Page 1 of 2
Addendum 5
Project: Village Court Apartments Phase IV Mountain Village, Colorado
Date – 04.7.22
Item Name: Foundation revisions, crawlspace access & additional soil stabilization plans Description:
• Added crawlspace access locations for both the East & West buildings. • Soil Stabilization Plans have been further developed and more detail added. • Added #5 rebar at typical pile detail over pile and added grade beam stirrups. • Trash compactor foundation clarified at exterior ramp. • Grade beam GB3 (2’-0” x 3’-0”) has been added at gridline 5 and gridline 6 at the East
Building. • New building sections have been added on sheet S2.00E & S2.01E & S2.02E. • Added rebar at grade beams per revised sheet S2.03E. • Reduced concrete retaining wall at detail 5/S204E. • Clarified retaining wall detail at East building East entrance. Reference new detail
2/S2.05E. Note: The costs for all pull/load testing and documentation for the soil nails and the micro-piles is to be included in GSI’s scope of work under the responsibility of the GC. If you have any questions, comments, and/or corrections please notify our office immediately.
Page 2 of 2
Addendum 5
Project: Village Court Apartments Phase IV Mountain Village, Colorado
Date – 04.7.22
Rachel Olson, AIA Olson Architects, L.L.C. (303) 305-9342 Attachments: A1.01E, A1.01W, S0.01, S0.02, S1.00E, S2.00E, S2.01E, S2.02E, S2.03E, S2.04E, S2.05E, SOIL STABILIZATION PLANS & SPEC SECTIONS 313233, 313236 & 316116.
REF.
WH
REF.
WH
DW
DW
REF.
REF.
DW
DW
WH
WH
REF.
WH
DW
REF.
WH
DW
REF.
WH
DW
DW DDDW W
REF.
DW
WH
W
REF.
WH
DW
WH
A
A
55
22
33
1
A3.02E
1
A3.02E
B
B
44
G.1
G.1
H
H
J
J
D
D
E
E
2
A3.01E
2
A3.01E
9' - 0" 11' - 5" 10' - 6" 11' - 10" 11' - 10" 10' - 6" 11' - 10" 10' - 6" 11' - 5" 9' - 0"
A2.02E2
A2.02E
1
A2.01E1
A2.01E
2
2' -
0"
23
' -
2"
1' -
1"
5' -
0"
13
' -
2"
11
' -
1"
2' -
0"
57
' - 6
" O
VE
RA
LL
C
C
11
66
TYPE 2B-R
101
TYPE 1B
102
TYPE 2B
103
TYPE 2B
105
TYPE 1A
106
TYPE 2B-R
107
B.1
B.1
F
F
G
G
3.13.1
3.23.2 DN
UP
UPD
N
A5.03E
AA
A5.05E
AA
A5.02E
AA 2
A3.02E
2
A3.02E
1
A3.01E
1
A3.01E
1ST LEVEL
CORRIDOR
101
EAST STAIR
102WEST STAIR
100
AAAA
AADD AA
BB
BB
BB
BB
BB
BB
DD
DD
CC
DD
CC
D01 D01
D02D02
1/4
" /
12
"
DD
GAS METER AT RETAINING WALL BELOW
2
A3.53E3
A3.53E
F.O
.S.
TY
P
MA
TIN
G
WA
LL
TY
PFDC
A4.01E
2
A4.02E
2
CARPET TILE & WOOD BASE
A6.01
7
DD
D01
AA AA
BB
BB
DD
1
A3.51E
A
A
55
22
33
1
A3.02E
1
A3.02E
9' - 0" 11' - 5" 10' - 6" 11' - 10" 11' - 10" 10' - 6" 11' - 10" 10' - 6" 11' - 5" 9' - 0"
57
' - 6
" O
VE
RA
LL
2' -
0"
11
' -
1"
13
' -
2"
5' -
0"
1' -
1"
6' -
9"
16
' -
5"
2' -
0"
A2.02E
1
A2.01E
2
A2.01E1
B
B
44
G.1
G.1
H
H
J
J
D
D
E
E
2
A3.01E
2
A3.01E
C
C
A2.02E2
11
66
TYPE 2-R
001
TYPE 1
002
TYPE 2
003
DASHED LINE INDICATES 1 HR FIRE WALL, TYP
DASHED LINE INDICATES 2 HR FIRE WALL, TYP. BETWEEN STAIR AND BUILDING
B.1
B.1
F
F
G
G
3.13.1
3.23.2
6' -
9"
CRAWLSPACECRAWLSPACE
UP
UP
LOWER
CORRIDOR
001
WEST STAIR
100EAST STAIR
102
FIRE RISER
004ELECTRICAL
002
LAUNDRY
ROOM
003
D13D12
D02 D02
D12
2
A3.02E
2
A3.02E
1
A3.01E
1
A3.01E
AADD
BB BB
DD
BBBB
D01 D01
2
A3.53E3
A3.53E
F.O
.S.
TY
P
MA
TIN
G
WA
LL
TY
P
FD
ELECTRIC WALL HEATER, TYPRE:MECH
A4.01E
1A4.02E
1
MODEM IN LOCKABLE PLASTIC BOX, MTD @ 60" AFF
PLASTIC LAMINATE 24" DEEP COUNTERTOP, GC TO PROVIDE STEEL WALL SUPPORT BRACKETS AT 3' O.C., TYP. COUNTER TO BE MOUNTED AT 30" AFF
W6 W2
W6
W6
W6
W7
W7
2X10 STUD
A6.04
5 TYP
9' - 0" 11' - 5" 44' - 8" 22' - 4"
CARPET TILE & WOOD BASE
A6.01
5A6.01
8
AA
D01
10
' -
0"
T.O. WALL = 9439'-0"
F.F.E. = 9441'- 1/8"
1
A3.51E
PANELRE:ELECT
METER STACKRE:ELECT
MAIN DISCONNECTRE:ELECT 2'-6" x 2'-6"
HOLLOW METAL ACCESS DOOR
2'-0" X 3'-0" CRAWL SPACE ACCESS HATCH WITH LOCK
PR
OJE
CT
NO
:
DRAWING TITLE
APPROVALS
AS
SE
SS
OR
S P
AR
CE
L N
O:
SHEET NO.
PROJ MGR
PRINCIPAL
THESE DRAWINGS AND SPECIFICATIONS SHALL REMAIN
THE PROPERTY OF THE ARCHITECT AND SHALL NOT BE
USED FOR ANY OTHER PROJECTS WITHOUT THE WRITTEN CONSENT
OF THE ARCHITECT.
OLSON ARCHITECTS, LLCRachel M. Olson, AIA
P.O. Box 4241Durango, Colorado 81302
T 303.305.9342
2 ADDENDUM 5 04.07.22
Ph
ase
IV
Vil
lag
e C
ou
rt A
pa
rtm
en
ts
008-2
021
RMO
477904200005
A1.01E
LOWER & FIRSTLEVEL FLOOR
PLANS
41
5 M
TN
VIL
LA
GE
BL
VD
MO
UN
TA
IN V
ILLA
GE
, C
O 8
14
35
RMO
BID
SE
T -
01.3
1.2
02
2
FLOOR PLAN NOTES
1/8" = 1'-0"
FIRST LEVEL FLOOR PLAN
1. ALL EXTERIOR WALLS TO BE OF 2X6 @ 16" O.C. NOMINAL CONSTRUCTION, UNLESS OTHERWISE NOTED. ALLINTERIOR WALLS TO BE OF 2X4 @ 16" O.C. CONSTRUCTION, UNLESS OTHERWISE NOTED.
2. VERIFY ALL TUB ROUGH-IN DIMENSIONS PRIOR TO FRAMING LAYOUT.
3. PROVIDE & INSTALL HAND RAILING AT STAIRS. TOP OF HANDRAILING TO BE 34" ABOVE NOSE OF STEP.HANDRAIL SHALL MEET ALL REQUIRMENTS SET FORTH BY THE INTERNATIONAL BUILDING CODE.
4. DIMENSION SYSTEM NOTE:ALL DIMENSIONS ARE FACE OF FRAMING TO FACE OF FRAMING OR FACE OFFRAMING TO CENTERLINE, U.N.O.
5. CONTRACTOR TO PROVIDE AND INSTALL BATHROOM ACCESSORIES IN ALL BATHROOMS. THIS INCLUDESTOWEL BAR, TOWEL RING AND TISSUE HOLDER. BASIS OF DESIGN: MOEN 'CONTEMPORARY DONNERCOLLECTION' P5118, ETC.
6. PROVIDE SHELF & ROD IN ALL CLOSETS, TYP. UNLESS OTHERWISE NOTED - OR APPROVED EQUAL BY OWNER.
7. PROVIDE AND INSTALL SOUND ATTENUATION IN ALL WALLS/FLOORS/CEILINGS SURROUNDING BEDROOMSAND BATHROOMS
8. THE CONTRACTOR TO PROVIDE AND INSTALL VAPOR BARRIERS IN THE FOLLOWING LOCATIONS: CRAWLSPACE - PROVIDE VAPOR BARRIER w/6" OVERLAP AND SEAL OR TAPE OVERLAP, BARRIER SHALL EXTEND 6"MIN. UP STEMWALL AND SHALL ATTACH TO STEMWALL.
9. ANY DISCREPANCIES WITH DIMENSIONS TO BE REPORTED TO ARCHITECT PRIOR TO CONSTRUCTION. IFCONTRACTOR, OWNER, OR SUBCONTRACTOR PROCEEDS WITH CONSTRUCTION WITHOUT ARCHITECTAPPROVAL THEN THE ARCHITECT IS NOT RESPONSIBLE FOR THAT PART OF THE WORK.
