Provided as Per Addendum No. 1 Page 2 July 27, 2018
ADDENDUM NO. 1
TERREBONNE PARISH CONSOLIDATED GOVERNMENT
PETIT CAILLOU LOCK STRUCTURE PARISH PROJECT NO. 16-LOCK-61
This Addendum is issued for the purpose of modifying, clarifying, or revising, as applicable, the specified items of the original Contract Documents. It is also issued for the purpose of adding, as applicable, the attached specified items to the original Contract Documents, or deleting, as applicable, the attached specified items from the original Contract Documents. The Addendum and attachments shall be construed as much a part of the original Contract Documents as contained therein. Changes made by Addenda shall take precedence over original Contract Documents. GENERAL ANNOUNCEMENT In the case that additional questions have been received but are not answered in this addendum, these questions will be answered in a subsequent addendum to be issued on a later date.
PART I – WRITTEN CONTRACTORS QUESTIONS
Contractor’s Written Questions and Engineer’s Responses
PART II – MODIFICATIONS TO CONTRACT DOCUMENTS, TECHNICAL SPECIFICATIONS, PLANS, AND OTHER DOCUMENTS
Modifications to Contract Documents and Technical Specifications.
PART III – APPROVED EQUAL REQUESTS
PART IV – ATTACHMENTS
1. Pre-Bid Conference Sign-in Sheet 2. Pre-Bid Conference Meeting Notes 3. Section C – Louisiana Uniform Public Work Bid Form (Revised as Per Addendum No. 1) 4. Plan Sheet CD-3 – Cofferdam Details (Revised as Per Addendum No. 1) 5. Plan Sheet FW-3 – Braced Wall Details (Revised as Per Addendum No. 1) 6. Geotechnical Report (Provided as Per Addendum No. 1)
Provided as Per Addendum No. 1 Page 3 July 27, 2018
PART I – Written Contractors’ Questions NOTE – The responses presented in PART I may differ from those presented in the Pre-Bid Conference. The responses in PART I are current as of the date of this Addendum and if different supersede those provided at the Pre-Bid Conference or any previous addenda.
Contractors’ General Questions Received
1. Is the contractor obligated to the round design on the cofferdam or can it be changed to a rectangle shape?
Response: The Contractor shall be responsible for the cofferdam design; therefore, the round cofferdam shape is not obligated. However, Contractor shall make sure dimensions for the proposed temporary bypass channel and fendering system are still accommodated as shown on the Plans. Please note that should the Contractor’s proposed cofferdam design were to cause any Bid Item quantity to increase, additional cost shall be at the Contractor’s expense.
2. What is the budget for the project?
Response: The budget set for this project is $8,000,000.
3. Please look at the quantity for the permanent fender system Item #316219-2? I find 43 ea @ 60’ = 2580 lf, bid qty = 1860 lf.
Response: There are a total of 59 timber piles proposed for the permanent fender system. Bid Item No. 316219-3 has been updated accordingly. See Part II – Modifications to Contract Documents, Technical Specifications, Plans, and Other Documents for further details.
4. Where does the 4 ea temporary timber pile on the east side of the by-pass channel get paid?
How long are they?
Response: Reference Bid Item No. F-2 for the four (4) 40’ timber piles required for the Project Signage.
Provided as Per Addendum No. 1 Page 4 July 27, 2018
5. Upon initial review of the construction documents I doubt this project can be constructed in 450 calendar days. Has there been discussion on this issue that might result in extending the contract time?
Response: As per this Addendum the Contract time shall be increased to 500 Calendar Days. See Part II – Modifications to Contract Documents, Technical Specifications, Plans, and Other Documents for further details.
6. I am inquiring as to whether or not the following considerations will apply to the subject project:
a. Federal Aid Buy America Restrictions b. Small Business Subcontracting obligations.
Response: No. These restrictions/obligations do not apply to this project.
7. Please compare spec 10 00 03.00 Section 5.12 and Dwg CH-2. Specs states window is “single hung”, but dwgs seems to depict a non-opening picture window. Please clarify.
Response: Windows for proposed Control House shall be single hung type as stated in the Technical Specifications.
8. Please clarify if the intent is for the project to be exempt from All sales taxes, State & Local. The specifications only list exemption of State sales tax.
Response: Yes. This project is exempt from all State & Local sales taxes.
9. The specifications do not contain a bid bond form. Is a specific form required?
Response: No. The Contractor is responsible for providing their own Bid Bond form.
10. Ref Sheet G-5. Can you further clarify the construction R.O.W., i.e. the extent of all property available for our use, specifically on the east side of the bayou?
Response: Yes. Any area available from the existing sector gate up to the proposed miter gate and the existing road on the east side of the project area, may be used as staging area for temporary stockpiling of material. Contractor shall inform the Engineer on the intended area to be used for these purposes.
Provided as Per Addendum No. 1 Page 5 July 27, 2018
11. Specifications require 20# creosote treatment of timbers and ALL piles: a. Would you consider an alternative treatment such as CCA? b. Would you consider untreated timber piles under gate sill?
Response: a. Yes, 0.80 PCF CCA is acceptable.
b. No, all timber piles to be located under the gate concrete sill shall be treated.
12. Question about the coating of the Pipe Pile. Section 6.8.1.1-Paint Top 25’ with the three coat system, then Section 6.8.1.2 –Paint an additional 20’ Top Coat after the 3rd Coat. So I need top paint Top 25’ with Section 6.8.1.1, then an additional 20’ of coater per Section 6.8.1.2. Please advise.
Response: Yes. Painting Specification No. 09 97 02, Section 6.8.1.2 has been modified for clarity. See Part II – Modifications to Contract Documents, Technical Specifications, Plans, and Other Documents for further details.
13. What type of geotechnical investigation was performed to obtain the data on G-7 through G-9?
Response: Geotechnical investigation included exploration of two borings as shown on Sheet G-7 of the Contract Drawings. Geotechnical Report including all other components of the investigation has been included in this addendum for reference.
14. Is there a full geotechnical report to support the data from the borings?
Response: See Response for Question No. 13 above.
15. Is there any additional geotechnical data?
Response: See Response for Question No. 13 above.
Provided as Per Addendum No. 1 Page 6 July 27, 2018
16. Drawing CD-3 Detail C shows and element on the outside of the box girder that appears to backing up the 5” x 5” x ½” angle. Please provide call out.
Response: Please note that Contractor shall be responsible for the design of the required temporary cofferdam structure. For your reference, Drawing CD-3 has been updated accordingly to reflect the requested dimension. See Part II – Modifications to Contract Documents, Technical Specifications, Plans, and Other Documents for further details.
17. Drawings FW-1 and FW-2 call out 1-1/2” HDG grating. Drawing FW-2 references specification section 06 73 01 which is fiberglass grating. Please clarify requirement.
Response: Walkway grating shall be of fiberglass and shall comply with Technical Specification No. 06 73 01. See Part II – Modifications to Contract Documents, Technical Specifications, Plans, and Other Documents for modifications made to the Drawings.
18. Is it to be assumed that all concrete in items 033129-1 Structural Marine Concrete Sill and 033129-2 Structural Marine Concrete Sill Retaining Walls is to be classified as Mass Concrete?
Response: Yes.
19. Section 05 12 00 Structural Steel paragraph 2.4.5 Stairs and 2.4.9 Ladders - designed by Louisiana Professional Engineer. Is this the contractor’s responsibility?
Response: The Contractor will be responsible to have stairs and ladders designed by a Louisiana Professional Engineer if the proposed design varies from the details and dimensions as provided in the Plans. See Part II – Modifications to Contract Documents, Technical Specifications, Plans, and Other Documents for further details.
20. Sheet fw3 - please provide connection detail for walkway to the sheetpile cap.
Response: A connection detail for the proposed walkway to sheet pile cap bent plate has been included on Sheet FW-3. See Part II – Modifications to Contract Documents, Technical Specifications, Plans, and Other Documents for modifications made to the Drawings.
Provided as Per Addendum No. 1 Page 7 July 27, 2018
21. Sheet FW3 – please provide connection detail for sheetpile cap bent plate to the top of sheetpile.
Response: See Response to Question 20 above.
22. Will Navigation Lights need to be installed on the “Temporary By Pass Channel” and will they need to be furnished by the contractor?
Response: Contractor shall be responsible for coordination for any required approvals from the US Coast Guard, including any required lighting for the temporary by-pass channel.
23. The 35 ft. Class 2 Wood Poles, Penta Treated. These are for Floods 1, 2, & 3 only? Poles 4 & 5 are the 12’ x 4” Steel Poles correct?
Response: Correct.
24. Will “Sleeves” be made into the floors of the Electrical Building and the Control Building, or
will the conduit penetrations all need to be “Core Drilled”?
Response: All conduit penetrations for the Generator and Control House Buildings shall be Core Drilled.
25. Pole Lights 1, 2, & 3 will Boring and or Trenching be allowed, or do they need to be in Duct Bank?
Response: Pole Lights 1, 2 & 3 shall be installed in Duct Bank.
26. Can the Generator be on an open Skid or does it need to be in a sound enclosure?
Response: Generator shall be enclosed by a sound enclosure.
Provided as Per Addendum No. 1 Page 8 July 27, 2018
PART II – Modifications to Contract Documents, Technical Specifications, Plans, and Other Documents
Contract Documents:
1. Section C – Louisiana Uniform Public Work Bid Form a. Please replace with revised Section C provided in this Addendum.
i. Revisions include but are not limited to: - Bid Item 316219-3 quantity has been revised to 3,540 Linear Feet
2. Section F – Standard Form of Agreement Between Owner and Contractor
a. Particle 3.1 – Please revise to read as follows: “The work will be substantially completed within Five Hundred (500) Four Hundred and Fifty (450) calendar days after the date when the Contract Time commences to run as provided in paragraph 2.3 of General Conditions, and completed and ready for final payment in accordance with paragraph 14.14 of the General Conditions with 45 days after the date of Substantial Completion.”
3. Section J – Special Provisions a. Paragraph 1.03 – Please revise to read as follows:
“The contract time as stipulated in the Proposal Form is Five Hundred (500) Four Hundred and Fifty (450) calendar days for substantial completion, with a forty-five (45) day clear lien period required prior to final payment.
Technical Specifications:
1. Technical Specification Section 05 12 00 – Structural Steel a. Second Paragraph of Section 2.4.5 – Please revise to read as follows:
“Design stairs by a qualified professional engineer in the State of Louisiana, using the criteria of OSHA 29 CFR 1910.24, if design varies from Plan details.”
b. Paragraph 2.4.9 – Please revise to read as follows: “Design steel ladders by a qualified professional engineer in the State of Louisiana, using a criteria of OSHA 29 CFR 1910.27, if design varies from Plan details. Rungs shall be knurled or textured to form a non-slip surface.”
2. Technical Specification Section 09 97 02 – Painting: Hydraulic Steel Structures a. First Paragraph of 6.8.1.2 – Please revise to read as follows:
“6.8.1.2 Fourth Top Coat of Top 20 Feet An additional Additionally, the top coat shall be applied after the 3rd coat on the Top 20 to 20 Feet of sheet pile, pipe piles, and all structure steel.”
Provided as Per Addendum No. 1 Page 9 July 27, 2018
Plans:
1. Plan Sheet No. CD-3 – Cofferdam Details
a. Please replace with revised Plan Sheet No. CD-3 provided in this Addendum. i. Revisions include but are not limited to:
- Addition of dimension callout on Typical Girder & Diaphragm Section
2. Plan Sheet No. FW-1 – Floodwall Plan
a. Please revise call out on West Walkway Plan detail as follows: i. “1½” Thk. HDG. FRP Grating”
3. Plan Sheet No. FW-2 – Floodwall Plan
a. Please revise call out on East Walkway Plan detail as follows: i. “1½” Thk. HDG. FRP Grating”
b. Revise note to read as follows: i. “Note: Reference the following Technical Specifications for Each of the
Floodwall Components: Pipe Piles – Section 31 62 14 Sheetpiles – Section 31 41 16.00 Structural Steel – Section 05 12 00 Grating – Section 06 73 01 Lighting – Section 26 00 00 and Plan Sheet E-200”
4. Plan Sheet No. FW-3 – Braced Wall Details a. Please replace with revised Plan Sheet No. FW-3 provided in this Addendum.
i. Revisions include but are not limited to: - Addition of Channel Cap Weld Detail
5. Plan Sheet No. F-1 – Timber Guide Wall Plan
a. Please revise call out on last timber pile on eastern fendering to read follows: i. N: 323396.29 323393.53
E: 3508861.56 3508860.57
6. Plan Sheet No. F-2 – Timber Guide Wall Plan a. Please revise call out on last timber pile (inside of proposed lock chamber) on
eastern fendering to read follows: i. N: 323396.29 323393.53
E: 3508861.56 3508860.57
Other Documents:
NONE
Provided as Per Addendum No. 1 Page 10 July 27, 2018
PART II – Approved Equal Requests
1. PZC-13 SSP as equal to AZ-14-770
Engineer’s Response: NOT APPROVED.
2. PZC-14 SSP as equal to AZ-14-770
Engineer’s Response: APPROVED.
3. PZC-18 SSP as equal to AZ-17-770
Engineer’s Response: Please note that AZ 17-700 sheets for the temporary cofferdam structure shown for bidding purposes only. The Contractor will be responsible for all design components for this item.
4. ESZ 17-700 steel sheet pile as equal to AZ 17-700
Engineer’s Response: Please note that AZ 17-700 sheets for the temporary cofferdam structure shown for bidding purposes only. The Contractor will be responsible for all design components for this item.
5. ESZ 19-700 steel sheet pile as equal to AZ 14-770.
Engineer’s Response: APPROVED.
Coastal Design & Infrastructure
197 Elysian Dr.
Houma, LA 70363
P: (985) 219-1000 | F: (985) 475-7014
www.gisyeng.com
GIS Global Headquarters | 18838 Highway 3235 | Galliano, LA 70354 | P: (985) 475-5238 | F: (985) 475-7014
Date: July 25, 2018, 10:00 A.M.
Project: Terrebonne Parish Consolidated Government
Petit Caillou Lock Structure Project
TPCG Project No. 16-LOCK-61
GIS Project No. 39130-1032/1033
Location: GIS Engineering, LLC Office
PRE-BID CONFERENCE
NOTES
SAFETY TOPIC – UV Eye Protection
1. Roster Signatures and Introductions
a. Owner – Terrebonne Parish Consolidated Government (TPCG)
b. Engineer – GIS Engineering, LLC (GIS)
2. Scope of Work
The work consists of providing all equipment, labor and material necessary for the construction of the proposed
Lock Structure at Bayou Petit Caillou, including the following components:
Double Leaf Steel Miter Gates
4’ Thick Concrete Sill Structure including piling system and cut off wall
Braced Steel Floodwall including plumb and batter piles
Temporary Cofferdam Structure
Temporary By-Pass Channel
Channel Dredging
Levee Tie-in Embankment, including bankline and scour protection.
Lockkepeer’s Control House
Temporary and Permanent Fendering System
Generator Building
3. Delivery of Bids:
Sealed bids will be received on Wednesday, August 8, 2018, by the Terrebonne Parish Consolidated Government (TPCG) Purchasing Division, at the City of Houma Service Complex, 301 Plant Road, in Houma, Louisiana until 2:00 P.M. as shown on the Purchasing Division Conference Room Clock, and, at the time and place, shall be publicly opened and read aloud. No bids will be received after 2:00 P.M.
2
4. Proper Preparation and Submission of Bids (Section 10.0 of Section B – Instruction to Bidders)
a. Bids to be submitted by the time and at place indicated in the Invitation to Bidders and shall be
enclosed in a sealed envelope.
b. Envelope shall include Project title and name, address and state license number of the Bidder.
c. Each Bid Proposal packet shall include:
i. Completed Uniform Public Work Bid Form
ii. Signature Authorization with written evidence of authority (LA R.S. 38:2212(B)(5))
iii. Bid Bond with Power of Attorney, or Certified Check or Cashier’s Check, all in the amount of
5% of the total amount of the bid.
iv. Completed Unit Price Form.
Pay close attention to all requirements of bid submission including preparation of package to be submitted.
Also be sure to fill in all items, including unit price and unit price extension. Make sure not to leave any areas
blank.
5. Bid Completeness Requirements – including, but not limited to, the following:
a. Acknowledgement of Addenda on Bid Proposal.
b. Properly fill in unit price and extension price of each item included in the Bid Form.
c. Complete bidder information as requested.
d. Sign and Attest the bid.
6. Project Addenda:
a. Clarifications in response to questions concerning Contract Documents will be issued in an Addendum.
b. Send all questions to [email protected]. Any questions submitted outside of this provided email
address will not be considered. Please make sure to include the Project Name in the Subject of the
email. Answers to questions received will be distributed to all plan holders via addendum.
c. Addenda will be issued as soon as possible, but no later than Friday, August 3, 2018 before 2:00 P.M.
Addenda will be available at http//www.centralbidding.com by clicking on the Project Link, and will also
be sent via email provided on the sign-in sheet for this meeting.
7. Contract Documents and Requirements:
a. Listed in Section F – Standard Form of Agreement Between Owner and Contractor
b. Contract Documents include complete Plan, Specifications, Addenda and Reference Documents.
8. General Project Information:
a. Contract Time: 450 Calendar Days from Notice to Proceed.
The contract time will be revised to 500 Calendar Days in the first addendum.
b. Estimated Project Budget: $8 Million
c. Required Contractor’s License: Heavy Construction
d. Liquidated Damages: $1,000.00 per day. Refer to Article 3 of Section F - Standard Form of Agreement
Between Owner and Contractor of the Contract Documents for specifics.
e. Contractor’s Liability Insurance: Please refer to Paragraph 5.4 of Section I – General Conditions for
requirements.
3
f. Construction Submittal Process – All Submittals, Schedules, Pay Requests, RFI’s, NCR’s, etc, is
required to be submitted to GIS electronically through the project portal. Access to this portal and
training will be coordinated with the successful bidder on this project.
g. There will be mandatory monthly progress meetings with Engineer and Owner personnel during
construction.
9. Special Provisions
a. 1.07 – Load Limits on local streets adjacent to the project.
b. 1.12 – Maintenance of Drainage; the Contractor shall be responsible for maintaining adequate drainage
during the construction of the proposed lock.
c. 1.15 – Engineer’s Field Office; Contractor will be responsible for furnishing temporary field office for the
use of the Engineer’s Project Rep through the contract period.
d. 1.18 – This project is exempt from State Sales Tax.
This is also includes exemption from local parish taxes.
e. 1.29 – Substantial completion for the proposed lock structure will be granted upon construction of steel
miter gate and braced floodwall, thus creating the lock chamber consisting of the levee embankment
located at the western bankline of the channel, along with the levee tie-in and existing road located at
the eastern side of the channel, to the dimensions, grades and elevations as depicted on Drawings and
as specified in the Technical Specifications, as well as the installation of all equipment and controls as
specified. Proposed lock must be in full operation as to allow vessel access thru the system when
needed.
10. Other Relevant Items
a. Cofferdam
i. Reference note 3 on sheet G-3 of the Contract Drawings.
ii. Design, Excavation, Backfilling, and any required maintenance shall be the Contractor’s
responsibility. Contractor shall submit stamped Cofferdam design for our review and approval.
iii. Cofferdam dimensions and details provided on the Plans are for bidding purposes only.
b. Reuse of existing Material
i. Timber Piles for Fendering System
ii. Riprap for bankline protection
c. Construction Sequence and Means & Methods
i. Responsibility of the Contractor.
ii. Contractor to submit project schedule within ten (10) days of the Effective Date of the
Agreement for Owner/Engineer Review and Approval.
*A copy of the full Geotech report will be issued with the first Addendum.
11. Agency/Owner Comments
12. Bid Questions & Responses
a. Questions received prior to this pre-bid conference will be addressed in an upcoming addendum within
the following days.
b. All future questions shall be in writing and sent to the email address [email protected]. We will
not accept any questions over the phone or sent to direct emails.
c. The last day to submit written questions will be Thursday, August 2, 2018 until 2:00 P.M.
13. Site Familiarity
14. Adjourn
4
Project Contact Information
GIS Engineering, LLC 985-219-1000
Dustin Malbrough, P.E. Division Manager
Chris Jeanice, P.E. Client Program Manager
Mariann Alvarez, E.I. Project Engineer
Austin Hebert, E.I. Project Engineer
Joe Chauvin Construction Manager
Ann Hebert ` Engineer Tech/Document Control
TPCG BID DOCUMENT 8/7/2017 PAGE #C-1 (REVISED AS PER ADDENDUM NO. 1)
SECTION C LOUISIANA UNIFORM PUBLIC WORK BID FORM
TO: Terrebonne Parish Consolidated Government City of Houma Service Complex 301 Plant Road Houma, LA 70363
(Owner to provide name and address of owner)
BID FOR: Petit Caillou Lock Structure Project Parish Project No. 16-LOCK-61 (Owner to provide name of project and other identifying information)
The undersigned bidder hereby declares and represents that she/he; a) has carefully examined and understands the Bidding Documents, b) has not received, relied on, or based his bid on any verbal instructions contrary to the Bidding Documents or any addenda, c) has personally inspected and is familiar with the project site, and hereby proposes to provide all labor, materials, tools, appliances and facilities as required to perform, in a workmanlike manner, all work and services for the construction and completion of the referenced project, all in strict accordance with the Bidding Documents prepared by: GIS Engineering, LLC and dated: July 2018 (Owner to provide name of entity preparing bidding documents.)
Bidders must acknowledge all addenda. The Bidder acknowledges receipt of the following ADDENDA: (Enter the number the
Designer has assigned to each of the addenda that the Bidder is acknowledging ) __________________________________________ . TOTAL BASE BID: For all work required by the Bidding Documents (including any and all unit prices designated “Base Bid” * but not alternates) the sum of:
Dollars ($ ) ALTERNATES: For any and all work required by the Bidding Documents for Alternates including any and all unit prices designated as alternates in the unit price description. Alternate No. 1 (Additive – Timber Plumb Piles for Permanent Fender System Walkway) for the lump sum of:
Dollars ($ ) Alternate No. 2 (Additive – Steel Walkway for Permanent Fendering) for the lump sum of:
Dollars ($ ) Alternate No. 3 (Additive – Spare Parts) for the lump sum of:
Dollars ($ ) NAME OF BIDDER:
ADDRESS OF BIDDER:
LOUISIANA CONTRACTOR’S LICENSE NUMBER:
NAME OF AUTHORIZED SIGNATORY OF BIDDER:
TITLE OF AUTHORIZED SIGNATORY OF BIDDER:
SIGNATURE OF AUTHORIZED SIGNATORY OF BIDDER **:
DATE: _______________________
* The Unit Price Form shall be used if the contract includes unit prices. Otherwise it is not required and need not be included with the form. The number of unit prices that may be included is not limited and additional sheets may be included if needed. ** If someone other than a corporate officer signs for the Bidder/Contractor, a copy of a corporate resolution or other signature authorization shall be required for submission of bid. Failure to include a copy of the appropriate signature authorization, if required, may result in the rejection of the bid unless bidder has complied with La. R.S. 38:2212(B)5. BID SECURITY in the form of a bid bond, certified check or cashier’s check as prescribed by LA RS 38:2218.A is attached to and made a part of this bid.
