WELCOMEYOU ALL
REVIEW OF RURAL TELECOMIN ORISSA
ON11.10.2007
Presentation by Shri I.G. Soren, DGM(PLG.),
Orissa Telecom. Circle
AGENDAAGENDA
1. BASIC INFORMATION 1. BASIC INFORMATION
2. CDMA WLL STATUS 2. CDMA WLL STATUS
3. VPT STATUS 3. VPT STATUS
4. GSM STATUS 4. GSM STATUS
5. BROADBAND STATUS 5. BROADBAND STATUS
6. CONSTRAINTS 6. CONSTRAINTS
Text
Text
Text
1 Name of the state Orissa
2 Area ( sq. kms ) 1,55,707
3 Population ( crores ) census 2001 3.68
4 No. of districts 30
5 No. of sub divisions 58
6 No. of tehsils 171
7 No. of blocks 314
8 No. of gram panchayats 5263
9 No. of Telecom districts 13
10 No of SDCAs 120
GENERALGENERAL
Text
Text
Text
GENERALGENERAL
11 No. of exchanges 1,156
12Fixed line
Switching capacity9,67,972
DEL 7,62,920
13 WLL Switching capacity 1,75,250
connections 1,38,709
14 Mobile
capacity 8,80,100
connections 8,23,668
No. of district headquarters covered
30(All)
No. of sub-divisional HQs covered 58(All)
No. of tehsil headquarters covered 170 out of 171
No. of block headquarters covered 268 out of 314
No. of villages covered (>5000) 123 out of 184
Total no. of villages covered 17580 out of
51349
As on 30.9.2007
Text
Text
Text
GENERALGENERAL
15 Waiting list
Fixed line 8,273
WLL 18,033
Mobile 0
Total 26,306
16 Total working connections
Landline 7,62,920
WLL 1,38,709
Mobile 8,23,668
Total 17,25,297
17 Tele density
Urban 14.89
Rural 2.31
Total (Avg) 4.20
As on 30.9.2007
Text
Text
Text
GENERALGENERAL
18OFC route in kms 18,456.80
Nos of SDCA on OFC SDH Ring (out of 120) 92
19 TAXcapacity 2,14,500
loading 1,43,880
20No. of PCOs
Local 3,923
STD 24,799
Highway 925
Total 29,647
21 Total villagesNumber (2001 census)
51,349
With VPT 41,166
22 No. of internet customers 69,236
23 No. of broadband customers 14,733
As on 30.9.2007
Text
Text
Text
MSC BASED WLL SERVICEMSC BASED WLL SERVICE
ItemItem Total No.Total No. InstalledInstalled Comm./AiredComm./Aired Target/ RemarkTarget/ Remark
MSC 1 1 1 Completed
BSC 2 2 2 Completed
BTSPh-I
67 67 67 (Aired) Completed
BTSPh-II
74 66 66 Oct’07 – 6Nov’07 - 2
A. STATUS OF PHASE - I & PHASE - IIA. STATUS OF PHASE - I & PHASE - II
MSC BASED WLL SERVICE
B. ROLL OUT PLAN FOR PHASE-III WLLB. ROLL OUT PLAN FOR PHASE-III WLL
Item Eqpt. Details
Eqpts. received
Infrastr-ucture
ready as on 30.9.07
No. of BTS to be commissioned by
Oct.’ 07
Nov.’07
Dec. ’ 07
Jan. ’ 08
Feb. ’ 08
MSC 50K 50K All All
BSC 2 2 All All
BTS 67 67 57 20 22 15 08 02
Sl. SSA No of SDCA allotted by USOF
for RDEL
No of RDEL provided
Waiting list as on
30-09-2007
1. Balasore 1 2160 1282
2. Baripada 7 9768 2073
3. Berhampur 9 5168 742
4. Bhubaneswar 1 1198 71
5. Bolangir 7 6229 45
6. Cuttack 3 8873 125
7. Dhenkanal 8 6842 88
8. Keonjhar 4 5478 6
9. Kalahandi 8 3975 752
10. Koraput 19 4492 0
11. Phulbani 10 3612 0
12. Sambalpur 14 8603 0
13. Sundargarh 5 2737 67
TOTAL 96 69135 5251
PROVISION OF RDELs
Sl SSA As per agreem
ent
After revisio
n
Already replace
d
To be replaced
Disturbed area
Plan for replacement
DSPT WLL GSM
1 Balasore 962 962 962 0 0 0 0 0
2 Baripada 974 974 960 14 0 8 6 0
