13
oint 5 mini safe room cooling / ventil A. L. Perrot , 30 th April 2013

R2E Point 5 mini safe room cooling / ventilation

  • Upload
    tala

  • View
    40

  • Download
    3

Embed Size (px)

DESCRIPTION

R2E Point 5 mini safe room cooling / ventilation . A. L. Perrot , 30 th April 2013. OPTIONS proposed on Friday 26 th April (brainstorming EN/EL, EN/CV, GS/SE, MEF-INT, R2E team). Option 1: - PowerPoint PPT Presentation

Citation preview

Page 1: R2E Point 5 mini safe room cooling / ventilation

R2E Point 5 mini safe room cooling / ventilation

A. L. Perrot , 30th April 2013

Page 2: R2E Point 5 mini safe room cooling / ventilation

Option 1:cooling ensured via apertures of 120 mm or 100 mm located at the bottom of the equipment (@ the level of the metallic structure of the safe room) along the whole safe room (18m); air pulsed from UTAs (?) located in UL557.

Option 2:cooling = air pulsed below in the metallic structure from UTAs located in UL557; 2 additional ducts to be drilled in the wall between UL557/UL558 and UL557/CMs to ensure air arrival from UTAs; cables would arrive from top in between equipment in safe room to liberate as much as possible space below the equipment in the metallic structure.

Actions: - EN/MEF: show the corresponding models; - CE: check the feasibility, number of ducts and distance in between;- R2E: discuss the integration feasibility with GS/ASE-DI/ODH team;- CV: calculate the efficiency of such a cooling (UTAs located in UL557- machine side)

OPTIONS proposed on Friday 26th April (brainstorming EN/EL, EN/CV, GS/SE, MEF-INT, R2E team)

Actions: - EN/MEF: show the corresponding models; - CV: calculate the efficiency of such a cooling (UTAs located in UL557- machine side)

Page 3: R2E Point 5 mini safe room cooling / ventilation

Option 3:Safe room moved as close as possible to its initial location (when position of the ducts was decided). Cooling ensured via primary solution proposed by CV.

Actions: - MEF-INT: show the corresponding models;- CV: calculate the efficiency of such a cooling ;

Option 4:Cooling ensured via lateral air pulsed from UL557 via a new duct to be drilled close to the safe room; need to relocate a vertical cable tray; UTAs located in UL557.

Actions: - MEF-INT: show the models;- CV: calculate the efficiency of such a cooling ;

OPTIONS proposed on Friday 26th April (brainstorming EN/EL, EN/CV, GS/SE, MEF-INT, R2E team)

Page 4: R2E Point 5 mini safe room cooling / ventilation

USC55- level 0 – CMS side

Page 5: R2E Point 5 mini safe room cooling / ventilation

USC55- level 0 – CMS side

Page 6: R2E Point 5 mini safe room cooling / ventilation
Page 7: R2E Point 5 mini safe room cooling / ventilation
Page 8: R2E Point 5 mini safe room cooling / ventilation
Page 9: R2E Point 5 mini safe room cooling / ventilation
Page 10: R2E Point 5 mini safe room cooling / ventilation
Page 11: R2E Point 5 mini safe room cooling / ventilation
Page 12: R2E Point 5 mini safe room cooling / ventilation
Page 13: R2E Point 5 mini safe room cooling / ventilation