TO: BID FOR: Petit Caillou Lock Structure Project
Parish Project No. 16-LOCK-61
DESCRIPTION:
REF. NO. QUANTITY: UNIT OF MEASURE: UNIT PRICE
01010-1 1 LUMP SUM
DESCRIPTION:
REF. NO. QUANTITY: UNIT OF MEASURE: UNIT PRICE
311100-1 1 LUMP SUM
DESCRIPTION:
REF. NO. QUANTITY: UNIT OF MEASURE: UNIT PRICE
311100-2 1 LUMP SUM
DESCRIPTION:
REF. NO. QUANTITY: UNIT OF MEASURE: UNIT PRICE
312300-1 7,000 CUBIC YARDS
DESCRIPTION:
REF. NO. QUANTITY: UNIT OF MEASURE: UNIT PRICE
312300-2 4,000 CUBIC YARDS
DESCRIPTION:
REF. NO. QUANTITY: UNIT OF MEASURE: UNIT PRICE
G-3 1,800 LINEAR FEET
Houma, LA 70363
xBase Bid or qAlt.# ___
UNIT PRICE EXTENSION (Quantity times Unit Price)
UNIT PRICE EXTENSION (Quantity times Unit Price)
Clearing & Grubbing
xBase Bid or qAlt.# ___
Channel Dredging to final lines and grades as shown on the Drawings, including temporary by-pass channel. Dredge material
may be stockpiled adjacent to the project site for reuse. Material to be reused for embankment construction shall conform to the
project specifications and be tested prior to installation.
UNIT PRICE EXTENSION (Quantity times Unit Price)
SECTION C
LOUISIANA UNIFORM PUBLIC WORK BID FORM
UNIT PRICE FORM
UNIT PRICES: This form shall be used for any and all work required by the Bidding Documents and described as unit prices. Amounts shall be stated in figures and only in figures.
xBase Bid or qAlt.# ___ Mobilization & Demobilization
Terrebonne Parish Consolidated Government
City of Houma Service Complex
301 Plant Road
UNIT PRICE EXTENSION (Quantity times Unit Price)
xBase Bid or qAlt.# ___Uncompacted Backfill Material for replacement of temporary bypass channel, and any other areas requiring backfill material as
depicted in the Drawings; including installation to lines and grade.
UNIT PRICE EXTENSION (Quantity times Unit Price)
xBase Bid or qAlt.# ___ Temporary Silt Fencing, including materials, installation, and removal
UNIT PRICE EXTENSION (Quantity times Unit Price)
xBase Bid or qAlt.# ___Removal of Obstructions. See Demolition Plan (Drawing G-6) in Plans. Contractor may reuse timber piles and timber guide
walls for construction of the temporary or permanent fender structures if removed without significant damage.
Page C-2
(REVISED AS PER ADDENDUM NO. 1)
DESCRIPTION:
REF. NO. QUANTITY: UNIT OF MEASURE: UNIT PRICE
CD-2 1 LUMP SUM
DESCRIPTION:
REF. NO. QUANTITY: UNIT OF MEASURE: UNIT PRICE
061333-1 5.18 THOUSAND BOARD FEET (MBF)
DESCRIPTION:
REF. NO. QUANTITY: UNIT OF MEASURE: UNIT PRICE
061333-2 0.72 THOUSAND BOARD FEET (MBF)
DESCRIPTION:
REF. NO. QUANTITY: UNIT OF MEASURE: UNIT PRICE
061333-3 0.184 THOUSAND BOARD FEET (MBF)
DESCRIPTION:
REF. NO. QUANTITY: UNIT OF MEASURE: UNIT PRICE
316219-1 1,080 LINEAR FEET
DESCRIPTION:
REF. NO. QUANTITY: UNIT OF MEASURE: UNIT PRICE
F-2 4 EACH
xBase Bid or qAlt.# ___
10"x12" Timber for Support of Guide Walls for Temporary Fender System (Lock Chamber Walls and North Side of New Miter
Gate), including materials and installation. Contractor may reuse Guide Walls removed from existing and temporary fender
system if removed without significant damage.
UNIT PRICE EXTENSION (Quantity times Unit Price)
xBase Bid or qAlt.# ___
8"x12" Timber for Guide Walls Splices for Temporary Fender System (Lock Chamber Walls and North Side of New Miter
Gate), including materials and installation. Contractor may reuse Guide Walls removed from existing and temporary fender
system if removed without significant damage.
UNIT PRICE EXTENSION (Quantity times Unit Price)
Supply and install all materials required for temporary cofferdam structure adequate to construct pile supported concrete sill.
Contractor shall be responsible for all design, pumping, excavation, temporary stockpile of excavated material, backfilling to
original ground elevation, and any maintenance required for installation. Contractor shall submit the Cofferdam structure design
stamped by a Licensed Professional Engineer for review and approval. Cofferdam details as shown on the Drawings are for
reference and bidding purposes only. Sheet pile used for this temporary cofferdam structure shall be removed in such way as to
avoid any damages to the sheets. Undamaged removed sheets are to be stockpiled on the east bank of the project area for future
Owner use; all other associated material is to be disposed of at the Contractor's discretion.
xBase Bid or qAlt.# ___
xBase Bid or qAlt.# ___12"x12" Timber for Temporary Fender Guide Walls, including materials, installation and removal. Contractor may reuse timber
for permanent Fender System Guide Walls if removed without significant damage.
UNIT PRICE EXTENSION (Quantity times Unit Price)
xBase Bid or qAlt.# ___Timber Plumb Piles for Temporary Fender System (ASTM D25 Timber x 60' Length), including materials, installation and
removal. Contractor may reuse timber plumb piles removed from existing fender system if removed without significant damage.
UNIT PRICE EXTENSION (Quantity times Unit Price)
UNIT PRICE EXTENSION (Quantity times Unit Price)
xBase Bid or qAlt.# ___ Piles with Project Signage, including materials, installation and removal.
UNIT PRICE EXTENSION (Quantity times Unit Price)
Page C-3
(REVISED AS PER ADDENDUM NO. 1)
DESCRIPTION:
REF. NO. QUANTITY: UNIT OF MEASURE: UNIT PRICE
314116-1 1,850 SQUARE FEET
DESCRIPTION:
REF. NO. QUANTITY: UNIT OF MEASURE: UNIT PRICE
033129-1 750 CUBIC YARDS
DESCRIPTION:
REF. NO. QUANTITY: UNIT OF MEASURE: UNIT PRICE
033129-2 320 CUBIC YARDS
DESCRIPTION:
REF. NO. QUANTITY: UNIT OF MEASURE: UNIT PRICE
316219-2 17,400 LINEAR FEET
DESCRIPTION:
REF. NO. QUANTITY: UNIT OF MEASURE: UNIT PRICE
031900-1 67 CUBIC YARDS
DESCRIPTION:
REF. NO. QUANTITY: UNIT OF MEASURE: UNIT PRICE
321500-1 710 TONS
DESCRIPTION:
REF. NO. QUANTITY: UNIT OF MEASURE: UNIT PRICE
MG-1-1 1 LUMP SUM
DESCRIPTION:
REF. NO. QUANTITY: UNIT OF MEASURE: UNIT PRICE
MG-1-2 1 LUMP SUM
xBase Bid or qAlt.# ___
UNIT PRICE EXTENSION (Quantity times Unit Price)
xBase Bid or qAlt.# ___ 4" Thick Seal Course Concrete for Concrete Sill, including materials and installation.
UNIT PRICE EXTENSION (Quantity times Unit Price)
xBase Bid or qAlt.# ___ 6" Thick Limestone Bedding Layer for Concrete Sill, including materials and installation.
UNIT PRICE EXTENSION (Quantity times Unit Price)
xBase Bid or qAlt.# ___ Transportation to Site and Installation of (2) Miter Gate Leafs, including all associated labor and materials.
UNIT PRICE EXTENSION (Quantity times Unit Price)
Fabrication and Machining of (2) Steel Miter Gate Leafs, including all associated labor and materials.
UNIT PRICE EXTENSION (Quantity times Unit Price)
xBase Bid or qAlt.# ___ Steel Sheet pile (AZ 14-770 or approved equal) for Cutoff Wall; including materials, installation, and painting.
UNIT PRICE EXTENSION (Quantity times Unit Price)
UNIT PRICE EXTENSION (Quantity times Unit Price)
xBase Bid or qAlt.# ___ Timber Piles (12" Diameter x 60' Length) for Concrete Sill, including materials and installation.
xBase Bid or qAlt.# ___ Structural Marine Concrete for Sill, including materials and installation.
UNIT PRICE EXTENSION (Quantity times Unit Price)
xBase Bid or qAlt.# ___ Structural Marine Concrete for Retaining Wall, including materials and installation.
Page C-4
(REVISED AS PER ADDENDUM NO. 1)
DESCRIPTION:
REF. NO. QUANTITY: UNIT OF MEASURE: UNIT PRICE
OM-2 1 LUMP SUM
DESCRIPTION:
REF. NO. QUANTITY: UNIT OF MEASURE: UNIT PRICE
100001-1 1 LUMP SUM
DESCRIPTION:
REF. NO. QUANTITY: UNIT OF MEASURE: UNIT PRICE
MG-9 1 LUMP SUM
DESCRIPTION:
REF. NO. QUANTITY: UNIT OF MEASURE: UNIT PRICE
MG-10 1 LUMP SUM
DESCRIPTION:
REF. NO. QUANTITY: UNIT OF MEASURE: UNIT PRICE
067301-1 65 LINEAR FEET
DESCRIPTION:
REF. NO. QUANTITY: UNIT OF MEASURE: UNIT PRICE
061333-4 1.85 THOUSAND BOARD FEET (MBF)
DESCRIPTION:
REF. NO. QUANTITY: UNIT OF MEASURE: UNIT PRICE
316214-1 1,575 LINEAR FEET
xBase Bid or qAlt.# ___
Fabrication, Machining, and Installation of (2) Lower Shaft Assemblies. Each Lower Shaft Assembly includes fabrication,
machining, and installation of (1) Lower Hinge Housing, machining and installation of (1) Lower Shaft, purchase and
installation of (1) Lower Shaft Bushing and (1) Lower Hinge Pin Housing Bushing, and purchase and installation of (1) Debris
Seal.
xBase Bid or qAlt.# ___ (2) J-Bulb Seals, (1) for each Miter Gate Leaf, includes materials and installation as shown on plans.
Steel Walkway for Miter Gate, includes fabrication, painting, and installation of frame, handrails, grating, and hardware.
UNIT PRICE EXTENSION (Quantity times Unit Price)
xBase Bid or qAlt.# ___ 8"x12" Timber Guide Walls for Miter Gate, includes materials and installation.
UNIT PRICE EXTENSION (Quantity times Unit Price)
xBase Bid or qAlt.# ___
UNIT PRICE EXTENSION (Quantity times Unit Price)
xBase Bid or qAlt.# ___ 14" Diameter x 112.5' Length Steel Plumb Piles for Braced Floodwall; including materials, painting, and installation
UNIT PRICE EXTENSION (Quantity times Unit Price)
xBase Bid or qAlt.# ___
Fabrication, Machining and Installation of (2) Upper Shaft Assemblies. Each Upper Shaft Assembly includes fabrication,
machining, and installation of (1) Upper Hinge Housing, machining and installation of (1) Upper Shaft and purchase and
installation (1) Sealed Spherical Roller Bearing.
UNIT PRICE EXTENSION (Quantity times Unit Price)
UNIT PRICE EXTENSION (Quantity times Unit Price)
UNIT PRICE EXTENSION (Quantity times Unit Price)
xBase Bid or qAlt.# ___ Fabrication and Installation of (2) Cylinder Base Assemblies, including all associated labor and materials.
Page C-5
(REVISED AS PER ADDENDUM NO. 1)
DESCRIPTION:
REF. NO. QUANTITY: UNIT OF MEASURE: UNIT PRICE
316214-2 1,512 LINEAR FEET
DESCRIPTION:
REF. NO. QUANTITY: UNIT OF MEASURE: UNIT PRICE
314116-2 6,850 SQUARE FEET
DESCRIPTION:
REF. NO. QUANTITY: UNIT OF MEASURE: UNIT PRICE
FW-6 1 LUMP SUM
DESCRIPTION:
REF. NO. QUANTITY: UNIT OF MEASURE: UNIT PRICE
067301-2 120 LINEAR FEET
DESCRIPTION:
REF. NO. QUANTITY: UNIT OF MEASURE: UNIT PRICE
FW-3 120 LINEAR FEET
DESCRIPTION:
REF. NO. QUANTITY: UNIT OF MEASURE: UNIT PRICE
FW-4 240 LINEAR FEET
DESCRIPTION:
REF. NO. QUANTITY: UNIT OF MEASURE: UNIT PRICE
061333-5 12 THOUSAND BOARD FEET (MBF)
UNIT PRICE EXTENSION (Quantity times Unit Price)
xBase Bid or qAlt.# ___Steel Walkway for Braced Floodwall Structure; includes fabrication, painting, and installation of frame, handrails, grating, and
hardware.
UNIT PRICE EXTENSION (Quantity times Unit Price)
xBase Bid or qAlt.# ___
12"x12" Timber Guide Walls for Permanent Fender System (Lock Chamber Walls and North Side of New Miter Gate),
including materials and installation. Contractor may reuse Guide Walls removed from existing and temporary fender system if
removed without significant damage.
UNIT PRICE EXTENSION (Quantity times Unit Price)
xBase Bid or qAlt.# ___ WT 6x15 Bracket Floodwall Connections, including materials, painting, and installation.
UNIT PRICE EXTENSION (Quantity times Unit Price)
xBase Bid or qAlt.# ___ HSS 10x10x5/8 Waler Beam for Floodwall Connections, including materials, painting, and installation.
UNIT PRICE EXTENSION (Quantity times Unit Price)
xBase Bid or qAlt.# ___ Braced Framing for Butterfly Valves, including fabrication, painting, and installation.
xBase Bid or qAlt.# ___ 12" Diameter x 108' Length Steel Battered Piles for Floodwall; including materials, painting, and installation
UNIT PRICE EXTENSION (Quantity times Unit Price)
xBase Bid or qAlt.# ___Steel Sheet Pile (AZ 14-770 or approved equal, 173' Width x 39.5' Length) for Braced Floodwall; including materials, painting,
and installation
UNIT PRICE EXTENSION (Quantity times Unit Price)
Page C-6
(REVISED AS PER ADDENDUM NO. 1)
DESCRIPTION:
REF. NO. QUANTITY: UNIT OF MEASURE: UNIT PRICE
061333-6 1.2 THOUSAND BOARD FEET (MBF)
DESCRIPTION:
REF. NO. QUANTITY: UNIT OF MEASURE: UNIT PRICE
061333-7 0.5 THOUSAND BOARD FEET (MBF)
DESCRIPTION:
REF. NO. QUANTITY: UNIT OF MEASURE: UNIT PRICE
316219-3 3,540 LINEAR FEET
DESCRIPTION:
REF. NO. QUANTITY: UNIT OF MEASURE: UNIT PRICE
316219-4 2 EACH
DESCRIPTION:
REF. NO. QUANTITY: UNIT OF MEASURE: UNIT PRICE
412426-1 1 LUMP SUM
DESCRIPTION:
REF. NO. QUANTITY: UNIT OF MEASURE: UNIT PRICE
412426-2 2 EACH
xBase Bid or qAlt.# ___
8"x12" Timber for Guide Walls Splices for Permanent Fender System (Lock Chamber Walls and North Side of New Miter
Gate), including materials and installation. Contractor may reuse Guide Walls removed from existing and temporary fender
system if removed without significant damage.
UNIT PRICE EXTENSION (Quantity times Unit Price)
UNIT PRICE EXTENSION (Quantity times Unit Price)
UNIT PRICE EXTENSION (Quantity times Unit Price)
xBase Bid or qAlt.# ___
Hydraulic Power Unit with Soft Starter included on HPU. Includes Solenoid Valves located on HPU and remote (includes
Solenoid Valves for Butterfly Valves). Remote Solenoid Valves shall be installed in a Junction Box, which is included in this
Bid Item. Includes materials, fabrication, painting, testing, and installation.
Hydraulic Cylinders with Gimbal and Rod-Locking Devices. Cylinders to have position feedback sensors. Includes materials
(including hardware to bolt to base), fabrication, painting, testing, and installation.
xBase Bid or qAlt.# ___
UNIT PRICE EXTENSION (Quantity times Unit Price)
xBase Bid or qAlt.# ___
UNIT PRICE EXTENSION (Quantity times Unit Price)
Timber Plumb Piles (ASTM D25 Timber x 60' Length) for Permanent Fender System (Lock Chamber Walls and North Side of
New Miter Gate); including materials and installation. Contractor may reuse timber plumb piles from existing and temporary
fender system if removed without significant damage.
xBase Bid or qAlt.# ___
10"x12" Timber for Support of Guide Walls for Permanent Fender System (Lock Chamber Walls and North Side of New Miter
Gate), including materials and installation. Contractor may reuse Guide Walls removed from existing and temporary fender
system if removed without significant damage.
xBase Bid or qAlt.# ___ (7-Pile) Protection Dolphins (ASTM D25 Timber x 60' Length) with Ladder; including materials and installation
UNIT PRICE EXTENSION (Quantity times Unit Price)
Page C-7
(REVISED AS PER ADDENDUM NO. 1)
DESCRIPTION:
REF. NO. QUANTITY: UNIT OF MEASURE: UNIT PRICE
412426-3 1 LUMP SUM
DESCRIPTION:
REF. NO. QUANTITY: UNIT OF MEASURE: UNIT PRICE
350141-1 4 EACH
DESCRIPTION:
REF. NO. QUANTITY: UNIT OF MEASURE: UNIT PRICE
312400-1 2,100 CUBIC YARDS
DESCRIPTION:
REF. NO. QUANTITY: UNIT OF MEASURE: UNIT PRICE
313716-1 750 TONS
DESCRIPTION:
REF. NO. QUANTITY: UNIT OF MEASURE: UNIT PRICE
313716-2 185 TONS
DESCRIPTION:
REF. NO. QUANTITY: UNIT OF MEASURE: UNIT PRICE
329219-1 1 ACRES
DESCRIPTION:
REF. NO. QUANTITY: UNIT OF MEASURE: UNIT PRICE
310519-1 2,250 SQUARE YARDS
UNIT PRICE EXTENSION (Quantity times Unit Price)
UNIT PRICE EXTENSION (Quantity times Unit Price)
xBase Bid or qAlt.# ___ Riprap Class 130 lb for Channel Bottom and Bankline Protection; including hauling, handling, and placing
UNIT PRICE EXTENSION (Quantity times Unit Price)
xBase Bid or qAlt.# ___ Geotextile Fabric Separator located under proposed Riprap and Limestone areas; including material and installation
Embankment Material for Levee Tie-in, including handling, placing and compacting to lines and grades as depicted on the
Drawings. Contractor may reuse stockpiled dredged material if tested and in compliance with the project embankment
specifications.
UNIT PRICE EXTENSION (Quantity times Unit Price)
xBase Bid or qAlt.# ___ Riprap Class 250 lb for Butterfly Valves and Levee Tie-In Area; including hauling, handling, and placing
UNIT PRICE EXTENSION (Quantity times Unit Price)
xBase Bid or qAlt.# ___Piping, tubing, hoses, etc. to connect HPU to Hydraulic Cylinders and Hydraulic Motors located on Butterfly Valves. Includes
materials, painting (if required), and installation.
UNIT PRICE EXTENSION (Quantity times Unit Price)
xBase Bid or qAlt.# ___
UNIT PRICE EXTENSION (Quantity times Unit Price)
Butterfly Valve, 6' x 6' with Hydraulically Actuated Motor Controls. Includes materials, fabrication, painting, and installation.
xBase Bid or qAlt.# ___ Seeding and Fertilizing for Levee Tie-In area; including materials and installation
xBase Bid or qAlt.# ___
Page C-8
(REVISED AS PER ADDENDUM NO. 1)
DESCRIPTION:
REF. NO. QUANTITY: UNIT OF MEASURE: UNIT PRICE
321500-2 200 TONS
DESCRIPTION:
REF. NO. QUANTITY: UNIT OF MEASURE: UNIT PRICE
100003-1 1 LUMP SUM
DESCRIPTION:
REF. NO. QUANTITY: UNIT OF MEASURE: UNIT PRICE
033129-3 28 CUBIC YARDS
DESCRIPTION:
REF. NO. QUANTITY: UNIT OF MEASURE: UNIT PRICE
316213-1 720 LINEAR FEET
DESCRIPTION:
REF. NO. QUANTITY: UNIT OF MEASURE: UNIT PRICE
033129-4 4 CUBIC YARDS
DESCRIPTION:
REF. NO. QUANTITY: UNIT OF MEASURE: UNIT PRICE
ES-001 1 LUMP SUM
DESCRIPTION:
REF. NO. QUANTITY: UNIT OF MEASURE: UNIT PRICE
ES-002 1 LUMP SUM
xBase Bid or qAlt.# ___
xBase Bid or qAlt.# ___14"x14" Square Cast in place Concrete Piles for Lock Keeper's House Foundation and to be tied into Concrete Sill and Retaining
Wall. Includes materials, painting, and installation.
UNIT PRICE EXTENSION (Quantity times Unit Price)
UNIT PRICE EXTENSION (Quantity times Unit Price)
UNIT PRICE EXTENSION (Quantity times Unit Price)
xBase Bid or qAlt.# ___ 14"x14" Square Precast Concrete Piles for Lock Keeper's House Foundation. Includes materials, painting, and installation.
xBase Bid or qAlt.# ___Marine Concrete for Lock Keeper's House Foundation (42' Length x 22' Width) as per plans and specs. Includes materials,
painting, and installation.
