Fulvio Roman Direttore Project Management LA GESTIONE DELLE COMMESSE IMPIANTISTICHE CHIAVI IN MANO...

Preview:

Citation preview

Fulvio RomanDirettore Project Management

DANIELI

LA GESTIONE DELLE COMMESSE IMPIANTISTICHE“CHIAVI IN MANO”

& C. Officine Meccaniche S.p.a.

DANIELITHE RELIABLEINNOVATIVETEAMIN THE METALSINDUSTRY

Product lines

Product lines

Worldwide companies and offices

Danieli CompaniesFranceGermanySpainSweden

Danieli Offices BrazilCanadaChinaEgypt

United KingdomUSAThe Netherlands

RussiaIndiaKoreaMalaysia

MexicoTaiwanThailand

Danieli HeadquartersItaly

Danieli Scorecard

97

Complete turnkey plants, designed, engineered, manufactured, erected and commissioned worldwide since 1967

Gestione di una commessa Turn-Key

Premessa

2

1

3

Cosa è un contratto

Cosa è un Turn-Key Project

Gestione di una commessa Turn-Key

4.1 Basic Design4.2 Detail Engineering4.3 Procurement4.4 Manufacturing4.5 Workshop testing e Pre-shipment

inspections4.6 Shipment, Custom clearance and site

forwarding4.7 Construction and erection4.8 Commissioning, Performance

demonstration e Provisional Acceptance

4.9 Guarantee period e Final acceptance

Fasi principali di un Turn-Key Project4

Gestione di una commessa Turn-Key

> Uffici tecnici macchine e processo> Uffici tecnici sistemi ausiliari> Uffici tecnici opere civili / infrastrutture> Uffici tecnici sistemi fluidi> Uffici tecnici sistemi elettrici e automazione> Uffici gestione construction, erection e

commissioning> Ufficio Acquisti> Produzione> Expediting, collaudi, ispezioni> Spedizioni> Project Management, Project Planning,

Control & Administration> Uffici finanziari e legali

Interfacce interne commessa Chiave in mano5

Gestione di una commessa Turn-Key

> Organizzazione Clienti> Consulenti dei Clienti (Engineers)> Organizzazione di cantiere per construction,

erection e commissioning> Enti Certificatori indipendenti> Sub-fornitori di sistemi, materiali,

componenti e servizi> Uffici tecnici esterni> Sub-contrattisti opere civili e montaggi> Partners consortili / Joint Ventures> Enti finanziatori / Banche> Assicurazioni

Interfacce esterne commessa Chiave in mano6

Turn-key Project Key-Personnel Organisation chart

Safety Officier

Planning & quantity Survey

Quality Assurance Eng.Accounting & Cost control

Building erection

Mechanical equipment

Reheating furnacePiping and aux. Systems

HV / LV power distribution & Automation system

Mechanical

Electrical

Piping

Director, Projects

Sales Manager

Export Finance & L/C Manager

Legal Dept. Manager

Procurement Manager

Quality Manager

Client Project Manager & Project Management Staff

P.M. DMH

P.E. Rolling process

P.E. Mech. Equipment eng.P.E. Hydraulics Lubrication

P.E. Piping Utilities

P.E. Instrumentation

P.M. DCC

P.E. Combustion processP.E. L.V. Distribution

P.E. Automation

P.M. DE

P.C. WTP process

P.E. Civil & structural des.

P.E. Interconnecting pipingP.E. InstrumentationP.E. HVAC

P.E. Firefighting system

P.E. Compressed air system

P.C. Workshop laboratory eq.

P.C. Cranes

P.M. DA

Process CoordinatorP.E. Substation, HV - LV power distrib.P.E. Interconnecting cablingP.C. Automation system level 1

P.C. Automation system level 2

P.M. DCM

P.E. Meltshop process

P.E. Mech. Equipment engin.

P.E. Hydraulics lubrication

P.E. Piping utilitiesP.E. Instrumentation

Site Technical Office Field Engineers

Civil and infrastructure construction Supervisor

Erection Supervisors

Startup and commissioning Team

Material Man

Client Site manager & Staff

P.C. Spare parts

P.C. Packing & Shipping

P.C. Training

P.C. Operation, maintenance & safety manuals

P.C. Expediting / testing (E LE) P.C. Quality Control

P.C. Manufacturing & expediting

P.C. Procurement cc

Danieli Construction & Commissioning (UMAC)P.M. Construct Erection & Commiss.