10. CONTRACTCONTRACTOR TO PROVIDE AND INSTALL RODS @ ALL TUB/SHOWER LOCATIONS. SHOWER RODBASIS OF DESIGN: MOEN BRUSHED NICKEL CURVED SHOWER ROD; CSR2164BN.
11. CONTRACTOR TO PROVIDE HORIZONTAL WINDOW BLINDS AT ALL UNIT WINDOWS. BASIS OF DESIGN: HUNTERDOUGLAS 'EVERWOOD' WOOD BLINDS WITH CORDLESS LIFT SYSTEM.
NORTH
1/8" = 1'-0"
LOWER LEVEL FLOOR PLAN
NORTH
#
SIZE
OPERATION HD HEIGHT COMMENTSWIDTH HEIGHT
AA 6' - 0" 5' - 0" CS 8'-0"
BB 2' - 0" 4' - 0" FX 8'-0"
CC 2' - 0" 3' - 0" CS 7'-0"
DD 6' - 0" 5' - 0" CS 8'-0" FIXED SIDE CLOSEST TO WALL MTD VENT
WINDOW SCHEDULE
# STYLE
SIZE FINISH FRAME
HARDWARE COMMENTSWIDTH HEIGHT INT EXT MATERIAL FINISH
D01 SLIDER 6' - 0" 8' - 0" FG FG FG FG MF
D02 SWING 3' - 0" 6' - 8" PAINT PAINT HM PAINT PS 90 MIN
D03 SWING 3' - 0" 6' - 8" PAINT PAINT WD PAINT EN 20 MIN
D04 SWING 2' - 10" 6' - 8" PAINT PAINT WD PAINT PR
D05 SWING 2' - 8" 6' - 8" PAINT PAINT WD PAINT PS
D07 SWING 2' - 6" 6' - 8" PAINT PAINT WD PAINT PS
D08 SWING 3' - 0" 6' - 8" WD WD WD WD PR
D09 BI-FOLD 4' - 0" 6' - 8" PAINT PAINT WD PAINT -
D10 BI-FOLD 5' - 0" 6' - 8" PAINT PAINT WD PAINT -
D11 SWING 1' - 6" 6' - 8" WD WD WD WD PS
D12 SWING 3' - 0" 6' - 8" PAINT PAINT HM PAINT ST 20 MIN
D13 SWING 3' - 0" 6' - 8" PAINT PAINT HM PAINT PS 20 MIN
DOOR
By-Pass 5' - 0" 6' - 8" PS
DOOR SCHEDULE
NOTES:FG = FIBERGLASSHM = HOLLOW METALPS = PASSAGE LOCKSETPR = PRIVACY LOCKSETST = STOREROOM LOCKSETEN = ENTRY LOCKSETMF = MANUFACTURER'S LOCKSET
TYPE 1A UNITS ARE CLASSIFIED AS TYPE A ACCESSIBLE UNITS PER SECTION 1003 OF THE ICC A117.1-2009.TYPE 1B, 2B AND 2B-R UNITS ARE CLASSIFIED AS TYPE B ACCESSIBLE UNITS PER SECTION 1004 OF THE ICC A117.1-2009.
ROOM FINISHES
HEIGHT COMMENTS# NAME FLOOR BASE WALL CEILING
001 LOWER CORRIDOR CPT TILE WD PAINT-1 GYP/PAINT 9'-0"
002 ELECTRICAL S.CONC N/A PAINT-1 GYP/PAINT 9'-0"
003 LAUNDRY ROOM S.CONC N/A PAINT-1 GYP/PAINT 9'-0"
004 FIRE RISER S.CONC N/A PAINT-1 GYP/PAINT 9'-0"
100 WEST STAIR WD MTL MTL GYP/PAINT 9'-0"
101 1ST LEVEL CORRIDOR CPT TILE WD PAINT-1 GYP/PAINT 9'-0"
102 EAST STAIR WD MTL MTL GYP/PAINT 9'-0"
201 2ND LEVELCORRIDOR
CPT TILE WD PAINT-1 GYP/PAINT 9'-0"
301 3RD LEVELCORRIDOR
CPT TILE WD PAINT-1 GYP/PAINT 9'-0"
FINISH SCHEDULE - COMMON ROOMS
REF.WH WH
DW
REF.
WH
DW
REF. REF.
WH
WH
DWDW
REF.
DW
REF.
DW
WH
REF.WH
REF.
D W
DW DW
REF.
WH
DW
D D D WW
WH
WH
H
H
B
B
3 3
E
E
J
J
4 4
5 5
G
G
C
C
D
D
F
F
6 6
2 2
1 1
9' - 0" 11' - 5" 10' - 6" 11' - 10" 10' - 11" 10' - 6" 11' - 10" 11' - 10" 10' - 6" 11' - 5" 9' - 0"
2
A3.02W
2
A3.02W
1
A3.01W
1
A3.01W
DN
UP
A
A
118' - 9" OVERALL
57
' - 6
" O
VE
RA
LL
2' -
0"
11
' -
1"
13
' -
2"
5' -
0"
1' -
1"
23
' -
2"
2' -
0"
B.1
B.1
D.1
D.1
G.1
G.1
3.1 3.1
3.2 3.2
A2.02W1
A2.01W1
A2.01W
2
A2.02W
2
UP
DN
1
A3.02W
1
A3.02W
5' - 7 1/2"5' - 7 1/2"
2
A4.03W
2
A4.03W
3
A3.02W
3
A3.02W
3' -
0"
1' -
7"
A4.01W
2
TYPE 2B-R
101
TYPE 2B-R
102
TYPE 2B
103
TYPE 2B
104
TYPE 2B
105
TYPE 2B-R
106
1ST LEVEL
CORRIDOR
101
NORTH STAIR
100
SOUTH STAIR
102
AADD AA AAAAAA
AADDAAAA
BB
BB
GG
GG
DD
AA AA
BB
BB
BB
BB
CCFF
D02 D02
D01 D01 D01
2
A3.01W
2
A3.01W
1"
/ 12
"
DD DD
GAS METER
SEWER VAULT ACCESSRE:SITE PLAN
FDC
A4.02W
2
10
' -
0"
CARPET TILE & WOOD BASE
H
H
B
B
3 3
E
E
J
J
4 4
5 5
11' - 5" 10' - 6" 11' - 10" 10' - 11" 10' - 6" 11' - 10" 11' - 10" 10' - 6" 11' - 5"
118' - 9" OVERALL
G
G
C
C
D
D
F
F
6 6
2' -
0"
11
' -
1"
13
' -
2"
5' -
0"
1' -
1"
23
' -
2"
2' -
0"
2 2
1 1
2
A3.02W
2
A3.02W
1
A3.01W
1
A3.01W
TYPE 2-R
001
TYPE 2-R
002
TYPE 1
003
UP
1 HOUR RATED WALL, TYP
DASHED LINE INDICATES 2 HR FIRE WALL, TYP. BETWEEN STAIR AND BUILDING
A
A
44
' - 5
" O
VE
RA
LL
B.1
B.1
D.1
D.1
G.1
G.1
3.1 3.1
3.2 3.2
A2.02W1
A2.01W1
A2.01W
2
A2.02W
2
RETAINING WALL, RE: STRUCT
UP
1
A3.02W
1
A3.02W
CRAWL SPACE
2
A4.03W
2
A4.03W
A4.03W
1
3
A3.02W
3
A3.02W
AADDAAAA
D02
SOUTH STAIR
102NORTH STAIR
100
LOWER
CORRIDOR
001
FIRE RISER
ROOM
002
LAUNDRY
ROOM
003ELECTRICAL
ROOM
004
CRAWL SPACE
SEWER
ACCESS VAULT
005
MAINT.
OFFICE
004
D01 D01 D01
D02
D04 D08D04
3' -
2"
2
A3.01W
2
A3.01W
A4.01W
1
A5.01W
AA
FD
A5.01W
1
3
2A5.01W
5
4
A4.02W
1
W5
W6 W6
2' -
0"
CARPET TILE & WOOD BASEA6.04
5
TYP
A6.01
8
2'-0" X 3'-0" CRAWL SPACE ACCESS
2'-6" X 2'-6" HOLLOW METAL ACCESS DOOR
2'-6" X 2'-6" HOLLOW METAL ACCESS DOOR
PR
OJE
CT
NO
:
DRAWING TITLE
APPROVALS
AS
SE
SS
OR
S P
AR
CE
L N
O:
SHEET NO.
PROJ MGR
PRINCIPAL
THESE DRAWINGS AND SPECIFICATIONS SHALL REMAIN
THE PROPERTY OF THE ARCHITECT AND SHALL NOT BE
USED FOR ANY OTHER PROJECTS WITHOUT THE WRITTEN CONSENT
OF THE ARCHITECT.
OLSON ARCHITECTS, LLCRachel M. Olson, AIA
P.O. Box 4241Durango, Colorado 81302
T 303.305.9342
2 ADDENDUM 5 04.07.22
Ph
ase
IV
Vil
lag
e C
ou
rt A
pa
rtm
en
ts
038-2
018
RMO
477904200005
A1.01W
LOWER & FIRSTLEVEL FLOOR
PLANS
41
5 M
TN
VIL
LA
GE
BL
VD
MO
UN
TA
IN V
ILLA
GE
, C
O 8
14
35
RMO
BID
SE
T -
01.3
1.2
02
2
FLOOR PLAN NOTES
1/8" = 1'-0"
FIRST LEVEL FLOOR PLAN
1. ALL EXTERIOR WALLS TO BE OF 2X6 @ 16" O.C. NOMINAL CONSTRUCTION, UNLESS OTHERWISE NOTED.ALL INTERIOR WALLS TO BE OF 2X4 @ 16" O.C. CONSTRUCTION, UNLESS OTHERWISE NOTED.