Electrical Service: Install electrical service from Utility Meter to Items located at Generator Building (150 kW Standby-
Generator, Automatic Transfer Switch, Panel "PP-1", Panel "LPB", 75 kVA Transformer, 15 kVA Transformer). Includes
cables, conduits, cable trays, etc and not actual equipment.
xBase Bid or qAlt.# ___
xBase Bid or qAlt.# ___
UNIT PRICE EXTENSION (Quantity times Unit Price)
Electrical Service: Furnish and install electrical service to the utility meter transformer enclosure, electrical meter pan, and main
fused disconnect switch. Includes cables, conduits, cable trays, etc.
UNIT PRICE EXTENSION (Quantity times Unit Price)
UNIT PRICE EXTENSION (Quantity times Unit Price)
Construction of Lock Keeper's House (26' Length x 14' Width) on site per plans and specs. Includes materials, painting, and
installation.
xBase Bid or qAlt.# ___ 610 Limestone for Levee Tie-in Road and Proposed Parking Lot, including placing and compaction
UNIT PRICE EXTENSION (Quantity times Unit Price)
Page C-9
(REVISED AS PER ADDENDUM NO. 1)
DESCRIPTION:
REF. NO. QUANTITY: UNIT OF MEASURE: UNIT PRICE
ES-003 1 LUMP SUM
DESCRIPTION:
REF. NO. QUANTITY: UNIT OF MEASURE: UNIT PRICE
ES-004 1 LUMP SUM
DESCRIPTION:
REF. NO. QUANTITY: UNIT OF MEASURE: UNIT PRICE
ES-005 1 LUMP SUM
DESCRIPTION:
REF. NO. QUANTITY: UNIT OF MEASURE: UNIT PRICE
ES-006 1 LUMP SUM
DESCRIPTION:
REF. NO. QUANTITY: UNIT OF MEASURE: UNIT PRICE
263213-1 1 EACH
DESCRIPTION:
REF. NO. QUANTITY: UNIT OF MEASURE: UNIT PRICE
262700-1 1 LUMP SUM
UNIT PRICE EXTENSION (Quantity times Unit Price)
UNIT PRICE EXTENSION (Quantity times Unit Price)
Electrical Service: Install electrical service from Miter Gate Control House to Flood Lights and Stanchion Lights. Includes
cables, conduits, cable trays, duct bank, etc. This item includes electrical services only and not supplying of equipment.
UNIT PRICE EXTENSION (Quantity times Unit Price)
xBase Bid or qAlt.# ___
xBase Bid or qAlt.# ___
Electrical Service: Install electrical service from Generator Building to Items located at Existing Sector Gate (Existing Utility
Power Pole, IRP-01, and Existing Sector Gate Control Panel). Includes cables, conduits, cable trays, etc. This item includes
electrical services only and not supplying of equipment.
Electrical Service: Furnish and install electrical grounding grid around Generator Building, Control Building, and across the
Bayou as shown on drawings. New grounding grid to tie into existing grounding grid at the Existing Sector Gate. This item
includes electrical services only and not supplying of equipment.
UNIT PRICE EXTENSION (Quantity times Unit Price)
UNIT PRICE EXTENSION (Quantity times Unit Price)
Electrical Service: Install electrical service from Generator Building to Items located at Miter Gate Control House (HPU Panel,
Disconnect Switch, Panel "PP-2", UPS, PLC & Marshalling Cabinet). Includes cables, conduits, cable trays, etc. This item
includes electrical services only and not supplying of equipment.
xBase Bid or qAlt.# ___
xBase Bid or qAlt.# ___ Stand-by Diesel Generator, 150 kW, 480V, 3 Ph, 60 Hz as described in Plans and Specs.
UNIT PRICE EXTENSION (Quantity times Unit Price)
xBase Bid or qAlt.# ___
Electrical Equipment (minus the Stand-by Diesel Generator) located in Generator Building consisting of the following:
Automatic Transfer Switch (300A), Transformer (75 kVA, 480V-120/240V, 3 Ph), Transformer (15 kVA, 480V-120/240V, 1
Ph), Panel PP-1 (480 VAC, 3 Ph, 3 W, 60 Hz, 42 Circuit, 200A Main), and Panel LPB 255:269(120/240 VAC, 1 Ph, 3 W, 60
Hz, 42 Circuit, 150A Main).
xBase Bid or qAlt.# ___
Page C-10
(REVISED AS PER ADDENDUM NO. 1)
DESCRIPTION:
REF. NO. QUANTITY: UNIT OF MEASURE: UNIT PRICE
262700-2 1 LUMP SUM
DESCRIPTION:
REF. NO. QUANTITY: UNIT OF MEASURE: UNIT PRICE
EE-001 1 LUMP SUM
DESCRIPTION:
REF. NO. QUANTITY: UNIT OF MEASURE: UNIT PRICE
100002-1 1 LUMP SUM
DESCRIPTION:
REF. NO. QUANTITY: UNIT OF MEASURE: UNIT PRICE
100002-2 1 LUMP SUM
DESCRIPTION:
REF. NO. QUANTITY: UNIT OF MEASURE: UNIT PRICE
EE-002 5 EACH
UNIT PRICE EXTENSION (Quantity times Unit Price)
Flood Lights - Includes poles, mounting brackets, hardware, and installation
UNIT PRICE EXTENSION (Quantity times Unit Price)
Surveillance Camera System for Lock. Includes minimum 8 cameras and 2 monitors. Cameras to be located to view North and
South Sides of New Miter Gate and Existing Sector Gate. One monitor to be located at Miter Gate Control House and one
monitor to be located at Existing Sector Gate Control House. Includes mounting hardware for cameras and monitors and cable,
conduit, cable trays, etc.
UNIT PRICE EXTENSION (Quantity times Unit Price)
xBase Bid or qAlt.# ___
xBase Bid or qAlt.# ___Electrical Equipment located in Miter Gate Control House consisting of the following: Disconnect Switch, Panel PP-2, UPS (3
kVA, 120/240V, 1 Ph) and PLC & Marshalling Cabinet (actual PLC equipment included on Bid Item 100002-1)
UNIT PRICE EXTENSION (Quantity times Unit Price)
xBase Bid or qAlt.# ___
xBase Bid or qAlt.# ___Electrical Equipment and Modifications to Existing Equipment in Existing Sector Gate Control House consisting of the
following: Breaker Box (150A), Panel IRP-01, Modifications to Existing Sector Gate Control Panel as per plans.
UNIT PRICE EXTENSION (Quantity times Unit Price)
xBase Bid or qAlt.# ___
Automated Control System which includes:
-(2) Control Consoles for Automated Controls System (includes HMI Touchscreen, switches, pushbuttons, and joysticks. One
console to be located at Miter Gate Control House and one console to be located at Existing Sector Gate Control House)
-(1) PLC for Automated Control System (PLC to be located inside PLC & Marshalling Cabinet as described in Bid Item 262700-
2)
-(4) Level Transmitters (located on North and South Side of New Miter Gate and Existing Sector Gate. Includes PVC pipe and
mounting hardware for transducer)
-(4) Limit Switches (located on New Miter Gate. Includes brackets and mounting hardware)
-Control Cables (includes cables, conduit, cable trays, etc. to connect PLC to Limit Switches, Level Transmitters, and Control
Consoles located on both New Miter Gate and Existing Sector Gate and Control Panel on HPU. Also includes cable, conduit,
cable trays, etc. to connect the HPU to solenoids mounted on opposite side of Bayou Petit Caillou. These cables to be routed thru
duct bank as part of Bid Item ES-004. Refer to Hydraulic Schematic in Plans for solenoids not mounted on HPU).
Page C-11
(REVISED AS PER ADDENDUM NO. 1)
DESCRIPTION:
REF. NO. QUANTITY: UNIT OF MEASURE: UNIT PRICE
EE-003 5 EACH
DESCRIPTION:
REF. NO. QUANTITY: UNIT OF MEASURE: UNIT PRICE
351233-1 2 EACH
DESCRIPTION:
REF. NO. QUANTITY: UNIT OF MEASURE: UNIT PRICE
264213-1 1 LUMP SUM
DESCRIPTION:
REF. NO. QUANTITY: UNIT OF MEASURE: UNIT PRICE
DW-1 2 EACH
DESCRIPTION:
REF. NO. QUANTITY: UNIT OF MEASURE: UNIT PRICE
220000-1 1 LUMP SUM
DESCRIPTION:
REF. NO. QUANTITY: UNIT OF MEASURE: UNIT PRICE
100004-1 1 LUMP SUM
DESCRIPTION:
REF. NO. QUANTITY: UNIT OF MEASURE: UNIT PRICE
033129-5 12 CUBIC YARDS
DESCRIPTION:
REF. NO. QUANTITY: UNIT OF MEASURE: UNIT PRICE
316213-2 360 LINEAR FEET
xBase Bid or qAlt.# ___ Stanchion Lights - Includes poles, mounting brackets, hardware, and installation
UNIT PRICE EXTENSION (Quantity times Unit Price)
xBase Bid or qAlt.# ___ Remove and Relocate Existing Navigation Aid Lights to proposed location on North Side of Miter Gate.
UNIT PRICE EXTENSION (Quantity times Unit Price)
UNIT PRICE EXTENSION (Quantity times Unit Price)
UNIT PRICE EXTENSION (Quantity times Unit Price)
xBase Bid or qAlt.# ___ 14"x14" Precast Concrete Piles for Generator Building, including materials, painting, and installation.
UNIT PRICE EXTENSION (Quantity times Unit Price)
xBase Bid or qAlt.# ___ Needle Girders for Dewatering System. Includes labor, materials and painting.
UNIT PRICE EXTENSION (Quantity times Unit Price)
xBase Bid or qAlt.# ___ Fabrication and Installation of Generator Building (20' Length x 16' Width) as per plans and specs.
UNIT PRICE EXTENSION (Quantity times Unit Price)
xBase Bid or qAlt.# ___Plumbing which includes waterline from Main Line to Miter Gate Control House, installation of sink and toilet at Miter Gate
Control House, and Marine Sanitation Device.
UNIT PRICE EXTENSION (Quantity times Unit Price)
xBase Bid or qAlt.# ___ Marine Concrete for Generator Building Foundation (28' Length x 16' Width), including materials, painting, and installation.
xBase Bid or qAlt.# ___ Cathodic Protection: Engineer, Furnish, and Install new Cathodic Protection System for Miter Gate
Page C-12
(REVISED AS PER ADDENDUM NO. 1)
DESCRIPTION:
REF. NO. QUANTITY: UNIT OF MEASURE: UNIT PRICE
323113-1 1 LUMP SUM
DESCRIPTION:
REF. NO. QUANTITY: UNIT OF MEASURE: UNIT PRICE
351233-2 1 LUMP SUM
DESCRIPTION:
REF. NO. QUANTITY: UNIT OF MEASURE: UNIT PRICE
316219-5 1 LUMP SUM
DESCRIPTION:
REF. NO. QUANTITY: UNIT OF MEASURE: UNIT PRICE
067301-3 250 LINEAR FEET
DESCRIPTION:
REF. NO. QUANTITY: UNIT OF MEASURE: UNIT PRICE
350141-2 1 LUMP SUM
Wording for “DESCRIPTION” is to be provided by the Owner.
All quantities are estimated. The contractor will be paid based upon actual quantities as verified by the Owner
BID ADDITIVE NO. 1
BID ADDITIVE NO. 2
BID ADDITIVE NO. 3
UNIT PRICE EXTENSION (Quantity times Unit Price)
Steel Walkway for Permanent Fendering (Lock Chamber Wall); includes fabrication, painting, and installation of frame,
handrails, grating, and hardware.
xBase Bid or qAlt.# ___ 6" x 18" Aluminum Reflector Placard, to include installation on handrails shown on drawings
UNIT PRICE EXTENSION (Quantity times Unit Price)
qBase Bid or xAlt.# 3
Spare Parts: (1) Butterfly Valve, 6' x 6' with Hydraulically Actuated Motor Controls, (1) Sealed Spherical Roller Bearing, (1)
Lower Shaft Bushing, (1) Lower Hinge Pin Housing Bushing, (1) Debris Seal, and (1) Hydraulic Cylinder with Rod Locking
Device and Position Feedback Sensors (No Gimbal).
UNIT PRICE EXTENSION (Quantity times Unit Price)
xBase Bid or qAlt.# ___
qBase Bid or xAlt.# 1
Timber Plumb Piles (ASTM D25 Timber x 40' Length, 800 linear feet total) and 3"x12" Timber Pile Support (1.041 MBF total)
for Permanent Fender System Walkway (Lock Chamber Wall); including materials and installation. Contractor may reuse timber
plumb piles from existing and temporary fender system if removed without significant damage.
qBase Bid or xAlt.# 2
UNIT PRICE EXTENSION (Quantity times Unit Price)
Chain Link Fencing around Generator Building and Lock-Keeper's House and security fencing on east and west sides floodwalls,
with gates, to include installation
UNIT PRICE EXTENSION (Quantity times Unit Price)
Page C-13
(REVISED AS PER ADDENDUM NO. 1)
Project number
Date
Drawn by
Checked by
39130-1032
JULY 2018
MAC, JJS
DMMPlot Date July 27, 2018
Designed by LD
Checked by CJJ
No. Description Date
REVISIONS
TERREBONNE PARISHCONSOLIDATED GOVERNMENT
PETIT CAILLOULOCK STRUCTURE
PROJECT
THIS DRAWING HAS
BEEN REDUCED TO
ONE HALF SIZE
THIS DOCUMENT IS THE PROPERTY OF GRAND ISLE
SHIP YARD ("GISY"). IT IS TO BE USED ONLY IN
CONNECTION WITH WORK BEING PERFORMED BY
GISY OR THE APPROVED CONTRACTOR.
REPRODUCTION IN WHOLE OR IN PART FOR ANY
PURPOSE OTHER THAN WORK PERFORMED BY
GISY OR THE APPROVED CONTRACTOR IS
FORBIDDEN EXCEPT BY EXPRESS WRITTEN
PERMISSION OF GISY. IT IS TO BE SAFEGUARDED
AGAINST BOTH DELIBERATE AND INADVERTENT
DISCLOSURE TO ANY THIRD PARTY.
CD-3
COFFERDAM DETAILS
SCALE:
TYPICAL COFFERDAM SEGMENT (8 REQ'D)1/4" = 1'-0"
SCALE:GIRDER CONNECTION DETAIL1
1"=1'-0"
SCALE:SPUD WELL DETAIL2
1"=1'-0"
A
SCALE:GIRDER CONNECTION DETAILA
1-1/2"=1'-0"
B
SCALE:SPUD WELL DETAILB
1"=1'-0"
C
SCALE:
TYPICAL GIRDER & DIAPHRAGM SECTIONC1-1/2"=1'-0"
SCALE:
HANGER DETAIL3/4" = 1'-0"
HANGER LAYOUT
FOR REFERENCE PURPOSES ONLY
Project number
Date
Drawn by
Checked by
39130-1032
JULY 2018
MAC, JJS
DMMPlot Date July 27, 2018
Designed by LD
Checked by CJJ
No. Description Date
REVISIONS
TERREBONNE PARISHCONSOLIDATED GOVERNMENT
PETIT CAILLOULOCK STRUCTURE
PROJECT
THIS DRAWING HAS
BEEN REDUCED TO
ONE HALF SIZE
THIS DOCUMENT IS THE PROPERTY OF GRAND ISLE
SHIP YARD ("GISY"). IT IS TO BE USED ONLY IN
CONNECTION WITH WORK BEING PERFORMED BY
GISY OR THE APPROVED CONTRACTOR.
REPRODUCTION IN WHOLE OR IN PART FOR ANY
PURPOSE OTHER THAN WORK PERFORMED BY
GISY OR THE APPROVED CONTRACTOR IS
FORBIDDEN EXCEPT BY EXPRESS WRITTEN
PERMISSION OF GISY. IT IS TO BE SAFEGUARDED
AGAINST BOTH DELIBERATE AND INADVERTENT
DISCLOSURE TO ANY THIRD PARTY.
FW-3
BRACED WALL
DETAILS
SCALE:
BRACED WALL PLAN
1"=1'-0"
SCALE:
BRACED WALL ASSEMBLY11-1/2"=1'-0"
SCALE:
SHEET PILE CAP23"=1'-0"
SCALE:
SECTION - TYPICAL BRACED WALLAFW-1 FW-3 1" = 1'-0"
SCALE:
GRATING ANCHOR DETAIL33"=1'-0"
SCALE:
CHANNEL CAP WELD DETAIL
1/2" = 1'-0"
GEOTECHNICAL EXPLORATION
TERREBONNE PARISH CONSOLIDATED GOVERNMENT
FLOODGATE STRUCTURE AT BAYOU PETIT CAILLOU
TERREBONNE PARISH, LOUISIANA
GIS PURCHASE ORDER NO. GEL000345
EUSTIS ENGINEERING PROJECT NO. 23366
FORGIS ENGINEERING, L.L.C.
HOUMA, LOUISIANA
ByEustis Engineering L.L.C.
Metairie, Louisiana
28 JULY 2017
TABLE OF CONTENTS
PAGE
INTRODUCTION . . . . . . . . . 1
SCOPE . . . . . . . . . . . 2
REFERENCES . . . . . . . . . . 2
DESIGN CRITERIA . . . . . . . . . 4
FURNISHED INFORMATION . . . . . . . . 7
GEOTECHNICAL DATA . . . . . . . . . 9
SUBSOIL CONDITIONS . . . . . . . . . 11
FOUNDATION ANALYSES AND RECOMMENDATIONS . . . . . 14
Site Preparation . . . . . . . . 14Areal Subsidence . . . . . . . . 21Pile Foundations - Capacity . . . . . . . 22Global Stability of Miter Gate and Steel Sheetpile Floodwalls . . . 25Local Stability of Steel Sheetpile Floodwalls . . . . . 26Piping Analyses for Sheetpile Tip Penetration . . . . . 28
ANALYSES OF LEVEE TIE-INS . . . . . . . . 29
Slope Stability Analyses . . . . . . . . 29Settlement Analyses of Levee Tie-In . . . . . . 30Bending Moment Analyses for Piles Subjected to Downdrag . . . 31Analyses of Cofferdam - TRS . . . . . . . 32Installation of Driven Piles . . . . . . . 35Test Pile and Load Test . . . . . . . . 37
VIBRATIONS . . . . . . . . . . 39
LIMITATIONS . . . . . . . . . . 40
FIGURES 1 THROUGH 15
APPENDICES I THROUGH V
Terrebonne Parish Consolidated GovernmentEustis Engineering Project No. 23366
Terrebonne Parish Consolidated Government Eustis Engineering Project No. 23366 Page 1 of 41
GEOTECHNICAL EXPLORATION
TERREBONNE PARISH CONSOLIDATED GOVERNMENT
FLOODGATE STRUCTURE AT BAYOU PETIT CAILLOU
TERREBONNE PARISH, LOUISIANA
GIS PURCHASE ORDER NO. GEL000345
EUSTIS ENGINEERING PROJECT NO. 23366
A. INTRODUCTION
1. This report comprises the results of a geotechnical subsurface exploration for the
proposed miter gate and adjoining braced walls, and levee tie-ins at Bayou Petit
Caillou in Chauvin, Terrebonne Parish, Louisiana. The project area is shown on
Figure 1, Site Vicinity Map. This report specifically addresses geotechnical design
considerations for the structures, provides axial pile capacity estimates, slope
stability analyses, seepage evaluations, and settlement analyses. Our professional
services have been performed in general accordance with Eustis Engineering
L.L.C.’s proposal dated 18 August 2016. Our professional services were authorized
in writing by Mr. Christopher Jeanice, P.E., Project Manager of GIS Engineering,
LLC, through Purchase Order No. GEL000345 dated 3 October 2016. GIS
Engineering is the prime design consultant for the project. The owner is the
Terrebonne Parish Consolidated Government. The purpose of the proposed
floodgate is to allow vessel traffic along the bayou while providing a higher flood
protection elevation.
Terrebonne Parish Consolidated Government Eustis Engineering Project No. 23366 Page 2 of 41
B. SCOPE
2. This report includes the results of engineering analyses and geotechnical
recommendations for the proposed floodgate, floodwalls, levee tie-ins, and
temporary cofferdam. Engineering analyses, presented herein, are based on the soil
borings and laboratory test results of undisturbed soil samples collected in the vicinity
of the proposed structures and include: estimates of allowable pile load capacities in
compression and tension; evaluation of global stability of the floodgate and braced
walls using Spencer’s Method with flood water at the top of the wall (TOW);
evaluation of local stability of the braced walls and sheetpiles used to construct
temporary retaining structure (TRS) using conventional earth pressure theory;
settlement analyses of the levee tie-ins; analysis of the floodgate due to sustained
structural loading and settlement due to downdrag; and a discussion of seepage
potential.
3. The development of lateral pile load-deflection curves (p-y) for the floodgate and
braced floodwall was part of our original scope. However, this was eliminated by GIS
Engineering and, therefore, it is not presented in this report.
4. Our geotechnical exploration and engineering analyses followed the Louisiana Flood
Protection Design Guidelines (LFPDG), dated 16 July 2015, and authored by the State
of Louisiana, Coastal Protection and Restoration Authority (CPRA).
C. REFERENCES
6. Computer Programs. We evaluated the proposed levee enlargements and braced
wall using the following computer programs.
Terrebonne Parish Consolidated Government Eustis Engineering Project No. 23366 Page 3 of 41
a. Stability Analysis, Spencer’s Method with Optimization Search Routine
using SLOPE/W, Version 8.16.1.13452, Geo-Slope International, Ltd.
b. Eustis Engineering’s Proprietary Program for Prediction of Axial Pile Load
Capacity and Proprietary Settlement Spreadsheet.
c. CWALSHT, Computer Program for Design and Analysis of Sheet-Pile Walls
by Classical Methods, Program No. X0031, 2 May 2003, U.S. Army Corps of
Engineers (USACE).
d. LPILE, Version 5.0.47, by Ensoft, Inc., for settlement induced bending
moment analyses.
