23
THESIS PROJECT THESIS PROJECT THESIS PROJECT THESIS PROJECT ESQUISSE ESQUISSE ESQUISSE ESQUISSE POST PRIMARY SCHOOL POST PRIMARY SCHOOL POST PRIMARY SCHOOL POST PRIMARY SCHOOL MULLINGAR MULLINGAR MULLINGAR MULLINGAR

School Esquisse

Embed Size (px)

Citation preview

Page 1: School Esquisse

THESIS PROJECT THESIS PROJECT THESIS PROJECT THESIS PROJECT ESQUISSEESQUISSEESQUISSEESQUISSE

POST PRIMARY SCHOOL POST PRIMARY SCHOOL POST PRIMARY SCHOOL POST PRIMARY SCHOOL MULLINGAR MULLINGAR MULLINGAR MULLINGAR

Page 2: School Esquisse

ARCHITECTURAL INTENTARCHITECTURAL INTENTARCHITECTURAL INTENTARCHITECTURAL INTENTARCHITECTURAL INTENTARCHITECTURAL INTENTARCHITECTURAL INTENTARCHITECTURAL INTENT

THE MAIN ARCHITECTURAL INTENT OF THE SCHOOL IS FOR THE STUDENTS TO BE ABLE TO READ HOW THE

BUILDING IS CONSTRUCTED. IN ORDER TO ACHIEVE THIS

EACH STRUCTURAL ELEMENT AND MATERIAL IS LEFT

EXPOSED . THIS CREATES A

THE MAIN ARCHITECTURAL INTENT OF THE SCHOOL IS FOR THE STUDENTS TO BE ABLE TO READ HOW THE

BUILDING IS CONSTRUCTED. IN ORDER TO ACHIEVE THIS

EACH STRUCTURAL ELEMENT AND MATERIAL IS LEFT

EXPOSED . THIS CREATES A

PROPOSED VIEW FROM INSIDE THE SCHOOL CARRIDORPROPOSED VIEW FROM INSIDE THE SCHOOL CARRIDORPROPOSED VIEW FROM INSIDE THE SCHOOL CARRIDORPROPOSED VIEW FROM INSIDE THE SCHOOL CARRIDOR

VIEW FROM INSIDE A CLASSROOMVIEW FROM INSIDE A CLASSROOMVIEW FROM INSIDE A CLASSROOMVIEW FROM INSIDE A CLASSROOM

CONTRAST BETWEEN THE BRICK TIMBER AND GLASS FINISHES THROUGHOUT THE SCHOOL.. EACH BUILDING IS

DESIGNED TO BE AS SUSTAINABLE AS POSSIBLE

BY UTILISING NATURAL STACK VENTILATION AND NATURAL LIGHT FROM THE

GLASS FACADES AND INTERNAL ATRIUM.

CONTRAST BETWEEN THE BRICK TIMBER AND GLASS FINISHES THROUGHOUT THE SCHOOL.. EACH BUILDING IS

DESIGNED TO BE AS SUSTAINABLE AS POSSIBLE

BY UTILISING NATURAL STACK VENTILATION AND NATURAL LIGHT FROM THE

GLASS FACADES AND INTERNAL ATRIUM.

SITE LAYOUTSITE LAYOUTSITE LAYOUTSITE LAYOUT

FIRST PERSON VIEW OF BUILDING (A)FIRST PERSON VIEW OF BUILDING (A)FIRST PERSON VIEW OF BUILDING (A)FIRST PERSON VIEW OF BUILDING (A) TYPICAL SECTION TYPICAL SECTION TYPICAL SECTION TYPICAL SECTION

Page 3: School Esquisse

SPACES REQUIRED BY THE DEPARTMENT OF EDUCATION BRIEF

SPACE PROVIDED BY THE ARCHITECT IN THEIR DESIGN

NO. OF SPACES TYPE OF SPACE DIMENSIONS AREA M2

NO. OF SPACES TYPE OF SPACE

DIMENSIONS AREA M3 NOTES / OBSERVATIONS

8 GENERAL CLASSROOMS 7X7 m 392 5 GENERAL CLASSROOMS 6.9 X 6.4 220 3 LESS + CLASSES ARE ONLY 44m3 LESS + CLASSES ARE ONLY 44m3 LESS + CLASSES ARE ONLY 44m3 LESS + CLASSES ARE ONLY 44m2222 SHOULD BE 49mSHOULD BE 49mSHOULD BE 49mSHOULD BE 49m2222

3 INTERLINKED CLASSROOMS3x (7x7 m) 147

6 INTERLINKED CLASSROOMS13.9 X 6.9 552NONE OF THE INTERLINKED ROOMS MEET THE NONE OF THE INTERLINKED ROOMS MEET THE NONE OF THE INTERLINKED ROOMS MEET THE NONE OF THE INTERLINKED ROOMS MEET THE DIMENSIONS REQUIREDDIMENSIONS REQUIREDDIMENSIONS REQUIREDDIMENSIONS REQUIRED