2. VERIFY ALL SHOWER STALL ROUGH-IN DIMENSIONS PRIOR TO FRAMING LAYOUT.
3. VERIFY ALL TUB ROUGH-IN DIMENSIONS PRIOR TO FRAMING LAYOUT.
4. PROVIDE & INSTALL WOODEN HAND RAILING AT STAIRS. TOP OF HANDRAILING TO BE 34" ABOVE NOSEOF STEP. HANDRAIL SHALL MEET ALL REQUIRMENTS SET FORTH BY THE INTERNATIONAL BUILDINGCODE.
5. DIMENSION SYSTEM NOTE:ALL DIMENSIONS ARE FACE OF FRAMING TO FACE OF FRAMING OR FACE OFFRAMING TO CENTERLINE, U.N.O.
6. CONTRACTOR TO PROVIDE AND INSTALL BATHROOM ACCESSORIES IN ALL BATHROOMS. THISINCLUDES TOWEL BAR, TOWEL RING AND TISSUE HOLDER. BASIS OF DESIGN: MOEN 'CONTEMPORARYDONNER COLLECTION' P5118, ETC.
7. PROVIDE SHELF & ROD IN ALL CLOSETS, TYP. UNLESS OTHERWISE NOTED - OR APPROVED EQUAL BYOWNER.
8. ANY DISCREPANCIES WITH DIMENSIONS TO BE REPORTED TO ARCHITECT PRIOR TO CONSTRUCTION.IF CONTRACTOR, OWNER, OR SUBCONTRACTOR PROCEEDS WITH CONSTRUCTION WITHOUTARCHITECT APPROVAL THEN THE ARCHITECT IS NOT RESPONSIBLE FOR THAT PART OF THE WORK.
9. CONTRACTOR TO PROVIDE AND INSTALL RODS @ ALL TUB/SHOWER LOCATIONS. SHOWER ROD BASISOF DESIGN: MOEN BRUSHED NICKEL CURVED SHOWER ROD; CSR2164BN.
10. PROVIDE AND INSTALL SOUND ATTENUATION IN ALL WALLS/FLOORS/CEILINGS SURROUNDINGBEDROOMS AND BATHROOMS
11. THE CONTRACTOR TO PROVIDE AND INSTALL VAPOR BARRIERS IN THE FOLLOWING LOCATIONS:CRAWL SPACE - PROVIDE VAPOR BARRIER w/6" OVERLAP AND SEAL OR TAPE OVERLAP, BARRIERSHALL EXTEND 6" MIN. UP STEMWALL AND SHALL ATTACH TO STEMWALL, CEILING - PROVIDE &INSTALL VAPOR BARRIER w/6" MIN. OVERLAP, SEAL OR TAPE OVERLAP. BARRIER TO SEAL w/HOUSEWRAP AT PLATES, TYP.
12. CONTRACTOR TO PROVIDE HORIZONTAL WINDOW BLINDS AT ALL UNIT WINDOWS. BASIS OF DESIGN:HUNTER DOUGLAS 'EVERWOOD' WOOD BLINDS WITH CORDLESS LIFT SYSTEM.
1/8" = 1'-0"
LOWER LEVEL FLOOR PLANNORTH
NORTH
#
SIZE
OPERATION HD HEIGHT COMMENTSWIDTH HEIGHT
AA 6' - 0" 5' - 0" CS 8'-0"
BB 2' - 0" 4' - 0" FX 8'-0"
CC 2' - 0" 3' - 0" CS 7'-0"
DD 6' - 0" 5' - 0" CS 8'-0"
FF 2' - 0" 3' - 0" CS 7'-0" 45 MIN FIRE RESISTIVE TEMPERED GLAZING
GG 2' - 0" 4' - 0" FX 8'-0" 45 MIN FIRE RESISTIVE TEMPERED GLAZING
WINDOW SCHEDULE
# STYLE
SIZE FINISH FRAME
FINISH HARDWARE COMMENTSWIDTH HEIGHT INT EXTMATERIA
L
D01 SLIDER 6' - 0" 8' - 0" FG FG FG PRE-FIN MF
D02 SWING 3' - 0" 6' - 8" WD WD HM HPC-1 PS 90 MIN
D03 SWING 3' - 0" 6' - 8" WD WD HM HPC-1 EN 20 MIN
D04 SWING 3' - 0" 6' - 8" WD WD HM HPC-1 ST 20 MIN
D05 SWING 2' - 8" 6' - 8" WD WD HM HPC-1 PR
D06 SWING 2' - 8" 6' - 8" WD WD WD PAINT-1 PR
D07 SWING 2' - 6" 6' - 8" WD WD WD PAINT-1 PS
D08 SWING 2' - 8" 6' - 8" WD WD HM HPC-1 PS 20 MIN
D09 BI-FOLD 4' - 0" 6' - 8" WD WD WD PAINT-1 -
D10 BI-FOLD 5' - 0" 7' - 0" WD WD WD PAINT-1 -
D11 SWING 2' - 8" 6' - 8" WD WD WD PAINT-1 PS
DOOR SCHEDULE
NOTES:FG = FIBERGLASSHM = HOLLOW METALPS = PASSAGE LOCKSETPR = PRIVACY LOCKSETST = STOREROOM LOCKSETEN = ENTRY LOCKSETMF = MANUFACTURER'S LOCKSET
TYPE 2B AND 2B-R UNITS ARE CLASSIFIED AS TYPE B ACCESSIBLE UNITS PER SECTION 1004 OF THE ICC A117.1-2009
SECTIONS 31 32 33
SHOTCRETE SOIL SLOPE STABILIZATION AND SOIL NAILING
1.1 REFERENCE STANDARDS
A. U.S. Department of Transportation Federal Highway Administration:
1. FHWA-NHI-14-007 – Soil Nail Walls Reference Manual (2015)
B. ASTM International:
1. ASTM C109 - Standard Test Method for Compressive Strength of Hydraulic Cement
Mortars (Using 2-in. or [50-mm] Cube Specimens)
2. ASTM C1140 - Standard Practice for Preparing and Testing Specimens from
Shotcrete Test Panels
1.2 MATERIALS
A. Soil Nails
1. Hollow Bar Soil Nails – Williams Form Engineering Corp:
i. X38 or T40N bar or similar
ii. 4” diameter bits
iii. Couplers and hex nuts to exceed 100% of the bar ultimate strength
iv. 8”x8”x3/8” bare steel plates
B. Cement Grout
1. Grout mix shall be neat cement grout, Portland cement and water only.
2. Potable water free of organics or other deleterious materials or chemicals that
would affect cement hydration process.
3. Portland Cement Type I, II, or I/II.
C. Shotcrete
1. Properties:
i. W/C ratio 0.4
ii. 3” slump
iii. 6% air content
2. Materials
i. 3/8” Aggregate – AASHTO M80, Class B
ii. Natural (river) Sand – AASHTO M6/ASTM C33
iii. Cement Type I, II, or I/II – AASTHO M85/ASTM C150
iv. Water – AASHTO M157/ASTM C94, clean and potable
v. Fly Ash – AASHTO M294/ASTM C618, Type F
1.3 EXECUTION
A. Equipment
1. Soil nails shall be installed with equipment designed and capable of drilling hollow
bar X or T thread with continuous grout circulation through the bar and drill hole
anulus while drilling.
2. Shotcrete to be wet-mix process consisting of thoroughly mixing all the ingredients,
introducing the mixture into the delivery equipment, and delivering it, by positive
displacement, to the nozzle. Air jet the wet-mix shotcrete from the nozzle at high
velocity onto the surface. Shotcrete to be placed from the lower part of the area
upwards to prevent accumulation of rebound.
3. Grout shall be mixed and pumped with double tub or colloidal shear grout mixing
equipment design and capable of delivering consistent, quality grout mix.
B. Installation
1. General Sequence
i. Excavate first lift (typically 4’-5’) where depicted and surveyed based on
project drawings
ii. Drill row of soil nails,
iii. Prepare facing reinforcement (welded wire mesh and rebar),
iv. Place shotcrete to nominal thickness and reinforcement coverage
requirements,
v. Excavate next lift (typically 5’ lifts) and repeat steps ii through iv.
2. Details/dimensions/etc. of soil nail and shotcrete wall provided in the project
drawings.
C. Quality Control
1. Soil Nail Testing
i. Install one sacrificial soil nail before production installation.
ii. With GSI approval production soil nails can be installed while waiting the 72
hours to test the verification nail.
iii. Proof testing shall occur on at least 5% of production soil nails. 48 hour wait
for grout cure to test any production nail.
iv. Verification and proof testing to be performed and accepted based on
FHWH-NHI-14-007 Section 9.4.
2. Grout Testing – Per ASTM C109
i. Obtain and test one set of grout cubes.
ii. Test 3, 7, and 28-day grout compressive strength.
3. Shotcrete Testing – Per ASTM C1140
i. Prepare and shoot two test panels.
ii. Panel shall be minimum inner dimensions of 24” x 24” square, 3.5” depth
and made of wood.
iii. Use 2x4 lumber and ¾” plywood for back panel.
iv. Core and compressive test shotcrete cores from both panels at 3, 7, and 28-
day.