7. Publications. The following publications were utilized for guidance in our
engineering analyses:
a. EM 1110-2-1901, Seepage Analysis and Control of Dams (April 1993);
b. ETL 1110-2-569, Design Guidance for Levee Underseepage (May 2005);
c. EM 1110-2-1901, Seepage Analysis and Control of Dams (April 1993);
d. EM 1110-2-1902, Slope Stability (October 2003);
e. EM 1110-2-1906, Design of Pile Foundations (January 1991);
f. EM 1110-2-1913, Design and Construction of Levees (April 2000);
g. EM 1110-2-2502, Retaining and Floodwalls (September 1989);
h. EM 1110-2-2504, Design of Sheet Pile Walls (March 1994);
i. ETL 1110-2-569, Design Guidance for Levee Underseepage (May 2005);
j. DIVR 1110-1-400, Soil Mechanics Data (December 1998);
k. TM 5-818-5, Dewatering and Groundwater Control (November 1983); and
l. U.S. Army Corps of Engineers (USACE) Hurricane and Storm Damage Risk
Reduction System (HSDRRS) interim design guidelines, updated 4 June
2012. The geotechnical section (Chapter 3) was updated on 14 June 2012.
Terrebonne Parish Consolidated Government Eustis Engineering Project No. 23366 Page 4 of 41
D. DESIGN CRITERIA
8. The project design criteria followed the LFPDG dated 16 July 2015. As stated
previously, the proposed project features are interior (protected side) structures
to the levees and alignment of the Morganza to the Gulf Risk Reduction System.
They will not be part of the Morganza to the Gulf of Mexico flood protection levees
and, therefore, did not require the extensive soil sampling required by the federal
and state agencies overseeing primary flood protection systems in southeastern
Louisiana.
9. Hydraulic Design Criteria. Hydraulic design criteria was provided by GIS
Engineering and is presented in Table 1. The existing ground surface elevations at
Bayou Petit Caillou, along the proposed alignment of the miter gate and steel
sheetpile floodwalls, range from approximate el 5 on the banks of the bayou to
approximate el -8.5 at the bayou centerline. The preliminary plans also show a
proposed dredging operation in the bayou to achieve a bottom at el -10
corresponding with the proposed miter gate sill elevation.
TABLE 1: HYDRAULIC DESIGN CRITERIA
DESIGN WATER CONDITIONS(1) ELEVATION IN FEET (NAVD 88)
TOW (Sector Gate and Steel Sheetpile Floodwalls)
5.0
LWL (Flood side and Protected Side) -1.0
(1)TOW = Top of Wall; LWL = Low Water Level
10. Water on the flood side of the levee was assumed to be sea (salt) water with a
unit weight of 64 pcf. Water on the protected side of the levee, including the pore
Terrebonne Parish Consolidated Government Eustis Engineering Project No. 23366 Page 5 of 41
water in the soils modeled from the levee crown and through the levee to natural
grade and below, was assumed to be fresh water with a unit weight of 62.4 pcf.
11. Geotechnical Design Criteria. Geotechnical design criteria are outlined in the
following sections. The project design criteria used in these geotechnical analyses
are described in detail in the LFPDG.
a. Axial Pile Capacity Design Methods and Assumptions. Factors of safety for
the axial pile capacity calculations are shown in Table 2. Additional pile
capacity criteria are presented in EM 1110-2-2906. S-case analyses are not
provided in this report because it has been our experience that the Q-case
(Q= “Quick”) will govern for soft clay conditions similar to those observed
at this location.
TABLE 2: AXIAL PILE LOAD CAPACITY
ITEM
LOADING CONDITIONS
DESIGN FEATURE OF CONSIDERATION
FACTOR OF SAFETY WATER LEVEL
SHEAR STRENGTH
PARAMETERS(1)
Axial Pile Load Capacity
N/A Q With Static Load Test 2.0
N/A Q With Dynamic Load Test 2.5
N/A Q Without Load Test 3.0
N/A Q With Dynamic Pile Test 2.5
(1)Q = “Quick” refers to unconsolidated undrained shear strengths defined in terms of total stresses.
b. Global Stability of Miter Gate, Steel Sheetpile Floodwalls, and Levee Tie-
ins. Global stability analyses were performed using Spencer’s Method of
Slices modeled with the SLOPE/W computer program. In Table 3, we
summarize the required minimum factors of safety for the deep-seated
Terrebonne Parish Consolidated Government Eustis Engineering Project No. 23366 Page 6 of 41
stability of the miter gate and steel sheetpile floodwalls that were used in
these analyses.
TABLE 3: DEEP-SEATED STABILITY OF PROPOSED PROJECT FEATURES
ITEM
LOADING CONDITIONS
FACTOR OF SAFETY
CONDITION WATER LEVEL(1)
SHEAR STRENGTH
PARAMETERS (2)
Miter Gate and Steel Sheetpile
Floodwalls Stability by Spencer’s
Method (with Optimization
Search Routine)
TOW on Flood Side
LWL on Protected Side
Q 1.40
If Target Factor of Safety is not
Achieved, Determine Required Unbalanced Force to Achieve This
Target Factor of Safety
Levee Tie-Ins Stability
Spencer’s Method (with Optimization
Search Routine)
CGL Q 1.40 Global and
Local Stability of Levee Tie-ins LWL Q 1.40
(1)TOW = Top of Wall; LWL = Low Water Level; PGL = Project Grade Line; CGL = Constructed Grade Line (2)Q = “Quick” refers to unconsolidated undrained shear strengths defined in terms of total stresses.
c. Local Stability of Steel Sheetpile Floodwalls Design Methods and
Assumptions. Eustis Engineering evaluated local wall stability of floodwalls
using the USACE’s CWALSHT software. Estimates of anchor force (lateral
stabilizing force supplied by the battered piles) and maximum bending
moments in the sheetpile floodwalls were estimated using a factor of
safety of 1.0. Hence, the structural engineer designing these walls will
need to include appropriate factors of safety to the structural components
of the wall. Minimum sheetpile tip elevations that satisfy local stability
were obtained using a factor of safety of 1.5 on the soil strengths.
Terrebonne Parish Consolidated Government Eustis Engineering Project No. 23366 Page 7 of 41
d. Seepage Design Methods and Assumptions. Piping analyses were
performed for the steel sheetpile floodwalls using the Lane’s Weighted
Creep Ratio (LWCR) approach. Water to the top of wall at el 5 and water
on the protected side in the canal to el -1 were utilized in these analyses.
These analyses comply with EM 1110-2-1913 and DIVR 1110-1-400.
E. FURNISHED INFORMATION
12. The project information furnished to Eustis Engineering includes the following
prepared by GIS.
a. Preliminary plans dated November 2016:
Title Sheet (Sheet No. 1)
Proposed Site Plan (Sheet No. 2)
Survey Plan (Sheet Nos. 3, 4 and 5)
Existing Sections (Sheet Nos. 6, 7, 8)
Double Sector Gate Plan View (Sheet No. 9)
Double Sector Gate – Transverse Section (Sheet No. 10)
Double Sector Gate – Longitudinal Section (Sheet No. 11)
Single Sector Gate – Plan View (Sheet No. 12)
Double Miter Gates – Plan View (Sheet No. 13)
Double Miter Gates Concrete Sill – Plan View (Sheet No. 14)
Proposed Site Plan By-Pass Channel (Sheet No. 15.)
b. Locks Operation Schematic dated 22 September 2016
c. Petit Caillou Lock Model – Miter Gates furnished on 9 March 2017
d. Miter Gate Load Cases furnished on 27 March 2017
e. Sheetpile Wall Load Cases furnished on 27 March 2017
Terrebonne Parish Consolidated Government Eustis Engineering Project No. 23366 Page 8 of 41
f. Station 600+00 Section furnished on 28 March 2017
g. Braced Wall Details (Sheet No FW-1) dated 22 June 2017
h. Braced Wall Piling Plan & Schedule (Sheet No. P-2) dated 22 June 2017
i. Braced Wall Pile Plan furnished on 22 June 2017
j. Temporary Cofferdam Plan (Sheet No. CD-1) dated 28 June 2017
k. Cofferdam Details (Sheet Nos. CD-2 through CD-4) dated 28 June 2017
l. Proposed Dredge Plan – Cofferdam (Sheet No. CW-11) dated 6 July 2017
13. Red-lined dredge sections were also provided by GIS Engineering. The pertinent
plans and drawings are provided in Appendix I. A miter gate and steel sheetpile
floodwalls are planned within the Bayou Petite Caillou, located on the eastern side
of Boudreaux Canal Road and Vin Street and north of Boudreaux Canal, in Chauvin,
Louisiana, as shown on Figure 2. The Bayou Petit Caillou structure will have an
approximate 56-ft wide opening for steel barges and will have approximately 50
feet of braced floodwalls with top of flood protection at el 5 (NAVD 88). The
proposed structures will be located on the protected side of the existing gate
structure. These structures are “interior” (protected side) to the levee and
structure alignment of the Morganza to the Gulf Risk Reduction System (i.e.,
Reaches H-1 and H-2 and the Bayou Petite Caillou Sector Gate). As stated
previously, the purpose of the proposed structures is to allow vessel traffic along
the bayou while providing a higher flood protection elevation. Figure 2 presents
a plan view of the project.
14. Based on a review of the furnished drawings and our discussions with GIS
Engineering, we understand the miter gate and steel sheetpile floodwalls are the
preferred alternative with a top at el 5. The steel sheetpile floodwalls extend to
the east and west of the miter gate and are to be embedded in the proposed levee
Terrebonne Parish Consolidated Government Eustis Engineering Project No. 23366 Page 9 of 41
section. It is also our understanding the anticipated pile tip elevations for these
structures will range from approximately el -87 to el -117.
15. We understand a temporary cofferdam is proposed for the floodgate structure
construction in dry conditions. This circular cofferdam will be approximately 126
feet in diameter and consist of steel sheetpiles braced by an internal box ring
girder that is held in place by 10-in. diameter steel spud pipes arranged in pairs
along the interior of the cofferdam at connection points between the box ring
girder sections. Eight box ring girder sections will form the proposed interior box
ring girder. The top of the box ring girder is proposed at el 3. We understand the
mudline on the inside of the cofferdam will be at el -10 (top of sill elevation) with
approximately 6 feet wide bench, as shown on Cofferdam Details, Sheet No. CD-
2, in Appendix I, then sloping down to the bottom of excavation at el -15 on a
2H:1V slope.
F. GEOTECHNICAL DATA
16. General. The geotechnical field exploration comprised one 5-in. diameter
undisturbed boring (designated as Boring B-1U) to a depth of 175 feet below the
ground surface within the bayou and one 3-in. diameter undisturbed boring to a
depth of 120 feet below the existing ground surface on the eastern bank of the
proposed miter gate. This boring was designated as Boring B-2 and was drilled
using a track mounted drill rig. Boring B-1U was drilled from a shallow draft
elevating barge platform. The borings were drilled using wet rotary methods and
in general accordance with the LFPDG requirements.
Terrebonne Parish Consolidated Government Eustis Engineering Project No. 23366 Page 10 of 41
17. Undisturbed Sampling. Two undisturbed sample type soil test borings were drilled
by Eustis Engineering for the proposed project during the period of 21 November
2016 through 9 January 2017. The borings were located in the field by GIS
Engineering. A plan view of the boring locations is provided on Figure 2. The
undisturbed samples collected from these borings were transported back to our
office where they were extruded for laboratory testing. Pocket penetrometer
tests were performed on the soil samples to give a general indication of their shear
strength or consistency. The results of these tests are shown on the logs of the
borings under the column heading “PP.” The boring logs are presented in
Appendix II of this report. Table 4 presents soil boring information for the
proposed structures.
TABLE 4: DESIGN SOIL BORING INFORMATION FOR THE STRUCTURES
LOCATION BORING NUMBER
BORING DIAMETER (INCHES)
BORING DEPTH BELOW
EXISTING GROUND SURFACE
(FEET)
AS-DRILLED GPS COORDINATES
LATITUDE (NORTH)
LONGITUDE (WEST)
Within Bayou Petit Caillou B-1U 5 175 29°23'14.57"N 90°37'2.39"W
Eastern Bank of Bayou Petit Caillou
B-2 3 120 29°23'14.36"N 90°37'1.48"W
18. Samples of cohesionless and semi-cohesive materials were obtained from these
borings during the performance of in situ Standard Penetration Tests (SPTs). The
SPTs consist of driving a 2-in. diameter splitspoon sampler 1 foot into the soil after
first seating it 6 inches. A 140-lb weight dropped 30 inches is used to advance the
sampler. The number of blows required to drive the sampler 1 foot is indicative
of the relative density of cohesionless soils and of the consistency of cohesive
soils. The results of the SPTs are shown on the boring logs in Appendix II under
the column heading “SPT.”
Terrebonne Parish Consolidated Government Eustis Engineering Project No. 23366 Page 11 of 41
19. GPS coordinates for the boring locations were obtained using a handheld unit and
are shown on the boring logs in terms of latitude and longitude and are
summarized in Table 4. These coordinates should therefore be considered as
approximate. Detailed descriptive logs of the borings are shown in both tabular
and graphical form in Appendix II.
20. Laboratory Testing. Soil mechanics laboratory tests, consisting of natural water
content, unit weight, three-point unconsolidated undrained triaxial compression
shear (UU), and one-point unconsolidated undrained triaxial compression shear
(OB), were performed on undisturbed samples obtained from the borings.
Atterberg liquid limit (LL) and plastic limit (PL) tests, and the percent passing the
U.S. Standard No. 200 mesh sieve (-#200), were also performed on selected
representative samples to aid in classification of the subsoils and to give an
indication of their relative compressibility and expected time-rate of settlement.
The results of these laboratory tests are tabulated on the boring logs in Appendix
II. The unconsolidated undrained triaxial compression shear test report sheets are
presented in Appendix III of this report.
21. Three consolidation tests were performed on selected representative samples.
These tests were performed to help define the stress history of the foundation
soils and to develop soil compressibility and time-rate of settlement parameters.
The results of these tests are provided on separate sheets in Appendix IV.
G. SUBSOIL CONDITIONS
22. General Geology. The project site is located in the vicinity of Bayou Petite Caillou
in Terrebonne Parish, Louisiana. The geology in this area generally consists of
Terrebonne Parish Consolidated Government Eustis Engineering Project No. 23366 Page 12 of 41
natural levee, swamp/marsh deposits, interdistributary deposits, substratum
deposits, and Pleistocene deposits. The geology map is presented as Figure 3.
Note, the substratum and Pleistocene deposits were not encountered by our
borings drilled to a maximum depth of 175 feet (el -180). Based on geologic
mapping performed by the USACE, the top of the Pleistocene deposits in this area
is assumed to be at approximate el -325.
23. Subsurface Conditions. Natural levee, comprising extremely soft to medium stiff
gray, dark gray, brown and tan silty clay, was encountered to depths of 12 to 22
feet below existing grade/mudline. The natural levee deposits are underlain by
interdistributary deposits with interbedded swamp deposits to boring termination
depths of 120 and 175 feet for Borings B-2 and B-1U, respectively. Swamp
deposits, consisting of soft to stiff gray, dark gray and brown organic clay with
decayed wood and organic matter and maximum stratum thicknesses of 4 and 5
feet, were encountered in the borings. The interdistributary deposits consisted
loose to medium dense gray and tan silty sand and fine sand; loose gray clayey
silt; and soft to very stiff gray, tan and reddish-brown clay to the borings terminal
depths. The subsoil profiles are illustrated on Figure 4.
24. Water Depths. At the time of drilling, Boring B-1U was performed over 7 feet of
water within Bayou Petite Caillou. In order to evaluate ground water conditions
at the time of our field exploration at Boring B-2, observations of the ground water
were made in an auger boring performed near Boring B-2 drilled on the eastern
bank of Bayou Petite Caillou. The auger boring was initially drilled to a depth of
12 feet without the addition of water. Free water was encountered at a depth of
12 feet at the time of drilling. After a period of approximately 24 hours, the depth
to ground water was measured at a depth of approximately 4 feet below grade.
Terrebonne Parish Consolidated Government Eustis Engineering Project No. 23366 Page 13 of 41
25. The depth to ground water will fluctuate with changes in seasonal climatic
conditions; drainage improvements; construction activity; rainfall variations;
surface water runoff; and fluctuations in the water levels in Bayou Petite Caillou
as well as in the nearby and adjacent canals, lakes, marsh, and bayous; and/or
other factors. For this reason, the depth to ground water should be determined
by those persons responsible for construction immediately prior to beginning
work.
26. Soil Design Parameters. Soil design parameters developed for this project are
undrained (Q-case) shear strength, moisture content, and unit weight. Based on
our interpretation of the laboratory results, we developed two design lines: one
within the bayou and another for the bayou bank. The design soil parameters
developed for the project are provided graphically in Figure 5. Undrained shear
strength, total unit weight, moisture content, and generalized soil stratum
descriptions are plotted on these sheets. The selected design undrained shear
strengths and total unit weights are shown as heavy lines over the plotted data.
The undrained shear strengths for the bayou are shown as blue heavy lines while
the red heavy lines provide the design line for the bank.
27. The design undrained shear strengths were established using data deemed of
good quality with trend lines approximating ratio of undrained shear strength
(cohesion) to vertical effective stress ratio (c/Po) of 0.22. This ratio has been used
by Eustis Engineering as a guide for evaluating undrained shear strength data in
normally consolidated clay deposits with depth in southern Louisiana and is
considered an appropriate relationship to aid in evaluating subsurface properties
at the project site.
Terrebonne Parish Consolidated Government Eustis Engineering Project No. 23366 Page 14 of 41
28. The strength results that plotted below the c/Po line of 0.17 are considered to be
unreasonably low and, therefore, were disregarded in our evaluations of soil
design strengths. These low strengths could be due to sampling disturbance.
Studies performed by government agencies in the State of Louisiana have
demonstrated that the c/Po line of approximately 0.17 is considered as a
demarcation between higher quality test data and lower quality test data caused
by sample disturbance.
H. FOUNDATION ANALYSES AND RECOMMENDATIONS
29. Site Preparation
a. Clearing and Stripping. Clearing and stripping in the proposed construction area
should be to the minimum depth necessary to remove any deleterious materials.
Removal should include all stumps, roots, buried logs, old drains, and any other
objectionable matter. Roots, stumps, or other natural obstructions over 1.5
inches in diameter should be removed to a depth of 3 feet below the natural
ground surface. Special attention should be given to any weak areas or
depressions discovered during the excavation operation. When possible, these
areas, including holes from stump/root removal, should be thoroughly cleaned
out and backfilled with an inorganic clay fill material placed and compacted under
controlled conditions. However, if compaction is not possible, a “bridge lift” may
be required in these areas as subsequently discussed in the section entitled “Fill
Compaction.” Underground utilities or other obstructions may be present in the
area of the project. If abandoned underground utilities exist, special care should
be taken in their removal. These structures could impact the performance of new
structures if not properly removed and backfilled with select fill material.
Terrebonne Parish Consolidated Government Eustis Engineering Project No. 23366 Page 15 of 41
Additional site preparation will likely be required in wet areas. Eustis Engineering
should be consulted during preparation of the plans and specifications to
evaluate construction alternatives and ensure these comply with the
assumptions used in our analyses.
b. Drainage During Construction. The initial step to prepare construction areas
should be to establish adequate temporary and permanent drainage to prevent
ponding of water and ensure immediate runoff of rainfall. We recommend the
contractor maintain adequate surface drainage away from all areas during and
after construction. This may be accomplished by utilizing existing drainage
features, as well as installing ditches and swales, and by setting grades to ensure
positive drainage of water.
c. Earthen Levee Embankment. Levee tie-in embankment fill should be constructed
of earthen materials naturally occurring or contractor blended. Materials
classified in accordance with ASTM D 2487 as CL or CH, with Atterberg liquid
limits no greater than 75, are suitable for use as embankment fill. Materials
classified as ML are suitable if blended to produce a material that classifies as CH
or CL according to ASTM D 2487. All fill materials should be free from masses of
organic matter, sticks, branches, roots, and other debris including hazardous and
regulated solid wastes. If isolated pieces of wood are encountered during
excavation, these materials should not be considered objectionable in the
embankment provided their length does not exceed 1 foot, their cross-sectional
area is less than 4 square inches, and they are distributed throughout the fill. No
more than 1% (by volume) of objectionable material shall be contained in the
earthen material placed in each cubic yard of the levee section. Materials placed
in the levee section must have a plasticity index at or above 10. Materials placed
Terrebonne Parish Consolidated Government Eustis Engineering Project No. 23366 Page 16 of 41
in the levee section must be at or below an organic content of 9% by weight as
determined by ASTM D 2974, Method C, and should have a sand content of less
than 35% by dry weight.
d. Fill Compaction. Fill material use for levee embankment should be compacted to
at least 90% of its maximum dry density as determined by ASTM D 698 (standard
Proctor compaction test). To facilitate compaction, fill should be placed at a
moisture content within the limits of plus 5 to minus 3 percentage points of the
optimum moisture content. Fill materials should generally be placed in loose lift
thicknesses not exceeding 8 inches. However, initial lift placement in areas with
a saturated ground surface or areas with standing water will likely not allow for
90% compaction. These areas will require an initial bridge lift to provide dry
conditions for placement and compaction of overlying materials. This bridge lift
may be compacted by several passes of a bulldozer and without regard to
compaction control.
e. Temporary Retaining Structures. All excavations in excess of 4 feet deep should
be open cut or will require a TRS (i.e., cofferdam). The TRS will comprise braced
steel sheetpiles. Strut loads, sheeting material properties, and sheeting
penetration will depend on the excavation depth, width, excavation duration,
construction techniques, and bracing system. Excavation and TRS designs for the
project features should conform to the requirements of Section 802 of the
Louisiana Standard Specifications for Roads and Bridges (LSSRB), 2006 edition.
Steel sheetpiles should conform to the requirements given in Section 803 of the
LSSRB. The construction contractor should have the responsibility for adequacy
of sheeting, bracing, and shoring systems. The design of these systems should be
made by a registered professional engineer. The construction contractor's
Terrebonne Parish Consolidated Government Eustis Engineering Project No. 23366 Page 17 of 41
engineer should make an independent interpretation of the subsoil conditions
encountered at the borings. The contractor should submit detailed plans to the
owner prior to construction for review of adequacy and to evaluate the design's
impact on adjacent structures. The engineer of record should perform this
review. The results of the soil borings, and laboratory tests contained in
Appendices II through IV may be used in determining the structural requirements
for the cofferdam components.
f. Dewatering and Pressure Relief. The proposed subgrade within the temporary
cofferdam will be located in materials with relatively low permeability. However,
fine sand deposits are expected approximately 2 feet below the maximum
excavation depth at el -15 and may be exposed by the proposed excavations. To
avoid seepage issues, we recommend ground water inside the excavation be
maintained at el -17 with the use of a series of sump pumps to remove rain water
and ground water from the sand. Should the subgrade remain saturated, it will
be difficult to utilize as a working platform. Overexcavation or use of an improved
working surface may assist in these efforts. The need for pressure relief should
be fully assessed by a qualified and experienced contractor. The specific
requirements for dewatering and pressure relief will require knowledge of the
contractor’s proposed sequences and methods of construction. For this reason,
we recommend the design of the pressure relief system, if necessary, be
completed by a registered professional engineer having expertise in the design
and operation of construction dewatering systems. Similarly, the contractor
should have demonstrated expertise in the installation and operation of these
systems. The contractor should submit detailed dewatering plans to the owner
prior to construction for review of adequacy and to evaluate the design’s
potential impact on adjacent structures.
