24
28/06/2022 BPD Zenith UK | Canada | USA | Australia | New Zealand Planning & Scheduling Presentation Presented by Mark Michael – BDM/Sales Manager Nov 2015

Maximo Planning & Scheduling - BPD Zenith Presentation

Embed Size (px)

Citation preview

Page 1: Maximo Planning & Scheduling - BPD Zenith Presentation

02/05/2023 BPD Zenith UK | Canada | USA | Australia | New Zealand

Planning & Scheduling Presentation

Presented byMark Michael – BDM/Sales Manager

Nov 2015

Page 2: Maximo Planning & Scheduling - BPD Zenith Presentation

Company Overview

– BPD Zenith is a global full service provider of Maximo Asset Management solutions– Head Office in Carlisle (UK) with Offices in Aberdeen (UK), Houston (USA), Calgary

(Canada), Melbourne (Australia) and New Zealand

• Currently over 90 staff• Are an Award wining IBM Maximo

Premier Business Partner• Only Gold Accredited Partner in the Oil

& Gas industry• Offer Maximo on premise and

MaxiCloud off premise solutions and support options

• Are driving business platforms for future smarter operations within our Clients

Page 3: Maximo Planning & Scheduling - BPD Zenith Presentation

Recent Awards

2015 IBM Awards

• Beacon Award for innovation – Manifest Solution – awarded March 2015

• Global Business Partner of the Year for Asset Management – Awarded October 2015

Interconnect 2015

Insights 2015

Page 4: Maximo Planning & Scheduling - BPD Zenith Presentation

Maximo - Product Offering Extension

• Maximo Customisations– Email listener for PO & PR– Authorisations split by value and OPEX or CAPEX– Manifest solution

• Maximo Implementation Framework– Complete documentation pack

• Extension of BI packs in Cognos– AM Focus– Master data and process compliance

• Maxicloud – Fully Managed solution– Suites business of all sizes.– Removes the support and hardware burden.– Upgrades and patches included.– Rapid instal – can be done within 4 weeks for industry solutions

Page 5: Maximo Planning & Scheduling - BPD Zenith Presentation

Why Schedule?

• Increase Productivity– Reduce Waste - Clients typically see ~10% increase in

trades utilisation after implementation by eliminate cherry picking – ROI in months

– More time to deal with Backlog

• Better labour requirement forecasting– Reduction in contractor numbers– Identify conflicting jobs requiring the same resources

Page 6: Maximo Planning & Scheduling - BPD Zenith Presentation

Why Schedule?

• Consistent process• Reduce paper• Changes In org structure• Too may WO’s for any

person to make sense of• Remove inefficiencies• Understand the dynamic

nature when changes are made.

• Help the organisation move towards less reactive maintenance

Page 7: Maximo Planning & Scheduling - BPD Zenith Presentation

Asset Management Journey

Page 8: Maximo Planning & Scheduling - BPD Zenith Presentation

How to Schedule

1. Identify available time– Understand Trade availability

2. Prioritise– Most critical/essential 1st

3. Look at work grouped by– Site– Location– Supervisor– Work type– Status

4. Allow for contingency– Reduce this over time

5. Its an iterative process.

Page 9: Maximo Planning & Scheduling - BPD Zenith Presentation

Scheduling Product Options

• Maximo Scheduler• Solufy “Akwire” Scheduler• CiM Scheduling

Common functions• Graphical Scheduling• Graphical Assignment• Dispatching

Page 10: Maximo Planning & Scheduling - BPD Zenith Presentation

Product Comparison

Maximo Scheduler• Embedded into Maximo• In the same screen• Only need to buy licenses for the

Planners/Schedulers• Optimisation tool• SQL builder/Asset/location availability• May need additional server power• Some technical items to deal with

(simple installation (half day), – Java versions to be checked to view charts,

likely increase memory of your Database and Application servers, some minor tweaks –Xmx1024m, Update statistics, clear browser cache, etc)

Akwire Solution• Client Server architecture• Utilise your local system resources,

so very quick to process data• Easy to install• Available on V6, V7, V7.5 and V7.6• Works on all common browsers• Easier calendar changes – ctrl V

Page 11: Maximo Planning & Scheduling - BPD Zenith Presentation

Data Requirements

• Minimum is– Just need WO’s – default values set at 1hr for each WO if not present

• To use full functionality you will need:-– Calendars– Shifts– Crafts– Labour (with Calendars/Shifts applied)– Properly populated Job Plans– Properly populated PM records– Work OrdersDepending on functionality you utilize– Costs– GIS info– Special tools

• Any other the Scheduling products will show your data visually – warts and all !!• Our advice – spend some time cleaning up your data prior to putting scheduling in place, or better still, keep

it up to date regularly.

Page 12: Maximo Planning & Scheduling - BPD Zenith Presentation

Maximo Scheduler Applications

Page 13: Maximo Planning & Scheduling - BPD Zenith Presentation

Maximo Scheduler Roadmap

Major changes1.New name2.New Graphical Engine3.Focus on useability enhancements – ie over 40 click reductions

Page 14: Maximo Planning & Scheduling - BPD Zenith Presentation

Maximo Scheduler Applications

Page 15: Maximo Planning & Scheduling - BPD Zenith Presentation

Maximo Scheduler

• Create Schedules1. How many records you want to view – it

can’t be everything2. Add a Shift & Calendar3. Create Queries using GUI

1. APPR WO’s2. Craft3. etc

Page 16: Maximo Planning & Scheduling - BPD Zenith Presentation

Maximo Scheduler

• Ghantt chart view Moving Records1. Drag to a new date2. Right click on work

record3. Adjust dates in table4. Group work

If outside constraints then dashed line appears

Page 17: Maximo Planning & Scheduling - BPD Zenith Presentation

Maximo Scheduler

• Graphical Assignment

Colours change dependent on job status

Page 18: Maximo Planning & Scheduling - BPD Zenith Presentation

Schedule Cost

Budget Adherence• Commited estimated Total• Saved estimated Total• Actual total

Page 19: Maximo Planning & Scheduling - BPD Zenith Presentation

Dispatcher

• Understand your dynamic work day

Page 20: Maximo Planning & Scheduling - BPD Zenith Presentation

Optimisation

• Compare Scenarios

Page 21: Maximo Planning & Scheduling - BPD Zenith Presentation

Performance Enhancements

• Further information– Tune the database

– Performance best practice

– iFixes

Page 22: Maximo Planning & Scheduling - BPD Zenith Presentation

More Information

• Recent Webinar Series• Maximo Scheduler Webinar Recording: Part 1 https://ibm.biz/BdHz3v• Maximo Scheduler Webinar Recording: Part 2https://ibm.biz/BdHfCj

• Maximo Scheduler Webinar Recording: Part 3 – due 20th Nov

• Scheduler Wiki

Page 23: Maximo Planning & Scheduling - BPD Zenith Presentation

??? Mark Michael Sales & BDM Manager

[email protected] 0410 524 641

Page 24: Maximo Planning & Scheduling - BPD Zenith Presentation

Akwire vScheduler

• Functionally Rich including:– One Click Assignment– Multi-Assigment– Mass Move / Realignment– Add more in here