Transcript
Page 1: MT. SAN ANTONIO COMMUNITY COLLEGE DISTRICT Addendum … · 2019-09-11 · MT. SAN ANTONIO COMMUNITY COLLEGE DISTRICT Addendum No. 2 April 5, 2017 Building 40 Modular Purchase –

MT. SAN ANTONIO COMMUNITY COLLEGE DISTRICT

Addendum No. 2

April 5, 2017

Building 40 Modular Purchase – SIM Lab (Building A) & Computer Lab (Building B)

Bid No. 3156

To All Bidders: All bidders shall acknowledge receipt of this Addendum on the bid form.

Acknowledgement of receipt of this Addendum shall be taken as prime facie evidence that, prior to submission of this bid, the bidder was fully cognizant of all provisions of the Addendum and of all work and conditions affected thereby.

FAILURE TO ACKNOWLEDGE RECEIPT OF THIS ADDENDUM MAY BE CAUSE TO REJECT BID AS BEING NON-RESPONSIVE.

In case of conflict among Bid Documents, Contract Documents and this Addendum, this Addendum shall govern.

This Addendum forms a part of the Bid Documents and modifies the original bid documents for the above-referenced project. The following changes, additions, or deletes shall be made. All other terms and conditions remain the same.

Changes/Additions: Item No. 1: Hardware cut sheets, see attachments Item No. 2: Added project summary schedule, see attachments RESPONSE TO RFIs:

QUESTION 1: Is there a DVBE for this project? Response: This purchase does not require DVBE participation goal. QUESTION 2: Why is single story modular required to be steel rigid frame construction?

A shear wall building will serve purpose and comply with all codes. Response: See Lines 12 – 19 on the Sim Lab and Computer Lab Modular

Specification Chart that call for Type V non-rated and wood floor.

Page 2: MT. SAN ANTONIO COMMUNITY COLLEGE DISTRICT Addendum … · 2019-09-11 · MT. SAN ANTONIO COMMUNITY COLLEGE DISTRICT Addendum No. 2 April 5, 2017 Building 40 Modular Purchase –

Bid No. 3156 Addendum No. 1

Page 2 of 10 QUESTION 3: Type-V non rate 2013 code, this should be to 2016 code? Response : Yes, the 2016 code. QUESTION 4: What window coverings are to be provided? Response: The owner will provide the window shades. QUESTION 5: Will this project require DSA approval? Response: No, but we want it built to DSA standards QUESTION 6: Will it require HCD approval? Response: Yes QUESTION 7: Will local city approvals and permits for the foundation and ramps be

required? Response: No QUESTION 8: If this is a DSA project would we be using our PC plans to submit over the

counter? Response: N/A QUESTION 9: Is an Architect assigned to the project? Response: N/A QUESTION 10: The site plan for building “A” depicts an existing building. Who is

responsible for removing or demolishing building? Response: The Owner will have the existing modular removed prior to the modular

vendor’s work starting. QUESTION 11: Is there a soils report available? Response: Not yet, assume a continuous poured in place concrete footing, on the

perimeter, 3’-2” deep by 1’-4” wide, with 2’-6” below grade, with intermediary footings to support the interior frames. Awarded vendor will be provided with final soils report, and the contract amount adjusted based upon quantities of materials.

QUESTION 12: Is the modular vendor responsible for excavating the pits and removing

the soil?

Page 3: MT. SAN ANTONIO COMMUNITY COLLEGE DISTRICT Addendum … · 2019-09-11 · MT. SAN ANTONIO COMMUNITY COLLEGE DISTRICT Addendum No. 2 April 5, 2017 Building 40 Modular Purchase –

Bid No. 3156 Addendum No. 1

Page 3 of 10 Response: Yes, all underground work / soil preparation and construction of the

foundation will be the responsibility of the modular vendor. The site utilities, power, water, sewer and data will be provided by the Site Utilities contractor, as a separate contract.