3 Berhampur 943 943 921 22 0 10 12 0
4 Bhubaneswar
755 1112 1112 0 0 0 0 0
5 Bolangir 634 751 747 4 0 3 1 0
6 Cuttack 1169 1169 1168 1 0 1 0 0
7 Dhenkanal 685 656 648 8 0 8 0 0
Replacement of MARR VPTReplacement of MARR VPT
Sl SSA As per agreement
After revision
Already replaced
To be replaced
Disturbed area
Plan for replacement
DSPT WLL GSM
8 Keonjhar 548 548 515 33 0 3 30 0
9 Kalahandi 693 736 736 0 0 0 0 0
10 Koraput 1857 1807 1689 118 0 0 36 82
11 Phulbani 259 259 251 8 0 0 8 0
12 Sambalpur 1291 1424 1301 123 60 25 38 0
13 Sundargarh 571 571 563 8 0 1 7 0
TOTAL 11341 11912 11573 339 60 51 146 82
Replacement of MARR VPT …contd
PROVISION OF VPT BY DSPT/ WLL
Sl. SSA No of Village
s as per
tender
Excluded due to Cumulative
acheivement as on 30.09.200
7
Balance No. of villages to be provided with VPTs
Balance new VPTs to be provided by
Disturbed area
Covered and
claimed in
OPEX
‘0’ Population
Non existin
g
DSPT WLL GSM
1 BLS 4 0 0 0 4 0 0 0 0 0
2 BPD 86 0 0 0 14 72 39 28 5 0
3 BER 638 4 0 14 29 591 465 40 86 0
4 BBS 293 0 0 0 224 69 5 64 0 0
5 BGR 138 0 0 0 24 114 51 29 34 0
6 CTK 12 0 0 0 3 9 3 4 2 0
7 DKL 194 0 0 0 33 67 58 9 0 0
8 KJR 0 0 0 23 71 7 64 0 0
9 BPT 200 0 0 0 78 122 122 0 0 0
10 KPT 1681 0 119 23 221 1318 169 368 388 393
11 PHI 1250 261 7 0 89 893 816 77 0 0
12 SBP 115 0 0 0 87 28 25 3 0 0
13 RKL 288 0 0 0 73 215 173 42 0 0
TOTAL 4899 265 126 37 902 3569 1933 728 515 393
Sl. SSA Total RCPs to be provided as per
agreement
RCPs provided till 30-09-2007
*Balance RCPs to be provided
1. Balasore 114 114 0
2. Baripada 28 28 0
3. Berhampur 76 76 0
4. Bhubaneswar 97 97 0
5. Bolangir 45 45 0
6. Cuttack 254 254 0
7. Dhenkanal 94 94 0
8. Kalahandi 91 91 0
9. Sambalpur 99 99 0
10. Sundargarh 38 38 0
TOTAL 936 936 0
Provision of RCPs
SlSl ItemItem DescriptionDescription
1 Total no of villages in the state (2001 census) 51,349
2 Total no of inhabitated villages in the state (2001)
47,529
3 No of villages provided with VPT :• Landline• WLL• MARR
1363427193 339
Total 41166
4 No of villages not covered with VPT 6363
VPT SUMMARY
… … contdcontd
Sl Item Description
5 No of villages not covered with VPT (As per 1991 census)
5823
6 No of villages which can not be provided with VPT due to :
• Thick forest• Naxal affected• No custodian
6531055 546
Total 2254
7 Remaining no of villages to be provided with VPT by March 2008
3569
VPT SUMMARYVPT SUMMARY
GSM STATUS & ROLL OUT PLANGSM STATUS & ROLL OUT PLAN
1 Phase-I 1(Bhubaneswar) 1 3 135 61 37000 EricssonInstalled & commissioned
2 Phase-II 1 18 76100 Ericsson Installed & commissioned
3 Ph-II+(25%) 27 18800 EricssonInstalled & commissioned
4 Ph-III(2.5M) 1 99 113000 EricssonInstalled & commissioned
5 Ph-IV(15M)2(Cuttack, Sambalpur)
132
(Diverted to A/N)
597 40 500000 NortelUnder instl.
6 Ph-IV+ 1(Berhampur) 1 TRX addition 100000 EricssonInstalled & commissioned
7 PH-IV+++ 1 4 346 300000 Ericsson Under instl.
5 21 11222+17 (spare)
101 1,144,900
Eqpt. Plan
BTS CCNBSC/TRC R-BSCMSCCapacity allotedPhaseSl
Name of the
vendorInstl. & comm.
