Personnel changes Retirements
Gilbert Dumont – end May Power supplies, crates, measurement instruments,
etc., etc. Albert Zimmer – end June
Pool reception Recruitment
Ex-industrial support Bertrand Smaniotto – Pool administration Alain Guy – Instruments
New Clement Richard – Pool reception, maintenance
Ex-CERN apprentice, 3 year LD, LS contract Started 1 December 2004
Paid from Pool funds Guy & Richard
1 D
ece
mber
20
04
- c
pEPTA
B7
3
Reduced opening hours 10:00 - 12:00, 14:00 - 16:00
In any case these were the most popular times
Help given out of these hours on request.
1 D
ece
mber
20
04
- c
pEPTA
B7
4
New financial conditions Approved by Cashmore
November 2003 Simplified conditions for
Rental Calculated from the real cost
Purchase + maintenance (verification & repair) Adjusted annually
Compensation 100% of purchase price for first year -10%/year to minimum of 10%
Resales Market value
See “Electronics Pool User’s Guide” http://ess.web.cern.ch/ESS/ElectronicsPoolUsersGui
de.htm
1 D
ece
mber
20
04
- c
pEPTA
B7
5
Pool rental “freeze” For experiments not wishing to
dismantle during shut-down “Freeze” conditions
18% of normal rental (~overhead costs) No use, no movements, no support
NA49, Cosmics, Dirac Offered to the LHC experiments
1 D
ece
mber
20
04
- c
pEPTA
B7
6
Financial status - end 2004 Income: 2.2 MCHF Maintenance: 250 kCHF Manpower: 80 k CHF Investment: 1 MCHF TOTAL: 870 kCHF
Manpower for 2005 ~200 kCHF Investment carry-over ~670 kCHF
1 D
ece
mber
20
04
- c
pEPTA
B7
7
InvestmentsJTAG hardware 17’400
Agilent LCR Meter 16’100
CAEN HV 225’000
CAEN Front end 120’000
Wiener CAMAC-PCI 10’000
CAEN USB-VME bridge 35’000
CAEN EASY (LV PS) 82’000
Wiener PL500 (LV PS) 140’000
Keithley Sourcemeter 50’000
Gossen PS 42’500
Delta PS 5230 46’000
Agilent Pulse generator 70’000
Lecroy Scopes 126’000
Total 980’000
1 D
ece
mber
20
04
- c
pEPTA
B7
8
Migration to BAAN400 First stage complete
Same instance as CERN Stores Water-tight from Stores accounting, etc.
Improved monthly billing procedure, No further need for database
support in ESS Group One full-time equivalent database
engineer position redeployed into technical support role
1 D
ece
mber
20
04
- c
pEPTA
B7
9
Electronic reservation Work by IT/AIS Ensures that budget accounts are
valid and provisioned EDH signature chain
Allows off-line work by Pool reception Better preparation
Requires a different approach by users Planning! “Self-service” still available
Web site
Electronic Systems Support
The Pool > 2004
1 D
ece
mber
20
04
- c
pEPTA
B7
11
Where to go Critical size
With given resources, Pool can handle certain level of “business”
We need to keep that level up to ensure best use of resources and survival of the service
Laboratory instruments? Principal (sole?) supplier of instruments
To PH, to CERN? Modular electronics
Coherent product lines in NIM and VME Modules Housings
What next? Power supplies
HV LV
1 D
ece
mber
20
04
- c
pEPTA
B7
12
Purchases of ‘scopes
CERN Pool
(kCHF) (kCHF)
%
2000
1’200 400 33%
2001
450 22 5%
2002
730 230 32%
2003
600 157 26%
2004
500 126 25%
1 D
ece
mber
20
04
- c
pEPTA
B7
13
Income > 2005
0
0.5
1
1.5
2
2.5
3
2001 2002 2003 2004 2005 2006
MCH
F
Rental income Equipment purchases
Guesstimate - Best case?Assumes that some
experiments will keep equipment in place at
“overhead” rate of 18%Guess!
Resumption of LHC test activity at 2004
levels, no fixed target and other
users continuing at 2004 levels
Overhead 13%
Overhead 19%
Overhead 20%
1 D
ece
mber
20
04
- c
pEPTA
B7
14
Electronics Pool Technical Advisory Board
Mandate EPTAB advises the ESS Group Leader on
the technical profile of the Electronics Pool (types and mix of equipment) and on the choice of individual items of equipment
Future Given the demise of the EAB, Dieter
Schlatter has asked me to proposed a broader mandate for a committee to cover the mandate of EPTAB and that part of the EAB mandate concerned with the Pool. Also to include representatives of the wider user community (CERN users)
1 D
ece
mber
20
04
- c
pEPTA
B7
15
EPTAB Members act
Ad personum As representatives of the
experiments As representatives of their groups
Thank you for your help We will need more of your time to
best define investments