QUESTION 13: Are there civil plans available showing existing underground utilities and

site elevations? Response: Yes, We will provide a civil plan and a package of site utilities will be bid

as a separate project on April 6, 2017 at 10:00 am. The Site Utilities contractor will pull the existing utilities out of the way of the foundation zone and then install the new utilities inside the foundation for hooking up the new modular.

QUESTION 14: Will the modular vendor responsible for providing temporary fencing? Response: Yes, See General conditions handed out at the job walk. Mt SAC will move

the existing K-rail for access on the east and west sides. QUESTION 15: We noticed that building B shows concrete decks and ramps, will this be

the same on building A and is the modular vendor responsible for these? Response: Yes, See item 25 on the Modular Spec charts and the site plans. The units

are to be set at +8” aff on the north side for the SIM Lab and at the north side for the Computer Lab, so the area will drain around the units. The ramps are to be concrete for longevity and constructability due to the low height of the ramps to the doors. NOTE there are ramps to all of the exit doors on each modular (2 exit doors per modular).

QUESTION 16: Will the modular vendor be responsible for designing and installing a fire

alarm system? Response: No, the school has a fire alarm vendor who can provide that service. QUESTION 17: Is a fire sprinkler system required? Response: No QUESTION 18: What type of HVAC system will be required end mounted or roof mounted

system? Response: A roof mounted system will be preferred due to the anticipated longevity

these units. QUESTION 19: The specification charts refer to other specifications i.e. item #35 states:

“See specs for sinks, faucets, valves and hardware”? Is there another specification document other than the matrix charts?

Response: Yes, see 18 page cut sheets for the following:

Chicago faucets – Electronic –SSPS faucet 116.931.AB.1 for restroom

Page 4: MT. SAN ANTONIO COMMUNITY COLLEGE DISTRICT Addendum … · 2019-09-11 · MT. SAN ANTONIO COMMUNITY COLLEGE DISTRICT Addendum No. 2 April 5, 2017 Building 40 Modular Purchase –

Bid No. 3156 Addendum No. 1

Page 4 of 10 sinks – 2 pages Sloan Royal Flushometer 111-1.28 – 1 page Zurn ZERK-CPM flush retrofit kit for closets – 1 page Vacuum Breaker Trap Primer VBF-72-A- 1 page Olsonite Commercial heavy – duty plastic toilet seat – 1 page Dahl – mini-ball valves – 1 page Chicago faucet for kitchen – 2301-8E34ABCP Manual faucet with sprayer – 1 page Pro 750 in-sink-erator Evolution Series – 1 page Elkay double sink Model ELUHAD311855PD – 2 pages McGuire Cast Body P-trap with cleanout – 1 page American Water Heater light duty model LDCE32-40L – 4 pages OR Alternate Bradford White ElectriFLEX LD Light duty commercial upright water heater model # LE240S3-3 – 2 pages

QUESTION 20: The floor plan for building “A” shows a Tub in one of the restrooms, will a

shower head also be required? Response: Yes this is to be a residential quality bathroom. QUESTION 21: Will the modular vendor be responsible for providing any of the furniture

shown on the plans? Response: No QUESTION 22: What is the engineer estimate on the project? Response: The estimated cost is $270,000, but feel free to bid less QUESTION 23: Will there be public opening of the bid? Response: Yes, see posted documents – Bids are due at April 13, at 2:00 pm. QUESTION 24: Will there be a scheduled job walk on the project? Response: Yes it was held on April 4, 2017 at 10:00 am

a) If not can we arrange a site visit? Response : No, we cannot reschedule another job walk. QUESTION 25: Is the Bid no. 3156 or 3157? Response: Bid no 3156

Page 5: MT. SAN ANTONIO COMMUNITY COLLEGE DISTRICT Addendum … · 2019-09-11 · MT. SAN ANTONIO COMMUNITY COLLEGE DISTRICT Addendum No. 2 April 5, 2017 Building 40 Modular Purchase –

Bid No. 3156 Addendum No. 1

Page 5 of 10 QUESTION 26: Is there a link to your website to download all documentation regarding the

above project? Response: http://www.mtsac.edu/purchasing/bid_info.html QUESTION 27: What code “CBC or IBC” do we use for the modular building? Response: Use CBC 2016 QUESTION 28: General condition list “A”. Item #1.1 – modular vendor to supply 4 each of

33 gallon trash cans and 1 broom and dust pans. Does Mt. Sac have any specification requirements on what type or model?