1 GROUP ROOM 7x 4.2 m 29 1 GROUP ROOM NOT PROVIDEDNOT PROVIDEDNOT PROVIDEDNOT PROVIDED

1 MUSIC/DRAMA AREA11.4 x 7 m 80

1 MUSIC/DRAMA AREA11.4 x 7 m 80 PROVIDED FOR IN BUILDING (B) COMBINED WITH

ART & DRAMA ROOM

BUILDING AUDITBUILDING AUDITBUILDING AUDITBUILDING AUDIT

1 LEARNING SUPPORT ROOM WITH STORE IN ROOM

9x 7 63 1 LEARNING SUPPORT ROOM WITH STORE IN ROOM

9x 7 63 NOT PROVIDEDNOT PROVIDEDNOT PROVIDEDNOT PROVIDED

1GUIDANCE SUITE (1 classroom + 1 office)

9x7 781

GUIDANCE SUITE (1 classroom + 1 office)

9x7 78 PROVIDED FOR IN BUILDING (B) COMBINED WITH MULTIMEDIA ROOM

1RELIGION ROOM (mediation area+ chaplains office)

7x7m +7x402m+4.8x3.2

m94 1

RELIGION ROOM (mediation area+ chaplains office)

7x7m +7x402m+4.8x3.2m

94 NOT PROVIDEDNOT PROVIDEDNOT PROVIDEDNOT PROVIDED

1 MATHS ROOM 9x7m 63 1 MATHS ROOM 9x7m 63 NOT PROVIDEDNOT PROVIDEDNOT PROVIDEDNOT PROVIDED

1 SOCIAL STUDIES ROOM 9X7m 63 1 SOCIAL STUDIES ROOM 57.5 AREA REQUIRED NOT PROVIDED

1MULTIMEDIA LEARNING LABOURATORY

11.4 x 7 m 801

MULTIMEDIA LEARNING LABOURATORY

11.4 x 7 m 80 PROVIDED FOR IN BUILDING (B) COMBINED WITH GUIDANCE SUITE

3SCIENCE LABOURATORIES & PREP AREA

11.41X7m +7X2.9m 3002

SCIENCE LABOURATORIES & PREP AREA 20.5 X 8.5m 346 ENOUGH AREA FOR 3 LABS BUT ONLY 2 PROVIDED

1 DEMONSTARTION ROOM 9X7m 63 1 DEMONSTARTION ROOM 9X7m 63 NOT PROVIDEDNOT PROVIDEDNOT PROVIDEDNOT PROVIDED

1ART & CRAFT ROOM AND STORES

14.2X7m 1001 ART / MUSIC /DRAMA ROOM 178

PROVIDED FOR IN BUILDING (B) COMBINED WITH MUSIC ROOM

1 HOME ECONOMICS ROOM + STORES

14.2X7m 100 1 HOME ECONOMICS ROOM + STORES 233 MORE THAN DOUBLE THE SPACE NEEDEDMORE THAN DOUBLE THE SPACE NEEDEDMORE THAN DOUBLE THE SPACE NEEDEDMORE THAN DOUBLE THE SPACE NEEDED

1ARCHITECTURAL TECHNOLOGY/MATERIALS TECHNOLOGY(WOOD)ROOM

14.2X9.6m 136 1ARCHITECTURAL TECHNOLOGY/MATERIALS TECHNOLOGY(WOOD)ROOM

295.6 COMBINED HOWEVER NOT ENOUGH SPACE PROVIDED

1 WOOD/TECHNOLOGY MACHINING AREA

14.2X4.6m 65 1 WOOD/TECHNOLOGY MACHINING AREA

COMBINED COMBINED HOWEVER NOT ENOUGH SPACE PROVIDED

1 ENGINEERING /METALWORK ROOM

14.2X9.6m 136 1 ENGINEERING /METALWORK ROOM

COMBINED COMBINED HOWEVER NOT ENOUGH SPACE PROVIDED

1 LIBRARY AND STORES 14.9X9.6m 136 1 LIBRARY AND STORES 447 OVER 3 TIMES THE AMOUNT OF SPACE REQUIRED AS PER THE BRIEFOVER 3 TIMES THE AMOUNT OF SPACE REQUIRED AS PER THE BRIEFOVER 3 TIMES THE AMOUNT OF SPACE REQUIRED AS PER THE BRIEFOVER 3 TIMES THE AMOUNT OF SPACE REQUIRED AS PER THE BRIEF3 SPECIAL TUITION ROOMS 7X3.2m 66 3 SPECIAL TUITION ROOMS 7X3.2m 66 NOT PROVIDEDNOT PROVIDEDNOT PROVIDEDNOT PROVIDED1 PRINCIPALS OFFICE 7X3.2m 22 1 PRINCIPALS OFFICE 15.7 TOO SMALL

1DEPUTY PRINCIPALS OFFICE

7X3.2m 22 1 DEPUTY PRINCIPALS OFFICE 14 TOO SMALL

1 GENERAL OFFICE 6X5m 30 1 GENERAL OFFICE 28 TOO SMALL1 PHOTOCOPY ROOM 3X2M 6 1 PHOTOCOPY ROOM 14 TOO BIG1 FIRST AID ROOM `4.8X3.2m 15 1 FIRST AID ROOM 14 TOO SMALL

