Page 1: A. Ballarino CERN, Geneva R2E and Avalilability Workshop · 2018. 11. 16. · A. Ballarino, 17/10/2014 Future Milestones (1/2) Test of SC Link, 20 m long, containing the full assembly

A. Ballarino, 17/10/2014

Superconducting Links

A. Ballarino

CERN, Geneva

R2E and Avalilability Workshop 17th October 2014

Page 2: A. Ballarino CERN, Geneva R2E and Avalilability Workshop · 2018. 11. 16. · A. Ballarino, 17/10/2014 Future Milestones (1/2) Test of SC Link, 20 m long, containing the full assembly

A. Ballarino, 17/10/2014

Outline

Introduction Cold Powering Systems with SC Links for R2E Cold Powering Systems with SC Links for

Hi Luminosity LHC

Status of development (LHC P7)

Project timeline and future milestones (LHC P7)

SC Links for P1 and P5

Page 3: A. Ballarino CERN, Geneva R2E and Avalilability Workshop · 2018. 11. 16. · A. Ballarino, 17/10/2014 Future Milestones (1/2) Test of SC Link, 20 m long, containing the full assembly

A. Ballarino, 17/10/2014

SC Links for LHC

P1

P6

P4

P2

P8

P3

P5

P7

P1

P6

P4

P2

P8

P3

P5

P7

Betatron Cleaning Collimators

CMS

ATLAS

R2E LHC Circuits Hi-Lumi Hi-Lumi Magnets

R2E

R2E Powering of arc

Hi-Lumi Powering of Triplets + D1

Hi-Lumi Powering MSs

R2E Powering of arc

Hi-Lumi Powering of Triplets + D1

Hi-Lumi Powering MSs

Page 4: A. Ballarino CERN, Geneva R2E and Avalilability Workshop · 2018. 11. 16. · A. Ballarino, 17/10/2014 Future Milestones (1/2) Test of SC Link, 20 m long, containing the full assembly

A. Ballarino, 17/10/2014

2013 2023 2018 2017 2016 2015 2014

SC Links at LHC P7

R2E

SC Links at LHC P1 and P5 R2E + Hi-Lumi

SC Links for LHC

Dates of installation of cold powering systems in the LHC machine

Page 5: A. Ballarino CERN, Geneva R2E and Avalilability Workshop · 2018. 11. 16. · A. Ballarino, 17/10/2014 Future Milestones (1/2) Test of SC Link, 20 m long, containing the full assembly

A. Ballarino, 17/10/2014

SC Links for LHC P7 Removal of DFBA (2) and DFBM (2)

SC Links (DSH) + New re-located “DFBs”(DFH) + Connection cryostats replacing the DFBs (DFA/M) (with the 2 leads 13 kA for EE of MB) + (associate cryo, control, protection,…)

Cold Powering System

Page 6: A. Ballarino CERN, Geneva R2E and Avalilability Workshop · 2018. 11. 16. · A. Ballarino, 17/10/2014 Future Milestones (1/2) Test of SC Link, 20 m long, containing the full assembly

A. Ballarino, 17/10/2014

Powering at LHC P7 DFBA

DFBM

DFBAM+DFBMH (P7L, RR73) DFBAN+DFBMH (P7R, RR77)

Page 7: A. Ballarino CERN, Geneva R2E and Avalilability Workshop · 2018. 11. 16. · A. Ballarino, 17/10/2014 Future Milestones (1/2) Test of SC Link, 20 m long, containing the full assembly

A. Ballarino, 17/10/2014

R771

TZ76 UJ76

Underground Installation Two SC Links, each 500 m long

Current Leads and Power Converters

~ 250 m

SC Links for LHC P7

J. P. Corso

Page 8: A. Ballarino CERN, Geneva R2E and Avalilability Workshop · 2018. 11. 16. · A. Ballarino, 17/10/2014 Future Milestones (1/2) Test of SC Link, 20 m long, containing the full assembly