status
Total
Pending BTS Status : Phase IV (15 M) =25, Phase IV +++ = 294, Total = 319
Total working BTS = 913
GSM STATUS – 30.09.2007
Sl Name of the item Achievement Remarks
1 No.of MSCs commissioned 2(1 New and 1 Expn.)Under Ph-IV+++ project
2 No. of BSCs commissioned 4Under PH-IV+++ project
3 No. of BTS commissioned 87UnderPH-IV Add on & PH-IV+++ project
4 Swapping
Whole Bhubaneswar SSA was swapped seamlessly comprising 162 BTS
Under PH-IV+++ project
5 No. of connection provided 57,633
6 RF capacity added 50,306
7 VAS LaunchedEDGE , PRBT, C-TOPUP, 12555 SERVICE EXCEL MAGIC
GSM Achievement as on 30/9/07GSM Achievement as on 30/9/07
Sl Name of the item Achievement
PH-IV+++ project
1 BTS planned to be commissioned 290
2 Capacity planned to be added 2,50,000
3 Connection planned to be provided 2,00,000
PH-V.I project
6 BTS planned to be commissioned 700
7 Capacity planned to be added 7,00,000 + 1,50,000(3G)
8 Connection planned to be provided 2,00,000
9 Target for connection for 07-08 4,85,000
10 VAS3G, VOICE SMS, LBS, POST PAID BILL PAYMENT BY PRE-PAID VOUCHER
GSM PLAN 2007-08 IN NEXT TWO QTR
BROADBAND STATUSBROADBAND STATUS
SSA Cities CapacityBalasore Balasore, Bhadrak 2520
Baripada Baripada 1260
Berhampur Berhampur, Paralakhemundi, Aska 3780
Bhawanipatna Bhawanipatna, Nuapada 2520
Bhubaneswar BBSR, Khurda,Puri,Nayagarh 23868
Bolangir Bolangir,Sonepur 2520
Cuttack CTC, Jagatsinghpur, Kendrapara, Jajpur Town 3780
Dhenkanal Dhenkanal, Anugul 2520
Keonjhar Keonjhar 1260
Koraput Koraput, Malkangiri, Rayagada, Nawarangpur 5040
Phulbani Phulbani,Boudh 2520
Rourkela Rourkela, Sundergarh 644
Sambalpur Sambalpur,Bargarh,Jharsuguda,Deogarh 8964
Total 66,996
Broadband Service, Cities to be coveredBroadband Service, Cities to be covered
A.A. Commissioning status of Core Equipment:
Sl. Core equipmentReceive
d & Installed
Commissioned Remarks
01BNG, RPR Tier-1 & RPR Tier-2
AllAll BNG, All RPR Tier-1 & 4nos. Of
RPR Tier-2
All left-out to be comm by
Oct‘07
Sl.
Type of equipment
Total quanti
ty ordere
dReceived
Installed
Commissione
d
PLAN FOR COMMISSIONING
Oct’07 Nov’07 Dec’07
1 DSLAM 366 350 323 17 25 120
All left out
2OC LAN Tier-2 29 29 29 0 All
B. Commissioning status Broadband B. Commissioning status Broadband Equipment:Equipment:
C. Rural Broadband Plan
Sl Name of the SSANo. of 64P
DSLAM orderedNo. of OC LAN Tier-2
switch orderedTotal ports
allotted
1 Balasore 48 2
24768
2 Baripada 22 3
3 Berhampur 42 6
4 Bhawanipatna 10 2
5 Bhubaneswar 10 2
6 Bolangir 12 3
7 Cuttack 117 8
8 Dhenkanal 42 3
9 Keonjhar 20 2
10 Koraput 21 3
11 Phulbani 8 1
12 Rourkela 16 2
13 Sambalpur 19 3
Total 387 40 24768
Sl SSAConnection
31.03.2005 31.03.2006 31.03.2007 30.09.2007
1 Balasore 0 0 88 141
2 Baripada 0 0 47 48
3 Berhampur 0 357 707 805
4 Bhubaneswar 7 1967 5813 8860
5 Cuttack 18 526 1247 1331
6 Dhenkanal 0 110 876 1194
7 Keonjhar 0 69 220 225
8 Koraput 0 193 573 603
9 Rourkela 0 328 899 977
10 Sambalpur 0 246 535 549
Total 25 3796 11005 14733
D. Broadband Growth
Nos of Subscribers
0
2000
4000
6000
8000
10000
12000
14000
16000
31.03.2005 31.03.2006 31.03.2007 30.09.2007
Connection
D. Broadband Growth
Constraints being faced
The NBLW towers are not supplied by TF Jabalpur even after lot of persuasions
DWDM transmission equipment not yet procured by BSNL HQ causing delay in expansion of media to overcome traffic congestion
Approval not yet received for procurement of Ethernet card required commissioning Broadband Eqpt.
Disturbed area in most part of Koraput , Sambalpur district
Less supply of CDMA IFWT
There is unexpected delay in getting 3-Phase connections from Electricity supply companies.
2 nos. of additional PE router is required for Cuttack & Rourkela
THANK YOUTHANK YOU