Response: No any good functional broom and dust pan, and heavy duty plastic trash

cans with lids will work. QUESTION 29: Item 11.2 – modular vendor to protect the site with construction

fence. Please provide how much area do we need to cover so all bidder will have the same quantity?

Response: The site plans are scaled. Provide fence inside the K-rail at the SIM Lab

or 5 ft. out from the Computer Lab modular on all sides. QUESTION 30: Building “A” drawing I-1.0 furniture plan: Who is responsible on providing

the furniture’s? Response: See response to question 20.

QUESTION 31: What is the occupancy classification “A” or “B” or “E” or “I” for the 36 x 60? Response: Type B QUESTION 32: Page 2 of 5 of the bid #3156 under additional scope of work page 2. Item

#1: “in-ground foundation as per plans”, and should make certain exterior dimensions are true dimensions and any modification to the building chassis shall be included.

a) Where is this drawings in the RFP package?

Response: See response to 25 above. There should be no chassis on a modular.

b) What type of in ground foundation “wood” or “concrete”?

Response: Provide a poured in place concrete foundation per response on question

10 above. c) Who is responsible on construction of the foundation, inclusive of the saw cut, demo, shoring, excavation, backfill, haul off, rebar and concrete?

Page 6: MT. SAN ANTONIO COMMUNITY COLLEGE DISTRICT Addendum … · 2019-09-11 · MT. SAN ANTONIO COMMUNITY COLLEGE DISTRICT Addendum No. 2 April 5, 2017 Building 40 Modular Purchase –

Bid No. 3156 Addendum No. 1

Page 6 of 10 Response: The modular vendor is responsible for the foundation construction

including the saw cut, demo, excavation, backfill, haul off, rebar, concrete and patching back the asphalt.

QUESTION 33: Page 2 of 5 of the Bid #3156 under additional scope of work page 2. Item #2: Contractor to submit shop drawings of buildings 2 weeks after notice of intent before fabrication. How do we spend money on drawings when the contract is only notice of intent?

Response: Per the revised bid documents, shop drawings of buildings will be four (4) weeks (minimum) after Notice of Intent before fabrication can start.

QUESTION 34: Did you mean notice to proceed?

Response: No, after notice of intent.

QUESTION 35: Will the building being requested on this bid be “new” or “like new” or “used”?

Response : New

QUESTION 36: Building “B” to be set and hooked up on 2/21/2018 to 2/23/2018. When do we deliver the building?

Response: In December after we remove the existing unit, then the construction of the foundation can begin – see schedules attached.

QUESTION 37: If this building is to be stored at modular facility, will the client provide insurance?

Response: No, not until it is completed on site. The fabrication date of the Computer Lab can be set so the storage time is limited.

QUESTION 38: Will the contractor be paid once the building is fabricated and not delivered?

Response: No, a partial payment can be made for the design drawings, and a payment made once the units are delivered, and a final payment upon completion.

QUESTION 39: When will the warranty take in effect at the time the building is done at the factory?

Response: No, the warranty starts when the building is completed on site.

QUESTION 40: Modular specification chart “A”. Item #10 – 20 lb. roof with 3 GNC build up roof with gutters and downspouts. Will the client accept a more energy efficient roofing materials on the buildings?