1CARETAKERS WORK AREA

4.8X3.2m 15 1CARETAKERS WORK AREA NOT PROVIDEDNOT PROVIDEDNOT PROVIDEDNOT PROVIDED

1 MEETING ROOM 7X4.8m 34 1 MEETING ROOM 36 TOO BIG

Page 4: School Esquisse

NO. OF SPACES TYPE OF SPACE DIMENSIONS AREA M2

NO. OF SPACES TYPE OF SPACE DIMENSIONS AREA M3 NOTES / OBSERVATIONS

1 STAFF ROOM 12X9m 108 1 STAFF ROOM NOT PROVIDEDNOT PROVIDEDNOT PROVIDEDNOT PROVIDED1 PROJECT STORAGE 9X7m 63 1 PROJECT STORAGE NOT PROVIDEDNOT PROVIDEDNOT PROVIDEDNOT PROVIDED1 GENERAL STORAGE 9X7m 63 1 GENERAL STORAGE NOT PROVIDEDNOT PROVIDEDNOT PROVIDEDNOT PROVIDED

1DATA COMMUNICATION CENTER

4.8X3.2m 15 1DATA COMMUNICATION CENTER NOT PROVIDEDNOT PROVIDEDNOT PROVIDEDNOT PROVIDED

MAIN ENTRANCE 40 MAIN ENTRANCE ????????????????????????????????????????????

STUDENT ENTRANCE 20 STUDENT ENTRANCE ????????????????????????????????????????????1 DINING AREA 150 1 DINING AREA 242.5 FAR TOO BIG

BUILDING AUDITBUILDING AUDITBUILDING AUDITBUILDING AUDIT

DINING AREA DINING AREA 242.5 FAR TOO BIG 1 GP ROOM STORE 18 1 GP ROOM STORE NOT PROVIDEDNOT PROVIDEDNOT PROVIDEDNOT PROVIDED1 STAFF CHANGE AREA AND WC 48 1 STAFF CHANGE AREA AND WC NOT PROVIDEDNOT PROVIDEDNOT PROVIDEDNOT PROVIDED

CLOAKS AND BAG STORAGE 40 CLOAKS AND BAG STORAGE 184 TOO BIG

LOCKERS 111 LOCKERS COMBINEDTOILETS VISITORS + ACCESSIBLE 20 TOILETS VISITORS + ACCESSIBLE NO TOILETS PROVIDED IN ANY BUILDINGNO TOILETS PROVIDED IN ANY BUILDINGNO TOILETS PROVIDED IN ANY BUILDINGNO TOILETS PROVIDED IN ANY BUILDINGTOILETS STAFF 40 TOILETS STAFF NO TOILETS PROVIDED IN ANY BUILDINGNO TOILETS PROVIDED IN ANY BUILDINGNO TOILETS PROVIDED IN ANY BUILDINGNO TOILETS PROVIDED IN ANY BUILDINGTOILETS STUDENT ENTRANCE 133 TOILETS STUDENT ENTRANCE NO TOILETS PROVIDED IN ANY BUILDINGNO TOILETS PROVIDED IN ANY BUILDINGNO TOILETS PROVIDED IN ANY BUILDINGNO TOILETS PROVIDED IN ANY BUILDING

1 BOILER AND PLANT ROOM 40 1 BOILER AND PLANT ROOM NO PLANT ROOM PROVIDED FOR ANY BUILDINGNO PLANT ROOM PROVIDED FOR ANY BUILDINGNO PLANT ROOM PROVIDED FOR ANY BUILDINGNO PLANT ROOM PROVIDED FOR ANY BUILDING

1MAIN ELECTRICAL SWITCH GEAR ROOM

10 NOT PROVIDEDNOT PROVIDEDNOT PROVIDEDNOT PROVIDED

1 LIFT SHAFT PER BUILDING 10 1 LIFT SHAFT PER BUILDING NO LIFTS PROVIDED NO LIFTS PROVIDED NO LIFTS PROVIDED NO LIFTS PROVIDED ACCOMMODATION STAIRS 2.4 WIDE 50m2 PER

FLOORACCOMMODATION STAIRS 2.4 WIDE

ONLY 0NE STAIRS PER BUILDING

FIRE SECURE STAIRS NOT PROVIDEDNOT PROVIDEDNOT PROVIDEDNOT PROVIDED

1 PE HALL 33X 18m 594 1 PE HALL 587

3 PE HALL EQUIPTMENT STORES 60 3 PE HALL EQUIPTMENT STORES 749 91 PE TUTORS CONTROL ROOM 9 1 PE TUTORS CONTROL ROOM 9 NOT PROVIDEDNOT PROVIDEDNOT PROVIDEDNOT PROVIDED