Terrebonne Parish Consolidated Government Eustis Engineering Project No. 23366 Page 18 of 41
g. Lateral Movement and Settlement of Adjacent Ground Surface. The contractor’s
TRS, dewatering, and pressure relief systems should be properly designed to
maintain a dry stable excavation and mitigate the potential for lateral movement
of the inplace soils. The subsidence and lateral movement of the soils
surrounding an excavation should be controlled and minimized by careful
attention to all details of excavation, bracing, dewatering, backfilling, and
installation and removal of sheetpiles. Even with careful attention, available
literature indicates settlement adjacent to sheetpile cofferdams can be as much
as 2% of the excavation depth. Removal of sheetpiles may result in additional
settlement of the surrounding ground surface and structures. If such settlement
is of concern, consideration should be given to leaving the sheetpiles in place.
h. Working Platform. We recommend construction of a working platform within
the TRS prior to bedding placement and floodgate construction. The working
surface could be created using crushed stone to serve as a suitable surface
against which overlying bedding materials can achieve adequate compaction. It
is important to note, the actual thickness of the working platform is partially
dependent on the specific means and methods of construction employed by the
contractor and on the need to replace soft soils encountered at the excavation
bottom. Alternate working platforms can be constructed using a seal slab,
geogrid reinforcement, or a combination of these methods with over excavation.
i. Geogrid Reinforcement. The base of the TRS is likely not suitable to compact the
floodgate base bedding; therefore, geogrid, such as Tensar BX1200 or an
approved equal, may serve as reinforcement of a bridge lift. Over excavation of
at least 12 inches is recommended for this type of working platform with the
Terrebonne Parish Consolidated Government Eustis Engineering Project No. 23366 Page 19 of 41
geogrid placed at its center. This bridge lift should consist of crushed stone
bedding meeting the material requirements provided below.
j. Sealant Slab. To provide a stable working platform during construction, a sealant
slab may be provided at the base of the prepared TRS excavation instead of the
geogrid reinforced crushed stone bridge lift. Flowable fill for a sealant slab should
meet the material and placement requirements given in Section 710 of the LSSRB.
k. Geotextile for Material Separation. Material separation should be provided
between the bedding materials and the natural subgrade. For this purpose, we
recommend the installation of a geotextile filter fabric conforming to the
requirements for Class D geotextile as stated in Section 1019 of the LSSRB. After
the excavation is cleared of all debris, standing water, muck, and loose soil, a
geotextile fabric should be spread or rolled over the surface of the undisturbed
soils in accordance with Section 726.03 of the LSSRB and with the manufacturer’s
construction recommendations. The fabric should be pulled taut and held in
place in accordance with the manufacturer’s recommendations during
placement of the crushed stone. The fabric will further need to provide
separation between the bedding and any overlying backfill materials. Sufficient
fabric should be present to line the excavation along its bottom, sides, and top to
completely encapsulate bedding materials that will be overlain by structural fill.
A minimum overlap of 2 feet should be provided at any two adjacent edges of
fabric.
l. Bedding Material and Compaction. The crushed stone used to construct the
bedding should conform to the requirements stated in Section 1003.02(b)2 of the
LSSRB for a Grade A, Size 57 stone. If a crushed stone working pad is used, the
Terrebonne Parish Consolidated Government Eustis Engineering Project No. 23366 Page 20 of 41
initial lift of this material may be placed in a loose thickness of 10 to 12 inches.
This initial lift should be manually spread and shaped to a uniform thickness. This
initial lift should be compacted to a minimum density corresponding to at least
70% of the relative density determined in accordance with ASTM D 4253 and D
4254. Subsequent lifts may be placed in loose thicknesses of 8 to 10 inches. All
stone within 1 foot of the concrete sill should achieve compaction having a
minimum density corresponding to at least 75% of the relative density as
determined by ASTM D 4253 and D 4254.
m. Backfill. Structural fill should be used to backfill portions of the excavation above
the bedding. Material and placement requirements should conform to Section
701.08 of the LSSRB. A select granular material, such as locally available pumped
river sand, can be used as backfill. Sand fill should be non-plastic and free of
roots, clay lumps, and other deleterious materials with no more than 10% by
weight of material passing a U.S. Standard No. 200 mesh sieve. The select fill
should have an organic content of 5% or less. Structural fill should be spread in
loose lifts of 6 to 8 inches. Each lift should be compacted to at least 95% of its
maximum dry density near optimum water content in accordance with ASTM D
698 for backfill. As previously noted, geotextile separation fabric meeting the
requirements given in this report should be placed between the structural sand
backfill and bedding materials.
n. Quality Control. Prior to transporting structural fill to the site, a sample of the
borrow material should be tested to verify its conformance to the specifications.
Density tests should be performed on each lift of the compacted structural fill to
determine if the contractor has achieved the recommended density. The
frequency of these tests is dependent on the overall size of the fill and type of fill
material, and should be determined once these variables are known. Should you
Terrebonne Parish Consolidated Government Eustis Engineering Project No. 23366 Page 21 of 41
require, Eustis Engineering is available to provide additional consultation for
quality control during construction. All clearing, filling, and compaction
operations should be accomplished only during periods of dry weather. The
contractor should exercise caution during and after inclement weather to ensure
subsoil support is not degraded by construction operations.
30. Areal Subsidence
a. Areal subsidence is a result of past filling of a site, lowering of the ground water
level over large areas, and ongoing consolidation of deltaic deposits. Areal
subsidence is considered a background condition over which designers have
no control and should be relatively uniform in the project area. Sufficient
information is not available in the geotechnical exploration to make accurate
estimates of the ongoing areal subsidence in the project area. Biodegradation
and disintegration of near surface organic materials should also be anticipated
and cannot be quantified.
b. Ongoing areal subsidence can result in differential settlement of grade
supported pavements or structures. Settlement of pile founded structures
may also be observed. Areal subsidence can also result in differential
settlement between grade supported and pile supported structures that is
larger than what would be estimated by consolidation settlement theory.
c. Settlement estimates we present in this report consider only existing
conditions within the project area. Should ground water conditions change
due to drainage improvements implemented in the design, additional
subsidence due to both primary and secondary consolidation should be
anticipated. The amount of settlement would depend on the depth to which
Terrebonne Parish Consolidated Government Eustis Engineering Project No. 23366 Page 22 of 41
ground water is lowered below existing levels. As a rule of thumb in the
cohesive Holocene sediments encountered in southern Louisiana, settlement
due to lowering of the existing ground water level will be approximately 2 to
3 inches per foot of lowered ground water elevation.
31. Pile Foundations - Capacity
a. Design Methods and Assumptions – Axial Capacity. Computations were
made to estimate the ultimate single pile load capacities for various sizes
of open end steel pipe piles and square precast concrete piles. We
understand open end steel pipe piles are being considered for the project.
Estimates of allowable single pile load capacities for various sizes of
treated timber piles are also provided in this report. Our analyses are
based on Q-case soil parameters (i.e., short term, undrained loading
conditions). It is our experience that Q-case conditions govern in
foundation design rather than S-case (long term, drained loading)
conditions within a soft clay foundation environment. Our analyses were
performed in accordance with EM 1110-2-2906 and Section 3.3 of the
HSDRRS Design Guidelines.
b. Results – Axial Capacity. Capacities were computed for piles driven from
an average ground surface at el -10. Computations include a factor of
safety of 1 against failure of a single pile (i.e., ultimate capacities). Q-case
tension and compression capacities of open end steel pipe piles and square
precast concrete piles are provided on Figures 6 (three sheets) and 7,
respectively. The allowable timber pile capacity estimates are provided on
Terrebonne Parish Consolidated Government Eustis Engineering Project No. 23366 Page 23 of 41
Figure 8, and include a factor of safety of 3.0, at the request of GIS
Engineering.
c. The design guidelines provided in Table 2 require a minimum factor of
safety based on the type of load testing chosen for the foundation.
d. Given the entire design profile for the pile capacity curves is cohesive with
the exception of a 9-ft layer at the top, the pile capacity curves, presented
on Figures 6 and 7, can be used to estimate axial capacity for foundations
supporting the miter gate and sheetpile floodwalls, regardless of the
bottom of the base slab elevation or grade elevation. Unbalanced loads
were not found in our global stability analyses as discussed subsequently.
Thus, a reduction in the allowable pile load capacity due to global stability
requirements is not applicable for this project. We present a methodology
for pile capacity reduction on Figure 9. This method can be used where pile
top elevations are below el -10.
e. Structural Capacity. Our estimates of ultimate pile load capacities are
based solely on the soil-pile relationship and include an approximate factor
of safety of 1 against failure of the piles through the soil. The structural
capacity of the individual piles to transmit these loads should be
determined by a structural engineer. The design pile load capacities
should be based on a factor of safety consistent with the testing program
as previously mentioned and summarized in Table 2.
f. Protrusion of Connections or Welds. Pile connections that protrude
beyond the surface of the outside wall of the pile reduce the frictional
Terrebonne Parish Consolidated Government Eustis Engineering Project No. 23366 Page 24 of 41
resistance acting on the pile surface above the protrusion. If the welds
protrude significantly past the pile’s outside dimensions, the soil-pile
adhesion is disturbed during installation of the pile and the pile’s capacity
may be reduced.
g. Pile Group Capacity and Spacing. Piles at this site will derive a majority of
their supporting capacity from skin friction. Therefore, it will be necessary
to consider the effect of group action on overall group capacity. In this
regard, the supporting capacity of the piles driven in groups should be
investigated on the basis of group perimeter shear by the formula shown
on Figure 10. The minimum spacing between piles should be determined
using the formula shown on Figure 11.
h. Lateral Loads and Lateral Soil-Pile Response. Horizontal and axial
components of batter pile loads should be determined from geometry
using the formulae shown on Figure 12. Eustis Engineering also
recommends lateral load and soil response analyses be performed on the
pile groups. We understand GIS Engineering is performing these analyses
including soil-pile interaction (p-y data) analyses.
i. Differential Settlement. GIS Engineering’s design should recognize the
potential for differential settlement between the pile supported miter gate
and sheetpile floodwalls. All structures should be designed as rigid as
possible to minimize the potential for differential settlements and have
foundation piles driven to equivalent depths, or to depths that would give
similar displacements under the imposed loads, in order to minimize
differential settlement.
Terrebonne Parish Consolidated Government Eustis Engineering Project No. 23366 Page 25 of 41
32. Global Stability of Miter Gate and Steel Sheetpile Floodwalls
a. Design Methods and Assumptions. Deep-seated global stability analyses
were performed for the proposed miter gate structure. The analyses
followed the criteria provided in the LFPDG as outlined for flood protection
T-walls. The guidelines require analyses by the Spencer’s Method for non-
circular failures. For the Spencer’s Method analyses, if the factor of safety
of a critical surface is greater than required in Table 3 of this report, a
stabilizing resisting force against deep-seated instability is not required to
be carried by the pile supported structure. If the factor of safety of the
critical failure surface is less than required, the analyses proceed to Step 2
of the guidelines.
b. Step 2 includes determination of the unbalanced force necessary to
achieve the required minimum factor of safety. The unbalanced force is
arrived at through a trial-and-error process where the load is varied until
the desired factor of safety is achieved. The critical failure plane is defined
as a failure surface that produces the greatest unbalanced load. Where
unbalanced loads are present, the axial pile capacity developed above the
critical failure plane should be disregarded.
c. Step 3 of the design includes computation of ultimate axial capacity. In
addition, computation of ultimate shear loads on individual piles at the
critical failure surface is made using the program LPILE by Ensoft, Inc.
Note, this step was not necessary for this project because there are no
unbalanced forces.
Terrebonne Parish Consolidated Government Eustis Engineering Project No. 23366 Page 26 of 41
d. Structural analyses (Steps 4 and 5) for this project will be performed by GIS
Engineering.
e. Results. Results of the stability analyses are presented on Figure 13. For
the floodgate structure, an unbalanced load is not present because the
factor of safety was greater than 1.4 (i.e., minimum computed factor of
safety of 3.18); therefore, Step 2 was not necessary.
33. Local Stability of Steel Sheetpile Floodwalls
a. Design Methods and Assumptions. The sheetpile floodwall, shown on
Figure 14, was analyzed using the USACE’s CWALSHT software to evaluate
wall stability of this permanent feature adjacent to the miter gate. The
sheetpile floodwall has a battered pile connected to its top for lateral
strength and stiffness. This floodwall provides a transition between the
miter gate and the adjacent earthen levee. We evaluated Q-case
(undrained) and S-case (drained) loads using the fixed earthen method
with factors of safety of 1.0 and 1.5. The factor of safety of 1.0 was used
to estimate the magnitude of the anchor force (lateral force supplied by
the battered pile), maximum lateral deflection of the wall, and the
maximum bending moments in the floodwall. The factor of safety of 1.5
was used to estimate the minimum sheetpile tip elevation for local
stability. The ground surface on either side of the wall was modeled at el
-10 to represent the worst case for the wall immediately adjacent to the
proposed miter gate and with the dredged bottom elevation of Bayou Petit
Caillou at the gate sill elevation. We assumed water within the bayou on
the protected side is at el -1 and flood water on the top of the wall is at el
Terrebonne Parish Consolidated Government Eustis Engineering Project No. 23366 Page 27 of 41
5. Soil adhesion/wall friction equal to 50% of the shear strength is used
below the sill of the miter gate (i.e., el -10). The anchor was placed at el 1
based on discussions with GIS Engineering.
b. Results. Our analyses show the tip of the sheetpile floodwall must extend
to el -19.5 to satisfy local stability under the governing S-case conditions.
This sheetpile tip elevation is based on factored soil parameters (factor of
safety ≈ 1.5) and flood water at el 5. However, a minimum sheetpile tip at
el -34.5 is required to prevent piping and achieve a minimum LWCR as will
be presented subsequently. Therefore, seepage governs the floodwall
sheetpile tip design. The estimated maximum bending moment is 10.7 kip-
ft/ft. The estimated maximum anchor force is 3.4 kips/ft, and the
estimated maximum scaled deflection is 5.50 x 108 lb-in.3/ft at el -7. To
obtain deflection in inches, divide the scaled deflection by the product of
modulus of elasticity (psi) and the moment of inertia (in.4). The results of
our analyses are provided on Figure 14.
c. Note, these estimates of maximum bending moment, anchor force, and
scaled deflection do not include the effects of settlement induced bending
moments (SIBM). Settlement of foundation soils immediately adjacent to
battered piles induces loading perpendicular to the axes of the piles. Since
the piles for both the miter gate and the sheetpile floodwall will be
installed in close proximity to fill for the new levee tie-ins, battered piles in
this location are expected to pick up additional bending moments and
shear forces due to settlement of the foundation soils, and these should
be included in the final design. The SIBM for these battered piles, following
HSDRRS Design Guidelines dated 4 June 2012 and found in Appendix F, was
Terrebonne Parish Consolidated Government Eustis Engineering Project No. 23366 Page 28 of 41
analyzed for this project and is discussed subsequently in the report. This
approach assumes pinned head pile connections. The project structural
engineer will then need to evaluate the results of our SIBM analyses in
conjunction with the available shear and bending moment capacity of the
battered pile(s) for hurricane and non-hurricane conditions.
34. Piping Analyses for Sheetpile Tip Penetration
a. Design Methods and Assumptions. Seepage potential of the ground
surface immediately adjacent to the miter gate structure and steel
sheetpile floodwall were evaluated at the protected side ground surface in
accordance with HSDRRS Design Guideline requirements. Seepage was
evaluated using the LWCR method to assess the potential for water to seep
along the sheetpile and upwards to the ground surface. Piping potential
was evaluated assuming flood water at el 5 and the water in the Bayou
Petit Caillou at el -1 on the protected side.
b. Results. A sheetpile tip at el -34.5 is required for the miter gate structure
and sheetpile floodwall to achieve the minimum LWCR of 3 for clays. The
LWCR governs the design of the sheetpile floodwalls.
c. Using this minimum sheetpile tip elevation, the global stability analyses
were repeated for the miter gate and sheetpile floodwall and the
corresponding factors of safety are summarized on Figure 13.
Terrebonne Parish Consolidated Government Eustis Engineering Project No. 23366 Page 29 of 41
I. ANALYSES OF LEVEE TIE-INS
35. Slope Stability Analyses
a. Design Method and Assumptions. Slope stability analyses were performed for
the proposed levee tie-ins, east and west banks existing geometries, and
dredging of the bayou bottom. We considered a clay fill material with a
cohesion of 600 psf and unit weight of 115 pcf for levee tie-in embankments
to el 5. Where specified by the designers, riprap was used with a unit weight
of 135 pcf and an internal friction angle of 40 degrees. Refer to the schematics
provided by GIS Engineering in Appendix I. We used a mudline of el -10 with
riprap to el -6 on the west bank and to el -8 on the east bank as proposed on
the cross-section. Some clay fill (buttress berm) on the western side is
required to achieve a minimum factor of safety of 1.40. Analyses followed the
criteria provided in Table 3. The guidelines require analyses by the Spencer’s
Method for non-circular and circular failures (including optimization search
routines). In accordance with current criteria, the “optimization feature” of
the SLOPE/W program was activated for our analyses. We occasionally found
from our stability analyses that negative interslice forces and/or negative base
normal stresses were encountered in the first few slices on the active side of
the sliding mass. When encountered, we imposed submerged tension cracks
to eliminate these negative forces and provide a more reasonable closure of
the force polygons. These tension cracks were modeled using a tension crack
line. Global stability analyses were performed using the Q-case soil design
parameters because this is considered to be the critical case for soft Holocene
sediments such as those encountered at this location. The Q-case refers to
the use of undrained shear strengths defined in terms of total stresses.
Terrebonne Parish Consolidated Government Eustis Engineering Project No. 23366 Page 30 of 41
b. Results. The proposed degrading of the canal bank on the eastern side, with
a slope of approximately 2H:1V, results in an adequate factor of safety of 1.4
or greater. Thus, a slope of 2H:1V is suitable to satisfy the minimum factor of
safety required for the LWL conditions at el -1 in the bayou. Because factors
of safety on the western side resulted in less than the minimum required
factor of safety of 1.40, semi-compacted clay fill, with an undrained shear
strength of 200 psf and a unit weight of 100 pcf, was added as a buttress berm
as shown on Figure 15. Some riprap was added from el -6.5 to el -10, top of
sill, for erosion control and to achieve a minimum factor of safety of 1.41. The
results of our analyses are presented on Figure 15.
36. Settlement Analyses of Levee Tie-In
a. Design Methods and Assumptions. Placement of the proposed fill will
induce consolidation settlement in the subsurface clay soils. This
settlement is typically realized as lateral plastic deformation (“lateral
spread”) when levees are constructed in virgin marsh/swamp
environments in addition to consolidation settlement during fill placement
and long term consolidation settlement after construction. Because the
levee tie-ins are proposed on an existing levee embankment and within
previously developed areas, we do not anticipate significant lateral
spreading to occur during construction of the crossings. Therefore, we did
not account for it in our settlement estimates.
b. Magnitudes and rates of consolidation settlement were estimated based
on Terzaghi's one-dimensional consolidation theory. The proposed fill was
modeled as a surcharge load placed instantaneously. The resulting stress
Terrebonne Parish Consolidated Government Eustis Engineering Project No. 23366 Page 31 of 41
distribution was predicted by the Westergaard theory due to the highly
stratified nature of the foundation deposits. We also considered shrinkage
of the compacted clay fill. The foundation soil compressibility parameters
were developed from Eustis Engineering's proprietary data set of
compressibility versus water content.
c. Results. Based on the furnished information of the existing and proposed
fill elevations provided by GIS Engineering, we estimate approximately ½
to 1 foot of ground surface settlement will occur after fill placement to el
5 due to consolidation of the underlying cohesive soils and levee shrinkage.
This settlement is expected to occur over an extended period of time.
37. Bending Moment Analyses for Piles Subjected to Downdrag
a. General. Downdrag is a pile settlement phenomenon caused by fill
placement which, for this project, comprises riprap on the canal banks and
levee tie-in embankment fill to el 5. As the fill settles from consolidation
of the underlying deposits, negative skin friction (drag loads) are induced
on the floodwall and floodgate piles. These drag loads will result in
additional pile settlement and may also result in additional bending of
batter (inclined) piles. This project has several battered 12-in. diameter
open end steel pipe piles planned to support the sheetpile wall. When a
pile is battered, a component of the total downdrag load on the pile acts
normal to the pile axis and induces bending moments. These bending
moments can be significant, and final selection of the pile type and
stiffness should explicitly consider these additional loads.
Terrebonne Parish Consolidated Government Eustis Engineering Project No. 23366 Page 32 of 41
b. Design Methodology and Assumptions. SIBM analyses were performed in
accordance with the design methodology described in the HSDRRS Design
Guidelines, Appendix F, “Interim Guidance, Revised 'LPILE Method' to
Calculate Bending Moments in Batter Piles for T-walls Subject to
Downdrag, Contract No. W912P8-07-D-0062" dated 26 December 2010.
This procedure has been used by Eustis Engineering on several hurricane
protection projects for the USACE and the CPRA where pile supported T-
walls were being designed and constructed. The SIBM results need to be
compared with the allowable bending moment capacity computed by the
structural engineer to assess whether or not the pile selected for design is
adequate in terms of bending moment capacity.
c. The 12-in. diameter open end steel pipe piles supporting the proposed
sheetpiles will be installed at an 18.4° inclination angle (1H:3V). The open
end steel pipe pile tips will bear at el -87 based on the furnished plans.
From the furnished plans, we determined the natural ground surface
elevation of 1 for the batter pile that is closest to the levee and where
maximum fill is anticipated.
d. Results. The maximum computed bending moment induced by the
placement of fill is 33.5 kip-ft. The results of this analysis are presented in
Appendix V.
38. Analyses of Cofferdam - (TRS)
a. General. A TRS will be required for construction of the floodgate
structures.