Page 7: MT. SAN ANTONIO COMMUNITY COLLEGE DISTRICT Addendum … · 2019-09-11 · MT. SAN ANTONIO COMMUNITY COLLEGE DISTRICT Addendum No. 2 April 5, 2017 Building 40 Modular Purchase –

Bid No. 3156 Addendum No. 1

Page 7 of 10 Response: Bid as specified and we will consider an alternate after award designation. QUESTION 41: Item #12 – 85 mph exposure. Will the client accept code compliance

exposure on the project? Response: No QUESTION 42: Item #18, 19 and 24, is the modular contractor responsible on providing

concrete foundation? Response: Yes, the modular and the foundation is considered one system. QUESTION 43: Who is responsible on providing the geotechnical report? Response: The Owner will provide a geotechnical report. QUESTION 44: If there is no geotechnical report available at this time, how do prepare the

soil prior to foundation installation? Response: See response to question 10. QUESTION 45: How do we determine on what demo do we need without site scope of

work parameters? Response: Use the requirements for your modular and fit it on the site. The utilities

are a separate bid project. QUESTION 46: Item #26 – flooring. It shows that the flooring contractor to install, is there

any requirements for us to prepare the subfloor and walls? Response: Yes, smooth plywood and straight walls. Modular vendor is to install coved

sheet vinyl in the 3 restrooms, and the Owner will have the flooring installed in all other rooms on site.

QUESTION 47: Item #30 T-bar ceiling at 8 ft. 6 inches, is this nominal height of the ceiling? Response: Yes in our classrooms. QUESTION 48: Item #31& 32 insulation – if this is a new building we will need to comply

to the latest energy code. Response: Yes QUESTION 49: Can we deviate from your specification? Response: Yes if the specification is a higher level of quality than specified. We will

be the ones to determine the level of quality.

Page 8: MT. SAN ANTONIO COMMUNITY COLLEGE DISTRICT Addendum … · 2019-09-11 · MT. SAN ANTONIO COMMUNITY COLLEGE DISTRICT Addendum No. 2 April 5, 2017 Building 40 Modular Purchase –

Bid No. 3156 Addendum No. 1

Page 8 of 10 QUESTION 50: Item #33 – (6) 20” dia. Tubular skylight. The number of skylight might now

work due to the latest energy code. Will the client accept on what is the acceptable quantity of skylight based on the latest code?

Response: Bid per quantity specified.

QUESTION 51: How will this layout in the roof if the building requires rooftop HVAC units, in lieu of wall mounted units?

Response: This will be part of the design process and we can take credits if we don’t use all 6 skylights.

QUESTION 52: Will the client require exterior ladder for the building for roof maintenance due to skylight?

Response: Yes, with locking panel to prevent aberrant climbers.

QUESTION 53: Item #41 aluminum frame windows. Based on latest energy code it will be more costly to provide aluminum frame window, will the client accept windows that is cost effective base on the code?

Response: Bid dual paned metal windows with Low E and UV coatings.

QUESTION 54: Item #43 – T1-11 siding is an old product for modular building, will the client accept smart or Hardi panel?

Response: Yes

QUESTION 55: Item #49 – what interior wall finishes will the IDF room requires ?

Response: Provide fire resistant ¾” Plywood, painted white with fire resistant paint, (except do not paint the labels), mounted at +4”” aff. on all 4 sides)

QUESTION 56: Item #52 – split system cooling. Please provide how much heat we will need to cool the room (example: BTU), so we can properly engineer the cooling system?

Response: This is a classroom, we are counting on the modular vendor to engineer the design for this size and use.

QUESTION 57: Item #78 – testing. What type of testing will you require on the project?

Response: We require testing on all elements that would be required by DSA, including but not limited to soils compaction, foundation forms, rebar, concrete, electrical on site work, water chlorination, air balance, fire alarm testing, ADA door pull testing. We have our own on-site DSA inspector.

QUESTION 58: Item #86 – campus hardware schlage hardware specs. Please provide a copy of the campus standard spec?

Page 9: MT. SAN ANTONIO COMMUNITY COLLEGE DISTRICT Addendum … · 2019-09-11 · MT. SAN ANTONIO COMMUNITY COLLEGE DISTRICT Addendum No. 2 April 5, 2017 Building 40 Modular Purchase –

Bid No. 3156 Addendum No. 1

Page 9 of 10

Response: See attached specifications for hardware.