SECTION 31 32 36
PINNED MESH SOIL NAILING
1.1 REFERENCE STANDARDS
A. U.S. Department of Transportation Federal Highway Administration:
1. FHWA-NHI-14-007 – Soil Nail Walls Reference Manual (2015)
B. ASTM International:
1. ASTM C109 - Standard Test Method for Compressive Strength of Hydraulic Cement
Mortars (Using 2-in. or [50-mm] Cube Specimens)
1.2 MATERIALS
A. Soil Nails
1. Hollow Bar Soil Nails – Williams Form Engineering Corp:
i. X38 or T40N bar or similar
ii. 4” diameter bits
iii. Couplers and hex nuts to exceed 100% of the bar ultimate strength
iv. Geobrugg spike plates
B. Cement Grout
1. Grout mix shall be neat cement grout, Portland cement and water only.
2. Potable water free of organics or other deleterious materials or chemicals that
would affect cement hydration process.
3. Portland Cement Type I, II, or I/II.
C. Pinned mesh and geofabric
1. Geobrugg Tecco G65/3 or equivalent
2. Geotex HF2x2 fabric or equivalent
1.3 EXECUTION
A. Equipment
1. Soil nails shall be installed with equipment designed and capable of drilling hollow
bar X or T thread with continuous grout circulation through the bar and drill hole
anulus while drilling.
2. Grout shall be mixed and pumped with double tub or colloidal shear grout mixing
equipment design and capable of delivering consistent, quality grout mix.
B. Installation
1. General Sequence
i. Excavate pinned mesh surface per project drawings. Typically, 1:1 (45 deg)
slope is the maximum slope angle for pinned mesh system. GSI engineering
representative may approve alternative slope angles.
ii. Drill soil nails,
iii. Prepare fabric and mesh,
iv. Install spike plates and tighten hex nuts with ratchet wrench or 100 to 250
ft-lb air wrench.
2. Details/dimensions/etc. of pinned mesh provided in the project drawings.
C. Quality Control
1. Soil Nail Testing
i. Install one sacrificial soil nail before production installation.
ii. With GSI approval production soil nails can be installed while waiting the 72
hours to test the verification nail.
iii. Proof testing shall occur on at least 5% of production soil nails. 48 hour wait
for grout cure to test any production nail.
iv. Verification and proof testing to be performed and accepted based on
FHWH-NHI-14-007 Section 9.4.
2. Grout Testing – Per ASTM C109
i. Obtain and test one set of grout cubes.
ii. Test 3, 7, and 28-day grout compressive strength.
SECTION 31 34 19
GEOSYNTHETIC SOIL REINFORCEMENT
1.1 REFERENCE STANDARDS
A. U.S. Department of Transportation Federal Highway Administration:
1. FHWA-HRT-17-080 – Design and Construction Guidelines for Geosynthetic
Reinforced Soil Abutments and Integrated Bridge Systems (2018).
B. ASTM International:
1. ASTM D698 - Standard Test Methods for Laboratory Compaction Characteristics of
Soil Using Standard Effort (12,400 ft-lbf/ft3) or approved equal.
2. ASTM D1557 - Standard Test Methods for Laboratory Compaction Characteristics of
Soil Using Modified Effort (56,000 ft-lbf/ft3 (2,700 kN-m/m3)) or approved equal.
C. Colorado Department of Transportation (CDOT)
1. Standard Specifications 2017 – Standard Specifications for Road and Bridge
Construction.
1.2 MATERIALS
A. Geosynthetic Fabric - Geotex 2x2HF fabric or better in terms of tensile and permeability
capacity.
B. Well-Graded Gravel – CDOT Class 5 or Class 6 base course (CDOT Standard Specifications
2017) or approved alternative per the criteria in Table 1 of FHW-HRT-17-080.
1.3 EXECUTION
A. General Sequence:
1. Excavate working width and backslope face,
2. Place layer of SierraScape System, Stone Face Baskets,
3. Place fabric layer (min seam overlap of 2’ as needed),
4. Place and compact to 95% modified proctor nominal 8 inch lifts of well-graded fill,
5. Place another fabric layer and 8 inch lift of compacted fill,
6. Repeat steps 2 through 5 until top of wall elevation 9439’ is reached.
B. Details/dimensions/etc. of GRS wall provided in the project drawings.
C. Refer to FHWA-HRT-17-080 for additional construction methodologies if needed.
SECTION 31 61 16
STEEL PILES
1.1 REFERENCE STANDARDS
A. U.S. Department of Transportation Federal Highway Administration:
1. FHWA NHI-05-039 – Micropile Design and Construction (2005)
B. ASTM International:
1. ASTM C109 - Standard Test Method for Compressive Strength of Hydraulic Cement
Mortars (Using 2-in. or [50-mm] Cube Specimens)
1.2 MATERIALS
A. Micropiles
1. Hollow Bar Micropiles – Williams Form Engineering Corp:
i. X51 or T76N bar or similar
ii. 4.5” diameter (X51), 5” dia. (T76N) bits
iii. Couplers and hex nuts to exceed 100% of the bar ultimate strength
iv. 8”x8”x1/2” bare steel plates
1. Casing – OCI Division
i. Minimum 5.5” OD, 0.362” wall thickness, 80 ksi steel casing
2. Solid Bar
i. #10 bare solid bar, grade 75
ii. Couplers and hex nuts to exceed 100% of the bar ultimate strength
B. Cement Grout
1. Grout mix shall be neat cement grout, Portland cement and water only.
2. Potable water free of organics or other deleterious materials or chemicals that
would affect cement hydration process.
3. Portland Cement Type I, II, or I/II.
1.3 EXECUTION
A. Equipment
1. Hollow bar micropiles shall be installed with equipment designed and capable of
drilling hollow bar X or T thread with continuous grout circulation through the bar
and drill hole anulus while drilling.
2. Casing micropiles shall be installed with equipment designed and capable of drilling
casing to the appropriate depths while clearing cuttings with continuous air
circulation in the drill string and anulus.
3. Grout shall be mixed and pumped with double tub or colloidal shear grout mixing
equipment design and capable of delivering consistent, quality grout mix.
B. Installation
1. General Sequence
i. Drill micropiles as depicted on the project drawings and surveyed,
1. T76N hollow bar and 5.5” casing with No. 10 inner bar is
interchangeable per contractor approach.
2. X51, X38, and/or T40N hollow bar not interchangeable, drill as
shown on drawings.
ii. Where casing micropiles are drilled install solid bar anchor within casing
section as depicted on project drawings and tremie grout inside of casing,
iii. Place two hex nuts and a plate on each micropile bar head.
2. Details/dimensions/etc. of micropiles provided in the project drawings.
C. Quality Control
1. Micropile Testing
i. Install two sacrificial vertical hollow bar micropiles before production
installation.
ii. With GSI approval production micropiles can be installed while waiting the
72 hours to test the verification piles.
iii. Proof testing shall occur on at least 5% of vertical production hollow bar
bearing micropiles. 48 hour wait for grout cure to test any production pile.
iv. Verification and proof testing to be performed and accepted based on
FHWH NHI-05-039 Section 7.4.
2. Grout Testing – Per ASTM C109
i. Obtain and test a total of two sets of grout cubes.
ii. Test 3, 7, and 28-day grout compressive strength.
© 2022 Microsoft Corporation © 2022 TomTom
C-01220190CO0104/01/22JPDEB
COVER SHEET
VILLAGE COURT APARTMENTS
SOIL STABILIZATION PLANSMOUNTAIN VILLAGE, CO
OLSON ARCHITECTS
VICINITY MAP(NOT TO SCALE)
SHEET INDEXNO. DESCRIPTION
C-01 COVER SHEET
C-02 SITE PLAN
C-03 MICROPILE PLAN
C-04 SNW PROFILE VIEW
C-05 GCS RETAINING WALL PROFILE VIEW
C-06 OVERALL SECTION VIEW
C-07 GCS SECTION VIEW
C-08 SOIL NAIL & SHOTCRETE DETAIL
C-09 SOIL NAIL & PINED MESH DETAIL
C-10 MICROPILE ANCHOR DETAILS
C-11 GCS MICROPILE CAP DETAILS
C-12 SHEAR SYSTEM CAP DETAILS
APPROXIMATEPROJECT LOCATIONLAT: 37.934617LONG: -107.854077
VILLAGE COURT APARTMENTS
Phone: 855.579.0536 | Fax: 970.245.7737www.geostabilization.comTHIS DRAWING IS FURNISHED SOLELY FOR THE USE OF OR IN CONNECTION WITH THIS
PROJECT AND THE PROPRIETARY INFORMATION SHOWN HEREON IS NOT TO BETRANSMITTED TO ANY OTHER ORGANIZATION WITHOUT SPECIFIC AUTHORIZATION BY
GEOSTABILIZATION INTERNATIONAL. (GSI). THE DESIGN IS ONLY VALID IFCONSTRUCTED AND SUPERVISED BY GSI OR ITS AUTHORIZED SUBCONTRACTOR.
