EINRIP Project Handover Road Safety Audits Project PHO RSA Closing Meeting, Makassar

30 April 2012

David Williamson

Road Safety Auditor

VicRoads International

2

South Sulawesi ESS-01 : Sengkang – Impa Impa – Tarumpakkae

Construction in progress in accordance with original design plans

Road safety audit (RSA) of detailed design plans conducted in June 2007

Design incorporates some of the recommendations of the RSA

Work still to be completed: • Shoulder sealing • Traffic islands at two major intersections • Guardrail installation • Pavement markings

3

Delineation of curves

4

Delineation of hazards

5

Delineation of hazards

6

Removal of hazards

7

Intersections – Jl. Bau Baharuddin (0+170)

Existing island to be

remove and new island

to be constructed as per

the design

8

Intersections – Jl. Rusa (1+300)

9

Intersections – Jl. A Baso (3+250)

10

Speed limits

11

Signs

12

South Sulawesi ESS-02 : Bantaeng – Bulukumba

Construction is complete - PHO 12 March 2012

Variation order for additional road safety works based on the RSA of the detailed design has been prepared and is awaiting approval

13

Guardrail – terminals

14

Guardrail – connection at bridges

15

Guardrail – overlapping of panels

16

Guardrail – connection at bridges

17

Guardrail – length

18

Intersection at Sta. 6+100

19

Intersection at Sta. 24+090

20

Roadside hazards

21

Parking lane at the market (4+375)

22

Obscured signs

23

End of project at Bulukumba

24