2 CHANGING SUITES 80 2 CHANGING SUITES 80 NOT PROVIDEDNOT PROVIDEDNOT PROVIDEDNOT PROVIDED

1 UA & TUTOR CHANGING ROOMS12

1 UA & TUTOR CHANGING ROOMS12

NOT PROVIDEDNOT PROVIDEDNOT PROVIDEDNOT PROVIDED

1 FITNESS SUITE + STORE 100 1 FITNESS SUITE + STORE 100 NOT PROVIDEDNOT PROVIDEDNOT PROVIDEDNOT PROVIDED

1 VISITORS + ACCESSIBLE WC 10 1 VISITORS + ACCESSIBLE WC 10 NOT PROVIDEDNOT PROVIDEDNOT PROVIDEDNOT PROVIDED

2 GENERAL CLEANERS STORES 16 2 GENERAL CLEANERS STORES 16 NOT PROVIDEDNOT PROVIDEDNOT PROVIDEDNOT PROVIDED

5 HARD PLAY COURTS AREA 2550 5 HARD PLAY COURTS AREA 2550 NOT PROVIDEDNOT PROVIDEDNOT PROVIDEDNOT PROVIDED

48 CAR PARKING 48 CAR PARKING NOT PROVIDEDNOT PROVIDEDNOT PROVIDEDNOT PROVIDED

1 EXTERNAL STORAGE 10X 5m 50 1 EXTERNAL STORAGE 50 NOT PROVIDEDNOT PROVIDEDNOT PROVIDEDNOT PROVIDED

1COVERED AREA FOR CONSTRUCTION STUDIES 6X5m 30 1

COVERED AREA FOR CONSTRUCTION STUDIES 30

NOT PROVIDEDNOT PROVIDEDNOT PROVIDEDNOT PROVIDED

Page 5: School Esquisse

SITE ANALYSISSITE ANALYSISSITE ANALYSISSITE ANALYSIS

PROPOSED SITE OUTLINED IN REDPROPOSED SITE OUTLINED IN REDPROPOSED SITE OUTLINED IN REDPROPOSED SITE OUTLINED IN RED

VP1

VP2

PROPOSED SITE LAYOUTPROPOSED SITE LAYOUTPROPOSED SITE LAYOUTPROPOSED SITE LAYOUT

SITE PHOTOGRAPH FROM SITE PHOTOGRAPH FROM SITE PHOTOGRAPH FROM SITE PHOTOGRAPH FROM VP1 SITE PHOTOGRAPH FROM SITE PHOTOGRAPH FROM SITE PHOTOGRAPH FROM SITE PHOTOGRAPH FROM VP2

Page 6: School Esquisse

STRUCTURAL ANALYSISSTRUCTURAL ANALYSISSTRUCTURAL ANALYSISSTRUCTURAL ANALYSIS

EACH BUILDING CONSITS OF A SERIES OF BRICK PEERS WHICH ARE LOAD BEARING. THE PEERS RANGE IN WIDTH FROM 665mm TO 1115mm AND ARE USED TO INCORPERATE THE STACK VENTILATION SYSTEM AND SERVICES FOR THE BUILDING. LARGE GLULAM BEAMS SPAN BETWEEN THESE BRICK PEERS AND ARE TIRED TOGETHER USING STAINLESS STEEL FLITCH PLATES AND BOLTS. THIS CREATES A SERIES OF THREE TIMBER RING BEAMS GIVING THE BUILDING STABILITY.

SMALLER GLULAM BEAMS AT TWO METER CENTERS SPAN BETWEEN EACH RINGBEAM. THE GLUALMS ARE CONNECTED USING A PROPRITORY PRE GALVINISED CONCEALED BEAM HANGER. SEE HANGER DETAIL (A)

HANGER DETAIL (A)

44 X 150 C16 FLOOR JOIST AT 400 CENTERS SPAN THE TWO METERS BETWEEN EACH GLULAM BEAM .

Page 7: School Esquisse

STRUCTURAL ANALYSISSTRUCTURAL ANALYSISSTRUCTURAL ANALYSISSTRUCTURAL ANALYSIS

BETWEEN EACH BRICK PEER IS A SERIES OF LARGE TRIPLE GLAZED ALUCLAD WINDOWS. THE BUILDINGS ARE SET OUT ON A MODULAR GRID PATERN SO THAT THE WINDOWS ARE OF A REGULAR AND SIMILAR SIZE TO IMPROVE BUILDABILITY. ALL THE BRICK PEERS ARE SET OUT IN STANDARD BRICK DIMENSIONS TO OPTIMIZE MATERIAL USE AND COST.

THE ROOF ON EACH BUILDING IS A LIGHT WEIGHT EXTENSIVE GREEN ROOF.