Site Manager

Deputy Site Manager

Danieli Engineering (DE) Project Manager

Project Planning & Control

Contract Administr.

Automation

Aux. Systems

General Management Flow Chart (part 1)

SCHEDULE (LEV. III)

WORK BREAKDOWN

PRICE BREAKDOWN

JOB POSITION (TPC/JET)

INSPECTION TEST SCHEDULE (ITS)

CASH FLOW

(PART 2) (PART 3)

RESPONSIBILITY

CONTRACT & FINANCING TOOLS REQUIREMENTS

MASTER PLANT LIST

TECHNICAL SPECIFICATIONCONTRACT SCHEDULE PAYMENT METHOD/FORMALITIES

PICS (PROJECT INTEGRATED CONTROL SYSTEM)

General Management Flow Chart (part 2)

OUTSIDE (E/LE) INSIDE (I)

(PART 3)

ENGINEERING (DOCUMENT MANAGEMENT SYSTEM - DMS)

TECHN. DOCUMENTS

JOB POSITION (TPC / JET) from part 1

MATERIAL REQUIR.

PROCUREMENT

PURCHASE & ORDERS

MANUFACTURING

General Management Flow Chart (part 3)

INSPECTION & TESTING (NOI/IRE/LOC/QCTM)

OUTSIDE (E) INSIDE (I/LE)

INSPECTION TEST SCHEDULE (ITS)

(FROM PART 1)

CERTIFICATIONS (IRE)

SHIPPING & INVOICING

CERTIFICATION (IRP)

PACKING LIST

INSPECTION PLANNING

NOTICE OF SURVEILLANCE (NOS)

PACKING

COMMISSIONING

JOB POSITION (TPC/JET) (FROM PART 1)

RELEASE CERTIFICATE (RC)

PRICE BREAKDOWN (FROM PART 1)

MANUFACTURING (FROM PART 2)

INSPECTION PLANNING

NOTICE OF INSPECTION (NOI)

CONSTRUCTION & ERECTION WORKS SITE PROGRESS MANAGEMENT (SPM)

Master Plant List (example)

Estratto Livello 3: Plant Unit 31 (Typical)

Programmazione di Livello 3 (Typical)

Programmazione di Livello 4 (Typical)

Cut-off date: Progress (Typical)

Curve pianificate di avanzamento (Typical)

planned progress

0

10

20

30

40

50

60

70

80

90

100

1999 2000 20011998

%

N D J MF A M J J A S O N D J MF A M J J A S O N D J MF A

Valide per tutte le discipline e attività

Esempi di fasi di avanzamento lavori (parte 1)

Inizio disegno: 10%Prima stesura disegno: 20%Disegno commentato : 30%Disegno approvato interno: 30%Disegno approvato da Cliente: 10%

ESEMPIO DI FASI DI MANUFACTURING DI UNA MACCHINAApprovvigionamento grezzi: 10%Disponibilità grezzi: 10%Costruzione carpenteria: 10%Costruzione parti meccaniche: 10%Machining: 20%Assemblaggio sottogruppi: 10%Assemblaggio macchina: 15%Collaudo: 3%Protezioni superfici: 10%Approntamento per la spedizione: 2%

ESEMPIO DI FASI DI ESECUZIONE DI UN DISEGNO

ESEMPIO DI FASI DI ESECUZIONE DI UNA FONDAZIONEScavo: 5%Getto magrone: 2%Casseforme: 28%Ferri di armatura: 35%Getto cementi: 25%Disarmo e finitura/curing: 5%

ESEMPIO DI FASI DI ESECUZIONE MONTAGGIO TUBAZIONI

Movimentazione: 5%Assiemaggio a terra: 25%Montaggio supporteria: 15%Montaggio e saldatura linee: 35%Controlli non distruttivi: 5%Decappaggio e flussaggio: 10%Collaudi: 5%

Esempi di fasi di avanzamento lavori (parte 2)

Gestione di una commessa Turn-Key

> M.P.L. (Master Plant List)> D.M.S. (Documentation Management

System)> Procurement & Manufacturing Progress> Pre-shipment inspection> Shipment> Invoicing> Cash-flow> Construction & erection> Commissioning & Performance test

Funzionalità e strumenti del P.I.C.S.

Gestione di una commessa Turn-Key

Project Manager

Recommended