QUESTION 59: Item #64 – medical curtain track mounted to ceiling per plan. Please provide structural cut sheets on how the curtain will be supported?

Response: Use DSA standard details for mounting ceiling elements.

QUESTION 60: Please provide cut sheets on curtains?

Response: These will be custom made – we have no cut sheets. They will be medical curtains as shown on the lighting plans.

QUESTION 61: Item #88 – ADA ramp. On the bid documents is stated that this building will be in-ground foundation, why do we require ADA ramp? And if Mt. Sac require ADA ramp what kind (wood or steel)?

Response: The SIM and Computer Lab Modular Specification Charts say on line 25 that the finished floor will be set at + 8 inches above grade, (i.e. the pavement), so the floor level will be above the ground level. The optimum way to build a ramp 8 inches tall is in concrete.

QUESTION 62: Drawing E-1.0 “SIM Lab Electrical Plan”. Who is responsible on providing the stove and hood or appliances?

Response: The owner will provide the range, hood, refrigerators. The modular vendor provides items specified herein, as noted above in question 18.

QUESTION 63: I would like to request 1 week bid extension on the project?

Response: No, we have to have the bids due on April 13, 2017 for funding reasons.

QUESTION 64: Can Restrooms be provided with sheet vinyl flooring from factory to be delivered complete? w/ transition to site flooring by others.

Response: See response to question 46. Restrooms are to be self-coved sheet vinyl provided by the modular manufacturer.

QUESTION 65: Is a membrane roof acceptable in lieu of a built-up roof?

Response: Yes if seams are well done.

QUESTION 66: Are there (6) 20" solatubes and in addition (1) skylight in restroom per restroom? If restroom is different, please provide spec.

Response: Include the 3 restroom skylights in with the count of 6 total skylights.

QUESTION 67: HVAC is to be fully ducted, but plan does not show plenum space at front of trailers which will take up approx. 18" the full width of modular.

Page 10: MT. SAN ANTONIO COMMUNITY COLLEGE DISTRICT Addendum … · 2019-09-11 · MT. SAN ANTONIO COMMUNITY COLLEGE DISTRICT Addendum No. 2 April 5, 2017 Building 40 Modular Purchase –

Bid No. 3156 Addendum No. 1

Page 10 of 10

Response: We will adjust the floor plan to accommodate the loss in the length.

QUESTION 68: We are advised to see specs for sinks, faucets, valves and hardware; specs not provided.

Response: See response to question 18 and cut sheets added for items listed.

QUESTION 69: Are ramp details available?

Response: No, design of an 8” high ramp with a handrail can be per the code details.

QUESTION 70: With answers pending, request the bid date be changed to 4/17 at a minimum.

Response: No, see response to question 40.

Attachments:

Revised Bid Docments Computer Lab + Site – Projects Schedule SIM Lab + Site – Projects Schedule   Cut sheets for Bath room & KitchenHardware for Computer Lab Hardward for SIM Lab    

END OF ADDENDUM

Page 11: MT. SAN ANTONIO COMMUNITY COLLEGE DISTRICT Addendum … · 2019-09-11 · MT. SAN ANTONIO COMMUNITY COLLEGE DISTRICT Addendum No. 2 April 5, 2017 Building 40 Modular Purchase –

PROJECT SUMMARY SCHEDULE DESIGN DSA BID Abatement AWARD CONSTRUCTIONDIRTT

WALLSFF & E Fabrication AV IT

Bldg. 40 COMPUTER LABdraft Board Mtg. school starts

3/29/2017

# Job # Options / Task SF

6 13 20 27 3 10 17 24 1 8 15 22 29 5 12 19 26 3 10 17 24 31 7 14 21 28 4 11 18 25 2 9 16 23 30 6