TYPICAL CROSS SECTION 3D CUT AWAY SECTION

Page 8: School Esquisse

ENVIROMENTAL DESIGN AND SERVICESENVIROMENTAL DESIGN AND SERVICESENVIROMENTAL DESIGN AND SERVICESENVIROMENTAL DESIGN AND SERVICESINTRODUCTION:INTRODUCTION:INTRODUCTION:INTRODUCTION:THE SCHOOL IS DIVIDED UP INTO THREE MAIN BUILDINGS. TWO SQUARE SHAPED BUILDINGS AND ONE RECTANGULAR BUILDING ALL TWO STORIES IN HEIGHT. THE THREE BUILDINGS ARE POSITIONED TO SURROUND AN OPEN SPACE TRANSITION AREA FOR STUDENTS TO PASS THROUGH FROM ONE BUILDING TO THE OTHER

BUILDING ORIENTATION:BUILDING ORIENTATION:BUILDING ORIENTATION:BUILDING ORIENTATION:THE IDEAL BUILDING ORIENTATION IS THAT THE MAIN LONG AXIS OF THE BUILDING RUNS EAST-WEST, I.E. THE RIDGE LINE. YOU CAN MOVE THIS BY AS MUCH AS 20 DEGREES WITHOUT ILL EFFECT, BUT THE MOST GLASS ON THE BUILDING MUST BE FACING TOWARDS THE SUN.[1]

TAKING THIS INTO CONSIDERATION EACH BUILDING IS ROTATED FORTY DEGREES OFF MAGNETIC NORTH WHICH IS TWENTY DEGREES OFF SOLAR NORTH. THIS IS THE IDEAL ORIENTATION FOR SOLAR GAIN.

SPACE HEATING:SPACE HEATING:SPACE HEATING:SPACE HEATING:THE BUILDINGS ARE DESIGNED IN SUCH A WAY AS TO HIDE AS MUCH OF THE SERVICES AS POSSIBLE. THIS WILL BE ACHIEVED BY USING A WEBBED JOIST FLOORING

[1]Eco Who http://www.ecowho.com/articles/6/The_importance_of_building_orientation.html [accessed 19/02/2013]

SYSTEM THROUGHOUT, ALLOWING PIPE-WORK AND DUCTING TO PASS THROUGH ALL FLOORS. AN UNDER-FLOOR HEATING SYSTEM WILL BE INSTALLED AND A ZONED CONTROL SYSTEM CREATED TO HELP ACHIEVE MAXIMUM THERMAL COMFORT. BECAUSE OF THE LARGE WIDTH OF THE BRICK PEERS ALL SERVICES CAN BE PASSED TROUGH THE VOIDS CREATED.

Page 9: School Esquisse

ENVIROMENTAL DESIGN AND SERVICESENVIROMENTAL DESIGN AND SERVICESENVIROMENTAL DESIGN AND SERVICESENVIROMENTAL DESIGN AND SERVICESOVERHEATING:OVERHEATING:OVERHEATING:OVERHEATING:DUE TO THE EXCESSIVE AMOUNT OF GLAZING IN EACH FACADE, OVERHEATING WILL BE A BIG ISSUE WITH EACH BUILDING. IN ORDER TO OVERCOME THIS, A MIXTURE OF AUTOMATIC BLINDS AND BRISOLE WILL BE USED ON THE SOUTH AND EAST SIDES OF THE BUILDING. ALSO NATURAL VENTILATION WILL BE UTILIZED AS MUCH AS POSSIBLE. ALOT OF THE GLASS USED WILL BE LOW-EMISSIVITY (LOW-E). THIS OFTEN RESULTS IN MORE EFFICIENT WINDOWS BECAUSE: RADIANT HEAT ORIGINATING FROM INDOORS IS REFLECTED BACK INSIDE, THUS KEEPING HEAT INSIDE IN THE WINTER, AND INFRARED RADIATION FROM THE SUN IS REFLECTED AWAY, KEEPING IT COOLER INSIDE IN THE SUMMER.[1]

SURFACE WATER:SURFACE WATER:SURFACE WATER:SURFACE WATER:ALL THREE BUILDINGS WILL HAVE AN EXTENSIVE GREEN ROOF TO HELP RETAIN SOME OF THE RAIN WATER AND REDUCE THE AMOUNT OF SURFACE WATER RUN-OFF. THERE WILL BE SOME FORM OF SUSTAINABLE DRAINAGE SYSTEM (SUDS) INSTALLED AROUND THE SCHOOL AND IN PARTICULAR THE OPEN SPACE AREA IN-BETWEEN EACH BUILDING. PERMEABLE PAVING WILL PROBABLY BE THE MOST SUITABLE SYSTEM.

[1] Carlen glass merchants ltd. http://www.carlenglass.ie/domestic%20low%20e%20glass.htm [accessed 19/02/2013]

Irish Suds. http://www.irishsuds.com/descriptions.htm [accessed 19/02/2013]

Page 10: School Esquisse

WATER STORAGE & CONSERVATION:WATER STORAGE & CONSERVATION:WATER STORAGE & CONSERVATION:WATER STORAGE & CONSERVATION:AN INDIRECT PUMPED RAIN WATER HARVESTING SYSTEM WILL BE INSTALLED ON EACH BUILDING AND THE WATER COLLECTED WILL BE USED TO SUPPLEMENT THE WATER NEEDS OF THE TOILETS.IN ORDER TO TRY AND CONSERVE WATER, WATERLESS URINALS AND SENSOR CONTROLLED TAPS WILL BE USED THROUGHOUT THE SCHOOL. THE USE OF WATERLESS URINALS ALONE CAN SAVE UP TO 100,000 LITRES OF POTABLE WATER PER URINAL A YEAR.[1]

