16
WELCOME Professional Growth and Evaluation System

WELCOME

  • Upload
    jalila

  • View
    22

  • Download
    0

Embed Size (px)

DESCRIPTION

WELCOME. Professional Growth and Evaluation System. Progress of Work. History Overview Timeline. Background. Wallace work Race to the Top Practitioner input to develop rubrics. Guidance. - PowerPoint PPT Presentation

Citation preview

Page 1: WELCOME

WELCOMEProfessional Growth and Evaluation System

Page 2: WELCOME

Progress of Work

• History

• Overview

• Timeline

Page 3: WELCOME

Background

Wallace workRace to the TopPractitioner input to develop rubrics

Page 4: WELCOME

Guidance

• Teacher and Principal Effectiveness Steering Committee(s) (KASA, KSBA, KEA, JCTA, CPE, colleges and universities, EPSB, parents, and individual teachers, principals and superintendents).

Page 5: WELCOME

PARADIGM SHIFT

Transitioning from Teacher & Principal Quality to Teacher & Principal Effectiveness

Grassroots effort to develop teacher & principal expectations

Holistic approach to determining teacher & principal effectiveness

Page 6: WELCOME

PARADIGM SHIFT

Use student data to inform evaluationMeet mandates associated with federal

fundingValidity and reliability studyMaintain teacher protections

Page 7: WELCOME

Characteristics of the New System

• Moves the discussion from teacher quality (as measured by degrees/rank) to teacher & leader effectiveness (are students learning?)

• Focuses on teacher and principal professional growth; is fair and equitable to those being evaluated

Page 8: WELCOME

Characteristics of the New System

• Developed through a collaborative, inclusive and transparent process

• Comprehensive/holistic approach incorporating multiple measures.

Page 9: WELCOME

What are the

Multiple Measures?

Page 10: WELCOME

What progress has been made to date?

• Through a focus group process, 25 volunteer districts recommended changes to the initial and subsequent rubrics over the course of 2010-11. A design team of KDE, KLA*, and Education Partners incorporated those changes to create revised version(s) of the rubric.

• The recommended changes were submitted to the steering committees on three

separate occasions for review and additional recommendations, using a focus group cycle to receive input. A professional development initiative within the Kentucky Association of School Administrators (KASA).

Page 11: WELCOME

Progress to Date: Implementation Cycle

The feedback loop provided local districts and steering committee members the opportunity to inform the work at each stage of the process.

Page 12: WELCOME

Progress to Date: Guidance from Experts

• James Stronge (2-day training, April 2011; review of rubric), Charlotte Danielson, Robert Pianta, Doug Reeves, Jon Saphier, Laura Goe

• Experts on the Val-Ed* 360 degree component of the principal rubric are scheduled to be brought in to work with the principal effectiveness steering committee

• and volunteer districts.

The Vanderbilt Assessment for Leadership in EducationTM (VAL-ED) is a research-based evaluation tool that measures the effectiveness of school leaders by providing a detailed assessment of a principal's performance.

Page 13: WELCOME

Timelines for Deployment of the New System

Page 14: WELCOME

Next Steps: Development Work

• Continued steering committee and volunteer district meetings scheduled for the upcoming year.

• Revisions to the rubric will continue based on data gleaned from initial focus group and steering committee work.

• Large-scale field-testing will occur during the 2011-2012

school year.

• Communication of the status of the work to

interested parties through presentations to

organizations will continue (KASA, NMSA,

KAAC, KSBA, OVEC, KEDC, CKEC).

Page 15: WELCOME

Rubric Discussion

ClarifyWhat questions do you have?

ValueWhat have you found that you like?

Support How does this support your

current work?

Page 16: WELCOME

Sites/Contacts

http://kyprofessionalgrowth.webs.com/documents.htm

http://www.education.ky.gov/kde/homepagerepository/about+kde/kde+strategic+plan+deployment.htm

[email protected]

[email protected]

[email protected]