 7. · AMBER orientation East 19.12 North AMBER near calibration stand Rishi:Plan to transmit

Nancy

Heatlet-3Rodrigo

Heatlet-2Heatlet-2

Heatlet-1

View from Coihueco FD