ENVIROMENTAL DESIGN AND SERVICESENVIROMENTAL DESIGN AND SERVICESENVIROMENTAL DESIGN AND SERVICESENVIROMENTAL DESIGN AND SERVICES

RENEWABLE ENERGY:RENEWABLE ENERGY:RENEWABLE ENERGY:RENEWABLE ENERGY:DUE TO THE FACT THAT ALL THREE BUILDINGS HAVE A FLAT EXTENSIVE GREEN ROOF, THEY ARE IDEAL FOR USING A PHOTOVOLTAIC ARRAY TO SUBSIDIZE THE ELECTRICITY COSTS OF THE BUILDING. THE MOST EFFICIENT TYPE OF PHOTOVOLTAIC PANEL TO USE WOULD BE A MONO-CRYSTALLINE SILICON PANEL.

LIGHTING:IGHTING:IGHTING:IGHTING:THE BUILDINGS ARE DESIGNED TO UTILISE THE MAXIMUM AMOUNT OF NATURAL LIGHTING AVAILABLE.HOWEVER TO SUBSIDISE THIS, A SERIES OF LOW ENERGY LIGHTING WITH SENSORS WILL BE USED. EACH AREA OF THE SCHOOL WILL BE ASSESSED TO DETERMINE WHAT LUX LEVEL IS NEEDED. THIS WILL REDUCE THE LIGHTING COST OF THE SCHOOL.

[1] Urimat. http://urimat-waterless-urinals.gemgate.ie [accessed 04/01/2013]

SAW TOOTH PHOTOVOLTAIC PANEL ARRAYSAW TOOTH PHOTOVOLTAIC PANEL ARRAYSAW TOOTH PHOTOVOLTAIC PANEL ARRAYSAW TOOTH PHOTOVOLTAIC PANEL ARRAY.

Page 11: School Esquisse

VENTILATION:VENTILATION:VENTILATION:VENTILATION:A COMBINATION OF NATURAL CROSS VENTILATION AND A STACKED VENTILATION SYSTEM WILL BE USED IN EACH BUILDING. THE LARGE BRICK PEERS WILL HAVE A SERIES OF CAVITIES BUILT IN TO ALLOW FOR VENTILATION.. THE CAVITIES WILL BE CREATED BY ADDING A SSERIES OF SPINE WALLS INTO THE PEERS WHICH WILL ALSO GIVE STRUCTURAL STABILITY AND INCREASED FIRE RATEING TO EACH STACK. OTHER VOIDS WILL BE USED TO HIDE SERVICES AND DUCT WORK.

ENVIROMENTAL DESIGN AND SERVICESENVIROMENTAL DESIGN AND SERVICESENVIROMENTAL DESIGN AND SERVICESENVIROMENTAL DESIGN AND SERVICES

WALL VENTS FOR EACH STACK IN WALL VENTS FOR EACH STACK IN WALL VENTS FOR EACH STACK IN WALL VENTS FOR EACH STACK IN EACH ROOMEACH ROOMEACH ROOMEACH ROOM

STACKS RISE ABOVE ROOF LEVELSTACKS RISE ABOVE ROOF LEVELSTACKS RISE ABOVE ROOF LEVELSTACKS RISE ABOVE ROOF LEVEL

SPINE WALLS ADDING STABILITYSPINE WALLS ADDING STABILITYSPINE WALLS ADDING STABILITYSPINE WALLS ADDING STABILITY

NATURAL CROSS VENTILATION NATURAL CROSS VENTILATION NATURAL CROSS VENTILATION NATURAL CROSS VENTILATION FROM GLASS FASCADEFROM GLASS FASCADEFROM GLASS FASCADEFROM GLASS FASCADE

TYPICAL 3D CUT AWAY SECTION SHOWING VENTILATION PROPOSALTYPICAL 3D CUT AWAY SECTION SHOWING VENTILATION PROPOSALTYPICAL 3D CUT AWAY SECTION SHOWING VENTILATION PROPOSALTYPICAL 3D CUT AWAY SECTION SHOWING VENTILATION PROPOSAL

Page 12: School Esquisse

18mm PLATERBOARD TO 18mm PLATERBOARD TO 18mm PLATERBOARD TO 18mm PLATERBOARD TO IMPROVE FIRE RATINGIMPROVE FIRE RATINGIMPROVE FIRE RATINGIMPROVE FIRE RATING

22 X 100mm HARDWOOD 22 X 100mm HARDWOOD 22 X 100mm HARDWOOD 22 X 100mm HARDWOOD FLOOR BOARDSFLOOR BOARDSFLOOR BOARDSFLOOR BOARDS