Terrebonne Parish Consolidated Government Eustis Engineering Project No. 23366 Page 33 of 41
b. Design Methods and Assumptions. TRS walls were analyzed using the
CWALSHT program for local stability. Braced walls were analyzed using the
Free Earth Support Method. For this evaluation, Q-case analyses
(undrained shear strengths) were made by applying factors of safety of 1.3
and 1.0 to the soil shear strengths with the water surface at el 5 (top of
wall conditions). The required sheetpile tip and maximum bending
moment are based on a factor of safety of 1.3; the anchor load and scaled
deflections are based on a factor of safety of 1.0. The structural engineer
should incorporate an adequate safety factor in designing the box ring
girder. In addition, S-case analyses (drained shear strengths) were
performed for the TRS with the water at el 5 outside the TRS and
incorporating a factor of safety of 1.0 and 1.3 into the soil shear strengths.
c. Adhesion, equal to 50% of the soil undrained shear strength, was modeled
between the soil and the sheetpile below the bottom of the excavation.
Adhesion and wall friction were not considered above the excavation
bottom.
d. Deep-seated stability analyses were performed for the cofferdam using
the Spencer's Method of Slices for non-circular and circular failures
(without optimization search routines) with the software SLOPE/W. The
“Entry and Exit” (EE) and “Block Specified” (BS) search routines of the
SLOPE/W program were used to determine the slip surface with the lowest
factor of safety. Global stability analyses were performed using the Q-
case soil design parameters. The Q-case refers to the use of undrained
shear strengths defined in terms of total stresses. Refer to the Cofferdam
Details, Sheet CD-2, by GIS Engineering, dated 28 June 2017 in Appendix I
Terrebonne Parish Consolidated Government Eustis Engineering Project No. 23366 Page 34 of 41
for geometry modeled. We modeled a 2H:1V slope from el -10 to el -15
on the interior side of the cofferdam.
e. Results. Assuming a single stage construction, a box ring girder, placed at
el 3.0 and maximum excavation made to el -15.0, a minimum sheetpile tip
to el -64.5 will be required for the TRS based on local stability analyses.
Global stability analyses indicated a sheetpile tip to el -60.5 and thus does
not control the design. Table 5 provides results of our TRS analyses
performed under Q-case and S-case. The bold values shown in the table
are minimum recommended for use in design.
TABLE 5: SUMMARY OF MINIMUM SHEETPILE TIP ELEVATION REQUIREMENTS
CONDITIONS FACTOR
OF SAFETY
MINIMUM REQUIRED
SHEETPILE TIP ELEVATION
IN FEET (NAVD 88)
MAXIMUM COMPUTED
BENDING MOMENT IN KIP-FT
PER FOOT OF WALL
ANCHOR FORCE(1) IN KIPS
MAXIMUM SCALED
DEFLECTION IN LB-IN3
Local Stability
Q-case 1.0 - 33.7(2) 5.2(2) 3.29 x 109
1.3 -64.5 - - -
Global Stability
Q-case 1.3 -60.5 - - -
Local Stability
S-case 1.0 - 37.3(2) 5.5(2) 3.46 x 109
1.3 -34 - -
(1)Box ring girder load per foot. (2)Based on a factor of safety equal to 1.0 applied to the soil strengths. Adequate factors of safety should be applied to the structural components.
f. The sheetpile should be selected to satisfy the maximum bending moment.
The bending moments and box ring girder forces provided in Table 5 were
computed using unfactored soil parameters (factor of safety of 1.0). The
Terrebonne Parish Consolidated Government Eustis Engineering Project No. 23366 Page 35 of 41
structural engineer should provide adequate factors of safety to all of the
structural components of the cofferdam. The contractor shall be solely
responsible for the design, layout, construction, maintenance, and
subsequent removal and disposal of all elements of the TRS systems as
stated in the specifications. To compute deflection in inches, divide the
scaled deflection by the product of modulus of elasticity (psi) and the
movement of inertia (in4).
g. Stability Analyses of Bypass Channel. The slope stability analyses of the
bypass cannel was not part of our scope of service. We recommend global
stability be checked prior to development of final plans and drawings.
Eustis Engineering is available to provide these analyses and corresponding
recommendations.
39. Installation of Driven Piles
a. Quality Control. Close field supervision should be maintained by
experienced personnel to ensure proper procedures are followed and
accurate records are kept for all pile driving operations. The driving record
should include, as a minimum, the date, pile type, overall length, side
dimension, embedment below finished grade, hammer type, duration of
driving, and number of blows per foot of penetration. An accurate driving
record is especially important to verify the piles are installed to the
required tip embedment and to give an indication of any unusual driving
characteristics which may indicate pile breakage. We recommend Eustis
Engineering be retained to observe, record, and evaluate all pile driving
operations with respect to the recommendations in this report.
Terrebonne Parish Consolidated Government Eustis Engineering Project No. 23366 Page 36 of 41
b. Air Hammers. Generally, we recommend a single acting air hammer be
used to install the concrete and steel pipe piles. The manufacturer’s rated
energy required to drive the piles will depend on the piles ultimate
compressive capacities prior to reductions due to unbalanced loads. Table
6 shows the estimated hammer energy versus ultimate compressive
capacity for steel and concrete piles recommended in this report.
TABLE 6: ESTIMATED HAMMER ENERGY VERSUS ULTIMATE PILE LOAD CAPACITY IN COMPRESSION FOR OPEN END STEEL AND SQUARE, PRECAST CONCRETE PILES
ESTIMATED ULTIMATE SINGLE PILE LOAD
COMPRESSIVE CAPACITY IN TONS
FACTOR OF SAFETY ≈ 1
APPROXIMATE RATED SINGLE ACTING HAMMER ENERGY
IN FT-LBS PER BLOW
Up to 120 120 to 240
240 to 300(1)
19,500 24,000 32,000
(1)Installation of piles with estimated ultimate capacities in excess of 300 tons should be evaluated by Wave Equation Analysis of Piles (WEAP) analyses. This responsibility should be directed to the construction contractor.
c. Diesel Hammer. In lieu of an air hammer, a diesel hammer may also be
used for the installation of the concrete and steel pipe piles. We
recommend the diesel hammer have a rated energy of one and one-half
times the energy recommended for a comparable installation with a single
acting air hammer.
d. Pile Refusal. Refusal criteria for the concrete and steel pipe piles should
be determined based on the results of the test pile program and dynamic
analyses or testing. If the piles are driven with the aid of a follower, or if
the pile driving helmet is allowed to impact the ground surface, Eustis
Engineering should be consulted to adjust these refusal criteria.
Terrebonne Parish Consolidated Government Eustis Engineering Project No. 23366 Page 37 of 41
e. Timber Piles. Treated ASTM D 25 quality timber piles, having tip diameters
of 7 inches or greater and butt diameters of 12 inches, may be driven with
a single acting air hammer having a manufacturer’s rated energy of 15,000
ft-lbs per blow. For these piles, the ram weight should not exceed 5,000
pounds and the maximum stroke should also be limited to 3 feet. Using
these driving energies, timber piles should be driven no harder than 25
blows per foot (refusal) to minimize structural damage to the piles.
f. Alternate Installation Methods. We do not recommend vibratory methods
or jetting be utilized for pile installation. If a vibratory hammer is selected
for the project, or if jetting for installation of concrete piles is considered,
Eustis Engineering should be contacted to evaluate the reduction in the
estimated ultimate pile load capacities presented. If any other alternate
installation methods are selected, Eustis Engineering should be contacted
to evaluate the effects on our estimates of capacity presented.
40. Test Pile and Load Test
a. Eustis Engineering considers a test pile program and load test as an
extension of our geotechnical exploration. Therefore, Eustis Engineering
should be retained to perform these services. Several test piles should be
installed for the project. The actual number of test piles should be
determined based on the number of piles used in any one area and the
load requirements (compression, tension). Eustis Engineering should be
consulted to develop a test pile program consistent with the project’s
scope. A test pile can also be used to evaluate installation technique
requirements, especially for piles with tip elevations planned within very
Terrebonne Parish Consolidated Government Eustis Engineering Project No. 23366 Page 38 of 41
stiff and dense subsoils approximately 120 feet below grade at the project
site.
b. The test piles should be allowed to set for 14 days subsequent to the
installation of the reaction system. The test pile should then be load tested
in tension and compression to 300% of the design load or to failure,
whichever occurs first, in general accordance with ASTM D 1143 and ASTM
D 3689, respectively. The results should be evaluated by Eustis Engineering
to verify the estimated pile load capacities presented in this report. As an
alternate, piles may be evaluated using dynamic pile testing methods to
evaluate capacity provided appropriate factors of safety are implemented
in the design as summarized in Table 2.
c. Dynamic Pile Testing (DPT). The initial installation of the piles may be
monitored and evaluated by DPT using a Pile Driving Analyzer® (PDA). A
PDA can monitor driving stresses during installation and evaluate pile
integrity during or after installation. A PDA can also monitor energy
transferred to the pile by the hammer to evaluate pile installation
efficiency. In order to evaluate pile capacity, a “restrike” DPT should be
performed a minimum of 14 days after its initial installation. Shorter
restrike set times may be considered, but a test may not indicate the full
ultimate capacity. In any case, we do not recommend a restrike set time
less than seven days to evaluate capacity of friction piles. Data from this
restrike should be further evaluated by CAPWAP® analyses.
Terrebonne Parish Consolidated Government Eustis Engineering Project No. 23366 Page 39 of 41
J. VIBRATIONS
41. Pile driving, as well as other construction activities, has the potential to generate
vibrations that may affect nearby structures, pavements, and underground
utilities. We have not been informed of specific structures or facilities that may
be susceptible to damage. However, Eustis Engineering recommends vibrations
be monitored at the locations of any critical structures during the test pile
program and subsequent construction activities of concern. This monitoring
should evaluate peak particle velocities during pile driving at critical structures
with a seismograph, as well as other construction activities generating vibrations
(hauling fill, moving heavy equipment, etc.). The record of peak particle velocities
will provide information in assessing potential damage and the need for changes
in construction operations. Peak particle velocities (measured at a structure)
exceeding 0.5 in./sec may induce damage to the structure, particularly when this
structure has been previously stressed by settlement or other movements. Peak
particle velocities between 0.25 and 0.5 in./sec may be sensed as being
detrimental by human perception. The locations and types of structures that may
be susceptible to construction vibrations should be defined by the designing
structural engineer. We recommend that structures susceptible to vibratory
damage be monitored by a seismograph. If sustained peak particle velocities at
identified structures are measured at or above 0.25 in./sec, the construction
activity affecting those vibrations should be suspended. At that time, Eustis
Engineering should be further consulted and, if necessary, construction activities
should be modified to reduce vibratory loads.
Terrebonne Parish Consolidated Government Eustis Engineering Project No. 23366 Page 40 of 41
K. LIMITATIONS
42. This report has been prepared in accordance with generally accepted geotechnical
engineering practice for the exclusive use of the Terrebonne Parish Consolidated
Government and GIS Engineering for specific application to the subject site. In the
event of any changes in the nature, design, or location of the proposed miter gate
and steel sheetpile floodwalls, the conclusions and recommendations contained
in this report shall not be considered valid unless the changes are reviewed and
the conclusions of this report are modified and verified in writing. Should these
data be used by anyone other than the Terrebonne Parish Consolidated
Government or GIS Engineering, the user should contact Eustis Engineering for
interpretation of data and to secure any other information which may be
pertinent to this project.
43. The analyses and recommendations contained in this report are based, in part, on
data obtained from soil borings. The nature and extent of subsurface variations
and subsoil conditions, away from these boring locations, may not become
evident until construction. If variations then appear, it will be necessary to
reevaluate the recommendations contained in this report.
44. Recommendations and conclusions contained in this report are to some degree
subjective and should be used only for design purposes. This report should not be
included in the contract plans and specifications. However, the results of the soil
borings and laboratory tests contained in the Appendices of this report may be
included in the plans and specifications.
45. This report is issued with the understanding that the owner or owner’s
representative has the responsibility to bring the information and
Terrebonne Parish Consolidated Government Eustis Engineering Project No. 23366 Page 41 of 41
recommendations contained herein to the attention of the engineers for the
project so they are incorporated into the plans and specifications for the project.
The owner or owner’s representative also has the responsibility to take the
necessary steps to see that the general contractor and all subcontractors follow
these recommendations. The owner or owner’s representative is responsible for
submittal of this report to the appropriate governing agencies.
46. Eustis Engineering has striven to provide our services in accordance with generally
accepted geotechnical engineering practices in this locality at this time. No
warranty or guarantee is expressed or implied. This report was prepared for the
exclusive use of the Terrebonne Parish Consolidated Government and GIS
Engineering.
47. Eustis Engineering should be provided the opportunity for a general review of the
final design and specifications in order that our foundation recommendations may
be properly interpreted and implemented in the design and specifications. If
Eustis Engineering is not accorded the privilege of making this recommended
review, we can assume no responsibility for misinterpretation of our
recommendations.
48. The scope of our service does not include an environmental assessment or an
investigation for the presence or absence of wetlands and hazardous or toxic
materials in the soil; surface water; ground water; or air on, below, or adjacent to
the subject property. Furthermore, the scope does not include the investigation
or detection of biological pollutants at the site. The term “biological pollutants”
includes, but is not limited to, molds, fungi, spores, bacteria, viruses, and the
byproducts of any such biological organisms.
J.L.S.
CADD FILE:
DATE:
JOB NO.:
CHECKED BY:
DRAWN BY:
D.J.B.
23366
VICINITY PLAN.DGNFIGURE 1
27 JULY 2017
GIS PURCHASE ORDER NO. GEL000345
TERREBONNE PARISH, LOUISIANA
FLOODGATE STRUCTURE AT BAYOU PETIT CAILLOU
TERREBONNE PARISH CONSOLIDATED GOVERNMENT
SITE VICINITY MAP
N
DULAC
CHAUVIN
WONDER LAKE
MADISON BAY
LAKE BOUDREAUX
QUITMANLAKE
HO
UM
A N
AVIG
ATIO
N C
AN
AL
PONDSWEETWATER
LAKE BARRE
LAKE TAMBOUR
PROJECT AREA
NOT TO SCALE
PROPOSED MITER GATE STRUCTURE
EXISTING SECTOR GATE
DENOTES LOCATIONS OF UNDISTURBED SOIL BORINGS DRILLED ON 21 NOVEMBER 2016 AND 4 JANUARY 2017
N
J.L.S.
CADD FILE:
DATE:
JOB NO.:
CHECKED BY:
DRAWN BY:
K.R.D.
23366
SITE PLAN.DGNFIGURE 2
27 JULY 2017
GIS PURCHASE ORDER NO. GEL000345
TERREBONNE PARISH, LOUISIANA
FLOODGATE STRUCTURE AT BAYOU PETIT CAILLOU
TERREBONNE PARISH CONSOLIDATED GOVERNMENT
BORING LOCATION PLAN
B-1U
B-2
BAYOUSIDE DRIVE
BOUDREAUX CANAL ROAD
VIN S
TR
EET
BO
UD
RE
AU
X C
AN
AL
BAYOU PETIT CAILLOU
SCALE: 1" = 100'
0100 10050
WEST SIDE
EAST SIDE
EXISTING SECTOR GATE
J.L.S.
CADD FILE:
DATE:
JOB NO.:
CHECKED BY:
DRAWN BY:
K.R.D.
23366
SITE PLAN.DGNFIGURE 3
28 JULY 2017
GIS PURCHASE ORDER NO. GEL000345
TERREBONNE PARISH, LOUISIANA
FLOODGATE STRUCTURE AT BAYOU PETIT CAILLOU
TERREBONNE PARISH CONSOLIDATED GOVERNMENT
HISTORICAL GEOLOGY MAP
N
BAYOUSIDE DRIVE
BOUDREAUX CANAL ROAD
VIN
ST
RE
ET
BO
UD
RE
AU
X C
AN
AL
BAYOU PETIT CAILLOU
SCALE: 1" = 300'
0300 300150
ABANDONED DISTRIBUTARY
INTERDISTRIBUTARY
MAP LEGEND:
DULAC, LA (1986)
DISTRIBUTION OF DELTAIC AND MARINE DEPOSITS
DELTAIC PLAIN
GEOLOGICAL INVESTIGATION MISSISSIPPI RIVER
MAP REFERENCE:
NATURAL LEVEE
VICINITY OF PROPOSED MITER GATE STRUCTURE
EAST SIDE
WEST SIDE
J.L.S.
CADD FILE:
DATE:
JOB NO.:
CHECKED BY:
DRAWN BY:
D.J.B.
23366
PROFILE.DGNFIGURE 4
28 JULY 2017
GIS PURCHASE ORDER NO. GEL000345TERREBONNE PARISH, LOUSIANA
FLOODGATE STRUCTURE AT BAYOU PETIT CAILLOUTERREBONE PARISH CONSOLIDATED GOVERNMENT
SUBSOIL PROFILE
NATURAL LEVEE
INTERDISTRIBUTARY
SWAMP
INTERDISTRIBUTARY
-210
-180
-150
-120
-90
-60
-30
0
30
-210
-180
-150
-120
-90
-60
-30
0
30
EL
EV
AT
ION
IN
FE
ET
(N
AV
D 8
8)
EL
EV
AT
ION
IN
FE
ET
(N
AV
D 8
8)
BORING MATERIAL GRAPHICS
CLAY
SILTY CLAY
SAND
SILTY SAND
CLAYEY SAND
CLAYEY SILT
ORGANIC CLAY
10
10
2
31
29
37
36
22
22
24
04 JAN 17
-90°37'2.3988"29°23'14.5788"
G.S.E. -6.40
B-1U21 NOV 16
-90°37'1.5"29°23'14.34"
G.S.E. 2.50
B-2
WATER
RESULTS OF STANDARD PENETRATION TESTS (SPT).
NUMBERS TO THE RIGHT OF THE BORING LOG (B-1U) REPRESENT
NOTE:
DRAWN BY: D.J.B.CHECKED BY: G.R.A. DATE: 8 MARCH 2017
JOB NO.: 23366
FIGURE 5FILE NAME: 23366 BAYOUPETIT SOIL PARAMETERS - BAYOU.GRF
SOIL DESIGN PARAMETERS
TERREBONNE PARISH CONSOLIDATED GOVERNMENTFLOODGATE STRUCTURE AT BAYOU PETIT CAILLOU
TERREBONNE PARISH, LOUISIANAGIS PURCHASE ORDER NO. GEL000345
0 2400 4800 7200 9600
EFFECTIVE VERTICAL OVERBURDEN STRESS ( 'VC) IN PSF
0 600 1200 1800 2400UNDRAINED SHEAR STRENGTH (SU) IN PSF
LEGEND
B-1U (UU)
B-1U (OB)
B-2 (OB)
c/Po = 0.17 - BAYOU
c/Po = 0.22 - BAYOU
c/Po = 0.22 - BANK
DESIGN LINES - BANK
DESIGN LINES - BAYOU
B-1U (CONSOL)B-2 (CONSOL)
80 100 120 140UNIT WEIGHT ( ) IN PCF
0 40 80 120WATER CONTENT (w) IN PERCENT
-210
-180
-150
-120
-90
-60
-30
0
30
ELEV
ATIO
N IN
FEE
T (N
AVD
88)
0 20 40N-VALUES IN BPF/ EQUIVALENT N60
NOTES:
1. THE BORINGS PERFORMED IN THE VICINITY OF THE PROPOSED STRUCUTRES ARE PRESENTED HEREIN. REFER TO FIGURES 2 AND 3 FOR THEAPPROXIMATE LOCATIONS OF THE BORINGS SHOWN ABOVE.
2. THE LOGS OF THE SOIL BORINGS SHOW ABOVE ARE PROVIDED IN APPENDIX II.3. DESIGN PROFILES SHOWN CANNOT FULLY ANTICIPATE ALL PARAMETERS WHICH MAY INFLUENCE SELECTION OF DESIGN VALUES FOR A SPECIFIC ANALYSIS. FOR THIS REASON,
THE USER SHOULD CONTACT EUSTIS ENGINEERING L.L.C. PRIOR TO USE OF DESIGN PROFILES IN ANY ANALYSES.4. THE GROUND SURFACE ELEVATION AT EACH BORING LOCATION WAS ESTIMATED FROM THE CROSS SECTIONS PROVIDED BY GIS ENGINEERING, L.L.C.5. FOR S-CASE, ANGLE OF INTERNAL FRICTION IS 23 DEGREES FOR CLAY AND 28 DEGREES FOR SILT, UNLESS SPECIFIED. COHESION FOR CLAY AND SILT IS ZERO.
WHERE,
OB = ONE POINT UNCONSOLIDATED UNDRAINEDTRIAXIAL COMPRESSION SHEAR TEST
UU = THREE POINT UNCONSOLIDATED UNDRAINEDTRIAXIAL COMPRESSION SHEAR TEST
= DISTURBED SAMPLE/ TEST RESULTS SKEWEDBECAUSE OF THE PRESENCE OF SILT LAYERS, POCKETSAND/OR LENSES.
CONSOL = CONSOLIDATION TEST DATA
EL. -6.5
EL. -17
EL. -26
EL. -35EL. -40
EL. -50
EL. -60
EL. -72
EL. -85
EL. -92
EL. -100
EL. -110
EL. -126
EL. -136
EL. -149
EL. -156
EL. -163
EL. -172
EL. -181
W=38%
W=25%
W=50%
W=70%
W=40%
W=95%
W=50%
W=40%
W=35%
W=45%
W=60%
W=70%
W=35%
W=65%
W=40%
W=27%
W=38%
W=38%
= 109pcf, ' = 46.6pcf
= 103pcf, ' = 40.6pcf
= 90pcf' = 27.6pcf
= 108pcf' = 45.6pcf
= 105pcf' = 42.6pcf
= 116pcf, ' = 53.6pcf
= 107pcf' = 44.6pcf
= 107pcf' = 44.6pcf
= 100pcf' = 37.6pcf
= 116pcf' = 53.6pcf
= 100pcf' = 37.6pcf
= 112pcf, ' = 49.6pcf
= 120pcf, ' = 57.6pcf
= 112pcf' = 49.6pcf
= 112pcf' = 49.6pcf
= 120pcf' = 57.6pcf
= 120pcf' = 57.6pcf
= 112pcf' = 49.6pcf
Clayey Silt (ML), C=200psf, =15°
Clayey Sand (SC), =30°
Silty Clay(CL), C=600psf EL. -1.5EL. 2.5
W=33%W=20% = 118pcf, ' = 55.6pcf
= 118pcf, ' = 55.6pcf Silty Clay(CL), C=450psf
Bank, Silty Clay(CL), C=450psfBayou, Silty Clay(CL), C=250psf
Fine Sand (SP), =28°
Bank, Clay(CH), C=500psfBayou, Clay(CH), C=300psf
Bank, Silty Clay(CL), C=600psfBayou, Silty Clay(CL), C=400psf
Bank, Organic Clay(OH), C=700psfBayou, Organic Clay(OH), C=500psf
Bank, Clay(CH), C=900psfBayou, Clay(CH), C=600psf
Bank, Silty Clay(CL), C=950psfBayou, Silty Clay(CL), C=800psf
Clay(CH), C=900psf
Clay(CH), C=1,050psf
Clay(CH), C=1,150psf
Silty Clay(CL), C=1,200psf
Clay(CH), C=1,350psf
Silty Clay(CL), C=1,500psf
Silty Clay(CL), C=1,650psf
Bank, Clay(CH), C=500psfBayou, Clay(CH), C=400psf
Bank, Clay(CH), C=900psfBayou, Clay(CH), C=700psf
0 50 100 150 200 250 300
ESTIMATED ULTIMATE SINGLE PILE LOAD CAPACITY IN TONS(FACTOR OF SAFETY 1) (SEE NOTE 4)
-180
-150
-120
-90
-60
-30
0PI
LE T
IP E
LEVA
TIO
N, F
EET
(NAV
D 88
)
COMPRESSION
TENSION
NOTES:
1) SELECTION OF PILE TIP ELEVATION SHOULD CONSIDER SETTLEMENT POTENTIAL DUE TOSTRUCTURAL LOADS AND FILL PLACEMENT. DESIGN OF PILE LENGTHS SHOULD CAREFULLYCONSIDER SETTLEMENT POTENTIAL AND PILE INSTALLATION REQUIREMENTS.