SHEET REVISIONSDATE NODESCRIPTION
PROJECT NAME:
SHEET TITLE:
DRAWN BY: CHECKED BY: DATE: PROJECT NUMBER: SHEET
C:\U
sers
\dam
ien.
boss
e\Bo
x\U
nite
d St
ates
\Col
orad
o\C
urre
nt P
roje
cts\
2201
90C
O01
- CO
- VC
A\En
gine
erin
g\C
AD\D
RAW
ING
S\22
0190
CO
01C
-DT.
dwg
- dam
ien.
boss
e - 4
/1/2
022
7:04
PM
IFBISSUED FOR BID02/22/22
IFB 2UPDATED GCS & MICROPILES04/01/22
NOT FOR
CONSTRUCTIO
N
TOP OF GCSWALL @ 9439'
EAST BLDG FLOORS· WALKOUT LEVEL @ 9441'· MAIN LEVEL @ 9452'· SEE SHEET C-04
WEST BLDG FLOORS· WALKOUT LEVEL @ 9442'· MAIN LEVEL @ 9453'· ALL FOUNDATIONS
SPREAD FOOTINGS
PERMANENT SOILNAIL WALL (SNW)
TOE OF GCS(SEE NOTE 1)
APPROX OUTERBLDG WALLS
9455'
9450'
9445'
9440'
9435'
9430'
9425'
9420'
9415'
9410'
9405'
9400'
9395'
105°
APPROX. PINNEDMESH AREA
POTENTIALACCESS ROAD
AC-03
Phone: 855.579.0536 | Fax: 970.245.7737www.geostabilization.comTHIS DRAWING IS FURNISHED SOLELY FOR THE USE OF OR IN CONNECTION WITH THIS
PROJECT AND THE PROPRIETARY INFORMATION SHOWN HEREON IS NOT TO BETRANSMITTED TO ANY OTHER ORGANIZATION WITHOUT SPECIFIC AUTHORIZATION BY
GEOSTABILIZATION INTERNATIONAL. (GSI). THE DESIGN IS ONLY VALID IFCONSTRUCTED AND SUPERVISED BY GSI OR ITS AUTHORIZED SUBCONTRACTOR.
SHEET REVISIONSDATE NODESCRIPTION
PROJECT NAME:
SHEET TITLE:
DRAWN BY: CHECKED BY: DATE: PROJECT NUMBER: SHEET
C:\U
sers
\dam
ien.
boss
e\Bo
x\U
nite
d St
ates
\Col
orad
o\C
urre
nt P
roje
cts\
2201
90C
O01
- CO
- VC
A\En
gine
erin
g\C
AD\D
RAW
ING
S\22
0190
CO
01C
-DT.
dwg
- dam
ien.
boss
e - 4
/1/2
022
7:04
PM
IFBISSUED FOR BID02/22/22
IFB 2UPDATED GCS & MICROPILES04/01/22
NOT FOR
CONSTRUCTIO
N
0 20' 40'10'
NOTES:1. TOE OF GCS WALL, ELEV TO MATCH
EXISTING GRADES ROUGHLY.MICROPILES AND CAP TO EXTENDAROUND ENTIRE TOE.
C-02220190CO0104/01/22JPDEB
SITE PLAN
VILLAGE COURT APARTMENTS
AC-04
AC-06
AC-05
SHEAR PILE SYSTEM ANDBEARING MICROPILES
FOR EAST BUILDING
A
1
B B.1 C D E F G G.1 H J
2
2.5
3
3.1
3.2
4
5
6
20° BATTER,TYP.
40° BATTER,TYP.
40° BATTER,TYP.
VERTICAL T40NMICROPILE, TYP.
MICROPILE CAPFOR GCS WALL
10° BATTER OUTWARD FROMCENTER OF PILE CAP, TYP.
EXTEND GRADE BEAM TOCONTINUE SHEAR SYSTEM
TO SECTION A & J
GB1GB1
GB1
GB1
GB1GB1
GB3
GB3
GB3
GB2
GB2
GB2
GB2
GB2
GB2
GB2
GB2
GB2
GB2
GB2
GB2
GB2
GB2
GB2
GB2
GB2
GB2
GB2
GB2
MICROPILES FOR LATERALFOOTERS TO ASSIST SOIL
OVERTURNING FORCES, TYP.
Phone: 855.579.0536 | Fax: 970.245.7737www.geostabilization.comTHIS DRAWING IS FURNISHED SOLELY FOR THE USE OF OR IN CONNECTION WITH THIS
PROJECT AND THE PROPRIETARY INFORMATION SHOWN HEREON IS NOT TO BETRANSMITTED TO ANY OTHER ORGANIZATION WITHOUT SPECIFIC AUTHORIZATION BY
GEOSTABILIZATION INTERNATIONAL. (GSI). THE DESIGN IS ONLY VALID IFCONSTRUCTED AND SUPERVISED BY GSI OR ITS AUTHORIZED SUBCONTRACTOR.
SHEET REVISIONSDATE NODESCRIPTION
PROJECT NAME:
SHEET TITLE:
DRAWN BY: CHECKED BY: DATE: PROJECT NUMBER: SHEET
C:\U
sers
\dam
ien.
boss
e\Bo
x\U
nite
d St
ates
\Col
orad
o\C
urre
nt P
roje
cts\
2201
90C
O01
- CO
- VC
A\En
gine
erin
g\C
AD\D
RAW
ING
S\22
0190
CO
01C
-DT.
dwg
- dam
ien.
boss
e - 4
/1/2
022
7:04
PM
IFBISSUED FOR BID02/22/22
IFB 2UPDATED GCS & MICROPILES04/01/22
NOT FOR
CONSTRUCTIO
N
0 10' 20'
NOTES:1. GRADE BEAM DIMENSIONS
ADAPTED FROM PROJECTDRAWINGS SHEET S1.00E.
C-03220190CO0104/01/22JPDEB
MICROPILE PLAN
VILLAGE COURT APARTMENTS
APPROX. QUANTITIES
DESC. QTY. UM
GCS PILES, X51, 40' 145 EA
SHEAR PILES, T76N, 50' 114 EA
SHEAR PILES, X51, 50' 57 EA
BEARING PILES, T40N,30', VERTICAL 88 EA
BEARING PILES, T40N,30', BATTERED 16 EA
GRADE BEAM W (IN) H (IN)
GB1 24 36
GB2 20 36
GB3 20 24
A MICROPILE PLANSCALE: N.T.S.
Elev
atio
n
Station
9430
9440
9450
9460
9470
1+001+78
1+001+78
APPROX. SNWBOUNDARY
15' SOIL NAILS(~13' EMBEDMENT), TYP.
AC-08
Phone: 855.579.0536 | Fax: 970.245.7737www.geostabilization.comTHIS DRAWING IS FURNISHED SOLELY FOR THE USE OF OR IN CONNECTION WITH THIS
PROJECT AND THE PROPRIETARY INFORMATION SHOWN HEREON IS NOT TO BETRANSMITTED TO ANY OTHER ORGANIZATION WITHOUT SPECIFIC AUTHORIZATION BY
GEOSTABILIZATION INTERNATIONAL. (GSI). THE DESIGN IS ONLY VALID IFCONSTRUCTED AND SUPERVISED BY GSI OR ITS AUTHORIZED SUBCONTRACTOR.
SHEET REVISIONSDATE NODESCRIPTION
PROJECT NAME:
SHEET TITLE:
DRAWN BY: CHECKED BY: DATE: PROJECT NUMBER: SHEET
C:\U
sers
\dam
ien.
boss
e\Bo
x\U
nite
d St
ates
\Col
orad
o\C
urre
nt P
roje
cts\
2201
90C
O01
- CO
- VC
A\En
gine
erin
g\C
AD\D
RAW
ING
S\22
0190
CO
01C
-DT.
dwg
- dam
ien.
boss
e - 4
/1/2
022
7:04
PM
IFBISSUED FOR BID02/22/22
IFB 2UPDATED GCS & MICROPILES04/01/22
NOT FOR
CONSTRUCTIO
N
A SNW PROFILESCALE: 1:10
C-04220190CO0104/01/22JPDEB
SNW PROFILE VIEW
VILLAGE COURT APARTMENTS
NOTES:1.
Station0+00 1+00 1+46
9400
9410
9420
9430
9440
9450
0+00 1+00 1+46
MICROPILE CAP
APPROX. EXISTING GRADEALONG MICROPILE CAP
GCS BASKET FACE
CORNER
CORNER
CORNER
Phone: 855.579.0536 | Fax: 970.245.7737www.geostabilization.comTHIS DRAWING IS FURNISHED SOLELY FOR THE USE OF OR IN CONNECTION WITH THIS
PROJECT AND THE PROPRIETARY INFORMATION SHOWN HEREON IS NOT TO BETRANSMITTED TO ANY OTHER ORGANIZATION WITHOUT SPECIFIC AUTHORIZATION BY
GEOSTABILIZATION INTERNATIONAL. (GSI). THE DESIGN IS ONLY VALID IFCONSTRUCTED AND SUPERVISED BY GSI OR ITS AUTHORIZED SUBCONTRACTOR.