EXTERNAL ENVELOPE EXTERNAL ENVELOPE EXTERNAL ENVELOPE EXTERNAL ENVELOPE

STRUCTURAL BRICK PEER WHICH CONTAINS STRUCTURAL BRICK PEER WHICH CONTAINS STRUCTURAL BRICK PEER WHICH CONTAINS STRUCTURAL BRICK PEER WHICH CONTAINS SERVICES AND STACK VENTILATION SERVICES AND STACK VENTILATION SERVICES AND STACK VENTILATION SERVICES AND STACK VENTILATION SHAFTSSHAFTSSHAFTSSHAFTS

EXPOSSED EXTERIOR EXPOSSED EXTERIOR EXPOSSED EXTERIOR EXPOSSED EXTERIOR GLULAM BEAM 650 X 150GLULAM BEAM 650 X 150GLULAM BEAM 650 X 150GLULAM BEAM 650 X 150

TRIPLE GLAZED TRIPLE GLAZED TRIPLE GLAZED TRIPLE GLAZED TIMBER WINDOW WITH TIMBER WINDOW WITH TIMBER WINDOW WITH TIMBER WINDOW WITH THERMAL BREAK BUILT THERMAL BREAK BUILT THERMAL BREAK BUILT THERMAL BREAK BUILT INTO FRAMEINTO FRAMEINTO FRAMEINTO FRAME

44 X 150mm TIMBER 44 X 150mm TIMBER 44 X 150mm TIMBER 44 X 150mm TIMBER JOISTS JOISTS JOISTS JOISTS @ 400 C/C400 C/C400 C/C400 C/C

100mm QUILTED 100mm QUILTED 100mm QUILTED 100mm QUILTED INSULATION BETWEEN INSULATION BETWEEN INSULATION BETWEEN INSULATION BETWEEN JOISTSJOISTSJOISTSJOISTS

ACOUSTIC UNDERLAYACOUSTIC UNDERLAYACOUSTIC UNDERLAYACOUSTIC UNDERLAY

IMPROVE FIRE RATINGIMPROVE FIRE RATINGIMPROVE FIRE RATINGIMPROVE FIRE RATING

MAIN STRUCTURAL LOADBEARING MAIN STRUCTURAL LOADBEARING MAIN STRUCTURAL LOADBEARING MAIN STRUCTURAL LOADBEARING GLULAM BEAM 450 X 225GLULAM BEAM 450 X 225GLULAM BEAM 450 X 225GLULAM BEAM 450 X 225

BEAM IS BOLTED TROUGH INTO BEAM IS BOLTED TROUGH INTO BEAM IS BOLTED TROUGH INTO BEAM IS BOLTED TROUGH INTO MAIN GLUM WITH 50mm RIGID MAIN GLUM WITH 50mm RIGID MAIN GLUM WITH 50mm RIGID MAIN GLUM WITH 50mm RIGID INSULATION SANDWICHED INSULATION SANDWICHED INSULATION SANDWICHED INSULATION SANDWICHED BETWEEN TO BREAK THE COLD BETWEEN TO BREAK THE COLD BETWEEN TO BREAK THE COLD BETWEEN TO BREAK THE COLD BRIDGE.BRIDGE.BRIDGE.BRIDGE.

18MM PLASTERBOAD CIELING 18MM PLASTERBOAD CIELING 18MM PLASTERBOAD CIELING 18MM PLASTERBOAD CIELING WITH 3mm SKIM FINISHWITH 3mm SKIM FINISHWITH 3mm SKIM FINISHWITH 3mm SKIM FINISH

SECONDARY STRUCTURAL GLULAM SECONDARY STRUCTURAL GLULAM SECONDARY STRUCTURAL GLULAM SECONDARY STRUCTURAL GLULAM BEAM 450 X 225 BEAM 450 X 225 BEAM 450 X 225 BEAM 450 X 225 @ 2METER C/C2METER C/C2METER C/C2METER C/C

FLOOR TO GLULAM JUNCTIONFLOOR TO GLULAM JUNCTIONFLOOR TO GLULAM JUNCTIONFLOOR TO GLULAM JUNCTION

Page 13: School Esquisse

EXTERNAL ENVELOPE EXTERNAL ENVELOPE EXTERNAL ENVELOPE EXTERNAL ENVELOPE

EXPOSSED GLULAM BEAM EXPOSSED GLULAM BEAM EXPOSSED GLULAM BEAM EXPOSSED GLULAM BEAM

FLOOR JOIST BUILT INTO FLOOR JOIST BUILT INTO FLOOR JOIST BUILT INTO FLOOR JOIST BUILT INTO BRICK PEERBRICK PEERBRICK PEERBRICK PEER

BRICK PEER WALL THICKNESS BRICK PEER WALL THICKNESS BRICK PEER WALL THICKNESS BRICK PEER WALL THICKNESS INCREASED TO ADD SUPPORT INCREASED TO ADD SUPPORT INCREASED TO ADD SUPPORT INCREASED TO ADD SUPPORT TO STRUCTURAL GLULAM BEAMTO STRUCTURAL GLULAM BEAMTO STRUCTURAL GLULAM BEAMTO STRUCTURAL GLULAM BEAM

