Upload
raimonda-foti
View
217
Download
3
Tags:
Embed Size (px)
Citation preview
Fulvio RomanDirettore Project Management
DANIELI
LA GESTIONE DELLE COMMESSE IMPIANTISTICHE“CHIAVI IN MANO”
& C. Officine Meccaniche S.p.a.
DANIELITHE RELIABLEINNOVATIVETEAMIN THE METALSINDUSTRY
Product lines
Product lines
Worldwide companies and offices
Danieli CompaniesFranceGermanySpainSweden
Danieli Offices BrazilCanadaChinaEgypt
United KingdomUSAThe Netherlands
RussiaIndiaKoreaMalaysia
MexicoTaiwanThailand
Danieli HeadquartersItaly
Danieli Scorecard
97
Complete turnkey plants, designed, engineered, manufactured, erected and commissioned worldwide since 1967
Gestione di una commessa Turn-Key
Premessa
2
1
3
Cosa è un contratto
Cosa è un Turn-Key Project
Gestione di una commessa Turn-Key
4.1 Basic Design4.2 Detail Engineering4.3 Procurement4.4 Manufacturing4.5 Workshop testing e Pre-shipment
inspections4.6 Shipment, Custom clearance and site
forwarding4.7 Construction and erection4.8 Commissioning, Performance
demonstration e Provisional Acceptance
4.9 Guarantee period e Final acceptance
Fasi principali di un Turn-Key Project4
Gestione di una commessa Turn-Key
> Uffici tecnici macchine e processo> Uffici tecnici sistemi ausiliari> Uffici tecnici opere civili / infrastrutture> Uffici tecnici sistemi fluidi> Uffici tecnici sistemi elettrici e automazione> Uffici gestione construction, erection e
commissioning> Ufficio Acquisti> Produzione> Expediting, collaudi, ispezioni> Spedizioni> Project Management, Project Planning,
Control & Administration> Uffici finanziari e legali
Interfacce interne commessa Chiave in mano5
Gestione di una commessa Turn-Key
> Organizzazione Clienti> Consulenti dei Clienti (Engineers)> Organizzazione di cantiere per construction,
erection e commissioning> Enti Certificatori indipendenti> Sub-fornitori di sistemi, materiali,
componenti e servizi> Uffici tecnici esterni> Sub-contrattisti opere civili e montaggi> Partners consortili / Joint Ventures> Enti finanziatori / Banche> Assicurazioni
Interfacce esterne commessa Chiave in mano6
Turn-key Project Key-Personnel Organisation chart
Safety Officier
Planning & quantity Survey
Quality Assurance Eng.Accounting & Cost control
Building erection
Mechanical equipment
Reheating furnacePiping and aux. Systems
HV / LV power distribution & Automation system
Mechanical
Electrical
Piping
Director, Projects
Sales Manager
Export Finance & L/C Manager
Legal Dept. Manager
Procurement Manager
Quality Manager
Client Project Manager & Project Management Staff
P.M. DMH
P.E. Rolling process
P.E. Mech. Equipment eng.P.E. Hydraulics Lubrication
P.E. Piping Utilities
P.E. Instrumentation
P.M. DCC
P.E. Combustion processP.E. L.V. Distribution
P.E. Automation
P.M. DE
P.C. WTP process
P.E. Civil & structural des.
P.E. Interconnecting pipingP.E. InstrumentationP.E. HVAC
P.E. Firefighting system
P.E. Compressed air system
P.C. Workshop laboratory eq.
P.C. Cranes
P.M. DA
Process CoordinatorP.E. Substation, HV - LV power distrib.P.E. Interconnecting cablingP.C. Automation system level 1
P.C. Automation system level 2
P.M. DCM
P.E. Meltshop process
P.E. Mech. Equipment engin.
P.E. Hydraulics lubrication
P.E. Piping utilitiesP.E. Instrumentation
Site Technical Office Field Engineers
Civil and infrastructure construction Supervisor
Erection Supervisors
Startup and commissioning Team
Material Man
Client Site manager & Staff
P.C. Spare parts
P.C. Packing & Shipping
P.C. Training
P.C. Operation, maintenance & safety manuals
P.C. Expediting / testing (E LE) P.C. Quality Control
P.C. Manufacturing & expediting
P.C. Procurement cc
Danieli Construction & Commissioning (UMAC)P.M. Construct Erection & Commiss.