SHEET REVISIONSDATE NODESCRIPTION
PROJECT NAME:
SHEET TITLE:
DRAWN BY: CHECKED BY: DATE: PROJECT NUMBER: SHEET
C:\U
sers
\dam
ien.
boss
e\Bo
x\U
nite
d St
ates
\Col
orad
o\C
urre
nt P
roje
cts\
2201
90C
O01
- CO
- VC
A\En
gine
erin
g\C
AD\D
RAW
ING
S\22
0190
CO
01C
-DT.
dwg
- dam
ien.
boss
e - 4
/1/2
022
7:04
PM
IFBISSUED FOR BID02/22/22
IFB 2UPDATED GCS & MICROPILES04/01/22
NOT FOR
CONSTRUCTIO
N
C-05220190CO0104/01/22JPDEB
GCS RETAINING WALL PROFILE VIEW
VILLAGE COURT APARTMENTS
A MICROPILE CAP AND BASKET PROFILESCALE: 1:10
TOP OF GCS WALL 9439'
9400
9410
9420
9430
9440
9450
9460
9470
1+00 1+50
1+00 1+50
GCS BASKETWALL
UP TO
19' TALL INM
AX SECTIO
N
10'
X51, 40' PILES, TWO ROWS,BATTERED 10 DEG, 1.5' OC EACHROW, STAGGERED SPACING
APARTMENT BUILDING
1 2 2.5 3 3.1 3.2 4 5 6
BEARING PILES, T40N(NOT ALL SHOWN)
SHEAR PILE SYSTEM(T76 & X51)
10' ACCESSBENCH
20' ANCHORS ANDPINNED MESH ON 1:1EXCAVATED SLOPE
AC-07
AC-09
AC-10
AC-12
A/BC-10
GCSMICROPILECAP
AC-11
Phone: 855.579.0536 | Fax: 970.245.7737www.geostabilization.comTHIS DRAWING IS FURNISHED SOLELY FOR THE USE OF OR IN CONNECTION WITH THIS
PROJECT AND THE PROPRIETARY INFORMATION SHOWN HEREON IS NOT TO BETRANSMITTED TO ANY OTHER ORGANIZATION WITHOUT SPECIFIC AUTHORIZATION BY
GEOSTABILIZATION INTERNATIONAL. (GSI). THE DESIGN IS ONLY VALID IFCONSTRUCTED AND SUPERVISED BY GSI OR ITS AUTHORIZED SUBCONTRACTOR.
SHEET REVISIONSDATE NODESCRIPTION
PROJECT NAME:
SHEET TITLE:
DRAWN BY: CHECKED BY: DATE: PROJECT NUMBER: SHEET
C:\U
sers
\dam
ien.
boss
e\Bo
x\U
nite
d St
ates
\Col
orad
o\C
urre
nt P
roje
cts\
2201
90C
O01
- CO
- VC
A\En
gine
erin
g\C
AD\D
RAW
ING
S\22
0190
CO
01C
-DT.
dwg
- dam
ien.
boss
e - 4
/1/2
022
7:04
PM
IFBISSUED FOR BID02/22/22
IFB 2UPDATED GCS & MICROPILES04/01/22
NOT FOR
CONSTRUCTIO
N
A EAST BUILDING SECTION SCALE: 1:10
C-06220190CO0104/01/22JPDEB
OVERALL SECTION VIEW
VILLAGE COURT APARTMENTS
NOTES:1. BEARING PILES BOTH VERTICAL AND
BATTERED SHOWN ON MICROPILEPLAN (SHEET C-03)
2. SHEAR PILES WILL BE INCORPORATEDINTO BUILDING LONGITUDINAL GRADEBEAMS ON SECTIONS 3.1 AND 5.
1'-6
"(T
YP.)
WAL
L H
EIG
HT
ASR
EQU
IRED
TO
MEE
T G
RAD
E
LIMIT OF GCS ZONEFOLLOW EXCAVATION
REINFORCED FILL
REINFORCEMENT LENGTH VARIES
BASE WIDTH0.3* WALL HEIGHT, MIN
SET TOP FACING UNIT INSIDELOWER UNIT TO FOLLOW GRADE
WIRE FORM FACING UNIT(SEE NOTES)
WOVEN GEOSYNTHETICREINFORCEMENT
TAIL STRUT
WIRE BASKET FACING UNIT = 9'-6"
GEO
TEXT
ILE
RO
LL W
IDTH
OVERLAP SECOND ROLL FOR ADDITIONALWIDTH AS NEEDED 2' MIN.
WRAP GEOTEXTILE OVERFACE; SECURE TAIL BYEMBEDDING WITHIN LIFT.
8"(MAX.)
1'-6" (Typ.)TAIL LENGTH
GEOTEXTILE
COMPACTEDGRANULAR BACKFILL
NOTES:1. FACING BASKETS ARE COMPOSED OF
SIERRASCAPE SYSTEM, STONE FACEBASKETS AND TAIL STRUTS.
2. GEOTEXTILE COMPOSED OF GEOTEX2X2HF OR EQUIVALENT.
3. ALL FACING UNITS SHALL BEGALVANIZED PER ASTM A123 AFTERFABRICATION.
PLAN VIEW SECTION VIEW
DETAIL VIEW
Phone: 855.579.0536 | Fax: 970.245.7737www.geostabilization.comTHIS DRAWING IS FURNISHED SOLELY FOR THE USE OF OR IN CONNECTION WITH THIS
PROJECT AND THE PROPRIETARY INFORMATION SHOWN HEREON IS NOT TO BETRANSMITTED TO ANY OTHER ORGANIZATION WITHOUT SPECIFIC AUTHORIZATION BY
GEOSTABILIZATION INTERNATIONAL. (GSI). THE DESIGN IS ONLY VALID IFCONSTRUCTED AND SUPERVISED BY GSI OR ITS AUTHORIZED SUBCONTRACTOR.
SHEET REVISIONSDATE NODESCRIPTION
PROJECT NAME:
SHEET TITLE:
DRAWN BY: CHECKED BY: DATE: PROJECT NUMBER: SHEET
C:\U
sers
\dam
ien.
boss
e\Bo
x\U
nite
d St
ates
\Col
orad
o\C
urre
nt P
roje
cts\
2201
90C
O01
- CO
- VC
A\En
gine
erin
g\C
AD\D
RAW
ING
S\22
0190
CO
01C
-DT.
dwg
- dam
ien.
boss
e - 4
/1/2
022
7:04
PM
IFBISSUED FOR BID02/22/22
IFB 2UPDATED GCS & MICROPILES04/01/22
NOT FOR
CONSTRUCTIO
N
C-07220190CO0104/01/22JPDEB
GCS SECTION VIEW
VILLAGE COURT APARTMENTS
A STANDARD DETAILSCALE: N.T.S.
CL
LENGTH PER PLAN
SELF-DRILLING SUPERNAIL™
PER PLAN
3,000 PSI NEAT CEMENT GROUT
4" Ø DRILLHOLE MIN.
SACRIFICIAL BIT 2"MIN
(2) 36" LONG NO. 4 GRADE 60 BARSVERTICAL EACH SIDE OF NAIL
8" x 8" x 3/8" A36 STEEL PLATE
HEX NUT
4 x 4 - W4.0 x W4.0 WELDEDWIRE FABRIC (ASTM A185)
6" NOMINAL 4,000 PSI SHOTCRETE UNDISTURBEDGUN FINISH (FINISH WILL BE BUMPY).2" COVER ON ALL STEEL
DOBIES, REBAR CHAIRS,OR SIMILAR(SEE NOTE 3)
(2) CONTINUOUS NO. 4GRADE 60 BARS HORIZONTAL
DRAIN STRIP
BIRDS BEAK(SHOTCRETE OR
GROUT BACKFILL)
36"
WALERS (REBAR)
STEEL PLATE TO BE WET SET
WELDED WIRE FABRIC
TYPICAL NAIL HEAD
(SEE NOTE 4)NOTES:1. LAP SPLICE LENGTH
1.1. NO. 4 REBAR - 24" MINIMUM1.2. NO. 5 REBAR - 30" MINIMUM
2. WELDED WIRE FABRIC TO HAVE AMINIMUM OF 8" OVERLAP (2 SQUARESOVERLAP FOR 4 x 4 MESH).
3. 2" WIRE DOBIES, REBAR CHAIRS, OREQUIVALENT TO BE USED TO ENSURESUFFICIENT CONCRETE COVERBETWEEN GROUND SURFACE ANDREINFORCEMENT. 2 TO 3 DOBIES PER5' x 10' SHEET OF MESH, TYPICAL.
4. HORIZONTAL WALERS ARECONTINUOUS
Phone: 855.579.0536 | Fax: 970.245.7737www.geostabilization.comTHIS DRAWING IS FURNISHED SOLELY FOR THE USE OF OR IN CONNECTION WITH THIS
PROJECT AND THE PROPRIETARY INFORMATION SHOWN HEREON IS NOT TO BETRANSMITTED TO ANY OTHER ORGANIZATION WITHOUT SPECIFIC AUTHORIZATION BY
GEOSTABILIZATION INTERNATIONAL. (GSI). THE DESIGN IS ONLY VALID IFCONSTRUCTED AND SUPERVISED BY GSI OR ITS AUTHORIZED SUBCONTRACTOR.
SHEET REVISIONSDATE NODESCRIPTION
PROJECT NAME:
SHEET TITLE:
DRAWN BY: CHECKED BY: DATE: PROJECT NUMBER: SHEET
C:\U
sers
\dam
ien.
boss
e\Bo
x\U
nite
d St
ates
\Col
orad
o\C
urre
nt P
roje
cts\
2201
90C
O01
- CO
- VC
A\En
gine
erin
g\C
AD\D
RAW
ING
S\22
0190
CO
01C
-DT.
dwg
- dam
ien.
boss
e - 4
/1/2
022
7:04
PM
IFBISSUED FOR BID02/22/22
IFB 2UPDATED GCS & MICROPILES04/01/22
NOT FOR
CONSTRUCTIO
N
C-08220190CO0104/01/22JPDEB
SOIL NAIL & SHOTCRETE DETAILS
VILLAGE COURT APARTMENTS
A STANDARD DETAILSCALE: N.T.S.
CL
SELF-DRILLING SUPERNAIL™
PER PLAN
3,000 PSI NEAT CEMENT GROUT
XX Ø DRILLHOLE MIN.