A. Ballarino, 17/10/2014

SC Links for LHC P7 LHC Electrical Circuits

Number of leads Current Rating (A) Circuit

DFBAM

2 13000 EE

4 600 RQS

20 600 RQTL

8 600 RQT

4 600 ROF

4 600 ROD

4 600 RSS

DFBMH

4 600 RQ6

Tot. 48 Leads rated 600 A 48 cables 600 A (28.8 kA) in the link

Focusing Octupoles

Defocusing Octupoles

Skew Sextupoles

MB Energy Extraction

Skew Quadrupoles

Trim Quadrupoles

Trim Quadrupoles

Quadrupoles in MSs

Page 9: A. Ballarino CERN, Geneva R2E and Avalilability Workshop · 2018. 11. 16. · A. Ballarino, 17/10/2014 Future Milestones (1/2) Test of SC Link, 20 m long, containing the full assembly

A. Ballarino, 17/10/2014

Status of System Development (LHC P7)

Cold Powering System Cryogenics Superconductors Superconducting Cables Superconducting Links

New DFBs and Current Leads

Page 10: A. Ballarino CERN, Geneva R2E and Avalilability Workshop · 2018. 11. 16. · A. Ballarino, 17/10/2014 Future Milestones (1/2) Test of SC Link, 20 m long, containing the full assembly

A. Ballarino, 17/10/2014

Cold Powering System Cryogenics Superconductors Superconducting Cables Superconducting Links

New DFBs and Current Leads

Status of System Development (LHC P7)

Page 11: A. Ballarino CERN, Geneva R2E and Avalilability Workshop · 2018. 11. 16. · A. Ballarino, 17/10/2014 Future Milestones (1/2) Test of SC Link, 20 m long, containing the full assembly

A. Ballarino, 17/10/2014

THe = 17 K THe < 40 K

THe < 35 K

Qcold_mass 0.3 W/m Qth_shield 2.5 W/m

TLead = 40 K-50 K

THe = 5 K

THe = 20 K

Room Temperature

MgB2

Top 20 K

Bi-2223 or YBCO

Cooling of Cold Powering System (LHC P7)

1

2

3

Page 12: A. Ballarino CERN, Geneva R2E and Avalilability Workshop · 2018. 11. 16. · A. Ballarino, 17/10/2014 Future Milestones (1/2) Test of SC Link, 20 m long, containing the full assembly

A. Ballarino, 17/10/2014

Cold Powering System Cryogenics Superconductors Superconducting Cables Superconducting Links

New DFBs and Current Leads

Status of System Development (LHC P7)

Page 13: A. Ballarino CERN, Geneva R2E and Avalilability Workshop · 2018. 11. 16. · A. Ballarino, 17/10/2014 Future Milestones (1/2) Test of SC Link, 20 m long, containing the full assembly

A. Ballarino, 17/10/2014

Cold Powering System (LHC P7)

Page 14: A. Ballarino CERN, Geneva R2E and Avalilability Workshop · 2018. 11. 16. · A. Ballarino, 17/10/2014 Future Milestones (1/2) Test of SC Link, 20 m long, containing the full assembly

A. Ballarino, 17/10/2014

U. Wagner, from CERN-ACC-2014-0065, Milestone Report of WP6

Cryogenics for Cold Powering System (LHC P7)

Cooling requirements are satisfied by the existing LHC cryogenic system

Page 15: A. Ballarino CERN, Geneva R2E and Avalilability Workshop · 2018. 11. 16. · A. Ballarino, 17/10/2014 Future Milestones (1/2) Test of SC Link, 20 m long, containing the full assembly

A. Ballarino, 17/10/2014

Cold Powering System Cryogenics Superconductors Superconducting Cables Superconducting Links

New DFBs and Current Leads

Status of System Development (LHC P7)

Page 16: A. Ballarino CERN, Geneva R2E and Avalilability Workshop · 2018. 11. 16. · A. Ballarino, 17/10/2014 Future Milestones (1/2) Test of SC Link, 20 m long, containing the full assembly

A. Ballarino, 17/10/2014

MgB2 Wire Development

3.60.67 mm2

1.61.6 mm2 1.11.1 mm2

1.11.1 mm2

37 filaments 61 filaments

Ni Matrix 12 MgB2 filaments Cu core – Fe barrier ff 14 %

Monel Matrix 12/19/37/61/91 MgB2 filaments Ni barrier ff up to 24 %

Wire produced at Columbus Superconductors

Product commercially available before development for SC Link Project (R&D CERN-Columbus)