50mm RIGID INSULATION TO 50mm RIGID INSULATION TO 50mm RIGID INSULATION TO 50mm RIGID INSULATION TO BREAK COLD BRIDGE AT BREAK COLD BRIDGE AT BREAK COLD BRIDGE AT BREAK COLD BRIDGE AT EXTERNAL JUNCTIONEXTERNAL JUNCTIONEXTERNAL JUNCTIONEXTERNAL JUNCTION

DPCDPCDPCDPC

EXTERNAL PEER WALL EXTERNAL PEER WALL EXTERNAL PEER WALL EXTERNAL PEER WALL

STRUCTURAL GLULAM BEAM STRUCTURAL GLULAM BEAM STRUCTURAL GLULAM BEAM STRUCTURAL GLULAM BEAM 450 X 225450 X 225450 X 225450 X 225

EXPOSSED GLULAM BEAM EXPOSSED GLULAM BEAM EXPOSSED GLULAM BEAM EXPOSSED GLULAM BEAM 650 X 150650 X 150650 X 150650 X 150

THERMAL BREAK OF WINDOW THERMAL BREAK OF WINDOW THERMAL BREAK OF WINDOW THERMAL BREAK OF WINDOW FRAME KEPT IN LINE WITH RIGID FRAME KEPT IN LINE WITH RIGID FRAME KEPT IN LINE WITH RIGID FRAME KEPT IN LINE WITH RIGID INSULATION TO PROVIDE INSULATION TO PROVIDE INSULATION TO PROVIDE INSULATION TO PROVIDE CONTINUOUS BREAK OF COLD CONTINUOUS BREAK OF COLD CONTINUOUS BREAK OF COLD CONTINUOUS BREAK OF COLD BRIDGEBRIDGEBRIDGEBRIDGE

EXTERNAL PEER WALL EXTERNAL PEER WALL EXTERNAL PEER WALL EXTERNAL PEER WALL THICKNESS INCREASE TO THICKNESS INCREASE TO THICKNESS INCREASE TO THICKNESS INCREASE TO SUPPORT EXPOSSED SUPPORT EXPOSSED SUPPORT EXPOSSED SUPPORT EXPOSSED GLULAM BEAMGLULAM BEAMGLULAM BEAMGLULAM BEAM

BRICK PEER AND FLOOR /BEAM JUNCTIONBRICK PEER AND FLOOR /BEAM JUNCTIONBRICK PEER AND FLOOR /BEAM JUNCTIONBRICK PEER AND FLOOR /BEAM JUNCTION

Page 14: School Esquisse

EXTERNAL ENVELOPE EXTERNAL ENVELOPE EXTERNAL ENVELOPE EXTERNAL ENVELOPE

PROPRITORY CONCEALED PROPRITORY CONCEALED PROPRITORY CONCEALED PROPRITORY CONCEALED CONNECTION PLATE REBATED CONNECTION PLATE REBATED CONNECTION PLATE REBATED CONNECTION PLATE REBATED INTO STRUCTURAL GLULAM BEAMINTO STRUCTURAL GLULAM BEAMINTO STRUCTURAL GLULAM BEAMINTO STRUCTURAL GLULAM BEAM

SECONDARY GLULAM BEAMS SECONDARY GLULAM BEAMS SECONDARY GLULAM BEAMS SECONDARY GLULAM BEAMS @ 2METER 2METER 2METER 2METER CENTERSCENTERSCENTERSCENTERS

SLOTS CUT INTO SECONDARY SLOTS CUT INTO SECONDARY SLOTS CUT INTO SECONDARY SLOTS CUT INTO SECONDARY GLULAM AND BOLTED TO GLULAM AND BOLTED TO GLULAM AND BOLTED TO GLULAM AND BOLTED TO CONNECTION PLATECONNECTION PLATECONNECTION PLATECONNECTION PLATE GLULAM CONNECTION DETAIL 1GLULAM CONNECTION DETAIL 1GLULAM CONNECTION DETAIL 1GLULAM CONNECTION DETAIL 1

STAINLESS STEEL FLITCH PLATE STAINLESS STEEL FLITCH PLATE STAINLESS STEEL FLITCH PLATE STAINLESS STEEL FLITCH PLATE USED TO JOIN GLULAM BEAMSUSED TO JOIN GLULAM BEAMSUSED TO JOIN GLULAM BEAMSUSED TO JOIN GLULAM BEAMS

CENTERSCENTERSCENTERSCENTERS

GLULAM CONNECTION DETAIL 2GLULAM CONNECTION DETAIL 2GLULAM CONNECTION DETAIL 2GLULAM CONNECTION DETAIL 2

USED TO JOIN GLULAM BEAMSUSED TO JOIN GLULAM BEAMSUSED TO JOIN GLULAM BEAMSUSED TO JOIN GLULAM BEAMS

Page 15: School Esquisse
Page 16: School Esquisse
Page 17: School Esquisse
Page 18: School Esquisse
Page 19: School Esquisse
Page 20: School Esquisse
Page 21: School Esquisse
Page 22: School Esquisse
Page 23: School Esquisse