SACRIFICIAL BIT
CLAW TYPE SPIKE PLATE
HEX NUTBIRDS BEAK(SHOTCRETE OR
GROUT BACKFILL)TYPICAL NAIL HEAD
CLAW TYPE SPIKE PLATE
HIGH CAPACITY MESH
~12" HOLE DUG OUT BEHIND PLATEFOR POST-TENSIONING WIRE MESH
LENGTH PER SECTION~12" x 8" HOLE DUG OUTBEHIND PLATE FORPOST-TENSIONING WIRE MESH
WIRE MESH SPECIFICATIONS ANDPLACEMENT:
MATERIAL:· GEOBRUGG TECCO G65/3 OR
EQUIVALENT· MESH SHALL BE UNDERLAIN WITH A
GEOTEX HF2X2 FABRIC OREQUIVALENT
DIMENSIONS:· LENGTH OF NET: 30m· WIDTH OF NET: 3.5m
PLACEMENT:· AN AREA SHALL BE DUG OUT AROUND
THE SOIL NAILS TO ALLOWSUFFICIENT SEATING OF PLATES.
· THE WIRE MESH WILL BE PLACEDALONG THE FACE OF THE SLOPEWITH THE SOIL NAILS EXTENDINGTHROUGH THE MESH.
· GALVANIZED SPIKE PLATES WILL BEPLACED ON THE SOIL NAILS ANDSECURED WITH GALVANIZED OREPOXY-COATED HEX NUTS.
· THE HEX NUTS WILL THEN BETIGHTENED USING AN IMPACT ORTORQUE WRENCH TO SUFFICIENTLYSEAT THE PLATES.
· REPAINT PLATES, NUTS, AND END OFHOLLOW BAR WITH EPOXY ORGALVANIZING SPRAY AFTER TORQUE.
COCONUT MATTING ORGEOTEXTILE
Phone: 855.579.0536 | Fax: 970.245.7737www.geostabilization.comTHIS DRAWING IS FURNISHED SOLELY FOR THE USE OF OR IN CONNECTION WITH THIS
PROJECT AND THE PROPRIETARY INFORMATION SHOWN HEREON IS NOT TO BETRANSMITTED TO ANY OTHER ORGANIZATION WITHOUT SPECIFIC AUTHORIZATION BY
GEOSTABILIZATION INTERNATIONAL. (GSI). THE DESIGN IS ONLY VALID IFCONSTRUCTED AND SUPERVISED BY GSI OR ITS AUTHORIZED SUBCONTRACTOR.
SHEET REVISIONSDATE NODESCRIPTION
PROJECT NAME:
SHEET TITLE:
DRAWN BY: CHECKED BY: DATE: PROJECT NUMBER: SHEET
C:\U
sers
\dam
ien.
boss
e\Bo
x\U
nite
d St
ates
\Col
orad
o\C
urre
nt P
roje
cts\
2201
90C
O01
- CO
- VC
A\En
gine
erin
g\C
AD\D
RAW
ING
S\22
0190
CO
01C
-DT.
dwg
- dam
ien.
boss
e - 4
/1/2
022
7:04
PM
IFBISSUED FOR BID02/22/22
IFB 2UPDATED GCS & MICROPILES04/01/22
NOT FOR
CONSTRUCTIO
N
C-09220190CO0104/01/22JPDEB
SOIL NAIL & PINNED MESH DETAILS
VILLAGE COURT APARTMENTS
A STANDARD DETAILSCALE: N.T.S.
VAR
IES
HOLLOW BARINJECTION ANCHOR
BEARING PLATE WITHNUT TOP AND BOTTOM
GROUND SURFACE
GROUT
SACRIFICIAL DRILL BIT
BEARING PLATE WITHNUT TOP AND BOTTOM
BOTTOM OF GRADEBEAM/SHEAR PILECAP ELEVATION
SOLID BAR ANCHOR,15' EMBEDMENT MIN
GROUT FILLIN CASING
CENTRALIZER,TYP.
CAS
ING
EMBE
DM
ENT
VAR
IES
STICKUP PERDETAILS
STICKUP PERDETAILS
Phone: 855.579.0536 | Fax: 970.245.7737www.geostabilization.comTHIS DRAWING IS FURNISHED SOLELY FOR THE USE OF OR IN CONNECTION WITH THIS
PROJECT AND THE PROPRIETARY INFORMATION SHOWN HEREON IS NOT TO BETRANSMITTED TO ANY OTHER ORGANIZATION WITHOUT SPECIFIC AUTHORIZATION BY
GEOSTABILIZATION INTERNATIONAL. (GSI). THE DESIGN IS ONLY VALID IFCONSTRUCTED AND SUPERVISED BY GSI OR ITS AUTHORIZED SUBCONTRACTOR.
SHEET REVISIONSDATE NODESCRIPTION
PROJECT NAME:
SHEET TITLE:
DRAWN BY: CHECKED BY: DATE: PROJECT NUMBER: SHEET
C:\U
sers
\dam
ien.
boss
e\Bo
x\U
nite
d St
ates
\Col
orad
o\C
urre
nt P
roje
cts\
2201
90C
O01
- CO
- VC
A\En
gine
erin
g\C
AD\D
RAW
ING
S\22
0190
CO
01C
-DT.
dwg
- dam
ien.
boss
e - 4
/1/2
022
7:04
PM
IFBISSUED FOR BID02/22/22
IFB 2UPDATED GCS & MICROPILES04/01/22
NOT FOR
CONSTRUCTIO
N
C-10220190CO0104/01/22JPDEB
MICROPILE ANCHOR DETAILS
VILLAGE COURT APARTMENTS
A HOLLOW BAR MICROPILESCALE: N.T.S. B CASED SHEAR MICROPILE
SCALE: N.T.S.
NOTE: ONLY TOP MAT OF REINFORCEMENT SHOWN
SIDE VIEW END VIEW
TOP VIEW
1'-4"TYP
2'TYP
3"
3"
NO. 5 GRADE 60TOP AND BOTTOMCONTINUOUS, TYP.
3'
2'TYP
2'
NO. 5 GRADE 60 CONTINUOUS
NO. 5 GRADE 602'
TYP
2'TYP
2"
2"
(BACK ROW) 24", C/C(FRONT ROW) 24", C/C
2'
3'
NO. 5 GRADE 60TOP & BOTTOMCONTINUOUS
3" MIN
3" MIN3"
END VIEW
2'
3'
X51 MICROPILES
1' 1'
1'
Phone: 855.579.0536 | Fax: 970.245.7737www.geostabilization.comTHIS DRAWING IS FURNISHED SOLELY FOR THE USE OF OR IN CONNECTION WITH THIS
PROJECT AND THE PROPRIETARY INFORMATION SHOWN HEREON IS NOT TO BETRANSMITTED TO ANY OTHER ORGANIZATION WITHOUT SPECIFIC AUTHORIZATION BY
GEOSTABILIZATION INTERNATIONAL. (GSI). THE DESIGN IS ONLY VALID IFCONSTRUCTED AND SUPERVISED BY GSI OR ITS AUTHORIZED SUBCONTRACTOR.
SHEET REVISIONSDATE NODESCRIPTION
PROJECT NAME:
SHEET TITLE:
DRAWN BY: CHECKED BY: DATE: PROJECT NUMBER: SHEET
C:\U
sers
\dam
ien.
boss
e\Bo
x\U
nite
d St
ates
\Col
orad
o\C
urre
nt P
roje
cts\
2201
90C
O01
- CO
- VC
A\En
gine
erin
g\C
AD\D
RAW
ING
S\22
0190
CO
01C
-DT.
dwg
- dam
ien.
boss
e - 4
/1/2
022
7:04
PM
IFBISSUED FOR BID02/22/22
IFB 2UPDATED GCS & MICROPILES04/01/22
NOT FOR
CONSTRUCTIO
N
A STANDARD DETAILSCALE: N.T.S.
C-11220190CO0104/01/22JPDEB
GCS MICROPILE CAP DETAILS
VILLAGE COURT APARTMENTS
SECTION VIEW - PILES
SECTION VIEW - REBAR
PLAN VIEW - PILES
PLAN VIEW - REBAR
24'
USE REBAR CHAIRS OR WIRETYING AS NEEDED TO
PROPERLY SUSPEND REBARAT LEAST 3" FROM ANY EDGE
OF CONCRETE
2" MIN ALLSIDES
3'
2'
1'
1'DRILL X51 AT BACK EDGE OF CAPSO CROSSOVER POINT CAN BE 1'
UP IN THE MIDDLE OF THE CAP
4 - #6 CONTINUOUSREBAR MAT TOP
AND BOTTOM
REBAR HOOP#4, 12" OC
2' MIN SPLICELENGTH
HOOPS, 12" OC
VERTICAL T76N
Phone: 855.579.0536 | Fax: 970.245.7737www.geostabilization.comTHIS DRAWING IS FURNISHED SOLELY FOR THE USE OF OR IN CONNECTION WITH THIS
PROJECT AND THE PROPRIETARY INFORMATION SHOWN HEREON IS NOT TO BETRANSMITTED TO ANY OTHER ORGANIZATION WITHOUT SPECIFIC AUTHORIZATION BY
GEOSTABILIZATION INTERNATIONAL. (GSI). THE DESIGN IS ONLY VALID IFCONSTRUCTED AND SUPERVISED BY GSI OR ITS AUTHORIZED SUBCONTRACTOR.
SHEET REVISIONSDATE NODESCRIPTION
PROJECT NAME:
SHEET TITLE:
DRAWN BY: CHECKED BY: DATE: PROJECT NUMBER: SHEET
C:\U
sers
\dam
ien.
boss
e\Bo
x\U
nite
d St
ates
\Col
orad
o\C
urre
nt P
roje
cts\
2201
90C
O01
- CO
- VC
A\En
gine
erin
g\C
AD\D
RAW
ING
S\22
0190
CO
01C
-DT.
dwg
- dam
ien.
boss
e - 4
/1/2
022
7:04
PM
IFBISSUED FOR BID02/22/22
IFB 2UPDATED GCS & MICROPILES04/01/22
NOT FOR
CONSTRUCTIO
N
C-12220190CO0104/01/22JPDEB
SHEAR SYSTEM CAP DETAILS
VILLAGE COURT APARTMENTS
A STANDARD DETAILSCALE: N.T.S.