Page 17: A. Ballarino CERN, Geneva R2E and Avalilability Workshop · 2018. 11. 16. · A. Ballarino, 17/10/2014 Future Milestones (1/2) Test of SC Link, 20 m long, containing the full assembly

A. Ballarino, 17/10/2014

wire = 0.99 mm 30 MgB2 filaments Twisted filaments (LT=100 mm) eq_MgB2 = 62 m ACu 5 % Awire

wire = 0.85 mm 37 MgB2 filaments Twisted filaments (LT=100 mm) eq_MgB2 = 56 m ACu 5 % Awire (th=30 m) Cu plating Sn coating of Cu surface

MgB2 wire – State of the art development

Wires produced at Columbus Superconductors

Baseline wire

Page 18: A. Ballarino CERN, Geneva R2E and Avalilability Workshop · 2018. 11. 16. · A. Ballarino, 17/10/2014 Future Milestones (1/2) Test of SC Link, 20 m long, containing the full assembly

A. Ballarino, 17/10/2014

MgB2 wire

Following Market Survey, launched in September 2014 procurement of 150 km of MgB2 round wire (previous material was produced via R&D contracts)

Page 19: A. Ballarino CERN, Geneva R2E and Avalilability Workshop · 2018. 11. 16. · A. Ballarino, 17/10/2014 Future Milestones (1/2) Test of SC Link, 20 m long, containing the full assembly

A. Ballarino, 17/10/2014

Cold Powering System Cryogenics Superconductors Superconducting Cables Superconducting Links

New DFBs and Current Leads

Status of System Development (LHC P7)

Page 20: A. Ballarino CERN, Geneva R2E and Avalilability Workshop · 2018. 11. 16. · A. Ballarino, 17/10/2014 Future Milestones (1/2) Test of SC Link, 20 m long, containing the full assembly

A. Ballarino, 17/10/2014

Cable-Twisted Pairs Cable 1

Cable 2 On both types of cables : Measured Ic > 600 A per cable at 30 K CERN Test Station in SM-18 Cable length = 20 m

Page 21: A. Ballarino CERN, Geneva R2E and Avalilability Workshop · 2018. 11. 16. · A. Ballarino, 17/10/2014 Future Milestones (1/2) Test of SC Link, 20 m long, containing the full assembly

A. Ballarino, 17/10/2014

Cabling machines Developed at CERN

Stacking and Insulating

Twisting and Insulating

Page 22: A. Ballarino CERN, Geneva R2E and Avalilability Workshop · 2018. 11. 16. · A. Ballarino, 17/10/2014 Future Milestones (1/2) Test of SC Link, 20 m long, containing the full assembly

A. Ballarino, 17/10/2014

Multi-Cable Assembly

= 40

30 kA 2 kg/m

Page 23: A. Ballarino CERN, Geneva R2E and Avalilability Workshop · 2018. 11. 16. · A. Ballarino, 17/10/2014 Future Milestones (1/2) Test of SC Link, 20 m long, containing the full assembly

A. Ballarino, 17/10/2014

L = 20 m (252) 1 kA @ 25 K, LHC Link P7

Page 24: A. Ballarino CERN, Geneva R2E and Avalilability Workshop · 2018. 11. 16. · A. Ballarino, 17/10/2014 Future Milestones (1/2) Test of SC Link, 20 m long, containing the full assembly

A. Ballarino, 17/10/2014

Cold Powering System Cryogenics Superconductors Superconducting Cables Superconducting Links

New DFBs and Current Leads

Status of System Development (LHC P7)

Page 25: A. Ballarino CERN, Geneva R2E and Avalilability Workshop · 2018. 11. 16. · A. Ballarino, 17/10/2014 Future Milestones (1/2) Test of SC Link, 20 m long, containing the full assembly

A. Ballarino, 17/10/2014

Nexans Semi-Flexible Cryostat (L=20 m)

Cryostat for SC Link

Page 26: A. Ballarino CERN, Geneva R2E and Avalilability Workshop · 2018. 11. 16. · A. Ballarino, 17/10/2014 Future Milestones (1/2) Test of SC Link, 20 m long, containing the full assembly