1 Building 40 COMPUTER LAB 2,160

2 Planning 10-16-16 to 01-17-17

3 Modular Design Drawings 01-31-17 to 03-10-17

4

5 MODULAR:

6 Bidding

7 Design Modular

8 Fabricate Modulars

9 Foundations

10 Delivery and Set-up

11

12 SITE UTILITIES:

13 Design Utilities

14 Bid Utilities

15 Remove restroom trainlers

16 Remove old Utilities

17 Install new Utilities

18 Hook-up Utilities

19

20 CARPET & FLOORING:

21 Install Furniture

22 AV Installation

23 IT Installation

24

25 Move In

cjlm: Mt. SAC/Bldg 40 COMPUTER LAB/Schedules / 03-29-17 - COMPUTER LAB -Project Schedule cjlm.xlsx

May June July October

MOVE IN

2017

August SeptemberMarch April

Page 12: MT. SAN ANTONIO COMMUNITY COLLEGE DISTRICT Addendum … · 2019-09-11 · MT. SAN ANTONIO COMMUNITY COLLEGE DISTRICT Addendum No. 2 April 5, 2017 Building 40 Modular Purchase –

ABATEMENT

13 20 27 4 11 18 25 2 9 16 23 30 6 13 20 27DecemberNovember

2018

January February

Page 13: MT. SAN ANTONIO COMMUNITY COLLEGE DISTRICT Addendum … · 2019-09-11 · MT. SAN ANTONIO COMMUNITY COLLEGE DISTRICT Addendum No. 2 April 5, 2017 Building 40 Modular Purchase –

PROJECT SUMMARY SCHEDULE DESIGN DSA BID Abatement AWARD CONSTRUCTIONDIRTT

WALLSFF & E Fabrication AV IT

Bldg. 40 SIM LABdraft Board Mtg. school starts

3/29/2017

# Job # Options / Task SF

6 13 20 27 3 10 17 24 1 8 15 22 29 5 12 19 26 3 10 17 24 31 7 14 21 28 4 11 18 25 2 9 16 23 30

1 Building 40 SIM LAB 2,160

2 Planning 10-16-16 to 01-17-17

3 Modular Design Drawings 01-31-17 to 03-10-17

4

5 MODULAR:

6 Bidding

7 Design Modular

8 Fabricate Modulars

9 Foundations

10 Delivery and Set-up

11

12 SITE UTILITIES:

13 Design Utilities

14 Bid Utilities

Remove existing modular

15 Remove old Utilities

16 Install new Utilities

17 Hook-up Utilities

18

19 CARPET & FLOORING:

20 Install Furniture

21 AV Installation

22 IT Installation

23

24 Move In

cjlm: Mt. SAC/Bldg 40 SIM LAB /Schedules / 03-29-17 - SIM LAB -Project Schedule cjlm.xlsx