Site Manager
Deputy Site Manager
Danieli Engineering (DE) Project Manager
Project Planning & Control
Contract Administr.
Automation
Aux. Systems
General Management Flow Chart (part 1)
SCHEDULE (LEV. III)
WORK BREAKDOWN
PRICE BREAKDOWN
JOB POSITION (TPC/JET)
INSPECTION TEST SCHEDULE (ITS)
CASH FLOW
(PART 2) (PART 3)
RESPONSIBILITY
CONTRACT & FINANCING TOOLS REQUIREMENTS
MASTER PLANT LIST
TECHNICAL SPECIFICATIONCONTRACT SCHEDULE PAYMENT METHOD/FORMALITIES
PICS (PROJECT INTEGRATED CONTROL SYSTEM)
General Management Flow Chart (part 2)
OUTSIDE (E/LE) INSIDE (I)
(PART 3)
ENGINEERING (DOCUMENT MANAGEMENT SYSTEM - DMS)
TECHN. DOCUMENTS
JOB POSITION (TPC / JET) from part 1
MATERIAL REQUIR.
PROCUREMENT
PURCHASE & ORDERS
MANUFACTURING
General Management Flow Chart (part 3)
INSPECTION & TESTING (NOI/IRE/LOC/QCTM)
OUTSIDE (E) INSIDE (I/LE)
INSPECTION TEST SCHEDULE (ITS)
(FROM PART 1)
CERTIFICATIONS (IRE)
SHIPPING & INVOICING
CERTIFICATION (IRP)
PACKING LIST
INSPECTION PLANNING
NOTICE OF SURVEILLANCE (NOS)
PACKING
COMMISSIONING
JOB POSITION (TPC/JET) (FROM PART 1)
RELEASE CERTIFICATE (RC)
PRICE BREAKDOWN (FROM PART 1)
MANUFACTURING (FROM PART 2)
INSPECTION PLANNING
NOTICE OF INSPECTION (NOI)
CONSTRUCTION & ERECTION WORKS SITE PROGRESS MANAGEMENT (SPM)
Master Plant List (example)
Estratto Livello 3: Plant Unit 31 (Typical)
Programmazione di Livello 3 (Typical)
Programmazione di Livello 4 (Typical)
Cut-off date: Progress (Typical)
Curve pianificate di avanzamento (Typical)
planned progress
0
10
20
30
40
50
60
70
80
90
100
1999 2000 20011998
%
N D J MF A M J J A S O N D J MF A M J J A S O N D J MF A
Valide per tutte le discipline e attività
Esempi di fasi di avanzamento lavori (parte 1)
Inizio disegno: 10%Prima stesura disegno: 20%Disegno commentato : 30%Disegno approvato interno: 30%Disegno approvato da Cliente: 10%
ESEMPIO DI FASI DI MANUFACTURING DI UNA MACCHINAApprovvigionamento grezzi: 10%Disponibilità grezzi: 10%Costruzione carpenteria: 10%Costruzione parti meccaniche: 10%Machining: 20%Assemblaggio sottogruppi: 10%Assemblaggio macchina: 15%Collaudo: 3%Protezioni superfici: 10%Approntamento per la spedizione: 2%
ESEMPIO DI FASI DI ESECUZIONE DI UN DISEGNO
ESEMPIO DI FASI DI ESECUZIONE DI UNA FONDAZIONEScavo: 5%Getto magrone: 2%Casseforme: 28%Ferri di armatura: 35%Getto cementi: 25%Disarmo e finitura/curing: 5%
ESEMPIO DI FASI DI ESECUZIONE MONTAGGIO TUBAZIONI
Movimentazione: 5%Assiemaggio a terra: 25%Montaggio supporteria: 15%Montaggio e saldatura linee: 35%Controlli non distruttivi: 5%Decappaggio e flussaggio: 10%Collaudi: 5%
Esempi di fasi di avanzamento lavori (parte 2)
Gestione di una commessa Turn-Key
> M.P.L. (Master Plant List)> D.M.S. (Documentation Management
System)> Procurement & Manufacturing Progress> Pre-shipment inspection> Shipment> Invoicing> Cash-flow> Construction & erection> Commissioning & Performance test
Funzionalità e strumenti del P.I.C.S.
Gestione di una commessa Turn-Key
Project Manager