A. Ballarino, 17/10/2014

H 4 m L = 20 m ext = 163 mm

Test Station at CERN

Page 27: A. Ballarino CERN, Geneva R2E and Avalilability Workshop · 2018. 11. 16. · A. Ballarino, 17/10/2014 Future Milestones (1/2) Test of SC Link, 20 m long, containing the full assembly

A. Ballarino, 17/10/2014

Cold Powering System Cryogenics Superconductors Superconducting Cables Superconducting Links

New DFBs and Current Leads

Status of System Development (LHC P7)

Page 28: A. Ballarino CERN, Geneva R2E and Avalilability Workshop · 2018. 11. 16. · A. Ballarino, 17/10/2014 Future Milestones (1/2) Test of SC Link, 20 m long, containing the full assembly

A. Ballarino, 17/10/2014

Cold Powering System

New concept: no DFB cryostat

Conceptual design at the University of Southampton, Task 3 of WP 6

Needs for transport in the tunnel has driven the concept of the system

1 2 3

Page 29: A. Ballarino CERN, Geneva R2E and Avalilability Workshop · 2018. 11. 16. · A. Ballarino, 17/10/2014 Future Milestones (1/2) Test of SC Link, 20 m long, containing the full assembly

A. Ballarino, 17/10/2014

Connection Cryostats

• Minimise work in the tunnel – Assemble and test before LS2 starts – Aim for installation within short time slot (radiation

cooldown time may be long..)

• Remove HCM only and replace with DFA – Keep 2x13 kA leads in current position – Keep cryo jumper in current position – Vertical link connection – Keep existing support beam and shuffling module

• Remove DFBMH and link Q6 to DFA – Possibly with no changes to Q6 QQS and jumper – Link routed above QRL

Delio Ramos, WP 6 Meeting, 5/03/2014

Page 30: A. Ballarino CERN, Geneva R2E and Avalilability Workshop · 2018. 11. 16. · A. Ballarino, 17/10/2014 Future Milestones (1/2) Test of SC Link, 20 m long, containing the full assembly

A. Ballarino, 17/10/2014

Future Milestones (1/2) Test of SC Link, 20 m long, containing the full assembly of 50 cables

December 2014

Construction and Test of Cold Powering System (new DFB with a set of current leads and 20 m long SC Link)

December 2015

Procurement of 60 m long SC Link cryostat Nov.2014-April 2015

Integration test at CERN using 60 m long SC Link cryostat (decision on need for civil engineering) May-June 2015

Test of Cold Powering System (new DFB with, full set of current leads and 60 m long SC Link)

November 2016

Page 31: A. Ballarino CERN, Geneva R2E and Avalilability Workshop · 2018. 11. 16. · A. Ballarino, 17/10/2014 Future Milestones (1/2) Test of SC Link, 20 m long, containing the full assembly

A. Ballarino, 17/10/2014

Future Milestones (2/2) Procurement of series components As from end 2015 Availability of two Cold Powering Systems for LHC P7 End 2016/Beginning 2017 Test of the two Cold Powering Systems for LHC P7 2017 Availability of spare components (one SC Link, Current Leads) 2018

Page 32: A. Ballarino CERN, Geneva R2E and Avalilability Workshop · 2018. 11. 16. · A. Ballarino, 17/10/2014 Future Milestones (1/2) Test of SC Link, 20 m long, containing the full assembly

A. Ballarino, 17/10/2014

2018 2017 2016 2015 2014

Series P7 300 km of wire

150 km of wire (being procured)

New DFBs, Current Leads and

SC Links for P7 available

New DFBs, Current Leads and

SC Links for P7 tested

Procurement of series components

Project Timeline

Page 33: A. Ballarino CERN, Geneva R2E and Avalilability Workshop · 2018. 11. 16. · A. Ballarino, 17/10/2014 Future Milestones (1/2) Test of SC Link, 20 m long, containing the full assembly

A. Ballarino, 17/10/2014

Superconducting Links for LHC P1 and P5

R2E

Page 34: A. Ballarino CERN, Geneva R2E and Avalilability Workshop · 2018. 11. 16. · A. Ballarino, 17/10/2014 Future Milestones (1/2) Test of SC Link, 20 m long, containing the full assembly

A. Ballarino, 17/10/2014

High-Current Cables –Synergy with the work done on the the SC Links needed for re-locating the DFBL and DFBX at P1 and P5 (Hi-Luminosity Upgrade)