2) PILES ARE ASSUMED TO BE INSTALLED BY IMPACT DRIVING EQUIPMENT WITHOUTASSISTANCE FROM VIBRATORY EQUIPMENT.
3) THE PILE CAPACITIES DO NOT INCLUDE THE WEIGHT OF THE PILE.
4) A FACTOR OF SAFETY EQUAL TO 2 MAY BE USED IF STATIC PILE LOAD TESTING ISPERFORMED, A FACTOR OF SAFETY EQUAL TO 2.5 MAY BE USED IF DYNAMIC TESTING ISPERFORMED, AND A FACTOR OF SAFETY EQUAL TO 3 SHOULD BE USED IF TESTING IS NOTPERFORMED.
5) SILL ELEVATION AT EL -10.0 (NAVD 88) WAS FURNISHED BY GIS ENGINEERING L.L.C.
6) FOR VARIATION IN MUDLINE ELEVATIONS, THE ULTIMATE APPLICABLE AXIAL CAPACITYCAN BE DETERMINED USING FIGURE 9.
12-IN. DIAMETER
DRAWN BY: D.J.B.
CHECKED BY: K.R.D. DATE: 22 MAR 17
JOB NO.: 23366
FIGURE 6, SHEET 1 OF 3FILE NAME:23366 - OSP1.GRF
ESTIMATED ULTIMATESINGLE PILE LOAD CAPACITIES
OPEN END STEEL PIPE PILES
TERREBONNE PARISH CONSOLIDATED GOVERNMENTFLOODGATE STRUCTURE AT
BAYOU PETIT CAILLOUTERREBONNE PARISH, LOUISIANA
GIS ENGINEERING L.L.C. PURCHASE ORDER NO. GEL000345
14-IN. DIAMETER
16-IN. DIAMETER
18-IN. DIAMETER
0 100 200 300 400 500 600
ESTIMATED ULTIMATE SINGLE PILE LOAD CAPACITY IN TONS(FACTOR OF SAFETY 1) (SEE NOTE 4)
-180
-150
-120
-90
-60
-30
0PI
LE T
IP E
LEVA
TIO
N, F
EET
(NAV
D 88
)
COMPRESSIONTENSION
NOTES:
1) SELECTION OF PILE TIP ELEVATION SHOULD CONSIDER SETTLEMENT POTENTIAL DUE TOSTRUCTURAL LOADS AND FILL PLACEMENT. DESIGN OF PILE LENGTHS SHOULD CAREFULLYCONSIDER SETTLEMENT POTENTIAL AND PILE INSTALLATION REQUIREMENTS.
2) PILES ARE ASSUMED TO BE INSTALLED BY IMPACT DRIVING EQUIPMENT WITHOUTASSISTANCE FROM VIBRATORY EQUIPMENT.
3) THE PILE CAPACITIES DO NOT INCLUDE THE WEIGHT OF THE PILE.
4) A FACTOR OF SAFETY EQUAL TO 2 MAY BE USED IF STATIC PILE LOAD TESTING ISPERFORMED, A FACTOR OF SAFETY EQUAL TO 2.5 MAY BE USED IF DYNAMIC TESTING ISPERFORMED, AND A FACTOR OF SAFETY EQUAL TO 3 SHOULD BE USED IF TESTING IS NOTPERFORMED.
5) SILL ELEVATION AT EL -10.0 (NAVD 88) WAS FURNISHED BY GIS ENGINEERING L.L.C.
6) FOR VARIATION IN MUDLINE ELEVATIONS, THE ULTIMATE APPLICABLE AXIAL CAPACITYCAN BE DETERMINED USING FIGURE 9.
24-IN. DIAMETER
DRAWN BY: D.J.B.
CHECKED BY: K.R.D. DATE: 22 MAR 17
JOB NO.: 23366
FIGURE 6, SHEET 2 OF 3FILE NAME:23366 - OSP2.GRF
ESTIMATED ULTIMATESINGLE PILE LOAD CAPACITIES
OPEN END STEEL PIPE PILES
TERREBONNE PARISH CONSOLIDATED GOVERNMENTFLOODGATE STRUCTURE AT
BAYOU PETIT CAILLOUTERREBONNE PARISH, LOUISIANA
GIS ENGINEERING L.L.C. PURCHASE ORDER NO. GEL000345
30-IN. DIAMETER
36-IN. DIAMETER
42-IN. DIAMETER
0 200 400 600 800 1000 1200
ESTIMATED ULTIMATE SINGLE PILE LOAD CAPACITY IN TONS(FACTOR OF SAFETY 1) (SEE NOTE 4)
-180
-150
-120
-90
-60
-30
0PI
LE T
IP E
LEVA
TIO
N, F
EET
(NAV
D 88
)
COMPRESSIONTENSION
NOTES:
1) SELECTION OF PILE TIP ELEVATION SHOULD CONSIDER SETTLEMENT POTENTIAL DUE TOSTRUCTURAL LOADS AND FILL PLACEMENT. DESIGN OF PILE LENGTHS SHOULD CAREFULLYCONSIDER SETTLEMENT POTENTIAL AND PILE INSTALLATION REQUIREMENTS.
2) PILES ARE ASSUMED TO BE INSTALLED BY IMPACT DRIVING EQUIPMENT WITHOUTASSISTANCE FROM VIBRATORY EQUIPMENT.
3) THE PILE CAPACITIES DO NOT INCLUDE THE WEIGHT OF THE PILE.
4) A FACTOR OF SAFETY EQUAL TO 2 MAY BE USED IF STATIC PILE LOAD TESTING ISPERFORMED, A FACTOR OF SAFETY EQUAL TO 2.5 MAY BE USED IF DYNAMIC TESTING ISPERFORMED, AND A FACTOR OF SAFETY EQUAL TO 3 SHOULD BE USED IF TESTING IS NOTPERFORMED.
5) SILL ELEVATION AT EL -10.0 (NAVD 88) WAS FURNISHED BY GIS ENGINEERING L.L.C.
6) FOR VARIATION IN MUDLINE ELEVATIONS, THE ULTIMATE APPLICABLE AXIAL CAPACITYCAN BE DETERMINED USING FIGURE 9.
48-IN. DIAMETER
DRAWN BY: D.J.B./K.R.D.
CHECKED BY: K.R.D. DATE: 22 MAR 17
JOB NO.: 23366
FIGURE 6, SHEET 3 OF 3FILE NAME:23366 - OSP3.GRF
ESTIMATED ULTIMATESINGLE PILE LOAD CAPACITIES
OPEN END STEEL PIPE PILES
TERREBONNE PARISH CONSOLIDATED GOVERNMENTFLOODGATE STRUCTURE AT
BAYOU PETIT CAILLOUTERREBONNE PARISH, LOUISIANA
GIS ENGINEERING L.L.C. PURCHASE ORDER NO. GEL000345
54-IN. DIAMETER
60-IN. DIAMETER
0 50 100 150 200 250 300
ESTIMATED ULTIMATE SINGLE PILE LOAD CAPACITY IN TONS(FACTOR OF SAFETY 1) (SEE NOTE 4)
-180
-150
-120
-90
-60
-30
0PI
LE T
IP E
LEVA
TIO
N, F
EET
(NAV
D 88
)
COMPRESSION
TENSION
NOTES:
1) SELECTION OF PILE TIP ELEVATION SHOULD CONSIDER SETTLEMENT POTENTIAL DUE TOSTRUCTURAL LOADS AND FILL PLACEMENT. DESIGN OF PILE LENGTHS SHOULD CAREFULLYCONSIDER SETTLEMENT POTENTIAL AND PILE INSTALLATION REQUIREMENTS.
2) PILES ARE ASSUMED TO BE INSTALLED BY IMPACT DRIVING EQUIPMENT WITHOUTASSISTANCE FROM VIBRATORY EQUIPMENT.
3) THE PILE CAPACITIES DO NOT INCLUDE THE WEIGHT OF THE PILE.
4) A FACTOR OF SAFETY EQUAL TO 2 MAY BE USED IF STATIC PILE LOAD TESTING ISPERFORMED, A FACTOR OF SAFETY EQUAL TO 2.5 MAY BE USED IF DYNAMIC TESTING ISPERFORMED, AND A FACTOR OF SAFETY EQUAL TO 3 SHOULD BE USED IF TESTING IS NOTPERFORMED.
5) SILL ELEVATION AT EL -10.0 (NAVD 88) WAS FURNISHED BY GIS ENGINEERING L.L.C.
6) FOR VARIATION IN MUDLINE ELEVATIONS, THE ULTIMATE APPLICABLE AXIAL CAPACITYCAN BE DETERMINED USING FIGURE 9.
12-IN. SQUARE
DRAWN BY: D.J.B.
CHECKED BY: K.R.D. DATE: 14 MAR 17
JOB NO.: 23366
FIGURE 7FILE NAME:23366 - SPC.GRF
ESTIMATED ULTIMATESINGLE PILE LOAD CAPACITIES
SQUARE, PRECAST CONCRETE PILES
TERREBONNE PARISH CONSOLIDATED GOVERNMENTFLOODGATE STRUCTURE AT
BAYOU PETIT CAILLOUTERREBONNE PARISH, LOUISIANA
GIS ENGINEERING L.L.C. PURCHASE ORDER NO. GEL000345
14-IN. SQUARE
16-IN. SQUARE
NOTE:
D1
D2
PC1 PC2
DE
PT
H O
F P
ILE
TIP
(D
)
BELOW THE FOUNDATION BASE
AND INCLUDES CAPACITY OF LENGTH OF PILE
WHERE THERE ARE NO UNBALANCED LOADS
CURVE REPRESENTING FULL CAPACITY
ESTIMATED SINGLE PILE LOAD CAPACITY (PC)
ESTIMATED ULTIMATE PILE LOAD CAPACITIES PRESENTED ON FIGURES 6 AND 7.
2. THE METHODOLOGY SHOWN ON THIS FIGURE IS TO BE USED IN CONJUNCTION WITH THE
FOUNDATIONS OUTLINED IN THE GEOTECHNICAL REPORT.
CAPACITY SHALL BE BASED ON THE FACTOR OF SAFETY RECOMMENDATIONS FOR PILE
BOTTOM OF STRUCTURE ELEVATION). D2 IS THE DEPTH OF THE PILE. THE FINAL DESIGN
(EITHER DUE TO THE PRESENCE OF AN UNBALANCED LOAD OR BECAUSE OF A LOWER
FROM PC2. D1 IS THE DEPTH ABOVE WHICH AXIAL CAPACITY IS TO BE IGNORED
THE USABLE AXIAL CAPACITY CAN BE DETERMINED BY SUBTRACTING PC1
CAPACITY NEEDS TO BE REDUCED FOLLOWING THE GUIDELINES SHOWN ABOVE.
WHEN THE TOP OF THE PILE IS DEEPER THAN THE GROUND LINE. THE AXIAL
1. WHERE THERE IS AN UNBALANCED LOAD TO BE SUPPORTED BY THE T-WALLS AND/OR
J.L.S.
CADD FILE:
DATE:
JOB NO.:
CHECKED BY:
DRAWN BY:
K.R.D.
23366
APC-FIGURE.DGNFIGURE 9
28 JULY 2017
GIS PURCHASE ORDER NO. GEL000345
TERREBONNE PARISH, LOUISIANA
FLOODGATE STRUCTURE AT BAYOU PETIT CAILLOU
TERREBONNE PARISH CONSOLIDATED GOVERNMENT
IS REQUIRED FOR CHANGES IN GRADEMETHOD TO DETERMINE PILE CAPACITY WHERE REDUCTION
DISTANCE IN FEET
-100
EL
EV
AT
ION
IN
FE
ET
(N
AV
D 8
8)
-40
-20
0
20
-60
FLOOD SIDE (SOUTH)PROTECTED SIDE (NORTH)
A
100 120 140 160-80 -60 -40 -20 0 20 40 60 80
J.L.S.
CADD FILE:
DATE:
JOB NO.:
CHECKED BY:
DRAWN BY:
K.R.D.
23366
MITER GATE.DGNFIGURE 13
28 JULY 2017
GIS PURCHASE ORDER NO. GEL000345
TERREBONNE PARISH, LOUISIANA
FLOODGATE STRUCTURE AT BAYOU PETIT CAILLOU
TERREBONNE PARISH CONSOLIDATED GOVERNMENT
SLOPE STABILITY ANALYSES USING SPENCER'S METHOD
FLOOD GATE AND FLOODWALL STRUCTURES
EL -10
EL -35
EL 5
1
500500900ORGANIC CLAY8
4004001120SILTY CLAY7
4004001030CLAY6
3003001090CLAY5
0012028FINE SAND4
2502501200SILTY CLAY3
00640SALT WATER2
0062.40FRESH WATER1
BASEAVG.
COHESION IN PSF
IN PCFWEIGHT
UNIT
DEGREESANGLE IN FRICTION
DESCRIPTIONNO.SOIL
(EWL FS)23366 FLOODWALL.GSZ
1.404.03OPTIMIZATION
FULLY SPECIFIED WITH D
(EWL BS)23366 FLOODWALL.GSZ
1.404.06OPTIMIZATION
WITHOUT BLOCK SPECIFIED
C
(EWL FS)23366 FLOOD MITER GATE.GSZ
1.403.18OPTIMIZATION
FULLY SPECIFIED WITH B
(EWL BS LINE EL -18)23366 FLOOD MITER GATE.GSZ
1.403.19OPTIMIZATION
WITHOUT BLOCK SPECIFIED
A
(SUBFILE NAME)FILE NAME
SAFETYFACTOR OF REQUIRED MINIMUM
SAFETYFACTOR OF COMPUTED
TYPE OF SEARCHDESIGNATIONSLIP SURFACE
2
6
8
3
7
-120-140
B
EL -40
EL -50
EL -26
EL -17
LOW WATER LEVEL
EL -60
5
4
EL -10
TOP OF WALL
D
C
TIP AT EL -34.5 (SEE NOTE 4)MINIMUM RECOMMENDED SHEETPILE
THE RECOMMENDED PILE TIP ELEVATIONS WELL EXCEED MINIUMUM LWCR REQUIREMENT FOR CLAYS.
REQUIRED TO ACHIEVE THE MINIMUM LWCR WHEN THE MUDLINE IS AT EL -10. EL -34.54. SHEETPILE TIP ELEVATION WAS EVALUATED BASED ON A SHEETPILE TIP
(SWL) CONDITIONS HAVE BEEN EXCEEDED.
3. TOP OF WALL (TOW) AT EL 5 ANALYSIS GOVERNS THE DESIGN SINCE THE MINIMUM FACTOR OF SAFETY FOR LOW WATER LEVEL (LWL) AND STILL WATER LEVEL
2. REFER TO APPENDIX I FOR FURNISHED PLANS AND DRAWING PROVIDED BY GIS. SILL AT EL -10 WAS PROVIDED BY GIS ENGINEERING.
1. SLOPE STABILITY ANALYSES WAS PERFORMED BY SPENCER'S METHOD WITH OPTIMIZATION ROUTINE USING SLOPE/W SOFTWARE, VERSION 8.16.1.13452.
NOTES:
0
10
-10
-20
-30
EL
EV
AT
ION
IN
FE
ET
(N
AV
D 8
8)
-40
0
10
-10
-20
-30
-40
ACONDITIONSAFETY
OFFACTOR
KIPS/FTFORCE (F )ANCHOR
STABILITYLOCAL
(NAVD 88)ELEVATION
WATER
Q
Q
(4)
KIP-FT/FTMOMENT
MAXIMUM
(1)(2)(1)(2)(1)ELEV, FEETSHEETPILE TIP
MINIMUM REQUIRED
COMPUTER FILE
-50 -50
1.0
1.5
-14.5 2.9
PROTECTED SIDE (NORTH)FLOOD SIDE (SOUTH)
(SEE NOTE 3)(MINIMUM REQUIRED SHEETPILE TIP ELEVATION)
EL -34.5; FS=1.50
STABILITYGLOBAL
(6)
5 (TOW)
5 (TOW)
5 (TOW)Q
7.8
4.03
-17.0
-34.5
ENGINEER (SEE NOTE 2)
DETERMINED BY THE STRUCTURAL
SHEETPILE TIP ELEVATIONS
VERTICAL AND BATTERED
GLOBAL STABILITY ANALYSES WERE BASED ON MUDLINE AND WATER ELEVATION, SHOWN ABOVE, PROVIDED BY GIS ENGINEERING, LLC.6. GLOBAL STABILITY ANALYSES WERE PERFORMED BY SPENCER'S METHOD AND THE OPTIMIZATION SEARCH ROUTINE USING SLOPE/W SOFTWARE, VERSION 8.16.1.13452.
THIS ZONE CONSIDERS A 45 DEGREE FAILURE PLANE EXTENDING FROM THE MINIMUM REQUIRED SHEETPILE TIP ELEVATION THAT CORRESPONDS TO A FS=1.0 FOR WALL STABILITY.5. FOR BRACED WALLS, AXIAL CAPACITY FOR VERTICAL AND BATTERED PILES SHOULD BE REDUCED BY NEGLECTING CAPACITY WITHIN THE ZONE SHOWN ABOVE.
4. LOCAL STABILITY ANALYSIS WAS PERFORMED USING CONVENTIONAL LATERAL EARTH PRESSURE THEORY AND THE CWALSHT PROGRAM.
THE MINIMUM LWCR REQUIREMENT FOR CLAYS. 3. CONSIDERING FLOOD WATER AT EL 5, A MINIMUM SHEETPILE TIP AT EL -34.5 IS REQUIRED TO ACHIEVE THE MINIMUM LANE'S WEIGHTED CREEP RATIO (LWCR). THE RECOMMENDED PILE TIP ELEVATION EXCEED
2. THESE RESULTS WERE COMPUTED USING A FACTOR OF SAFETY OF 1.0. THEREFORE, ADEQUATE FACTORS OF SAFETY SHOULD BE APPLIED TO ALL STRUCTURAL COMPONENTS BY THE STRUCTURAL ENGINEER.
1. BOLD VALUES SHOWN IN THE TABLE ARE THE MINIMUM RECOMMENDED VALUES TO BE USED FOR DESIGN.
NOTES:
J.L.S.
CADD FILE:
DATE:
JOB NO.:
CHECKED BY:
DRAWN BY:
K.R.D.
23366
BR_WALL.DGNFIGURE 14
28 JULY 2017
GIS PURCHASE ORDER NO. GEL000345
TERREBONNE PARISH, LOUISIANA
FLOODGATE STRUCTURE AT BAYOU PETIT CAILLOU
TERREBONNE PARISH CONSOLIDATED GOVERNMENT
BRACED WALL ANALYSES
EL
EV
AT
ION
IN
FE
ET
(N
AV
D 8
8)
TOW EL 5
ANCHOR FORCE (F ) EL 1
LWL EL -1.0SHEETPILE
(SEE NOTE 5)WITHIN THESE ZONESBATTERED PILE CAPACITYNEGLECT VERTICAL AND
EL -17.0; FS = 1.0
TOP OF WALL (TOW) AT EL 5
EL -10EL -10
A
TOP OF PILE AT EL 2.5
S 1.05 (TOW) -17.0
S 1.55 (TOW) -19.5
3.4 10.7
(ELEVATION)LB-IN
DEFLECTIONSCALED
3
3.04 x 10 (-6)8
5.50 x 10 (-7)8
23366_GWL-1_TOW+5_FS1.0_Q-CASE_ANCHOR EL .OUT
23366_GWL-1_TOW+5_FS1.5_Q-CASE_ANCHOR EL .OUT
23366_GWL-1_TOW+5_FS1.0_S-CASE_ANCHOR EL .OUT
23366_GWL-1_TOW+5_FS1.5_S-CASE_ANCHOR EL .OUT
23366 FLOODWALL.GSZ
DISTANCE IN FEET
0 30
EL
EV
AT
ION
IN
FE
ET
(N
AV
D 8
8)
-60
0
30 BAYOU PETITE CAILLOU
5. EUSTIS ENGINEERING SHOULD BE CONTACTED IF THE CROSS-SECTION HAS CHANGED OR IF ANY ASSUMPTIONS PRESENTED HEREIN ARE NO LONGER VALID, SO THAT WE CAN REVISE OUR ENGINEERING ANALYSES.
4. ALTHOUGH NOT PRESENTED HEREIN, THE SLOPE STABILITY ANALYSES FOR THE TIE-IN SIDE SLOPES WERE ANALYZED. FACTORS OF SAFETY GREATER THAN 1.40 WERE COMPUTED.
3. REFER TO APPENDIX I FOR CROSS-SECTION FURNISHED BY GIS ENGINEERING, LLC.
2. A TENSION CRACK WAS INCORPORATED IN THE ANALYSIS TO ELIMINATE NEGATIVE BASE NORMAL FORCES AND NEGATIVE INTERSLICE FORCES WHEN FOUND AT THE BASE OF THE UPPER SLICES.
1. SLOPE STABILITY ANALYSES PERFORMED BY SPENCER'S METHOD OF SLICES USING SLOPE/W SOFTWARE, VERSION 8.16.1.13452 WITH OPTIMIZATION SEARCH ROUTINES.
