23
Selling Data Vault Dutch Data Vault Masters A Gathering of Creative Minds Presenter : Date: Note: Company: eMail: Twitter: Elwyn Lloyd Jones 5 June 2014 Sevenoaks Systems Ltd. [email protected]

Data Vault ReConnect Speed Presenting PM Part Four

Embed Size (px)

DESCRIPTION

Third set of 5x5 Speed Presenting Updates: 1) Selling Data Vault - Elwyn Lloyd Jones 2) DV as Leverage for Data Migration - Antoine Stelma 3) QUIPU in Banking - Juan-José van der Linden 4) Volvo Data Vault Automation - Frederik Naessens 5) Are we ready for a DV Conversion Standard - Frederik Naessens, Stijn Roelens, Kristof Vanduren

Citation preview

Page 1: Data Vault ReConnect Speed Presenting PM Part Four

Selling Data Vault

Dutch Data Vault MastersA Gathering of Creative Minds

Presenter: Date:

Note:

Company:eMail:

Twitter:

Elwyn Lloyd Jones5 June 2014

Sevenoaks Systems [email protected]

Page 2: Data Vault ReConnect Speed Presenting PM Part Four

Types of Argument

1. ad Verecundiam / ad HominemNSA, US Army, JP Morgan, ABN AMRO, KPN, Bank of England, Volvo, Mercedes, Volkswagen, Bill Inmon

2. ad Populum800 organizations

3. ad BaculumAudit-able system of records

4. Reducto ad Misericordiam Throw away and start from scratch Source integration => Enterprise crash

5. Up and UnderWhile client watches the BI - we’ll watch the DWH

6. Scallability (cost) – busting Moore’s LawNo columnar Netezza, Exadata, etc.

Page 3: Data Vault ReConnect Speed Presenting PM Part Four

Data Vault as leverage for Data Migration

Exploring the benefits

Dutch Data Vault MastersA Gathering of Creative Minds

Presenter: Date:

Note:

Company:eMail:

Twitter:

Antoine StelmaJune 5 2014Presentation

Centennium [email protected]@antoinestelma

Page 4: Data Vault ReConnect Speed Presenting PM Part Four

Challenges

Client: • wants new ERP• 10 old source systems• own plant with intensive processes• MD/MT data is spread• unify & simplify architecture• business process changed

Page 5: Data Vault ReConnect Speed Presenting PM Part Four

Quest

A data warehouse that:• helps speeding up and unifying data migration• contains current data and processes• is a solid base for a new ERP • unifies master & meta data

Page 6: Data Vault ReConnect Speed Presenting PM Part Four

Two scenario’s

Source Source

Source SourceE D W

Source Source

Source Source

E D W

ERP

Module 1

Module 2 Module 3

Module 4

Module 5

Migrated data ETL

Source/MD/MT

Classic approach

Suggested approach

ERP

Module 1

Module 2 Module 3

Module 4

Module 5

Migrated data

ETL

Organization

Page 7: Data Vault ReConnect Speed Presenting PM Part Four

How?

• scope of data for migration• type DV • collect master & metadata in H+S• unify & data cleaning • relations/links/etc. • alignment between old source and new ERP

Page 8: Data Vault ReConnect Speed Presenting PM Part Four

Lessons (to be) Learned

#lesson1: An EDW can help you with data migration by using DV#lesson 2: EDW does not have to wait for full ERP implementation#lesson 3: It’s all about Data! # be creative

Page 9: Data Vault ReConnect Speed Presenting PM Part Four

in Banking

Enabling market risk data analysis

Dutch Data Vault MastersA Gathering of Creative Minds

Presenter: Date:

Note:

Company:eMail:

Twitter:

Juan-José van der LindenJune 5, 2014

[email protected]@OS_Quipu

Page 10: Data Vault ReConnect Speed Presenting PM Part Four

Bank Example

- Prudential Regulation Authority (PRA) - Prevent new financial crisis- Regular collection and storage data of firms’

trading book positions- Simulate risk scenarios

Page 11: Data Vault ReConnect Speed Presenting PM Part Four

High-level requirements

Deliver an effective stress testing capability:

– Report stress results with material accuracy and on a timely basis

Requires an industrial-strength infrastructure for data collection, risk analysis and reporting

Challenges:Need for a flexible data repository:

– Effective data management (model changes)

– Facilitate historical data analysis – Facilitate data provenance

management

Page 12: Data Vault ReConnect Speed Presenting PM Part Four

Architecture

Metadata

Data

Legend

Oracle data modeler

SQL Server

SSIS/SSAS/SSRS

Quipu

Tableau

Source data files

Matadata flow

Data flow

Based on

Stg DV 3NFETL

Src

SrcBM

xls Stg DV 3NFSSISSSIS

SSAS

SSIS

SSRS

Tableau

Page 13: Data Vault ReConnect Speed Presenting PM Part Four

Proof of Concept and Project

Three-week proof of concept:- 1 week business data model support- 1 week data warehouse development - 1 week demonstrating changes and developing

Tableau reporting

Project support:- Model validation- Quipu training- Architecture support and validation

Ongoing:- Quipu product support as part of software

license

Page 14: Data Vault ReConnect Speed Presenting PM Part Four

Takeaways

# 1 – Invest in getting the input 3NF business model.# 2 – Automation requires good data models.# 3 – Model and code generation drastically speeds up projects.# 4 – Generation tooling needs to support model changes. # 5 – Business value is made visible at reporting level.# 6 – DV modeling is an enabler, not the goal.

Page 15: Data Vault ReConnect Speed Presenting PM Part Four

Volvo DV Automation

Dutch Data Vault MastersA Gathering of Creative Minds

Presenter: Date:

Note:

Company:eMail:

Twitter:

Frederik NaessensJune 5 2014In cooperation with Stijn Roelens & Kristof [email protected]

Page 16: Data Vault ReConnect Speed Presenting PM Part Four

Volvo: criteria Automation Tool selection

Agile way of working– Handle migration between DEV-QA-PROD– Handle parallel development

Automation– Perform automatic data migration when data

model is modified– Automatically generate ELT code

Respect industry standards– Be netezza compliant– Generate a 100% Data Vault compliant data

model

Fluent interaction between business & it– Provide or interact with a business data model

Page 17: Data Vault ReConnect Speed Presenting PM Part Four

3D – Configure extended properties

Page 18: Data Vault ReConnect Speed Presenting PM Part Four

3D – Use predefined but flexible Model Conversion rules

Page 19: Data Vault ReConnect Speed Presenting PM Part Four

3D – Configure extended properties

Page 20: Data Vault ReConnect Speed Presenting PM Part Four

Are we ready for a Data Vault Standard?

Dutch Data Vault MastersA Gathering of Creative Minds

Presenter: Date:

Note:

Company:eMail:

Twitter:

Frederik NaessensJune 5 2014In cooperation with Stijn Roelens & Kristof [email protected]

Page 21: Data Vault ReConnect Speed Presenting PM Part Four

Wherescape 3D

What we do: • Configure Source/Business model using 3NF

modeling conventions• Add additional metadata at Table /

Column / Link / … level• Based on a set of preconfigured rules,

generate:– Data vault model– Staging model– Staging Out views

Page 22: Data Vault ReConnect Speed Presenting PM Part Four

Marketplace

Isn’t this what different software packages or consultancy firms are currently providing in the marketplace?

See:• Presentation of Lulzim Bilali on DWA

congress• QUIPU• BIReady• Generators built on top of data modeling

tools (Powerdesigner, ERWIN,… )

Page 23: Data Vault ReConnect Speed Presenting PM Part Four

DV Model Conversion standard

Is now not the moment to define a DV model conversion standard?Why?• Different tools can align to a single standard

and create synergies• This can be a catalysator to convince

organisations or people which are new to DV concepts

• Brings the focus to the really important concepts of Data Vault:

• Business keys• UOW• …