Number of leads

Current rating

Circuit

DFBAA (P1L)/DFBAI (P5L)

2 13000 EE

12 6000 RQ7,RQ8, RQ9, RQ12

28 600 ROF,ROD,RSSRQT13, RQTL11

RQT12,RQS

Superconducting Links for LHC P1 and P5

Page 35: A. Ballarino CERN, Geneva R2E and Avalilability Workshop · 2018. 11. 16. · A. Ballarino, 17/10/2014 Future Milestones (1/2) Test of SC Link, 20 m long, containing the full assembly

A. Ballarino, 17/10/2014

20 kA Six cables, = 19.5 mm

Concentric 3 kA Seven cables, = 8.4 mm

0.4 kA Four cables

0.12 kA Eighteen cables

ext 65 mm

High-Current Rating, LHC P1 and P5

18 MgB2 wires = 6.5 mm

Cu

MgB2 , = 0.85 mm

Hi-Lumi Triplets and D1

Mass 11 kg/m (880 kg for H=80 m)

Page 36: A. Ballarino CERN, Geneva R2E and Avalilability Workshop · 2018. 11. 16. · A. Ballarino, 17/10/2014 Future Milestones (1/2) Test of SC Link, 20 m long, containing the full assembly

A. Ballarino, 17/10/2014

18 MgB2 wires wire = 0.98 mm Cable = 6.5 mm Tw = 400 mm Ltot=210 m

LHe (L=2 m)

GHe (L=10 m) T < 1 K

+ -

5000 A

= 6.5 mm

10507 A

MgB2 Cables developed and tested at CERN

Page 37: A. Ballarino CERN, Geneva R2E and Avalilability Workshop · 2018. 11. 16. · A. Ballarino, 17/10/2014 Future Milestones (1/2) Test of SC Link, 20 m long, containing the full assembly

A. Ballarino, 17/10/2014

MgB2 Cables developed and tested at CERN

Imax Power Converter

I = 20 kA T = 24 K Bp = 1 T

=19.5 mm

Hcable =3.7 H

T along line 1 T

Page 38: A. Ballarino CERN, Geneva R2E and Avalilability Workshop · 2018. 11. 16. · A. Ballarino, 17/10/2014 Future Milestones (1/2) Test of SC Link, 20 m long, containing the full assembly

A. Ballarino, 17/10/2014

80 m

LHC Tunnel Integration drawings by J.P. Corso and S. Weisz

Superconducting Links for LHC P1

Page 39: A. Ballarino CERN, Geneva R2E and Avalilability Workshop · 2018. 11. 16. · A. Ballarino, 17/10/2014 Future Milestones (1/2) Test of SC Link, 20 m long, containing the full assembly

A. Ballarino, 17/10/2014

Present baseline: SC Links from the tunnel to the surface

On-going studies on need for civil engineering for Hi-Luminosity equipment may offer the possibility of using new underground caverns for housing the new DFBs

Superconducting Links for LHC P1 and P5

BUT

Page 40: A. Ballarino CERN, Geneva R2E and Avalilability Workshop · 2018. 11. 16. · A. Ballarino, 17/10/2014 Future Milestones (1/2) Test of SC Link, 20 m long, containing the full assembly

A. Ballarino, 17/10/2014

Conclusions

Development work on SC Links for LHC P7 is well advanced. A decision on the integration of the system in 2018 is needed soon – procurement of series components shall be launched in 2015 The work on the SC links at P1 and P5 for R2E is in synergy with the development done for Hi-Luminosity LHC (SC Links replacing the DFBX and the DFBL). A decision is needed in order to take into account specific requirements both for system design and integration studies

Page 41: A. Ballarino CERN, Geneva R2E and Avalilability Workshop · 2018. 11. 16. · A. Ballarino, 17/10/2014 Future Milestones (1/2) Test of SC Link, 20 m long, containing the full assembly

A. Ballarino, 17/10/2014

Acknowledgments: B. Bordini, S. Giannelli, J. Hurte, A. Jacquemod, A. Gharib, R. Betemps, U. Wagner and the SM-18 team The Hi-Lumi EU WP6 Collaborators (Univ. Southampton, INFN)