NOTES:
A
60 90 120 150 180-30-60-90-120-150-180
-30
-90
J.L.S.
CADD FILE:
DATE:
JOB NO.:
CHECKED BY:
DRAWN BY:
K.R.D.
23366
TIE-IN.DGNFIGURE 15
28 JULY 2017
GIS PURCHASE ORDER NO. GEL000345
TERREBONNE PARISH, LOUISIANA
FLOODGATE STRUCTURE AT BAYOU PETIT CAILLOU
TERREBONNE PARISH CONSOLIDATED GOVERNMENT
LEVEE TIE-INS
SLOPE STABILITY ANALYSES BY SPENCER'S METHOD
EL -85
EL -72
EL -60
EL -50
EL -40
EL -35
EL -26
EL -17
EL -6.5
EL 2.2
EL -1.5
3H:1V (SEE NOTE 4)
7007001059009001050CLAY15
6006001089009001080CLAY14
50050090700700900ORGANIC CLAY13
4004001126006001120SILTY CLAY12
4004001035005001030CLAY11
4004001095005001090CLAY10
001200012028SAND9
2502501204504501200SILTY CLAY8
4504501184504501180SILTY CLAY7
6006001186006001180SILTY CLAY6
6006001156006001150FILL
COMPACTED CLAY 5
20002000150200020001500CONCRETE SILL4
2002001002002001000FILL*
UNCOMPACTED 3
001320013240RIPRAP2
0062.40062.40WATER1
BASEAVG.BASEAVG.
COHESION
IN PCFWEIGHT
UNIT COHESION
IN PCFWEIGHT
UNIT
DEGREESANGLE INFRICTION
DESCRIPTIONNO.SOIL
VERTICALS 2 AND 3VERTICALS 1 AND 4
3H:1V (SEE NOTE 4)5
6
77
8
10
12
14
15
13
11
9
35' 35'
1
3H:1V
1H:1V3H:1V
3H:1V2H:1V
4
5
6
2
2
EL -10
SLOPE/W FILE NAME: 23366 TIE-INS_REVISED 3.GSZ
WEST, LT TO RT, TIE-IN EE LOCAL1.401.91OPTIMIZATION
ENTRY EXIT WITH F
WEST, LT TO RT, TIE-IN EE1.401.41OPTIMIZATION
ENTRY EXIT WITH E
WEST, LT TO RT, TIE-IN BS1.401.94OPTIMIZATION
BLOCK SPECIFIED WITH D
EAST, RT TO LT, TIE-IN EE LOCAL (2)1.402.58OPTIMIZATION
ENTRY EXIT WITHC
EAST, RT TO LT, TIE-IN EE1.401.70OPTIMIZATION
ENTRY EXIT WITHB
EAST, RT TO LT, TIE-IN BS1.401.96OPTIMIZATION
BLOCK SPECIFIED WITH A
SUBFILE NAME
SAFETYFACTOR OF REQUIRED MINIMUM
SAFETYFACTOR OF COMPUTED MINIMUM
TYPE OF SEARCHDESIGNATION
SLIP
EL -1
VERTICAL 1 VERTICAL 2 VERTICAL 3 VERTICAL 4
B
C
D
EF
EL 5 EL 5
EXISTING MUDLINE
WEST SIDE EAST SIDE
(1' THICK)
EL -9EL -8
2' THICK
2H:1V
2H:1V
2
EL -13
(2' THICK)EL -6.5
3
* RECOMMENDED BUTTRESS BERM
71
523
378
542
398
519
369
431
13281078
0123456
89
10
1213
15.5
18.5
21.523242526272829303132333435363738394041424344
474849
74
93
87
73
56
62
78
81
4745
39423536363133
393533
2627
22
23
4933344740625075618377626145434040443939357580
839396
106
121
117
107
97
101
112
112
9288
0
0
0
0
0
0
0
0
0 0
29
64
96
41
19
25
25
22
10
39
71
19
-#200 = 89.8%
10
10
2
Very soft to soft gray & dark gray siltyclay w/some organic matter
Soft to medium stiff gray silty clay
w/trace of decayed wood
Loose gray silty sandLoose gray clayey silt w/some fine sand
Loose gray & tan fine sand
Very loose gray & tan fine sandMedium stiff gray silty clay w/clay layersMedium stiff gray clay w/few silt pockets& trace of organic matterMedium stiff gray silty clay w/clay layersSoft to medium stiff gray clay w/few siltpockets, trace of concretions, & organicmatter
w/few concretions, decayed wood, & trace of silt pockets w/silt pockets & lenses
Soft gray silty clay w/trace of concretions
Soft gray clay w/silt pockets & lensesSoft gray silty clay w/some shell fragments
Soft gray & tan clay w/trace of siltpockets & decayed wood
Stiff gray, dark gray, & brown organic clay w/decayed wood w/some organic matter & trace of
CL
CL
SMML
SP
SPCL
CHCLCH
CL
CHCL
CH
OH
OB
OB
UU
UU
OB
UU
OB
UU
UU OB
1A1B1C1D2A2B2C
3A3B3C
4A4B
PB-5
PB-6
PB-78A8B8C8D9A9B9C9D
10A10B10C10D11A11B11C11D12A12B12C12D13A13B
14A14B14C
SPLR
Visual Classification USC SampleNumber
Depthin Feet
Density
Drypcf
Wetpcf
Shear Tests Atterberg LimitsOther Tests
Scale inFeet PP
0
5
10
15
20
25
30
35
40
45
50
SPT SymbolWater
Content% Type C
psf LL PL PI
EU
ST
IS G
INT
LIB
RA
RY
0120
17.
GLB
EE
ST
AN
DA
RD
BO
RIN
G L
OG
233
66.G
PJ
7/2
8/17
Page 1 of 4
NOTES: Boring drilled in 7' of water
LOG OF BORING AND TEST RESULTS
See Text175.0 ft
-6.4NAVD88Date:
23366
Water Depth:Total Depth:
Elevation:Datum:
Project No:
29.38738°-90.61733°
Terrebonne Parish ConsolidatedGovernment
Floodgate Structure at Bayou PetitCaillou
Terrebonne Parish, Louisiana
01/04/2017 - 01/09/2017Boring: B-1U
Longitude:Latitude:
925
1343
936
1004
567
10361319
1466
454
788
532
552
1035821
5051525354555657585960616263646566676869707172737475767778798081828384858687888990919293949596979899
61
78
73
69
83
7956
64
85
7372
69
76
6871
11666656565464238434858484748495584333836363442726154603534303137363436484942543340564237385655515563
101
111
107
106
115
11296
103
116
99107
106
108
105108
0
0
0
0
0
0 0
0
0
0
0
0
0 0
109
79
3048
26
25
2126
83
54
922
CONS0.25
0.25
0.25
0.25
0.50
0.50
decayed woodStiff gray, dark gray, & brown organic clayw/few silt pocketsMedium stiff to stiff gray clay w/trace of silt pockets & shell fragments w/trace of silt pockets & decayed wood w/few silt pockets & trace of roots
w/some wood & trace of silt pockets
w/some organic matter, decayed wood, & trace of silt pockets
w/decayed wood, organic matter, trace of silt pockets, & concretionsMedium stiff to stiff gray silty clayw/trace of concretions w/trace of organic matter
w/clay layers & trace of concretionsStiff gray clay w/few decayed wood & siltpockets w/few silt pockets & lenses, & trace of decayed wood
Stiff gray silty clay w/trace of concretions
Soft to medium stiff gray clay w/siltpocketsSoft to medium stiff gray & tan silty clay
Medium stiff gray clay w/silt pockets &lenses w/silty sand lenses & layersSoft to medium stiff gray silty clay w/claylayersSoft to stiff gray clay w/few silt pockets &lenses, & trace of shell fragments w/silty sand pockets & lenses w/silt pockets w/silty sand lenses & layers, & trace of concretions w/trace of silty sand pockets & shell fragments w/trace of silt pockets & concretions
OHCH
CL
CH
CL
CHCL
CH
CLCH
UU
OB
UU
OB
UU
UU OB
UU
OB
UU
OB
UU
UU OB
14D15A15B15C15D16A16B16C16D17A17B17C17D18A18B18C18D19A19B19C19D20A20B20C20D21A21B21C21D22A22B22C22D23A23B23C23D24A24B24C24D25A25B25C25D26A26B26C26D27A
SPLR
Visual Classification USC SampleNumber
Depthin Feet
Density
Drypcf
Wetpcf
Shear Tests Atterberg LimitsOther Tests
Scale inFeet PP
50
55
60
65
70
75
80
85
90
95
100
SPT SymbolWater
Content% Type C
psf LL PL PI
EU
ST
IS G
INT
LIB
RA
RY
0120
17.
GLB
EE
ST
AN
DA
RD
BO
RIN
G L
OG
233
66.G
PJ
7/2
8/17
Page 2 of 4
NOTES: Boring drilled in 7' of water
LOG OF BORING AND TEST RESULTS
See Text175.0 ft
-6.4NAVD88Date:
23366
Water Depth:Total Depth:
Elevation:Datum:
Project No:
29.38738°-90.61733°
Terrebonne Parish ConsolidatedGovernment
Floodgate Structure at Bayou PetitCaillou
Terrebonne Parish, Louisiana
01/04/2017 - 01/09/2017Boring: B-1U
Longitude:Latitude:
1472
13461466
1386
225
2086
763917
631
1372
1345
2208
4016
1697
100101102103104105106107108109110111112
115116117118119120121122123124125126127128129130131132133134135136137
139140141142143144145146147148149
640
5958
84
58
42
8288
86
73
73
66
50
79
59607294676860353835446368
861045858363934344235
243333494254485053545676
6579788535364151282829
1023
9998
115
98
85
114118
116
108
109
103
90
112
0
0 0
0
0
0
0 0
0
0
0
0
0
0
114
32
91
195
26
34
21
25
68
23
80
11
66
127
3
CONS
0.50
0.50
0.25
0.25
0.25
1.25
0.50
0.75
Stiff gray clay w/trace of silt pockets &concretions w/some decayed wood, trace of silty sand pockets, & shell fragmentsMedium stiff brown & gray organic clayw/decayed woodStiff gray clay w/trace of silt pockets &decayed wood w/some decayed wood & roots, & few silt pocketsMedium stiff to stiff gray silty clay w/fewconcretionsStiff gray clay w/some silt pockets &lenses w/few silt pocketsMedium stiff gray clay w/few silty sandpockets, trace of shell fragments, &decayed woodVery stiff dark gray & gray organic clayw/decayed woodVery stiff gray clay w/trace of silt pockets& decayed woodMedium stiff gray silty clay w/trace of concretions
Stiff gray clay w/silt pockets & lensesStiff gray silty clay
Stiff to very stiff gray, tan, &reddish-brown clay w/trace of siltpockets w/few silt pockets w/few silt pockets & lenses, & trace of concretions w/some decayed wood & roots
Hard dark gray, gray, & brown organicclay w/decayed wood
Stiff gray silty clay w/trace of decayedwoodStiff gray clay w/trace of silt pockets &decayed wood w/few silt pockets & trace of decayed woodMedium dense gray clayey silt w/some
CH
OHCH
CLCH
CH
OHCH
CL
CHCL
CH
OH
CL
CH
ML
UU
OB UU
UU
OB
UU
OB UU
UU
OB
UU
OB
UU
OB
27B27C27D28A28B28C28D29A29B29C29D30A30B
31A31B31C31D32A32B32C32D33A33B33C33D34A34B34C34D35A35B35C35D36A36B36C
37A37B37C37D38A38B38C38D39A39B39C
SPLR
Visual Classification USC SampleNumber
Depthin Feet
Density
Drypcf
Wetpcf
Shear Tests Atterberg LimitsOther Tests
Scale inFeet PP
100
105
110
115
120
125
130
135
140
145
150
SPT SymbolWater
Content% Type C
psf LL PL PI
EU
ST
IS G
INT
LIB
RA
RY
0120
17.
GLB
EE
ST
AN
DA
RD
BO
RIN
G L
OG
233
66.G
PJ
7/2
8/17
Page 3 of 4
NOTES: Boring drilled in 7' of water
LOG OF BORING AND TEST RESULTS
See Text175.0 ft
-6.4NAVD88Date:
23366
Water Depth:Total Depth:
Elevation:Datum:
Project No:
29.38738°-90.61733°
Terrebonne Parish ConsolidatedGovernment
Floodgate Structure at Bayou PetitCaillou
Terrebonne Parish, Louisiana
01/04/2017 - 01/09/2017Boring: B-1U
Longitude:Latitude:
150.5
153.5
156.5
159.5
163.5
168.5
173.5
25
29
41
45
30
31
46
31
29
37
36
22
22
24
fine sand lensesDense tan & gray silty sandMedium dense to dense gray & tanclayey sand
Hard gray silty clay w/trace of shellfragments
Hard gray clay w/few silty sand pockets &trace of decayed woodVery stiff gray silty clay w/trace oforganic matter
Compact gray clayey silt
Very stiff gray silty clay
SMSC
CL
CHCL
ML
CL
PB-40
PB-41
PB-42
PB-43
PB-44
PB-45
PB-46
SPLR
Visual Classification USC SampleNumber
Depthin Feet
Density
Drypcf
Wetpcf
Shear Tests Atterberg LimitsOther Tests
Scale inFeet PP
150
155
160
165
170
175
180
185
190
195
200
SPT SymbolWater
Content% Type C
psf LL PL PI
EU
ST
IS G
INT
LIB
RA
RY
0120
17.
GLB
EE
ST
AN
DA
RD
BO
RIN
G L
OG
233
66.G
PJ
7/2
8/17
Page 4 of 4
NOTES: Boring drilled in 7' of water
LOG OF BORING AND TEST RESULTS
See Text175.0 ft
-6.4NAVD88Date:
23366
Water Depth:Total Depth:
Elevation:Datum:
Project No:
29.38738°-90.61733°
Terrebonne Parish ConsolidatedGovernment
Floodgate Structure at Bayou PetitCaillou
Terrebonne Parish, Louisiana
01/04/2017 - 01/09/2017Boring: B-1U
Longitude:Latitude:
1188
299
442
550
899
490
580
410
0
2
5
8
11
14
19
23
28
33
38
43
48
96
88
94
94
75
78
69
82
17
24
34
30
29
30
24
47
40
43
53
39
119
118
121
122
110
112
105
114
0
0
0
0
0
0
0
0
46
43
60
39
23
22
19
19
23
21
41
20
-#200 = 2.7%
1.00
0.50
0.25
0.75
1.00
1.00
0.75
0.75
1.00
0.50
Stiff gray & brown silty clay w/roots &vegetation
Soft gray & tan silty clay w/trace of shellfragments
Medium stiff gray silty clay w/trace ofshell fragments
Loose gray fine sand w/trace of silt
Soft to medium stiff gray clay w/trace ofsilt pockets & organic matter
w/some silt lenses & pockets, & some roots
w/silt pockets & trace of organic matter
w/few silt pockets & trace of organic matter
Soft to medium stiff gray silty clay w/claylenses
CL
CL
CL
SP
CH
CL
OB
OB
OB
OB
OB
OB
OB
OB
PB-1
2
3
4
5
6
7
PB-8
9
10
11
12
13
SPLR
Visual Classification USC SampleNumber
Depthin Feet
Density
Drypcf
Wetpcf
Shear Tests Atterberg LimitsOther Tests
Scale inFeet PP
0
5
10
15
20
25
30
35
40
45
50
SPT SymbolWater
Content% Type C
psf LL PL PI
EU
ST
IS G
INT
LIB
RA
RY
0120
17.
GLB
EE
ST
AN
DA
RD
BO
RIN
G L
OG
233
66.G
PJ
7/2
8/17
Page 1 of 3
NOTES:
LOG OF BORING AND TEST RESULTS
See Text120.0 ft
2.5NAVD88Date:
23366
Water Depth:Total Depth:
Elevation:Datum:
Project No:
29.38732°-90.61708°
Terrebonne Parish ConsolidatedGovernment
Floodgate Structure at Bayou PetitCaillou
Terrebonne Parish, Louisiana
11/21/2016 - 11/22/2016Boring: B-2
Longitude:Latitude:
610
767
720
501
568
53
58
63
68
73
78
83
88
93
98
89
69
67
83
75
31
74
54
43
58
51
38
39
45
59
117
106
105
115
109
0
0
0
0
0
100
60
29
27
71
33
SPECIFIC GRAVITY,CONS
SPECIFIC GRAVITY,CONS
0.25
0.75
1.00
1.00
0.50
0.25
0.25
0.25
0.25
Soft to medium stiff gray silty clay w/claylenses
Medium stiff gray & dark gray organicclay w/wood
Medium stiff gray clay w/trace of siltpockets
w/silt pockets & trace of organic matter
w/few silt pockets & decayed wood
w/silt lenses & layers
w/silty clay layers & trace of roots
w/silt lenses & pockets
w/few silt pockets
w/silt pockets & trace of wood
CL
OH
CH
OB
OB
OB
OB
OB
14
15
16
17
18
19
20
21
22
23
SPLR
Visual Classification USC SampleNumber
Depthin Feet
Density
Drypcf
Wetpcf
Shear Tests Atterberg LimitsOther Tests
Scale inFeet PP
50
55
60
65
70
75
80
85
90
95
100
SPT SymbolWater
Content% Type C
psf LL PL PI
EU
ST
IS G
INT
LIB
RA
RY
0120
17.
GLB
EE
ST
AN
DA
RD
BO
RIN
G L
OG
233
66.G
PJ
7/2
8/17
Page 2 of 3
NOTES:
LOG OF BORING AND TEST RESULTS
See Text120.0 ft
2.5NAVD88Date:
23366
Water Depth:Total Depth:
Elevation:Datum:
Project No:
29.38732°-90.61708°
Terrebonne Parish ConsolidatedGovernment
Floodgate Structure at Bayou PetitCaillou
Terrebonne Parish, Louisiana
11/21/2016 - 11/22/2016Boring: B-2
Longitude:Latitude:
809
711
935
853
103
108
113
118
73
89
75
73
46
31
45
49
106
117
109
109
0
0
0
0
85 23 62
0.25
0.75
1.00
1.00
Medium stiff gray clay w/silt pockets &trace of wood
w/few silt pockets & trace of decayed wood
Medium stiff to stiff gray silty clayw/some silty sand pockets
Medium stiff to stiff gray clay w/few siltlenses & pockets
w/few silt pockets & lenses
CH
CL
CH
OB
OB
OB
OB
24
25
26
27
SPLR
Visual Classification USC SampleNumber
Depthin Feet
Density
Drypcf
Wetpcf
Shear Tests Atterberg LimitsOther Tests
Scale inFeet PP
100
105
110
115
120
125
130
135
140
145
150
SPT SymbolWater
Content% Type C
psf LL PL PI
EU
ST
IS G
INT
LIB
RA
RY
0120
17.
GLB
EE
ST
AN
DA
RD
BO
RIN
G L
OG
233
66.G
PJ
7/2
8/17
Page 3 of 3
NOTES:
LOG OF BORING AND TEST RESULTS
See Text120.0 ft
2.5NAVD88Date:
23366
Water Depth:Total Depth:
Elevation:Datum:
Project No:
29.38732°-90.61708°
Terrebonne Parish ConsolidatedGovernment
Floodgate Structure at Bayou PetitCaillou
Terrebonne Parish, Louisiana
11/21/2016 - 11/22/2016Boring: B-2
Longitude:Latitude:
Tested By: ASR Checked By: RR
CONSOLIDATION TEST REPORT
Cv
(ft.2
/day)
0
2
4
6
8
10
Applied Pressure - tsf0.01 0.1 1 10
Void
Ratio
0.52
0.56
0.60
0.64
0.68
0.72
0.76
0.80
0.84
0.88
0.92
Natural Dry Dens.LL PI Sp. Gr.
Pc CcInitial Void
Saturation Moisture (pcf) (tsf) Ratio
99.0 % 32.3 % 89.0 30 9 2.63 2.4 0.23 0.858
SO G SICL CL
23366 GIS ENGINEERING, L.L.C., LOUISIANA
TERREBONNE PARISH CONSOLIDATED GOVERNMENTFLOODGATE STRUCTURE BAYOU PETIT CAILLO, TERREBONNE PARISH,
MATERIAL DESCRIPTION USCS AASHTO
Project No. Client: Remarks:
Project:
Source of Sample: B-1U Depth: 80.0' Sample Number: 22B
Figure
Tested By: ASR Checked By: RR
CONSOLIDATION TEST REPORT
Cv
(ft.2
/day)
0
0.02
0.04
0.06
0.08
0.1
Applied Pressure - tsf0.1 1 10
Void
Ratio
0.4
0.5
0.6
0.7
0.8
0.9
1.0
1.1
1.2
1.3
1.4
Natural Dry Dens.LL PI Sp. Gr.
Pc CcInitial Void
Saturation Moisture (pcf) (tsf) Ratio
97.9 % 46.9 % 73.4 91 66 2.69 4.0 0.78 1.288
ST G CL W/ FEW SI POC & LENS, TR-CONC (FLOC) CH
23366 GIS ENGINEERING, L.L.C., LOUISIANA
TERREBONNE PARISH CONSOLIDATED GOVERNMENTFLOODGATE STRUCTURE BAYOU PETIT CAILLO, TERREBONNE PARISH,
MATERIAL DESCRIPTION USCS AASHTO
Project No. Client: Remarks:
Project:
Source of Sample: B-1U Depth: 133.0' Sample Number: 35C
Figure
Tested By: KE Checked By: RR
CONSOLIDATION TEST REPORT
Cv
(ft.2
/day)
0
0.01
0.02
0.03
0.04
0.05
Applied Pressure - tsf0.1 1 10
Void
Ratio
0.30
0.45
0.60
0.75
0.90
1.05
1.20
1.35
1.50
1.65
1.80
Natural Dry Dens.LL PI Sp. Gr.
Pc CcInitial Void
Saturation Moisture (pcf) (tsf) Ratio
99.9 % 60.1 % 63.8 100 71 2.65 1.8 0.76 1.595
SO G & DK G ORG CL W/ WD OH
23366 GIS ENGINEERING, L.L.C., LOUISIANA
TERREBONNE PARISH CONSOLIDATED GOVERNMENTFLOODGATE STRUCTURE BAYOU PETIT CAILLO, TERREBONNE PARISH,
MATERIAL DESCRIPTION USCS AASHTO
Project No. Client: Remarks:
Project:
Source of Sample: B-2 Depth: 58.0' Sample Number: 15
Figure