S0.01GENERAL FOUNDATION & RETAINING WALLDETAILS
Checked By:
Designed by:
Drawn By:
Project Number:
Sheet
Revisions:
Issue Record:
GOFF ENGINEERING& SURVEYING, INC.126 ROCK POINTDRIVE SUITE A
P.O. BOX 97DURANGO,
COLORADO 81302(970) 247-1705
www.GoffEngineering.com
4-7-22
1-31-221-5-22
7-31-197-19-19
PHAS
E IV
EXP
ANSI
ON
EAST
BUI
LDIN
GVI
LLAG
E CO
URT
APAR
TMEN
TS
GEG
GEG
GJG
18-215
PERMIT SET80% CONSTRUCTION DOCS
50% CONSTRUCTION DOCSBID SET
ADDENDUM #5
GA R
T H E. GLA SCOCOL O R A D O R E G IS T ERED
P R O F E S S I O N A L E N G I NE E R
1
A C
2
1
2
A C
Checked By:
Designed by:
Drawn By:
Project Number:
Sheet
Revisions:
Issue Record:
GOFF ENGINEERING& SURVEYING, INC.126 ROCK POINTDRIVE SUITE A
P.O. BOX 97DURANGO,
COLORADO 81302(970) 247-1705
www.GoffEngineering.com
4-7-22
1-31-221-5-22
7-31-197-19-19
PHAS
E IV
EXP
ANSI
ON
EAST
BUI
LDIN
GVI
LLAG
E CO
URT
APAR
TMEN
TS
GEG
GEG
GJG
18-215
PERMIT SET80% CONSTRUCTION DOCS
50% CONSTRUCTION DOCSBID SET
ADDENDUM #5
GA R
T H E. GLA SCOCOL O R A D O R E G IS T ERED
P R O F E S S I O N A L E N G I NE E R
S0.02TRASH ENCLOSURE
A
A
55
22
33
B
B
44
G.1
G.1
H
H
J
J
D
D
E
E
C
C
11
66
B.1
B.1
F
F
G
G
3.13.13.23.2
A
5
6
B C D E F G G.1
4
3
2
1
JB.1 H
2.5
3.1
3.2
A B C D E G.1 H JB.1 F G
Checked By:
Designed by:
Drawn By:
Project Number:
Sheet
Revisions:
Issue Record:
GOFF ENGINEERING& SURVEYING, INC.126 ROCK POINTDRIVE SUITE A
P.O. BOX 97DURANGO,
COLORADO 81302(970) 247-1705
www.GoffEngineering.com
4-7-22
1-31-221-5-22
7-31-197-19-19
PHAS
E IV
EXP
ANSI
ON
EAST
BUI
LDIN
GVI
LLAG
E CO
URT
APAR
TMEN
TS
GEG
GEG
GJG
18-215
PERMIT SET80% CONSTRUCTION DOCS
50% CONSTRUCTION DOCSBID SET
ADDENDUM #5
GA R
T H E. GLA SCOCOL O R A D O R E G IS T ERED
P R O F E S S I O N A L E N G I NE E R
S1.00EEAST BUILDINGFOUNDATION PLAN
34
53.
13.
2
23
45
3.1
3.2
2.5
61
AA
5 23
BB
4
G.1
G.1
HH
JJ
DD
EE
CC
16
B.1
B.1
FF
GG
3.1
3.2
A
56
BC
DE
FG
G.1
4 3 2 1
JB
.1H
2.5
3.1
3.2
34
3.1
3.2
S2.00EEAST BUILDINGSECTIONS & DETAILS
Checked By:
Designed by:
Drawn By:
Project Number:
Sheet
Revisions:
Issue Record:
GOFF ENGINEERING& SURVEYING, INC.126 ROCK POINTDRIVE SUITE A
P.O. BOX 97DURANGO,
COLORADO 81302(970) 247-1705
www.GoffEngineering.com
4-7-22
1-31-221-5-22
7-31-197-19-19
PHAS
E IV
EXP
ANSI
ON
EAST
BUI
LDIN
GVI
LLAG
E CO
URT
APAR
TMEN
TS
GEG
GEG
GJG
18-215
PERMIT SET80% CONSTRUCTION DOCS
50% CONSTRUCTION DOCSBID SET
ADDENDUM #5
GA R
T H E. GLA SCOCOL O R A D O R E G IS T ERED
P R O F E S S I O N A L E N G I NE E R
23
45
3.1
3.2
2.5
61
23
45
3.1
3.2
2.5
61
23
45
3.1
3.2
2.5
61
S2.01EEAST BUILDINGSECTIONS & DETAILS
Checked By:
Designed by:
Drawn By:
Project Number:
Sheet
Revisions:
Issue Record:
GOFF ENGINEERING& SURVEYING, INC.126 ROCK POINTDRIVE SUITE A
P.O. BOX 97DURANGO,
COLORADO 81302(970) 247-1705
www.GoffEngineering.com
4-7-22
1-31-221-5-22
7-31-197-19-19
PHAS
E IV
EXP
ANSI
ON
EAST
BUI
LDIN
GVI
LLAG
E CO
URT
APAR
TMEN
TS
GEG
GEG
GJG
18-215
PERMIT SET80% CONSTRUCTION DOCS
50% CONSTRUCTION DOCSBID SET
ADDENDUM #5
GA R
T H E. GLA SCOCOL O R A D O R E G IS T ERED
P R O F E S S I O N A L E N G I NE E R
23
45
3.1
3.2
2.5
61
23
45
3.1
3.2
2.5
61
23
45
3.1
3.2
2.5
61
S2.02EEAST BUILDINGSECTIONS & DETAILS
Checked By:
Designed by:
Drawn By:
Project Number:
Sheet
Revisions:
Issue Record:
GOFF ENGINEERING& SURVEYING, INC.126 ROCK POINTDRIVE SUITE A
P.O. BOX 97DURANGO,
COLORADO 81302(970) 247-1705
www.GoffEngineering.com
4-7-22
1-31-221-5-22
7-31-197-19-19
PHAS
E IV
EXP
ANSI
ON
EAST
BUI
LDIN
GVI
LLAG
E CO
URT
APAR
TMEN
TS
GEG
GEG
GJG
18-215
PERMIT SET80% CONSTRUCTION DOCS
50% CONSTRUCTION DOCSBID SET
ADDENDUM #5
GA R
T H E. GLA SCOCOL O R A D O R E G IS T ERED
P R O F E S S I O N A L E N G I NE E R
S2.03EEAST BUILDINGSECTIONS & DETAILS
Checked By:
Designed by:
Drawn By:
Project Number:
Sheet
Revisions:
Issue Record:
GOFF ENGINEERING& SURVEYING, INC.126 ROCK POINTDRIVE SUITE A
P.O. BOX 97DURANGO,
COLORADO 81302(970) 247-1705
www.GoffEngineering.com
4-7-22
1-31-221-5-22
7-31-197-19-19
PHAS
E IV
EXP
ANSI
ON
EAST
BUI
LDIN
GVI
LLAG
E CO
URT
APAR
TMEN
TS
GEG
GEG
GJG
18-215
PERMIT SET80% CONSTRUCTION DOCS
50% CONSTRUCTION DOCSBID SET
ADDENDUM #5
GA R
T H E. GLA SCOCOL O R A D O R E G IS T ERED
P R O F E S S I O N A L E N G I NE E R
S2.04EEAST BUILDINGSECTIONS & DETAILS
Checked By:
Designed by:
Drawn By:
Project Number:
Sheet
Revisions:
Issue Record:
GOFF ENGINEERING& SURVEYING, INC.126 ROCK POINTDRIVE SUITE A
P.O. BOX 97DURANGO,
COLORADO 81302(970) 247-1705
www.GoffEngineering.com
4-7-22
1-31-221-5-22
7-31-197-19-19
PHAS
E IV
EXP
ANSI
ON
EAST
BUI
LDIN
GVI
LLAG
E CO
URT
APAR
TMEN
TS
GEG
GEG
GJG
18-215
PERMIT SET80% CONSTRUCTION DOCS
50% CONSTRUCTION DOCSBID SET
ADDENDUM #5
GA R
T H E. GLA SCOCOL O R A D O R E G IS T ERED
P R O F E S S I O N A L E N G I NE E R
S2.05EEAST BUILDINGSECTIONS & DETAILS
Checked By:
Designed by:
Drawn By:
Project Number:
Sheet
Revisions:
Issue Record:
GOFF ENGINEERING& SURVEYING, INC.126 ROCK POINTDRIVE SUITE A
P.O. BOX 97DURANGO,
COLORADO 81302(970) 247-1705
www.GoffEngineering.com
4-7-22
1-31-221-5-22
7-31-197-19-19
PHAS
E IV
EXP
ANSI
ON
EAST
BUI
LDIN
GVI
LLAG
E CO
URT
APAR
TMEN
TS
GEG
GEG
GJG
18-215
PERMIT SET80% CONSTRUCTION DOCS
50% CONSTRUCTION DOCSBID SET
ADDENDUM #5
GA R
T H E. GLA SCOCOL O R A D O R E G IS T ERED
P R O F E S S I O N A L E N G I NE E R