May June July October

MOVE IN

2017

August SeptemberMarch April

Page 14: MT. SAN ANTONIO COMMUNITY COLLEGE DISTRICT Addendum … · 2019-09-11 · MT. SAN ANTONIO COMMUNITY COLLEGE DISTRICT Addendum No. 2 April 5, 2017 Building 40 Modular Purchase –
Page 15: MT. SAN ANTONIO COMMUNITY COLLEGE DISTRICT Addendum … · 2019-09-11 · MT. SAN ANTONIO COMMUNITY COLLEGE DISTRICT Addendum No. 2 April 5, 2017 Building 40 Modular Purchase –
Page 16: MT. SAN ANTONIO COMMUNITY COLLEGE DISTRICT Addendum … · 2019-09-11 · MT. SAN ANTONIO COMMUNITY COLLEGE DISTRICT Addendum No. 2 April 5, 2017 Building 40 Modular Purchase –
Page 17: MT. SAN ANTONIO COMMUNITY COLLEGE DISTRICT Addendum … · 2019-09-11 · MT. SAN ANTONIO COMMUNITY COLLEGE DISTRICT Addendum No. 2 April 5, 2017 Building 40 Modular Purchase –
Page 18: MT. SAN ANTONIO COMMUNITY COLLEGE DISTRICT Addendum … · 2019-09-11 · MT. SAN ANTONIO COMMUNITY COLLEGE DISTRICT Addendum No. 2 April 5, 2017 Building 40 Modular Purchase –
Page 19: MT. SAN ANTONIO COMMUNITY COLLEGE DISTRICT Addendum … · 2019-09-11 · MT. SAN ANTONIO COMMUNITY COLLEGE DISTRICT Addendum No. 2 April 5, 2017 Building 40 Modular Purchase –
Page 20: MT. SAN ANTONIO COMMUNITY COLLEGE DISTRICT Addendum … · 2019-09-11 · MT. SAN ANTONIO COMMUNITY COLLEGE DISTRICT Addendum No. 2 April 5, 2017 Building 40 Modular Purchase –
Page 21: MT. SAN ANTONIO COMMUNITY COLLEGE DISTRICT Addendum … · 2019-09-11 · MT. SAN ANTONIO COMMUNITY COLLEGE DISTRICT Addendum No. 2 April 5, 2017 Building 40 Modular Purchase –
Page 22: MT. SAN ANTONIO COMMUNITY COLLEGE DISTRICT Addendum … · 2019-09-11 · MT. SAN ANTONIO COMMUNITY COLLEGE DISTRICT Addendum No. 2 April 5, 2017 Building 40 Modular Purchase –
Page 23: MT. SAN ANTONIO COMMUNITY COLLEGE DISTRICT Addendum … · 2019-09-11 · MT. SAN ANTONIO COMMUNITY COLLEGE DISTRICT Addendum No. 2 April 5, 2017 Building 40 Modular Purchase –
Page 24: MT. SAN ANTONIO COMMUNITY COLLEGE DISTRICT Addendum … · 2019-09-11 · MT. SAN ANTONIO COMMUNITY COLLEGE DISTRICT Addendum No. 2 April 5, 2017 Building 40 Modular Purchase –
Page 25: MT. SAN ANTONIO COMMUNITY COLLEGE DISTRICT Addendum … · 2019-09-11 · MT. SAN ANTONIO COMMUNITY COLLEGE DISTRICT Addendum No. 2 April 5, 2017 Building 40 Modular Purchase –
Page 26: MT. SAN ANTONIO COMMUNITY COLLEGE DISTRICT Addendum … · 2019-09-11 · MT. SAN ANTONIO COMMUNITY COLLEGE DISTRICT Addendum No. 2 April 5, 2017 Building 40 Modular Purchase –
Page 27: MT. SAN ANTONIO COMMUNITY COLLEGE DISTRICT Addendum … · 2019-09-11 · MT. SAN ANTONIO COMMUNITY COLLEGE DISTRICT Addendum No. 2 April 5, 2017 Building 40 Modular Purchase –
Page 28: MT. SAN ANTONIO COMMUNITY COLLEGE DISTRICT Addendum … · 2019-09-11 · MT. SAN ANTONIO COMMUNITY COLLEGE DISTRICT Addendum No. 2 April 5, 2017 Building 40 Modular Purchase –
Page 29: MT. SAN ANTONIO COMMUNITY COLLEGE DISTRICT Addendum … · 2019-09-11 · MT. SAN ANTONIO COMMUNITY COLLEGE DISTRICT Addendum No. 2 April 5, 2017 Building 40 Modular Purchase –
Page 30: MT. SAN ANTONIO COMMUNITY COLLEGE DISTRICT Addendum … · 2019-09-11 · MT. SAN ANTONIO COMMUNITY COLLEGE DISTRICT Addendum No. 2 April 5, 2017 Building 40 Modular Purchase –
Page 31: MT. SAN ANTONIO COMMUNITY COLLEGE DISTRICT Addendum … · 2019-09-11 · MT. SAN ANTONIO COMMUNITY COLLEGE DISTRICT Addendum No. 2 April 5, 2017 Building 40 Modular Purchase –
Page 32: MT. SAN ANTONIO COMMUNITY COLLEGE DISTRICT Addendum … · 2019-09-11 · MT. SAN ANTONIO COMMUNITY COLLEGE DISTRICT Addendum No. 2 April 5, 2017 Building 40 Modular Purchase –

4-5-17 pg. 1 HARDWARE COMPUTER LAB B41B

HARDWARE SET FOR COMPUTER LAB B41B BID 3156 BUILDING “B”

4-5-17

HW SET 001: Door 1, 2 Entry doors

1 EA CONTINUOUS HINGE 112HD 628 VON 1 EA EXIT DEVICE RX-QEL-9947 626 VON 1 EA IC RIM CYLINDER 20-057 626 VON 1 EA PERMANENT CORE 23-030 626 SCH 1 EA DOOR PULL VR910NL 630 IVE 1 EA SURFACE CLOSER 4040XP EDA 689 LCN 1 EA KICK PLATE 8400 10” X 2” LDW 630 IVE 1 EA FLOOR STOP FS18 BLK IVE 1 SET PERIMETER SEAL 160S HEAD & JAMBS AL NGP 1 EA DOOR BOTTOM 320N AL NGP 1 EA THRESHOLD FULL WIDTH OF FRAME AL NGP

HW SET 002: Door 3 IDF Room

3 EA HINGE 5BB1 4.5 X 4.5 652 IVE 1 EA STOREROOM LOCK ND80PD LHO 626 SCH 1 EA SURFACE CLOSER 4040XP (Remove hold open) 689 LCN 1 EA KICK PLATE 8400 10” X 2” LDW 630 IVE 1 EA FLOOR STOP FS436/438 AS REQ’D 626 IVE 3 EA SILENCER SR64 GRY IVE

Page 33: MT. SAN ANTONIO COMMUNITY COLLEGE DISTRICT Addendum … · 2019-09-11 · MT. SAN ANTONIO COMMUNITY COLLEGE DISTRICT Addendum No. 2 April 5, 2017 Building 40 Modular Purchase –

4-5-17 HARDWARE SIM Lab B41A pg. 1 

HARDWARE SET FOR SIM LAB B41A BID 3156 BUILDING “A”

4-5-17

HW SET 001: Door 1, 2 Entry doors

1 EA CONTINUOUS HINGE 112HD 628 VON 1 EA EXIT DEVICE RX-QEL-9947 626 VON 1 EA IC RIM CYLINDER 20-057 626 VON 1 EA PERMANENT CORE 23-030 626 SCH 1 EA DOOR PULL VR910NL 630 IVE 1 EA SURFACE CLOSER 4040XP EDA 689 LCN 1 EA KICK PLATE 8400 10” X 2” LDW 630 IVE 1 EA FLOOR STOP FS18 BLK IVE 1 SET PERIMETER SEAL 160S HEAD & JAMBS AL NGP 1 EA DOOR BOTTOM 320N AL NGP 1 EA THRESHOLD FULL WIDTH OF FRAME AL NGP

HW SET 002: Door 3 IDF Room

3 EA HINGE 5BB1 4.5 X 4.5 652 IVE 1 EA STOREROOM LOCK ND80PD LHO 626 SCH 1 EA SURFACE CLOSER 4040XP (Remove hold open) 689 LCN 1 EA KICK PLATE 8400 10” X 2” LDW 630 IVE 1 EA FLOOR STOP FS436/438 AS REQ’D 626 IVE 3 EA SILENCER SR64 GRY IVE

HW SET 003: Door 4 Store room

3 EA HINGE 5BB1 4.5 X 4.5 652 IVE 1 EA STOREROOM LOCK ND80PD RHO 626 SCH 1 EA SURFACE CLOSER 4040XP EDA 689 LCN 1 EA KICK PLATE 8400 10” X 2” LDW 630 IVE 1 EA FLOOR STOP FS118S BLK IVE 3 EA SILENCER SR64 GRY IVE


Recommended